- Excavation*
- Embankment*
- Steel H-beam
- Handrail L.50.50.4
-Plat 15mm, anchor 19mm
- Stone Masonry 1:4
- Plaster 1:3
- Concrete K-225
- Pembesian diameter 16
- Plankwood 5/20
point
4
m3
m3
kg
kg
kg
m3
m2
m3
kg
m3
171.5
74.725
28,000.00
45,000.00
4,802,000.00
3,362,625.00
13.3
18.85
288.61
42.65
3.234
9.8
278.832
1.08
22,000.00
18,000.00
18,000.00
576,500.00
40,000.00
1,100,000.00
15,000.00
4,500,000.00
292,600.00
339,300.00
5,194,980.00
24,587,725.00
129,360.00
10,780,000.00
4,182,480.00
4,860,000.00
58,531,070.00
Analisa Perhitungan
Satuan
Excavation
Alas
Sisi atas
Lebar
Tinggi
Volume
=
=
=
=
=
13 m
15 m
3.5 m
3.5 m
171.5 m3
Embankment
panjang
Lebar
Tinggi
Volume
=
=
=
=
6.1 m
3.5 m
3.5 m
74.725 m3
Beton
Area
Lebar
Volume
=
=
=
2.34 m
3.5 m
8.19 m3
=
=
=
=
=
=
8m
0.2 m
0.4 m
24 m
0.00841 m2
66 kg/m
13.32144 Kg
Stone Masonry
Area
Lebar
Volume
=
=
=
12.185 m
3.5 m
42.6475 m3
Bearing Pad
Area
Lebar
Volume beton
=
=
=
0.46 m
3.5 m
1.61 m3
Mortar
panjang
Lebar
Tebal
Volume
=
=
=
=
4.62 m
3.5 m
0.1 m
3.234 m3
Pembesian
Rebar Bearing Pad
Rebar concrete K-225
=
=
48.78 kg
230.052 kg
Volume
Plankwood 5/20
Jumlah balok kayu
panjang balok kayu
panjang total balok kayu
luas penampang
volum
=
=
=
=
=
40 buah
2.7 m
108 m
0.01 m2
1.08 m3
Handrail 50x50x4
Berat
Jumlah tiang sandaran
tinggi tiang sandaran
Panjang Total
Volum
=
=
=
=
=
3.77 kg/m'
10 buah
0.5 m
5m
18.85 kg
=
=
0.7 m
3.5 m
117.8 kg/m2
288.61 kg
278.832 kg