Harga awal (P)


Nilai akhir (S)
Umur ekonomis (N)
Jam kerja per tahun (Wt)
Kapasitas kerja (k)
Tingkat Suku Bunga (i)
Persentase Asuransi (i)
Persentase Pajak (Pj)
Nilai tetapan x
Konsumsi bahan bakar (FC)
Daya motor (Pm)
Harga bahan bakar (Fp)
Konsumsi pelumas (OC)
Harga pelumas (Op)
Upah operator (Uop)
Harga ban (Hban)
Umur pakai ban (UPBan)
Nilai tetapan y
Biaya sewa pengolahan tanah

13200000
1320000
10
2500
2
12
5
2
2
0.2
8.9
7500
0.08
25000
13
3000000
5
55
350000

Rp
Rp
tahun
jam/tahun
ha/jam
%
%
%

A/F,12%,10
F/P,12%,0

0.057
1.12

Parameter
Harga awal (P)
Nilai akhir (S)
Umur ekonomis (N)
Jam kerja per tahun (Wt)
Kapasitas kerja (k)
Tingkat Suku Bunga (i)
Persentase Asuransi (i)
Persentase Pajak (Pj)
Nilai tetapan x

Nilai
7000000
700000
5
2
3
12
5
2
2

PARAMETER

l/HP/jam
HP
Rp/l
l/HP/100 jam
Rp/jam
Rp/jam
Rp
tahun
Rp/Ha

Satuan
Rp
Rp
tahun
jam/tahun
ha/jam
%
%
%

Nilai tetapan y

15

A/F,12%,5
F/P,12%,0

0.1574
1.12

BIAYA TETAP
1. BIAYA PENYUSUTAN
2. BIAYA BUNGA MODAL
3. PAJAK
4. BIAYA GARASI

BIAYA TIDAK TETAP


1.BIAYA BAHAN BAKAR(Bb)
2.biaya oli pelumasan
3.BIAYA GREASE
4.BIAYA PERBAIKAN DAN PEMELIUHARAAN
5.BIAYA SUKU CADANG
6.BIAYA OPERATOR
7.BIAYA BAN

BIAYA TOTAL
BIAYA POKOK

BIAYA TETAP
1.BIAYA PENYUSUTAN

2.BIAYA BUNGA MODAL


3.PAJAK
4.BIAYA GARANSI

BIAYA TIDAK TEPAT


1.BIAYA BAHAN BAKAR
2.biaya oli pelumasan
3.BIAYA GREASE

758419.2
363000
264000
132000
1517419.2

33375000
44500000
26700000
659340000
528000
32500
1500000000
2264475500

2265992919.2
1812794.33536

1110614.4
50400000
140000
70000
51720614.4

0
0
0

4.BIAYA
5.BIAYA
6.BIAYA
7.BIAYA

PERBAIKAN DAN PEMELIUHARAAN


SUKU CADANG
OPERATOR
BAN

BIAYA TOTAL
BIAYA POKOK

1512
560000
0
0
561512

52282126.4
78423189.6

SATUAN

Rp /Tahun
Rp /Tahun
Rp /Tahun
Rp /Tahun
Rp /Tahun
Rp /Tahun
Rp /Tahun
Rp /Tahun
Rp /Tahun
Rp /Tahun
Rp /Tahun
Rp /Tahun
Rp /Tahun
Rp /Tahun
Rp /Tahun

ANALISIS PROYEK (mengunakan metode sinking fun

NPV Ca
tahun

biaya (C)
(Rp/Thn)
1 2318275045.6
2 2318275045.6
3 2318275045.6
4 2318275045.6
5 2318275045.6
6 2318275045.6
7 2318275045.6
8 2318275045.6
9 2318275045.6
10 2318275045.6

ngunakan metode sinking fund)


NPV Cara Pertama
Manfaat(B)
(B-C)
(Rp/Thn)
(Rp/Thn)
1750000000
-568275045.6
1750000000
-568275045.6
1750000000
-568275045.6
1750000000
-568275045.6
1750000000
-568275045.6
1750000000
-568275045.6
1750000000
-568275045.6
1750000000
-568275045.6
1750000000
-568275045.6
1750000000
-568275045.6

Nilai Sekarang
DF 12%
(Rp/Thn)
0.892857143 -507388433.57143
0.797193878 -453025387.11735
0.711780248 -404486952.78335
0.635518078 -361149064.98513
0.567426856 -322454522.30815
0.506631121 -287905823.48942
0.452349215 -257058770.9727
0.403883228 -229516759.79705
0.360610025 -204925678.39023
0.321973237 -182969355.70556
NPV
-3210880749.1204

C
2069888433.57143
1848114672.83163
1650102386.45681
1473305702.19358
1315451519.8157
1174510285.54973
1048669897.81226
936312408.760947
835993222.107988
746422519.739275
13098771048.8394
Groos B/C

NPV Cara Kedua


Total B - Total C

1562500000
1395089285.7143
1245615433.6735
1112156637.2085
992996997.50755
886604462.06031
791611126.83956
NPV Cara Kedua
706795648.9639
631067543.71776
563453164.03372
9887890299.719 -3210880749.12035
0.7548716031 < 1, PROYEK TIDAK LAYAK

(B-C)
DF 12%
Nillai Sekarang DF 15%
Nillai Sekarang DF 20%
(Rp/Thn)
-568275045.6 0.892857 -507388433.571 0.869565 -494152213.565 0.833333
-568275045.6 0.797194 -453025387.117 0.756144 -429697577.013 0.694444
-568275045.6 0.71178 -404486952.783 0.657516 -373650066.968 0.578704
-568275045.6 0.635518 -361149064.985 0.571753 -324913101.711 0.482253
-568275045.6 0.567427 -322454522.308 0.497177 -282533131.923 0.401878
-568275045.6 0.506631 -287905823.489 0.432328 -245680984.281 0.334898
-568275045.6 0.452349 -257058770.973 0.375937 -213635638.505 0.279082
-568275045.6 0.403883 -229516759.797 0.326902 -185770120.439 0.232568
-568275045.6 0.36061 -204925678.39 0.284262 -161539235.164 0.193807
-568275045.6 0.321973 -182969355.706 0.247185 -140468900.143 0.161506
JUMLAH
-3210880749.12
-2852040969.71
IRR
0.3884385288 ( i1=12% i2=15% )

Nillai Sekarang
-411793511.304
-298401095.148
-216232677.644
-156690346.119
-113543729.071
-82278064.5445
-59621785.9018
-43204192.6825
-31307386.0018
-22686511.5955
-1435759300.01

Df 1%
0.990099
0.980296
0.97059
0.96098
0.951466
0.942045
0.932718
0.923483
0.91434
0.905287

Nilai Sekarang
-562648560
-557077782.18
-551562160.57
-546101149.08
-540694207.01
-535340799.02
-530040395.07
-524792470.37
-519596505.31
-514451985.46
-5382306014.1
IRR

0.282657