ENGINEERING ESTIMATE

NO
1

URAIAN PEKERJAAN
2

PEKERJAAN PAGAR KELILING


1 Pagar keliling
- Galian tanah
- Pasir urug
- Anstampeng
- Pondasi batu kali
- Strouss
Pengeboran
Beton
Tulangan
10
6
- Kolom
Beton
Tulangan
10
Bekisting
- Panel dinding beton (5x40x240cm)
2 Saluran keliling
- Galian tanah
- Box culvert (800x1000x1200)
2 Saluran keliling
- Galian tanah
- Box culvert (300x300x1200)

SATUAN

VOLUME

HARGA SATUAN

JUMLAH HARGA

6=4x5

m3
m3
m3
m3

314.77
4.85
90.70
314.77

m1
m3

300.00
9.42

kg
kg

1,017.29
309.65

m3

15.22

kg
m2

4,156.05
382.08
995.00

m3
unit

485.00
405.00

m3
unit

20.80
109.00

SUB TOTAL
JUMLAH TOTAL PEKERJAAN