StrategyforALARPDemonstration

StructureofPresentation
What is ALARP ?
Why are we doing an ALARP demonstration ?
How is the project achieving ALARP ?
How are you contributing ?
Decision making & ALARP

StrategyforALARPDemonstration

WhatdoesALARPmean?
As Low As Reasonably Practicable.
WhatdowemeanbytheALARPPrinciple?
Risks are ALARP when it can be shown that there
would be a gross disproportion between the cost of
additional reduction measures and the reduction in
risk achieved.

StrategyforALARPDemonstration

WhyisanALARPDemonstrationrequired?
Requirement of the Sakhalin II Basis of Design , that
the risks to personnel on, and associated with the LUNA and PA-B facilities are demonstrated to be ALARP.
SEIC required to produce HSE Case demonstrating all
risks have been identified & managed to ALARP

StrategyforALARPDemonstration

Responsibilities
Management sets the framework for the
engineers to follow.
Not solely the responsibility of the HSE
Engineering Discipline.
Overall process is a continuous one which starts
with concept selection and follows through to
operation.

StrategyforALARPDemonstration

HowisanALARPdesignachieved bytheProject?
Project
Decisionmakingframework

-communication
-Reviews&audits
-Monitorperformance
-Decideprocedurestobeused
HEMP
Engineers

appropriatecodesandstandards,

goodengineeringpractice,

engineeringjudgmentbasedontechnical
experience

HSEMANAGEMENT

Managementstructure

HSE
CASE

StrategyforALARPDemonstration

ApplicationofALARPStrategy
CONCEPT & FEED
STUDIES

DETAIL
DESIGN

ENGINEERING
JUDGEMENT
GOOD PRACTICE
CODES & STANDARDS

ALARP demonstration in detail design primarily driven by


codes & standards, engineering judgment, good practice,
company values.
Builds upon studies & decisions established in Concept &
FEED phases.

StrategyforALARPDemonstration

HowisALARPbuiltintootherdisciplineswork?
Piping E.g. Piping & Equipment layouts
Structural risk based design
Process - E.g. Minimizing leak sources
Mechanical E.g. Material selection, specification of
pump seals
Electrical E.g. Equipment selection in accordance
with hazardous areas
Instrument E.g. IPF Review , ESD system

StrategyforALARPDemonstration

DecisionMaking&ALARP
What happens when there is a difficult decision to be
made / when codes & standards are not enough?
The decision is elevated to higher level
Safety involvement to ensure safety risk
management achieved, compare with set criteria

StrategyforALARPDemonstration

ProjectRiskAcceptanceCriteria

INTOLERABLE

TOLERABLE

BROADLY ACCEPTABLE

ALARP
Region
Unacceptable
Risk
(all workers)

CONSIDER
FURTHER
RISK
REDUCTION
MEASURES

5 x 10-4
Average Individual Risk (per annum)

1 x 10- -5

Negligible Risk
Broadly Acceptable

StrategyforALARPDemonstration

CostBenefitAnalysisCBA

CBA can be used as one of the inputs to assist


decision making, to determine whether risk
reduction measures are reasonably practicable.
These decisions take into account the initial level
of risk, the risk reduction that would be achieved,
and the cost of achieving the risk reduction.

Further reduction in risk is disproportionate to


cost of achieving this reduction.

StrategyforALARPDemonstration

ALARP
Amecsintentionistoprovidea
topsidesdesignwhich
demonstratestherisksassociated
withitareAsLowAsReasonably
Practicable.