4 Pek.

List Ornament plat dak Tampak Samping


Lantai 1

Lantai 2

Total Luas List Ornament Plat Dak

dak Tampak Samping

Segmen 1

Segmen 1

t Plat Dak

Total Luas

egmen 1 + segmen 2
L. list dinding

egmen 1 + segmen 2
L. list dinding

Total Luas

=
=
=

P
5.10
1.02

x
x
m

=
=
=

P
4.40
0.44

x
x
m

1.5

al Luas

8.81

t
0.20

t
0.10

1.5

NO

URAIAN PEKERJAAN

2
C.

Bekisting tangga

Bekisting
Anak Tangga
V1

Bekisting
Bordes
V3

ERJAAN

Optrade ( b )
Antrade ( c )
Lebar anak tangga
J.tangga
t. pelat
P. plat
t. bordes
L. bordes
P.bordes
a2
a2

a
P. plat

V1

V2

V3

Bekisting
Plat Tangga
V2

V total

PERHITUNGAN
3
=
=
=
=
=
=
=
=
=
=
=

b2
0.20

+
+

0.20
0.30
1.90
10
0.20
3.60
0.20
1.85
3.80
c2
0.30

0.36

=
=
=

0.36
3.60

=
=
=

0.20
3.8
7.6

7.20

=
=
=
=

(pxl)+(p x t)
(3.60 x 1.90) + (3.60 x 0.2)
7.56
15.12

(p x l)

x
m
m
x
m2
m2

m2
m2

=
=

(3.80 x 1.85)
7.03
=
=

m2
7.6
29.75

0.20
0.30
1.90
10
0.20
3.60
0.20
1.85
3.80

m
m
m
Bh
m
m
m
m
m

(ditentukan)

10
x

1.90
x

x
2

10

+
m2

15.12

7.03

JUMLAH
4

29.75

m2

7.03

Rencana Anggaran Biaya


Program
Pekerjaan
Lokasi

:
:

TUGAS AKHIR
Pembangunan Anime Class dan Cosplay Center di Samarinda
JL. M. Yamin

Tahun Anggaran

2015

No.

URAIAN PEKERJAAN

LANTAI 1
I

PENDAHULUAN

II

PEKERJAAN STRUKTUR

III

PEKERJAAN ARSITEKTUR

IV

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


LANTAI 2

II

PEKERJAAN STRUKTUR

III

PEKERJAAN ARSITEKTUR

IV

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


LANTAI 3

II

PEKERJAAN STRUKTUR

III

PEKERJAAN ARSITEKTUR

IV

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


JUMLAH
PPN 10 %
TOTAL
DIBULATKAN

Biaya

ter di Samarinda

JUMLAH HARGA
3

91,166,080.00
10,590,369,726.09
1,224,491,278.53
97,906,432.75

22,535,692,966.58
1,413,800,545.50
68,364,537.75

2,004,259,018.43
1,446,722,661.02
66,820,705.75

39,539,593,952.39
3,953,959,395.24
43,493,553,347.63

43,493,553,000.00

Samarinda, Agustus 2015


Dibuat Oleh :
Nama Mahasiswa

BAYU AJI SETIAWAN


12 619 004

Rencana Anggaran Biaya


Program
Pekerjaan
Lokasi

:
:

TUGAS AKHIR
Pembangunan Anime Class dan Cosplay Center di Samarinda
JL. M. Yamin

Tahun Anggaran

2015

No.

URAIAN PEKERJAAN

VOLUME

1
I

II
A

III
A

PENDAHULUAN
1 Papan Nama Proyek
2 Pengukuran dan Pemasangan Bowplank
3 Pembersihan Lokasi
4 Pemasangan Seng Gelombang tinggi 2 M

PEKERJAAN STRUKTUR
Pekerjaan Tanah
1 Galian tanah pondasi Foot Plat
2 Urugan tanah kembali pondasi Footplat
3 Urugan pasir bawah lantai
4 Urugan pasir bawah Poer plat

1
193
2100
193

185.22
156.6
21.3
6.14

Pekerjaan Pondasi
1 Pancang mini pile 20/20-6m
2 Lantai kerja di bawah foot pile cap tebal 5 cm
3 Cor rabat bawah lantai tebal 5 cm

116
2.845
26.15

Pekerjaan Beton Bertulang


1 Pondasi Footplat 200 x 200 x 40
2 Sloof 30/60
3 Sloof 20/40
4 Kolom 50x50
5 Kolom 15/15
6 Cor Rabat

30.6
446.4
5.04
26.25
4.873
35.75

PEKERJAAN ARSITEKTUR
Pekerjaan Pasangan dan Plesteran
1 Pasangan Bata 1 : 2
2 Pasangan Bata 1 : 4
3 Plesteran 1 : 2
4 Plesteran 1: 4
5 Kaca

15.3
19
15.3
19
241

No.

URAIAN PEKERJAAN

VOLUME

1
B

IV
A

Pekerjaan Penutup Lantai


2 Pasang lantai keramik 20 x 20 untuk km/wc
3 Pasang dinding keramik 20 x 25 untuk km/wc
5 Pasangan Lantai keramik 60x60

38.5
49.35
568

Pekerjaan Kusen Daun Pintu dan Jendela Kaca


1 Kusen
2 Daun Pintu P1
3 Daun Pintu P2
4 Daun Pintu P3

15
10
12
9

Pekerjaan Kunci Penggantung


1 Pekerjaan Pasangan Engsel Pintu 4"
2 Pekerjaan Pasangan Engsel Pintu 3"
4 Pekerjaan Pasangan Kunci KM/WC

44
10
7

Pekerjaan Plafon
1 Pasang rangka metal furing
2 Pasang plafond GRC board
3 List plafond GRC + Finishing
Pekerjaan Sanitasi
1 Floor Drain stainless
2 Kloset Duduk
4 Wastafel + aksesoris
5 Septictank + Resapan
Pengerjaan Pengecatan
1 Cat dinding interior & eksterior
3 Cat plafond

Pekerjaan Lain-lain
1 Railing Tangga Besi hollow

668.54
668.54
372

10
7
4
1

34.3
668.54

11

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


Pekerjaan Plumbing
1 Instalasi Pipa Air bersih dia. 1/2"
2 Instalasi Pipa Air Bekas dia. 2"
3 Instalasi Pipa Kotoran Padat dia. 4"

95
98
100

Pekerjaan Elektrikal
1 Instalasi Lampu

288

No.

URAIAN PEKERJAAN

VOLUME

2 Instalasi Stop kontak


3 Lampu TL 36 watt
4 Lampu Downlight 4"+ SL 18 watt
7 Stop Kontak
8 Pemasangan Box MCB
9 Penangkal Petir

II
A

III
A

LANTAI 2
PEKERJAAN STRUKTUR
Pekerjaan Beton Bertulang
1 Kolom 50x50
2 Kolom 15/15
3 Balok 30/60
4 Balok 20/40
5 Plat Lantai

PEKERJAAN ARSITEKTUR
Pekerjaan Pasangan dan Plesteran
1 Pasangan Bata 1 : 2
2 Pasangan Bata 1 : 4
3 Plesteran 1 : 2
4 Plesteran 1: 4
5 Kaca

Pekerjaan Penutup Lantai


2 Pasang lantai keramik 20 x 20 untuk km/wc
3 Pasang dinding keramik 20 x 25 untuk km/wc
5 Pasangan Lantai keramik 60x60
Pekerjaan Kusen Daun Pintu dan Jendela Kaca
1 Kusen
2 Daun Pintu P1
3 Daun Pintu P2
4 Daun Pintu P3
Pekerjaan Kunci Penggantung
1 Pekerjaan Pasangan Engsel Pintu 4"
2 Pekerjaan Pasangan Engsel Pintu 3"
4 Pekerjaan Pasangan Kunci KM/WC

27
116
172
17
1
3

30.25
1.50
446.40
12.25
606.5

35.4
188.2
35.4
188.2
262

38.5
63
676

123.8
2
7
4

4
16
4

No.

URAIAN PEKERJAAN

VOLUME

1
E

IV
A

II
A

Pekerjaan Plafon
1 Pasang rangka metal furing
2 Pasang plafond GRC board
3 List plafond GRC + Finishing
Pekerjaan Sanitasi
1 Floor Drain stainless
2 Kloset Duduk
4 Wastafel + aksesoris

763
763
389.5

8
6
6

Pengerjaan Pengecatan
1 Cat dinding interior
3 Cat plafond

223.6
763

Pekerjaan Lain-lain
1 Railing Tangga Besi holo

11

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


Pekerjaan Plumbing
1 Instalasi Pipa Air bersih dia. 1/2"
2 Instalasi Pipa Air Bekas dia. 2"
3 Instalasi Pipa Kotoran Padat dia. 4"

98
100
112

Pekerjaan Elektrikal
1 Instalasi Lampu
2 Instalasi Stop kontak
3 Lampu TL 36 watt
4 Lampu Downlight 4"+ SL 18 watt
7 Stop Kontak
8 Pemasangan Box 4 MCB

260
15
108
152
15
1

LANTAI 3
PEKERJAAN STRUKTUR
Pekerjaan Beton Bertulang
1 Kolom D 40
2 Kolom 15/15
3 Balok 25/40
4 Balok 20/35
5 Balok 40/60
5 Plat Lantai

22.736
3.87
2.1195
14.08
36
25.45

No.

URAIAN PEKERJAAN

VOLUME

1
III
A

IV
IV.A

PEKERJAAN ARSITEKTUR
Pekerjaan Pasangan dan Plesteran
1 Pasangan Bata 1 : 2
2 Pasangan Bata 1 : 4
3 Plesteran 1 : 2
4 Plesteran 1: 4
5 Kaca

36.6
137
36.6
137.7
357

Pekerjaan Penutup Lantai


2 Pasang lantai keramik 20 x 20 untuk km/wc
3 Pasang dinding keramik 20 x 25 untuk km/wc
4 Pasangan Lantai Keramik 60 x 60

38.5
33
726.8

Pekerjaan Kusen Daun Pintu dan Jendela Kaca


1 Kusen
2 Daun Pintu P1
3 Daun Pintu P2
4 Daun Pintu P3

10
6
8
10

Pekerjaan Kunci Penggantung


1 Pekerjaan Pasangan Engsel Pintu 4"
2 Pekerjaan Pasangan Engsel Pintu 3"
4 Pekerjaan Pasangan Kunci KM/WC

12
36
10

Pekerjaan Plafon
1 Pasang rangka metal furing
2 Pasang plafond GRC board
3 List plafond GRC + Finishing
Pekerjaan Sanitasi
1 Floor Drain stainless
2 Roof Drain stainless
3 Kloset Duduk
5 Wastafel + aksesoris

726.8
726.8
350.45

10
8
10
6

Pengerjaan Pengecatan
1 Cat dinding interior
3 Cat plafond

174.3
726.8

Pekerjaan Lain-lain
1 Railing Tangga Besi holo

11

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


Pekerjaan Plumbing

No.
1

IV.B

URAIAN PEKERJAAN
2
1 Instalasi Pipa Air bersih dia. 1/2"
2 Instalasi Pipa Air Bekas dia. 2"
3 Instalasi Pipa Kotoran Padat dia. 4"
Pekerjaan Elektrikal
1 Instalasi Lampu
2 Instalasi Stop kontak
3 Lampu TL 36 watt
4 Lampu Downlight 4"+ SL 18 watt
7 Stop Kontak
8 Pemasangan Box 4 MCB

VOLUME
3
100
110
120

245
21
98
147
21
1

ran Biaya

Center di Samarinda

SAT
4

HARGA SATUAN
(Rp)
5

Ls
M1
M2
M1

JUMLAH HARGA
(Rp)
6

500,000.00
67,540.00
15,000.00
239,020.00

500,000.00
13,035,220.00
31,500,000.00
46,130,860.00
91,166,080.00

63,500.00
18,020.00
145,400.00
145,400.00

11,761,470.00
2,821,932.00
3,097,020.00
892,756.00

Buah
M3
M3

305,975.00
1,388,094.60
1,388,094.60

35,493,100.00
3,949,129.14
36,298,673.79

M3
M3
M3
M3
M3
M3

14,314,934.07
19,482,570.88
18,535,223.55
18,868,568.12
24,361,288.00
18,281,651.01

438,036,982.44
8,697,019,642.71
93,417,526.69
495,299,913.16
118,712,556.42
653,569,023.74
10,590,369,726.09

130,205.00
248,460.00
57,991.20
52,772.00
2,800,000.00

1,992,136.50
4,720,740.00
887,265.36
1,002,668.00
674,800,000.00

Jumlah

M3
M3
M3
M3

JUMLAH

M2
M2
M2
M2
M2

SAT
4

HARGA SATUAN
(Rp)
5

JUMLAH HARGA
(Rp)
6

M2
M2
M2

215,975.00
202,347.50
526,600.00

8,315,037.50
9,985,849.13
299,108,800.00

M1
BH
BH
BH

241,472.90
2,000,000.00
1,200,000.00
700,000.00

3,622,093.50
20,000,000.00
14,400,000.00
6,300,000.00

BH
BH
BH

52,810.00
38,900.00
152,750.00

2,323,640.00
389,000.00
1,069,250.00

M2
M2
M1

135,260.00
30,571.00
48,345.00

90,426,720.40
20,437,936.34
17,984,340.00

BH
BH
BH
BH

37,200.00
2,410,343.00
572,270.00
4,300,000.00

372,000.00
16,872,401.00
2,289,080.00
4,300,000.00

M2
M2

29,750.00
23,770.00

1,020,425.00
15,891,195.80

M1

543,700.00

5,980,700.00
1,224,491,278.53

M1
M1
M1

21,815.75
25,449.88
47,274.00

2,072,496.25
2,494,087.75
4,727,400.00

Titik

143,628.25

41,364,936.00

JUMLAH

HARGA SATUAN
(Rp)
5
150,478.25
91,400.00
53,400.00
35,400.00
267,400.00
7,509,400.00
JUMLAH

JUMLAH HARGA
(Rp)
6
4,062,912.75
10,602,400.00
9,184,800.00
601,800.00
267,400.00
22,528,200.00
97,906,432.75

18,868,568.12
24,361,288.00
23,730,094.00
20,199,310.00
18,281,651.01

570,774,185.64
36,541,932.00
10,593,113,961.60
247,441,547.50
11,087,821,339.84
22,535,692,966.58

M2
M2
M2
M2
M2

130,205.00
248,460.00
57,991.20
52,772.00
2,800,000.00

4,609,257.00
46,760,172.00
2,052,888.48
9,931,690.40
733,600,000.00

M2
M2
M2

215,975.00
202,347.50
526,600.00

8,315,037.50
12,747,892.50
355,981,600.00

M1
M2
M2
M2

241,472.90
1,367,618.05
1,036,888.00
1,036,888.00

29,894,345.02
2,735,236.10
7,258,216.00
4,147,552.00

BH
BH
BH

52,810.00
38,900.00
152,750.00

211,240.00
622,400.00
611,000.00

SAT
4
Titik
BH
BH
BH
Unit
Unit

M3
M3
M3
M3
M3
Jumlah

SAT
4

HARGA SATUAN
(Rp)
5

JUMLAH HARGA
(Rp)
6

M2
M2
M1

135,260.00
30,571.00
48,345.00

103,203,380.00
23,325,673.00
18,830,377.50

BH
BH
BH

37,200.00
2,410,343.00
572,270.00

297,600.00
14,462,058.00
3,433,620.00

M2
M2

29,750.00
23,770.00

6,652,100.00
18,136,510.00

M1

543,700.00

5,980,700.00
1,413,800,545.50

M1
M1
M1

21,815.75
25,449.88
47,274.00

2,137,943.50
2,544,987.50
5,294,688.00

Titik
Titik
BH
BH
BH
Unit

143,628.25
150,478.25
91,400.00
53,400.00
35,400.00
267,400.00

37,343,345.00
2,257,173.75
9,871,200.00
8,116,800.00
531,000.00
267,400.00
68,364,537.75

18,868,568.12
24,361,288.00
23,730,094.00
20,199,310.00
18,917,078.66
18,281,651.01

428,995,764.78
94,278,184.56
50,295,934.23
284,406,284.80
681,014,831.76
465,268,018.30
2,004,259,018.43

JUMLAH

JUMLAH

M3
M3
M3
M3
M3
M3
JUMLAH

SAT
4

HARGA SATUAN
(Rp)
5

JUMLAH HARGA
(Rp)
6

M2
M2
M2
M2
M2

130,205.00
248,460.00
57,991.20
52,772.00
2,800,000.00

4,765,503.00
34,039,020.00
2,122,477.92
7,266,704.40
999,600,000.00

M2
M2
M2

57,991.20
52,772.00
189,768.00

2,232,661.20
1,741,476.00
137,923,382.40

M1
M2
M2
M2

202,347.50
1,367,618.05
1,036,888.00
1,036,888.00

2,023,475.00
8,205,708.30
8,295,104.00
10,368,880.00

BH
BH
BH

52,810.00
38,900.00
152,750.00

633,720.00
1,400,400.00
1,527,500.00

M2
M2
M1

135,260.00
30,571.00
135,260.00

98,306,968.00
22,219,002.80
47,401,867.00

BH
BH
BH
BH

37,200.00
37,200.00
2,410,343.00
572,270.00

372,000.00
297,600.00
24,103,430.00
3,433,620.00

M2
M2

29,750.00
23,770.00

5,185,425.00
17,276,036.00

M1

543,700.00

5,980,700.00
1,446,722,661.02

JUMLAH

SAT
4
M1
M1
M1

HARGA SATUAN
(Rp)
5
21,815.75
25,449.88
47,274.00

JUMLAH HARGA
(Rp)
6
2,181,575.00
2,799,486.25
5,672,880.00

143,628.25
150,478.25
91,400.00
53,400.00
35,400.00
267,400.00

35,188,921.25
3,160,043.25
8,957,200.00
7,849,800.00
743,400.00
267,400.00
66,820,705.75

Titik
Titik
BH
BH
BH
Unit
JUMLAH

Samarinda, Agustus 2015


Dibuat Oleh :
Nama Mahasiswa

BAYU AJI SETIAWAN


12 619 004

P
Bowplank
P. Lokasi
P. Seng

L
37
37
37

P
GT. Footplat
UT. Pondasi FT
UP. B Lantai
UP. Footplat

JUMLAH

TOTAL

22
22
22

L
1.4

118
814
118

T
1.4

1.4
P

Area

JUMLAH

1.65
1.2
476

0.1
0.05

1.4
L

Area

Area

Pancang Mini Pile


pancang ulin
P. BT

TOTAL
39 126.126
39
46.8
47.6
39
3.822

JUMLAH

TOTAL
39

#REF!
0.48
P

Pondasi Footplat
sloof 30/40
sloof 20/30
Kolom D
KOLOM 15/15
PLAT LANTAI

1.3

1.3

0.2

0.3

Area

JUMLAH

0.3
0.12
4
4
0.1

0.196
0.0225
476

Area
4
4

156
119
238.97 114.7056
TOTAL
39
19.773
164.67 19.7604
68.5
4.11
35
27.44
30
2.7
47.6

JUMLAH
TOTAL
68.5
274
38
152
274
548
152
304
119.47
477.88

L. 20x20
L. 20x25
L. Parkit

Area
1.6

Engsel 4
Engsel 3
K. WC

JUMLAH

TOTAL

37
50
239.4

37
80
239.4

Area

JUMLAH

TOTAL

Area

JUMLAH

TOTAL
14
18
18

#REF!

42
54
18

P
kolom
kolom 15
balok 15/30
balok 20/40
plat lantai

Area
4
4

0.15
0.2

0.3
0.4

JUMLAH

0.196
0.0225
47.5
198

0.1

Area

TOTAL
35
27.44
60
5.4
2.1375
15.84
515
51.5

JUMLAH

4
4

TOTAL
80
54

Area

JUMLAH

320
216

TOTAL

52
96
130
P

Area

52
96
130
JUMLAH

TOTAL

L
0.15
0.15
0.2
0.4

T
0.15
0.3
0.4
0.6

Area

JUMLAH

4
4

0.196

0.1

514

TOTAL
29
22.736
43
3.87
47.1
2.1195
176
14.08
150
36
51.4

Area

JUMLAH
TOTAL
43.25
173
37.5
150

Area

JUMLAH

4
4

TOTAL

LUAS M2
B.2
B.1
Sloof 20/30
B.1
B.2
B.1
B.2

213
263

44
24.5
164.8
164.67

LUAS M1
60.67
58.8

26
32

P1
P2
P3

5.9
5.8
5.7

59
69.6
51.3

P1
P2
P3

5.9
5.8
5.7

11.8
40.6
22.8

P1
P2
P3

5.9
5.8
5.7

35.4
46.4
57

DAFTAR ANALISA DAN UPAH


TUGAS AKHIR
: Pembangunan Martial Arts Center
: JL. A.W.Syahranie
: 2015

PROGRAM
PEKERJAAN
LOKASI

TAHUN ANGGARAN

URAIAN PEKERJAAN DAN


ANALISA
2

NO
1
1

PEKERJAAN PERSIAPAN

Pengukuran dan Pemasangan Bouwplank


0.0120
M3
Kayu meranti 5/7
0.0070
M3
Papan Meranti
0.0200
Kg
Paku biasa 1" - 3,5"
0.1000
Oh
Pekerja
0.1000
Oh
Tukang Kayu
0.0100
Oh
Kepala Tukang
0.0050
Oh
Mandor

SATUAN
(Rp)
3
M'
2,450,000.00
2,700,000.00
17,000.00
80,000.00
90,000.00
120,000.00
140,000.00
Jumlah

Pembersihan Lokasi
0.1000
OH
0.0500
OH

M2
80,000.00
140,000.00

Pekerja
Mandor
Jumlah

Pagar Sementara dari Seng gelombang tinggi 2 meter


1.2000
Lbr
Seng Gelombang BJLS 20
0.0720
M
Kayu 5/7
0.0600
Kg
Paku biasa 2" - 5"
0.4000
OH
Pekerja
0.2000
OH
Tukang Kayu
0.0200
OH
Kepala Tukang
0.0200
OH
Mandor

PEKERJAAN TANAH

Galian Tanah Biasa sedalam 1 M


0.7500
OH
Pekerja
0.0250
OH
Mandor

Urugan Kembali
0.1920
0.0190

M1
32,000.00
2,450,000.00
17,000.00
80,000.00
90,000.00
120,000.00
140,000.00
Jumlah
M3
80,000.00
140,000.00
Jumlah

OH
OH

M3
80,000.00
140,000.00

Pekerja
Mandor
Jumlah

Urugan Pasir
1.2000
0.3000
0.0100

M3
OH
OH

M3
100,000.00
80,000.00
140,000.00

Pasir Urug (Mahakam)


Pekerja
Mandor
Jumlah

Urugan Tanah dan Pemadatan


1.2000
M3
Tanah Urug
0.3000
OH
Pekerja
0.0100
OH
Mandor

M3
85,000.00
80,000.00
140,000.00
Jumlah

URAIAN PEKERJAAN DAN


ANALISA
2

NO
1
3

PEKERJAAN PONDASI

Pasangan Pondasi Batu Gunung Camp. 1 : 4


1.2000
M3
Batu gunung
163.0000
Kg
Semen
0.5200
M3
Pasir Pasang (Tenggarong)
1.5000
OH
Pekerja Biasa
0.7500
OH
Tukang Batu
0.0750
OH
Kepala Tukang
0.0750
OH
Mandor

SATUAN
(Rp)
3
M3
200,000.00
1,300.00
165,000.00
80,000.00
90,000.00
120,000.00
140,000.00
Jumlah

Pasangan Anstamping
1.2000
M3
0.4320
M3
0.7800
OH
0.3900
OH
0.0390
OH
0.0390
OH

M3
200,000.00
165,000.00
80,000.00
90,000.00
120,000.00
120,000.00

Batu gunung
Pasir Pasang (Tenggarong)
Pekerja Biasa
Tukang Batu
Kepala Tukang
Mandor
Jumlah

Pemancangan Mini Pile 25 x 25 cm


1.0000
M3
Mini Pile 25 x 25 cm
1.0000
LS
Upah Pemancangan

M'
205,975.00
100,000.00
Jumlah

Pekerjaan Water profing


1.1000
Kg
0.0300
OH
0.0500
OH
0.0400
OH
0.0260
OH

M2
65,000.00
85,000.00
115,000.00
126,000.00
138,000.00

Water profing
Pekerja Biasa
Tukang
Kepala Tukang
Mandor
Jumlah

PEKERJAAN DINDING DAN PASANGAN

Pas. Batu Bata Tebal 1/2 Bata 1 : 2


18.9500
Kg
Semen Portland 50 Kg
70.0000
Bh
Batu Bata Merah
0.0380
M3
Pasir Pasang (Tenggarong)
0.3000
OH
Pekerja Biasa
0.1000
OH
Tukang Batu
0.0100
OH
Kepala Tukang
0.0150
OH
Mandor

M2
1,300.00
900.00
165,000.00
80,000.00
90,000.00
120,000.00
140,000.00
Jumlah

Pas. Batu Bata Tebal 1/2 Bata 1 : 4


11.5000
Kg
Semen Portland 50 Kg
70.0000
Bh
Batu Bata Merah
0.0430
M3
Pasir Pasang (Tenggarong)
0.3000
OH
Pekerja Biasa
0.1000
OH
Tukang Batu
0.0100
OH
Kepala Tukang
0.0150
OH
Mandor

Pas. Batu Bata Tebal 1 Bata 1 : 4


26.5500
Kg
Semen Portland 50 Kg
140.0000
Bh
Batu Bata Merah

M2
1,300.00
900.00
165,000.00
80,000.00
90,000.00
120,000.00
140,000.00
Jumlah
M2
1,300.00
900.00

URAIAN PEKERJAAN DAN


ANALISA
2

NO
1
0.0930
0.6000
0.2000
0.0200
0.0300

M3
OH
OH
OH
OH

SATUAN
(Rp)
3

Pasir Pasang (Tenggarong)


Pekerja Biasa
Tukang Batu
Kepala Tukang
Mandor

165,000.00
80,000.00
90,000.00
120,000.00
140,000.00
Jumlah

PEKERJAAN PLESTERAN

Plesteran Tebal 15 mm Camp. 1 : 2


10.2240
Kg
Semen Portland 50 Kg
0.0200
M3
Pasir Pasang (Tenggarong)
0.3000
OH
Pekerja Biasa
0.1500
OH
Tukang Batu
0.0150
OH
Kepala Tukang
0.0150
OH
Mandor

M2
1,300.00
165,000.00
80,000.00
90,000.00
120,000.00
140,000.00
Jumlah

Plesteran Tebal 15 mm Camp. 1 : 4


6.2400
Kg
Semen Portland 50 Kg
0.0240
0.3000
0.1500
0.0150
0.0100

M3
OH
OH
OH
OH

M2
1,300.00

Pasir Pasang (Tenggarong)


Pekerja Biasa
Tukang Batu
Kepala Tukang
Mandor

165,000.00
80,000.00
90,000.00
120,000.00
140,000.00
Jumlah

Acian
3.2500
0.2000
0.1000
0.0100
0.0100

Kg
OH
OH
OH
OH

M2
1,300.00
80,000.00
90,000.00
120,000.00
140,000.00

Semen Portland 50 Kg
Pekerja Biasa
Tukang batu
Kepala Tukang
Mandor

PEKERJAAN ORNAMENT DINDING

1 M2 Pasangan Alluminium Komposit Panel


1.100 M2
Alluminium Composit Panel
0.100 HRG
Perekat+Peralatan Bantu (35%)
1.000 Ls
Upah Pemasangan

864,600.00
302,610.00
200,000.00
Jumlah

PEKERJAAN KAYU

Pemacangan kayu ulin 10/10 - 2 M + sunduk ulin 5/10


0.0400
M3
Kayu Ulin Balok
0.0025
M3
Sunduk ulin 5/10 - 50 cm
1.0000
Ls
Peralatan pancang
Pekerja
0.0650
OH
Kepala tukang
0.1625
OH
Tukang kayu
0.0163
OH
Mandor
0.0325
OH

Ttk
3,750,000.00
3,750,000.00
50,000.00
80,000.00
90,000.00
120,000.00
140,000.00
Jumlah

1 M Memasang Kalang Ulin 2 x 2/20 cm


1.1000 M
Papan Ulin 2/20 cm
0.1000 kg
Paku Ulin
0.1000 OH
Pekerja Biasa
0.2500 OH
Mandor

M3
4,000,000.00
25,000.00
80,000.00
140,000.00

URAIAN PEKERJAAN DAN


ANALISA
2

NO
1

SATUAN
(Rp)
3
Jumlah

Listplank 2x20 + Finishing


0.0200
0.1000
1.0000
0.1000
0.2000
0.0250
0.0050

M
Kg
M2
OH
OH
OH
OH

M2
4,200,000.00
17,000.00
44,145.00
80,000.00
90,000.00
120,000.00
140,000.00

papan kayu bengkirai


Paku biasa 2" - 5"
Pengecatan Bidang Kayu baru
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Jumlah

PEKERJAAN ALLUMINIUM

Pasang 1 M kusen pintu/jendela alluminium


1.1000
M3
Profil alluminium
2.0000
Kg
Skrup fixer
0.0600
Ltr
Sealant
0.0430
Oh
Pekerja
0.0430
Oh
Tukang Khusus Alluminium
0.0043
0.0021

Oh
Oh

M1
200,000.00
5,500.00
39,215.00
80,000.00
90,000.00

Kepala Tukang
Mandor

120,000.00
140,000.00
Jumlah

Pasang 1 M2 Daun Pintu Kaca Rangka alluminium


4.4000
M2
Profil Alluminium
4.5000
M2
Kaca Bening 5mm
0.2700
Ltr
Sealant
0.0850
Oh
Pekerja
0.0850
Oh
Tukang Khusus Alluminium / Kaca
0.0090
Oh
Kepala Tukang
0.0050
Oh
Mandor

M2
200,000.00
102,400.00
39,215.00
80,000.00
90,000.00
120,000.00
140,000.00
Jumlah

Pasang 1 Buah Daun Pintu PVC untuk WC


1.0000
M2
Pintu PVC
0.0850
Oh
Pekerja
0.0850
Oh
Tukang
0.0090
Oh
Kepala Tukang
0.0050
Oh
Mandor

Pasang 1 M2 Daun Jendela Kaca Rangka Alluminium


4.4000
M2
Profil Alluminium
0.7200
M2
Kaca Bening 5mm
0.2700
Ltr
Sealant
0.4400
Oh
Pekerja
0.4400
Oh
Tukang
0.0440
Oh
Kepala Tukang
0.0220
Oh
Mandor

Bh
700,000.00
80,000.00
90,000.00
120,000.00
140,000.00
Jumlah
M2
200,000.00
102,400.00
39,215.00
80,000.00
90,000.00
120,000.00
140,000.00
Jumlah

Pasang 1 M2 Kaca Bening 5mm untuk bouvenlight


1.1000
M2
Kaca Bening 5mm
0.0150
Oh
Pekerja
0.1500
Oh
Tukang
0.0150
Oh
Kepala Tukang
0.0008
Oh
Mandor

M2
102,400.00
80,000.00
90,000.00
120,000.00
140,000.00

URAIAN PEKERJAAN DAN


ANALISA
2

NO
1

SATUAN
(Rp)
3
Jumlah

Pasang 1 M2 kusen pintu geser bahan multiplex 12mm


1.0000
M2
Pintu Geser
0.4400
Oh
Pekerja
0.4400
Oh
Tukang
0.0440
Oh
Kepala Tukang
0.0220
Oh
Mandor

Pasang engsel pintu 4"


1.0000
Bh
0.1250
OH
0.0130
OH

M2
700,000.00
80,000.00
90,000.00
120,000.00
140,000.00
Jumlah
M3
40,000.00
90,000.00
120,000.00

Engsel 4"
Tukang
Kepala Tukang
Jumlah

M3
30,000.00
80,000.00
90,000.00

Pasang engsel jendela 3"


1.0000
0.1000
0.0100

Bh
OH
OH

Engsel 3"
Pekerja
Tukang
Jumlah

Pasang kunci tanam biasa


1.0000
Bh
0.5000
OH
0.0500
OH

M3
150,000.00
80,000.00
90,000.00

Kunci tanam biasa


Pekerja
Tukang
Jumlah

10

Pasang kunci slot km/wc


1.0000
Bh
0.2500
OH
0.0250
OH

M3
130,500.00
80,000.00
90,000.00

kunci slot km/wc


Pekerja
Tukang
Jumlah

11

Pasang grendel pintu


1.0000
Bh
0.1000
OH

M3
20,000.00
80,000.00

Grendel pintu
Pekerja
Jumlah

12

Pasang grendel jendela


1.0000
Bh
0.1000
OH

M3
17,500.00
80,000.00

Grendel jendela
Pekerja
Jumlah

13

Pasang rel pintu geser bagian atas


1.0000
Bh
Rel pintu geser atas
0.1000
OH
Pekerja

14

Pasang rel pintu geser bagian bawah

M3
150,000.00
80,000.00
Jumlah

1.0000
0.1000

Bh
OH

M3
120,000.00
80,000.00

Rel pintu geser bawah


Pekerja
Jumlah

15

1 M2 Pasang Rangka Tangga Besi Hollow


1.0000

M2

1.0000

Ls

Railing Tangga besi Hollow


Alat Bantu (Las)

400,000.00

0.0150

OH

Pekerja

80,000.00

0.9000

OH

Tukang

90,000.00

0.0900

OH

Kepala Tukang

120,000.00

0.0050

OH

Mandor

140,000.00

50,000.00

Jumlah

URAIAN PEKERJAAN DAN


ANALISA
2

NO
1
15

SATUAN
(Rp)
3

1 M2 Pasang Rangka Pagar Besi Hollow


1.0000

M2

1.0000

Ls

Railing Pagar besi Hollow


Alat Bantu (Las)

400,000.00

0.0150

OH

Pekerja

80,000.00

0.9000

OH

Tukang

90,000.00

0.0900

OH

Kepala Tukang

120,000.00

0.0050

OH

Mandor

140,000.00

50,000.00

Jumlah

PEKERJAAN BETON

Beton Cor manual 1 Pc : 3 Ps : 5 Kr ( K-175 )


0.7600
M3
Pasir Beton
326.0000
Kg
Semen Portland 50 Kg
1.0290
M3
Koral Beton
1.6500
OH
Pekerja Biasa
0.2750
OH
Tukang Batu
0.0280
OH
Kepala Tukang
0.0830
OH
Mandor

Beton Cor manual 1 Pc : 2 Ps : 3 Kr ( K-225 )


0.6980
M3
Pasir Beton
371.0000
Kg
Semen Portland 50 Kg
1.0470
M3
Koral Beton
1.6500
OH
Pekerja Biasa
0.2750
OH
Tukang Batu
0.0280
OH
Kepala Tukang
0.0830
OH
Mandor

140,000.00
M3
173,000.00
1,300.00
300,000.00
80,000.00
90,000.00
120,000.00
140,000.00

Jumlah
M3
173,000.00
1,300.00
300,000.00
80,000.00
90,000.00
120,000.00
140,000.00
Jumlah
3

Beton cor readymix dengan mutu K 225


1.0250
M3
Beton readymix K-225
0.5400
Oh
Pekerja
0.0900
Oh
Tukang batu
0.0090
Oh
Kepala Tukang
0.0270
Oh
Mandor
1.0250
M3
Concrete Pump
0.0100
hr
Vibrator
0.1500
ltr
Bensin

M3
2,154,734.54
80,000.00
90,000.00
120,000.00
140,000.00
381,907.19
54,446.15
7,800.00
Jumlah

Beton cor readymix dengan mutu K 300


1.0250
M3
Beton readymix K-300
0.5400
Oh
Pekerja
0.0900
Oh
Tukang batu
0.0090
Oh
Kepala Tukang
0.0270
Oh
Mandor
1.0250
M3
Concrete Pump
0.0100
hr
Vibrator
0.1500
ltr
Bensin

M3
2,173,635.77
80,000.00
90,000.00
120,000.00
140,000.00
381,907.19
54,446.15
7,800.00
Jumlah

Bekisting untuk pondasi


0.0400
M3
0.3000
Kg

Papan Meranti
Paku biasa 1" - 3,5"

M2
2,450,000.00
17,000.00

URAIAN PEKERJAAN DAN


ANALISA
2

NO
1
0.1000
0.5200
0.2600
0.0260
0.0260

Ltr
Oh
Oh
Oh
Oh

SATUAN
(Rp)
3

Minyak begesting
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

25,000.00
80,000.00
90,000.00
120,000.00
140,000.00
Jumlah

Bekisting Sloof/Tie Beam


0.0450
M3
0.3000
Kg
0.1000
Ltr
0.5200
Oh
0.2600
Oh
0.0260
Oh
0.0260
Oh

M2
2,450,000.00
17,000.00
25,000.00
80,000.00
90,000.00
120,000.00
140,000.00

Papan Meranti
Paku biasa 1" - 3,5"
Minyak begesting
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah

URAIAN PEKERJAAN DAN


ANALISA
2

NO
1
7

Bekisting Kolom
0.3500
0.0400
0.0150
2.0000
0.4000
0.2000
0.6600
0.3300
0.0330
0.0330

Lbr
M3
M3
Btg
Kg
Ltr
Oh
Oh
Oh
Oh

SATUAN
(Rp)
3
M2
90,000.00
2,700,000.00
2,450,000.00
10,000.00
17,000.00
25,000.00
80,000.00
90,000.00
120,000.00
140,000.00

Plywood 9mm
Papan Meranti
Kayu meranti
Dolken kayu galam dia. 8 - 10 cm
Paku biasa 1" - 3,5"
Minyak begesting
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah

Bekisting Tangga
0.3500
Lbr
0.0300
M3
0.0150
M3
2.0000
Btg
0.4000
0.1500
0.6600
0.3300
0.0330
0.0330

M2
90,000.00
2,700,000.00
2,450,000.00
10,000.00

Plywood 9mm
Papan Meranti
Kayu meranti
Dolken kayu galam dia. 8 - 10 cm

Kg
Ltr
Oh
Oh
Oh
Oh

Paku biasa 1" - 3,5"


Minyak begesting
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

17,000.00
25,000.00
80,000.00
90,000.00
120,000.00
140,000.00
Jumlah

Bekisting Plat/Dak
0.3500
Lbr
0.0400
M3
0.0150
M3
6.0000
Btg
0.4000
Kg
0.2000
Ltr
0.6600
Oh
0.3300
Oh
0.0330
Oh
0.0330
Oh

M2
90,000.00
2,700,000.00
2,450,000.00
10,000.00
17,000.00
25,000.00
80,000.00
90,000.00
120,000.00
140,000.00

Plywood 9mm
Papan Meranti
Kayu meranti
Dolken kayu galam dia. 8 - 10 cm
Paku biasa 1" - 3,5"
Minyak begesting
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah

10

Bekisting Balok
0.3500
0.0400
0.0180
2.0000
0.4000
0.2000
0.6600
0.3300
0.0330
0.0330

Lbr
M3
M3
Btg
Kg
Ltr
Oh
Oh
Oh
Oh

M2
90,000.00
2,700,000.00
2,450,000.00
10,000.00
17,000.00
25,000.00
80,000.00
90,000.00
120,000.00
140,000.00

Plywood 9mm
Papan Meranti
Kayu meranti
Dolken kayu galam dia. 8 - 10 cm
Paku biasa 1" - 3,5"
Minyak begesting
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah

11

Pembesian Polos
10.5000
0.0150

Kg
Kg

Besi Beton Polos


Kawat Beton/ Bendrat

Kg
9,800.00
20,400.00

URAIAN PEKERJAAN DAN


ANALISA
2

NO
1
0.0070
0.0070
0.0007
0.0004

Oh
Oh
Oh
Oh

SATUAN
(Rp)
3

Pekerja
Tukang besi
Kepala Tukang
Mandor

80,000.00
90,000.00
120,000.00
140,000.00
Jumlah

12

Pembesian Ulir
10.5000
0.0150
0.0070
0.0070
0.0007
0.0004

Kg
Kg
Oh
Oh
Oh
Oh

Kg
10,300.00
20,400.00
80,000.00
90,000.00
120,000.00
140,000.00

Besi Beton Ulir


Kawat Beton/ Bendrat
Pekerja
Tukang besi
Kepala Tukang
Mandor
Jumlah

URAIAN PEKERJAAN DAN


ANALISA
2

NO
1
13

Sloof 25/30 (S1)


1.0000
140.1236
8.0000

M3
Kg
M2

SATUAN
(Rp)
3
M3
2,154,734.00
109,786.00
124,610.00

Beton cor readymix dengan mutu K 225


Pembesian Ulir
Bekisting Sloof/Tie Beam
Jumlah

14

Sloof 15/20 (S2)


1.0000
142.6992
13.3333

M3
Kg
M2

Beton cor readymix dengan mutu K 225


Pembesian Ulir
Bekisting Sloof/Tie Beam

2,154,734.00
109,786.00
124,610.00
Jumlah

15

Kolom D 50 (K1)
1.0000
129.0472
11.6667

M3
Kg
M2

M3
2,173,635.00
109,786.00
216,630.00

Beton cor readymix dengan mutu K 300


Pembesian Ulir
Bekisting Kolom
Jumlah

18

Kolom praktis 15/15 (Kp)


1.0000
M3
173.0000
20.0000

Kg
M2

M3
1,035,710.00

Beton Cor manual 1 Pc : 3 Ps : 5 Kr (K-175)


Pembesian Ulir
Bekisting Kolom

109,786.00
216,630.00
Jumlah

19

Balok 40/60 (B1)


1.0000
135.0000
8.6670

M3
Kg
M2

Beton cor readymix dengan mutu K 225


Pembesian Ulir
Bekisting Balok

2,154,734.00
109,786.00
223,980.00
Jumlah

20

Balok 30/40 (B2)


1.0000
146.0000
9.0000

M3
Kg
M2

M3
2,154,734.00
109,786.00
223,980.00

Beton cor readymix dengan mutu K 225


Pembesian Ulir
Bekisting Balok
Jumlah

21

Balok 15/30 (B3)


1.0000
170.0000
13.0000

M3
Kg
M2

M3
2,154,734.00
109,786.00
223,980.00

Beton cor readymix dengan mutu K 225


Pembesian Ulir
Bekisting Balok
Jumlah

24

Plat lantai tebal 15 cm


1.0000
M3
129.0000
Kg
8.3333
M2

Beton cor readymix dengan mutu K 225


Pembesian Polos
Bekisting Plat/Dak

2,657,932.23
104,536.00
256,630.00
Jumlah

26

Foot Plat 130 x 130 x 30


1.0000
M3
111.0000
Kg
0.4762
M2

Beton cor readymix dengan mutu K 225


Pembesian Polos
Bekisting Footplate/Pile Cap

2,657,932.23
104,536.00
112,360.00
Jumlah

30

Plat tangga beton


1.0000
408.8303
29.7500

M3
Kg
M2

Beton cor readymix dengan mutu K 225


Pembesian Polos
Bekisting Plat Tangga

2,657,932.23
104,536.00
188,380.00
Jumlah

PEKERJAAN PENUTUP ATAP

URAIAN PEKERJAAN DAN


ANALISA
2

NO
1
1

Pamasangan Atap Metal Deck


0.2000
Kg
0.6100
Lbr
0.2000
OH
0.1000
OH
0.0100
OH
0.0010
OH

SATUAN
(Rp)
3
M2
13,200.00
200,000.00
80,000.00
90,000.00
120,000.00
138,000.00

Paku
Atap Metal Deck
Pekerja Biasa
Tukang Kayu
Kepala Tukang
Mandor
Jumlah

Pemasangan Rangka Atap Baja Ringan


1.1500
M2
Baja Ringan
0.0600
OH
Pekerja
0.0600
OH
Tukang Las Konstruksi
0.0600
OH
Kepala Tukang
0.0030
OH
Mandor

M2
125,000.00
80,000.00
90,000.00
120,000.00
140,000.00
Jumlah

9
1

PEKERJAAN LANGIT-LANGIT
Rangka Metal Furing
2.0000
1.6000
4.0000
1.0000
0.3000
0.3100
0.2300
0.0200

M1
M1
Bh
Ls
OH
OH
OH
OH

M2
Furing CR
Furing MR
Furing JC
Kawat Pengggantung
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

10,000.00
8,500.00
1,100.00
15,000.00
80,000.00
90,000.00
120,000.00
138,000.00
Jumlah

Pasang Plafond GRC


0.3640
Lbr
0.1100
Kg
0.0250
Zak
0.0300
Rol
0.1000
Oh
0.0500
Oh
0.0050
Oh
0.0050
Oh

M2
64,000.00
25,300.00
88,000.00
32,400.00
85,000.00
115,000.00
126,000.00
138,000.00

Gypsum GRC (120x240x9) mm


Paku GRC
Kompon
JointTape
Pekerja
Tukang
Kepala Tukang
Mandor
Jumlah

Pasang Plafond Calsium silicate board 6 mm(bebas Asbes)


0.3640
Lbr
Calsium silicate board 6 mm(bebas Asbes)
0.0100
Ktk
Paku Sekrup
0.0250
Zak
Kompon
0.0300
Rol
JointTape
0.1000
Oh
Pekerja
0.0500
Oh
Tukang
0.0050
Oh
Kepala Tukang
0.0050
Oh
Mandor

M2
140,000.00
13,200.00
88,000.00
32,400.00
85,000.00
115,000.00
126,000.00
138,000.00
Jumlah

Pasangan list gypsum


1.0500
M1
0.1500
Kg
0.0600
OH
0.0600
OH

List GRC
Lem GRC
Pekerja Biasa
Tukang Kayu

M1
32,000.00
10,500.00
85,000.00
115,000.00

URAIAN PEKERJAAN DAN


ANALISA
2

NO
1
0.0060
0.0030

OH
OH

SATUAN
(Rp)
3

Kepala Tukang
Mandor

126,000.00
138,000.00
Jumlah

10
1

PEKERJAAN LANTAI DAN DINDING KERAMIK


Pasang Dinding Keramik Uk. 25 x 20 cm
11.0000
Kg
Semen Portland 50 Kg
1.6000
Kg
Semen Warna
0.0215
M3
Pasir Pasang (Tenggarong)
20.0000
Buah
Keramik 25x20 cm
0.6200
OH
Pekerja Biasa
0.3500
OH
Tukang Batu
0.0350
OH
Kepala Tukang
0.0300
OH
Mandor

M2
1,300.00
2,500.00
165,000.00
3,950.00
85,000.00
115,000.00
126,000.00
138,000.00
Jumlah

Pasang Lantai Keramik Uk. 20 x 20 cm (unpolish)


10.4000
Kg
Semen Portland 50 Kg
1.6200
Kg
Semen Warna
0.0450
26.5000
0.7000
0.3500
0.0350
0.0300

M3
Buah
OH
OH
OH
OH

M2
1,300.00
2,500.00

Pasir Pasang (Tenggarong)


Keramik 20x20 cm (unpolish)
Pekerja Biasa
Tukang Batu
Kepala Tukang
Mandor

165,000.00
3,120.00
85,000.00
115,000.00
126,000.00
138,000.00
Jumlah

Pasang Lantai Keramik Uk. 60 x 60 cm (polish)


9.8000
Kg
Semen Portland 50 Kg
1.3000
Kg
Semen Warna
0.0450
M3
Pasir Pasang (Tenggarong)
6.6300
Buah
Keramik 60x60 cm
0.2500
OH
Pekerja Biasa
0.1250
OH
Tukang Batu
0.0130
OH
Kepala Tukang
0.0130
OH
Mandor

M2
1,300.00
2,500.00
165,000.00
19,200.00
85,000.00
115,000.00
126,000.00
138,000.00
Jumlah

Pasang Lantai Keramik Uk. 40 x 40 cm (unpolish)


11.3800
Kg
Semen Portland 50 Kg
1.6500
Kg
Semen Warna
0.0215
M3
Pasir Pasang (Tenggarong)
6.2500
Buah
Keramik 40x40 cm
0.6200
OH
Pekerja Biasa
0.3500
OH
Tukang Batu
0.0350
OH
Kepala Tukang
0.0300
OH
Mandor

Pasang Lapis Batu alam acak


1.0000
M2
11.3800
Kg
0.0215
M3
0.6200
Oh
0.3500
Oh
0.0350
Oh

M2
1,300.00
2,500.00
165,000.00
14,400.00
85,000.00
115,000.00
126,000.00
138,000.00
Jumlah

Batu alam
Semen portland
Pasir pasang
Pekerja
Tukang batu
Kepala Tukang

M2
200,000.00
1,300.00
165,000.00
80,000.00
90,000.00
120,000.00

URAIAN PEKERJAAN DAN


ANALISA
2

NO
1
0.0300

Oh

SATUAN
(Rp)
3

Mandor

140,000.00
Jumlah

11
1

PEKERJAAN CAT-CATAN
Pengecatan Bidang Kayu Baru (1 Lapis Plamir) 1 Lapis Cat Dasar dan 3 Lapis Cat
Penutup
0.1700
Kg
Cat Dasar
0.2000
Kg
Cat Meni
0.2600
Ltr
Cat Kilap
0.1500
Kg
Plamir Kayu
0.0700
OH
Pekerja Biasa
0.0900
OH
Tukang Cat
0.0060
OH
Kepala Tukang
0.0025
OH
Mandor
Jumlah
Pengecatan dinding 2 lapis dengan roll
0.1000
Kg
Plamir Tembok
0.4700
Ltr
Cat tembok ex mowilex
0.0100
Bh
Roll
0.5000
0.0400
0.0300
0.0030
0.0020

Lbr
Oh
Oh
Oh
Oh

Amplas
Pekerja
Tukang Cat
Kepala Tukang
Mandor

M2
25,000.00
30,000.00
45,000.00
49,500.00
80,000.00
90,000.00
120,000.00
140,000.00
M2
35,000.00
38,000.00
20,000.00
3,300.00
80,000.00
90,000.00
120,000.00
140,000.00

Jumlah
3

M2
35,000.00
38,000.00
20,000.00
3,300.00
80,000.00
90,000.00
120,000.00
140,000.00

Pengecatan Plafon 2 lapis dengan roll


0.1000
Kg
Plamir Tembok
0.2400
Ltr
Cat tembok ex mowilex
0.0100
Bh
Roll
0.5000
Lbr
Amplas
0.0600
Oh
Pekerja
0.0400
Oh
Tukang Cat
0.0040
Oh
Kepala Tukang
0.0030
Oh
Mandor
Jumlah

11
1

PEKERJAAN LISTRIK
Titik
13,700.00
4,795.00
80,000.00
140,000.00

Pekerjaan Pasangan Instalasi Lampu


3.5000
0.3500
1.0000
0.1000

M
%
Oh
Oh

Kabel
Kelengkapan harga kabel
Pekerja
Mandor
Jumlah

Titik
13,700.00
4,795.00
80,000.00
140,000.00

Pekerjaan Pasangan Instalasi Stop Kontak


4.0000
0.3500
1.0000
0.1000

M
%
Oh
Oh

Kabel
Kelengkapan harga kabel
Pekerja
Mandor
Jumlah

Titik
82,000.00
80,000.00
140,000.00

Pekerjaan Pasangan Lampu TL 18 Watt


1.0000
0.1000
0.0100

Bh
Oh
Oh

Lampu TL 18 Watt
Pekerja
Mandor
Jumlah

URAIAN PEKERJAAN DAN


ANALISA
2

NO
1
4

SATUAN
(Rp)
3
Titik
44,000.00
80,000.00
140,000.00

Pekerjaan Pasangan Lampu SL 18 Watt


1.0000
0.1000
0.0100

Bh
Oh
Oh

Lampu SL 18 Watt
Pekerja
Mandor
Jumlah

Titik
37,500.00
80,000.00
140,000.00

Pekerjaan Pasangan Lampu SL 13 Watt


1.0000
0.1000
0.0100

Bh
Oh
Oh

Lampu SL 13 Watt
Pekerja
Mandor
Jumlah

Titik
26,000.00
80,000.00
140,000.00

Pekerjaan Pasangan Stop Kontak


1.0000
0.1000
0.0100

Bh
Oh
Oh

Stop kontak
Pekerja
Mandor
Jumlah

Titik
29,900.00
80,000.00
140,000.00

Pekerjaan Pasangan Saklar Tunggal


1.0000

Bh

Saklar Tunggal

0.1000
0.0100

Oh
Oh

Pekerja
Mandor
Jumlah

Titik
35,000.00
80,000.00
140,000.00

Pekerjaan Pasangan Saklar Double


1.0000
0.1000
0.0100

Bh
Oh
Oh

Saklar Double
Pekerja
Mandor
Jumlah

Titik
258,000.00
80,000.00
140,000.00

Pekerjaan Pasangan MCB


1.0000
0.1000
0.0100

M
Oh
Oh

MCB
Pekerja
Mandor
Jumlah

10

Titik
7,500,000.00
80,000.00
140,000.00

Pekerjaan Pasangan Penangkal Petir


1.0000
0.1000
0.0100

M
Oh
Oh

Penangkal petir
Pekerja
Mandor
Jumlah

12
1

PEKERJAAN SANITASI
Memasang Satu Buah Kloset Duduk Porselin
6.0000
Kg
Semen Portland 50 Kg
0.0100
M3
Pasir Pasang (Tenggarong)
1.0000
Bh
Kloset Duduk
1.0000
OH
Pekerja Biasa
1.5000
OH
Tukang Batu
0.3000
OH
Kepala Tukang
0.1600
OH
Mandor

Bh
1,706.00
170,700.00
2,125,000.00
80,000.00
90,000.00
120,000.00
140,000.00
Jumlah

Memasang 1m' Pipa PVC Type AW Diameter 1/2"


1.2000
M'
Pipa PVC 1/2"
0.3500
Bh
Perlengkapan 35 % Harga Pipa
0.0360
OH
Pekerja Biasa
0.0600
OH
Tukang Batu
0.0060
OH
Kepala Tukang

M1
9,500.00
3,325.00
80,000.00
90,000.00
120,000.00

URAIAN PEKERJAAN DAN


ANALISA
2

NO
1
0.0018

OH

SATUAN
(Rp)
3

Mandor

140,000.00
Jumlah

Memasang 1m' Pipa PVC Type AW Diameter 2"


1.2000
M'
Pipa PVC 2"
0.3500
Bh
Perlengkapan 35 % Harga Pipa
0.0540
OH
Pekerja Biasa
0.0900
OH
Tukang Batu
0.0090
OH
Kepala Tukang
0.0027
OH
Mandor

M1
8,750.00
3,062.50
80,000.00
90,000.00
120,000.00
140,000.00
Jumlah

Memasang 1m' Pipa PVC Type AW Diameter 4"


1.2000
M'
Pipa PVC 4"
0.3500
Bh
Perlengkapan 35 % Harga Pipa
0.0810
OH
Pekerja Biasa
0.1350
OH
Tukang Batu
0.0135
OH
Kepala Tukang
0.0041
OH
Mandor

M1
20,000.00
7,000.00
80,000.00
90,000.00
120,000.00
140,000.00
Jumlah

Memasang 1 Buah Floor Drain Stainless


1.0000
Bh
Floor Drain Stainless
0.1000
OH
Tukang Batu
0.0100
OH
Kepala Tukang

Bh
27,000.00
90,000.00
120,000.00
Jumlah

Memasang 1 Buah Roof Drain Stainless


1.0000
Bh
Roof Drain Stainless
0.1000
OH
Tukang Batu
0.0100
OH
Kepala Tukang

Memasang 1 Buah Shower Kloset


1.0000
Bh
Shower Kloset
0.0100
OH
Pekerja Biasa
0.1000
OH
Tukang Batu
0.0100
OH
Kepala Tukang
0.0050
OH
Mandor

Bh
27,000.00
90,000.00
120,000.00
Jumlah
Bh
320,000.00
80,000.00
90,000.00
120,000.00
140,000.00
Jumlah

Memasang 1 Buah Wastafel + aksesoris


6.0000
Kg
Semen Portland 50 Kg
0.0100
M3
Pasir Pasang (Tenggarong)
1.0000
Bh
Wastafel + aksesoris
0.1200
Bh
Perlengkapan 12 % Harga wastafel
1.2000
OH
Pekerja Biasa
1.4500
OH
Tukang Batu
0.1500
OH
Kepala Tukang
0.1000
OH
Mandor

Bh
1,300.00
165,000.00
300,000.00
36,000.00
80,000.00
90,000.00
120,000.00
140,000.00
Jumlah

NO
1

URAIAN PEKERJAAN DAN


ANALISA
2

SATUAN
(Rp)
3

N UPAH

UPAH
(Rp)
4

BAHAN
(Rp)
5

JUMLAH
(Rp)
6

29,400.00
18,900.00
340.00
8,000.00
9,000.00
1,200.00
700.00
18,900.00

48,640.00

8,000.00
7,000.00
15,000.00

67,540.00

15,000.00
38,400.00
176,400.00
1,020.00

32,000.00
18,000.00
2,400.00
2,800.00
23,200.00

215,820.00

239,020.00

60,000.00
3,500.00
63,500.00

63,500.00

15,360.00
2,660.00
18,020.00

18,020.00
120,000.00

24,000.00
1,400.00
25,400.00

120,000.00

145,400.00

102,000.00
24,000.00
1,400.00
25,400.00

102,000.00

127,400.00

UPAH
(Rp)
4

BAHAN
(Rp)
5

JUMLAH
(Rp)
6

240,000.00
211,900.00
85,800.00
120,000.00
67,500.00
9,000.00
10,500.00
207,000.00

537,700.00

744,700.00

240,000.00
71,280.00
62,400.00
35,100.00
4,680.00
4,680.00
106,860.00

311,280.00

418,140.00

205,975.00
100,000.00
305,975.00

305,975.00

71,500.00
2,550.00
5,750.00
5,040.00
3,588.00
16,928.00

71,500.00

88,428.00

24,635.00
63,000.00
6,270.00
24,000.00
9,000.00
1,200.00
2,100.00
36,300.00

93,905.00

130,205.00

14,950.00
63,000.00
7,095.00
24,000.00
9,000.00
1,200.00
2,100.00
36,300.00

85,045.00
34,515.00
126,000.00

121,345.00

UPAH
(Rp)
4

BAHAN
(Rp)
5

JUMLAH
(Rp)
6

15,345.00
48,000.00
18,000.00
2,400.00
4,200.00
72,600.00

175,860.00

248,460.00

13,291.20
3,300.00
24,000.00
13,500.00
1,800.00
2,100.00
41,400.00

16,591.20

57,991.20

8,112.00
3,960.00
24,000.00
13,500.00
1,800.00
1,400.00
40,700.00

12,072.00

52,772.00

4,225.00
16,000.00
9,000.00
1,200.00
1,400.00
27,600.00

4,225.00

31,825.00

951,060.00
30,261.00
200,000.00
200,000.00

981,321.00

1,181,321.00

150,000.00
9,375.00
50,000.00
5,200.00
14,625.00
1,950.00
4,550.00
26,325.00

209,375.00
4,400,000.00

2,500.00
8,000.00
35,000.00

235,700.00

UPAH
(Rp)
4
45,500.00

BAHAN
(Rp)
5
4,400,000.00

JUMLAH
(Rp)
6
4,445,500.00

84,000.00
1,700.00
44,145.00
8,000.00
18,000.00
3,000.00
700.00
29,700.00

129,845.00

159,545.00

220,000.00
11,000.00
2,352.90
3,440.00
3,870.00
516.00
294.00
8,120.00

233,352.90

241,472.90

880,000.00
460,800.00
10,588.05
6,800.00
7,650.00
1,080.00
700.00
16,230.00

1,351,388.05

1,367,618.05

700,000.00
6,800.00
7,650.00
1,080.00
700.00
16,230.00

700,000.00

716,230.00

880,000.00
73,728.00
35,200.00
39,600.00
5,280.00
3,080.00
83,160.00

953,728.00
112,640.00

1,200.00
13,500.00
1,800.00
112.00

1,036,888.00

UPAH
(Rp)
4
16,612.00

BAHAN
(Rp)
5
112,640.00

JUMLAH
(Rp)
6
129,252.00

700,000.00
35,200.00
39,600.00
5,280.00
3,080.00
83,160.00

700,000.00

783,160.00

40,000.00
11,250.00
1,560.00
12,810.00

40,000.00

52,810.00

30,000.00
8,000.00
900.00
8,900.00

30,000.00

38,900.00

150,000.00
40,000.00
4,500.00
44,500.00

150,000.00

194,500.00

130,500.00
20,000.00
2,250.00
22,250.00

130,500.00

152,750.00

20,000.00
8,000.00
8,000.00

20,000.00

28,000.00

17,500.00
8,000.00
8,000.00

17,500.00

25,500.00

150,000.00
8,000.00
8,000.00

150,000.00

158,000.00

120,000.00
8,000.00
8,000.00

120,000.00

128,000.00

400,000.00
50,000.00
1,200.00
81,000.00
10,800.00
700.00
93,700.00

450,000.00

543,700.00

UPAH
(Rp)
4

BAHAN
(Rp)
5

JUMLAH
(Rp)
6

400,000.00
50,000.00
1,200.00
81,000.00
10,800.00
700.00
93,700.00

450,000.00

543,700.00

131,480.00
423,800.00
308,700.00
132,000.00
24,750.00
3,360.00
11,620.00
171,730.00

863,980.00

1,035,710.00

120,754.00
482,300.00
314,100.00
132,000.00
24,750.00
3,360.00
11,620.00
171,730.00

917,154.00

1,088,884.00

2,208,602.90
43,200.00
8,100.00
1,080.00
3,780.00

56,160.00

391,454.87
544.46
1,170.00
2,601,772.23

2,657,932.23

2,227,976.66
43,200.00
8,100.00
1,080.00
3,780.00

56,160.00

391,454.87
544.46
1,170.00
2,621,146.00
98,000.00
5,100.00

2,677,306.00

UPAH
(Rp)
4

BAHAN
(Rp)
5

JUMLAH
(Rp)
6

2,500.00
41,600.00
23,400.00
3,120.00
3,640.00
6,760.00

105,600.00

112,360.00

110,250.00
5,100.00
2,500.00
41,600.00
23,400.00
3,120.00
3,640.00
6,760.00

117,850.00

124,610.00

UPAH
(Rp)
4

BAHAN
(Rp)
5

JUMLAH
(Rp)
6

31,500.00
108,000.00
36,750.00
20,000.00
6,800.00
5,000.00
52,800.00
29,700.00
3,960.00
4,620.00
8,580.00

208,050.00

216,630.00

31,500.00
81,000.00
36,750.00
20,000.00
6,800.00
3,750.00
52,800.00
29,700.00
3,960.00
4,620.00
8,580.00

179,800.00

188,380.00

31,500.00
108,000.00
36,750.00
60,000.00
6,800.00
5,000.00
52,800.00
29,700.00
3,960.00
4,620.00
8,580.00

248,050.00

256,630.00

31,500.00
108,000.00
44,100.00
20,000.00
6,800.00
5,000.00
52,800.00
29,700.00
3,960.00
4,620.00
8,580.00

215,400.00
102,900.00
306.00

223,980.00

UPAH
(Rp)
4
560.00
630.00
84.00
56.00
1,330.00

BAHAN
(Rp)
5

103,206.00

JUMLAH
(Rp)
6

104,536.00

108,150.00
306.00
560.00
630.00
84.00
56.00
1,330.00

108,456.00

109,786.00

UPAH
(Rp)
4

BAHAN
(Rp)
5

JUMLAH
(Rp)
6
2,154,734.00
15,383,609.55
996,880.00
18,535,223.55
2,154,734.00
15,666,374.37
1,661,462.51
19,482,570.88
2,173,635.00
14,167,575.90
2,527,357.22
18,868,568.12
1,035,710.00
18,992,978.00
4,332,600.00
24,361,288.00
2,154,734.00
14,821,110.00
1,941,234.66
18,917,078.66
2,154,734.00
16,028,756.00
2,015,820.00
20,199,310.00
2,154,734.00
18,663,620.00
2,911,740.00
23,730,094.00
2,657,932.23
13,485,144.00
2,138,574.78
18,281,651.01
2,657,932.23
11,603,496.00
53,505.83
14,314,934.07
2,657,932.23
42,737,482.77
5,604,305.00
50,999,720.00

UPAH
(Rp)
4

BAHAN
(Rp)
5

JUMLAH
(Rp)
6

2,640.00
122,000.00
16,000.00
9,000.00
1,200.00
138.00
26,338.00

124,640.00

150,978.00

143,750.00
4,800.00
5,400.00
7,200.00
420.00
13,020.00

148,550.00

161,570.00

20,000.00
13,600.00
4,400.00
15,000.00
24,000.00
27,900.00
27,600.00
2,760.00
82,260.00

53,000.00

135,260.00

23,296.00
2,783.00
2,200.00
972.00
8,500.00
5,750.00
630.00
690.00
1,320.00

29,251.00

30,571.00

50,960.00
132.00
2,200.00
972.00
8,500.00
5,750.00
630.00
690.00
7,070.00

54,264.00
33,600.00
1,575.00

5,100.00
6,900.00

61,334.00

UPAH
(Rp)
4
756.00
414.00
13,170.00

BAHAN
(Rp)
5

35,175.00

JUMLAH
(Rp)
6

48,345.00

14,300.00
4,000.00
3,547.50
79,000.00
52,700.00
40,250.00
4,410.00
4,140.00
101,500.00

100,847.50

202,347.50

13,520.00
4,050.00
7,425.00
82,680.00
59,500.00
40,250.00
4,410.00
4,140.00
108,300.00

107,675.00

215,975.00

12,740.00
3,250.00
7,425.00
127,296.00
21,250.00
14,375.00
1,638.00
1,794.00
39,057.00

150,711.00

189,768.00

14,794.00
4,125.00
3,547.50
90,000.00
52,700.00
40,250.00
4,410.00
4,140.00
101,500.00

112,466.50
200,000.00
14,794.00
3,547.50

49,600.00
31,500.00
4,200.00

213,966.50

UPAH
(Rp)
4
4,200.00
89,500.00

BAHAN
(Rp)
5
218,341.50

JUMLAH
(Rp)
6
307,841.50

4,250.00
6,000.00
11,700.00
7,425.00
5,600.00
8,100.00
720.00
350.00
14,770.00

29,375.00

44,145.00

3,500.00
17,860.00
200.00
1,650.00
3,200.00
2,700.00
360.00
280.00
6,540.00

23,210.00

29,750.00

3,500.00
9,120.00
200.00
1,650.00
4,800.00
3,600.00
480.00
420.00
9,300.00

14,470.00

23,770.00

47,950.00
1,678.25

80000.00
14000.00
94,000.00

49,628.25

143,628.25

54,800.00
1,678.25

80000.00
14000.00
94,000.00

56,478.25

150,478.25

82,000.00

8000.00
1400.00
9,400.00

82,000.00

91,400.00

UPAH
(Rp)
4

BAHAN
(Rp)
5

JUMLAH
(Rp)
6

44,000.00

8000.00
1400.00
9400.00

44,000.00

53,400.00

37,500.00

8000.00
1400.00
9,400.00

37,500.00

46,900.00

26,000.00

8000.00
1400.00
9,400.00

26,000.00

35,400.00

29,900.00

8000.00
1400.00
9,400.00

29,900.00

39,300.00

35,000.00

8000.00
1400.00
9,400.00

35,000.00

44,400.00

258,000.00

8000.00
1400.00
9,400.00

258,000.00

267,400.00

7,500,000.00

8000
1400
9,400.00

7,500,000.00

7,509,400.00

10,236.00
1,707.00
2,125,000.00
80,000.00
135,000.00
36,000.00
22,400.00
273,400.00

2,136,943.00
11,400.00
1,163.75

2,880.00
5,400.00
720.00

2,410,343.00

UPAH
(Rp)
4

BAHAN
(Rp)
5

252.00
9,252.00

12,563.75

JUMLAH
(Rp)
6
21,815.75

10,500.00
1,071.88
4,320.00
8,100.00
1,080.00
378.00
13,878.00

11,571.88

25,449.88

24,000.00
2,450.00
6,480.00
12,150.00
1,620.00
574.00
20,824.00

26,450.00

47,274.00

27,000.00
9,000.00
1,200.00
10,200.00

27,000.00

37,200.00

27,000.00
9,000.00
1,200.00
10,200.00

27,000.00

37,200.00

320,000.00
800.00
9,000.00
1,200.00
700.00
11,700.00

320,000.00

331,700.00

7,800.00
1,650.00
300,000.00
4,320.00
96,000.00
130,500.00
18,000.00
14,000.00
258,500.00

313,770.00

Samarinda, Agustus 2015


Dibuat Oleh :

572,270.00

UPAH
(Rp)
4

BAHAN
(Rp)
5
Nama Mahasiswa

ACHMAD FARUG
12 619 014

JUMLAH
(Rp)
6

DAFTAR SATUAN UPAH DA


PROGRAM
PEKERJAAN
LOKASI
TAHUN ANGGARAN

No.

:
:
:
:

BAHAN - BAHAN

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

AGREGAT KASAR, BAHAN PEREKAT DAN


BAHAN JADINYA
Batu bata merah
Batu gunung
Pancang mini pile 25 x 25 cm
Batu kerikil lokal
Koral Beton
Pasir urug
Pasir pasang
Pasir beton
Tanah urug pilihan
Semen
Semen warna
Cor beton ready mix K-225
Cor beton ready mix K-300
Batu Alam Acak
Concrete pump
Vibrator
Bensin
Lem Gypsum
Lem kayu
Sealeant
Kompon
Joint Tape
Buis beton diameter 100 cm
Aluminium Composite Panel
Pintu Geser
Pintu PVC

1
2
3

BAHAN FINISHING
Amplas
Thinner A Spesial
Cat dasar kayu

4
5
6
8
9
10
10
11
12
15
16
19

Cat kilap
Plamir tembok / Kayu
Cat tembok ex mowilex
Cat meni
Cat meni besi
Roll
Dempul kayu
Minyak cat kilap
Minyak begesting
Finishing Melamic ducco natural gelap
Finishing Melamic ducco natural terang
Water Proofing

No.

BAHAN - BAHAN

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

BAHAN KAYU DAN BAHAN JADI LAINNYA


Papan Ulin
Papan Meranti
Papan Bengkirai
Kayu Ulin
Kayu Bengkirai
Kayu Kapur
Kayu Meranti
Dolken kayu Galam
Plywood 4 mm
Plywood 9 mm
Multiplek 12 mm
Teakwood
GRC 9 mm
Calsium silicate board 9 mm (bebas Asbes)
Calsium silicate board motif jati (bebas Asbes)
List plafond gypsum + finishing
List Plafond Plywood 5 cm + Finishing

1
2
3
4

BAHAN KERAMIK DAN PELAPIS DINDING


Keramik uk. 25x20 cm (polish)
Keramik uk. 20x20 cm (unpolish)
Keramik uk. 60x60 cm (polish)
Keramik uk. 40x40 cm (unpolish)

1
2
3
4
5
6
7
8
9
10
11
12

BAHAN LOGAM DAN PAKU


Besi beton polos
Besi beton Ulir
Kawat ikat beton
Kawat Penggantung
Paku kayu
Paku ulin
Paku plywood
Paku gypsum
Paku Sekrup
Seng Gelombang BJLS 20
Seng Plat BJLS 20
Railing Pagar besi Hollow

13
14
15
16
17
18
19
20

Railing Tangga besi Hollow


Teralis besi hollow pada main entrance + Finishing
Rangka Metal (untuk dinding)
Rangka Metal Furing CR
Rangka Metal Furing MR
Rangka Metal Furing JC
Alluminium Profil
Skrup fixer

BAHAN KACA
Kaca Bening tbl 5 mm

No.

BAHAN - BAHAN

1
2
3
4
5
8
9
10
11

BAHAN SANITASI
Kloset Duduk
Floor drain stainless
Roof drain stainless
Biological Filter Septicktank
Wastafel + aksesoris
Shower Kloset
Pipa Dia. 1/2"
Pipa Dia. 2"
Pipa Dia. 4"

1
2

BAHAN PENUTUP ATAP


Atap Metal Deck
Rangka Atap Baja ringan

1
2
3
4
5
6
7
8
9

BAHAN PENGGANTUNG DAN KUNCI


Engsel 3 "
Handle Jendela
Engsel 4"
Grandel pintu
Grandel jendela
Kunci pintu tanam
Kunci slot Km/Wc
Rel pintu geser bagian atas
Rel pintu geser bagian bawah

1
2
3
4
5
6
8
9
10
11

BAHAN ELEKTRIKAL
Lampu TL 18 watt
Lampu Downlight 4" + SL 18 watt
Lampu Downlight 3" + SL 13 watt
Saklar tunggal
Saklar double
Stop kontak
Kabel
Perlengkapan Harga kabel
Zekring kast 4 box MCB
Penangkal petir

Bahan / material sepenuhnya menggunaka

No.

1
2
3
4
6
7
8
9
11
12

U RAIAN
DAFTAR UPAH KERJA
Pekerja
Tukang kayu
Tukang batu
Tukang besi
Tukang cat
Kepala Tukang kayu
Kepala Tukang batu
Kepala Tukang besi
Kepala Tukang cat
Mandor

DAFTAR SATUAN UPAH DAN BAHAN


TUGAS AKHIR
Pembangunan Martial Arts Center
JL. A.W.Syahranie
2015

BAHAN - BAHAN

SATUAN

AR, BAHAN PEREKAT DAN


Bh
M3
M1
M3
M3
M3
M3
M3
M3
Kg
Kg
M3
M3
M2
Jam
Jam
Ltr
Kg
Liter
Liter
Zak
Rol
Buah
M2
Unit
Unit

Lbr
Ltr
Kg

mic ducco natural gelap


mic ducco natural terang

Liter
Kg
kg
Kg
Kg
Bh
Kg
Liter
Ltr
M2
M2
Kg

BAHAN - BAHAN

SATUAN

DAN BAHAN JADI LAINNYA

board 9 mm (bebas Asbes)


board motif jati (bebas Asbes)

wood 5 cm + Finishing

M3
M3
M3
M3
M3
M3
M3
Btg
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
M1
M1
M1

MIK DAN PELAPIS DINDING

20 cm (unpolish)

40 cm (unpolish)

Bh
Bh
Bh
Bh

Btg
Btg
Kg
Kg
Kg
Kg
Kg
Kg
Ktk
Lbr
Lbr
M1

ow pada main entrance + Finishing

M1
M1
M1
M1
M1
Bh
Bh
Bh

M2

BAHAN - BAHAN

SATUAN

bh
bh
bh
Unit
Set
Bh
M1
M1
M1

M2
Kg

GANTUNG DAN KUNCI

ht 4" + SL 18 watt
ht 3" + SL 13 watt

bh
bh
bh
bh
bh
bh
bh
M1
M1

bh
bh
bh
bh
bh
bh
Ttk
Ttk
Unit
Unit
Bahan / material sepenuhnya menggunakan kandungan lokal

U RAIAN
DAFTAR UPAH KERJA

SATUAN

1 HARI
1 HARI
1 HARI
1 HARI
1 HARI
1 HARI
1 HARI
1 HARI
1 HARI
1 HARI

N BAHAN

HARGA

900.00
200,000.00
205,975.00
325,000.00
300,000.00
100,000.00
165,000.00
173,000.00
65,000.00
1,300.00
2,500.00
2,154,734.54
2,173,635.77
200,000.00
381,907.19
54,446.15
7,800.00
10,500.00
30,800.00
39,215.00
88,000.00
32,400.00
412,000.00
864,600.00
700,000.00
500,000.00

3,300.00
20,000.00
25,000.00

KETERANGAN

Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Terpasang
Terpasang
Terpasang

Di lokasi
Di lokasi
Di lokasi

45,000.00
35,000.00
38,000.00
30,000.00
35,000.00
20,000.00
66,000.00
12,500.00
25,000.00
150,000.00
150,000.00
65,000.00

Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi

HARGA

4,000,000.00
2,700,000.00
4,200,000.00
3,750,000.00
3,900,000.00
2,500,000.00
2,450,000.00
10,000.00
65,000.00
90,000.00
130,000.00
65,000.00
64,000.00
140,000.00
18,000.00
32,000.00
7,500.00

KETERANGAN

Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Terpasang

3,950.00
3,120.00
19,200.00
14,400.00

Di lokasi
Di lokasi
Di lokasi
Di lokasi

9,800.00
10,300.00
25,000.00
15,000.00
17,000.00
25,000.00
30,000.00
25,300.00
13,200.00
32,000.00
30,700.00
400,000.00

Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Terpasang

400,000.00
75,000.00
20,000.00
10,000.00
8,500.00
1,100.00
200,000.00
5,500.00

Terpasang
Terpasang
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi

102,400.00

Di lokasi

n kandungan lokal

HARGA

KETERANGAN

550,000.00
27,000.00
27,000.00
4,300,000.00
300,000.00
320,000.00
10,000.00
8,750.00
20,000.00

Di lokasi
Di lokasi
Di lokasi
Terpasang
Di lokasi
Di lokasi
Di lokasi
Di lokasi
Di lokasi

200,000.00
125,000.00

Terpasang
Terpasang

30,000.00
20,000.00
40,000.00
20,000.00
17,500.00
150,000.00
130,500.00
150,000.00
120,000.00

Terpasang
Terpasang
Terpasang
Terpasang
Terpasang
Terpasang
Terpasang
Terpasang
Terpasang

82,000.00
44,000.00
37,500.00
29,900.00
35,000.00
26,000.00
13,700.00
4,795.00
258,000.00
7,500,000.00

Terpasang
Terpasang
Terpasang
Terpasang
Terpasang
Terpasang
Terpasang
Terpasang
Terpasang
Terpasang

HARGA

80,000.00
90,000.00
90,000.00
90,000.00
90,000.00
120,000.00
120,000.00
120,000.00
120,000.00
140,000.00

KETERANGAN

Tenaga lokal
Tenaga lokal
Tenaga lokal
Tenaga lokal
Tenaga lokal
Tenaga lokal
Tenaga lokal
Tenaga lokal
Tenaga lokal
Tenaga lokal