STEEL BRIDGE L > 4 M

- Excavation*
- Embankment*
- Steel H-beam
- Handrail L.50.50.4
-Plat 15mm, anchor 19mm
- Stone Masonry 1:4
- Plaster 1:3
- Concrete K-225
- Pembesian diameter 16
- Plankwood 5/20

point

4
m3
m3
kg
kg
kg
m3
m2
m3
kg
m3

171.5
74.725

28,000.00
45,000.00

4,802,000.00
3,362,625.00

13.3
18.85
288.61
42.65
3.234
9.8
278.832
1.08

22,000.00
18,000.00
18,000.00
576,500.00
40,000.00
1,100,000.00
15,000.00
4,500,000.00

292,600.00
339,300.00
5,194,980.00
24,587,725.00
129,360.00
10,780,000.00
4,182,480.00
4,860,000.00
58,531,070.00

Analisa Perhitungan

Satuan

Excavation
Alas
Sisi atas
Lebar
Tinggi
Volume

=
=
=
=
=

13 m
15 m
3.5 m
3.5 m
171.5 m3

Embankment
panjang
Lebar
Tinggi
Volume

=
=
=
=

6.1 m
3.5 m
3.5 m
74.725 m3

Beton
Area
Lebar
Volume

=
=
=

2.34 m
3.5 m
8.19 m3

Steel H Beam (WF 400x200x8x13)


panjang
Lebar
Tinggi
Panjang total
Luas Penampang Gelagar
Berat
Volume

=
=
=
=
=
=

8m
0.2 m
0.4 m
24 m
0.00841 m2
66 kg/m
13.32144 Kg

Stone Masonry
Area
Lebar
Volume

=
=
=

12.185 m
3.5 m
42.6475 m3

Bearing Pad
Area
Lebar
Volume beton

=
=
=

0.46 m
3.5 m
1.61 m3

Mortar
panjang
Lebar
Tebal
Volume

=
=
=
=

4.62 m
3.5 m
0.1 m
3.234 m3

Pembesian
Rebar Bearing Pad
Rebar concrete K-225

=
=

48.78 kg
230.052 kg

Volume

Plankwood 5/20
Jumlah balok kayu
panjang balok kayu
panjang total balok kayu
luas penampang
volum

=
=
=
=
=

40 buah
2.7 m
108 m
0.01 m2
1.08 m3

Handrail 50x50x4
Berat
Jumlah tiang sandaran
tinggi tiang sandaran
Panjang Total
Volum

=
=
=
=
=

3.77 kg/m'
10 buah
0.5 m
5m
18.85 kg

=
=

0.7 m
3.5 m
117.8 kg/m2
288.61 kg

Plat 15mm, anchor 19mm


panjang plat
lebar
Berat
Volum

278.832 kg