Sket Untuk Menghitung Volume Galian Lereng Proyek Jalan
Sket Untuk Menghitung Volume Galian Lereng Proyek Jalan
Existin
g
5 (2,50/2,40)
1,20
3 (7,30/2,00)
2,30
2,40
49+012
Galian
2,00
2 (5,00/2,00)
2,00
4,00
0 (0/0)
1 (4,00/0)
CL
4(8,30/7,00)
5(3,50/5,90)
3,00
Existin
g
1,50
5,90
49+029
3(6,80/4,00)
2(5,30/4,00)
Galian
4,00
2,00
3,30
0(0/0)
1 (3,30/0)
4(8,95/4,50)
5(2,50/3,50)
1,50
2,70
3,50
49+038,7
3(8,20/3,00)
2(5.50/3,00)
3,00
2,00
4,00
0 (0/0)
1(4,00/0)
C
E
L
A
H
4(8,05/2,50)
5(2,00/2,00)
49+043,2
2,00
2,00
2,00
2(5,05/1,50)
1,50
4,30
0 (0/0)
1(4,30/0)
4(8,00/5,00)
5(3,00/4,00)
2,00
2,00
49+069,7
2,00
0 (0/0)
1,00
3(7,05/1,50)
2,00
3(7,00/3,00)
2(5,00/3,00)
3,00
3,50
1(3,50/0)
STA/KM
ELEVASI
4 (8,90/6,00)
3,00
Existin
g
1,50
5,00
49+084,7
3 (7,40/3,00)
2 (5,90/3,00)
Galian
3,00
2,00
CL
4,40
1 (4,40/0)
0 (0/0)
4 (9,40/4,00)
5 (2,70/3,00)
Existin
Galian
3,00
49+096,1
1,50
3 (8,65/2,50)
2 (6,65/2,50)
2,50
2,00
2,00
5,40
1 (5,40/0)
0(0/0)
4 (9,40/4,00)
5 (2,80/3,30)
Existin
Galian
3,30
49+114,1
2,00
1,50
3 (8,65/2,50)
2 (6,65/2,50)
1,50
2,20
4,00
0(0/0)
1 (5,40/0)
10 (14,35/8,50)
8 (12,75/7,50)
11 (4,50/7,20)
1,50
Existin
49+137,1
2,00
4,00
0(0/0)
6 (10,50/6,00)
2,00
2,00
Galian
5 (9,50/4,00)
4 (7,50/4,00)
2,00
1,50
3 (6,50/2,00)
2 (5,00/2,00)
2,00
1 (4,00/0)
STA/KM
10 (14,35/8,50)
8 (12,75/7,50)
1,10
1,00
9 (13,85/7,50)
1,50
7 (12,00/6,00)
6 (10,50/6,00)
5 (9,50/4,00)
ELEVASI
11 (5,50/8,70)
1,00
8 (12,75/7,50)
Existin
49+160,1
1,50
1,20
6 (10,50/6,00)
1,80
1,50
Galian
5 (9,50/4,00)
4 (7,50/4,00)
2,00
1,50
3 (6,50/2,00)
2 (5,00/2,00)
4,40
CL
2,00
2,50
3,50
0(0/0)
1 (4,00/0)
10 (14,75/8,50)
8 (13,25/7,50)
1,50
6 (11,25/6,50)
7 (12,75/6,50)
2,00
2,00
5 (10,25/4,50)
4 (8,25/4,50)
11 (4,50/7,40)
Existin
g
Galian
49+183,1
2,00
2,50
3 (7,00/2,00)
2 (5,00/2,00)
2,00
4,00
2,00
1 (4,00/0)
0(0/0)
6 (11,00/9,00)
7 (4,70/8,00)
3,00
1,00
Existin
Galian
49+216,1
4 (8,50/6,00)
2,00
1,50
3 (7,50/4,00)
2 (6,00/4,00)
4,00
2,00
4,00
1 (4,00/0)
49+237,1
3 (0,90/1,20)
2,00
Existin
4,50
5 (9,50/6,00)
2 (5,25/1,50)
1,50
C
E
L
A
H
/
B
L
A
N
1 (4,50/0)
STA/KM
2,00
1,00
9 (13,85/7,50)
1,50
7 (12,00/6,00)
6 (10,50/6,00)
10 (14,75/8,50)
8 (13,25/7,50)
1,50
1,00
1,00
7 (12,75/6,50)
2,00
5 (10,25/4,50)
6 (11,00/9,00)
5 (9,50/6,00)
1,00
9 (14,25/7,50)
ELEVASI
7 (3,00/6,30)
2,00
1,50
CL
Existin
5 (8,50/5,00)
4 (7,00/5,00)
Galian
49+244,1
2,50
1,50
3,00
3 (5,75/2,50)
2 (4,25/2,50)
2,00
2,50
3,00
1 (3,00/0)
0(0/0)
11 (5,90/11,90)
8 (15,25/11,50)
Existin
2,00
Galian
6 (11,25/7,50)
2,50
2,00
49+253,1
5 (10,00/5,00)
4 (8,00/5,00)
2,50
1,50
3 (6,75/2,50)
2 (5,25/2,50)
2,50
4,00
2,00
1 (4,00/0)
0(0/0)
11 (4,50/7,90)
8 (12,85/6,70)
Existin
g
6 (10,10/5,20)
Galian
7,90
4 (8,35/3,70)
2,00
49+290,1
2,00
0(0/0)
2 (5,60/2,20)
4,50
2,20
1 (4,50/0)
1,00
2,00
7 (12,10/5,20)
1,50
5 (9,35/3,70)
1,50
3 (7,60/2,20)
STA/KM
10 (18,25/13,50)
2,00
8 (15,25/11,50)
2,00
9 (17,25/11,50)
4,00
7 (13,25/7,50)
6 (11,25/7,50)
5 (10,00/5,00)
10 (15,85/8,70)
8 (12,85/6,70)
2,00
1,50
7 (12,10/5,20)
5 (9,35/3,70)
2,00
9 (14,85/6,70)
ELEVASI
49+314,1
CL
Existin
2 (8,50/7,00)
g
Galian
2,00
3,00
7,00
1 (7,00/0)
0(0/0)
9 (5,50/6,80)
Existin
6 (13,50/6,00)
4 (11,00/4,00)
Galian
6,80
1,50
1,50
3 (10,25/2,50)
2 (9,25/2,50)
2,50
1,00
49+335,1
2,00
8,00
1 (8,00/0)
0(0/0)
10 (15,00/7,00)
11 (4,50/6,40)
8 (13,00/6,00)
Existin
2,00
6 (10,00/4,00)
Galian
7 (12,00/4,00)
1,50
6,40
2,50
4 (6,75/2,50)
5 (9,25/2,50)
1,50
1,50
2 (4,50/1,00)
4,00
1,00 3 (6,00/1,00)
49+376,1
2,00
1 (4,00/0)
0(0/0)
C
E
L
A
H
49+383,1
3 (0,50/0,90)
2,00
0,90
Existin
2 (6,10/1,20)
5,50
0(0/0)
49+398,1
3 (0,50/2,00)
2,00
0,90
0(0/0)
Existin
6,00
1,2
0
1 (5,50/0)
2 (6,15/3,00)
3,0
0
1 (6,00/0)
STA/KM
8 (16,25/7,50)
6 (13,50/6,00)
1,50
1,50
2,00
7 (15,50/6,00)
2,00
5 (12,50/4,00)
3 (10,25/2,50)
2 (9,25/2,50)
10 (15,00/7,00)
8 (13,00/6,00)
1,50
1,00
9 (14,50/6,00)
2,00
7 (12,00/4,00)
ELEVASI
11 (6,50/9,90)
CL
Existin
1,50
7 (11,00/6,00)
Galian
6 (9,50/6,00)
2,00
1,50
5 (8,50/4,00)
4 (7,00/4,00)
1,50
2,00
3 (6,00/2,00)
2 (4,50/2,00)
2,00
9,90
49+432,1
2,00
3,50
0(0/0)
1 (3,50/0)
6 (13,00/6,00)
7 (5,50/5,80)
Existin
5,80
49+448,1
Galian
1,50
2 (8,50/2,00)
1,50
3 (9,50/2,00)
2,00
2,00
7,50
0(0/0)
49+507,1
1,50
4 (10,25/3,50)
5 (2,50/2,90)
2,90
2,00
1 (7,50/0)
Existin
g
2,00
2,00
Galian
6,00
0(0/0)
4 (11,50/4,00)
3 (10,50/2,00)
2 (8,50/2,00)
2,00
1 (7,50/0)
8 (14,60/6,60)
9 (3,50/4,90)
Existin
g
49+523,1
4,90
2,00
0(0/0)
6 (12,10/4,60)
1,50
4 (10,10/3,60)
5 (11,60/3,60)
1,50
1,80
2 (7,55/2,10)
3 (9,35/2,10)
2,10
6,50
1 (6,50/0)
STA/KM
9 (14,00/8,00)
8 (12,00/8,00)
2,00
7 (11,00/6,00)
6 (9,50/6,00)
6 (13,00/6,00)
2,50
1,50
1,50
5 (11,75/3,50)
3 (9,50/2,00)
3 (10,50/2,00)
8 (14,60/6,60)
2,00
1,50
7 (13,60/4,60)
1,00
5 (11,60/3,60)
ELEVASI
7 (5,50/7,00)
CL
Existin
g
Galian
7,00
4 (11,75/3,50)
49+571,1
1,50
2,00
1,50
3 (11,00/2,00)
2 (9,50/2,00)
2,00
8,50
0(0/0)
1 (8,50/0)
C
E
L
A
H
/
B
L
A
N
4 (12,50/7,00)
5 (5,00/5,80)
Existin
49+577,1
1,50
5,80
4,00
2,00
7,50
0(0/0)
1 (7,50/0)
4 (9,00/6,00)
5 (3,50/5,00)
49+620,1
Existin
3,50
2,00
0(0/0)
2,00
Galian
5,00
4,00
3 (7,25/2,50)
2 (5,25/2,50)
2,50
1 (4,00/0)
3 (11,00/4,00)
2 (9,50/4,00)
Galian
STA/KM
4,70
1,50
5 (13,25/3,50)
1,50
3 (11,00/2,00)
2 (9,50/2,00)
4 (12,50/7,00)
3,00
3 (11,00/4,00)
2 (9,50/4,00)
ELEVASI
KM. 50+620
PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
CL
50+620
Existin
3 (3,00/1,90)
2 (6,80/2,60)
Galian
1,90
2,00
2,60
5,50
0(0/0)
1 (5,50/0)
Existin
g
3 (2,50/3,60)
50+641
3,60
2,00
2 (6,75/4,50)
4,50
Galian
4,50
0(0/0)
1 (4,50/0)
3 (2,00/3,80)
Existin
2 (5,10/4,20)
50+701
3,80
2,00
0(0/0)
Galian
4,20
3,00
1 (3,00/0)
STA/KM
ELEVASI
KM. 51+885
PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
2 (4,00/2,00)
51+885
2,00
3 (3,00/0)
1 (1,50/1,50)
Galian
3,00
1,50
2,00
0(0/0)
2 (9,50/8,00)
1 (4,50/6,90)
3,00
Existin
1,00
3 (8,00/5,00)
4 (7,00/5,00)
6,90
Galian
5,00
51+900
2,00
4,50
0(0/0)
5 (4,50/0)
2 (14,25/7,50)
1 (6,00/6,50)
2,50
3,00
3 (13,00/5,00)
Existin
g
4 (10,00/5,00)
51+934
5 (8,25/1,50)
6,50
Galian
3,50
1,00
6 (7,25/1,50)
1,50
2,00
6,50
7 (6,50/0)
0(0/0)
2 (14,35/7,70)
2,50
3 (13,10/5,20)
1 (5,00/5,90)
1,50
4 (11,60/5,20)
1,20
5 (11,00/4,00)
51+941
1,50
Existin
g
6 (9,50/4,00)
Galian
2,00
5,90
1,50
7 (8,50/2,00)
8 (7,00/2,00)
2,00
9 (6,00/0)
6,00
2,00
0(0/0)
CL
STA/KM
ELEVASI
KM. 51+953
PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
2 (14,75/7,50)
1 (5,50/5,90)
2,00
1,50
3 (13,75/5,50)
4 (12,25/5,50)
1,50
5 (11,50/4,00)
51+953
CL
Existin
2,00
Galian
5,90
6 (9,50/4,00)
2,00
1,50
8 (7,00/2,00)
7 (8,50/2,00)
2,00
2,00
6,00
0(0/0)
9 (6,00/2,00)
2 (13,90/7,00)
1,50
1 (5,50/5,90)
1,40
Existin
4 (11,75/5,50)
3 (13,15/5,50)
2,50
5 (10,50/3,00)
51+980
1,50
6 (9,00/3,00)
2,00
7 (8,00/1,00)
Galian
1,50
5,90
8 (6,50/1,00)
2,00
6,00
1,00
0(0/0)
9 (6,00/0)
2 (10,50/5,00)
1 (3,50/3,90)
2,50
51+997
Existin
g
2,00
3 (9,25/2,50)
4 (7,25/2,50)
Galian
2,50
3,90
2,00
5,00
0(0/0)
5 (6,00/0)
52+029
1 (0,80/1,00)
2 (3,75/1,50)
1,50
3 (3,00/0)
3,00
1,00
0(0/0)
C
E
L
A
H
/
B
L
A
N
STA/KM
ELEVASI
KM. 52+400
PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
CL
1 (2,50/2,90)
Existin
g
2 (5,50/4,00)
4,00
52+400
2,90
Galian
2,00
3,50
0(0/0)
3 (3,50/0)
2 (7,50/8,00)
1 (9,50/6,90)
Existin
52+427
G. Batu
6,90
Galian
8,00
2,00
9,00
0(0/0)
3 (3,50/0)
2 (3,50/1,00)
52+454
1 (1,00/0,80)
3,00
1,00
0(0/0)
3 (3,00/0)
2 (4,75/2,50)
2,50
52+491
0,80
1 (0,90/1,90)
1,90
2,00
3,50
0(0/0)
3 (3,50/0)
52+521
G. Batu
2 (4,25/1,50)
1,50
1 (0,80/1,00)
3,50
0(0/0)
3 (3,50/0)
2 (4,25/1,50)
1,50
52+525,5
1 (0,80/1,00)
3,50
1,00
0(0/0)
3 (3,50/0)
1 (1,50/1,60)
2 (5,25/2,50)
52+592
1,00
2,50
3 (4,00/0)
4,00
1,60
0(0/0)
STA/KM
ELEVASI
KM. 52+607
PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
Existin
1 (2,50/1,90)
2 (5,25/2,50)
52+607
Galian
4,00
2,50
2,00
0(0/0)
3 (4,00/0)
1 (3,50/4,50)
2 (8,75/5,50)
Existin
G. Biasa
3,00
2,00
3 (7,25/2,50)
4 (5,25/2,50)
52+644
CL
1,90
4,50
2,50
G. Batu Lepas
2,00
4,00
0(0/0)
5 (4,00/0)
1 (2,50/2,90)
2 (5,65/3,30)
52+663
Existin
g
2,90
Galian
3,30
2,00
4,00
0(0/0)
3 (4,00/0)
B
L
A
N
G
2 (3,50/1,00)
52+691
1 (0,90/0,80)
2,00
3,00
1,00
0(0/0)
3 (3,00/0)
Existin
2 (5,75/3,50)
52+703
1 (2,00/2,50)
2,50
Galian
3,50
2,00
4,00
0(0/0)
3 (4,00/0)
2 (11,05/9,50)
G. Biasa
3,50
52+732
3 (9,30/6,00)
1 (5,30/7,90)
2,30
Existin
g
4 (7,00/6,00)
7,90
6,00
G. Batu Lepas
B
L
A
N
G
4,00
5 (4,00/0)
2,00
0(0/0)
STA/KM
ELEVASI
KM. 52+833
PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
1 (1,50/2,20)
2 (4,00/3,00)
52+833
3,00
2,00
2,50
0(0/0)
3 (2,50/0)
2 (8,50/11,00)
CL
2,20
Galian
1 (4,80/9,80)
Existin
9,80
Galian
11,00
2,00
3,00
52+851
3 (3,00/0)
0(0/0)
1 (2,40/2,80)
2 (4,90/3,50)
52+895
G. Batu
2,80
3,50
2,00
2,50
0(0/0)
3 (2,50/0)
B
L
A
N
G
Existin
52+905
G. Batu
1 (2,50/1,90)
2 (6,25/2,50)
2,50
1,90
2,00
5,00
0(0/0)
3 (5,00/0)
1 (4,10/4,60)
2 (6,00/6,00)
Existin
g
52+951
G. Batu
4,60
6,00
4,00
3 (4,00/0)
2,00
0(0/0)
STA/KM
ELEVASI
KM. 53+001
PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
CL
1 (4,00/6,90)
2 (8,00/8,00)
Existin
g
8,00
6,90
Galian
53+001
2,00
4,00
0(0/0)
3 (4,00/0)
Existin
2 (5,00/3,00)
53+051
1 (1,50/1,90)
1,90
Galian
3,00
3,50
0(0/0)
3 (3,50/0)
1 (1,50/1,50)
2 (3,50/2,00)
2,00
53+111
2,50
1,50
0(0/0)
3 (2,50/0)
B
L
A
N
G
G. Batu Lepas
2 (4,00/2,00)
2,00
53+200
3,00
1 (1,80/1,50)
1,50
0(0/0)
3 (3,00/0)
1 (1,50/1,40)
2 (5,00/2,00)
53+250
2,00
1,40
4,00
0(0/0)
3 (4,00/0)
1 (1,20/1,40)
2 (4,50/2,00)
53+270
2,00
3 (3,50/0)
1,40
3,50
0(0/0)
STA/KM
ELEVASI
KM. 53+315
PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
1 (2,00/1,90)
2 (3,75/2,50)
1,90
2,50
53+315
CL
2,50
0(0/0)
3 (2,50/0)
1 (1,90/2,20)
2 (4,50/3,00)
53+365
2,20
3,00
3,00
0(0/0)
3 (3,00/0)
1 (1,50/1,50)
2 (3,50/2,00)
1,50
2,00
53+415
2,50
0(0/0)
3 (2,50/0)
1 (1,90/4,90)
2 (7,50/9,00)
Existin
4,90
Galian
9,00
53+465
2,00
3,00
3 (3,00/0)
0(0/0)
1 (3,40/5,20)
2 (5,50/6,00)
Existin
6,00
Galian
5,20
53+515
2,50
3 (2,50/0)
0(0/0)
STA/KM
ELEVASI
KM. 53+565
PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
1 (1,00/1,50)
1,50
2,00
1,50
2 (2,50/2,00)
2,00
53+565
0(0/0)
3 (1,50/0)
1 (2,50/2,20)
2 (3,00/3,00)
53+615
2,20
3,00
2,00
2,50
0(0/0)
3 (1,50/0)
Existin
2 (5,00/3,00)
53+679
3,00
1 (2,20/2,10)
Galian
2,10
2,00
3,50
0(0/0)
3 (3,50/0)
B
L
A
N
G
2 (5,50/3,00)
1 (2,20/2,20)
1,50
2,50
2,20
3 (4,75/1,50)
4 (2,25/1,50)
2,00
1,50
1,50
0(0/0)
5 (1,50/0)
53+696
2 (14,50/8,00)
1 (9,50/6,90)
G. Biasa
4,00
6,90
2,50
3 (12,50/4,00)
1' (5,40/3,90)
4 (10,00/4,00)
53+719
2' (10,00/4,00)
4,00
G. Batu
8,00
3' (8,00/0)
2 (16,50/9,00)
0(0/0)
5 (8,00/0)
4,00
G. Biasa
1 (10,00/7,10)
7,10
2,00
3 (14,50/5,00)
2,00
4 (12,50/5,00)
1' (6,90/4,90)
2' (12,50/5,00)
53+750
5,00
G. Batu
3' (10,00/0)
10,00
2,00
CL
5 (10,00/0)
STA/KM
0(0/0)
C
E
L
A
H
/
B
L
A
N
G
ELEVASI
KM. 53+765
PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
2 (15,00/6,00)
CL
1 (10,00/5,10)
G. Biasa
2,50
2,00
3 (13,75/3,50)
53+765
5,10
4 (11,75/3,50)
1' (6,50/3,20)
2' (11,75/3,50)
3,50
G. Batu
2,00
10,00
3' (10,00/0)
0(0/0)
5 (10,00/0)
Existin
1 (9,00/3,80)
2 (12,25/4,50)
53+791
G. Batu
4,50
3,80
G. Batu
2,00
10,00
0(0/0)
3 (10,00/0)
Existin
g
1 (3,00/4,20)
2 (5,00/5,00)
Galian
5,00
4,20
53+860
2,00
2,50
0(0/0)
3 (2,50/0)
B
L
A
N
G
1 (4,00/3,20)
2 (6,50/4,00)
53+932
G. Batu
3,20
4,00
2,00
4,50
0(0/0)
3 (4,50/0)
1 (1,80/1,90)
2 (3,75/2,50)
53+975
G. Batu
1,90
2,50
2,00
2,50
0(0/0)
3 (2,50/0)
1 (1,80/1,50)
54+015
2 (3,50/2,00)
2,00
3 (2,50/0)
1,50
2,50
2,00
0(0/0)
STA/KM
C
E
L
A
H
/
B
L
A
N
G
ELEVASI
KM. 54+065
PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
2 (4,25/3,50)
2,90
Galian
3,50
54+065
2,00
2,50
0(0/0)
3 (2,50/0)
1 (3,00/4,10)
2 (5,00/5,00)
Existin
5,00
54+115
4,10
Galian
2,50
3 (2,50/0)
2,00
0(0/0)
1 (4,00/4,90)
2 (7,00/6,00)
4,00
Existin
Galian
4,90
1,50
3 (5,00/2,00)
54+125
CL
1 (2,50/2,90)
Existin
g
4 (3,50/2,00)
2,00
2,50
2,00
0(0/0)
5 (2,50/0)
2 (8,00/6,00)
1 (4,50/5,10)
2,00
3 (7,00/4,00)
Existin
1,50
4 (5,50/4,00)
5,10
Galian
54+146
4,00
2,00
3,50
0(0/0)
5 (3,50/0)
Existin
54+171
2 (4,50/2,00)
2,00
1 (0,80/1,00)
1,00
3,50
0(0/0)
3 (3,50/0)
B
L
A
N
G
2 (3,50/3,00)
54+263
G. Batu
1 (0,90/2,10)
3,00
2,00
2,00
3 (2,00/0)
STA/KM
0(0/0)
C
E
L
A
H
/
B
L
A
N
G
ELEVASI
KM. 54+318
PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
1 (3,30/5,20)
2 (5,00/6,00)
Existin
Galian
6,00
CL
5,20
54+318
2,00
2,00
0(0/0)
3 (2,00/0)
1 (1,80/1,80)
2 (3,00/2,00)
2,00
54+336
1,80
2,00
2,00
3 (2,00/0)
0(0/0)
2 (12,50/6,00)
B
L
A
N
G
1 (8,00/5,10)
5,10
6,00
54+357
G. Batu
2,00
9,50
0(0/0)
3 (9,50/0)
1 (1,60/2,10)
2 (3,50/3,00)
2,10
3,00
54+403
3 (2,00/0)
2 (6,00/3,00)
54+489
2,00
2,00
0(0/0)
1 (3,10/2,60)
2,60
3,00
2,00
4,50
0(0/0)
3 (4,50/0)
1 (2,50/1,70)
54+495
2 (5,50/2,00)
2,00
3 (4,50/0)
1,70
4,50
2,00
0(0/0)
STA/KM
C
E
L
A
H
/
B
L
A
N
G
ELEVASI
KM. 54+515
PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
2 (8,00/5,00)
54+515
2,00
3 (7,00/3,00)
1 (4,00/4,50)
G. Biasa
1,50
4 (5,50/3,00)
1' (2,70/2,90)
2' (5,50/3,00)
3,00
G. Batu
4,00
3' (4,00/0)
5 (4,00/0)
2 (4,25/2,50)
2,50
2,00
0(0/0)
Existin
g
54+553
CL
4,50
1 (2,00/1,90)
Galian
3 (3,00/0)
3,00
1,90
2,00
0(0/0)
B
L
A
N
G
B
L
A
N
G
STA/KM
C
E
L
A
H
/
B
L
A
N
G
ELEVASI
KM. 54+650
PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
CL
54+650
G. Batu
3 (1,50/2,10)
2 (3,25/2,50)
2,10
2,00
2,50
2,00
0(0/0)
1 (2,00/0)
3 (1,80/2,10)
54+675
2 (4,50/3,00)
2,10
3,00
2,00
3,00
0(0/0)
1 (3,00/0)
B
L
A
N
G
Existin
3 (2,00/2,80)
2 (5,25/3,50)
Galian
2,80
54+950
2,00
3,50
3,50
0(0/0)
1 (3,50/0)
6 (13,50/9,00)
7 (4,80/7,90)
Existin
2,00
4 (9,50/5,00)
7,90
1,50
3 (8,75/3,50)
2 (6,75/3,50)
2,00
Galian
54+963
3,50
2,00
5,00
0(0/0)
1 (5,00/0)
8 (15,50/10,00)
9 (5,10/8,80)
Existin
g
6 (12,25/7,50)
1,50
Galian
5 (11,25/5,50)
4 (9,75/5,50)
2,50
54+985
2,00
3 (8,50/3,00)
2 (6,50/3,00)
2,00
0(0/0)
3,00
5,00
1 (5,00/0)
STA/KM
6 (13,50/9,00)
4,00
5 (11,50/5,00)
3 (8,75/3,50)
8 (15,50/10,00)
2,50
2,00
2,00
7 (14,25/7,50)
5 (11,25/5,50)
4 (9,75/5,50)
ELEVASI
KM. 55+008
PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
CL
6 (13,75/7,5)
7 (3,90/6,00)
Existin
1,50
3 (9,75/3,50)
2 (7,75/3,50)
2,00
Galian
6,00
2,00
4 (10,50/5,00)
55+008
3,50
2,00
6,00
0(0/0)
1 (6,00/0)
6 (12,75/7,50)
7 (3,50/5,90)
Existin
4 (9,50/5,00)
g
Galian
7,90
55+062
1,50
3 (8,75/3,50)
2 (6,75/3,50)
2,00
3,50
2,00
0(0/0)
5,00
1 (5,00/0)
2,00
STA/KM
6 (13,75/7,5)
2,50
2,00
5 (12,50/5,00)
3 (9,75/3,50)
6 (12,75/7,50)
2,50
5 (11,50/5,00)
3 (8,75/3,50)
ELEVASI
KM. 55+062
PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
8 (17,95/10,70)
9 (7,50/9,20)
Existin
6 (15,50/8,80)
3,10
5 (13,95/5,70)
1,60
Galian
9,20
4 (12,35/5,70)
2,90
55+062
1,50
3 (10,90/2,80)
2 (9,40/2,80)
2,80
8,00
2,00
0(0/0)
1 (8,00/0)
11 (10,10/13,70)
8 (18,50/12,00)
Existin
g
6 (15,85/10,30)
3,60
13,70
Galian
1,70
5 (14,05/6,70)
4 (12,35/6,70)
3,10
2,00
55+081
3 (10,80/3,60)
2 (8,80/3,60)
3,60
2,00
7,00
0(0/0)
1 (7,00/0)
STA/KM
8 (17,95/10,70)
1,90
7 (17,00/8,80)
1,50
6 (15,50/8,80)
3,10
5 (13,95/5,70)
10 (21,25/15,50)
3,50
1,00
8 (18,50/12,00)
1,80
9 (19,50/12,00)
1,70
7 (17,65/10,30)
3,60
5 (14,05/6,70)
ELEVASI
KM. 55+094
PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
11 (10,70/17,90)
8 (19,10/16,20)
5,00
Existin
g
1,50
7 (16,60/11,20)
6 (15,10/11,20)
Galian
3,10
17,90
1,50
5 (13,55/8,10)
4 (12,05/8,10)
55+094
1,50
2,60
3 (10,75/5,50)
2 (9,25/5,50)
5,50
2,00
6,50
0(0/0)
1 (6,50/0)
13 (10,20/15,70)
10 (22,30/14,80)
1,40
Existin
g
8 (19,40/11,80)
9 (20,80/11,80)
3,40
15,70
Galian
55+115
2,60
4 (12,30/5,80)
1,60
5 (13,90/5,80)
2,20
2,40
2 (8,80/3,60)
3,60
2,00
7,00
0(0/0)
2,50
6 (15,20/8,40)
1 (7,00/0)
3 (11,20/3,60)
7 (17,70/8,40)
STA/KM
4,00
2,00
9 (21,10/16,20)
5,00
7 (16,60/11,20)
12 (25,45/18,30)
3,50
1,40
10 (22,30/14,80)
11 (23,70/14,80)
3,00
1,40
9 (20,80/11,80)
7 (17,70/8,40)
ELEVASI
6 (13,90/11,60)
7 (6,40/10,50)
Existin
2,00
4 (10,00/7,80)
Galian
10,50
55+167
3,00
1,10
3 (8,50/4,80)
2 (7,40/4,80)
4,80
2,00
5,00
0(0/0)
1 (5,00/0)
6 (13,90/11,60)
7 (6,40/10,50)
Existin
g
2,00
4 (10,00/7,80)
10,50
55+206,5
Galian
3,00
1,10
3 (8,50/4,80)
2 (7,40/4,80)
4,80
2,00
0(0/0)
5,00
1 (5,00/0)
STA/KM
6 (13,90/11,60)
3,80
5 (12,00/7,80)
4 (10,00/7,80)
3 (8,50/4,80)
6 (13,90/11,60)
3,80
5 (12,00/7,80)
4 (10,00/7,80)
3 (8,50/4,80)
ELEVASI
CL
1 (2,50/2,90)
Existin
g
2 (5,50/4,00)
4,00
Galian
3,50
3 (3,50/0)
2,90
2,00
0(0/0)
STA/KM
52+521
G. Batu
DUDIPA I
ELEVASI
C
E
L
A
H
/
B
L
A
N
G
ELEVASI