Anda di halaman 1dari 17

Michigan Operations Remediation

REACH D

July 2, 2007
Michigan Operations Remediation

GeoMorph® Site Characterization


Confluence of Tittabawassee and Chippewa Rivers

Approximately 6.4 River Miles

Divided Into 15 River Reaches

Gordonville Road Bridge

Smith’s Crossing Bridge


7/2/2007 Page 2
Michigan Operations Remediation

Reach D

7/2/2007 Page 3
Michigan Operations Remediation

Reach D - 1948

7/2/2007 Page 4
Michigan Operations Remediation

Reach D – 2/2/07

7/2/2007 Page 5
Michigan Operations Remediation

7/2/2007 Page 6
Michigan Operations Remediation

7/2/2007 Page 7
Michigan Operations Remediation

7/2/2007 Page 8
Michigan Operations Remediation

UPSTREAM PORTION OF PROJECT DOWNSTREAM PORTION OF PROJECT

4 to 6.5 ft Gravel and Rip Rap Stone ~2 ft Gravel Roadway

4.5 – 6 ft Clay Cap

9 to 10 ft black stained gravel and sandy gravel


[Reach D Deposit]

Gravel & Coarse Sand = 22% to 71%


Fine & Medium Sand = 22% to 74% TEQ = 8,300 - 21,000 ppt
Silt & Clay = 4% to 11% Gravel & Coarse Sand = 7% to 23% Benzene = 0.2 - 79 ppm
Fine & Medium Sand = 28% to 47% Chlorobenzene = 4.7 - 950 ppm
Silt & Clay = 30% to 63% Hexabutadiene = 18 – 120 ppm
TEQ = 170 ppt to 29,000 ppt, mean=9,250ppt, PCE = 0.6 - 75 ppm
median=3,700ppt 1,2-DCB = 22 – 390 ppm
Hexachlorobenzene = below detection to 0.8 ppm 1,4-DCB = 18 – 310 ppm
1,2,4-TCB = <0.3 – 18 ppm
1,2,4,5-TtCB = <0.3 – 5 ppm
3 – 5 ft “Reach D Deposit”

Medium to Coarse Sand Stiff CLAY Sandy Silt


[natural soils] TEQ = <10 - 22 ppt [natural soils] TEQ = <10 ppt to 860 ppt
VOC and SVOC = below Benzene = <0.05 – 4.9 ppm
detection Chlorobenzene = <0.05 – 6.4 ppm
1,2-DCB = <0.3 – 1.8 ppm
7/2/2007 1,4-DCB = <0.3 – 3.2 ppm
Page 9
Michigan Operations Remediation

7/2/2007 Page 10
Michigan Operations Remediation

7/2/2007 Page 11
Michigan Operations Remediation

7/2/2007 Page 12
Michigan Operations Remediation

7/2/2007 Page 13
Michigan Operations Remediation

Remediation Approach and Water Balance


Polymer Addition

8” Hydraulic HDPE Pipe/


Dredge Geotubes
8” Booster pumps
700 – 1600 gpm

solids

Filtrate
Disposal
560 – 1280 gpm
100 ppm

NPDES Outfall
Storage Area Dow WWTP
031A
0.5 MGD average /
1.0 MGD maximum
Average 18-20 MGD

7/2/2007 Page 14
Michigan Operations Remediation

Project Layout

7/2/2007 Page 15
Michigan Operations Remediation

7/2/2007 Page 16
Michigan Operations Remediation

Project Schedule

Microsoft Excel
Worksheet

7/2/2007 Page 17

Anda mungkin juga menyukai