CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR

Level #:

SEPTIC TANK

Page #:

01/01

FOUNDATION BAR BENDING SCHEDULE


S.No
A

Description

Dia

C/C

Mark

No.of Bars

T.Nos

7''

149

149

Cut Length
(Rft)

Total Length
(Rft)

Shape of the Bar

RAFT

2.5"
1 Main bar

3/8''

21.25

3166.25

20'-10''
85'-10''

2.5"
2 Dist. bar

3/8''

8''

32

32

86.25

2760.00

3/8''

8''

32

64

1.67

106.88

3 Top Short bars

3/8''

6''

39

78

7.92

617.76

7'-6''

2.5"

4 Top Long bars

3/8''

7''

14

28

21.25

595.00

20'-10''

2.5"

1/2''

8''

29

58

8.41

487.78

3/8''

6''

13

26

23.17

602.42

Over Lap

1'-8''

B Partition Wall-1

1 Vertical Dowel

1'-8'' 6'-9''
1'-8''

H-Bars

19'-10''

C Columns

6''
3'-1''
1 Vertical Dowel

5/8''

12

5.25

63.00

1'-8''

2 Vertical Dowel

1/2''

12

5.25

63.00

1'-8'' 3'-1''

6''

Rings

3''
1'-9''

6''

3/8''

4''

10

20

5.00

100.00

1 Short side Vertical Dowel

1/2''

8''

30

120

9.41

1129.20

2 H-Bars

3/8''

6''

15

60

23.17

1390.20

3 Long side Vertical Dowel

1/2''

8''

129

516

9.41

4855.56

8'-6'' 1'-8''
1'-8''

4 H-Bars

3/8''

6''

15

60

88.17

5290.20

84'-10''

3/8''

8''

15

120

1.67

200.40

#8

#7

#6

#5

D External Walls

7'-9''
1'-8''
1'-8''

19'-10''
7'-9''

Over Lap

Dia.

#4

#3

Grand Total Length (Rft)

63.000

6,535.540

14,829.110

Weight (Kg/Rft)

0.4725

0.3024

0.1701

Total Weight (Kgs)

29.768

1,976.347

2,522.432

Weight in M.Ton For One Septic Tank:-

______________________

1'-8''
Total Weight

4,528.546
4.5285

_________________________________

CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR
Level #:

SEPTIC TANK

Page #:

01/01

FOUNDATION BAR BENDING SCHEDULE


S.No

Description

KGL Representative

Dia

C/C

Mark

No.of Bars

T.Nos

Cut Length
(Rft)

Total Length
(Rft)

Shape of the Bar

JV CIV-TECH & EPAC Representative

CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR
Level #:

SEPTIC TANK

Page #:

01/01

FOUNDATION BAR BENDING SCHEDULE


S.No

Description

Dia

C/C

Mark

No.of Bars

T.Nos

Cut Length
(Rft)

Total Length
(Rft)

Shape of the Bar

CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR
Level #:

SEPTIC TANK

Page #:

01/01

FOUNDATION BAR BENDING SCHEDULE


S.No

Description

Dia

C/C

Mark

No.of Bars

T.Nos

Cut Length
(Rft)

Total Length
(Rft)

Shape of the Bar

CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR
Level #:

SEPTIC TANK

Page #:

01/01

FOUNDATION BAR BENDING SCHEDULE


S.No

Description

Dia

C/C

Mark

No.of Bars

T.Nos

Cut Length
(Rft)

Total Length
(Rft)

Shape of the Bar

9"

CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR
Level #:

SEPTIC TANK

Page #:

01/01

FOUNDATION BAR BENDING SCHEDULE


S.No
A

Description

Dia

C/C

Mark

No.of Bars

T.Nos

Cut Length
(Rft)

Total Length
(Rft)

Shape of the Bar

RAFT

2.5"
1 Main bar

3/8''

7''

149

149

21.25

3166.25

20'-10''

2 Dist. bar

3/8''

8''

32

32

86.25

2760.00

85'-10''

3/8''

8''

32

64

1.67

106.88

3/8''

6''

39

39

7.92

308.88

7'-6''

2.5"

3/8''

6''

7.92

63.36

7'-6''

2.5"

3/8''

7''

14

14

21.25

297.50

20'-10''

2.5"

3/8''

7''

3.00

24.00

1/2''

8''

29

58

8.41

487.78

3/8''

6''

13

26

23.17

602.42

2.5"

Over Lap

3 Top Short bars


Top Short bars
(Under Column)

4 Top Long bars

Top Long bars (U/Cols)

1'-8''

3'-0''

B Partition Wall-1

1 Vertical Dowel

1'-8'' 6'-9''
1'-8''

H-Bars

19'-10''

C Columns

6''
3'-1''
1 Vertical Dowel

5/8''

12

5.25

1'-8''

63.00

6''
2 Vertical Dowel

Rings

1/2''

12

5.25

63.00

1'-8'' 3'-1''
3''
1'-9''

6''

3/8''

4''

10

20

5.00

100.00

1 Short side Vertical Dowel 1/2''

8''

30

120

9.41

1129.20

2 H-Bars

3/8''

6''

15

60

23.17

1390.20

3 Long side Vertical Dowel

1/2''

8''

129

516

9.41

4855.56

8'-6'' 1'-8''
1'-8''

4 H-Bars

3/8''

6''

15

60

88.17

5290.20

84'-10''

3/8''

8''

15

120

1.67

200.40

#8

#7

#6

#5

D External Walls

7'-9''
1'-8''
1'-8''

19'-10''
7'-9''

Over Lap

Dia.

#4

#3

Grand Total Length (Rft)

63.000

6,535.540

14,310.090

Weight (Kg/Rft)

0.4725

0.3024

0.1701

Total Weight (Kgs)

29.768

1,976.347

2,434.146

Weight in M.Ton For One Septic Tank:-

1'-8''
Total Weight

4,440.261
4.4403

CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR
Level #:

SEPTIC TANK

Page #:

01/01

FOUNDATION BAR BENDING SCHEDULE


S.No

Description

______________________
KGL Representative

Dia

C/C

Mark

No.of Bars

T.Nos

Cut Length
(Rft)

Total Length
(Rft)

Shape of the Bar

_________________________________
JV CIV-TECH & EPAC Representative

CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR
Level #:

SEPTIC TANK

Page #:

01/01

BEAM & WALLS BAR BENDING SCHEDULE


S.No

Description

Dia

C/C

Mark

No.of Bars

T.Nos

Cut Length
(Rft)

Total Length
(Rft)

Shape of the Bar

BEAM

4"
1 Bottom Bars

5/8''

20.5

82.00

19'-10''

2 Top Bars

1/2''

20.50

41.00

19'-10''

Rings

3/8''

9''

26

26

3.50

91.00

3''
1'-0'

4"

6''

B Partition Wall-1

4''
1 Vertical Dowel

1/2''

8''

29

58

6.58

381.64

3/8''

6''

11

22

23.17

509.74

1'-8''
H-Bars

6'-3''

19'-10''

C Partition Wall-2

4'' 10'-9''
Vertical Dowel

1/2''

8''

29

58

11.42

662.36

H-Bars

3/8''

6''

19

38

23.17

880.46

1'-8''

19'-10''

D External Walls

4'' 7'-8''
1 Short side Vertical Dowel 1/2''

8''

29

116

8.00

928.00

1'-8''

19'-10''

2 H-Bars

3/8''

6''

10

40

23.17

926.80

3 Long side Vertical Dowel

1/2''

8''

129

516

8.00

4128.00

8'-6'' 1'-8''
1'-8''

4 H-Bars

3/8''

6''

10

40

88.17

3526.80

84'-10''

3/8''

8''

10

80

1.67

133.60

#8

#7

#6

#5

7'-9''

Over Lap

Dia.

#4

#3

Grand Total Length (Rft)

82.000

6,141.000

6,068.400

Weight (Kg/Rft)

0.4725

0.3024

0.1701

Total Weight (Kgs)

38.745

1,857.038

1,032.235

Weight in M.Ton For One Septic Tank:-

1'-8''

Total Weight

2,928.018
2.9280

CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR
Level #:

SEPTIC TANK

Page #:

01/01

BEAM & WALLS BAR BENDING SCHEDULE


S.No

Description

______________________
KGL Representative

Dia

C/C

Mark

No.of Bars

T.Nos

Cut Length
(Rft)

Total Length
(Rft)

Shape of the Bar

_________________________________
JV CIV-TECH & EPAC Representative

CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR
Level #:

SEPTIC TANK

Page #:

01/01

BEAM & WALLS BAR BENDING SCHEDULE


S.No

Description

Dia

C/C

Mark

No.of Bars

T.Nos

Cut Length
(Rft)

Total Length
(Rft)

Shape of the Bar

CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR
Level #:

SEPTIC TANK

Page #:

01/01

BEAM & WALLS BAR BENDING SCHEDULE


S.No

Description

Dia

C/C

Mark

No.of Bars

T.Nos

Cut Length
(Rft)

Total Length
(Rft)

Shape of the Bar

CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR
Level #:

SEPTIC TANK

Page #:

01/01

BEAM & WALLS BAR BENDING SCHEDULE


S.No

Description

Dia

C/C

Mark

No.of Bars

T.Nos

Cut Length
(Rft)

Total Length
(Rft)

Shape of the Bar

9"

CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHA
Level #:

SEPTIC TANK

Page #:

SLAB BAR BENDING SCHEDULE


S.No

Description

Mark No.of Bars

T.Nos

Cut Length
(Rft)

Total Length

Dia

C/C

(Rft)

1 Main bar (L/4)

1/2''

4''

255

255

19.92

5079.60

2 Dist. bar

1/2''

6''

39

39

84.92

3311.88

3 Over Lap

1/2''

6''

39

78

1.67

130.26

5 Long side

1/2''

6''

10

20

84.83

1696.60

6 Short side

1/2''

6''

14

28

19.83

555.24

1 L-Bars

1/2''

6''

16

48

3.83

183.84

2 O-Bars

1/2''

6''

12

9.92

119.04

#8

#7

#6

#5

SLAB

4 Dist. bar under bent up

B Man Hole

Dia.
Grand Total Length (Rft)
Weight (Kg/Rft)
Total Weight (Kgs)

Weight in M.Ton For One Septic Tank:-

#4
-

0.4725
-

11,076.46
0.3024
3,349.522

#3
0.1701
-

CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHA
Level #:

SEPTIC TANK

Page #:

SLAB BAR BENDING SCHEDULE


S.No

Description

______________________
KGL Representative

Dia

C/C

Mark No.of Bars

T.Nos

Cut Length
(Rft)

Total Length
(Rft)

_____________________________
JV CIV-TECH & EPAC Represen

BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR


01/01
SLAB BAR BENDING SCHEDULE
Shape of the Bar

6"

5'-2"

14'-2''
6"

6'-11"

77'-6''

1'-8''

84'-10''

19'-10''

1'-10''
2'

3''

3'dia

8'-6''
Total Weight

3,349.522
3.3495

BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR


01/01
SLAB BAR BENDING SCHEDULE
Shape of the Bar

_________________________________
JV CIV-TECH & EPAC Representative