Drainase Samburakat
Drainase Samburakat
No.
SATUAN
USULAN
HARGA SATUAN (Rp)
2009
4
A. UPAH
1 Mandor
oh
2 Mekanik
oh
Rp
130,000.00
3 Mekanik pembantu
oh
4 Kepala tukang
oh
Rp
110,000.00
5 Tukang batu
oh
Rp
100,000.00
6 Tukang kayu
oh
oh
8 Tukang cat
oh
9 Tukang listrik
oh
Rp
85,000.00
Rp
103,000.00
oh
oh
12 Operator terlatih
oh
oh
14 Pembantu operator
oh
oh
oh
oh
18 Pekerja terlatih
oh
oh
oh
21 Penjaga
oh
22 Pemasak aspal
oh
23 Pengangkut air
oh
B. MATERIAL/BAHAN
Atap genteng (standar KIA)
lembar
buah
buah
buah
lembar
lembar
lembar
lembar
Unit
Unit
m'
m'
No.
SATUAN
buah
buah
buah
buah
buah
buah
Bataco
buah
Batacote
m'
Batu apung
USULAN
HARGA SATUAN (Rp)
2009
kg
buah
bh
bh
Rp
1,400.00
bh
Rp
398,000.00
Rp
398,000.00
Rp
324,700.00
Batu kapur
Rp
235,000.00
Rp
347,000.00
Batu paras
Batu kacang
m3
Batu/cor (palu)
Rp
426,000.00
Rp
363,000.00
Rp
18,000.00
Rp
22,000.00
m
m
m
m
Batu teraso
buah
Baut klem
buah
Bensin premium
liter
kg
kg
Besi beton
kg
kg
kg
Besi siku
6 m'
Besi strip
kg
Kawat
kg
Plat kembang 3 mm
m2
Besi strip 2 x 3
m'
m'
No.
SATUAN
Unit
Unit
Bend PVC 50 x 90
Unit
Bend PVC 80 x 90
Unit
m'
buah
buah
buah
buah
buah
buah
Box sekering
set
bh
bh
bh
lembar
buah
buah
buah
buah
buah
m'
Besi teralis 6 mm - 10 mm
USULAN
HARGA SATUAN (Rp)
2009
Rp
32,000.00
Rp
32,000.00
m'
buah
buah
buah
buah
buah
kg
kg
Cat dasar
kg
Cat genteng
kg
Cat jalan
kg
Cat jembatan
kg
Cat menie
kg
Rp
27,000.00
Cat kayu
kg
Rp
27,000.00
Cat minyak
kg
Rp
27,000.00
Cat tembok
kg
Rp
100,000.00
kg
Rp
70,000.00
kg
Rp
93,000.00
kg
kg
Cat vernis
kg
buah
buah
Rp
321,000.00
buah
Rp
152,000.00
No.
SATUAN
buah
bh
bh
bh
bh
unit
unit
unit
unit
buah
buah
Conblock tebal 6 cm
Conblock tebal 8 cm
Dempul
kg
Kapur tembok
kg
Minyak cat
Ltr
Plamur tembok
kg
Dempul Gypsum
kg
Dempul jadi
kg
buah
Door stop
buah
Dop PVC 50 mm
unit
unit
unit
unit
bh
bh
bh
USULAN
HARGA SATUAN (Rp)
2009
4
Rp
134,000.00
buah
buah
Rp
27,000.00
buah
Rp
43,000.00
buah
set
Rp
54,000.00
buah
2 bh
2 bh
m2
lembar
m
buah
lbr
No.
SATUAN
bh
unit
Filler
USULAN
HARGA SATUAN (Rp)
2009
4
kg
Kran wastafel
buah
Kran air
buah
Rp
38,000.00
Wastafel lengkap
buah
Rp
576,000.00
buah
bh
bh
bh
Kabel biasa
m'
Kabel bulat
m'
m'
m'
Kabel slink
m'
Rp
160,000.00
m
Kaca bening tebal 3 mm
Rp
128,000.00
Rp
138,000.00
Rp
177,000.00
Rp
848,000.00
Rp
22,000.00
Rp
3,329,000.00
Papan ulin
Rp
3,994,000.00
Rp
2,769,000.00
papan bengkirai
Rp
2,929,000.00
Meranti Balok
Rp
2,024,000.00
papan Meranti
Rp
2,226,000.00
Kusen kayu K II
Rp
2,322,000.00
Papan bauplank
Rp
872,000.00
Rp
2,929,000.00
Rp
2,226,000.00
Rp
2,550,000.00
Rp
2,769,000.00
m
Daun
Kaca ryben 3 m
m2
Kaca ryben 5 m
m2
Kain kassa
kg
buah
buah
Kapur bakar
No.
SATUAN
USULAN
HARGA SATUAN (Rp)
2009
4
Rp
2,769,000.00
Rp
2,550,000.00
Rp
2,550,000.00
Rp
2,024,000.00
Rp
60,000.00
Rp
76,000.00
Kayu bakar
m3
m3
batang
m'
m'
Keramik 15 x 15 cm
Keramik 15 x 20 cm
Keramik 20 x 25 (cm)
Keramik 25 x 25 cm
m2
m2
m2
m2
m2
m2
buah
buah
buah
bh
bh
Kompon gypsum
lembar
Koral beton
m3
Kopling dia 13 mm
bh
bh
No.
SATUAN
buah
buah
Kuas roll
buah
buah
buah
buah
USULAN
HARGA SATUAN (Rp)
2009
4
bh
Rp
16,000.00
Kunci lemari
bhb
Rp
16,000.00
bh
Rp
107,000.00
bh
Rp
281,000.00
bh
Rp
167,000.00
Kunci silinder
bh
Rp
64,000.00
Kunci tanam
bh
Rp
107,000.00
No.
SATUAN
USULAN
HARGA SATUAN (Rp)
2009
4
bh
Rp
281,000.00
bhb
Rp
64,000.00
Kunci gembok
bh
Rp
26,000.00
set
set
set
set
Kusen alumunium
m'
Jendela alumunium
Rp
693,000.00
Rp
112,000.00
buah
buah
set
titik
Rp
203,000.00
titik
Rp
203,000.00
bh
Rp
42,000.00
bh
Rp
52,000.00
sakelar engkel
bh
Rp
31,000.00
sakelar double
bh
Rp
42,000.00
m'
Rp
5,000.00
m'
kg
kg
klg
titik
titik
Minyak bekisting
liter
liter
liter
Minyak solar
liter
liter
lembar
lembar
lembar
lembar
lembar
m2
Paku
kg
Rp
22,000.00
Paku triplek
kg
Rp
24,000.00
Paku ulin
kg
Rp
22,000.00
kg
kg
kg
Paku jembatan
kg
No.
SATUAN
USULAN
HARGA SATUAN (Rp)
2009
4
Paku kait
bh
Paku sekrup
bh
Paku multiroof
kg
Rp
27,000.00
Paku tembok
kg
Rp
38,000.00
Paku Gypsum
kg
buah
buah
buah
buah
Parquette lantai
Rp
373,000.00
Pasir pasang
Rp
134,000.00
Rp
134,000.00
Rp
267,000.00
Rp
32,000.00
Pasir kasar
Pegangan pintu/door holder
m3
buah
kg
unit
unit
Pintu besi
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
buah
buah
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
No.
SATUAN
USULAN
HARGA SATUAN (Rp)
2009
4
m'
Rp
51,000.00
m'
Rp
16,000.00
m'
Rp
139,000.00
m'
Rp
22,000.00
m'
Rp
217,000.00
m'
m;
Rp
24,000.00
Rp
14,000.00
Rp
59,000.00
Plamuer
kg
Plint keramik 10 x 15 cm
buah
Plint keramik 10 x 20 cm
buah
Plint keramik 10 x 40 cm
buah
buah
buah
buah
lembar
lembar
lembar
lembar
lembar
lembar
Rp
80,000.00
lembar
Rp
139,000.00
Politur
liter
Politur jadi
liter
Porcelaint uk. 11 cm x 11 cm
Profil aluminium T
Pengadaan Water meter dia 13 mm
buah
m'
unit
m'
m'
m'
m'
m'
Rapidrant
kg
buah
buah
buah
unit
unit
unit
buah
Residu
liter
Rolling door
m2
lembar
buah
No.
SATUAN
kg
Saklar
buah
Saklar dobel
buah
Sealent
kg
Semen PC @ 50 kg
kg
kg
Semen Kujang
kg
Semen Padang
kg
kg
Semen putih
kg
m3
m3
lembar
lembar
Rp
2,100.00
Rp
3,200.00
kg
buah
Sabun
Semen warna
USULAN
HARGA SATUAN (Rp)
2009
m2
Kp
buah
m
Slot jendela
buah
Rp
16,000.00
Slot pintu
buah
Rp
16,000.00
buah
buah
buah
buah
Soda api
Softboard uk. 1,20 x 2,40 (m), tebal 4 mm
kg
lembar
Stone Coating
kg
titik
bh
Streorox - 100
kg
Sunscreen alumunium
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
No.
SATUAN
lembar
lembar
lembar
m2
unit
bh
unit
unit
unit
unit
unit
unit
unit
unit
Tee Pvc 80 x 80 mm
unit
unit
buah
Ter
kg
Timbunan biasa
lembar
lembar
m2
m2
m2
m2
buah
buah
Ubin granito 30 x 30 cm
Ubin granito 40 x 40 cm
Ubin wafel
buah
Urinoir terasso
Unit
Ventilasi dia 80 mm
unit
Venetion blinds
Vertical blinds
Wallpaper bermotif
Wallpaper polos
unit
bh
bh
buah
unit
Water stop
m'
Zinc alum
m2
USULAN
HARGA SATUAN (Rp)
2009
4
No.
SATUAN
1 Bulldozer
jam
2 Stone Crusher
jam
3 Motor grader
jam
4 Pemecah batu
jam
5 Mesin penyaring
jam
6 Wheel loader
jam
7 Wheel tractor
jam
8 Track Loader
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
21 Trailer 1 Ton
jam
22 Concrete Vibratur
jam
23 Concrete Mixer
jam
24 Vibrator Roller
jam
jam
26 Drump Truck
jam
27 Excavator
jam
28 Pulvi Mixer
jam
29 Generator set
jam
jam
31 Tamper
jam
32 Jack Hammer
jam
33 Pedestrian Roller
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
45 Peralatan traktor
jam
46 Asphalt Finisher
jam
USULAN
HARGA SATUAN (Rp)
2009
4
No.
SATUAN
jam
48 Tandem Roller
jam
jam
C. LAIN-LAIN
1 a.Biaya Penyambungan Daya Listrik PLN
- 900 Watt
Ls
- 1300 Watt
Ls
- 2200 Watt
Ls
- 220000 Watt
b.Biaya Pemasangan Instalasi Listrik
2 Biaya Penyambungan Air bersih (PDAM)
3 Biaya Penyambungan Telepon
Ls
Titik
Ls
Unit
USULAN
HARGA SATUAN (Rp)
2009
4
DAFTAR
UMUM UPAH, BAHAN DAN PERALATAN
UKSI KOTA PANGKALPINANG
N ANGGARAN 2009
Tidak Termasuk PPN)
HARGA SATUAN (Rp)
2009
5
KET.
6
Rp
95,496.24
Rp
79,228.75
Rp
53,923.77
Rp
87,151.63
Rp
79,228.75
Rp
79,228.75
Rp
75,000.00
Rp
79,228.75
Rp
75,000.00
Rp
75,000.00
Rp
75,000.00
Rp
82,241.25
Rp
68,986.26
Rp
51,815.02
Rp
76,216.26
Rp
68,750.00
Rp
51,815.02
Rp
67,178.77
Rp
53,125.00
Rp
48,802.53
Rp
60,250.00
Rp
48,802.53
Rp
48,802.53
Rp
14,300.00
Rp
4,961.25
Rp
3,150.00
Rp
2,646.00
Rp
88,300.00
Rp
97,100.00
Rp
158,000.00
Rp
74,800.00
Rp
2,193,411.78
Rp
2,741,848.20
Rp
1,134,000.00
Rp
913,500.00
KET.
6
Rp
693,000.00
Rp
321,200.00
Rp
644,200.00
Rp
317,700.00
Rp
353,000.00
Rp
494,200.00
Rp
1,750,000.00
Rp
2,115.00
Rp
61,800.00
Rp
441,300.00
Rp
2,600.00
Rp
2,600.00
Rp
1,800.00
Rp
1,764.00
Rp
1,512.00
Rp
511,000.00
Rp
401,500.00
Rp
401,500.00
Rp
100,600.00
Rp
97,100.00
Rp
207,400.00
Rp
176,500.00
Rp
203,000.00
Rp
441,300.00
Rp
416,745.00
Rp
374,125.00
Rp
446,516.67
Rp
455,520.00
Rp
455,520.00
Rp
601,397.36
Rp
291,200.00
Rp
185,300.00
Rp
10,600.00
Rp
7,900.00
Rp
5,670.00
Rp
44,100.00
Rp
19,800.00
Rp
19,656.00
Rp
19,400.00
Rp
22,900.00
Rp
315,945.00
Rp
53,550.00
Rp
23,730.00
Rp
200,037.60
Rp
29,100.00
Rp
651,622.86
KET.
6
Rp
1,645,142.94
Rp
626,618.16
Rp
822,487.68
Rp
182,701.26
Rp
274,051.26
Rp
29,100.00
Rp
61,800.00
Rp
101,500.00
Rp
64,400.00
Rp
59,800.00
Rp
72,300.00
Rp
82,300.00
Rp
56,700.00
Rp
44,100.00
Rp
6,300.00
Rp
28,350.00
Rp
85,600.00
Rp
61,800.00
Rp
43,200.00
Rp
5,433.75
Rp
7,200.00
Rp
4,680.00
Rp
37,100.00
Rp
69,700.00
Rp
494,200.00
Rp
1,147,300.00
Rp
460,700.00
Rp
105,000.00
Rp
460,700.00
Rp
22,176.00
Rp
50,793.75
Rp
32,700.00
Rp
30,693.60
Rp
63,800.00
Rp
64,400.00
Rp
18,405.00
Rp
42,840.00
Rp
59,062.50
Rp
24,680.00
Rp
9,648.95
Rp
16,443.00
Rp
15,172.50
Rp
12,810.00
Rp
19,500.00
Rp
2,047,400.00
Rp
181,400.00
Rp
200,300.00
KET.
6
Rp
238,300.00
Rp
441,000.00
Rp
143,850.00
Rp
1,554,000.00
Rp
383,250.00
Rp
91,183.68
Rp
104,519.52
Rp
173,365.92
Rp
207,539.64
Rp
69,700.00
Rp
57,400.00
Rp
2,016.00
Rp
2,268.00
Rp
34,177.50
Rp
6,510.00
Rp
6,414.55
Rp
11,263.00
Rp
5,040.00
Rp
146,500.00
Rp
2,200.00
Rp
88,300.00
Rp
41,674.50
Rp
5,000.94
Rp
127,857.24
Rp
74,347.56
Rp
25,200.00
Rp
441,000.00
Rp
630,000.00
Rp
1,420,800.00
Rp
325,500.00
Rp
15,000.00
Rp
20,300.00
Rp
28,200.00
Rp
10,600.00
Rp
90,000.00
Rp
20,370.00
Rp
14,553.00
Rp
32,700.00
Rp
34,400.00
Rp
37,100.00
Rp
22,680.00
Rp
75,000.00
Rp
84,500.00
Rp
152,100.00
Rp
200,900.00
Rp
48,400.00
Rp
79,400.00
KET.
6
Rp
136,025.82
Rp
548,436.42
Rp
1,512.00
Rp
11,500.00
Rp
7,900.00
Rp
4,203,957.24
Rp
16,800.00
Rp
503,566.88
Rp
700,000.00
Rp
882,000.00
Rp
3,400.00
Rp
4,800.00
Rp
5,800.00
Rp
12,200.00
Rp
30,800.00
Rp
359,400.00
Rp
102,294.36
Rp
132,300.00
Rp
253,100.00
Rp
432,400.00
Rp
165,000.00
Rp
197,700.00
Rp
263,900.00
Rp
441,300.00
Rp
529,500.00
Rp
220,600.00
Rp
34,776.00
Rp
135,025.38
Rp
151,200.00
Rp
2,137,800.00
Rp
874,600.00
Rp
16,500.00
Rp
10,899.00
Rp
16,800.00
Rp
105,900.00
KET.
6
Rp
315,000.00
Rp
1,066,867.20
Rp
636,498.84
Rp
19,096.88
Rp
3,075,995.61
Rp
3,574,100.00
Rp
19,400.00
Rp
2,652,249.52
Rp
2,462,200.00
Rp
10,100.00
Rp
1,919,318.71
Rp
1,676,800.00
Rp
4,236,000.00
Rp
1,209,000.00
Rp
74,100.00
Rp
79,400.00
Rp
74,100.00
Rp
75,900.00
Rp
77,700.00
Rp
92,700.00
Rp
81,200.00
Rp
93,500.00
Rp
84,700.00
Rp
79,400.00
Rp
84,700.00
Rp
95,300.00
Rp
77,700.00
Rp
60,725.70
Rp
67,155.48
Rp
72,514.26
Rp
60,102.00
Rp
55,010.34
Rp
68,040.00
Rp
6,200.00
Rp
3,100.00
Rp
3,700.00
Rp
3,830.40
Rp
9,169.02
Rp
47,700.00
Rp
453,600.00
Rp
7,560.00
Rp
50,400.00
KET.
6
Rp
39,700.00
Rp
48,500.00
Rp
29,100.00
Rp
6,200.00
Rp
7,900.00
Rp
13,200.00
Rp
26,500.00
Rp
40,600.00
Rp
150,000.00
Rp
238,300.00
Rp
40,600.00
Rp
184,400.00
Rp
132,400.00
KET.
6
Rp
150,000.00
Rp
63,500.00
Rp
18,427.50
Rp
69,195.00
Rp
53,550.00
Rp
105,210.00
Rp
75,600.00
Rp
133,358.40
Rp
612,100.00
Rp
759,700.00
Rp
234,800.00
Rp
234,800.00
Rp
264,500.00
Rp
79,394.92
Rp
113,300.00
Rp
87,800.00
Rp
118,600.00
Rp
68,800.00
Rp
70,600.00
Rp
86,500.00
Rp
98,800.00
Rp
23,310.00
Rp
11,340.00
Rp
29,000.00
Rp
31,500.00
Rp
6,300.00
Rp
52,300.00
Rp
389,400.00
Rp
9,700.00
Rp
28,900.00
Rp
22,050.00
Rp
6,655.32
Rp
11,500.00
Rp
292,100.00
Rp
361,100.00
Rp
407,200.00
Rp
142,100.00
Rp
213,200.00
Rp
996,320.00
Rp
19,358.18
Rp
37,900.00
Rp
30,900.00
Rp
31,270.91
Rp
28,200.00
Rp
33,500.00
Rp
61,800.00
KET.
6
Rp
1,700.00
Rp
1,800.00
Rp
27,846.00
Rp
26,500.00
Rp
39,585.00
Rp
101,700.00
Rp
130,200.00
Rp
133,700.00
Rp
180,200.00
Rp
150,000.00
Rp
132,400.00
Rp
94,900.00
Rp
91,250.00
Rp
79,380.00
Rp
88,300.00
Rp
900.00
Rp
2,356,300.00
Rp
3,549,400.00
Rp
529,500.00
Rp
882,500.00
Rp
23,059.89
Rp
28,005.18
Rp
69,235.32
Rp
69,235.32
Rp
43,995.00
Rp
54,138.00
Rp
77,742.00
Rp
6,779.01
Rp
32,700.00
Rp
42,400.00
Rp
65,700.00
Rp
84,700.00
Rp
98,000.00
Rp
134,600.00
Rp
413,900.00
Rp
141,200.00
Rp
232,100.00
Rp
38,507.18
Rp
62,178.48
Rp
181,450.71
Rp
10,168.52
Rp
24,462.90
Rp
7,969.50
Rp
16,537.50
Rp
30,712.50
Rp
46,068.75
Rp
12,700.00
KET.
6
Rp
22,100.00
Rp
7,200.00
Rp
56,500.00
Rp
9,500.00
Rp
92,700.00
Rp
2,833.87
Rp
40,229.78
Rp
19,400.00
Rp
1,800.00
Rp
2,600.00
Rp
3,500.00
Rp
8,300.00
Rp
8,800.00
Rp
10,600.00
Rp
73,200.00
Rp
79,400.00
Rp
77,700.00
Rp
114,700.00
Rp
121,800.00
Rp
130,600.00
Rp
59,700.00
Rp
98,300.00
Rp
1,600.00
Rp
45,900.00
Rp
441,000.00
Rp
1,152,500.00
Rp
45,900.00
Rp
55,600.00
Rp
26,500.00
Rp
61,800.00
Rp
349,500.00
Rp
325,600.00
Rp
3,400.00
Rp
10,100.00
Rp
14,000.00
Rp
12,100.00
Rp
821,737.79
Rp
1,330,085.01
Rp
1,450,942.73
Rp
220,600.00
Rp
18,500.00
Rp
463,137.05
Rp
503,000.00
Rp
414,800.00
Rp
123,600.00
Rp
10,200.00
KET.
6
Rp
5,775.00
Rp
9,300.00
Rp
18,900.00
Rp
31,400.00
Rp
61,800.00
Rp
1,398.00
Rp
1,432.80
Rp
1,432.80
Rp
1,432.80
Rp
1,432.80
Rp
1,958.73
Rp
77,380.00
Rp
68,620.00
Rp
16,200.00
Rp
56,500.00
Rp
70,600.00
Rp
59,503.50
Rp
73,347.12
Rp
2,600.00
Rp
70,600.00
Rp
14,100.00
Rp
15,900.00
Rp
15,000.00
Rp
10,600.00
Rp
12,100.00
Rp
8,800.00
Rp
38,800.00
Rp
61,800.00
Rp
41,300.00
Rp
46,620.00
Rp
25,803.18
Rp
5,300.00
Rp
79,400.00
Rp
3,208,800.00
Rp
2,643,630.24
Rp
9,712,800.00
Rp
29,564,600.00
Rp
2,797,500.00
Rp
6,354,000.00
Rp
8,454,400.00
Rp
10,801,800.00
Rp
12,628,600.00
Rp
1,200,200.00
Rp
2,647,500.00
Rp
5,295,000.00
Rp
9,712,800.00
Rp
970,800.00
KET.
6
Rp
113,400.00
Rp
144,700.00
Rp
220,600.00
Rp
67,500.00
Rp
2,626,206.97
Rp
3,780.00
Rp
829,015.83
Rp
1,330,085.01
Rp
1,450,060.89
Rp
1,209,008.92
Rp
1,934,590.30
Rp
626,600.00
Rp
317,700.00
Rp
604,503.63
Rp
829,015.83
Rp
365,568.84
Rp
64,400.00
Rp
8,977.50
Rp
70,600.00
Rp
114,700.00
Rp
74,800.00
Rp
79,380.00
Rp
49,350.00
Rp
58,716.00
Rp
79,380.00
Rp
102,375.00
Rp
5,300.00
Rp
6,200.00
Rp
185,300.00
Rp
5,100.00
Rp
825,300.00
Rp
365,568.84
Rp
67,500.00
Rp
5,250.00
Rp
240,900.00
Rp
96,000.00
Rp
1,279,073.88
Rp
661,500.00
Rp
437,850.00
Rp
467,700.00
Rp
856,000.00
Rp
107,100.00
Rp
69,300.00
KET.
6
Rp
420,000.00
Rp
400,000.00
Rp
334,000.00
Rp
702,000.00
Rp
278,300.00
Rp
318,600.00
Rp
124,200.00
Rp
300,000.00
Rp
135,600.00
Rp
210,900.00
Rp
254,900.00
Rp
277,200.00
Rp
61,000.00
Rp
10,600.00
Rp
8,100.00
Rp
98,900.00
Rp
28,500.00
Rp
1,139,300.00
Rp
165,100.00
Rp
122,800.00
Rp
13,200.00
Rp
101,000.00
Rp
101,400.00
Rp
139,200.00
Rp
113,200.00
Rp
181,400.00
Rp
313,000.00
Rp
262,750.00
Rp
155,600.00
Rp
38,800.00
Rp
41,250.00
Rp
100,000.00
Rp
230,000.00
Rp
1,125,000.00
Rp
173,200.00
Rp
217,300.00
Rp
156,700.00
Rp
124,800.00
Rp
249,000.00
Rp
11,900.00
Rp
39,500.00
Rp
79,100.00
Rp
73,000.00
Rp
9,800.00
Rp
57,000.00
Rp
340,600.00
KET.
6
Rp
2,142,800.00
Rp
191,800.00
Rp
200,000.00
Rp
3,402,402.86
Rp
39,925,924.60
Rp
6,543,046.53
Rp
65,430,465.30
Rp
196,260.22
Rp
1,701,079.74
Rp
1,570,321.83
Lb
Ha
Hb
Lc
Ld
L
Lebar
Jarak Total
543.50
La
M1
1000
0.2
543.50
Lb
M1
Lc
M1
Ld
M1
L = La+Lb+Lc
M1
Ha
M1
Tinggi
Hb
M1
0.6
0.2
0.4
1.00
0.7
0.2
H = Ha+Hb
M1
Luas A
(Lb+Ld)/2xHa
M2
Luas B
(LxH)-A
M2
0.9
0.35
0.55
190.225
Ket. Menggunakan dimensi yang sama dalam
perenc. Drainase sepanjang 540.5 M
IMANTAN TIMUR
ten Berau
Gunung Tabur
Vol
Kiri
M3
298.925
298.925
543.4
147.35
La
Lb
Perhitungan Galian
Panjang
Lebar
Total
La
Lb
M1
M1
M1
543.50
Tinggi
H
M1
Luas
0.5(La+Lb)*H
M2
Volume
M3
0.9
0.90
Total volume
489.15
489.15
: KALTIM
KABUPATEN
: BERAU
KECAMATAN
: GUNUNG TABUR
DESA
: SAMBURAKAT
LOKASI
:-
JENIS PRASARANA
: DRAINASE
No
1
Jenis Pekerjaan
HOK
10.870
543.50
0.0040 m3
2.174
Paku
0.0700 Kg
38.045
Pekerja
0.0420 HOK
22.827
Tukang
0.0630 HOK
34.241
489.15 m3
195.660
146.75 m3
0.1920
HOK
2.174
0.4000 HOK
Volume Kebutuhan
0.0040 m3
Pekerja
5
Volume Pekerjaan
543.50 m2
0.0200
Pekerja
4
Sat
Kofisien
28.175
298.93 m3
1.1000
m3
328.818
163.0000
kg
48724.775
Pasir pasang
0.5200
m3
155.441
Tukang batu
0.6000
HOK
179.355
Pekerja
1.5000
HOK
448.388
190.23 m2
989.170
PC
5.2000
kg
Pasir pasang
0.0200
m3
3.805
Tukang batu
0.1500
HOK
28.534
Pekerja
0.2000
HOK
38.045
: KALTIM
KABUPATEN
: BERAU
KECAMATAN
: GUNUNG TABUR
DESA
: SAMBURAKAT
LOKASI
:-
JENIS PRASARANA
: DRAINASE
No
Jenis Pekerjaan
Kofisien
Sat
Harga
Satuan
HOK
85,000.00
0.0040
m3
2,226,000.00
0.0040
m3
2,024,000.00
Paku
0.0700
Kg
22,000.00
Pekerja
0.0420
HOK
85,000.00
Tukang
0.0630
HOK
100,000.00
0.4000
HOK
85,000.00
0.1920
HOK
85,000.00
1.1000
m3
324,700.00
163.0000
kg
2100.00
Pasir pasang
0.5200
m3
134,000.00
Tukang batu
0.6000
HOK
100,000.00
Pekerja
1.5000
HOK
85,000.00
PC
5.2000
kg
2100.00
Pasir pasang
0.0200
m3
134,000.00
Tukang batu
0.1500
HOK
100,000.00
0.2000
HOK
85,000.00
Pekerja
Jumlah
Pekerjaan Bowplank
Jumlah
3
Jumlah
6
Plesteran 1 Pc : 4 Ps, t = 15 mm
Pekerja
Jumlah
R ANALISA PEKERJAAN
Harga
Perpekerjaan
1,700.00
1,700.00
8,904.00
8,096.00
1,540.00
3,570.00
6,300.00
28,410.00
34,000.00
34,000.00
16,320.00
16,320.00
357,170.00
342,300.00
69,680.00
60,000.00
127,500.00
956,650.00
10,920.00
2,680.00
15,000.00
17,000.00
45,600.00
RINCIAN
RENCANA ANGGARAN BIAYA
PEMBANGUNAN GEDUNG KANTOR SAMBURAKAT
KECAMATAN GUNUNG TABUR
KABUPATEN BERAU
TAHUN ANGGARAN 2015
No
Volume
Pekerjaan
Pekerjaan Drainase
A
543.50
Pekerjaan Bowplank
543.50
489.15
Urugan tanah
146.75
Jumlah I
298.93
Plesteran
190.23
4.00
Jumlah II
Jumlah I&II (Pembulatan)
Jumlah total
DiKetahui Oleh
.
Kepala Kampung
RINCIAN
RENCANA ANGGARAN BIAYA
UNAN GEDUNG KANTOR SAMBURAKAT
KECAMATAN GUNUNG TABUR
KABUPATEN BERAU
TAHUN ANGGARAN 2015
Satuan
Harga
Jumlah Harga
Satuan (Rp)
(Rp)
Pekerjaan Drainase
m2
Rp
1,700.00
Rp
923,950.00
Rp
28,410.00
Rp
15,440,835.00
m3
Rp
34,000.00
Rp
16,631,100.00
m3
Rp
16,320.00
Rp
2,394,878.40
Rp
35,390,763.40
956,650.00
Rp
285,966,601.25
Jumlah I
m3
Jumlah II
Jumlah I&II (Pembulatan)
Jumlah total
Rp
m2
Rp
45,600.00
Rp
8,674,260.00
Ls
Rp
340,500.00
Rp
1,362,000.00
Rp
296,002,861.25
Rp
331,393,600.00
PPN 10% Rp
33,139,360.00
Rp
364,532,960.00
Dibuat Oleh
Rp
35,390,763.40
Rp
331,393,624.65
Rp
609,739.88
Rp
296,002,861.25
Rp
331,393,624.65
Rp
33,139,362.47
Rp
Rp
364,532,987.12
609,739.83
Rp
9,941,808.74
Rp
6,627,872.00
Rp
381,102,667.85
Lb
Ha
Hb
Lc
Ld
L
Lebar
STA
JARAK
0+000
H = Ha+Hb
M1
Luas A
(Lb+Ld)/2xHa
M2
0.2
0.87
0.36
0.68
0.2
0.88
0.35
1.23
0.66
0.2
0.86
0.43
0.48
1.02
0.75
0.2
0.95
0.41
0.2
0.43
0.96
0.65
0.2
0.85
0.32
0.2
0.42
0.98
0.71
0.2
0.91
0.35
La
M1
1000
0.2
Lb
M1
Lc
M1
Ld
M1
L = La+Lb+Lc
M1
Ha
M1
0.61
0.2
0.45
1.01
0.67
0.21
0.59
0.19
0.43
0.99
0.25
0.74
0.24
0.55
0.21
0.61
0.2
0.2
0.56
0.2
0.58
Tinggi
Hb
M1
25.00
0+025
22.00
0+047
28.00
0+075
25.00
0+100
25.00
0+125
25.00
0+150
0.18
0.61
0.20
0.46
0.99
0.67
0.2
0.87
0.36
0.192
0.58
0.201
0.42
0.97
0.72
0.2
0.92
0.36
0.181
0.62
0.192
0.425
0.99
0.81
0.2
1.01
0.42
0.2
0.56
0.201
0.42
0.96
0.71
0.2
0.91
0.35
0.21
0.57
0.18
0.36
0.96
0.7
0.2
0.9
0.33
0.18
0.58
0.175
0.36
0.94
0.78
0.2
0.98
0.37
0.2
0.6
0.2
0.43
1.00
0.68
0.2
0.88
0.35
18.80
0+169
6.20
0+175
25.00
0+200
25.00
0+225
25.00
0+250
26.70
0+277
Total Jarak
276.70
98.26
Ket. Menggunakan dimensi yang sama dalam
perenc. Drainase sepanjang 540.5 M
ALIMANTAN TIMUR
paten Berau
n Gunung Tabur
Luas B
(LxH)-A
M2
Luas
Rata-rata
M2
Vol
Kiri
M3
0.52
13.10
0.58
12.72
0.60
16.69
0.53
13.18
0.51
12.85
0.52
12.93
0.52
0.52
0.63
0.56
0.49
0.53
0.50
0.52
9.73
0.56
3.46
0.55
13.83
0.53
13.31
0.54
13.60
0.54
14.41
0.54
0.58
0.53
0.54
0.55
0.53
149.82
Ket. Menggunakan dimensi yang sama dalam
543.4
STA
JARAK
Buangan
Ld
M1
L = La+Lb+Lc
M1
Ha
M1
Tinggi
Hb
M1
0.19
0.47
0.95
0.72
0.2
0.92
0.64
0.195
0.495
1.04
0.725
0.2
0.925
0.216
0.581
0.225
0.415
1.02
0.68
0.2
0.88
0.208
0.58
0.195
0.43
0.98
0.72
0.2
0.92
0.216
0.581
0.225
0.415
1.02
0.68
0.2
0.88
21.50
La
M1
1000
0.17
0.59
Kr (serba guna)
58.40
0.202
Kn (serba guna)
19.20
total jarak
45.80
65.00
Depan SD
0+000
15.00
Lb
M1
Lebar
Lc
M1
H = Ha+Hb
M1
0+015
0.22
0.605
0.23
0.415
1.05
0.68
0.2
0.88
0.235
0.615
0.185
0.382
1.04
0.605
0.2
0.805
0.18
0.58
0.192
0.302
0.95
0.68
0.2
0.88
56.00
0+071
28.10
0+099
Total Jarak
99.10
Luas A
(Lb+Ld)/2xHa
M2
Luas B
(LxH)-A
M2
Luas
Rata-rata
M2
Vol
Kiri
M3
0.38
0.49
10.59
0.41
0.55
31.99
0.34
0.56
10.77
0.36
0.54
24.77
35.53
0.34
0.56
0.57
8.50
0.35
0.57
0.30
0.53
0.30
37.82
0.55
30.92
0.53
15.03
0.54
54.45
147.35
La
Lb
Perhitungan Galian
Panjang
Lebar
Total
La
Lb
M1
M1
M1
Tinggi
H
M1
Luas
0.5(La+Lb)*H
M2
Volume
M3
Total Jarak
0.9
0.90
Total volume
#VALUE!
#VALUE!
No
JARAK
VOLUME
276.70
149.82
21.50
10.59
58.40
31.99
65.00
35.53
99.10
54.45
520.70
282.38
Total
298.925
94.47
KETERANGAN
Buangan
Kr (serba guna)
Kn (serba guna)
Depan SD