Anda di halaman 1dari 3
OLTC SPECLFLCATION 89 VOLTAGE CONTROL ‘Whore specified inthe Schedles, equpneat for varying the tr io without roucing phase dsplcsnen shal be provide, in confomnance wih IS Sosa Suna ‘Al eds and connections to fed and moving canta assis and been the ‘eansformer andthe vollag control device sal be supped and adequacy base {2 wiht the maim prspective shot sce Tr ohch he ‘transformer is designed, = Eauipment for varying the efcsve tr's tio onload shall sonst tp hanging gear aranged for ll hand tnd electrical operation al rams earl operation I hl also be so designe that itmay ely be apd to ponte by sama conta ‘The up changing swiches and mechusiom shal be mount in an eecesible oskion in ol tanks or compartment ad shal be supported om the ma ti ‘is base dain vale shall be provide. Its psf tht exainatin and repr of bth sector and diver stehesicladng thir asociatd eget en be cried ot witout lowering toa evel inthe min tank. However, the ‘sigs of tupchangers which ave lowering the lve in the nator tank ‘maybe acepad wit he ageamen’ ofthe Project Manager, 1 sill not be possible fo te il in tose somparients of the tp change ‘Sumer which contain consis used for making and breaking cute 1» mi ‘withthe on the sin warsarmer A Butte ety device shal be tel nthe Pipework fom the tp-tageconservatn, “Teil n compartments of te main tp-chang appara which do not cnn contats ued for making or treakng cert hl be manaited under Crs head by means of «pipe conection Tom the higher pit ofthe chamber the conservator, and metn sal be provided for i iulton in rermal opeaton This onnetion shal be conrad by asuale valve an shal be arened ha any gi leaving he haber wil ps to the gs and lacs ly, Each compartment in which the lls at maintained under conservator hed shall be provided withan oi poze Any celsed compartment ot ol ile shal be aoe ventilated and des red to prevent the ingress of vermin. Al contacts, olay caso fer pat sl fe suitaly potted aint eras erotics, Limit sts shall be provided to prevent over-running of the mesharism and sallbe diel connate inthe ie of theapeaing motor. Linswitch ney be cooneted in the conrl clei of the opting molor provided hat & ‘mechanialdcltching esha ie ncrprate. ‘A mscunial stop or oer device shall be provided to prevent overrun the rnecanism une ny enon (Overessure and overemparatue devices shal be ites to resistor compris ofthe tapchangee and aranged to enor alarm and ip chute vets a 4/3 Thema maine doves oor arte mes sal be provided pt ip Io aa control res against over-ands and shores Switches forthe nition of tap change shall ae the inscription "ie Tap Nuke’ or "Lover Tap Numbers appa, ‘Tepping conta associate with any thermal device wed forthe pret of ap staging equipment shall be suitable for making and breaking 150 VA wt O36 ower factor, betwen the ints of 30 an 250 vets ne. breaking 190 VA td making 500 VA btveen the nits of 11034250 vot de A our. vie shall be fied co the apchangng machin to indi te hunber of pestis completed by the euipmen A permanently legible arian chat shal be ita with he deviag metas chamber The teinals ofthe operating motor shal be cle and peranety ica ‘wih umes eorespoting to thse on the ads tached hse auipment for focal an remote eeczl an lca hae operation sal som withthe flowing sndtons= 4 Its ne possible to operate the eles dive when the han opting garb ine. bt sha ot be possible for any two laticl conzo points to bein ‘pean th ain ine © Each step movement shal equi spae nation a the contol pont. 4 Allert contol switches and the lel operation gar shal be sty ‘abled once the dition of phar ‘The equiprane shall be arangod so a o ens tit when @ sp mover has been commenced it sl be complied indepanerty ofthe operation othe onal Fels or switches. Ifa ilare oF the sunita supply dung stp charge ay ter contingensy, would est ina vem nbn compat mers chal be proviod to safeguard he vansfrmer and is tia ape Appar shall be provided © To give indeation mechanically tthe transformer and eerily the ‘en contol pin ofthe tapes ins. The inter eater shall show the umber of tapping in we a the inctor the re nol point shal shaw clea che ata vate rai. fo give indication a the remote contol point tht & tap change isin rows: by means ofa amp. If he tap change is at eomleed i ip Sected eve an ale shal be hen Ta give indication a the remote contr point by means ofan lied lndatoe when the units ofa group of warmer aang fo open it ral ae ou of ep by an aged sou, When egustd in the Schedules, to give indication mechanically te ‘arene, of he iximom and rau tap psitn reac dig ary sect ine period. The ncators must be eaable of beng ety ed. All nating eves sal peat corey at any ylage between the his of 85% -115%¢of nominal value 2/3 Ie spi in the Schedules onload upctungiog equipment sal be ube fr telecontol. The required con relay arms and ial felading a epaste "m-way swith, ving oe fied conte or ach ip pion shal be povided forts purpese and red othe conto pata tthe marsaling ask obi. Unies eters specified all ter componers ofthe lecertrleqipmn il be spp under separate contact ‘Where he ond ap changing equipment i fully autmsti a vlogs regulating relay shal be provides. The ea shal be resporsvete variation olage of one ‘cet frm the setng over the range seid, A calibrated sele al be Incorporated within the insure to ely show the relay sting terns of he rated volage The relay shall he fited val a me delay device cape oF tajastnent over a range of 2100 sent and the device shal Be ofthe Seting pela th evet of file ofthe sappy to the relay the tp caning Inechunis shal yerain onthe lpping uety mse, and an alarm, “Ausie Yalge Centol Fi stall be given It spied inthe Schedles a ie drop competing device shal be provide and shal be designed to ive progressive boos om aahing st nol to. pe- Aeerined amount at ill aad. Unless there spied the voltage and cro ‘rarsarmers fr hese dovces wll ba provided user separate conta, (road tp-hange wansirmers rovidd wt fly suomi contol nd sired to operat in parla royal be provided with mane fo ene tthe Voltage corol equipment asomaily rine in sap. AN "outlse" insets sab rovided having cots abe fr niin naar. All alan inisting devices sal be provided with efiint const to initiate Joel emateandconmon abr rests All programma relays ace to Be suppl filly configured tgster ah the reltan preparing software and interface calling 10 fsiate th clay Configuration ep) from a laptop compe Should the programmable aay ensist of rear mouted communication pts panel frontman pig io Be Insled for lapap communication interac coanecton purposes, 3/3

Anda mungkin juga menyukai