Anda di halaman 1dari 15

Data Calculation Truss

No. Truss C.75.65


2
2
2
2
2
2
2
2
2
2

C.75.75

C.75.100

Trus
Total

C.75.65

C.75.75

C.75.100

001

107.30

15

0.00

1609.50

0.00

002

51.84

23

0.00

1192.32

0.00

003

25.00

0.00

225.00

0.00

004

0.00

0.00

0.00

005

0.00

0.00

0.00

0.00

3026.82

0.00

Hip Rafter
Jack Rafter

4
2

C.75.100

C.75.75

C.75.65

C.75.100

C.75.65

C.75.75
8

0
0
0
0
0
0
0
0
0
0

120
92
18
-

0
0.00 230.00

0.00 =

230.00
12

2760

Total Length Truss


C75.100

0.00 =

0.00

C75.75

0.00 =

3026.82

C75.65

0.00 =

0.00

CHANAL
LENGTH

C75.10

QUANTITY

0.00

0.00

C75.75

3326.72

554.45

C75.65

0.00

NOK + RAFTER

HIP RAFTER
BRACKET
HORIZONTAL SUPPORT
OUTTRIGGER
OUTTRIGGER PALSU
JOINT 100
JOINT 75
JOINT 65

=
=

0
555

19.9
50

=
=
=
=
=
=

0
0
0.00
230.00
0.00

555
RENG ( Top Span )
LENGTH

ROOF BATTEN
CEILING BATTEN
WEB BACHING
JOINT RENG
VALLEY GUTTER

=
=
=
=

TOTAL LENGTH

1341
445
360
243

6
6
6
6
6

QUANTITY

223.5
74.1667
60
40.5
0

144
9
10
27
8

198
SCREW 12-14x20
Total
Point

Screw

Total
Truss
15
23
9

TRUSS 001
TRUSS 002
TRUSS 003

=
=
=

64
32
16

3
3
3

NOK + RAFTER

Total Screw
2880
2208
432

BIJI
BIJI
BIJI

BIJI

HIP RAFTER
BRACKET
HORIZONTAL SUPPORT
OUTTRIGGER
OUTTRIGGER PALSU
JOINT CHANAL

0
180

=
=
=
=
=
=

0
0
2760

4
3
3
3
2

0
540
0
0
0
2760

BIJI
BIJI
BIJI
BIJI
BIJI
BIJI

8820
SCREW 10-16x21
QUANTITY

Screw

Total Screw

ROOF BATTEN

1050

2100

BIJI

CEILING BATTEN
WEB BRACHING
JOINT RENG
VALLEY GUTTER

342

=
=
=

1800
1220

684
3600
1220
0

BIJI
BIJI
BIJI
BIJI

7604
DYNABOLT
DYNABOLT

QUANTITY

Screw

370

TECHNICAL
ROOF BATTEN
WEB BRACHING
CEILING BATTEN
NOK
LISTPLANK
AREA TRUSS
AREA ROOF
TALANG

Total Screw
370

BIJI

0 BTG
560 BTG
BTG

QUANTITY

144
9
10
27
8

198

tal Screw

210 BTG

tal Screw

8900 BIJI

7700 BIJI

tal Screw

370 BIJI

1050.00
243.00
445.00
19.90
156.32
1090.00
1128.00
0.00

14.88
30.8
49.9

56.52

99.8
156.32

Quotation
HT - 1039FIX/TRUSS/09/13
RT. Timah
Jl. Timah, Makassar
Nisha Syabania
Truss / RBR
PT. HAPINS Indonesia

Project No.
Project Name
Project Location
Custumer Name
Contractor Name
Telp / Fax / HP
Order/Sales
Product Name
Order By
Date

7/11/2015

1090

Area Truss

HI-Truss

m2

Quantity

Main Truss (C.75.100)


Main Truss (C.75.75)
Main Truss (C.75.65)
Top Span (U Type) 0.45
Top Span (U Type) 0.50
Screw 12-14x20
Screw 10-16x21
Talang (valley gutter)
Dynabolt

Length (m)

0
560
0
0
210

Data Design Roofing


Roof Type
Roof Pitch
Overhang
Trus Spacing
Roof Batten
Web Braching
Ceiling Batten
Panjang Nok
Length listplank
Area Roof
Checked By
Estimator I

Muhammad Akbar Mali

Atap Spandek
10 Degree
800 mm
1300 mm
360.00 m'
243.00 m'
445.00 m'
19.90 m'
156.32 m'
1128.00 m2

6
6
6
6
6

Total Unit

1
Revisi

Total
0
3360
0
0
1260
8900
7700
0.00
370

Remark.

Set of
m'
m'
m'
m'
m'
pcs
pcs
m'
pcs

By www.@kbar_only.com

Anda mungkin juga menyukai