Suvli P/S
1. Pump House

2015.08.25 (Tue)
Suvli P/S
1. Pump House
Existing pump was
under repair work

by end user.

2015.08.25 (Tue)
Suvli P/S
1. Pump House
No. 6 new pump

2015.08.25 (Tue)
Suvli P/S
No. 7 new pump

2015.08.25 (Tue)
Suvli P/S
Coupling may need to be
clearned.

2015.08.25 (Tue)
Suvli P/S
Water leakage from
most of all inlet covers.
Also, much leakage from

existing pumps.
Therefore, floor drainage
pumps are critical to
carry out works in pump
room.

2015.08.25 (Tue)
Suvli P/S
Drain sump and drainage
pumps.
Right side pump is

out of servise.

2015.08.25 (Tue)
Suvli P/S
Only left side drainage
pump is working.
Capacity is so far enough

against leaking water


amount.
Drainage pump is operated
manually.

2015.08.25 (Tue)
Suvli P/S

2015.08.25 (Tue)
Suvli P/S
Discharge pipeline
No.8 (right end) is closed.

2015.08.25 (Tue)
Suvli P/S
Existing compensator
will be cut from the
pointed part.

2015.08.25 (Tue)
Suvli P/S
Connection point of
exisitng compensator.

2015.08.25 (Tue)
Suvli P/S
Support of existing
compensator will be cut
as red line of the photo.

Support will be re-used.


Support beam shall be
extended.

2015.08.25 (Tue)
Suvli P/S
Existing No.8 compensator
is abandoned.
Support beam of this

compensator will be cut


and used for extension.

2015.08.25 (Tue)
Suvli P/S
New compensator
at storage.

2015.08.25 (Tue)
Suvli P/S
The connection point of
existing supporting beam
will interfare the flange
of new compensator.

Therefore, the existing


supporting beam shall be
extended.

2015.08.25 (Tue)
Suvli P/S
New compensator
Temporary stopper
shall be removed

after installation.

2015.08.25 (Tue)
Suvli P/S
New compensator
Position is same as
shown in drawing.

(100mm from edge)

2015.08.25 (Tue)
Suvli P/S
2. Compensator
Flow meter chamber

2015.08.25 (Tue)
Suvli P/S
2. Compensator
Flow meter chamber

There is gap between


pipe and chamber.

2015.08.25 (Tue)
Suvli P/S
2. Compensator
Flow meter chamber

There is gap between


pipe and chamber.

2015.08.25 (Tue)
Suvli P/S
3. Electric room
Incoming connection point

2015.08.25 (Tue)
Suvli P/S
3. Electric room
Entrance room

2015.08.25 (Tue)
Suvli P/S
3. Electric room
Next room from entrance.

2015.08.25 (Tue)
Suvli P/S
3. Electric room
LV & Transformer room

2015.08.25 (Tue)
Suvli P/S
3. Electric room
LV & Transformer room

2015.08.25 (Tue)
Suvli P/S
3. Electric room
HV room

2015.08.25 (Tue)
Suvli P/S
3. Electric room
HV room

Door is very small and


not enough to carry
panels into room.

2015.08.25 (Tue)
Suvli P/S
3. Electric room
Outside cable trench
(electric room side)

2015.08.25 (Tue)
Suvli P/S
3. Electric room
Outside cable trench
(pump room side)

2015.08.25 (Tue)
Suvli P/S
4. Storage

2015.08.25 (Tue)
Suvli P/S
4. Storage
Fence is installed.

2015.08.25 (Tue)
Suvli P/S
4. Storage
Pad lock at entrance.

2015.08.25 (Tue)
Suvli P/S
4. Storage
Wooden boxes inside
storage are covered by

vinyl sheet.

2015.08.25 (Tue)
Suvli P/S
4. Storage
2 x 20ft containers

2015.08.25 (Tue)
Suvli P/S
4. Storage
Inside container

2015.08.25 (Tue)
Suvli P/S
4. Storage
Inside container

2015.08.25 (Tue)
Suvli P/S
4. Storage
Lighting

Pole was existing.


Ortex prepared lamp
and cable, they said.

2015.08.25 (Tue)
Suvli P/S
4. Storage
Compensators are kept
out of strage area.

2015.08.25 (Tue)
Suvli P/S
5. Site office
Right side container is
Kubota site office.

Container is not new,


but renovated.

2015.08.25 (Tue)
Suvli P/S
5. Site office
Room at right hand side.

2 desks, 2 chairs and


air conditioner is insatlled.

2015.08.25 (Tue)
Suvli P/S
5. Site office
Bathroom

2015.08.25 (Tue)
Suvli P/S
5. Site office
Bathroom

2015.08.25 (Tue)
Suvli P/S
5. Site office
Bathroom

Water from shower is


available.

2015.08.25 (Tue)
Suvli P/S
5. Site office
Bathroom

Water from tap is available.

2015.08.25 (Tue)
Suvli P/S
5. Site office
Bathroom

Drain of toilet is
connected.

2015.08.25 (Tue)
Suvli P/S
5. Site office
Room at left hand side.

2015.08.25 (Tue)
Suvli P/S
5. Site office
Room at left hand side.

2015.08.25 (Tue)
Suvli P/S
6. Discharge works
Discharge pipeline.

Left side pipe is painted.


(for pump No. 6 & 7)

2015.08.25 (Tue)
Suvli P/S
6. Discharge works
Flanges for air valves.

2015.08.25 (Tue)
Suvli P/S
6. Discharge works
Flange for siphon breaker
valves.

2015.08.25 (Tue)
Suvli P/S
6. Discharge works

2015.08.25 (Tue)
Suvli P/S
6. Discharge works
Left side canal.
Concrete work is done.

2015.08.25 (Tue)
Suvli P/S
6. Discharge works
Right side canal.
Concrete work not yet done.