Anda di halaman 1dari 25
(CONTROLLED COPY ee cent Ero emo Sra erat Senn et Se Eten |Pxcsroni TaD NOALTD, {or 29[t0(1S 4 86 moa | —o FRAP ‘oar | -ca |“ ats [Re ‘scpon aw | Cec | prove FEVSIONS fy MAHARASHTRA STATE ELECTRICITY TRANS. COLLTD. frcuect: 400/220 KV SUB-STATION AT ALKUD, SANGLI ‘CECT ASS ECISETEALSTOMTOORTOUTETONE konrer: oATED-zipozos lcomacroe: ALSTON TAD NDIA LTD, NOIDA i 4001220 KV SUB-STATION AT ALKUD, SANGLI NITROGEN INJECTION FIRE PROTECTION SYSTEM FOR, 4167MVA 400/220KV ICT ALSTOM RANG HO. ca ALSTOM TAD NDALIED fer nkounsene ne '5427PW050-AKD-E-NIFPSICT 0 cia PRPVED Excoutive Eiginasr (ORE-S1) | Design, Ct tn seen Sen Pr shgenga? ot). sural SYSTEM BY NITROGEN TSIECTION METHOD FOR 4X67 WVA, 400/220/33 HV TCTFOR (A LIMITED, NOIDA A/C MAIARASHTRA STATE. ELECORICITY ‘PRAMGHISSION CORPORATION ‘LIMITED (HETCL) (P.0.82_5427-4500775640 DATED 27.03.2015) (PROJECTS ALKUD PROJECT) ee ee > | Be isR2 aa G0 [oetatts oF Conrot. BOX OF a aera (2 SHEETS) 220 vDc vv ee eee ce ee ng te Sf ASS ets aad eee 14 frowoste: ancl APIPEP TESIHEAY PARTREMARS oo a P.0.NR: 5427. RATING: 4x16 4500775640 1 MVA, €00/220/33 KV ICE [> aPPRpveD | conn AE (08st) | Design, € & M Section Prateshgangat nea (Gaet, Mumbel = 03.2015 THE CAPACITY OF OTL TANK WILL RE DERRIVED ATER tHE RECEIPT OF TRANSFORMER GENERAL ARRANGEMENT DRAWING IN AUTO CAD FORMA EGRPARED | SERED [REPROD [ CINTERI MOET SEE + nysben2(re) | sy:Dewiee) | vso4( 2) (COPY TO CUSTOMER Tnitiala | _KvPsobk mvP Sern GNI GTi Date | 04.05.2015 | 04.05.2018 [04.05.2018 [7 CUSTOMER: ALSTOM TED INDIA LIMITED, NOIDA ND USER: WARARASINRA SURE HT TRANSMISSION CORPORATION LINTIED osseen) PROJECT: BLKUD PROIKCT P.O.4m: 5427-4500775640 DANE RATING: 4X167 MVA, 400/220/: 7 KW Ter | Design, Co Section \.*Prateshoangat ear Enel), Mumbal 64 2015 #10x2516.SL0T FoR MOUNTING (4NRS.) pean 25059} 700 z a ® ® ® ter ton tw, Hos Soy ha’ ‘oe ha @ ® 8: 8) & 8: | Huo Ste 21 ies) Mumba 650 SPEpVED a (08 mc Sat i rrveehvanped ed rn wn, 097/35 et E tt BE] 0. Texove | ascrniow vos [reo [raw osm ECT W PROGRESS Hos [seen [eas mer valve close 117807 [eo | oFERENTIAL RELAY TRIP 12 | m2/508 Tema TR ie | ie [nem [une raucr re orvecTon 15] a5 [reo one FAULT OFFERENTAL RELAY 6 [m6 [eo June Fauct avarwouz RELAY 7 | on? [res [une ran Pawaram we | ws [rer [one FAUT teansronueR Te | 403 [eo [une FaULr row | so" | = Parone zi] 52 |= [bemenow muense Ovoremm—] i | 503 [mre fiw Test pea. ; 23] mo |_- [Wun /Awoo amu | Eveowve Engfier (08-81) ae] vi = [sun avo Acs FoR de BaMPLY PAL op Moon 4] | Serr wares ror oneanon 20 0 a ao 1) lose Sa 2} foane [atom sore ol ‘i oe em ee [scrim more URNE Nees TR eee i a EL fmm] = — 4200{W) x 500(0) 2) fate — [oer wx acomarsvr 4 4 i oo ESE YSN UGH EGA wAVENST ‘OUT OF SERVICE OL_DRAIN PIPE |W SERVICE 2oWAY BALL VALVE PRESSURE MONITOR ‘SWITCH IN SERVICE = SWAY BALL VALVE ‘OUT OF SERVICE INSPECTION) OlL_DRAIN BUTTERFLY O1L_DRAWN CLOSED (unostursen |, TRANSFORMER OPERATION) OPEN (OIL, DRAIN IN PROGRESS) Sa BE foe fesse sar aac narra VALVE fae {, Dewan. 6 ge Ls *Brakasnoanga” in fae wa aT po eet gy es Es I 5 i a yo To Stee Gouge Commer DeIWeEN FLANGES WUE DESPATCH TewcroRcR ‘HS ML BE REPLASED WH Tew (evry) ourena syste hestalanon AY Se 2. SOLATON VALE SHOULD a PPROMDED BETWEEN CONSERUTOR TANK AND TOW (OMIM), 3. CONSERVATOR PIPE ANGLE INCASE OF ANGLE OTHER THON 2 Tos CONSULT CIR FOR ‘tment IF ouNTING FUNGE BETALS 3 fear 2 | come sez stonwoe |r 2 uc vance 2 fue | sonore INR Se aaron comeRe =e 1 fice] | ~ PP aeeagven } se esc pe a ae rl ce fe ser uss ene eer eauaaon mT ] aaa oe Se ee arenes | I ee 1531 (hein =H aa a eg eee eas SESSA ROTO NATIT] 4 — 7 (08e-s1) reo, i rou cose section rer lt eo a Be ee }| foite [er wa yaya ener Sr [ERO ETL EARS RAST AV SRNR, OF FIRE DETECTOR —— QuarTz010 BULB 141 DEG.C SLEEVE CONNECTING PIECE RELEASE PIN 200, MAX. 5.3, SSWADGED NIPPLE 93 MIT SWITCH APPROVED tf: (086-S1) "a section —————— ee fain ee or | I Ba ae Teal [aire = i ee H | TRANSFORMER SIDE > + panes i} 1000 (ees a 7 t oh | ‘ SS Py oo oS . fo Li 1 ae 5 = | i H : & i : 0. carts — a] concrere 124] prick NOTE: 1)BRICK AND PLASTERING WORK TO BE UNDERTAKEN. AFTER COMPLETION OF PIPE CONNECTIONS BETWEEN F.E.CUBICLE AND OIL PIT ESOT RT ees Sage SS fa] Rrra Sr STON OGD AIEEE? MARTINIS] 15, p10 amr ale | i $2 kz 8xanes, [=a ee | 930 922 HOLE X 5 NRS bb oo [ arPagves | evant ge “ (one-s1) Fy ARSE | Design, C2 Section ns rrakoshuaege® sue, unbat84 BOTTOM VIEW wounmine arackers ” "S=8' aNRS PP PPEBE EE Eh ele +P Leet LAE Fagg TERMINAL'STRIP_(TS2) SEE or roan uma os [cree Goer See an FA H a ll b INDTA LIME, BRA STATE ELECTALCE TON CORPORATT Concorde ase) ‘Design, © 1 Section focshgangat et), umbal= 84 ofA aT =e Ee es BG Gun: anevox rep INDIA LIMITED, TRANSMZSSTON (MSENCL) PROJECT: ALKUD PROJEC' P.O.MR: 5427-4500775640 27.03 RATING: 4X167 MVA, AC r Exccutlvg Engineer (O8E-81) Designs O&M Section § spravashoanga? gos eae), rural No: ssponpeslals fe] BY 9 [10]17 [ra [13] 14 [ihe] 7 7 es {ci aa aN Ra —————— tesco inert Ih Sree are aaeeemennaete a oa a aie S17 and svi Asan a ache [Sagas renal kw fst en SOC] st —- T ‘APPROVED: econ coae-sy) | |, Bosiga, ¢'8 1% Saetion nsrick*Praicangangat |= 3 endrdeaat-Mumbale Bt TECHSTREET aT Star err aT 15 fotttetnteneciber fitness eal xcoutiEFaineer (OE-S1) | Deslgn, C+ Seeten {80 0 sPraratpangat eo ee apveD | nL oF SERIAL FoR EXPLOSIVE RTINGVISHING SHB TTR | a 7 yr IZ2ORE X Let 50208 ver IMINACTOREE | ere eMHACIURIN DOUSTLES LOAD, Foo TTA a

Anda mungkin juga menyukai