Tabel Material Yang Dibutuhkan

Material Yang Dibutuhkan


BAK MANDI FIBER
Batu bata
Batu kali
Besi Beton
BIOSEPTICTANK
Cat Dasar Tembok
Cat Penutup 2x Interior (Catylac)
Cat Penutup 2x Exterior (Catylac)
CLOSET DUDUK
Dinding Mozaik Batu Alam 200x200 Tebal 60 mm
EXHAUST FAN
FLOOR DRAIN
Kaso 5x7x4m
Kawat Beton
Keramik dinding putih 30 x 30 ex Mulia
KERAN KAMAR MANDI
KERAN PANTRY
KERAN TAMAN
LAMPU DINDING (FC)
LAMPU DOWNLIGHT INBOW 3"
LAMPU SPOTLIGHT EKSTERIOR (FC)
LAMPU TAMAN (FC)
Mould oil
MU 400
MU 408
Multiplek 5mm 4"x8" KW I
Paku
Papan 2/10
Pasang plafond gypsum tebal 9 mm rangka hollow
Pasir beton
Pasir Pasang
Pasir Urug
PEK. LISTPLANK - lebar 30 CM, tebal 3 CM
PEK. NOK ATAP - GENTENG BETON CISANGKAN
PEK. PENUTUP ATAP - GENTENG BETON CISANGKAN
PEK. RANGKA BAJA RINGAN
PEK. TALANG AIR
Plamir
POMPA SUMUR BOR
Prancah
ROOF DRAIN

Volume
1.00
18,597.00
26.00
1,514.00
1.00
24.00
30.00
33.00
1.00
7.00
1.00
1.00
1.09
16.00
72.00
1.00
1.00
2.00
1.00
8.00
1.00
3.00
4.00
11.00
18.00
9.00
50.00
0.18
45.00
8.00
29.00
5.28
20.00
6.00
51.39
51.39
2.60
24.00
1.00
648.85
1.00

Satuan
BH
Bh
m3
kg
BH
Kg
Kg
Kg
BH
m2
BH
BH
m3
kg
m2
BH
BH
BH
BH
BH
BH
BH
ltr
sak
kg
lbr
kg
m3
m2
m3
m3
m3
M1
M1
M2
M2
M1
Kg
BH
m2
BH

SAKLAR SINGLE
SAKLAT DOUBEL
Scafolding
Semen 3 roda @ 50 kg
SOCKET ANTENA TV
SOCKET TELEPON
Split
STOP KONTAK
TORN 500L
ZINK PANTRY

2.00
4.00
11.20
260.00
1.00
1.00
12.00
8.00
1.00
1.00

BH
BH
m2
zak
BH
BH
m3
BH
BH
BH

Catatan :
Satuan Setelah Harga Digunakan Bila Satuan Yang Dijual
Berbeda Dengan Satuan Yang Dibutuhkan

NOTE :
Harga di atas hanya harga material, belum termasuk upah pengerjaan
Spesifikasi yang dipakai diantaranya sbb :
* Sanitair yang dipakai ex. TOTO, jika ada referensi lain silahkan diganti
* Pompa sumur bor ex. Sanyo 236 A
* Toren ex. Penguin
* Cat tembok ex. Catylac
* Septic tank ex. Bio Seven (kap. Max 6 org)
Harga tidak mengikat, jika ingin mengambil spesifikasi lain, silahkan sesuaikan dengan ke

Harga Ajeng
550,000.00
500.00
288,000.00
8,500.00
2,550,000.00
215,000.00
460,000.00
490,000.00
2,967,000.00
750,000.00
450,000.00
333,300.00
65,000.00
20,000.00
53,000.00
181,500.00
181,500.00
181,500.00
265,000.00
122,500.00
245,000.00
435,900.00
95,000.00
150,000.00
14,500.00
85,000.00
13,000.00
3,000,000.00
100,000.00
290,000.00
290,000.00
220,000.00
105,000.00
18,000.00
25,000.00
98,000.00
70,000.00
20,000.00
855,000.00
72,000.00
175,000.00

Satuan
BH
Bh
m3
kg
BH
pail
pail
pail
BH
m2
BH
BH
btg
kg
dus
BH
BH
BH
BH
BH
BH
BH
gln
sak
kg
lbr
kg
m3
m2
m3
m3
m3
M1
bh
bh
M2
M1
Kg
BH
m2
BH

Total Kebutuhan
184,547,116.03
550,000.00
9,298,500.00
7,488,000.00
12,869,000.00
2,550,000.00
5,160,000.00 1.2121212
13,800,000.00 1.5151515
16,170,000.00 1.6666667
2,967,000.00
5,250,000.00
450,000.00
333,300.00
70,552.03
0.014
320,000.00
3,816,000.00
181,500.00
181,500.00
363,000.00
265,000.00
980,000.00
245,000.00
1,307,700.00
380,000.00
1,650,000.00
261,000.00
765,000.00
650,000.00
528,000.00
4,500,000.00
2,320,000.00
8,410,000.00
1,161,864.00
2,100,000.00
108,000.00
1,284,650.00
5,035,828.00
182,000.00
480,000.00
855,000.00
46,717,272.00
175,000.00

suaikan dengan kebutuhan.

32,000.00
45,000.00
110,000.00
63,000.00
35,000.00
37,500.00
260,000.00
50,000.00
750,000.00
169,500.00

BH
BH
m2
zak
BH
BH
m3
BH
BH
BH

64,000.00
180,000.00
1,231,450.00
16,380,000.00
35,000.00
37,500.00
3,120,000.00
400,000.00
750,000.00
169,500.00

1 pail
19.8
19.8
19.8

72
78.00

16
16
16

13,437.50
28,750.00
30,625.00

10,858.59
23,232.32
24,747.47

4,680,000.00

1600000

9900

22,222.22

10000

-100