1

Ripping + Dozing
TP

Simbol

TD
TD

x
+

TR
TR

, m3/Jam

Ripping
TR

TR

Lk x

x
J/F +

Lk x

Kb x
J/F +

60
J/R

Fk
Z

, m3/Jam

Kb x

60 x
CTd

Fk

, m3/Jam

J x
J/R +

60
Z

Fk

, m3/Jam

J x
CTd

60

Fk

, m3/Jam

Dozing
TD

TD

Keterangan

1
Lk
P
J
F
R
Z
Tf
Tr
CTd
Fk
Rf
SF
dr
Kb

2
Lebar Kerja Ripper
Panjang Penetrasi
Jarak Kerja
Kec. Maju ( = F1 x 0.75)
Kec. Mundur (= R2 x 0.85)
Fixed Time
Waktu maju
Waktu mundur
Cycle time
Faktor Koreksi
Ripper Factor
Swell Factor
Density material
Kap. Blade

TR

Taksiran Kap. Prod. Ripping

TD

Taksiran Kap. Dozing

atau;

Persen
ton/bcm
Lcm
Bcm
Ton/Jam
Lcm
Bcm
Ton/Jam
Ton/thn

D65E
4
0.75
0.75
25.00
46.00
120.00
0.10
0.54
0.21
0.85
0.63
1.00
0.85
2.10
3.72
3.16
6.64
624.04
530.43
1113.91
6,032,921

D85E-SS-2
5
0.75
0.75
25.00
45.00
110.00
0.10
0.56
0.23
0.88
0.63
1.00
0.85
2.10
5.30
4.51
9.46
602.11
511.80
1074.77
5,820,965

Aternatif
Cat D7R
6
0.75
0.40
25.00
45.00
155.00
0.10
0.56
0.16
0.82
0.70
1.00
0.85
2.10
5.89
5.01
10.51
385.63
327.79
688.35
3,728,098

Lcm
Bcm
Ton/Jam

140.62
119.52
251.00

200.34
170.29
357.61

247.38
210.27
441.57

Satuan
3
m
m
m
m/min
m/min
min
min
min
min
Persen

Ton/thn

1,385,518

1,936,799

2,391,561

Taksiran Kap. Prod. Gabungan (OB)

Lcm
Bcm
Ton/Jam
Ton/thn

114.76
97.54
204.84
1,109,424

150.32
127.77
268.33
1,481,165

150.70
128.10
269.01
1,484,916

TPrb
MR
SR
Tprob
nP
nR
nD

Target Produksi Batubara


Mining Recovery + Yield Coal
Stripping Ratio
Target Produksi OB
Jumlah Alat "Bulldozer"
Jumlah Alat "Bulldozer"
Jumlah Alat "Bulldozer"

ton/thn
Persen

480,000
0.6
8
6,400,000
5.77
1.06
4.62

480,000
0.6
8
6,400,000
4.32
1.10
3.30

480,000
0.6
8
6,400,000
4.31
1.72
2.68

nP nyata
nR nyata
nD nyata

Jumlah "Bulldozer" untuk Dorong + Ripper


Jumlah Alat "Bulldozer" untuk Ripper
Jumlah Alat "Bulldozer" untuk Dorong

Unit
Unit
Unit

6
1
5

4
1
3

4
2
3

TP

ton/thn
Unit
Unit
Unit

atau ;

Aternatif
D375A-5
7
0.75
0.75
25.00
50.00
58.00
0.10
0.50
0.43
1.03
0.70
1.00
0.85
2.10
12.90
10.97
23.03
572.85
486.92
1022.53
5,538,033
541.80
460.53
967.11

D155A-2A
0.75
0.75
25.00
50.00
58.00
0.10
0.50
0.43
1.03
0.70
1.00
0.85
2.10
10.10
8.59
18.03
572.85
486.92
1022.53
5,538,033
424.20
360.57
757.20

5,237,884

4,100,979

278.45
236.68
497.03
2,743,580

243.72
207.16
435.04
2,401,436

480,000
0.6
8
6,400,000
2.33
1.16
1.22

480,000
0.6
8
6,400,000
2.67
1.16
1.56

2
1
2

3
1
2

TP

C x

60 x
CTL

Fk

, m3/Jam

Simbol

Keterangan

Satuan

PC 400-6
4

Cat 330
5

Alat Muat
PC 1250
6

Lcm
Bcm
Ton

2.1
1.79
3.75

2.4
2.04
4.28

6.1
5.19
10.89

0.95

0.95

0.95

min

0.40

0.40

0.37

Jam/thn
Persen
ton/m3
Lcm/Jam
Bcm/Jam
Ton/Jam
Ton/thn
ton/thn
Persen

5416
0.85
2.10
119.70
101.75
251.37
1,361,420
480,000
0.6
8
6,400,000
4.70
5

5416
0.85
2.10
136.80
116.28
287.28
1,555,908
480,000
0.6
8
6,400,000
4.11
4

5416
0.85
2.10
347.70
295.55
730.17
3,954,601
480,000
0.6
8
6,400,000
1.62
2

Kapasitas Alat Muat per cyclus

Fk

Faktor Koreksi

CT

CT alat muat

Wh
SF
dr
TP

Jam kerja pertahun


Swell Factor
Density Material
Taksiran Kapasitas Produksi

TPrb
MR
SR
Tprob
nL
nLnyata

Target Produksi Batubara


Mining Recovery + Yield Coal
Stripping Ratio
Target Produksi OB
Jumlah Alat "Excavator"
Jumlah Alat "Excavator"

ton/thn
Unit
Unit

Alat Muat
PC 200
7

PC 750
8

0.8
0.68
1.43

4.5
3.83
8.03

0.95

0.95

0.4

0.4

5416
0.85
2.10
45.60
38.76
95.76
518,636
480,000
0.6
8
6,400,000
12.34
12

5416
0.85
2.10
256.50
218.03
538.65
2,917,328
480,000
0.6
8
6,400,000
2.19
2

Jenis dan model mesin


Perlengkapan
Harga mesin

Wellloader W90-2
General Purpose, Bucket 2,3 m3
937,089,000

Harga Ban

30,195,000

Mesin bekas

93,708,900

Nilai Penyusutan

813,185,100

I. Biaya Penilikan
1. Penyusutan

Nilai Penyusutan

Umur Kegunaan

Biaya per Jam,Rp

813,185,100

8,000

101,648

Umur alat, tahun

Annual rate

Harga mesin

Biaya per Jam

3.2

22

937,089,000

5,411,688.98

Nilai Penyusutan
Umur Kegunaan
Biaya Penyusutan per jam
2. Bunga nodal (18%),asuransi (1%)

101,648

pajak (2%),ongkos gudang(1%)


(n+1)/2n x Annual rate x Harga mesin
Umur Kegunaan per Tahun (=2,500 Jam)
Total Biaya per Jam

5,411,688.98

Total Biaya Pemilikan per Jam

5,513,337.11

II. Biaya Operasi


1. Bahan Bakar dan Minyak Pelumas

Pemakaian (ltr/jam,

Harga (per ltr,

Km/Jam,Jam)

per Kg)

Biaya per Jam,Rp

a. Bahan bakar

18.5

6,300

116,550.00

b. Oli mesin

0.1

22,000

2,200.00

c. Oli Transmisi

0.04

22,000

880.00

d. Oli Drive

0.04

25,000

1,000.00

e. Oli Hidrolis

0.14

25,000

3,500.00

f. Gemuk

0.01

35,000

350.00

50

150,000

7,500,000.00

g. Filter
Total Biaya per Jam

7,624,480.00

2. Pemakaian Ban

Harga ban, Rp

Harga ban

Umur,Jam

30,195,000

Biaya per jam,Rp

1,500

20,130.00

Umur kegunaan (1,500)


Total Biaya per Jam

20,130.00

3. Perbaikan
Faktor Perbaikan x Harga mesin
Umur kegunaan (8,000)

Harga mesin,Rp

Faktor Perbaikan

104,121

Umur, Jam
0.6

Atau Cara Lain :

8,000.00
Depr.per Jam

90% x Depresiasi

7.81
Biaya per jam,Rp

101,648

Total Biaya per Jam


4. Ongkos ganti alat Gali, Point Ripper

Biaya per Jam

91,483.20
7.81

Harga ,Rp

Harga Poit Ripper

Umur,Jam
1,335

1,500

Biaya per Jam


0.89

Umur Kegunaan
Total Biaya per Jam
5. Ongkos Operetor
Total Biaya per Jam
Total Biaya Operasi per Jam
Total Biaya Operasi Per Jam ( I + II)

0.89
Gaji per bln

Jam kerja per bln

Biaya per Jam

2,500,000.00

600

4,166.67
4,166.67
7,648,785.37
13,162,122.48

TP

TP

K
x
60
x
Fk
(n x CT) + J/V1 + J/V2 + t1 + t2

Simbol
1
C
K

Fk
n
CT
J
V1
V2
t1
t2
th
te
CTh
SF
dr
TP

TPrb
nD
nDnyata

60
CTh

Keterangan
2
Kapasitas Alat Gali
Kapasitas Alat Angkut Truck per rit
Volvo BM (ROM)

Fk

Satuan
3
Lcm

PC 750-6
4
5.3

Lcm
Bcm
Ton

21.2
14.84
13.2076

Lcm
Bcm
Ton

Volvo FM (Clean Coal)

Lcm
Bcm
Ton

Target Produksi Batubara


Jumlah Alat "hauling"
Jumlah Alat "hauling"

atau;

, m3/Jam

CWB (ROM)

Faktor Koreksi
Jumlah rit pengisian
CT alat muat
Jarak angkut
Kec. Angkut
Kec. Kembali
Waktu dumping
Waktu atur posisi
Waktu Angkut
Waktu Kembali
Cycle Time Alat Angkut
Swell Factor
Density Material
Taksiran Kapasitas Truck (OB)

, m3/Jam

Persen
min
m
m/Jam
m/Jam
min
min
min
min
min

Lcm/Jam
Bcm/Jam
Ton/Jam
Ton/thn
ton/thn
Unit
Unit

Alat Muat
PC400-6
PC 1250-6
5
6
2.1
6.1
24.4
17.08
15.2012
12.6
8.82
7.8498

0.95
4
0.4
4500
583
583
0.20
0.30
7.72
7.72
17.54
0.70
0.89
1208.40
845.88
752.83
3,655,758
800,000
0.22
1

0.95
6
0.4
4500
583
583
0.20
0.30
7.72
7.72
18.34
0.70
0.89
718.20
502.74
639.20
3,103,945
800,000
0.26
1

0.95
4
0.4
4500
583
583
0.20
0.30
7.72
7.72
17.54
0.70
0.89
1390.80
973.56
1237.81
6,010,815
800,000
0.13
1

uat
PC400-6
7
2.1

16.8
11.76
10.4664
0.95
8
0.4
34000
583
583
0.20
0.30
58.32
58.32
120.34
0.70
0.89
957.60
670.32
852.26
4,138,594
800,000
0.19
1

TP

TP

Simbol
1
C
K

Fk
n
CT
J
V1
V2
t1
t2
th
te
CTh
SF
dr
TP

TPrb
MR
SR
Tprob
nD
nDnyata

K
x
60
x
Fk
(n x CT) + J/V1 + J/V2 + t1 + t2
K

60
CTh

Keterangan
2
Kapasitas Alat Gali
Kapasitas Alat Angkut Truck per rit

Faktor Koreksi
Jumlah rit pengisian
CT alat muat
Jarak angkut
Kec. Angkut
Kec. Kembali
Waktu dumping
Waktu atur posisi
Waktu Angkut
Waktu Kembali
Cycle Time Alat Angkut
Swell Factor
Density Material
Taksiran Kapasitas Truck (OB)

Target Produksi Batubara


Mining Recovery
Stripping Ratio
Target Produksi OB
Jumlah Alat "hauling"
Jumlah Alat "hauling"

Fk

, m3/Jam

atau;

, m3/Jam

Satuan
3
Lcm
Lcm
Bcm
Ton
Persen
min
m
m/Jam
m/Jam
min
min
min
min
min

Lcm/Jam
Bcm/Jam
Ton/Jam
Ton/thn
ton/thn

ton/thn

PC 750-6
4
5.3
21.2
18.02
37.842

Alat Muat
PC1250
5
6.1
18.3
15.555
32.6655

PC 1100
6
5.9
23.6
20.06
42.126

0.95
4
0.4
500
250
250
0.20
0.30
2.00
2.00
6.10
0.85
2.10
1208.40
1027.14
2156.99
10,474,363
800,000
0.95
10
8,421,053
0.80
1

0.95
3
0.4
500
300
250
0.20
0.30
1.67
2.00
5.37
0.85
2.10
1043.10
886.64
2190.51
10,637,117
800,000
0.95
10
8,421,053
0.79
1

0.95
4
0.4
500
300
250
0.20
0.30
1.67
2.00
5.77
0.85
2.10
1345.20
1143.42
2824.92
13,717,812
800,000
0.95
10
8,421,053
0.61
1

Jenis dan model mesin


Perlengkapan
Hagra mesin

Wellloader W90-2
General Purpose, Bucket 2,3 m3
937,089,000

Harga Ban

30,195,000

Mesin bekas

93,708,900

Nilai Penyusutan

813,185,100

I. Biaya Penilikan
1. Penyusutan

Nilai Penyusutan

Nilai Penyusutan

813,185,100

Umur Kegunaan
Biaya Penyusutan per jam
2. Bunga nodal (18%),asuransi (1%)

Umur alat, tahun

Annual rate

3.2

22

pajak (2%),ongkos gudang(1%)


(n+1)/2n x Annual rate x Harga mesin
Umur Kegunaan per Tahun (=2,500 Jam)
Total Biaya per Jam
Total Biaya Pemilikan per Jam

II. Biaya Operasi


1. Bahan Bakar dan Minyak Pelumas

Pemakaian (ltr/jam,
Km/Jam,Jam)

a. Bahan bakar

18.5

b. Oli mesin

0.1

c. Oli Transmisi

0.04

d. Oli Drive

0.04

e. Oli Hidrolis

0.14

f. Gemuk

0.01

g. Filter

50

Total Biaya per Jam


2. Pemakaian Ban

Harga ban, Rp
Harga ban

30,195,000

Umur kegunaan (1,500)


Total Biaya per Jam
3. Perbaikan
Faktor Perbaikan x Harga mesin
Umur kegunaan (8,000)

Harga mesin,Rp

Faktor Perbaikan

104,121

0.6

Atau Cara Lain :


90% x Depresiasi
Total Biaya per Jam
4. Ongkos ganti alat Gali, Point Ripper

Harga ,Rp

Harga Poit Ripper

1,335

Umur Kegunaan
Total Biaya per Jam
5. Ongkos Operetor

Gaji per bln


2,500,000.00

Total Biaya per Jam


Total Biaya Operasi per Jam

Total Biaya Operasi Per Jam ( I + II)

Umur Kegunaan

Biaya per Jam,Rp

8,000

101,648

Harga mesin

Biaya per Jam

937,089,000

5,411,688.98

101,648

5,411,688.98
5,513,337.11

Harga (per ltr,

Biaya per Jam,Rp

per Kg)
6,300

116,550.00

22,000

2,200.00

22,000

880.00

25,000

1,000.00

25,000

3,500.00

35,000

350.00

150,000

7,500,000.00
7,624,480.00

Umur,Jam

Biaya per jam,Rp


1,500

20,130.00
20,130.00

Umur, Jam

Biaya per Jam


8,000.00

Depr.per Jam

7.81
Biaya per jam,Rp

101,648

91,483.20
7.81

Umur,Jam

Biaya per Jam


1,500

0.89
0.89

Jam kerja per bln

Biaya per Jam

600

4,166.67
4,166.67
7,648,785.37

13,162,122.48