Anda di halaman 1dari 6

COMMERCIAL COOLING LOAD CALCULATION

Project
Location CALAFONNIA

Bldg./Room

Engrs.

Calc. by
DB
F
100

Outdoor
Room

WB
F
69

RH
%
50

W
gr/lb
101
66

Gross

Net
120

CLTD, F
Table
Corr.
14
13

0.28

300

180

20

SHGF
216

A
120

SC
0.81

CLF
0.72

3.41
3.41
10
10

1.25

BF x
BF x

78

Conduction

Dir.

Color

Chk. By

A, ft2

0.94

Daily Range

Day
Lat.

33
21-Jul
39N

Ave.

84

SCL
BTU/hr
1466

Group

Glass

Wall

N
S
E
W

DARK
19

958
0
0
0
0

2400

xWx
xWx
SHG x
LHG x

15116

Glass

Lights
Lights
People
Equipment
Equipment
Infiltration 1.1
x
0.68
x

250
200

150
150

nx
n

CFM x
CFM x

22
40

CLF
CLF

10230

CLF

2500
2000

TC
gr/lb

3630
4080

LCL
BTU/hr

Subtotal
SA duct gain
SA duct leakage
Total CL
BTU/hr

SA fan gain (draw through)


Room/Building Cooling Load,
Infiltration 1.1
0.68

SA fan gain (blow through)


x
CFM x
x
CFM x

RA duct gain
RA fan gain

TC
gr/lb

Cooling Coil Load


Refrigeration Load

Pump gain

39980

1.1x(Tr-Tsa)

Sh.

RSCL

Dir
W

CFMsa =

Solar

RSHR = RSCL/RTCL =

. =

Roof/Ceiling
Floor
Partition
Door

COMMERCIAL COOLING LOAD CALCULATION


Project Superb SuperMarket
Location Ohio, Clumbus

Bldg./Room

Engrs.

DB
F
90

Outdoor
Room
Dir.

Color

W
W
E

Glass

Group

WB
F
77

RH
%

W
gr/lb

Daily Range

A, ft2

1.01
1.01
1.01

Gross
-

Net
830
42
42

19
21-Jul
40

CLTD, F
Table
Corr.
13
11
13
11
13
11

W
E
N
S
E

D
D
D
D
D
D
D

0.11
0.11
0.11
0.11
0.09
0.35
0.39

1260
-

388
1176
840
840
5400
5400
42

17
26
11
17
36
-

Dir
W
W
E

Sh.
no
no
no

SHGF
216
216
216

A
42
830
42

SC
0.94
0.69
0.94

CLF
0.71
0.71
0.19

16200

xWx
xWx
SHG x
LHG x

3.41
3.41
60
60

1.2

BF x
BF x
1

15
24
9
16
35
9
24

Haroon Sab

Ave.

81

SCL
BTU/hr
9221
467
467
640
3105
832
1478
17010
17010
393

Lights
Lights
People

250
200

Equipment
Equipment
Infiltration 1.1
x
0.68
x

nx
n

CFM x
CFM x

CLF
CLF

CLF

66290
15000

LCL
BTU/hr
12000

TC
gr/lb
Subtotal

SA duct gain
SA duct leakage
Total CL
BTU/hr

SA fan gain (draw through)


Room/Building Cooling Load,
Infiltration

1.1
0.68

SA fan gain (blow through)


x
CFM x
x
CFM x

RA duct gain
RA fan gain

TC
gr/lb

Cooling Coil Load


Refrigeration Load

Pump gain

1.1x(Tr-Tsa)

RSCL

Glass

6055
87829
1620

CFMsa =

Solar

RSHR = RSCL/RTCL =

. =

Roof/Ceiling
Floor
Partition
Door

Chk. By

Day
Lat.

76

Conduction

Wall

Single Story Building with a Basement


Haroon Sab
Calc. by MA Javaid

COMMERCIAL COOLING LOAD CALCULATION


Project Peak Cooling Load
Bldg./Room
Location Sacramento, California Engrs.

DB
F
83

Outdoor
Room

Glass

Group

Calc. by
WB
F

RH
%

Roof/Ceiling
Floor
Partition
Door

Solar

Glass

Lights
Lights
People

W
gr/lb

Day
Lat.

0.81
0.28
0.28
-

Net
120
180
300
-

CLTD, F
Table
Corr.
9
7
9
7
2
-

Sh.
D
-

SHGF
216
-

A
-

SC
120
-

CLF
0.17
-

xWx
xWx
SHG x
LHG x

3.41
3.41
10
10

1.25

BF x
BF x
1

Color

W
W
E
-

D
D
-

Dir
W
2400

Equipment
Equipment
Infiltration 1.1
x
0.68
x

A, ft2

Daily Range

Gross
300
300
-

Dir.

250
200

M.A Javaid

50

78

Conduction

Wall

General Office
Haroon Sab

nx
n

CFM x
CFM x

CLF
CLF

CLF

TC
gr/lb
Subtotal

SA duct gain
SA duct leakage
SA fan gain (draw through)
Room/Building Cooling Load,
Infiltration 1.1

SA fan gain (blow through)


x
CFM x

TC

0.68

RA duct gain
RA fan gain

CFM x

gr/lb

Cooling Coil Load


Refrigeration Load

Pump gain

ALCULATION
Chk. By

Haroob Sab

33
Ave.
F
7/21/2007, at 1200 hr
39

83

SCL
BTU/hr
680

10230
2500

LCL
BTU/hr
2000

Subtotal

lding Cooling Load,

Total CL
BTU/hr

1.1x(Tr-Tsa)

RSCL

CFMsa =

4406

RSHR = RSCL/RTCL =

. =

353
168

oil Load

ion Load

Anda mungkin juga menyukai