NO
SAT
DKI JAKARTA (SK.1.1 Jakg s/d 1.13 Boo, SK.1.16 Tng, 1.17
Thb, 1.18 Srp, JRK 1.1 Cpn dan 1.2 Boo)
JURNAL
JURNAL
TAHUN 2014 TAHUN 2015
A. UPAH TENAGA KERJA / JASA.
1 Mandor
2 Kepala tukang batu / besi / kayu / cat
3 Tukang batu / besi / kayu / cat
4 Pekerja
5 Pelaksana Konstruksi
6 Pelaksana Pengecatan
7 Pengawas
8 Juru Optik / Ukur
9 Operator Mesin
oh
oh
oh
oh
oh
oh
oh
oh
oh
150,382.00
132,928.00
115,457.00
98,019.00
107,988.29
103,253.70
150,382.00
157,901.00
139,574.00
121,230.00
102,920.00
113,387.71
108,416.40
157,901.00
150,382.00
157,901.00
TAHUN
2014
102,300.00
92,427.00
78,543.00
75,000.00
78,501.86
77,097.00
102,300.00
78,543.00
102,300.00
TAHUN 2015
109,800.00
99,073.00
84,316.00
83,300.00
83,901.00
82,259.00
109,800.00
92,086.00
109,800.00
BANTALAN
TBH.36
1PERHITUNGAN HARGA 1 (satu) BATANG BANTALAN KAYU
BANTALAN KAYU BIASA UK. -->
BANTALAN KAYU WESEL UK. -->
Faktor Penyesuaian (a) = 1,030
BANTALAN KAYU JEMBATAN UK. -->
Faktor Penyesuaian (b) = 1,020
*) HA m3
HA m3
HA m3
HA m3
1.Untuk Pemakaian Kayu Kls.II
a. Harga bantalan biasa kayu Kls.II ........
Faktor Penyesuaian (a) = 1,030 = (100+3) % x Rp.192.000,00 --->
b. Harga bantalan wesel kayu Kls.II ........
Faktor Penyesuaian (a) = 1,030 = (100+3) % x Rp.352.000,00 --->
c. Harga bantalan jembatan kayu Kls.II ........
Faktor Penyesuaian (a) = 1,020 = (100+2) % x Rp.256.000,00 --->
Hal 5 dari 401 halaman
BANTALAN
PAPAN
KASAU
KASAU
DAN BAHAN
EL DAN JEMBATAN
AKARTA
BANTEN (SK 1.19 Prp s/d 1.22 SUKABUMI (SK 1.14 Prk dan 1.15
Clg dan JRK 1.3 Rk)
Si)
70,000.00
65,000.00
60,000.00
50,000.00
55,000.00
52,500.00
70,000.00
109,800.00
71,600.00
65,700.00
75,000.00
60,300.00
57,600.00
109,800.00
TAHUN 2014
72,000.00
67,000.00
62,000.00
52,000.00
57,000.00
54,500.00
72,000.00
KET
TAHUN 2015
79,500.00
73,600.00
67,700.00
77,000.00
62,300.00
59,600.00
79,500.00
#REF! = Rp.
#REF! = Rp.
JUMLAH = Rp.
ANALISA
#REF!
+
#REF!
#REF! = Rp.
JUMLAH = Rp.
#REF! +
#REF!
#REF! = Rp.
JUMLAH = Rp.
TOTAL BIAYA /BTG = Rp
#REF! +
#REF!
#REF!
@. Rp
Bahan :
1.00
ls
Analisa Kutami
Alat bantu
@. Rp
Analisa Kutami
50 MUAT DAN BONGKAR BANTALAN BETON
Untuk tiap 1 batang bantalan :
Upah :
0.370 oh
Analisa Kutami
Pekerja
@. Rp
#REF! = Rp.
JUMLAH = Rp.
* Alat bantu: Material/alat kerja yang dipakai untuk memudahkan perkerjaan tersebut
#REF! +
#REF!
Bahan :
10.00
0.312
Analisa Kutami
Contoh:
10.00
0.312
Analisa Kutami
c. Menggeser lengkung
0.02050 oh Mandor
0.78460 oh Pekerja
Analisa Kutami
Jumlah Upah Total
Jumlah Bahan Total
@ Rp
@ Rp
= Rp
JUMLAH = Rp.
#REF!
#REF!
+
#REF!
#REF!
#REF!
+
#REF!
- +
-
#REF! = Rp
#REF!
+
#REF! = Rp
JUMLAH
= Rp.
#REF!
= Rp.
#REF!
= Rp.
#REF!
TOTAL BIAYA /MSP
= Rp
#REF!
- Untuk pengukuran anak panah dan pertinggian sebelum dan sesudah pekerjaan revisi lengkung dapat dilakukan pleh Tenaga Dinas
- Untuk perencanaan perhitungan dan penggambaran geseran lengkung dapat dilakukan oleh Tenaga Dinas
Upah :
0.04000
0.11500
0.01400
0.00490
Analisa Kutami
c. Menggeser lengkung
0.02050
0.78460
Analisa Kutami
@Rp.
@Rp.
@. Rp
@. Rp
#REF! =
#REF! =
JUMLAH =
TOTAL BIAYA /M3 =
Rp
Rp
Rp
Rp
#REF! = Rp.
#REF! = Rp.
JUMLAH = Rp.
#REF!
+
#REF!
#REF!
#REF!
#REF! +
#REF!
Bahan :
0.0500
1.00
kg
ls
@. Rp
@. Rp
#REF! =
#REF! =
JUMLAH =
TOTAL BIAYA /M' =
Rp.
Rp.
Rp.
Rp
@. Rp
@. Rp
#REF! = Rp.
#REF! = Rp.
JUMLAH = Rp.
@. Rp
@. Rp
#REF! = Rp.
#REF! = Rp.
#REF!
+
#REF!
#REF!
kg
ls
Analisa Kutami
#REF!
#REF! +
#REF!
Bahan :
0.0500
1.00
#REF!
+
JUMLAH = Rp.
TOTAL BIAYA /M' = Rp
@. Rp
@. Rp
#REF! = Rp.
#REF! = Rp.
JUMLAH = Rp.
#REF!
#REF!
Analisa Kutami
#REF!
#REF! +
#REF!
Bahan :
0.05
1.00
kg
ls
@. Rp
@. Rp
@. Rp
@. Rp
#REF! =
#REF! =
JUMLAH =
TOTAL BIAYA /M' =
Rp.
Rp.
Rp.
Rp
#REF! = Rp.
#REF! = Rp.
JUMLAH = Rp.
#REF!
0.05
1
+
#REF!
#REF!
#REF!
#REF! +
#REF!
Bahan :
0.05
1.00
kg
ls
@. Rp
@. Rp
#REF! =
#REF! =
JUMLAH =
TOTAL BIAYA /M' =
Rp.
Rp.
Rp.
Rp
#REF!
+
#REF!
#REF!
0.05
1
@. Rp
@. Rp
#REF! = Rp.
#REF! = Rp.
JUMLAH = Rp.
#REF!
#REF! +
#REF!
Bahan :
Bahan :
10.00
1.00
kg
ls
@. Rp
@. Rp
#REF! =
#REF! =
JUMLAH =
TOTAL BIAYA /UNIT =
@. Rp
@. Rp
Rp.
Rp.
Rp.
Rp
#REF! = Rp.
#REF! = Rp.
JUMLAH = Rp.
#REF!
+
#REF!
#REF!
#REF!
#REF! +
#REF!
Bahan :
10.00 kg
1.00
ls
Analisa Kutami
10.0000
1.0000
@. Rp
@. Rp
#REF! =
#REF! =
JUMLAH =
TOTAL BIAYA /UNIT =
@. Rp
@. Rp
Rp.
Rp.
Rp.
Rp
#REF! = Rp.
#REF! = Rp.
#REF!
10.00
+
#REF!
#REF!
#REF!
#REF! +
0.312
Analisa Kutami
JUMLAH
= Rp.
#REF!
Bahan :
Bahan :
10.00 kg
1.00
ls
Analisa Kutami
@. Rp
@. Rp
#REF! =
#REF! =
JUMLAH =
TOTAL BIAYA /UNIT =
@. Rp
@. Rp
Rp.
Rp.
Rp.
Rp
#REF! = Rp.
#REF! = Rp.
JUMLAH = Rp.
#REF!
10.0000
0.312
+
#REF!
#REF!
Analisa Kutami
#REF!
#REF! +
#REF!
Bahan :
10.00
1.00
kg
ls
@. Rp
@. Rp
#REF! =
#REF! =
JUMLAH =
TOTAL BIAYA /UNIT =
Rp.
Rp.
Rp.
Rp
#REF!
+
#REF!
#REF!
10.00
1.00
@. Rp
@. Rp
#REF! = Rp.
#REF! = Rp.
JUMLAH = Rp.
#REF!
#REF! +
#REF!
Bahan :
15.00 kg
1.00
ls
Analisa Kutami
@. Rp
@. Rp
#REF! =
#REF! =
JUMLAH =
TOTAL BIAYA /UNIT =
Rp.
Rp.
Rp.
Rp
@. Rp
@. Rp
#REF! = Rp.
#REF! = Rp.
JUMLAH = Rp.
@. Rp
@. Rp
Rp.
Rp.
Rp.
Rp
#REF!
10.00
+
#REF!
#REF!
Analisa Kutami
#REF!
#REF! +
#REF!
Bahan :
15.0
1.00
kg
ls
#REF! =
#REF! =
JUMLAH =
TOTAL BIAYA /UNIT =
@. Rp
#REF! = Rp.
#REF!
+
#REF!
#REF!
#REF!
0.312
Analisa Kutami
33.30
oh
Pekerja
@. Rp
#REF! = Rp.
= Rp.
JUMLAH
#REF! +
#REF!
Bahan :
15.00 kg
1.00
ls
Analisa Kutami
@. Rp
@. Rp
#REF! =
#REF! =
JUMLAH =
TOTAL BIAYA /UNIT =
Rp.
Rp.
Rp.
Rp
@. Rp
@. Rp
#REF! = Rp.
#REF! = Rp.
JUMLAH = Rp.
@. Rp
@. Rp
Rp.
Rp.
Rp.
Rp
#REF! =
#REF! =
JUMLAH =
TOTAL BIAYA /UNIT =
#REF!
+
#REF!
#REF!
0.312
Analisa Kutami
#REF!
#REF! +
#REF!
#REF!
+
#REF!
#REF!
31.20
Analisa Kutami
Bahan :
15.00
Analisa Kutami
11.
#REF!
#REF! +
#REF!
#REF!
+
#REF!
MENGGANTI BANTALAN B
Upah kerja dihitung untuk :
- Melepas alat penambat d
- Meratakan balas dan me
- Memasang bantalan bet
- Mengecer bantalan beto
- Mengeluarkan bantalan
a. Di lintas bebas untuk 1
Upah :
0.16
0.72
Analisa SNI diambil dar
b. Di emplasemen tidak p
Upah :
0.20
0.80
Analisa SNI diambil dar
c.
@. Rp
@. Rp
#REF! = Rp.
#REF! = Rp.
JUMLAH
= Rp.
#REF!
+
#REF!
Di emplasemen (pada p
Upah :
0.30
1.20
Analisa SNI diambil dar
Mandor
Pekerja
@. Rp
@. Rp
JUMLAH
= Rp.
= Rp.
= Rp.
- +
-
JUMLAH
= Rp.
= Rp.
= Rp.
- +
-
Mandor
Pekerja
@. Rp
@. Rp
alisa Kutami
kg
ls
Kawat Pral
Alat bantu
alisa Kutami
@. Rp
@. Rp
=
=
JUMLAH =
TOTAL BIAYA /BTG =
Rp.
Rp.
Rp.
Rp
- +
-
@. Rp
@. Rp
= Rp.
= Rp.
= Rp.
- +
-
alisa Kutami
oh
oh
Mandor
Pekerja
JUMLAH
kg
ls
Kawat Pral
Alat bantu
@. Rp
@. Rp
=
=
JUMLAH =
TOTAL BIAYA /BTG =
alisa Kutami
Rp.
Rp.
Rp.
Rp
- +
-
@ Rp
@ Rp
@ Rp
=
=
=
JUMLAH =
Rp
Rp
Rp
Rp.
- +
-
oh
oh
oh
oh
Mandor
Tukang kayu
Pekerja
Juru ukur(surveyor)
@
@
@
@
=
=
=
=
JUMLAH =
Rp
Rp
Rp
Rp
Rp.
- +
-
- +
-
Rp
Rp
Rp
Rp
alisa Kutami
enggeser lengkung
oh
Mandor
oh
Pekerja
alisa Kutami
Jumlah Upah Total
Jumlah Bahan Total
@ Rp
@ Rp
=
=
JUMLAH =
=
=
TOTAL BIAYA /MSP =
Rp
Rp
Rp.
Rp.
Rp.
Rp
- +
-
@Rp.
@Rp.
=
=
JUMLAH =
TOTAL BIAYA /M3 =
Rp
Rp
Rp
Rp
- +
-
= Rp.
= Rp.
= Rp.
- +
-
= Rp.
= Rp.
- +
oh
oh
Mandor
Pekerja
@. Rp
@. Rp
JUMLAH
alisa Kutami
kg
Kawat f 5 mm (pengikat)
ls
Alat bantu
@. Rp
@. Rp
JUMLAH = Rp.
TOTAL BIAYA /M' = Rp
alisa Kutami
oh
oh
Mandor
Pekerja
@. Rp
@. Rp
JUMLAH
alisa Kutami
kg
Kawat f 5 mm (pengikat)
ls
Alat bantu
@. Rp
@. Rp
= Rp.
= Rp.
= Rp.
- +
-
= Rp.
= Rp.
- +
JUMLAH = Rp.
TOTAL BIAYA /M' = Rp
alisa Kutami
oh
oh
Mandor
Pekerja
@. Rp
@. Rp
JUMLAH
kg
ls
Kawat f 5 mm (pengikat)
Alat bantu
= Rp.
= Rp.
= Rp.
=
=
JUMLAH =
TOTAL BIAYA /M' =
- +
-
@. Rp
@. Rp
Rp.
Rp.
Rp.
Rp
- +
-
@. Rp
@. Rp
= Rp.
= Rp.
= Rp.
- +
-
oh
oh
Mandor
Pekerja
JUMLAH
kg
ls
Kawat f 5 mm (pengikat)
Alat bantu
@. Rp
@. Rp
=
=
JUMLAH =
TOTAL BIAYA /M' =
Rp.
Rp.
Rp.
Rp
- +
-
Mandor
Pekerja
@. Rp
@. Rp
JUMLAH
kg
ls
Kawat f 5 mm (pengikat)
Alat bantu
= Rp.
= Rp.
= Rp.
=
=
JUMLAH =
TOTAL BIAYA /UNIT =
- +
-
@. Rp
@. Rp
Rp.
Rp.
Rp.
Rp
- +
-
@. Rp
@. Rp
= Rp.
= Rp.
= Rp.
- +
-
= Rp.
= Rp.
- +
Mandor
Pekerja
JUMLAH
kg
Kawat f 5 mm (pengikat)
ls
Alat bantu
@. Rp
@. Rp
JUMLAH = Rp.
TOTAL BIAYA /UNIT = Rp
alisa Kutami
Mandor
Pekerja
@. Rp
@. Rp
= Rp.
= Rp.
- +
JUMLAH
kg
Kawat f 5 mm (pengikat)
ls
Alat bantu
@. Rp
@. Rp
= Rp.
= Rp.
= Rp.
- +
JUMLAH = Rp.
TOTAL BIAYA /UNIT = Rp
alisa Kutami
Mandor
Pekerja
@. Rp
@. Rp
JUMLAH
kg
ls
Kawat 5 mm (pengikat)
Alat bantu
@. Rp
@. Rp
= Rp.
= Rp.
= Rp.
=
=
JUMLAH =
TOTAL BIAYA /UNIT =
Rp.
Rp.
Rp.
Rp
- +
- +
-
Mandor
Pekerja
@. Rp
@. Rp
JUMLAH
alisa Kutami
kg
Kawat f 5 mm (pengikat)
ls
Alat bantu
@. Rp
@. Rp
= Rp.
= Rp.
= Rp.
- +
-
= Rp.
= Rp.
- +
JUMLAH = Rp.
TOTAL BIAYA /UNIT = Rp
alisa Kutami
Mandor
Pekerja
@. Rp
@. Rp
JUMLAH
alisa Kutami
kg
Kawat f 5 mm (pengikat)
ls
Alat bantu
@. Rp
@. Rp
= Rp.
= Rp.
= Rp.
- +
-
= Rp.
= Rp.
- +
JUMLAH = Rp.
TOTAL BIAYA /UNIT = Rp
alisa Kutami
Mandor
@. Rp
= Rp.
oh
Pekerja
@. Rp
JUMLAH
alisa Kutami
kg
Kawat f 5 mm (pengikat)
ls
Alat bantu
@. Rp
@. Rp
= Rp.
= Rp.
- +
-
= Rp.
= Rp.
- +
JUMLAH = Rp.
TOTAL BIAYA /UNIT = Rp
alisa Kutami
Mandor
Pekerja
@. Rp
@. Rp
JUMLAH
alisa Kutami
alisa Kutami
kg
Kawat f 5 mm (pengikat)
ls
Alat bantu
@. Rp
@. Rp
= Rp.
= Rp.
= Rp.
- +
-
= Rp.
= Rp.
- +
JUMLAH = Rp.
TOTAL BIAYA /UNIT = Rp
oh
Mandor
@. Rp
#REF! = Rp.
oh
Pekerja
@. Rp
#REF! = Rp.
alisa SNI diambil dari Analisa Kutami
JUMLAH
= Rp.
emplasemen tidak pada peron, sepur utama untuk 1 batang bantalan
#REF!
#REF! +
#REF!
oh
Mandor
oh
Pekerja
alisa SNI diambil dari Analisa Kutami
#REF! = Rp.
#REF! = Rp.
JUMLAH
= Rp.
#REF!
#REF! = Rp.
#REF! = Rp.
JUMLAH
= Rp.
#REF!
@. Rp
@. Rp
+
#REF!
oh
Mandor
oh
Pekerja
alisa SNI diambil dari Analisa Kutami
@. Rp
@. Rp
+
#REF!
Daop 1 Jak
SAT
JURNAL
TAHUN 2014
TAHUN 2014
JURNAL
TAHUN 2015
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
kg
249,780.00
289,780.00
248,770.00
288,770.00
248,706.00
288,706.00
177,500.00
217,500.00
237,740.00
277,740.00
12,400.00
2) B A T U .
1 Batu kali / belah hitam
2 Batu kali / belah hitam (diangkut dng truck)
3 Koral beton / kerikil (uk. 3/5 cm)
4 Koral beton / kerikil (uk. 3/5 cm) (diangkut dng truck)
5 Batu pecah / Split uk.1/2 cm
6 Batu pecah / Split uk.1/2 cm (diangkut dng truck)
7 Batu pecah / Split uk.2/3 cm
8 Batu pecah / Split uk.2/3 cm (diangkut dng truck)
9 Batu pecah (balas uk.2/6 cm)
10 Batu pecah (balas uk.2/6 cm) (diangkut dng truck)
11 Bata merah (press mesin)
12 Buis beton 1/2 bulat dia.20 cm, L = 1 m, tanpa tulangan
13 Buis beton 1/2 bulat dia.30 cm, L = 1 m, tanpa tulangan
14 Buis beton 1/2 bulat dia.50 cm, L = 1 m, tanpa tulangan
15 Buis beton 1/2 bulat dia.80 cm, L = 1 m, tanpa tulangan
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
bh
bh
bh
bh
bh
245,015.00
285,015.00
245,000.00
285,000.00
248,730.00
288,730.00
249,560.00
289,560.00
3) B E S I .
1 Besi beton U.32
2 Besi beton U.24
3 Beugel rel bendel 19 mm' (L.70.70.7)
4 Beugel glugu
5 Baut glugu dm 19 - 300 sd 400 mm
6 Sepatu glugu
7 Cincin glugu
8 Baut angker dia. 12 mm' - 400 mm'
9 Baut angker dia. 22 mm' - 550 mm'
kg
kg
Set
bh
bh
bh
bh
bh
bh
19,459.00
19,459.00
508.00
66,000.00
93,500.00
277,200.00
462,000.00
196,000.00
236,000.00
201,000.00
241,000.00
143,000.00
183,000.00
34,000.00
74,000.00
170,000.00
210,000.00
7,500.00
12,000.00
282,536.00
322,536.00
277,385.00
317,385.00
279,224.00
319,224.00
240,000.00
280,000.00
280,680.00
320,680.00
169,600.00
212,000.00
185,500.00
227,900.00
190,800.00
233,200.00
180,200.00
222,600.00
165,000.00
217,300.00
477.00
32,860.00
44,500.00
103,350.00
219,950.00
290,823.00
330,823.00
264,120.00
304,120.00
276,920.00
316,920.00
276,920.00
316,920.00
611.00
66,000.00
93,500.00
277,200.00
462,000.00
16,000.00
16,000.00
215,700.00
36,500.00
34,980.00
20,100.00
20,400.00
39,180.00
46,640.00
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
kg
bh
kg
bh
kg
bh
kg
lbr
lbr
lbr
lbr
btg
btg
kg
kg
kg
kg
10,794.00
11,449.00
10,970.00
10,794.00
10,746.00
37,100.00
44,520.00
31,800.00
58,300.00
58,300.00
44,520.00
38,600.00
52,470.00
38,600.00
55,650.00
46,640.00
52,470.00
58,300.00
40,810.00
64,925.00
29,680.00
84,800.00
29,700.00
64,925.00
16,000.00
560,800.00
1,495,500.00
1,121,600.00
747,700.00
#REF!
16,000.00
16,000.00
16,000.00
16,000.00
12,591.00
12,392.00
11,000.00
4) K A W A T .
1
2
3
4
5
6
kg
kg
kg
rool
kg
kg
30,030.00
18,022.00
kg
kg
kg
kg
kg
bh
kg
17,800.00
16,736.00
25,488.00
65,568.00
24,380.00
17,500.00
18,600.00
65,500.00
16,400.00
31,500.00
19,917.00
78,800.00
5) P A K U .
1
2
3
4
5
6
7
Paku biasa
Paku campur
Paku seng
Paku sumbat
Paku maskram
Paku tripon
Paku asbes
24,934.00
14,500.00
15,900.00
22,260.00
14,500.00
18,870.00
31,800.00
24,900.00
25,580.00
25,380.00
6) SENG / FIBERGLASS
1
2
3
4
5
6
7
8
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
26,000.00
64,000.00
28,600.00
15,000.00
35,300.00
139,300.00
176,900.00
227,500.00
m'
m'
m'
m'
m2
m2
m'
m'
32,120.00
53,240.00
123,722.50
3,932.50
20,350.00
30,400.00
82,250.00
6,800.00
24,900.00
24,900.00
130,200.00
264,650.00
zak
zak
kg
klg
63,200.00
80,400.00
65,000.00
70,000.00
16,000.00
53,000.00
Semen PC @ 50 kg
Semen Putih @ 40 Kg
Bahan grouting
Additive beton
65,185.00
87,315.00
9) C A T .
1
2
3
4
5
6
7
Cat minyak
Cat marine blue / MB
Cat tembok Setara Vinilex
Cat loodmenie A
Cat loodmenie B
Cat loodmenie C
Cat loodmenie D
kg
kg
kg
kg
kg
kg
kg
18,728.00
31,800.00
71,550.00
30,000.00
63,600.00
63,600.00
71,550.00
71,550.00
20,568.00
8
9
10
11
12
13
14
15
16
17
18
19
Cat dasar
Cat meni ( Kayu / besi )
Plamur
Residu
Teer
Aspal
Kwas cat uk. 2"
Kwas cat uk. 3"
Kwas cat uk. 4"
Amplas
Thiner Cat
Minyak cat SSK
Garuk Balas
Gergaji kayu
Gerinda batu api
Gerinda tangan
Glugu
Kaca mata gerenda
Kaca mata las
Kain majun
Karung plastik
Kawat
Kayu bakar
Kek besi
Kikir segi empat
Kikir uk. 1,5"
Klem selang
kg
kg
kg
gln
kg
kg
bh
bh
bh
lbr
ltr
kg
lbr
set
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
kg
bh
bh
kg
kg
kg
kg
bh
bh
bh
bh
bh
bh
btg
bh
bh
kg
bh
kg
pikul
bh
bh
bh
bh
42,950.00
13,001.80
22,585.00
47,817.00
9,500.00
3,420.00
23,695.00
23,467.00
30,950.00
15,000.00
21,800.00
50,000.00
14,840.00
9,500.00
9,100.00
14,700.00
19,400.00
6,850.00
6,350.00
13,550.00
6,850.00
952,200.00
1,100,000.00
344,500.00
46,600.00
58,766.00
111,300.00
1,802,000.00
196,100.00
84,800.00
53,000.00
68,900.00
17,500.00
31,800.00
8,150.00
8,480,000.00
14,840,000.00
40,810.00
159,000.00
127,000.00
66,250.00
9,000.00
159,000.00
90,100.00
45,000.00
32,700.00
2,089,450.00
344,500.00
23,300.00
23,300.00
9,000.00
2,800.00
16,300.00
79,500.00
5,800.00
53,000.00
37,900.00
8,500.00
15,575.00
22,988.00
45,000.00
7,172.00
11,845.00
14,982.00
5,124.00
25,625.00
27,380.00
5,124.00
952,500.00
344,500.00
46,600.00
53,000.00
8,150.00
40,810.00
150,000.00
127,000.00
66,250.00
159,000.00
90,100.00
45,000.00
32,700.00
344,500.00
2,800.00
17,500.00
37,900.00
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77 Tambang bambu
78 Tambang manila
79 Tambang Plastik dia. 10 mm
80 Tangkai martil
81 Tenda Plastik uk 4 x 4 m
82 Termometer 200o C
83 Kapur sirih
84 Senteleng bambu
11) K A Y U.
1 Kayu rimba kwalitas I / setara Bengkirai
2 Btl ky rimba uk 13 x 22 x 200 Cm
bh
bh
bh
bh
bh
bh
bh
bh
unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
kg
btl
btl
btl
bh
kg
bh
bh
bh
m'
btg
stel
bh
bh
bh
unit
bh
ltr
bh
bh
kg
kg
bh
bh
bh
bh
bh
434,600.00
137,800.00
174,900.00
434,600.00
95,400.00
620,550.00
116,600.00
795,000.00
712,320.00
795,000.00
503,000.00
1,028,000.00
53,000.00
44,000.00
583,000.00
306,300.00
6,300.00
6,300.00
23,850.00
63,600.00
127,200.00
349,800.00
100,700.00
100,700.00
100,700.00
17,000.00
116,600.00
336,800.00
71,550.00
9,000.00
74,200.00
18,500.00
69,960.00
18,550.00
12,720.00
68,900.00
708,900.00
20,100.00
2,300.00
190,800.00
70,900.00
40,800.00
2,650.00
3,700.00
132,500.00
53,000.00
16,960.00
70,000.00
m3
btg
11,000,000.00
630,000.00
22,384.00
95,400.00
620,550.00
795,000.00
53,000.00
6,300.00
18,500.00
18,550.00
12,720.00
20,100.00
40,800.00
2,650.00
132,500.00
53,000.00
btg
870,000.00
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
m3
m3
m3
btg
btg
lbr
lbr
lbr
lbr
629,200.00
692,000.00
755,000.00
786,500.00
818,000.00
881,000.00
944,000.00
1,007,000.00
1,070,000.00
1,101,000.00
1,133,000.00
1,196,000.00
1,259,000.00
896,000.00
784,000.00
968,000.00
1,065,000.00
726,000.00
799,000.00
872,000.00
944,000.00
1,017,000.00
1,089,000.00
1,161,600.00
1,235,000.00
1,307,000.00
1,380,000.00
1,452,000.00
4,800,000.00
3,750,000.00
1,500,000.00
17,850.00
344,500.00
53,500.00
96,900.00
145,750.00
99,400.00
83,853.00
143,856.00
208,131.00
53,500.00
Regulator oksigen
Regulator Elpiji
Oksigen
Acytellin
LPG (tabung 46 kg)
LPG (12 kg)
Oli SAE 40
Rored Oil EP-90
Paselin
Minyak Turalik-52
bh
bh
tbg
tbg
tbg
tbg
ltr
ltr
kg
ltr
530,000.00
530,000.00
95,400.00
110,700.00
318,000.00
90,000.00
32,230.00
32,010.00
16,700.00
19,903.00
Hal 42 dari 401 halaman
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
kg
ltr
ltr
ltr
ltr
ltr
ltr
ltr
ltr
ltr
kg
ltr
ltr
ltr
ltr
ltr
ltr
bh
bh
btl
kg
psg
psg
bh
bh
45,220.00
21,138.00
22,230.00
25,650.00
22,563.00
22,800.00
5,500.00
6,500.00
7,000.00
9,000.00
7,500.00
8,500.00
produk SHELL
95,000.00
8,400.00
hr
hr
hr
btg
unit
unit
unit
unit
btg
btg
unit
unit
unit
unit
unit
unit
46,640.00
81,620.00
23,320.00
1,135,260.00
7,460.00
7,750.00
14,840.00
12,720.00
8,340.00
32,325.00
100,000.00
159,000.00
4,240.00
4,000.00
6,360.00
81,620.00
m'sp
m'sp
m'sp
hr
hr
hr
10,400.00
5,800.00
6,000.00
275,600.00
79,500.00
42,400.00
7 weldehear manual
8 Sewa genset penerang
9 Sewa mesin walls + Pemeliharaan
hr
hr
hr
63,600.00
106,000.00
58,300.00
TonKm
TonKm
TonKm
3,700.00
3,180.00
2,650.00
btg
bh
bh
bh
bh
275,600.00
31,800.00
25,440.00
12,720.00
12,190.00
B. Transportasi
bh
58,300.00
598,900.00
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
28,300.00
171,700.00
192,400.00
29,700.00
13,700.00
10,800.00
48,200.00
10,800.00
5,000.00
7,525.00
15,475.00
8,095,000.00
8,095,000.00
8,361,000.00
40,000.00
165,150.00
48,200.00
37,700.00
165,150.00
15,475.00
48,200.00
779,100.00
174,900.00
28,300.00
344,500.00
146,800.00
37,100.00
162,600.00
107,900.00
67,600.00
184,400.00
Hal 44 dari 401 halaman
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
120 mm
130 mm
150 mm
160 mm
170 mm
180 mm
200 mm
220 mm
240 mm
250 mm
260 mm
280 mm
300 mm
320 mm
340 mm
360 mm
380 mm
120 mm
130 mm
150 mm
160 mm
170 mm
180 mm
200 mm
220 mm
240 mm
250 mm
260 mm
280 mm
300 mm
320 mm
340 mm
360 mm
380 mm
120 mm
220 mm
240 mm
250 mm
270 mm
380 mm
410 mm
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
bh
bh
Unit
Unit
Set
84,800.00
88,000.00
67,575.00
67,575.00
67,575.00
67,575.00
67,575.00
67,575.00
75,525.00
75,525.00
75,525.00
79,500.00
79,500.00
79,500.00
79,500.00
79,500.00
79,500.00
83,475.00
83,475.00
64,925.00
64,925.00
64,925.00
64,925.00
64,925.00
64,925.00
72,875.00
72,875.00
72,875.00
76,850.00
76,850.00
76,850.00
76,850.00
76,850.00
76,850.00
80,825.00
80,825.00
67,575.00
75,525.00
75,525.00
79,500.00
79,500.00
83,475.00
83,475.00
146,810.00
353,510.00
174,900,000.00
1,696,000.00
1,802,000.00
116,600,000.00
111,300,000.00
80,030,000.00
JM. Konstruksi
JM. Fasilitas
MUHSININ
NIPP. 43855
WAWAN HIDAYAT
NIPP. 36933
ENDANG RUHIYAT
NIPP. 38482
MI JJ IA
MI JJ IB
MI JJ IC
M. ZAKIR
NIPP. 40260
YULIANTO
NIPP. 45484
KARJAN
NIPP. 38342
AFIF RUSMIYADI
NIPP. 40934
BANTALAN
BANTALAN
PAPAN
KASAU
KASAU
TBH.36
19) PERHITUNGAN HARGA 1 (satu) BATANG BANTALAN KAYU
BANTALAN KAYU BIASA UK. -->
BANTALAN KAYU WESEL UK. -->
Faktor Penyesuaian (a) = 1,030
BANTALAN KAYU JEMBATAN UK. -->
Faktor Penyesuaian (b) = 1,020
*)
HAR m3
HAR m3
HAR m3
HAR m3
AN (dlm Rupiah)
KET
TAHUN 2015
ESTIMASI 2015
207,000.00
250,000.00
213,000.00
255,000.00
151,000.00
193,000.00
36,000.00
780,000.00
180,000.00
220,000.00
8,000.00
12,500.00
179,700.00
224,000.00
196,000.00
241,000.00
202,000.00
247,000.00
191,000.00
236,000.00
190,000.00
505.00
34,831.00
47,000.00
109,500.00
233,000.00
16,000.00
16,000.00
228,600.00
38,000.00
37,078.00
21,306.00
21,600.00
41,530.00
49,438.00
207,760.00
250,160.00
213,060.00
255,460.00
151,580.00
193,980.00
36,040.00
78,440.00
180,200.00
222,600.00
7,950.00
12,720.00
179,776.00
224,720.00
196,630.00
241,574.00
202,248.00
247,192.00
191,012.00
235,956.00
174,900.00
230,338.00
505.62
34,831.60
47,170.00
109,551.00
233,147.00
16,960.00
16,960.00
228,642.00
38,690.00
37,078.80
21,306.00
21,624.00
41,530.80
49,438.40
39,300.00
47,100.00
33,700.00
61,700.00
61,700.00
47,190.00
40,900.00
55,600.00
40,900.00
58,900.00
49,430.00
55,618.00
61,798.00
43,250.00
68,820.00
31,460.00
89,800.00
31,480.00
68,820.00
16,960.00
590,000.00
1,500,000.00
1,180,000.00
790,000.00
56,000.00
92,600.00
16,900.00
16,900.00
16,900.00
16,900.00
39,326.00
47,191.20
33,708.00
61,798.00
61,798.00
47,191.20
40,916.00
55,618.20
40,916.00
58,989.00
49,438.40
55,618.20
61,798.00
43,258.60
68,820.50
31,460.80
89,888.00
31,482.00
68,820.50
16,960.00
594,448.00
1,585,230.00
1,188,896.00
792,562.00
#REF!
#VALUE!
16,960.00
16,960.00
16,960.00
16,960.00
-
560,829.12
1,495,544.32
1,121,658.24
747,772.16
25,800.00
18,500.00
19,700.00
69,400.00
17,300.00
33,300.00
25,842.80
18,550.00
19,716.00
69,430.00
17,384.00
33,390.00
-
15,300.00
16,800.00
23,500.00
15,300.00
20,000.00
33,700.00
26,300.00
15,370.00
16,854.00
23,595.60
15,370.00
20,002.20
33,708.00
26,394.00
-
27,500.00
67,800.00
30,300.00
15,900.00
37,400.00
147,600.00
187,500.00
241,100.00
27,560.00
67,840.00
30,316.00
15,900.00
37,418.00
147,658.00
187,514.00
241,150.00
-
21,500.00
32,200.00
87,100.00
7,200.00
26,300.00
26,300.00
138,000.00
280,500.00
21,571.00
32,224.00
87,185.00
7,208.00
26,394.00
26,394.00
138,012.00
280,529.00
-
68,900.00
74,200.00
16,900.00
56,100.00
68,900.00
74,200.00
16,960.00
56,180.00
-
33,700.00
75,800.00
31,800.00
67,400.00
67,400.00
75,800.00
75,800.00
###
###
harga distributor
harga distributor
520,735.60
###
###
###
33,708.00
75,843.00
31,800.00
67,416.00
67,416.00
75,843.00
75,843.00
32,800.00
15,900.00
23,100.00
53,000.00
15,700.00
10,000.00
9,600.00
15,500.00
20,500.00
7,200.00
6,700.00
14,300.00
7,200.00
1,009,300.00
1,166,000.00
365,100.00
49,300.00
32,807.00
15,900.00
23,108.00
53,000.00
15,730.40
10,070.00
9,646.00
15,582.00
20,564.00
7,261.00
6,731.00
14,363.00
7,261.00
1,009,332.00
1,166,000.00
365,170.00
49,396.00
117,900.00
1,910,100.00
207,800.00
89,800.00
56,100.00
73,000.00
18,500.00
33,700.00
8,600.00
8,988,800.00
15,730,400.00
43,250.00
168,540.00
134,620.00
70,200.00
9,540.00
168,540.00
95,500.00
47,700.00
34,600.00
2,214,800.00
365,100.00
24,600.00
24,600.00
9,500.00
2,900.00
17,200.00
84,270.00
6,100.00
56,180.00
40,100.00
9,000.00
117,978.00
1,910,120.00
207,866.00
89,888.00
56,180.00
73,034.00
18,550.00
33,708.00
8,639.00
8,988,800.00
15,730,400.00
43,258.60
168,540.00
134,620.00
70,225.00
9,540.00
168,540.00
95,506.00
47,700.00
34,662.00
2,214,817.00
365,170.00
24,698.00
24,698.00
9,540.00
2,968.00
17,278.00
84,270.00
6,148.00
56,180.00
40,174.00
9,010.00
Hal 55 dari 401 halaman
460,600.00
146,000.00
185,300.00
460,600.00
101,100.00
657,700.00
123,500.00
842,700.00
755,000.00
842,700.00
533,100.00
1,089,600.00
56,180.00
46,640.00
617,980.00
324,600.00
6,600.00
6,600.00
25,200.00
67,400.00
134,800.00
370,700.00
106,700.00
106,700.00
106,700.00
18,000.00
123,500.00
357,000.00
75,800.00
9,500.00
78,600.00
19,600.00
74,100.00
19,600.00
13,400.00
73,000.00
751,400.00
21,300.00
2,400.00
202,200.00
75,100.00
43,200.00
2,800.00
3,900.00
140,450.00
56,180.00
17,900.00
74,200.00
460,676.00
146,068.00
185,394.00
460,676.00
101,124.00
657,783.00
123,596.00
842,700.00
755,059.20
842,700.00
533,180.00
1,089,680.00
56,180.00
46,640.00
617,980.00
324,678.00
6,678.00
6,678.00
25,281.00
67,416.00
134,832.00
370,788.00
106,742.00
106,742.00
106,742.00
18,020.00
123,596.00
357,008.00
75,843.00
9,540.00
78,652.00
19,610.00
74,157.60
19,663.00
13,483.20
73,034.00
751,434.00
21,306.00
2,438.00
202,248.00
75,154.00
43,248.00
2,809.00
3,922.00
140,450.00
56,180.00
17,977.60
74,200.00
11,660,000.00
667,800.00
11,660,000.00
667,800.00
Hal 56 dari 401 halaman
992,200.00
666,900.00
733,500.00
800,300.00
833,600.00
867,000.00
933,800.00
100,600.00
1,067,400.00
1,134,200.00
1,167,000.00
1,200,900.00
1,267,700.00
1,334,500.00
949,700.00
831,000.00
1,026,000.00
1,128,900.00
769,500.00
846,900.00
924,300.00
1,000,600.00
1,078,000.00
1,154,300.00
1,231,200.00
1,309,100.00
1,385,400.00
1,462,800.00
1,539,100.00
5,088,000.00
3,975,000.00
1,590,000.00
18,900.00
365,100.00
56,700.00
102,700.00
154,400.00
105,300.00
561,800.00
561,800.00
101,100.00
117,300.00
337,000.00
95,400.00
34,100.00
33,900.00
17,700.00
21,000.00
922,200.00
666,952.00
733,520.00
800,300.00
833,690.00
867,080.00
933,860.00
1,000,640.00
1,067,420.00
1,134,200.00
1,167,060.00
1,200,980.00
1,267,760.00
1,334,540.00
949,760.00
831,040.00
1,026,080.00
1,128,900.00
769,560.00
846,940.00
924,320.00
1,000,640.00
1,078,020.00
1,154,340.00
1,231,296.00
1,309,100.00
1,385,420.00
1,462,800.00
1,539,120.00
5,088,000.00
3,975,000.00
1,590,000.00
18,921.00
365,170.00
56,710.00
102,714.00
154,495.00
105,364.00
561,800.00
561,800.00
101,124.00
117,342.00
337,080.00
95,400.00
34,163.80
33,930.60
17,702.00
21,097.18
Hal 57 dari 401 halaman
47,900.00
22,400.00
23,500.00
27,100.00
23,900.00
24,100.00
7,500.00
7,600.00
8,000.00
9,500.00
100,700.00
8,900.00
49,400.00
86,500.00
24,700.00
1,203,300.00
7,900.00
8,200.00
15,730.00
13,480.00
8,840.00
34,200.00
106,000.00
168,500.00
168,500.00
4,200.00
6,700.00
86,500.00
11,000.00
6,100.00
6,300.00
292,100.00
84,200.00
44,900.00
47,933.20
22,406.28
23,563.80
27,189.00
23,916.78
24,168.00
5,830.00
6,890.00
7,420.00
9,540.00
100,700.00
8,904.00
49,438.40
86,517.20
24,719.20
1,203,375.60
7,907.60
8,215.00
15,730.40
13,483.20
8,840.40
34,264.50
106,000.00
168,540.00
4,494.40
4,240.00
6,741.60
86,517.20
11,024.00
6,148.00
6,360.00
292,136.00
84,270.00
44,944.00
Hal 58 dari 401 halaman
67,400.00
112,300.00
61,700.00
3,900.00
3,300.00
2,800.00
292,000.00
33,700.00
26,900.00
13,400.00
12,900.00
61,700.00
634,800.00
29,900.00
182,000.00
203,900.00
31,400.00
14,500.00
11,400.00
51,000.00
11,400.00
5,300.00
7,900.00
16,400.00
850,700.00
850,700.00
8,862,600.00
42,400.00
175,000.00
51,000.00
39,900.00
175,000.00
16,400.00
51,000.00
825,800.00
185,300.00
29,900.00
365,000.00
155,600.00
39,300.00
172,300.00
114,300.00
71,600.00
195,400.00
67,416.00
112,360.00
61,798.00
3,922.00
3,370.80
2,809.00
292,136.00
33,708.00
26,966.40
13,483.20
12,921.40
61,798.00
634,834.00
29,998.00
182,002.00
203,944.00
31,482.00
14,522.00
11,448.00
51,092.00
11,448.00
5,300.00
7,976.50
16,403.50
8,580,700.00
8,580,700.00
8,862,660.00
42,400.00
175,059.00
51,092.00
39,962.00
175,059.00
16,403.50
51,092.00
825,846.00
185,394.00
29,998.00
365,170.00
155,608.00
39,326.00
172,356.00
114,374.00
71,656.00
195,464.00
Hal 59 dari 401 halaman
89,800.00
93,200.00
71,600.00
71,600.00
71,600.00
71,600.00
71,600.00
71,600.00
80,000.00
80,000.00
80,000.00
84,200.00
84,200.00
84,200.00
84,200.00
84,200.00
84,200.00
88,400.00
88,400.00
68,800.00
68,800.00
68,800.00
68,800.00
68,800.00
68,800.00
77,200.00
77,200.00
77,200.00
81,400.00
81,400.00
81,400.00
81,400.00
81,400.00
81,400.00
85,600.00
85,600.00
71,600.00
80,000.00
80,000.00
80,000.00
80,000.00
88,400.00
88,400.00
155,600.00
374,700.00
185,394,000.00
1,797,700.00
1,910,100.00
123,596,000.00
117,978,000.00
84,831,800.00
89,888.00
93,280.00
71,629.50
71,629.50
71,629.50
71,629.50
71,629.50
71,629.50
80,056.50
80,056.50
80,056.50
84,270.00
84,270.00
84,270.00
84,270.00
84,270.00
84,270.00
88,483.50
88,483.50
68,820.50
68,820.50
68,820.50
68,820.50
68,820.50
68,820.50
77,247.50
77,247.50
77,247.50
81,461.00
81,461.00
81,461.00
81,461.00
81,461.00
81,461.00
85,674.50
85,674.50
71,629.50
80,056.50
80,056.50
84,270.00
84,270.00
88,483.50
88,483.50
155,618.60
374,720.60
185,394,000.00
1,797,760.00
1,910,120.00
123,596,000.00
117,978,000.00
84,831,800.00
MI JJ ID
DARSONO
NIPP. 36937
ANALISA PEKERJAAN JALAN REL DAN JEMBATAN PT. KERETA API INDONESIA (PERSE
1. PERHITUNGAN HARGA BALAS KRICAK
Untuk tiap 1 m3 balas batu pecah.
Bahan :
1.0
m3
@. Rp
190,000
JUMLAH
Upah :
a. Ongkos muat ke gerbong dengan loader
*)
*)
12,000
0.330
oh
Pekerja
@. Rp
1.500
ton
@. Rp
83,300
@. Rp
1 m3 Ongkos angkutan dengan Truck
untuk material yang diangkut dengan truck Di sesuaikan dengan tarif pemerintah daerah (dari quary ke lo
* (Surat Edaran Direksi 6/LL.413/KA-2007 tgl.22-6-2007 harga sewa angkutan per ton Rp 5.0
c. Ongkos bongkar dan ecer dilokasi
Upah :
0.06270
oh
Mandor
@. Rp
109,800
0.23870
oh
Pekerja
@. Rp
83,300
JUMLAH
Analisa Kutami
2. MENGGANTI/MENGURAS BALAS KOTOR
a.
Mengeluarkan balas kotor dari jalan rel untuk setiap 1 m3 meter sepur
Upah :
0.1940
oh
Mandor
@. Rp
109,800
1.1200
oh
Pekerja
@. Rp
83,300
JUMLAH
Analisa Kutami
b.
oh
Mandor
@. Rp
109,800
0.7500
oh
Pekerja
@. Rp
83,300
82
JUMLAH
c.
oh
Mandor
@. Rp
109,800
0.330
oh
Pekerja
@. Rp
83,300
JUMLAH
83
K = a (L+75) / 324
Jarak pengangkutan ( > 30 m )
950
Upah Pekerja
Biaya tiap m3
83,300
@Rp.
d.
oh
Mandor
@. Rp
109,800
0.45550
oh
Pekerja
@. Rp
83,300
JUMLAH
Analisa Kutami
Bahan
0.33340
m2
@. Rp
24,900
JUMLAH
m3
@. Rp
207,000
JUMLAH
Upah :
b.
*)
*)
0.13330
c.
oh
Pekerja
@. Rp
83,300
oh
Mandor
@. Rp
109,800
0.116670
oh
Pekerja
@. Rp
83,300
12,000
JUMLAH
84
0.23210
oh
Mandor
@. Rp
109,800
0.69640
oh
Pekerja
@. Rp
83,300
JUMLAH
Analisa Kutami
Bila diangkut dengan KA berlaku ongkos angkutan sama dengan analisa No.1
4. MENAMBAH BALAS
(Tanpa pekerjaan memecok)
Upah kerja dihitung untuk memasukkan balas, dengan balas tersedia di tubuh jalan, tanpa mendandang/memecok.
a.
Balas pasir.
untuk tiap 1m3 balas :
Upah :
0.010
oh
Mandor
@. Rp
109,800
0.200
oh
Pekerja
@. Rp
83,300
JUMLAH
85
b.
Balas kricak
untuk tiap 1m3 balas :
Upah :
0.01250
oh
Mandor
@. Rp
109,800
0.250
oh
Pekerja
@. Rp
83,300
JUMLAH
5. PERBAIKAN SUBGRADE
a.
Mengeluarkan balas kotor dari jalan rel untuk setiap 1 m Panjang spoor
Upah :
0.1940
oh
Mandor
@. Rp
109,800
1.1200
oh
Pekerja
@. Rp
83,300
JUMLAH
b.
oh
Mandor
@. Rp
109,800
0.7500
oh
Pekerja
@. Rp
83,300
JUMLAH
c.
oh
Mandor
@. Rp
109,800
0.3300
oh
Pekerja
@. Rp
83,300
JUMLAH
d.
83,300
@Rp.
e.
86
0.0120
oh
Mandor
@. Rp
109,800
0.3600
oh
Pekerja
@. Rp
83,300
JUMLAH
Bahan :
0.3600
m3
Pasir Urug
@. Rp
193,000
JUMLAH
TOTAL BIAYA/MSP
f.
oh
Pekerja
@. Rp
83,300
JUMLAH
Bahan :
3.00
m2
Geotextile
@. Rp
24,900
3.00
m2
Geograde
@. Rp
24,900
JUMLAH
TOTAL BIAYA/MSP
87
Bantalan Kayu
1) Untuk kec. KA 20 km/jam, dari kec. 5 km/jam
Untuk tiap 1 m'sp :
Upah :
0.0250
oh
Mandor
@. Rp
109,800
0.2500
oh
Pekerja
@. Rp
83,300
JUMLAH
oh
Mandor
@. Rp
109,800
0.4500
oh
Pekerja
@. Rp
83,300
JUMLAH
oh
Mandor
@. Rp
109,800
0.500
oh
Pekerja
@. Rp
83,300
JUMLAH
Catatan: Untuk pekerjaan pada jalan rel bergigi dikalikan dengan koefisien 1,8
4) Untuk kec. KA > 60 km/jam.
dikerjakan dengan alat berat (MTT, PBR, VDM dsb)
Untuk tiap 1 m'sp :
Upah :
0.035
oh
@. Rp
92,086
0.350
oh
Pekerja
@. Rp
83,300
3.000
kali
@. Rp
11,000
1.000
kali
@. Rp
6,100
1.000
kali
@. Rp
6,300
JUMLAH
B.
Bantalan Besi
1) Untuk kec. KA 20 km/jam, dari kec. 5 km/jam
Untuk tiap 1 m'sp :
88
Upah :
0.0280
oh
Mandor
@. Rp
109,800
0.2800
oh
Pekerja
@. Rp
83,300
JUMLAH
oh
Mandor
@. Rp
109,800
0.4950
oh
Pekerja
@. Rp
83,300
JUMLAH
oh
Mandor
@. Rp
109,800
0.5500
oh
Pekerja
@. Rp
83,300
JUMLAH
89
4) Untuk kec. KA > 60 km/jam. dikerjakan dengan alat berat (MTT, PBR, VDM dsb)
Untuk tiap 1 m'sp :
Upah :
0.0350
oh
@. Rp
92,086
0.3500
oh
Pekerja
@. Rp
83,300
3.0000
kali
@. Rp
11,000
1.0000
kali
@. Rp
6,100
1.0000
kali
@. Rp
6,300
JUMLAH
C.
Bantalan Beton
1) Untuk kec. KA 20 km/jam, dari kec. 5 km/jam
Untuk tiap 1 m'sp :
Upah :
0.0380
oh
Mandor
@. Rp
109,800
0.3800
oh
Pekerja
@. Rp
83,300
JUMLAH
oh
Mandor
@. Rp
109,800
0.49320
oh
Pekerja
@. Rp
83,300
JUMLAH
Analisa Kutami
3) Untuk kec. KA 60 km/jam dari kecepatan 40 km/jam
Untuk tiap 1 m'sp :
Upah :
0.15630
oh
Mandor
@. Rp
109,800
0.57440
oh
Pekerja
@. Rp
83,300
JUMLAH
Analisa Kutami
4) Untuk kec. KA > 60 km/jam.
dikerjakan dengan alat berat (MTT, PBR, VDM dsb)
Untuk tiap 1 m'sp :
Upah :
0.0350
oh
@. Rp
92,086
0.3500
oh
Pekerja
@. Rp
83,300
3.0000
kali
@. Rp
11,000
1.0000
kali
@. Rp
6,100
1.0000
kali
@. Rp
6,300
90
JUMLAH
m3
batu belah
@. Rp
169,600
JUMLAH
Upah :
0.0250
oh
Mandor
@. Rp
109,800
0.2500
oh
Pekerja
@. Rp
83,300
JUMLAH
b.
m3
batu belah
@. Rp
169,600
JUMLAH
91
Upah :
0.2200
oh
Mandor
@. Rp
109,800
2.2000
oh
Pekerja
@. Rp
83,300
JUMLAH
c.
m3
batu belah
@. Rp
169,600
JUMLAH
Upah :
0.0250
oh
Mandor
@. Rp
109,800
0.2500
oh
Pekerja
@. Rp
83,300
JUMLAH
d.
m3
batu belah
@. Rp
169,600
JUMLAH
Upah :
0.2200
oh
Mandor
@. Rp
109,800
2.2000
oh
Pekerja
@. Rp
83,300
JUMLAH
92
Upah :
0.040
oh
Mandor
@. Rp
109,800
0.180
oh
Pekerja
@. Rp
83,300
JUMLAH
bh
Bor kayu
@ Rp
84,800
0.009
kg
Teer
@ Rp
14,840
JUMLAH
* Bila penggantian bantalan pada rel paksa maka untuk tenaga dikalikan 1,5
b.
oh
Mandor
@. Rp
109,800
0.200
oh
Pekerja
@. Rp
83,300
JUMLAH
93
Bahan :
0.1000
bh
Bor kayu
@ Rp
84,800
0.0090
kg
Teer
@ Rp
14,840
JUMLAH
c.
oh
Mandor
@. Rp
109,800
0.3000
oh
Pekerja
@. Rp
83,300
JUMLAH
bh
Bor kayu
@ Rp
84,800
0.0090
kg
Teer
@ Rp
14,840
JUMLAH
d.
oh
Mandor
@. Rp
109,800
0.9000
oh
Pekerja
@. Rp
83,300
JUMLAH
bh
Bor kayu
@ Rp
84,800
0.0090
kg
Teer
@ Rp
14,840
0.0050
bh
kwas 3 inch
@ Rp
14,700
0.0400
bh
senteleng bambu
@ Rp
70,000
0.4000
kg
tambang manila
@ Rp
40,800
JUMLAH
e.
oh
Pekerja
@. Rp
83,300
JUMLAH
94
Catatan :
Untuk jembatan dinding pelat, jembatan panjang > 50 m upah dikalikan koefisien 1,1
Untuk jembatan dengan Guard-Rail/gongsol ditambah analisa upah bongkar pasang Guard-Rail/gongsol
Untuk bantalan ukuran luar biasa upah dikalikan koefisien 1,2
Untuk jalan rel gigi upah dikalikan koefisien 1,5
oh
Mandor
@. Rp
109,800
0.170
oh
Pekerja
@. Rp
83,300
JUMLAH
95
b.
oh
Mandor
@. Rp
109,800
0.15480
oh
Pekerja
@. Rp
83,300
JUMLAH
Analisa Kutami
c.
oh
Mandor
@. Rp
109,800
0.3000
oh
Pekerja
@. Rp
83,300
JUMLAH
Catatan :
d.
oh
Pekerja
@. Rp
83,300
JUMLAH
oh
Mandor
@. Rp
109,800
0.540
oh
Pekerja
@. Rp
83,300
JUMLAH
oh
Mandor
@. Rp
109,800
0.600
oh
Pekerja
@. Rp
83,300
JUMLAH
oh
Mandor
@. Rp
109,800
96
1.200
oh
Pekerja
@. Rp
83,300
JUMLAH
oh
Mandor
@. Rp
109,800
0.720
oh
Pekerja
@. Rp
83,300
JUMLAH
97
b.
oh
Mandor
@. Rp
109,800
0.800
oh
Pekerja
@. Rp
83,300
JUMLAH
oh
Mandor
@. Rp
109,800
1.200
oh
Pekerja
@. Rp
83,300
JUMLAH
oh
Mandor
@. Rp
109,800
1.1100
oh
Pekerja
@. Rp
83,300
JUMLAH
Bahan :
0.1000
bh
Bor kayu
@ Rp
84,800
0.0090
kg
Teer
@ Rp
14,840
JUMLAH
b.
oh
Mandor
@. Rp
109,800
1.3340
oh
Pekerja
@. Rp
83,300
JUMLAH
98
Bahan :
0.1000
bh
Bor kayu
@ Rp
84,800
0.0090
kg
Teer
@ Rp
14,840
JUMLAH
13 MODIFIKASI BANTALAN BESI MERUBAH LEBAR SEPUR DENGAN MENGGESER BASE PLATE PERBATANG B
a.
tbg
Oxygen
@ Rp
101,100
0.0200
tbg
Acetylin
@ Rp
117,300
0.0480
lt
Bensin
@ Rp
7,600
0.0100
lt
Oli SAE 40
@ Rp
34,100
0.0800
kg
@ Rp
49,300
JUMLAH
99
Upah :
0.0750
oh
Tukang las
@ Rp
84,316
0.1500
oh
Tukang gerinda
@ Rp
84,316
0.0650
oh
Pengawas las
@ Rp
109,800
0.0480
oh
Pekerja
@ Rp
83,300
JUMLAH
b.
tbg
Oxygen
@ Rp
101,100
0.01250
tbg
Acetylin
@ Rp
117,300
0.04800
lt
Bensin
@ Rp
7,600
0.01000
lt
Oli SAE 40
@ Rp
34,100
0.08000
kg
@ Rp
49,300
0.75000
lt
Solar
@ Rp
7,500
0.85000
kg
@ Rp
33,300
0.02000
kg
Kain lap
@ Rp
9,500
JUMLAH
Upah :
0.0500
hr
@ Rp
292,100
0.1500
oh
Tukang las
@ Rp
84,316
0.0950
oh
Tukang gerinda
@ Rp
84,316
0.0850
oh
Pengawas las
@ Rp
109,800
0.0750
oh
Pekerja
@ Rp
83,300
JUMLAH
Rel R.25.
Untuk tiap 1 M panjang sepur
Upah :
0.010
oh
Mandor
@. Rp
109,800
0.280
oh
Pekerja
@. Rp
83,300
JUMLAH
100
Bahan :
0.1650
bh
Bor kayu
@ Rp
84,800
0.0150
kg
Teer
@ Rp
14,840
JUMLAH
b.
Rel R.33.
Untuk tiap 1 M panjang sepur
Upah :
0.0150
oh
Mandor
@. Rp
109,800
0.3600
oh
Pekerja
@. Rp
83,300
JUMLAH
Bahan :
0.1650
bh
Bor kayu
@ Rp
84,800
0.0150
kg
Teer
@ Rp
14,840
JUMLAH
TOTAL BIAYA /MSP
101
c.
Rel R.41/42.
Untuk tiap 1 M panjang sepur
Upah :
0.0150
oh
Mandor
@. Rp
109,800
0.40
oh
Pekerja
@. Rp
83,300
JUMLAH
Bahan :
0.1650
bh
Bor kayu
@ Rp
84,800
0.0150
kg
Teer
@ Rp
14,840
JUMLAH
d.
Rel R.50.
Untuk tiap 1 M panjang sepur
Upah :
0.0180
oh
Mandor
@. Rp
109,800
0.4760
oh
Pekerja
@. Rp
83,300
JUMLAH
Bahan :
0.1650
bh
Bor kayu
@ Rp
84,800
0.0150
kg
Teer
@ Rp
14,840
JUMLAH
e.
Rel R.54.
Untuk tiap 1 M panjang sepur
Upah :
0.0190
oh
Mandor
@. Rp
109,800
0.5140
oh
Pekerja
@. Rp
83,300
JUMLAH
Bahan :
0.1650
bh
Bor kayu
@ Rp
84,800
0.0150
kg
Teer
@ Rp
14,840
JUMLAH
TOTAL BIAYA /MSP
Rel R.25.
Untuk tiap 1 M panjang sepur
102
Upah :
0.04420
oh
Mandor
@. Rp
109,800
0.16580
oh
Pekerja
@. Rp
83,300
JUMLAH
Rel R.33.
Untuk tiap 1 M panjang sepur
Upah :
0.0120
oh
Mandor
@. Rp
109,800
0.2280
oh
Pekerja
@. Rp
83,300
JUMLAH
c.
Rel R.41/42.
Untuk tiap 1 M panjang sepur
Upah :
0.04750
oh
Mandor
@. Rp
109,800
0.25200
oh
Pekerja
@. Rp
83,300
JUMLAH
103
d.
Rel R.50.
Untuk tiap 1 M panjang sepur
Upah :
0.04400
oh
Mandor
@. Rp
109,800
0.33430
oh
Pekerja
@. Rp
83,300
JUMLAH
Rel R.54.
Untuk tiap 1 M panjang sepur
Upah :
0.0440
oh
Mandor
@. Rp
109,800
0.3590
oh
Pekerja
@. Rp
83,300
JUMLAH
Rel R.41/42.
Untuk tiap 1 M panjang sepur
Upah :
0.08670
oh
Mandor
@. Rp
109,800
0.44640
oh
Pekerja
@. Rp
83,300
JUMLAH
Rel R.50.
Untuk tiap 1 M panjang sepur
Upah :
0.07430
oh
Mandor
@. Rp
109,800
0.55860
oh
Pekerja
@. Rp
83,300
JUMLAH
Rel R.54.
Untuk tiap 1 M panjang sepur
Upah :
0.07860
oh
Mandor
@. Rp
109,800
0.59290
oh
Pekerja
@. Rp
83,300
JUMLAH
Alat - alat bangunan atas telah tersedia ditempat kerja, untuk penggantian satu sisi rel (1 m') berlaku setengahnya dar
a.
Rel R.25.
104
oh
Mandor
@. Rp
109,800
0.0840
oh
Pekerja
@. Rp
83,300
JUMLAH
Bahan :
0.0900
bh
Bor kayu
@ Rp
84,800
0.0090
kg
Teer
@ Rp
14,840
JUMLAH
TOTAL BIAYA /M'
b.
Rel R.33.
Untuk tiap 1 M panjang spoor
Upah :
0.00450
oh
Mandor
@. Rp
109,800
0.10800
oh
Pekerja
@. Rp
83,300
JUMLAH
105
Bahan :
0.0900
bh
Bor kayu
@ Rp
84,800
0.0090
kg
Teer
@ Rp
14,840
JUMLAH
TOTAL BIAYA /M'
c.
Rel R.41/42.
Untuk tiap 1 M panjang spoor
Upah :
0.00450
oh
Mandor
@. Rp
109,800
0.120
oh
Pekerja
@. Rp
83,300
JUMLAH
Bahan :
0.0900
bh
Bor kayu
@ Rp
84,800
0.0090
kg
Teer
@ Rp
14,840
JUMLAH
TOTAL BIAYA /M'
d.
Rel R.50.
Untuk tiap 1 M panjang spoor
Upah :
0.00540
oh
Mandor
@. Rp
109,800
0.14280
oh
Pekerja
@. Rp
83,300
JUMLAH
Bahan :
0.0900
bh
Bor kayu
@ Rp
84,800
0.0090
kg
Teer
@ Rp
14,840
JUMLAH
TOTAL BIAYA /M'
e.
Rel R.54.
Untuk tiap 1 M panjang spoor
Upah :
0.00570
oh
Mandor
@. Rp
109,800
0.15420
oh
Pekerja
@. Rp
83,300
JUMLAH
Bahan :
0.0900
bh
Bor kayu
@ Rp
84,800
0.0090
kg
Teer
@ Rp
14,840
JUMLAH
106
Alat - alat bangunan atas telah tersedia ditempat kerja, untuk penggantian satu sisi rel (1 m') berlaku setengahnya dar
a.
Rel R.25.
Untuk tiap 1 M panjang spoor
Upah :
0.00240
oh
Mandor
@. Rp
109,800
0.06720
oh
Pekerja
@. Rp
83,300
JUMLAH
b.
Rel R.33.
Untuk tiap 1 M panjang spoor
Upah :
0.00360
oh
Mandor
@. Rp
109,800
0.06840
oh
Pekerja
@. Rp
83,300
JUMLAH
107
c.
Rel R.41/42.
Untuk tiap 1 M panjang spoor
Upah :
0.00360
oh
Mandor
@. Rp
109,800
0.0960
oh
Pekerja
@. Rp
83,300
JUMLAH
d.
Rel R.50.
Untuk tiap 1 M panjang spoor
Upah :
0.004320
oh
Mandor
@. Rp
109,800
0.11430
oh
Pekerja
@. Rp
83,300
JUMLAH
e.
Rel R.54.
Untuk tiap 1 M panjang spoor
Upah :
0.004560
oh
Mandor
@. Rp
109,800
0.12330
oh
Pekerja
@. Rp
83,300
JUMLAH
Alat - alat bangunan atas telah tersedia ditempat kerja, untuk penggantian satu sisi rel (1 m') berlaku setengahnya dar
a.
Rel R.41/42.
Untuk tiap 1 M panjang spoor
Upah :
0.04980
oh
Mandor
@. Rp
109,800
0.11770
oh
Pekerja
@. Rp
83,300
JUMLAH
Rel R.50.
Untuk tiap 1 M panjang spoor
Upah :
0.0660
oh
Mandor
@. Rp
109,800
0.13390
oh
Pekerja
@. Rp
83,300
JUMLAH
Rel R.54.
Untuk tiap 1 M panjang spoor
Upah :
0.0660
oh
Mandor
@. Rp
109,800
0.13450
oh
Pekerja
@. Rp
83,300
108
JUMLAH
oh
Mandor
@. Rp
109,800
0.100
oh
Pekerja
@. Rp
83,300
JUMLAH
b.
oh
Mandor
@. Rp
109,800
0.1200
oh
Pekerja
@. Rp
83,300
JUMLAH
109
c.
oh
Mandor
@. Rp
109,800
0.1400
oh
Pekerja
@. Rp
83,300
JUMLAH
d.
oh
Mandor
@. Rp
109,800
0.1670
oh
Pekerja
@. Rp
83,300
JUMLAH
e.
oh
Mandor
@. Rp
109,800
0.1800
oh
Pekerja
@. Rp
83,300
JUMLAH
oh
Mandor
@. Rp
109,800
0.6160
oh
Pekerja
@. Rp
83,300
JUMLAH
b.
oh
Mandor
@. Rp
109,800
0.7330
oh
Pekerja
@. Rp
83,300
JUMLAH
c.
oh
Mandor
@. Rp
109,800
0.7920
oh
Pekerja
@. Rp
83,300
JUMLAH
Rel R.25.
Untuk tiap 1 M panjang sepur
110
Upah :
0.0120
oh
Mandor
@. Rp
109,800
0.0960
oh
Pekerja
@. Rp
83,300
JUMLAH
b.
Rel R.33.
Untuk tiap 1 M panjang sepur
Upah :
0.0120
oh
Mandor
@. Rp
109,800
0.1240
oh
Pekerja
@. Rp
83,300
JUMLAH
c.
Rel R.41/42.
Untuk tiap 1 M panjang sepur
Upah :
0.0120
oh
Mandor
@. Rp
109,800
0.1580
oh
Pekerja
@. Rp
83,300
JUMLAH
111
d.
Rel R.50.
Untuk tiap 1 M panjang sepur
Upah :
0.01820
oh
Mandor
@. Rp
109,800
0.1880
oh
Pekerja
@. Rp
83,300
JUMLAH
e.
Rel R.54.
Untuk tiap 1 M panjang sepur
Upah :
0.01960
oh
Mandor
@. Rp
109,800
0.20300
oh
Pekerja
@. Rp
83,300
JUMLAH
Rel R.25.
Untuk tiap 1 M panjang sepur
Upah :
0.01260
oh
Mandor
@. Rp
109,800
0.10100
oh
Pekerja
@. Rp
83,300
JUMLAH
b.
Rel R.33.
Untuk tiap 1 M panjang sepur
Upah :
0.01260
oh
Mandor
@. Rp
109,800
0.13000
oh
Pekerja
@. Rp
83,300
JUMLAH
c.
Rel R.41/42.
Untuk tiap 1 M panjang sepur
Upah :
0.0120
oh
Mandor
@. Rp
109,800
0.1620
oh
Pekerja
@. Rp
83,300
JUMLAH
d.
Rel R.50.
Untuk tiap 1 M panjang sepur
Upah :
0.0150
oh
Mandor
@. Rp
109,800
0.2020
oh
Pekerja
@. Rp
83,300
JUMLAH
112
e.
Rel R.54.
Untuk tiap 1 M panjang sepur
Upah :
0.01620
oh
Mandor
@. Rp
109,800
0.21800
oh
Pekerja
@. Rp
83,300
JUMLAH
oh
Mandor
@. Rp
109,800
12.0
oh
Pekerja
@. Rp
83,300
JUMLAH
113
b.
oh
Mandor
@. Rp
109,800
16.0
oh
Pekerja
@. Rp
83,300
JUMLAH
c.
oh
Mandor
@. Rp
109,800
20.0
oh
Pekerja
@. Rp
83,300
JUMLAH
d.
oh
Mandor
@. Rp
109,800
26.0000
oh
Pekerja
@. Rp
83,300
JUMLAH
JUMLAH
oh
Mandor
@. Rp
109,800
24.0
oh
Pekerja
@. Rp
83,300
JUMLAH
f.
oh
Mandor
@. Rp
109,800
32.0
oh
Pekerja
@. Rp
83,300
JUMLAH
g.
oh
Mandor
@. Rp
109,800
114
40.0
oh
Pekerja
@. Rp
83,300
JUMLAH
h.
oh
Mandor
@. Rp
109,800
52.0
oh
Pekerja
@. Rp
83,300
JUMLAH
I.
Kruis stuk (sepur silang) rel R.25 sudut 1:10 dan 1:8.
Untuk 1 unit wesel ;
Upah :
0.50
oh
Mandor
@. Rp
109,800
6.00
oh
Pekerja
@. Rp
83,300
JUMLAH
115
j.
Kruis stuk (sepur silang) rel R.33 sudut 1:10 dan 1:8.
Untuk 1 unit wesel ;
Upah :
0.500
oh
Mandor
@. Rp
109,800
8.000
oh
Pekerja
@. Rp
83,300
JUMLAH
k.
oh
Mandor
@. Rp
109,800
10.180
oh
Pekerja
@. Rp
83,300
JUMLAH
l.
oh
Mandor
@. Rp
109,800
13.10
oh
Pekerja
@. Rp
83,300
JUMLAH
m.
oh
Mandor
@. Rp
109,800
13.10
oh
Pekerja
@. Rp
83,300
JUMLAH
n.
oh
Mandor
@. Rp
109,800
13.10
oh
Pekerja
@. Rp
83,300
ls
ls
116
Upah :
1.500
oh
Mandor
@. Rp
109,800
18.000
oh
Pekerja
@. Rp
83,300
JUMLAH
b.
oh
Mandor
@. Rp
109,800
22.00
oh
Pekerja
@. Rp
83,300
JUMLAH
c.
oh
Mandor
@. Rp
109,800
26.00
oh
Pekerja
@. Rp
83,300
JUMLAH
117
d.
oh
Mandor
@. Rp
109,800
33.00
oh
Pekerja
@. Rp
83,300
JUMLAH
e.
oh
Mandor
@. Rp
109,800
34.0
oh
Pekerja
@. Rp
83,300
JUMLAH
f.
oh
Mandor
@. Rp
109,800
42.00
oh
Pekerja
@. Rp
83,300
JUMLAH
g.
oh
Mandor
@. Rp
109,800
50.00
oh
Pekerja
@. Rp
83,300
JUMLAH
h.
oh
Mandor
@. Rp
109,800
64.00
oh
Pekerja
@. Rp
83,300
JUMLAH
26 MERUCAT WESEL
- Mempreteli yang telah dikeluarkan dari lintas;
- Menyusun bekas bongkarannya diatas stapeling, jarak angkut 15 M.
- Mengumpulkan komponen alat-alat kecil wesel digudangterdekat
a.
118
Upah :
0.80
oh
Mandor
@. Rp
109,800
8.00
oh
Pekerja
@. Rp
83,300
JUMLAH
b.
oh
Mandor
@. Rp
109,800
10.0
oh
Pekerja
@. Rp
83,300
JUMLAH
c.
oh
Mandor
@. Rp
109,800
12.0
oh
Pekerja
@. Rp
83,300
JUMLAH
119
d.
oh
Mandor
@. Rp
109,800
15.0
oh
Pekerja
@. Rp
83,300
JUMLAH
e.
oh
Mandor
@. Rp
109,800
15.0
oh
Pekerja
@. Rp
83,300
JUMLAH
f.
oh
Mandor
@. Rp
109,800
18.0
oh
Pekerja
@. Rp
83,300
JUMLAH
g.
oh
Mandor
@. Rp
109,800
20.0
oh
Pekerja
@. Rp
83,300
JUMLAH
h.
oh
Mandor
@. Rp
109,800
26.00
oh
Pekerja
@. Rp
83,300
JUMLAH
120
Upah :
0.20120
oh
Mandor
@. Rp
109,800
5.88100
oh
Pekerja
@. Rp
83,300
JUMLAH
Analisa Kutami
b.
oh
Mandor
@. Rp
109,800
8.450
oh
Pekerja
@. Rp
83,300
JUMLAH
Analisa Kutami
c.
oh
Mandor
@. Rp
109,800
37.64690
oh
Pekerja
@. Rp
83,300
Analisa Kutami
JUMLAH
121
d.
oh
Mandor
@. Rp
109,800
51.0
oh
Pekerja
@. Rp
83,300
JUMLAH
e.
oh
Mandor
@. Rp
109,800
8.79050
oh
Pekerja
@. Rp
83,300
JUMLAH
Analisa Kutami
f.
oh
Mandor
@. Rp
109,800
11.70
oh
Pekerja
@. Rp
83,300
JUMLAH
Analisa Kutami
g.
oh
Mandor
@. Rp
109,800
55.0
oh
Pekerja
@. Rp
83,300
JUMLAH
h.
oh
Mandor
@. Rp
109,800
71.0
oh
Pekerja
@. Rp
83,300
JUMLAH
@. Rp
@. Rp
109,800
83,300
JUMLAH
Bahan :
0.5
bh
@ Rp
56,180
122
JUMLAH
29 MENGEBOR REL.25, 33, 41/42, 50/54.
Untuk tiap titik bor
Upah :
0.0220 oh Mandor
0.1250 oh Pekerja
@ Rp.
@ Rp.
109,800
83,300
JUMLAH
Bahan :
0.0500
bh
@ Rp.
842,700
JUMLAH
oh
Mandor
@. Rp
109,800
0.06800
oh
Pekerja
@. Rp
83,300
JUMLAH
123
oh
Mandor
@. Rp
109,800
0.07800
oh
Pekerja
@. Rp
83,300
JUMLAH
oh
Mandor
@. Rp
109,800
0.08500
oh
Pekerja
@. Rp
83,300
JUMLAH
oh
Mandor
@. Rp
109,800
0.10900
oh
Pekerja
@. Rp
83,300
JUMLAH
oh
Mandor
@. Rp
109,800
0.1600
oh
Pekerja
@. Rp
83,300
JUMLAH
b.
oh
Mandor
@. Rp
109,800
0.3200
oh
Pekerja
@. Rp
83,300
124
JUMLAH
c.
oh
Mandor
@. Rp
109,800
0.4200
oh
Pekerja
@. Rp
83,300
JUMLAH
oh
Mandor
@. Rp
109,800
0.1760
oh
Pekerja
@. Rp
83,300
JUMLAH
125
b.
oh
Mandor
@. Rp
109,800
0.3520
oh
Pekerja
@. Rp
83,300
JUMLAH
c.
oh
Mandor
@. Rp
109,800
0.4620
oh
Pekerja
@. Rp
83,300
JUMLAH
oh
Mandor
@. Rp
109,800
0.3040
oh
Pekerja
@. Rp
83,300
JUMLAH
b.
oh
Mandor
@. Rp
109,800
0.5400
oh
Pekerja
@. Rp
83,300
JUMLAH
c.
oh
Mandor
@. Rp
109,800
0.6000
oh
Pekerja
@. Rp
83,300
JUMLAH
126
oh
Mandor
@. Rp
109,800
0.433300
oh
Pekerja
@. Rp
83,300
JUMLAH
b.
oh
Mandor
@. Rp
109,800
0.624200
oh
Pekerja
@. Rp
83,300
JUMLAH
127
c.
oh
Mandor
@. Rp
109,800
0.711900
oh
Pekerja
@. Rp
83,300
JUMLAH
36 ANGKAT LISTRING DENGAN MTT PADA JALAN REL BANTALAN KAYU DAN BETON.
Untuk kecepatan > 60 km/jam
Dilaksanakan setelah dilalui sekurang-kurangnya 2 KA pada kec. 60 km/jam.
Untuk tiap 1 M'sp :
Upah :
0.0350
oh
@. Rp
92,086
0.3500
oh
Pekerja
@. Rp
83,300
3.0000
kali
@. Rp
11,000
1.0000
kali
@. Rp
6,100
1.0000
kali
@. Rp
6,300
JUMLAH
oh
Mandor
@. Rp
109,800
0.03090
oh
Pekerja
@. Rp
83,300
JUMLAH
Analisa Kutami
Bahan :
0.0500
kg
@. Rp
18,600
1.0000
ls
Alat bantu
@. Rp
7,040
Analisa Kutami
JUMLAH
TOTAL BIAYA /M'
128
0.00260
oh
Mandor
@. Rp
109,800
0.03660
oh
Pekerja
@. Rp
83,300
JUMLAH
Analisa Kutami
Bahan :
0.0500
kg
@. Rp
19,700
1.0000
ls
Alat bantu
@. Rp
7,900
JUMLAH
Analisa Kutami
oh
Mandor
@. Rp
109,800
0.04180
oh
Pekerja
@. Rp
83,300
JUMLAH
129
Bahan :
0.05
kg
@. Rp
19,700
ls
Alat bantu
@. Rp
7,040
JUMLAH
oh
Mandor
@. Rp
109,800
0.0550
oh
Pekerja
@. Rp
83,300
JUMLAH
Bahan :
0.05
kg
@. Rp
19,700
ls
Alat bantu
@. Rp
7,040
JUMLAH
oh
Mandor
@. Rp
109,800
11.1000
oh
Pekerja
@. Rp
83,300
JUMLAH
Bahan :
10.0000
kg
@. Rp
19,700
1.0000
ls
Alat bantu
@. Rp
7,750
JUMLAH
130
0.92500
oh
Mandor
@. Rp
109,800
14.80000
oh
Pekerja
@. Rp
83,300
JUMLAH
Bahan :
10.0000
kg
@. Rp
19,700
1.0000
ls
Alat bantu
@. Rp
7,750
JUMLAH
Analisa Kutami
oh
Mandor
@. Rp
109,800
22.20000
oh
Pekerja
@. Rp
83,300
JUMLAH
131
Bahan :
10.0000
kg
@. Rp
19,700
1.0000
ls
Alat bantu
@. Rp
7,750
JUMLAH
Analisa Kutami
oh
Mandor
@. Rp
109,800
29.2000
oh
Pekerja
@. Rp
83,300
JUMLAH
Bahan :
10.00
kg
@. Rp
19,700
1.00
ls
Alat bantu
@. Rp
7,750
JUMLAH
oh
Mandor
@. Rp
109,800
18.50000
oh
Pekerja
@. Rp
83,300
JUMLAH
Analisa Kutami
Bahan :
15.00
kg
@. Rp
19,700
1.0000
ls
Alat bantu
@. Rp
7,750
Analisa Kutami
JUMLAH
TOTAL BIAYA /UNIT
132
0.92500
oh
Mandor
@. Rp
109,800
25.9000
oh
Pekerja
@. Rp
83,300
JUMLAH
Analisa Kutami
Bahan :
15.0000
kg
@. Rp
19,700
1.0000
ls
Alat bantu
@. Rp
7,750
JUMLAH
Analisa Kutami
oh
Mandor
@. Rp
109,800
33.30
oh
Pekerja
@. Rp
83,300
Analisa Kutami
JUMLAH
133
Bahan :
15.00
kg
@. Rp
19,700
1.00
ls
Alat bantu
@. Rp
7,750
JUMLAH
Analisa Kutami
oh
Mandor
@. Rp
109,800
43.9000
oh
Pekerja
@. Rp
83,300
JUMLAH
Analisa Kutami
Bahan :
15.0000
kg
Kawat f 5 mm (pengikat)
@. Rp
19,700
1.0000
ls
Alat bantu
@. Rp
7,750
JUMLAH
Analisa Kutami
oh
Pekerja
@. Rp
83,300
JUMLAH
Analisa Kutami
Bahan :
1.0000
ls
Alat bantu
@. Rp
7,750
JUMLAH
Analisa Kutami
oh
Pekerja
@. Rp
Analisa Kutami
83,300
JUMLAH
* Alat bantu: Material/alat kerja yang dipakai untuk memudahkan perkerjaan tersebut
Contoh:
134
oh
Pekerja
@. Rp
83,300
JUMLAH
Bahan :
1.00000
ls
Alat bantu
@. Rp
7,750
JUMLAH
135
Peron + 1,000
0.07
10.4
1
0.01670
oh
Mandor
0.64750
oh
Pekerja
@. Rp
0.06
Kolom Panel Beton 20 x 20 cm
@. Rp
0.06 109,800
0.20
83,300
JUMLAH
0.08
Bahan :
1.00000
ls
Alat bantu
1.00 @.
Balas
0.60
Rp
SubBalas
JUMLAH
Balas di gorek
3 L
TOTAL BIAYA
/M3
Karung goni
Balas
7,750
Galian dinding
0.70panel beton sedalam 20 cm
0.20
SubBalas
- Bila hanya pekerjaan bongkar saja dihitung 0.5 dari biaya upah
Untuk tiap 1 m3 Tanah :
Tanah asli
Tanah asli
Upah :
L
2
3
0.40
0.01300
oh
Mandor
@. Rp
109,800
0.55500
oh
Pekerja
@. Rp
83,300
JUMLAH
Bahan :
1.00000
ls
Alat bantu
@. Rp
7,750
JUMLAH
oh
Mandor
@. Rp
109,800
0.02890
oh
Pekerja
@. Rp
83,300
JUMLAH
Bahan :
1.00000
ls
Alat bantu
@. Rp
7,750
JUMLAH
TOTAL BIAYA /M
136
Upah :
0.00650
oh
Mandor
@. Rp
109,800
0.06680
oh
Pekerja
@. Rp
83,300
JUMLAH
Bahan :
1.0000
ls
Alat bantu
@. Rp
7,750
JUMLAH
TOTAL BIAYA /M
oh
Mandor
@. Rp
109,800
0.07680
oh
Pekerja
@. Rp
83,300
JUMLAH
137
Bahan :
1.0000
ls
Alat bantu
@. Rp
7,750
JUMLAH
TOTAL BIAYA /M
oh
Mandor
@. Rp
109,800
0.10120
oh
Pekerja
@. Rp
83,300
JUMLAH
Bahan :
1.0000
ls
Alat bantu
@. Rp
7,750
JUMLAH
TOTAL BIAYA /M
oh
Pekerja
@. Rp
83,300
JUMLAH
* Alat bantu : Material/alat kerja yang dipakai untuk memudahkan pekerjaan tersebut.
Contoh : Balok angkutan rel, pikulan, tali, pengki.
TOTAL BIAYA /BTG
oh
Tukang
@. Rp
84,316
0.0120
oh
Pekerja
@. Rp
83,300
JUMLAH
b.
oh
Tukang
@. Rp
84,316
0.0200
oh
Pekerja
@. Rp
83,300
138
JUMLAH
TOTAL BIAYA /MSP
lt
Solar
@ Rp
7,500
0.150
tbg
Oxigen
@ Rp
101,100
0.070
tbg
Acetylin
@ Rp
117,300
1.500
lt
Bensin campur
@ Rp
8,000
0.050
lt
Olie SAE 40
@ Rp
34,100
0.050
kg
@ Rp
9,500
0.300
bh
@ Rp
49,300
0.020
bh
@ Rp
365,100
1.200
kg
@ Rp
70,200
0.300
kg
@ Rp
134,620
JUMLAH
1)
139
2) Upah kerja
0.200
oh
Pengawas
@ Rp
109,800
0.400
oh
Tukang las
@ Rp
84,316
0.400
oh
Tukang gurinda
@ Rp
84,316
0.200
oh
@ Rp
83,300
JUMLAH
2)
3) Lain-lain
0.200
Unit
Transportasi
@ Rp
168,500
0.600
Unit
Pengamanan operasi
@ Rp
106,000
JUMLAH
3)
TOTAL BIAYA /
B.
lt
Solar
@ Rp
7,500
0.150
tbg
Oxigen
@ Rp
101,100
0.070
tbg
Acetylin
@ Rp
117,300
1.500
lt
Bensin campur
@ Rp
8,000
0.050
lt
Olie SAE 40
@ Rp
34,100
0.050
lb
Kain lap
@ Rp
9,500
0.300
bh
@ Rp
49,300
0.020
bh
@ Rp
365,100
1.300
kg
@ Rp
70,200
0.400
kg
@ Rp
134,620
JUMLAH
1)
2) Upah kerja
0.200
oh
Pengawas
@ Rp
109,800
0.400
oh
Tukang las
@ Rp
84,316
0.400
oh
Tukang gurinda
@ Rp
84,316
0.200
oh
@ Rp
83,300
JUMLAH
2)
3) Lain-lain
0.200
Unit
Transportasi
@ Rp
168,500
0.600
Unit
Pengamanan operasi
@ Rp
106,000
JUMLAH
3)
TOTAL BIAYA /
140
C.
tbg
Oxigen
@ Rp
101,100
0.0300
tbg
Elpiji 46 kg
@ Rp
337,000
1.5000
lt
Bensin
@ Rp
7,600
0.0600
lt
Olie SAE 40
@ Rp
34,100
0.0200
kg
@ Rp
9,500
0.0100
lb
@ Rp
140,450
0.1500
bh
@ Rp
49,300
0.0050
bh
Regulator oxigen
@ Rp
561,800
0.0050
bh
@ Rp
561,800
JUMLAH
1)
2) Bahan las
1.000
set
Bahan las
@ Rp
1,009,300
JUMLAH
2)
141
3) Upah kerja
0.250
oh
Pengawas
@ Rp
109,800
0.500
oh
Tukang las
@ Rp
84,316
0.500
oh
Tukang gurinda
@ Rp
84,316
0.750
oh
@ Rp
83,300
JUMLAH
3)
4) Lain-lain
0.200
unit
Transportasi
@ Rp
168,500
0.600
unit
Pengamanan operasi
@ Rp
106,000
JUMLAH
4)
TOTAL BIAYA /
: 100 mm
lebar
dalam
: 5 mm
lt
Solar
@ Rp
7,500
1.000
lt
Bensin murni
@ Rp
7,600
1.000
lt
Bensin campur
@ Rp
8,000
0.020
lt
Olie SAE 40
@ Rp
34,100
0.010
bh
@ Rp
365,100
0.200
bh
@ Rp
49,300
0.200
kg
Elektroda layer
@ Rp
70,200
0.300
kg
Elektroda pengerasan
@ Rp
134,620
0.020
kg
Kain lap
@ Rp
9,500
JUMLAH
1)
2 Upah kerja
0.10
oh
Pengawas
@ Rp
109,800
0.10
oh
Tukang las
@ Rp
84,316
0.10
oh
Tukang gurinda
@ Rp
84,316
0.20
oh
@ Rp
83,300
JUMLAH
2)
3 Lain-lain
0.10
unit
Transportasi
@ Rp
168,500
0.20
unit
Pengamanan operasi
@ Rp
106,000
142
JUMLAH
3)
Pengecekan keretakan
1.00 paket pemeriksaan awal, persiapan,
@ Rp
109,800
@ Rp
83,300
Jumlah 1
Bahan pendukung
0.1750
btl
penetron cleaner
@ Rp
106,700
0.1250
btl
penetron revelator
@ Rp
106,700
1.0000
bh
disc gurinda
@ Rp
365,100
143
0.5000
bh
thermometer 200oC
@ Rp
56,180
0.2500
bh
@ Rp
365,100
5.0000
kg
@ Rp
168,540
Jumlah 2
ltr
solar
@ Rp
7,500
25.000
ltr
bensin
@ Rp
7,600
2.000
ltr
@ Rp
34,100
0.0750
btl
elpiji
@ Rp
90,000
0.0750
btl
oxygen
@ Rp
95,400
Jumlah 3
oh
pengawas
@ Rp
109,800
0.500
oh
Mandor
@ Rp
109,800
2.000
oh
tukang las
@ Rp
84,316
2.000
oh
tukang gerinda
@ Rp
84,316
4.000
oh
pekerja
@ Rp
83,300
Jumlah 4
Lain - lain
1.00 paket
@ Rp
106,000
1.00 paket
transportasi
@ Rp
168,500
1.00 paket
pemberesan lokasi
@ Rp
106,000
1.00
penjagaan semboyan
@ Rp
83,300
oh
Jumlah 5
Upah (1+4+5) :
Bahan (2+3) :
TOTAL BIAYA /UNIT
b. Kerusakan sedang
- Hanya mengelas rel yang depek = 8 ~ 13 ttk/wesel
- 1 titik las = panjang 10 cm, lebar sesuai kepala rel, tebal = 5 mm.
1
Pengecekan keretakan
1.00 paket pemeriksaan awal, persiapan,
penggerindaan awal untuk pengecekan adanya
keretakan jarum
@ Rp
109,800
@ Rp
83,300
Jumlah 1
144
Bahan pendukung
0.350
btl
penetron cleaner
@ Rp
106,700
0.250
btl
penetron revelator
@ Rp
106,700
2.000
bh
disc gurinda
@ Rp
365,100
0.500
bh
thermometer 200oC
@ Rp
56,180
0.500
bh
@ Rp
365,100
10.000
kg
@ Rp
168,540
Jumlah 2
ltr
solar
@ Rp
7,500
60.00
ltr
bensin
@ Rp
7,600
4.80
ltr
@ Rp
34,100
0.18
btl
elpiji
@ Rp
90,000
0.18
btl
oxygen
@ Rp
95,400
Jumlah 3
145
oh
pengawas
@ Rp
109,800
1.00
oh
mandor
@ Rp
109,800
4.00
oh
tukang las
@ Rp
84,316
4.00
oh
tukang gerinda
@ Rp
84,316
8.00
oh
pekerja
@ Rp
83,300
Jumlah 4
Lain - lain
1.00 paket
@ Rp
106,000
1.00 paket
transportasi
@ Rp
168,500
1.00 paket
pemberesan lokasi
@ Rp
106,000
4.00
penjagaan semboyan
@ Rp
83,300
oh
Jumlah 5
Upah ( 1+4+5) :
Bahan (2+3) :
TOTAL BIAYA /UNIT
c. Kerusakan berat
- Hanya mengelas rel yang depek > 13 ttk/wesel
- 1 titik las = panjang 10 cm, lebar sesuai kepala rel, tebal = 5 mm.
1
Pengecekan keretakan
1.00 paket pemeriksaan awal, persiapan,
penggerindaan awal untuk pengecekan adanya
@ Rp
109,800
@ Rp
83,300
keretakan jarum
2
Jumlah 1
Bahan pendukung
0.70
btl
penetron cleaner
@ Rp
106,700
0.50
btl
penetron revelator
@ Rp
106,700
4.00
bh
disc gurinda
@ Rp
365,100
2.00
bh
thermometer 200oC
@ Rp
56,180
1.00
bh
@ Rp
365,100
20.00
kg
@ Rp
168,540
Jumlah 2
ltr
solar
@ Rp
7,500
100.00
ltr
bensin
@ Rp
7,600
8.00
ltr
@ Rp
34,100
0.30
btl
elpiji
@ Rp
90,000
0.30
btl
oxygen
@ Rp
95,400
146
Jumlah 3
4
oh
pengawas
@ Rp
109,800
2.00
oh
mandor
@ Rp
109,800
8.00
oh
tukang las
@ Rp
84,316
8.00
oh
tukang gerinda
@ Rp
84,316
16.00
oh
pekerja
@ Rp
83,300
Jumlah 4
Lain - lain
1.00 paket
@ Rp
106,000
1.00 paket
transportasi
@ Rp
168,500
1.00 paket
pemberesan lokasi
@ Rp
106,000
4.00
penjagaan semboyan
@ Rp
83,300
oh
Jumlah 5
Upah ( 1+4+5) :
Bahan (2+3) :
TOTAL BIAYA /UNIT
147
Ls
Ls
Ls
Ls
Ls
JUMLAH
3,975,000
15,300
33,700
JUMLAH
Upah :
0.04000
0.11500
0.01400
0.00490
Analisa Kutami
b.
c.
oh
oh
oh
oh
Mandor
Tukang kayu
Pekerja
Juru ukur(surveyor)
@
@
@
@
Rp
Rp
Rp
Rp
109,800
84,316
83,300
92,086
JUMLAH
Menggeser lengkung
0.02050 oh Mandor
0.78460 oh Pekerja
Analisa Kutami
Jumlah Upah Total
Jumlah Bahan Total
@ Rp
@ Rp
JUMLAH
109,800
83,300
JUMLAH
- Untuk pengukuran anak panah dan pertinggian sebelum dan sesudah pekerjaan revisi lengkung dapat dilakukan ple
- Untuk perencanaan perhitungan dan penggambaran geseran lengkung dapat dilakukan oleh Tenaga Dinas
65 MEMBUAT DRAINASE DARI PASANGAN BATU KOSONG DI BUNGKUS IJUK TIAP M3
a.
oh
Mandor
@ Rp
109,800
1.000
oh
Pekerja
@ Rp
83,300
JUMLAH
Pasang drainase
148
Upah :
0.0750
oh
Mandor
@ Rp
109,800
1.6500
oh
Pekerja
@ Rp
83,300
JUMLAH
Bahan :
1.2000
m3
Batu kali
@ Rp
169,600
3.0000
kg
Ijuk
@ Rp
12,000
JUMLAH
149
66 PEKERJAAN REL
Untuk tiap 1 ton
a.
oh
Mandor
@ Rp
109,800
0.06750
oh
Pekerja
@ Rp
83,300
JUMLAH
Analisa Kutami
b.
42
kg / m'
oh
Mandor
@ Rp
109,800
0.02090
oh
Pekerja
@ Rp
83,300
JUMLAH
Untuk 1 Ton :
Upah =
1000 Kg
@ Rp
3,168
@ Rp
1,590,000
42
Bahan :
0.00450
m3
Kayu ganjal
JUMLAH
TOTAL BIAYA /TON
c.
Pekerjaan Angkut rel ke atas gerobag dilokasi penimbunan dan dibongkar dilokasi tujuan
Angkut rel dengan KA per ton menggunakan SKAD
Upah :
0.50
oh
Mandor
@ Rp
109,800
5.00
oh
Pekerja
@ Rp
83,300
JUMLAH
Bahan :
0.00450
m3
Kayu ganjal
@ Rp
1,590,000
0.050
kg
Kawat Pral
@ Rp
19,700
JUMLAH
Untuk biaya angkut dengan kereta api mengikut instruksi direksi PT. KAI
d.
oh
Operator Forklift
@ Rp
102,300
0.049400
oh
Pekerja
@ Rp
83,300
0.004940
oh
Mandor
@ Rp
109,800
150
JUMLAH
Bahan :
0.005
m3
Kayu ganjal
@ Rp
1,590,000
0.050
kg
Kawat Pral
@ Rp
19,700
JUMLAH
Alat :
0.0370
jam
@ Rp
JUMLAH
TOTAL BIAYA /TON
e.
Angkut rel keatas Trailer (*minimal 25 km, lebih dari 25 km disesuaikan jarak tempuhnya) dengan mengg
Untuk tiap 1 ton
Upah :
5.000
oh
Pekerja
@Rp.
83,300.00
0.500
oh
Mandor
@Rp.
109,800.00
JUMLAH
151
Jasa :
30.000
Km
@Rp.
3,180.00
JUMLAH
Bahan :
0.500
Kg
Kawat pral
@Rp.
19,700.00
JUMLAH
oh
Mandor
@ Rp
109,800
0.2000
oh
Pekerja
@ Rp
83,300
JUMLAH
Alat :
2.008030
Jam
Jack Hammer
@ Rp
12,500
2.008030
Jam
Compresor
@ Rp
62,500
JUMLAH
oh
Pekerja
@Rp.
83,300
0.77380
oh
Mandor
@Rp.
109,800
JUMLAH
Analisa Kutami
b
oh
Pekerja
@Rp.
83,300
0.05000
oh
Mandor
@Rp.
109,800
JUMLAH
oh
Pekerja
@Rp.
83,300
0.01000
oh
Mandor
@Rp.
109,800
JUMLAH
Memasukan balas kricak baru balas telah tersedia di tubuh jalan, dan Mendandang / memecok untuk kec
Upah :
152
0.46430
oh
Pekerja
@Rp.
83,300
0.13930
oh
Mandor
@Rp.
109,800
JUMLAH
Analisa Kutami
e
oh
Mandor
@ Rp
109,800
0.1417440
oh
Pekerja
@ Rp
83,300
JUMLAH
Bahan :
1.6691000
m3
@ Rp
185,500
0.1478880
m3
@ Rp
196,000
98.58570
kg
Aspal
@ Rp
9,500
0.46000
Jam
Babyrollers
@ Rp
86,000
JUMLAH
153
ton
142,000
JUMLAH
oh
mandor
@Rp.
109,800.00
0.2240
oh
pekerja
@Rp.
83,300.00
JUMLAH
Bahan :
0.050
bh
mata bor
@Rp.
842,700.00
1.000
unit
alat bantu
@Rp.
6,700.00
JUMLAH
TOTAL BIAYA /M'
154
155
oh
Pekerja
@Rp.
83,300.00
2.00
oh
Tukang
@Rp.
84,316.00
1.00
oh
Kepala Tukang
@Rp.
99,073.00
7.00
oh
JUMLAH
600,905.00
Upah OH Pengecatan
8.00
oh
Pekerja
@Rp.
83,300.00
1.00
oh
Tukang
@Rp.
84,316.00
1.00
oh
Kepala Tukang
@Rp.
99,073.00
10.00
oh
JUMLAH
849,789.00
oh
Pekerja
@Rp.
83,300.00
2.08920
oh
Tukang
@Rp.
84,316.00
JUMLAH
Analisa Kutami
Harga satuan upah untuk 1 m2 = 1/12 x
520,315.27
Bahan :
0.520
M3
@Rp.
3,975,000.00
16.000
Lbr
Seng BJLS 28
@Rp.
30,300.00
13.000
Lbr
Triplek tebal 4 mm
@Rp.
56,700.00
2.000
Kg
Paku campur
@Rp.
16,800.00
0.500
Kg
Paku seng
@Rp.
23,500.00
JUMLAH
3,332,641.32
TOTAL BIAYA /M
156
8.000
oh
Pekerja
@Rp.
83,300.00
2.000
oh
Tukang
@Rp.
84,316.00
JUMLAH
835,032.00
Bahan :
0.790
m3
@Rp.
3,975,000.00
20.000
Lbr
Seng BJLS 28
@Rp.
30,300.00
20.000
Lbr
Triplek tebal 4 mm
@Rp.
56,700.00
3.000
kg
Paku campur
@Rp.
16,800.00
0.750
kg
Paku seng
@Rp.
23,500.00
0.900
m3
Beton tumbuk
@Rp.
616,484.00
JUMLAH
5,503,110.60
TOTAL BIAYA /M
157
oh
Pekerja
@Rp.
83,300.00
4.78170
oh
Tukang
@Rp.
84,316.00
JUMLAH
Analisa Kutami
Harga satuan upah untuk 1 m2 = 1/27 x
1,451,254.42
Bahan :
1.15020
m3
@Rp.
3,975,000.00
29.99970
Lbr
Seng BJLS 28
@Rp.
30,300.00
24.00030
Lbr
Triplek tebal 4 mm
@Rp.
56,700.00
3.99870
kg
Paku campur
@Rp.
16,800.00
0.99900
kg
Paku seng
@Rp.
23,500.00
2.00070
bh
@Rp.
420,000.00
3.99870
bh
@Rp.
170,000.00
1.35000
m3
Beton tumbuk
@Rp.
616,484.00
JUMLAH
9,284,833.98
TOTAL BIAYA /M
oh
Pekerja
@Rp.
83,300.00
JUMLAH
Analisa Kutami
TOTAL BIAYA /M
oh
Pekerja
@Rp.
83,300.00
0.50
oh
Mandor
@Rp.
109,800.00
JUMLAH
Jasa :
35.00
Km
@Rp.
3,180.00
JUMLAH
Bahan :
158
0.50
Kg
Kawat pral
@Rp.
18,600.00
JUMLAH
oh
Operator Forklift
@ Rp
102,300
0.0494000
oh
Pekerja
@ Rp
83,300
0.0049400
oh
Mandor
@ Rp
109,800
JUMLAH
Bahan :
0.005
m3
Kayu ganjal
@ Rp
0.050
kg
Kawat Pral
@ Rp
18,600
JUMLAH
Untuk biaya angkut dengan kereta api mengikut instruksi direksi PT. KAI
-
Km
@Rp.
JUMLAH
159
Alat:
0.037040
jam
forklift
@ Rp
0
JUMLAH
Kg
Baja
@Rp.
16,900.00
10.00
Kg
Baut setel
@Rp.
31,460.00
55.00
Kg
Paku sumbat
@Rp.
15,300.00
5.00
Kg
Drip perusut
@Rp.
43,250.00
1.50
Kg
Cat Loodmenie A
@Rp.
67,400.00
1.50
Kg
Cat Loodmenie B
@Rp.
67,400.00
1.65
Kg
Cat Alluminium C
@Rp.
75,800.00
1.00
Kg
Cat Alluminium D
@Rp.
75,800.00
0.65
Kg
@Rp.
75,800.00
0.65
Kg
Cookes
@Rp.
8,600.00
0.50
Bh
@Rp.
15,500.00
1.00
Bh
@Rp.
40,100.00
0.20
Bh
@Rp.
1,089,600.00
0.30
Bh
@Rp.
34,600.00
0.20
Tb
LPG @ 12 kg
@Rp.
95,400.00
1.00
Tb
@Rp.
101,100.00
3.00
Kg
Majun
@Rp.
9,500.00
3.00
Kg
Sabun cream
@Rp.
8,900.00
24.00
Kg
Tambang manila
@Rp.
43,200.00
3.00
Bh
Karung plastik
@Rp.
2,900.00
15.00
Ltr
Minyak tanah
@Rp.
9,500.00
25.00
Ltr
Minyak solar
@Rp.
7,500.00
0.50
Ltr
@Rp.
34,100.00
0.40
M3
@Rp.
5,088,000.00
2.00
Bh
Senteleng bambu
@Rp.
74,200.00
JUMLAH
Upah :
1. Untuk jumlah perawatan dalam 1 jembatan < 0,20 Ton
450.00
Analisa Kutami
oh
Pelaksana
@Rp.
85,843.57
JUMLAH
160
2. Untuk jumlah perawatan dalam 1 jembatan > 0,200 ton < 0,500 ton
385.00
oh
Pelaksana
@Rp.
85,843.57
JUMLAH
Analisa Kutami
oh
Pelaksana
@Rp.
85,843.57
JUMLAH
Analisa Kutami
oh
Pelaksana
@Rp.
85,843.57
JUMLAH
161
Bahan :
1,100
Kg
Paku sumbat
@Rp.
15,300.00
14.00
Kg
Drip perusut
@Rp.
43,250.00
18.00
Kg
Baut stel
@Rp.
31,460.00
750.00
Kg
Cookes
@Rp.
8,600.00
3.00
Kg
Cat Loddmenie A
@Rp.
67,400.00
2.00
Kg
Cat Loddmenie B
@Rp.
67,400.00
1.00
Kg
Cat Alluminium C
@Rp.
75,800.00
1.00
Kg
Cat Alluminium D
@Rp.
75,800.00
1.00
Kg
@Rp.
75,800.00
24.00
Kg
Tambang manila
@Rp.
43,200.00
15.00
Bh
@Rp.
2,900.00
1.00
Bh
@Rp.
40,100.00
2.00
Bh
@Rp.
15,500.00
4.00
Bh
Senteleng bambu
@Rp.
74,200.00
600.00
Ltr
Minyak solar
@Rp.
7,500.00
12.00
Ltr
@Rp.
34,100.00
25.00
Ltr
Minyak tanah
@Rp.
9,500.00
JUMLAH
oh
Pelaksana
@Rp.
85,843.57
JUMLAH
Bahan :
1.00
Lbr
@Rp.
241,100.00
0.50
Kg
Baut setel
@Rp.
31,460.00
0.50
Kg
Cookes
@Rp.
8,600.00
0.40
Kg
Tambang manila
@Rp.
43,200.00
0.04
Bh
@Rp.
40,100.00
0.02
Bh
@Rp.
2,900.00
0.04
Bh
Senteleng bambu
@Rp.
74,200.00
0.20
m2
Pengecatan lengkap
@Rp.
84,978.90
JUMLAH
162
oh
Pelaksana
@Rp.
85,843.57
JUMLAH
Analisa Kutami
Upah memasukan
2.32140
oh
Pelaksana
@Rp.
85,843.57
JUMLAH
Analisa Kutami
Bahan
0.320
Zak
Cement Portland / PC @ 50 Kg
@Rp.
68,900.00
0.200
Kg
Tambang manila
@Rp.
43,200.00
0.020
Bh
Senteleng bambu
@Rp.
74,200.00
0.150
Kg
Paseline
@Rp.
16,700.00
JUMLAH
163
oh
Pelaksana
@Rp.
85,843.57
JUMLAH
Upah memasukan
3.00
oh
Pelaksana
@Rp.
85,843.57
JUMLAH
Bahan
0.480
Zak
Cement Portland / PC @ 50 Kg
@Rp.
68,900.00
0.500
Kg
Tambang manila
@Rp.
43,200.00
0.050
Bh
Senteleng bambu
@Rp.
74,200.00
0.250
Kg
Paseline
@Rp.
16,700.00
JUMLAH
oh
Pelaksana
@Rp.
85,843.57
JUMLAH
Upah memasukan
5.00
oh
Pelaksana
@Rp.
85,843.57
JUMLAH
Bahan
0.60
Zak
Cement Portland / PC @ 50 Kg
@Rp.
68,900.00
0.50
Kg
Tambang manila
@Rp.
43,200.00
0.05
Bh
Senteleng bambu
@Rp.
74,200.00
0.25
Kg
Paseline
@Rp.
16,700.00
JUMLAH
oh
Pelaksana
@Rp.
85,843.57
JUMLAH
Bahan
164
15.00
Kg
Bahan grouting
@Rp.
16,900.00
0.25
Bh
Ember
@Rp.
9,540.00
0.25
Kg
Tambang manila
@Rp.
43,200.00
4.00
Bh
Kek besi
@Rp.
6,100.00
0.50
Kg
Cookes
@Rp.
8,600.00
0.25
Kg
Cetok
@Rp.
18,500.00
0.20
Kg
Paseline
@Rp.
16,700.00
0.05
Bh
Snteleng bambu
@Rp.
74,200.00
JUMLAH
oh
Pelaksana
@Rp.
85,843.57
JUMLAH
165
Upah memasukkan
20.00
oh
Pelaksana
@Rp.
85,843.57
JUMLAH
Bahan
4.80
2.40
zak
Cement Portland / PC
@Rp.
68,900.00
0.80
0.40
m3
Pasir beton
@Rp.
213,000.00
1.00
0.50
m3
Split 1/2 cm
@Rp.
191,000.00
2.00
1.00
kg
Tambang manila
@Rp.
43,200.00
0.20
0.10
bh
Senteleng bambu
@Rp.
74,200.00
0.10
0.05
bh
@Rp.
40,100.00
6.00
3.00
kg
Cookes
@Rp.
8,600.00
2.00
1.00
ltr
Minyak tanah
@Rp.
9,500.00
JUMLAH
Volume andas beton = m3 x (1m3 dari analisa beton termasuk tulangan dan bekisting)
Beton K.175 dengan penulangan per 100 kg dan bekisting tinggi < 4m = Rp <dihitung>
Catatan :
oh
Pelaksana
@Rp.
85,843.57
JUMLAH
Analisa Kutami
Bahan
0.10
Bh
@Rp.
1,089,600.00
4.00
Bh
@Rp.
51,000.00
25.00
Kg
Cement Grouting
@Rp.
16,000.00
1.00
Bh
@Rp.
46,640.00
1.00
Ltr
Minyak solar
@Rp.
7,500.00
JUMLAH
OH
Pelaksana
@Rp.
85,843.57
JUMLAH
166
79 PENGGANTIAN JEMBATAN
A. Jembatan Bentang < 10 M'
Untuk tiap 1 ton
Upah
98.9910
oh
Pelaksana
@Rp.
85,843.57
JUMLAH
Analisa Kutami
Bahan
2.00
Btg
@Rp.
992,200.00
4.00
Bh
@Rp.
39,300.00
1.00
Kg
Cat Alluminium D
@Rp.
75,800.00
1.50
Kg
@Rp.
75,800.00
8.00
Bh
Paku tirefond
@Rp.
33,700.00
15.00
Kg
Cookes
@Rp.
8,600.00
50.00
Kg
Besi beton U 24
@Rp.
16,000.00
4.00
Zak
Cement Portland / PC
@Rp.
68,900.00
167
0.50
M3
Pasir beton
@Rp.
213,000.00
0.41
M3
Split
@Rp.
202,000.00
0.25
M3
@Rp.
179,700.00
4.00
Kg
Tambang manila
@Rp.
43,200.00
5.00
Ltr
Minyak tanah
@Rp.
9,500.00
0.50
Kg
Paseline
@Rp.
16,700.00
1.00
Bh
@Rp.
2,900.00
0.02
M3
Papan bekisting
@Rp.
56,700.00
0.40
Bh
@Rp.
15,500.00
0.20
Bh
Sikat bulu
@Rp.
13,400.00
5.00
Kg
Kawat pral
@Rp.
19,700.00
0.20
Bh
Senteleng bambu
@Rp.
74,200.00
0.25
Kg
Paku maskram
@Rp.
20,000.00
1.00
Bh
Gagang martil
@Rp.
3,900.00
0.50
Bh
Boor kayu
@Rp.
89,800.00
0.50
Bh
Cangkul
@Rp.
56,100.00
0.50
Bh
@Rp.
18,500.00
0.50
Bh
Linggis songkel
@Rp.
101,100.00
0.50
Bh
Linggis bobok
@Rp.
101,100.00
0.50
Bh
Martil besar @ 5 kg
@Rp.
67,400.00
0.20
Bh
Gergaji kayu
@Rp.
47,700.00
0.20
Bh
@Rp.
40,100.00
0.40
M3
@Rp.
3,975,000.00
2.00
Ton
@Rp.
150,000.00
JUMLAH
Catatan
oh
Pelaksana
@Rp.
85,843.57
JUMLAH
Analisa Kutami
Bahan
17.000
Kg
Paku sumbat / PS
@Rp.
15,300.00
15.000
Kg
Baut setel
@Rp.
31,460.00
5.000
Kg
Drip perusut
@Rp.
43,250.00
1.000
Btg
@Rp.
992,200.00
168
2.000
Bh
@Rp.
37,100.00
1.000
Kg
Cat Alluminium D
@Rp.
71,550.00
1.000
Kg
@Rp.
71,550.00
3.000
Bh
Paku tirefond
@Rp.
33,700.00
40.000
Kg
Cookes
@Rp.
8,600.00
20.000
Kg
Besi beton U 24
@Rp.
16,000.00
4.000
Zak
Cement Portland / PC
@Rp.
68,900.00
0.500
M3
Pasir beton
@Rp.
213,000.00
0.300
M3
Split
@Rp.
202,000.00
0.200
M3
@Rp.
179,700.00
2.000
Btg
Glugu
@Rp.
344,500.00
1.000
Bh
Cincin glugu
@Rp.
20,400.00
2.000
Bh
Sepatu glugu
@Rp.
20,100.00
1.000
Bh
@Rp.
34,980.00
1.000
Btl
Zat asam
@Rp.
101,100.00
0.200
Btl
LPG @ 12 Kg
@Rp.
95,400.00
169
4.000
Kg
Tambang manila
@Rp.
43,200.00
5.000
Ltr
Minyak tanah
@Rp.
9,500.00
8.000
Ltr
Minyak solar
@Rp.
7,500.00
0.500
Ltr
Olie SAE 40
@Rp.
34,100.00
0.200
Kg
Paseline
@Rp.
16,700.00
1.000
Bh
@Rp.
2,900.00
0.010
M3
Papan bekisting
@Rp.
56,700.00
0.200
ltr
Thinner
@Rp.
6,700.00
0.400
Bh
@Rp.
15,500.00
0.100
Bh
Sikat bulu
@Rp.
13,400.00
3.000
Kg
Kawat pral
@Rp.
18,600.00
0.200
Bh
Senteleng bambu
@Rp.
74,200.00
0.250
Kg
Paku maskram
@Rp.
18,870.00
0.500
Bh
Gagang martil
@Rp.
3,900.00
0.250
Bh
Boor kayu
@Rp.
84,800.00
0.250
Bh
Cangkul
@Rp.
53,000.00
0.100
Bh
@Rp.
17,500.00
0.100
Bh
Linggis songkel
@Rp.
101,100.00
0.100
Bh
Linggis bobok
@Rp.
101,100.00
0.300
Bh
Martil besar @ 5 kg
@Rp.
67,400.00
0.150
Bh
Gergaji kayu
@Rp.
47,700.00
0.120
Bh
Martil snaper
@Rp.
620,550.00
0.040
Bh
Snaper drodot
@Rp.
708,900.00
0.100
Bh
@Rp.
40,100.00
0.020
Bh
@Rp.
32,700.00
0.020
Bh
@Rp.
1,028,000.00
0.010
Bh
Reumer
@Rp.
336,800.00
0.100
M3
@Rp.
3,750,000.00
0.600
Ton
@Rp.
150,000.00
JUMLAH
80 PENGECATAN LENGKAP
Diketrek dan dicat 4 lapis, termasuk touchup/spot repair
Untuk tiap 1 m2.
Upah
0.750
oh
Pelaksana Pengecatan
@Rp.
84,978.90
JUMLAH
170
Bahan
0.0769240
ltr
Cat Loodmenie A
@Rp.
67,400.00
0.0769240
ltr
Cat Loodmenie B
@Rp.
67,400.00
0.0769240
ltr
Cat Alluminium C
@Rp.
75,800.00
0.0384620
ltr
Cat Alluminium D
@Rp.
75,800.00
0.0290
ltr
@Rp.
75,800.00
0.0100
ltr
Thiner
@Rp.
6,700.00
0.0200
Bh
@Rp.
19,600.00
0.0200
Bh
Sikat bulu
@Rp.
13,400.00
0.0400
Bh
@Rp.
15,500.00
0.0100
Btg
Bambu
@Rp.
19,600.00
0.0400
Kg
Tambang manila
@Rp.
43,200.00
0.0020
Kg
Majun
@Rp.
9,500.00
0.0020
Kg
Sabun cream
@Rp.
8,900.00
JUMLAH
TOTAL BIAYA /M2
81 MENGELUPAS PLESTERAN
Untuk tiap 1 m2
171
Upah
0.1380
oh
Pekerja
@Rp.
83,300.00
0.0120
oh
Mandor
@Rp.
109,800.00
JUMLAH
Bahan
0.0150
Bh
Senteleng bambu
@Rp.
74,200.00
0.0030
Bh
Tangkai martil
@Rp.
3,900.00
0.0010
Kg
Tambang manila
@Rp.
43,200.00
JUMLAH
TOTAL BIAYA /M2
oh
Pekerja
@Rp.
83,300.00
0.400
oh
Mandor
@Rp.
109,800.00
JUMLAH
Bahan
0.01250
Bh
Palu bobok
@Rp.
67,400.00
0.10000
Bh
Sarung tangan
@Rp. Err:509
0.01250
Bh
Pahat bobok
@Rp.
6,300.00
0.10000
Bh
Tangkai Palu
@Rp.
3,900.00
0.00100
Kg
Tambang manila
@Rp.
43,200.00
JUMLAH
TOTAL BIAYA /M3
oh
Pekerja
@Rp.
83,300.00
0.7500
oh
Tukang
@Rp.
84,316.00
0.0750
oh
Kepala tukang
@Rp.
99,073.00
0.0750
oh
Mandor
@Rp.
109,800.00
JUMLAH
Bahan
4.0400
Zak
Portland Cement / PC @ 50 Kg
@Rp.
68,900.00
0.4850
M3
Pasir pasang
@Rp.
207,000.00
1.2000
M3
@Rp.
169,600.00
JUMLAH
172
oh
Pekerja
@Rp.
83,300.00
0.1500
oh
Tukang
@Rp.
84,316.00
0.0150
oh
Kepala Tukang
@Rp.
99,073.00
0.0150
oh
Mandor
@Rp.
109,800.00
JUMLAH
Bahan
0.12680
Zak
Portland Cement / PC @ 50 Kg
@Rp.
68,900.00
0.01200
M3
Pasir pasang
@Rp.
207,000.00
JUMLAH
TOTAL BIAYA /M2
173
oh
Pekerja
@Rp.
83,300.00
0.1500
oh
Tukang
@Rp.
84,316.00
0.0150
oh
Kepala Tukang
@Rp.
99,073.00
0.0150
oh
Mandor
@Rp.
109,800.00
JUMLAH
Bahan
0.155520
Zak
Portland Cement / PC @ 50 kg
@Rp.
68,900.00
0.023000
M3
Pasir pasang
@Rp.
207,000.00
JUMLAH
TOTAL BIAYA /M2
86 KAPURAN 2 LAPIS
Untuk tiap 1 m2
Upah
0.140
oh
Pelaksana
@Rp.
84,978.90
JUMLAH
Bahan
0.700
Kg
Kapur sirih
@Rp.
0.080
Btg
Bambu
@Rp.
19,600.00
0.050
Kg
Tambang manila
@Rp.
43,200.00
JUMLAH
TOTAL BIAYA /M2
oh
Pelaksana
@Rp.
84,978.90
JUMLAH
Bahan
0.300
Kg
Cat tembok
@Rp.
31,800.00
0.080
Btg
Bambu
@Rp.
19,600.00
0.050
Kg
Tambang manila
@Rp.
43,200.00
0.050
Bh
@Rp.
15,500.00
JUMLAH
TOTAL BIAYA /M2
88 TEER 2 LAPIS
174
Untuk tiap 1 m2
Upah
0.170
oh
Pelaksana
@Rp.
84,978.90
JUMLAH
Bahan
0.350
Kg
Teer
@Rp.
15,700.00
JUMLAH
TOTAL BIAYA /M2
oh
Pekerja
@Rp.
83,300.00
0.3900
oh
Tukang
@Rp.
84,316.00
0.0390
oh
Kepala tukang
@Rp.
92,427.00
0.0390
oh
Mandor
@Rp.
109,800.00
JUMLAH
Bahan
1.2000
M3
@Rp.
179,700.00
0.4320
M3
Pasir Urug
@Rp.
151,000.00
175
JUMLAH
TOTAL BIAYA /M3
(SNI BANGUNAN GEDUNG 2008, Pekerjaan plesteran, halaman 24, bab 6.9)
90 URUGAN SIRTU
Untuk tiap 1 m3
Upah
0.2500
oh
Pekerja
@Rp.
83,300.00
0.0250
oh
Mandor
@Rp.
109,800.00
JUMLAH
Bahan
1.2000
M3
Sirtu
@Rp.
180,000.00
JUMLAH
TOTAL BIAYA /M3
oh
Pekerja
@Rp.
83,300.00
0.010
oh
Mandor
@Rp.
109,800.00
JUMLAH
Bahan :
1.200
M2
Gebalan rumput
@Rp.
8,000.00
0.020
Btg
Bambu
@Rp.
19,600.00
JUMLAH
TOTAL BIAYA /M2
92 BONGKAR BETON
Untuk tiap 1 m3
Upah :
6.30
oh
Pekerja
@Rp.
83,300.00
0.40
oh
Mandor
@Rp.
109,800.00
JUMLAH
Bahan :
0.015750
Bh
Palu bobok
@Rp.
67,400.00
0.158760
Bh
Sarung tangan
@Rp. Err:509
0.015750
Bh
Pahat bobok
@Rp.
6,300.00
0.126000
Bh
Tangkai Palu
@Rp.
3,900.00
0.001260
Kg
Tambang manila
@Rp.
43,200.00
176
JUMLAH
TOTAL BIAYA /M3
1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata p
Harga Satuan yang Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai keten
Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari k
dan biaya-biaya lainnya.
177
Untuk tiap 1 m3
Upah
1.000
oh
Pekerja
@Rp.
83,300.00
0.125
oh
Mandor
@Rp.
109,800.00
JUMLAH
Bahan
0.12500
Bh
Compressor
@Rp.
12,500
0.12500
Bh
Jack Hammer
@Rp.
62,500
JUMLAH
TOTAL BIAYA /M3
oh
Pekerja
@Rp.
83,300.00
0.2500
oh
Tukang
@Rp.
84,316.00
0.0250
oh
Kepala Tukang
@Rp.
92,427.00
0.0800
oh
Mandor
@Rp.
109,800.00
JUMLAH
Bahan
4.3600
Zak
Portland Cement / PC @ 50 Kg
@Rp.
68,900.00
0.5200
M3
Pasir beton
@Rp.
213,000.00
0.8700
M3
Split 2/3 cm
@Rp.
236,000.00
JUMLAH
TOTAL BIAYA /M3
oh
Pekerja
@Rp.
83,300.00
0.3750
oh
Tukang
@Rp.
84,316.00
0.1250
oh
Mandor
@Rp.
109,800.00
JUMLAH
Bahan
15.0000
Kg
@Rp.
25,800.00
1.1000
M3
Batu kali
@Rp.
224,000.00
JUMLAH
TOTAL BIAYA /M3
178
96 PEKERJAAN BETON
Untuk pekerjaan beton diatas k-175 , dimungkinkan untuk menggunakan beton readymix pada lokasi yang mudah dija
A. Beton Campuran Mutu Beton K.100, SLUMP 12 2 CM, W/C = 0.87
Untuk tiap 1 m3
a. Upah beton
1.65000
oh
Pekerja
@Rp.
83,300.00
0.27500
oh
Tukang
@Rp.
84,316.00
0.02800
oh
Kepala Tukang
@Rp.
92,427.00
0.08300
oh
Mandor
@Rp.
109,800.00
JUMLAH
b. Upah bekisting
2.14900
oh
Pekerja
@Rp.
83,300.00
1.07450
oh
Tukang
@Rp.
84,316.00
0.53720
oh
Mandor
@Rp.
109,800.00
1.48570
oh
Tukang bongkar
@Rp.
84,316.00
JUMLAH
179
b. Bahan beton
4.940000
zak
Portland Cement / PC @ 50 Kg
@Rp.
68,900.00
0.620720
M3
Pasir beton
@Rp.
213,000.00
0.555000
M3
Split 2/3 cm
@Rp.
236,000.00
JUMLAH
TOTAL BIAYA /M3
d. Bahan bekisting
1.700000
Lbr
Multiplek tebal 12 mm
@Rp.
93,800.00
0.004000
M3
Kayu kelas IV
@Rp.
1,590,000.00
2.000000
Kg
Paku campur
@Rp.
16,800.00
JUMLAH
TOTAL BIAYA /M3
oh
Pekerja
@Rp.
83,300.00
0.27500
oh
Tukang
@Rp.
84,316.00
0.02800
oh
Kepala Tukang
@Rp.
92,427.00
0.08300
oh
Mandor
@Rp.
109,800.00
JUMLAH
b. Upah bekisting
2.14900
oh
Pekerja
@Rp.
83,300.00
1.07450
oh
Tukang
@Rp.
84,316.00
0.53720
oh
Mandor
@Rp.
109,800.00
1.48570
oh
Tukang bongkar
@Rp.
84,316.00
JUMLAH
b. Bahan beton
5.520000
zak
Portland Cement / PC @ 50 Kg
@Rp.
68,900.00
0.5914290
M3
Pasir beton
@Rp.
213,000.00
0.562230
M3
Split 2/3 cm
@Rp.
236,000.00
JUMLAH
d. Bahan bekisting
1.700000
Lbr
Multiplek tebal 12 mm
@Rp.
93,800.00
0.004000
M3
Kayu kelas IV
@Rp.
1,500,000.00
2.000000
Kg
Paku campur
@Rp.
16,800.00
JUMLAH
TOTAL BIAYA /M3
180
(Untuk upah dan bahan beton menggunakan analisa SNI BANGUNAN GEDUNG 2008, Pekerjaan Beton
C. Beton Campuran Mutu Beton K.150, SLUMP 12 2 CM, W/C = 0.72
Untuk tiap 1 m3
a. Upah beton
1.65000
oh
Pekerja
@Rp.
83,300.00
0.27500
oh
Tukang
@Rp.
84,316.00
0.02800
oh
Kepala Tukang
@Rp.
92,427.00
0.08300
oh
Mandor
@Rp.
109,800.00
JUMLAH
b. Upah bekisting
2.14900
oh
Pekerja
@Rp.
83,300.00
1.07450
oh
Tukang
@Rp.
84,316.00
0.53720
oh
Mandor
@Rp.
109,800.00
1.48570
oh
Tukang bongkar
@Rp.
84,316.00
JUMLAH
181
b. Bahan beton
5.980000
zak
Portland Cement / PC @ 50 Kg
@Rp.
68,900.00
0.570714
M3
Pasir beton
@Rp.
213,000.00
0.565000
M3
Split 2/3 cm
@Rp.
236,000.00
JUMLAH
d. Bahan bekisting
1.700000
Lbr
Multiplek tebal 12 mm
@Rp.
93,800.00
0.004000
M3
Kayu kelas IV
@Rp.
1,500,000.00
2.000000
Kg
Paku campur
@Rp.
16,800.00
JUMLAH
TOTAL BIAYA /M3
(Untuk upah dan bahan beton menggunakan analisa SNI BANGUNAN GEDUNG 2008, Pekerjaan Beton
D. Beton Campuran Mutu Beton K.175, SLUMP 12 2 CM, W/C = 0.66
Untuk tiap 1 m3
a. Upah beton
1.650
oh
Pekerja
@Rp.
83,300.00
0.275
oh
Tukang
@Rp.
84,316.00
0.02800
oh
Kepala Tukang
@Rp.
92,427.00
0.08300
oh
Mandor
@Rp.
109,800.00
JUMLAH
b. Upah bekisting
2.14900
oh
Pekerja
@Rp.
83,300.00
1.07450
oh
Tukang
@Rp.
84,316.00
0.53720
oh
Mandor
@Rp.
109,800.00
1.48570
oh
Tukang bongkar
@Rp.
84,316.00
JUMLAH
c. Bahan beton
6.52
zak
Portland Cement / PC @ 50 Kg
@Rp.
68,900.00
0.542858
M3
Pasir beton
@Rp.
213,000.00
0.57167
M3
Split 2/3 cm
@Rp.
236,000.00
JUMLAH
d. Bahan bekisting
1.700000
Lbr
Multiplek tebal 12 mm
@Rp.
93,800.00
0.004000
M3
Kayu kelas IV
@Rp.
1,500,000.00
2.000000
Kg
Paku campur
@Rp.
16,800.00
182
JUMLAH
TOTAL BIAYA /M3
(Untuk upah dan bahan beton menggunakan analisa SNI BANGUNAN GEDUNG 2008, Pekerjaan Beton
E. Beton Campuran Mutu Beton K.225 1 PC : 1, 5 PS : 2,5 KR
a. Upah beton
1.65000
oh
Pekerja
@Rp.
83,300.00
0.27500
oh
Tukang
@Rp.
84,316.00
0.02800
oh
Kepala Tukang
@Rp.
92,427.00
0.08300
oh
Mandor
@Rp.
109,800.00
JUMLAH
b. Upah bekisting
2.14900
oh
Pekerja
@Rp.
83,300.00
1.07450
oh
Tukang
@Rp.
84,316.00
0.53720
oh
Mandor
@Rp.
109,800.00
1.48570
oh
Tukang bongkar
@Rp.
84,316.00
JUMLAH
183
c. Bahan beton
7.420000
zak
Portland Cement / PC @ 50 Kg
@Rp.
68,900.00
0.4985720
M3
Pasir beton
@Rp.
213,000.00
0.5816670
M3
Split 2/3 cm
@Rp.
236,000.00
JUMLAH
d. Bahan bekisting
1.700000
Lbr
Multiplek tebal 12 mm
@Rp.
93,800.00
0.004000
M3
Kayu kelas IV
@Rp.
1,590,000.00
2.000000
Kg
Paku campur
@Rp.
16,800.00
JUMLAH
TOTAL BIAYA /M3
(Mutu beton K.225 digunakan untuk Struktural baru (Box Culvert, pangkal/pilar)
Analisa Kutami
F. Beton Campuran Mutu Beton K.300, SLUMP 12 2 CM, W/C = 0.52
a. Upah beton
1.65000
oh
Pekerja
@Rp.
83,300.00
0.27500
oh
Tukang
@Rp.
84,316.00
0.02800
oh
Kepala Tukang
@Rp.
92,427.00
0.08300
oh
Mandor
@Rp.
109,800.00
JUMLAH
b. Upah bekisting
2.14900
oh
Pekerja
@Rp.
83,300.00
1.07450
oh
Tukang
@Rp.
84,316.00
0.53720
oh
Mandor
@Rp.
109,800.00
1.48570
oh
Tukang bongkar
@Rp.
84,316.00
JUMLAH
c. Bahan beton
8.260000
zak
Portland Cement / PC @ 50 Kg
@Rp.
68,900.00
0.486430
M3
Pasir beton
@Rp.
213,000.00
0.5672230
M3
Split 2/3 cm
@Rp.
236,000.00
JUMLAH
d. Bahan bekisting
1.7000
Lbr
Multiplek tebal 12 mm
@Rp.
93,800.00
0.0040
M3
Kayu kelas IV
@Rp.
1,500,000.00
2.0000
Kg
Paku campur
@Rp.
16,800.00
JUMLAH
184
(Untuk upah dan bahan beton menggunakan analisa SNI BANGUNAN GEDUNG 2008, Pekerjaan Beton
G. Beton Campuran Mutu Beton K.350, SLUMP 12 2 CM, W/C = 0.48
a. Upah beton
2.1000
oh
Pekerja
@Rp.
83,300.00
0.3500
oh
Tukang
@Rp.
84,316.00
0.0350
oh
Kepala Tukang
@Rp.
92,427.00
0.1050
oh
Mandor
@Rp.
109,800.00
JUMLAH
b. Upah bekisting
2.14900
oh
Pekerja
@Rp.
83,300.00
1.07450
oh
Tukang
@Rp.
84,316.00
0.53720
oh
Mandor
@Rp.
109,800.00
1.48570
oh
Tukang bongkar
@Rp.
84,316.00
JUMLAH
185
c. Bahan beton
8.960000
zak
Portland Cement / PC @ 50 Kg
@Rp.
68,900.00
0.476430
M3
Pasir beton
@Rp.
213,000.00
0.555560
M3
Split 2/3 cm
@Rp.
236,000.00
JUMLAH
d. Bahan bekisting
1.7000
Lbr
Multiplek tebal 12 mm
@Rp.
93,800.00
0.0040
M3
Kayu kelas IV
@Rp.
1,500,000.00
2.0000
Kg
Paku campur
@Rp.
16,800.00
JUMLAH
TOTAL BIAYA /M3
(Untuk upah dan bahan beton menggunakan analisa SNI BANGUNAN GEDUNG 2008, Pekerjaan Beton
H. Beton Campuran 1 PC : 2 PS : 3 KR
Untuk tiap 1 m3
a. Upah beton
1.65
oh
Pekerja
@Rp.
83,300.00
0.25
oh
Tukang
@Rp.
84,316.00
0.0250
oh
Kepala Tukang
@Rp.
92,427.00
0.0800
oh
Mandor
@Rp.
109,800.00
JUMLAH
c. Bahan beton
4.640
zak
Portland Cement / PC @ 50 Kg
@Rp.
68,900.00
0.520
M3
Pasir beton
@Rp.
213,000.00
0.780
M3
Split 2/3 cm
@Rp.
236,000.00
JUMLAH
TOTAL BIAYA /M3
97 TULANGAN BETON
A. Besi beton U. 24
Untuk tiap 100 kg
Upah
0.700
oh
Pekerja
@Rp.
83,300.00
0.700
oh
Tukang
@Rp.
84,316.00
0.070
oh
Kepala Tukang
@Rp.
92,427.00
0.040
oh
Mandor
@Rp.
109,800.00
JUMLAH
128,193.09
186
Bahan
105.00
Kg
Besi beton U. 24
@Rp.
16,000.00
1.50
Kg
Kawat beton
@Rp.
18,500.00
JUMLAH
1,707,750.00
TOTAL BIAYA /KG
oh
Pekerja
@Rp.
83,300.00
0.700
oh
Tukang
@Rp.
84,316.00
0.070
oh
Kepala Tukang
@Rp.
92,427.00
0.040
oh
Mandor
@Rp.
109,800.00
JUMLAH
128,193.09
187
Bahan
105.00
Kg
Besi beton U. 32
@Rp.
16,000.00
1.50
Kg
Kawat beton
@Rp.
18,500.00
JUMLAH
1,707,750.00
TOTAL BIAYA /KG
Catatan
98 PEKERJAAN BEKISTING
Untuk tiap 1 m3 beton
a. Bekisting untuk konstruksi beton tinggi < 4 m
Upah
2.14900
oh
Pekerja
@Rp.
83,300.00
1.07450
oh
Tukang
@Rp.
84,316.00
0.53720
oh
Mandor
@Rp.
109,800.00
1.48570
oh
Tukang bongkar
@Rp.
84,316.00
JUMLAH
Analisa Kutami
bahan
1.7000
lbr
Multiplex tebal 12 mm
@Rp.
93,800.00
0.0040
m3
@Rp.
3,975,000.00
2.0000
kg
paku
@Rp.
15,300.00
JUMLAH
TOTAL BIAYA /M3
188
Upah
0.050
oh
Pekerja
@Rp.
83,300.00
JUMLAH
Bahan
0.010
Zak
Cement Portland / PC @ 50 kg
@Rp.
68,900.00
0.350
Kg
@Rp.
49,438.00
JUMLAH
oh
Pekerja
@Rp.
83,300.00
0.0250
oh
Mandor
@Rp.
109,800.00
JUMLAH
TOTAL BIAYA /M3
189
oh
Pekerja
@Rp.
83,300.00
0.0450
oh
Mandor
@Rp.
109,800.00
JUMLAH
TOTAL BIAYA /M3
oh
Pekerja
@Rp.
83,300.00
0.0670
oh
Mandor
@Rp.
109,800.00
JUMLAH
TOTAL BIAYA /M3
oh
Pekerja
@Rp.
83,300.00
0.0320
oh
Mandor
@Rp.
109,800.00
JUMLAH
TOTAL BIAYA /M3
Org
Pekerja
@Rp.
83,300.00
0.060
Org
Mandor
@Rp.
109,800.00
JUMLAH
TOTAL BIAYA /M3
Org
Pekerja
@Rp.
83,300.00
0.0450
Org
Mandor
@Rp.
109,800.00
JUMLAH
TOTAL BIAYA /M3
Org
Pekerja
@Rp.
83,300.00
190
0.0050
Org
Mandor
@Rp.
109,800.00
JUMLAH
TOTAL BIAYA /M2
oh
Pekerja
@Rp.
83,300.00
0.00750
oh
Mandor
@Rp.
109,800.00
JUMLAH
TOTAL BIAYA /M3
oh
Pekerja
@Rp.
83,300.00
0.01250
oh
Mandor
@Rp.
109,800.00
JUMLAH
TOTAL BIAYA /M3
191
oh
Pekerja
@Rp.
83,300.00
0.010
oh
Mandor
@Rp.
109,800.00
JUMLAH
TOTAL BIAYA /M3
K. Angkut/Buang Tanah Galian sejauh > 30 M' Untuk Tenaga Orang Max 150 M
- Untuk tiap 1 m3 Pembuangan tanah sejauh 150 m (An. SNI - revisi 6.8.1)
Upah
0.516
oh
Pekerja
@Rp.
83,300.00
0.050
oh
Mandor
@Rp.
109,800.00
JUMLAH
83,300.00
@Rp.
9,982.64
TOTAL BIAYA /M3
oh
Pekerja
@Rp.
83,300.00
0.008
oh
Mandor
@Rp.
109,800.00
JUMLAH
TOTAL BIAYA /M3
oh
Pekerja
@Rp.
83,300.00
0.010
oh
Mandor
@Rp.
109,800.00
JUMLAH
Bahan
1.20
m3
Pasir urug
@Rp.
193,000.00
JUMLAH
192
1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata p
Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi)
dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari k
dan biaya-biaya lainnya.
Untuk tiap 1 m3
Upah
0.40
oh
Pekerja
@Rp.
83,300.00
0.10
oh
Mandor
@Rp.
109,800.00
JUMLAH
193
Bahan
0.550
m3
Agregat Kasar
@Rp.
180,000.00
0.550
m3
Pasir
@Rp.
207,000.00
JUMLAH
Alat
0.1606430
1
Jam
Ls
Tamper
@Rp.
Alat Bantu
@Rp.
62,500.00
JUMLAH
TOTAL BIAYA /M3
1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata p
Harga Satuan yang Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai keten
Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari k
dan biaya-biaya lainnya.
Untuk tiap 1 m3
Upah
0.00426410
oh
Pekerja
@Rp.
83,300.00
0.00106610
oh
Mandor
@Rp.
109,800.00
JUMLAH
Alat
0.00746220
Jam
Excavator
@Rp.
350,000.00
0.13016100
Jam
Dump Truck
@Rp.
175,000.00
Alat Bantu
@Rp.
50,000.00
Ls
JUMLAH
1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata p
Harga Satuan yang Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai keten
194
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari k
dan biaya-biaya lainnya.
Untuk tiap 1 m3
Upah
0.00213300
oh
Pekerja
@Rp.
83,300.00
0.00106610
oh
Mandor
@Rp.
109,800.00
JUMLAH
Alat
0.0074630
Jam
Excavator
@Rp.
350,000.00
0.3064100
Jam
Dump Truck
@Rp.
175,000.00
Alat Bantu
@Rp.
50,000.00
Ls
JUMLAH
195
1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata p
Harga Satuan yang Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai keten
Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari k
dan biaya-biaya lainnya.
Untuk tiap 1 m3
Upah
0.00426410
oh
Pekerja
@Rp.
83,300.00
0.00106610
oh
Mandor
@Rp.
109,800.00
JUMLAH
Bahan
0.5
m3
Urugan pilihan
@Rp.
193,000.00
JUMLAH
Alat
0.00746220
Jam
Excavator
@Rp.
350,000.00
0.01450300
Jam
Bulldozer
@Rp.
175,000.00
Ls
Alat Bantu
@Rp.
50,000.00
JUMLAH
1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata p
Harga Satuan yang Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai keten
Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari k
dan biaya-biaya lainnya.
Untuk tiap 1 m3
Upah
196
0.0236900
oh
Pekerja
@Rp.
83,300.00
0.0023690
oh
Mandor
@Rp.
109,800.00
JUMLAH
Bahan
1
Ls
@Rp.
m3
Urugan pilihan
@Rp.
193,000.00
JUMLAH
Alat
0.01658250
Jam
Excavator
@Rp.
350,000.00
0.02900
Jam
Bulldozer
@Rp.
1,500,000.00
Ls
Alat Bantu
@Rp.
50,000.00
JUMLAH
197
1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata p
Harga Satuan yang Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai keten
Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari k
dan biaya-biaya lainnya.
Untuk tiap 1 m3
Upah
0.04264100
oh
Pekerja
@Rp.
83,300.00
0.00355340
oh
Mandor
@Rp.
109,800.00
JUMLAH
Bahan
1.00
Ls
@Rp.
0.60
m3
Urugan pilihan
@Rp.
193,000.00
JUMLAH
Alat
0.0248740
Jam
Excavator
@Rp.
350,000.00
0.0290050
Jam
Bulldozer
@Rp.
1,500,000.00
Ls
Alat Bantu
@Rp.
50,000.00
1.0
JUMLAH
TOTAL BIAYA /M3
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Bahan
1.500
Kg
Tambang manila
@Rp.
43,200.00
2.000
Ltr
Minyak solar
@Rp.
7,500.00
0.080
Ltr
@Rp.
34,100.00
0.010
Btl
@Rp.
95,400.00
0.050
Btl
Zat asam
@Rp.
101,100.00
198
0.250
Bh
Baut mur
@Rp.
29,700.00
JUMLAH
(Analisa Kutami)
102 MENCABUT PANCANGAN REL
Untuk tiap 1 batang rel
Upah
4.00
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
199
Bahan
4.000
Kg
Tambang manila
@Rp.
43,200.00
4.000
Ltr
Minyak solar
@Rp.
7,500.00
0.160
Ltr
@Rp.
34,100.00
0.010
Btl
@Rp.
95,400.00
0.050
Btl
Zat asam
@Rp.
101,100.00
0.400
Kg
@Rp.
33,300.00
JUMLAH
(Analisa Kutami)
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Bahan
4.000
Kg
Tambang manila
@Rp.
43,200.00
6.000
Ltr
Minyak solar
@Rp.
7,500.00
0.260
Ltr
@Rp.
34,100.00
0.020
Btl
@Rp.
95,400.00
0.080
Btl
Zat asam
@Rp.
101,100.00
0.090
bh
Senteleng bambu
@Rp.
74,200.00
0.200
Bh
Topi H Beam
@Rp.
JUMLAH
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Bahan
2.000
Kg
Tambang manila
@Rp.
43,200.00
0.010
Btl
@Rp.
95,400.00
0.050
Btl
Zat asam
@Rp.
101,100.00
0.010
bh
Senteleng bambu
@Rp.
74,200.00
JUMLAH
200
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Bahan
100.000
Kg
Baja
@Rp.
16,960.00
0.100
kg
Tambang Manila
@Rp.
43,200.00
0.040
bh
Senteleng bambu
@Rp.
74,200.00
0.050
bh
Zat asam
@Rp.
101,100.00
0.010
btl
LPG 12 kg
@Rp.
95,400.00
JUMLAH
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
201
107 MENGERJAKAN LAS DENGAN ELEKTRODA TIAP 100 MM, DALAM 10 MM LEBAR 15 MM
(pekerjaan mengelas slempang, pemikul sekunder, waterpass)
Upah Membuat
0.020
oh
Tukang Las
@Rp.
84,316.00
0.002
oh
Kepala Tukang
@Rp.
99,073.00
0.002
oh
Mandor
@Rp.
109,800.00
JUMLAH
Bahan
0.400
Kg
Kawat las
@Rp.
33,300.00
0.300
lt
Solar
@Rp.
7,500.00
0.040
lt
Olie SAE 30 - 40
@Rp.
34,100.00
0.040
bh
Senteleng bambu
@Rp.
74,200.00
0.100
kg
Tambang Manila
@Rp.
43,200.00
JUMLAH
oh
Pekerja
@Rp.
83,300.00
0.220
oh
Mandor
@Rp.
109,800.00
JUMLAH
Bahan
20.0
bh
Karung plastik
@Rp.
2,900.00
2.00
Btg
Bambu
@Rp.
19,600.00
JUMLAH
TOTAL BIAYA /M'
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Upah bongkar
1.00
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
JUMLAH TOTAL
202
Bahan
1.50
Kg
Paku maskram
@Rp.
20,000.00
JUMLAH
TOTAL BIAYA /M'
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Upah bongkar
2.00
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
203
111 MEMASANG & MEMBONGKAR GAMBANGAN LENGKAP DENGAN REL BENDEL UNTUK DASAR PERANCAH
Untuk tiap 1 m2
Upah pasang
0.73130
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Upah bongkar
0.3250
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Bahan
2.00
Bh
@Rp.
49,430.00
0.20
Bh
Bor kayu
@Rp.
56,100.00
JUMLAH
TOTAL BIAYA /M2
Analisa Kutami
112 PASANG & BONGKAR PERANCAH TYPE I
Untuk tiap 1 stel
Upah pasang
2.00
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Upah bongkar
1.50
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Bahan
8.00
Kg
@Rp.
31,460.00
0.20
Kg
Tambang manila
@Rp.
43,200.00
JUMLAH
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Upah bongkar
1.85710
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
204
Bahan
12.00
Kg
@Rp.
31,460.00
0.50
Kg
Tambang manila
@Rp.
43,200.00
JUMLAH
Analisa Kutami
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Upah bongkar
2.00
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
205
Bahan
1.000
Btg
Glugu
@Rp.
365,100.00
1.000
Bh
Beugel glugu
@Rp.
38,000.00
1.000
Bh
Sepatu glugu
@Rp.
21,306.00
0.200
Bh
Cincin glugu
@Rp.
21,600.00
3.000
Bh
Baut glugu
@Rp.
37,078.00
3.000
Bh
Paku tirefond
@Rp.
33,700.00
2.000
Kg
Tambang manila
@Rp.
43,200.00
0.080
Bh
Senteleng bambu
@Rp.
74,200.00
4.000
Ltr
Minyak solar
@Rp.
7,500.00
0.160
Ltr
@Rp.
34,100.00
0.010
Btl
LPG @ 12 kg
@Rp.
95,400.00
0.050
Btl
Zat asam
@Rp.
101,100.00
JUMLAH
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Upah bongkar
2.60
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Bahan
4.00
Bh
@Rp.
55,618.00
2.00
Kg
Tambang manila
@Rp.
43,200.00
JUMLAH
Analisa Kutami
116 MEMBONGKAR BALAS DIGANTI STAPLING BANTALAN DIKERJAKAN DIANTARA PERJALANAN KA
Untuk tiap 1 m3
Upah
2.27500
oh
Pekerja
@Rp.
83,300.00
0.28440
oh
Mandor
@Rp.
109,800.00
JUMLAH
Analisa Kutami
206
oh
Pekerja
@Rp.
83,300.00
0.350
oh
Mandor
@Rp.
109,800.00
JUMLAH
TOTAL BIAYA /M3
Bahan :
1.000
m3
Balas kricak
@Rp.
190,000.00
JUMLAH
TOTAL BIAYA /M3
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
207
Upah bongkar
5.20
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Bahan
4.000
Bh
@Rp.
55,618.00
0.250
Bh
Bor kayu
@Rp.
56,100.00
0.100
Kg
Paseline
@Rp.
17,700.00
2.000
Kg
Tambang manila
@Rp.
43,200.00
JUMLAH
Analisa Kutami
b. Panjang > 12 m jenis dinding pelat
Untuk tiap 1 ton
Upah pasang
20.00
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Upah bongkar
10.00
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Bahan
12.00
Kg
Baut stel
@Rp.
31,460.00
0.40
Bh
Bor kayu
@Rp.
56,100.00
0.10
Kg
Paseline
@Rp.
17,700.00
4.50
Kg
Tambang manila
@Rp.
43,200.00
6.00
Kg
Drip perusut
@Rp.
43,250.00
0.40
Bh
Senteleng bambu
@Rp.
74,200.00
JUMLAH
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Upah bongkar
11.870
oh
Tenaga pelaksana
@Rp.
83,901.00
208
JUMLAH
Bahan
12.00
Kg
Baut mur
@Rp.
31,480.00
0.40
Bh
Bor kayu
@Rp.
56,100.00
5.00
Kg
Tambang manila
@Rp.
43,200.00
6.00
Kg
Drip perusut
@Rp.
43,250.00
0.50
Bh
Senteleng bambu
@Rp.
74,200.00
0.10
Kg
Paselin
@Rp.
17,700.00
JUMLAH
Analisa Kutami
119 MENYETEL DAN MENGELING JEMBATAN DINDING PLAT / RASUK RANGKA
Untuk tiap 1 ton
Upah
28.4460
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
209
Bahan
15.00
Kg
Baut stel
@Rp.
31,460.00
40.00
Kg
Cookes
@Rp.
8,150.00
4.00
Kg
Tambang manila
@Rp.
43,200.00
5.00
Kg
Drip perusut
@Rp.
43,250.00
17.00
Kg
Paku sumbat
@Rp.
14,500.00
0.50
Ltr
@Rp.
32,230.00
10.00
Ltr
Minyak solar
@Rp.
5,500.00
JUMLAH
Catatan:
Untuk Jembatan Dinding Rangka OH Pelaksana dan Bahan dikalikan 1.1 dipisahkan analis
Analisa Kutami
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Bahan
15.00
Kg
Baut stel
@Rp.
31,460.00
6.00
Kg
Drip perusut
@Rp.
43,250.00
45.00
Kg
Cookes
@Rp.
8,150.00
4.50
Kg
Tambang manila
@Rp.
43,200.00
19.00
Kg
Paku Sumbat
@Rp.
14,500.00
0.50
Ltr
@Rp.
32,230.00
11.00
Ltr
Minyak solar
@Rp.
5,500.00
JUMLAH
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Bahan
7.500
Kg
Baut stel
@Rp.
31,460.00
2.250
Kg
Drip perusut
@Rp.
43,250.00
20.000
Kg
Cookes
@Rp.
8,150.00
2.000
Kg
Tambang manila
@Rp.
43,200.00
210
0.050
Btl
Zat asam
@Rp.
101,100.00
0.010
Btl
LPG @ 12 kg
@Rp.
95,400.00
2.500
Ltr
Minyak tanah
@Rp.
9,000.00
0.050
Kg
Paseline
@Rp.
16,700.00
0.050
Bh
@Rp.
37,900.00
JUMLAH
Analisa Kutami
122 MEMBONGKAR JEMBATAN DINDING RANGKA
Untuk tiap 1 ton
Upah
15.8340
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Bahan
8.000
Kg
Baut stel
@Rp.
31,460.00
2.500
Kg
Drip perusut
@Rp.
43,250.00
22.000
Kg
Cookes
@Rp.
8,150.00
211
2.000
Kg
Tambang manila
@Rp.
43,200.00
0.050
Btl
Zat asam
@Rp.
101,100.00
0.010
Btl
LPG @ 12 kg
@Rp.
95,400.00
2.500
Ltr
Minyak tanah
@Rp.
9,000.00
0.050
Kg
Paseline
@Rp.
16,700.00
0.050
Bh
@Rp.
37,900.00
JUMLAH
Analisa Kutami
123 MEMBUAT & BONGKAR KONSTRUKSI GESERAN JEMBATAN BENTANG < 15 M
Untuk tiap 1 unit
Upah pasang
9.00
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Upah bongkar
2.00
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Bahan
10.00
Bh
Paku tirefond
@Rp.
33,700.00
0.50
Kg
Paseline
@Rp.
16,700.00
0.80
Bh
Bor kayu
@Rp.
56,100.00
JUMLAH
124 MEMBUAT & MEMBONGKAR KONSTRUKSI GESERAN DENGAN ROLLERS / ROL 10 X 100 CM
Untuk tiap 1 unit
Upah pasang
20.000
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Upah bongkar
7.000
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Bahan
15.000
Bh
Paku tirefond
@Rp.
33,700.00
0.560
Kg
Paseline
@Rp.
16,700.00
2.000
Kg
Tambang manila
@Rp.
43,200.00
212
JUMLAH
TOTAL BIAYA /UNIT
Catatan
oh
Pekerja
@Rp.
83,300.00
0.050
oh
Mandor
@Rp.
109,800.00
JUMLAH
Bahan
1.0000
Btg
@Rp.
992,200.00
2.0000
Bh
@Rp.
39,300.00
0.1000
Bh
Bor kayu
@Rp.
56,100.00
0.0100
Kg
Teer
@Rp.
15,700.00
0.0050
Bh
@Rp.
15,500.00
213
0.0400
Bh
Senteleng bambu
@Rp.
74,200.00
0.4000
Kg
Tambang manila
@Rp.
43,200.00
JUMLAH
CATATAN :
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Upah memasang
0.75000
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Bahan
45.00
Kg
Baja
@Rp.
16,960.00
2.50
Kg
@Rp.
33,300.00
3.00
Ltr
Minyak solar
@Rp.
7,500.00
JUMLAH
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Upah memasang
2.46070
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Bahan
90.00
Kg
Baja
@Rp.
16,960.00
5.00
Kg
@Rp.
33,300.00
6.00
Ltr
Minyak solar
@Rp.
7,500.00
JUMLAH
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
214
Bahan
0.100
Btg
Glugu
@Rp.
365,100.00
0.200
Bh
Beugel glugu
@Rp.
38,000.00
0.200
Bh
@Rp.
37,078.00
1.200
Bh
Paku tirefond
@Rp.
33,700.00
0.120
Kg
Tambang manila
@Rp.
43,200.00
0.080
Bh
Senteleng bambu
@Rp.
74,200.00
0.010
Btl
LPG @ 12 kg
@Rp.
95,400.00
0.050
Btl
Zat asam
@Rp.
95,400.00
JUMLAH
TOTAL BIAYA /M2
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
215
Bahan
0.08
bh
Bambu Besar
@Rp.
19600
0.015
kg
Sabun krim
@Rp.
8900
0.002
kg
Kain Majun
@Rp.
9500
0.002
bh
Sikat Bulu
@Rp.
12720
0.05
kg
Tambang manila
@Rp.
43200
0.025
ltr
Premium
@Rp.
7600
0.0012
ltr
Olie SAE 40
@Rp.
34100
0.02
ltr
@Rp. PM
JUMLAH
TOTAL BIAYA /m2
129 MEMASANG PIPA BESI DENGAN MANUAL DIA 0.7 METER PER M'
Pengecatan pipa 2 lapis untuk tiap m2
Upah mengecat
0.1800
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Bahan
0.2
kg
Cat etanol
@Rp.
65000
0.015
bh
Sikat Baja
@Rp.
19600
0.015
bh
Sikat Bulu
@Rp.
13400
0.015
bh
Kuas
@Rp.
15500
0.002
bh
Majun
@Rp.
9500
0.005
kg
Sabun Krim
@Rp.
8900
0.001
ltr
Thinner
@Rp.
6,700
JUMLAH
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Bahan
0.04
kg
Tambang Manila
@Rp.
43200
0.012
ltr
Premium
@Rp.
7600
0.08
btg
@Rp.
18,900
JUMLAH
TOTAL BIAYA /m'
130 MEMASANG PIPA BESI DENGAN MANUAL DIA 0.8 METER PER M'
216
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Bahan
0.23
kg
Cat etanol
@Rp.
65000
0.019
bh
Sikat Baja
@Rp.
19600
0.019
bh
Sikat Bulu
@Rp.
13400
0.019
bh
Kuas
@Rp.
15500
0.002
bh
Majun
@Rp.
9500
0.005
kg
Sabun Krim
@Rp.
8900
0.001
ltr
Thinner
@Rp.
6,700
JUMLAH
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
217
Bahan
0.05
kg
Tambang Manila
@Rp.
43200
0.012
ltr
Premium
@Rp.
7600
0.08
btg
@Rp.
18,900
JUMLAH
TOTAL BIAYA /m'
131 MEMASANG PIPA BESI DENGAN MANUAL DIA 1 METER PER M'
Pengecatan pipa 2 lapis untuk tiap m2
Upah mengecat
0.2000
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Bahan
0.25
kg
Cat etanol
@Rp.
65000
0.02
bh
Sikat Baja
@Rp.
19600
0.02
bh
Sikat Bulu
@Rp.
13400
0.02
bh
Kuas
@Rp.
15500
0.002
bh
Majun
@Rp.
9500
0.005
kg
Sabun Krim
@Rp.
8900
0.001
ltr
Thinner
@Rp.
6,700
JUMLAH
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Bahan
0.05
kg
Tambang Manila
@Rp.
43200
0.012
ltr
Premium
@Rp.
7600
0.08
btg
@Rp.
18,900
JUMLAH
TOTAL BIAYA /m'
132 MEMASANG PIPA BESI DENGAN MANUAL DIA 1.5 METER PER M'
Pengecatan pipa 2 lapis untuk tiap m2
Upah mengecat
0.2500
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Bahan
0.4
kg
Cat etanol
@Rp.
65000
0.05
bh
Sikat Baja
@Rp.
19600
218
0.05
bh
Sikat Bulu
@Rp.
13400
0.05
bh
Kuas
@Rp.
15500
0.005
bh
Majun
@Rp.
9500
0.01
kg
Sabun Krim
@Rp.
8900
0.002
ltr
Thinner
@Rp.
6,700
JUMLAH
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Bahan
0.1
kg
Tambang Manila
@Rp.
43200
0.2
ltr
Premium
@Rp.
7600
0.1
btg
@Rp.
18,900
JUMLAH
TOTAL BIAYA /m'
219
133 MENYETEL & MEMBONGKAR GANTUNGAN UNTUK PENYETELAN & PEMBONGKARAN JEMBATAN
Untuk tiap 1 jalur
Upah
12.00
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
Bahan
8.00
Bh
@Rp.
58,300.00
JUMLAH
TOTAL BIAYA/JALUR
134 MEMASANG & MEMBONGKAR SPOOR UNTUK TRANSPORT, PENYETELAN & PEMBONGKARAN
Untuk tiap 1 msp
Upah
3.00
oh
Tenaga pelaksana
@Rp.
83,901.00
JUMLAH
oh
Pelaksana
@Rp.
83,901.00
JUMLAH
Upah Bongkar
0.34960
oh
Pekerja
@Rp.
83,300.00
0.01750
oh
Mandor
@Rp.
109,800.00
JUMLAH
Bahan
0.1650
Bh
Bor kayu
@Rp.
89,800.00
0.0150
Kg
Teer
@Rp.
15,700.00
JUMLAH
Analisa Kutami
136 PASANG PIPA GALVANIS UNTUK DRAINASE
Untuk tiap 1 titik
Upah pasang mengikuti upah pekerjaan pasang batu
Bahan
0.10
Btg
@Rp.
87,100.00
220
JUMLAH
TOTAL BIAYA /TTK
oh
Pekerja
@Rp.
83,300.00
0.0200
oh
Tukang Besi
@Rp.
84,316.00
0.0020
oh
Mandor
@Rp.
109,800.00
JUMLAH
Bahan
0.400
Kg
@Rp.
33,300.00
0.300
Ltr
Minyak solar
@Rp.
7,500.00
0.040
Ltr
Minyak Pelumas
@Rp.
34,100.00
JUMLAH
221
oh
Tenaga pelaksana
@Rp.
83,901.00
1.0000
Unit
Sewa Perahu
@Rp.
160,000.00
JUMLAH
Bahan :
15.0000
kg
@Rp.
2,800.00
0.0340
M3
@Rp.
3,975,000.00
1.1000
Btg
Bambu
@Rp.
19,600.00
JUMLAH
Analisa Kutami
139 GESER JEMBATAN BENTANG SAMPAI DENGAN 25 M
Untuk tiap 1 ton
Upah :
1.03270
oh
Pelaksana
@Rp.
83,901.00
JUMLAH
Bahan :
0.050
m3
Kayu Klas II
@Rp.
5,088,000.00
1.100
Kg
Maskram
@Rp.
20,000.00
1.200
bh
Rollers
@Rp.
PM
JUMLAH
Analisa Kutami
140 GESER JEMBATAN BENTANG SAMPAI DENGAN > 25 - 40 M
Untuk tiap 1 ton
Upah :
0.57230
oh
Pelaksana
@Rp.
83,901.00
JUMLAH
Bahan :
0.050
m3
Kayu Klas II
@Rp.
5,088,000.00
0.900
Kg
Maskram
@Rp.
20,000.00
0.240
bh
Rollers
@Rp.
PM
JUMLAH
Analisa Kutami
222
oh
Pelaksana
@Rp.
83,901.00
JUMLAH
Bahan :
0.010
m3
Kayu Klas II
@Rp.
5,088,000.00
0.200
Kg
Maskram
@Rp.
20,000.00
0.090
bh
Rollers
@Rp.
PM
JUMLAH
Analisa Kutami
142 MEMBUAT DAN BONGKAR JUG PENERIMAAN JEMBATAN PER M2
Upah :
6.250
oh
Pelaksana pasang
@Rp.
83,901.00
3.000
oh
Pelaksana bongkar
@Rp.
83,901.00
JUMLAH
223
Bahan :
3.000
bh
Paku Tirepon
@Rp.
33,700.00
0.150
btg
glugu
@Rp.
365,100.00
0.300
bh
beugel glugu
@Rp.
38,000.00
0.300
bh
@Rp.
61,798.00
0.880
bh
@Rp.
55,618.00
1.000
kg
tambang manila
@Rp.
43,200.00
JUMLAH
TOTAL BIAYA /M2
143 PEKERJAAN BONGKAR PASANG PELAT TUTUP JEMBATAN UNTUK PEKERJAAN PENGECATAN
a. Pasang pelat tutup 1 buah
Upah :
0.140
oh
Pelaksana
@Rp.
83,901.00
JUMLAH
Bahan :
1.000
lbr
Plat tutup
@Rp.
560,800.00
0.050
btl
LPG
@Rp.
95,400.00
0.010
btl
Zat Asam
@Rp.
101,100.00
0.050
bh
Nozel
@Rp.
45,000.00
0.010
bh
Palu besar
@Rp.
67,400.00
0.050
bh
Tangkai Martil
@Rp.
3,900.00
0.010
bh
Kunci Inggris
@Rp.
146,000.00
0.100
bh
Senteleng bambu
@Rp.
74,200.00
JUMLAH
oh
Pelaksana
@Rp.
83,901.00
JUMLAH
oh
Pekerja
@Rp.
83,300.00
0.14960
oh
Mandor
@Rp.
109,800.00
224
JUMLAH
Bahan :
0.20
btl
LPG
@Rp.
95,400.00
1.00
btl
Zat asam
@Rp.
101,100.00
0.10
bh
Martil besar
@Rp.
67,400.00
0.30
bh
Tangkai martil
@Rp.
3,900.00
3.00
kg
Cookes
@Rp.
8,600.00
2.00
bh
Sarung tangan
@Rp. Err:509
JUMLAH
TOTAL BIAYA /BUAH
Analisa Kutami
b. Pemasangan 2 buah jarum
Upah :
1.000
oh
Pekerja
@Rp.
83,300.00
0.150
oh
Mandor
@Rp.
109,800.00
JUMLAH
225
Bahan :
0.500
bh
Bor kayu
@Rp.
89,800.00
0.010
bh
Kunci Inggris
@Rp.
146,000.00
0.500
kg
Tambang manila
@Rp.
43,200.00
0.500
bh
Linggis songkel
@Rp.
101,100.00
20.000
bh
Tirepon
@Rp.
33,700.00
5.000
kg
Baut setel
@Rp.
31,460.00
0.500
kg
Cat putih
@Rp.
31,800.00
JUMLAH
oh
Pekerja
@Rp.
83,300.00
0.30
oh
Mandor
@Rp.
109,800.00
JUMLAH
Bahan :
0.500
bh
Bor kayu
@Rp.
89,800.00
0.010
bh
Martil besar
@Rp.
67,400.00
0.050
bh
Tangkai martil
@Rp.
3,900.00
0.500
bh
Kunci Inggris
@Rp.
146,000.00
1.000
kg
Tambang manila
@Rp.
43,200.00
0.500
btl
Zat asam
@Rp.
101,100.00
0.100
btl
LPG
@Rp.
95,400.00
2.000
bh
Sarung tangan
@Rp.
Err:509
20.000
bh
Tirepon
@Rp.
33,700.00
5.000
kg
Baut stel
@Rp.
31,460.00
JUMLAH
oh
Pekerja
@Rp.
83,300.00
0.150
oh
Mandor
@Rp.
109,800.00
JUMLAH
Bahan
226
0.50
bh
Kunci Inggris
@Rp.
146,000.00
1.00
kg
Tambang manila
@Rp.
43,200.00
JUMLAH
oh
mandor
@Rp.
83,300.00
0.0300
oh
pekerja
@Rp.
109,800.00
JUMLAH
Bahan :
1.0
bh
baud gonsol
@Rp.
45,000.00
JUMLAH
227
oh
mandor
@Rp.
109,800.00
0.140
oh
pekerja
@Rp.
83,300.00
JUMLAH
TOTAL BIAYA /M'
oh
Pelaksana (Pasang)
@Rp.
83,901.00
2.0
oh
Pelaksana (bongkar)
@Rp.
83,901.00
JUMLAH
Bahan
0.150
m3
@Rp.
1,590,000.00
1.000
kg
Paku campur
@Rp.
16,800.00
JUMLAH
228
229
148 PEKERJAAN BALAST STOPPER DARI DINDING PANEL BETON UKURAN 1200x400x70
Untuk tiap 10 m'
oh
Pekerja
@Rp.
83,300.00
0.2500
oh
Tukang
@Rp.
83,901.00
0.0250
oh
Kepala Tukang
@Rp.
92,427.00
0.0800
oh
Mandor
@Rp.
109,800.00
JUMLAH
c. Bahan beton
4.640
zak
Portland Cement / PC @ 50 Kg
@Rp.
65,000.00
0.520
M3
Pasir beton
@Rp.
201,000.00
0.780
M3
Split 2/3 cm
@Rp.
180,200.00
JUMLAH
0.0336 m3
0.0720 m3
=
=
0.0240 m3
Untuk tiap 10 m' diperlukan 8 buah panel beton dan 9 buah kolom panel, bisa tersusun dalam 1 shaf atau 2 shaf
Jadi untuk Dinding panel 1 shaf sepanjang 10 m'
Jadi untuk Dinding panel 2 shaf sepanjang 10 m'
0.4800 m2
oh
Pekerja
@Rp.
83,300.00
0.700
oh
Tukang
@Rp.
83,901.00
0.070
oh
Kepala Tukang
@Rp.
92,427.00
0.040
oh
Mandor
@Rp.
109,800.00
230
JUMLAH
127,902.59
Bahan
105.000
Kg
Besi beton U. 24
@Rp.
16,000.00
1.500
Kg
Kawat beton
@Rp.
17,500.00
JUMLAH
1,706,250.00
7.2000 kg
2.4000 kg
Untuk tiap 10 m' diperlukan 8 buah panel beton dan 9 buah kolom panel bisa tersusun dalam 1 shaf atau 2 shaf
Jadi untuk Dinding panel 1 shaf sepanjang 10 m', berat pembesian
Jadi untuk Dinding panel 2 shaf sepanjang 10 m', berat pembesian
c. 1m' Pekerjaan Pengukuran (benangan) dan pemasangan patok
Upah :
0.0050
oh
Mandor
@ Rp
109,800
0.1000
oh
Pekerja
@ Rp
83,300
Analisa SNI
JUMLAH
231
oh
Pekerja
@Rp.
83,300.00
0.0320
oh
Mandor
@Rp.
109,800.00
JUMLAH
0.4800 m3
0.096 m3
Untuk tiap 10 m' dibutuhkan 9 titik galian kolom dan 8 spasi galian panel beton
e. Pemasangan Dinding Panel Beton (sudah termasuk mengecer dari penimbunan ke lokasi pekerjaan)
Konversi satuan diambil dari pemasangan bantalan beton di lintas bebas dan hanya diambil 25% saja dikarenakan tid
pekerjaan melepas penambat, memasukkan dan mengeluarkan bantalan dan memecok
Untuk 1 bantalan beton
0.1025 m3
0.0876 m3
0.85
oh
Mandor
@. Rp
109,800
0.11475
oh
Pekerja
@. Rp
83,300
JUMLAH
Untuk tiap 10 m' tersusun 1 shaf dibutuhkan 8 buah Dinding Panel dan 9 Buah Kolom H
Untuk tiap 10 m' tersusun 2 shaf dibutuhkan (8*2) buah Dinding Panel dan 9 Buah Kolom H
f. 1m3 Pekerjaan Gorek Balas di Kaki balas, diambil dari 50% pekerjaan Mengeluarkan balas kotor dari jalan rel, dikaren
balas di kaki balas tidak sepadat di badan balas
Upah :
0.1940
oh
Mandor
@. Rp
109,800
1.1200
oh
Pekerja
@. Rp
83,300
Analisa Kutami
JUMLAH
0.125 m3
h. 1 m3 Menaikkan kembali balas ke dalam balas stoper, diambil dari 50% pekerjaan Memasukkan balas kricak baru dan
sampai dapat dilalui KA. Diambil 50% dikarenakan balas yang dinaikkan tidak perlu di pecok
Upah :
0.08200
oh
Mandor
@. Rp
109,800
0.45550
oh
Pekerja
@. Rp
83,300
232
Analisa Kutami
Untuk 1 m', balas yang dinaikkan
JUMLAH
0.125 m3
Untuk tiap 10 m', Pekerjaan menaikkan kembali balas ke dalam balas stoper
TAL BIAYA 1 SHAF/M'
TAL BIAYA 2 SHAF/M'
233
oh
Mandor
@. Rp
109,800
1.1200
oh
Pekerja
@. Rp
83,300
Analisa Kutami
JUMLAH
0.24 m3
oh
Pekerja
@Rp.
109,800.00
0.0320
oh
Mandor
@Rp.
83,300.00
JUMLAH
0.35 m3
oh
Pekerja
@Rp.
83,300.00
0.3900
oh
Tukang
@Rp.
78,543.00
0.0390
oh
Kepala tukang
@Rp.
92,427.00
0.0390
oh
Mandor
@Rp.
109,800.00
JUMLAH
Bahan
1.2000
M3
@Rp.
169,600.00
0.4320
M3
Pasir Urug
@Rp.
143,000.00
JUMLAH
0.35 m3
oh
Mandor
@. Rp
109,800
0.7500
oh
Pekerja
@. Rp
83,300
JUMLAH
234
0.24 m3
oh
Mandor
@. Rp
109,800
0.330
oh
Pekerja
@. Rp
83,300
JUMLAH
0.18 m3
oh
Mandor
@. Rp
109,800
0.45550
oh
Pekerja
@. Rp
83,300
Analisa Kutami
JUMLAH
JUMLAH
Bahan
0.500 karung Karung goni/geotekstil
@. Rp
12,000
JUMLAH
Untuk 1 m' memasukkan balas
0.24 m3
TOTAL BIAYA /M'
235
150 PROTEKSI TEBING RAWAN LONGSOR DENGAN KEMIRINGAN MAX 63 DERAJAT DENGAN KONSTRUKSI SHO
a. Mobilisasi Alat-alat kerja /ton
Upah :
5.00
oh
Pekerja
@Rp.
75,000.00
0.50
oh
Mandor
@Rp.
102,300.00
JUMLAH
Jasa :
25.00
Km
@Rp.
3,500.00
JUMLAH
Bahan :
0.50
Kg
Kawat pral
@Rp.
18,600.00
JUMLAH
oh
Pekerja
@Rp.
75,000.00
0.02
oh
Mandor
@Rp.
102,300.00
JUMLAH
236
Bahan :
0.10
Kg
Tambang Injuk
@Rp.
0.15
Btg
@Rp.
18,500.00
JUMLAH
oh
Pekerja
@Rp.
75,000.00
0.0250
oh
Mandor
@Rp.
102,300.00
JUMLAH
oh
Pekerja
@Rp.
75,000.00
0.010
oh
Mandor
@Rp.
102,300.00
JUMLAH
oh
Pekerja
@Rp.
75,000.00
0.01
oh
Mandor
@Rp.
102,300.00
JUMLAH
237
unit
@Rp.
JUMLAH
unit
@Rp.
JUMLAH
Oh
Tukang Besi
@Rp.
78543
0.5
Oh
Tukang Bor
@Rp.
78543
0.5
Oh
Pekerja
@Rp.
75000
0.100
Oh
Mandor
@Rp.
102,300.00
JUMLAH
Bahan :
0.50
Jam
@Rp.
0.15
Jam
Mixer
@Rp.
1.00
Unit
Alat bantu
@Rp.
JUMLAH
Oh
Pekerja
@Rp.
75000
Oh
Nozle Man
@Rp.
Oh
Mandor
@Rp.
Oh
Supervisor
@Rp.
Oh
@Rp.
1.000
Oh
Operator
@Rp.
102,300.00
102,300.00
JUMLAH
Jasa Sewa:
1
Jam
Generator Set
@Rp.
Jam
Beton Molen
@Rp.
Jam
Mesin Shotcrete
@Rp.
0
79000
238
Jam
Pompa Air
@Rp.
20
Ltr
Bahan bakar
@Rp.
190,000.00
JUMLAH
Bahan :
0.60
m3
Pasir Beton
@Rp.
0.35
m3
@Rp.
10.00
sak
@Rp.
50.00
kg
Silica Fume
@Rp.
5.00
kg
Expanding Agent
@Rp.
2.50
Ltr
Superplasticiser
@Rp.
5.00
Ltr
Accelerator
@Rp.
0.90
Kg
Fibremesh
@Rp.
201,000.00
JUMLAH
TOTAL BIAYA /m2
239
240
241
= Rp.
= Rp.
190,000.00 +
190,000.00
= Rp.
12,000.00
= Rp.
27,489.00
= Rp.
= Rp.
= Rp.
6,884.46
= Rp.
19,883.71 +
26,768.17
= Rp.
= Rp
216,768.17
= Rp.
21,301.20
= Rp.
= Rp.
93,296.00 +
114,597.20
= Rp.
2,745.00
= Rp.
62,475.00 +
242
= Rp.
65,220.00
= Rp.
1,098.00
= Rp.
27,489.00 +
28,587.00
= Rp.
243
263,526.23
m
= Rp
= Rp.
9,003.60
= Rp.
37,943.15 +
46,946.75
= Rp.
= Rp.
= Rp.
8,301.66 +
8,301.66
= Rp
55,248.41
= Rp.
= Rp.
207,000.00 +
207,000.00
= Rp.
12,000.00
= Rp.
11,103.89
= Rp.
329.40
= Rp.
9,718.61 +
10,048.01
= Rp.
244
= Rp.
25,484.58
= Rp.
58,010.12 +
83,494.70
= Rp.
= Rp
mendandang/memecok.
= Rp.
1,098.00
= Rp.
= Rp.
16,660.00 +
17,758.00
= Rp
17,758.00
245
19977.75
= Rp.
1,372.50
= Rp.
= Rp.
20,825.00 +
22,197.50
= Rp
22,197.50
= Rp.
21,301.20
= Rp.
= Rp.
93,296.00 +
114,597.20
= Rp.
2,745.00
= Rp.
= Rp.
62,475.00 +
65,220.00
= Rp.
1,098.00
= Rp.
27,489.00 +
28,587.00
= Rp.
g terpisah (mukomoko)
K = ((5a+1)/17280)*(L+360)
m
K = ((5*75000+1)/17280)*(950+360)
K = (375001/17280)*(1310)
= Rp.
= Rp
K = 28428.89
246
= Rp.
1,317.60
= Rp.
29,988.00 +
31,305.60
= Rp.
= Rp.
= Rp.
= Rp
= Rp.
= Rp.
69,480.00 +
69,480.00
100,785.60
2,748.90 +
2,748.90
= Rp.
74,700.00
= Rp.
74,700.00 +
149,400.00
= Rp.
= Rp
247
= Rp.
2,745.00
= Rp.
= Rp.
20,825.00 +
23,570.00
= Rp.
5,490.00
= Rp.
= Rp.
37,485.00 +
42,975.00
= Rp.
5,490.00
= Rp.
= Rp.
41,650.00 +
47,140.00
= Rp.
3,223.01
= Rp.
29,155.00
= Rp.
33,000.00
= Rp.
6,100.00
= Rp.
6,300.00 +
77,778.01
= Rp.
248
= Rp.
3,074.40
= Rp.
= Rp.
23,324.00 +
26,398.40
= Rp.
6,039.00
= Rp.
= Rp.
41,233.50 +
47,272.50
= Rp.
6,039.00
= Rp.
45,815.00 +
51,854.00
= Rp.
249
= Rp.
3,223.01
= Rp.
29,155.00
= Rp.
33,000.00
= Rp.
6,100.00
= Rp.
= Rp.
6,300.00 +
77,778.01
= Rp.
4,172.40
= Rp.
= Rp.
31,654.00 +
35,826.40
= Rp.
15,185.34
= Rp.
= Rp.
41,083.56 +
56,268.90
= Rp.
17,161.74
= Rp.
47,847.52 +
65,009.26
= Rp.
157,104.56
= Rp.
3,223.01
= Rp.
29,155.00
= Rp.
33,000.00
= Rp.
6,100.00
= Rp.
6,300.00 +
250
= Rp.
77,778.01
= Rp.
= Rp.
22,896.00 +
22,896.00
= Rp.
2,745.00
= Rp.
= Rp.
20,825.00 +
16,375.00
= Rp
39,271.00
= Rp.
203,520.00 +
203,520.00
= Rp.
251
= Rp.
24,156.00
= Rp.
= Rp.
183,260.00 +
207,416.00
= Rp
410,936.00
= Rp.
= Rp.
5,766.40 +
5,766.40
= Rp.
2,745.00
= Rp.
= Rp.
20,825.00 +
23,570.00
= Rp
21,815.00
= Rp.
= Rp.
50,744.32 +
50,744.32
= Rp.
24,156.00
= Rp.
= Rp.
183,260.00 +
207,416.00
= Rp
258,160.32
252
= Rp.
4,392.00
= Rp.
= Rp.
14,994.00 +
19,386.00
= Rp
8,480.00
= Rp
133.56 +
8,613.56
= Rp.
= Rp
27,999.56
= Rp.
5,490.00
= Rp.
16,660.00 +
22,150.00
= Rp.
253
= Rp.
8,480.00
= Rp.
133.56 +
8,126.00
= Rp.
= Rp
30,276.00
= Rp.
8,235.00
= Rp.
= Rp.
24,990.00 +
33,225.00
= Rp
8,480.00
= Rp
133.56 +
8,126.00
= Rp.
= Rp
41,351.00
= Rp.
4,941.00
= Rp.
= Rp.
74,970.00 +
79,911.00
= Rp
8,480.00
= Rp
133.56
= Rp
73.50
= Rp
2,800.00
= Rp
16,320.00 +
27,807.06
= Rp.
= Rp
= Rp.
= Rp.
107,718.06
16,660.00 +
16,660.00
254
= Rp
16,660.00
pasang Guard-Rail/gongsol
= Rp.
4,392.00
= Rp.
14,161.00 +
18,553.00
= Rp.
255
= Rp.
8,838.90
= Rp.
= Rp.
12,894.84 +
21,733.74
= Rp.
8,235.00
= Rp.
24,990.00 +
33,225.00
= Rp.
= Rp.
= Rp.
16,660.00 +
16,660.00
= Rp.
13,176.00
= Rp.
= Rp.
44,982.00 +
58,158.00
= Rp.
16,470.00
= Rp.
= Rp.
49,980.00 +
66,450.00
= Rp.
32,940.00
256
= Rp.
= Rp.
99,960.00 +
132,900.00
= Rp.
17,568.00
= Rp.
59,976.00 +
77,544.00
= Rp.
257
= Rp.
21,960.00
= Rp.
= Rp.
66,640.00 +
88,600.00
= Rp.
32,940.00
= Rp.
= Rp.
99,960.00 +
132,900.00
= Rp.
11,638.80
= Rp.
= Rp.
92,463.00 +
104,101.80
= Rp
8,480.00
= Rp
133.56 +
8,613.56
= Rp.
= Rp
112,715.36
= Rp.
13,944.60
= Rp.
111,122.20 +
125,066.80
= Rp.
258
= Rp
8,480.00
= Rp
133.56 +
8,613.56
= Rp.
= Rp
133,680.36
= Rp
4,044.00
= Rp
2,346.00
= Rp
364.80
= Rp
341.00
= Rp
3,944.00 +
11,039.80
= Rp
259
= Rp
6,323.70
= Rp
12,647.40
= Rp
7,137.00
= Rp
= Rp
3,998.40 +
30,106.50
= Rp
41,146.30
= Rp
2,527.50
= Rp
1,466.25
= Rp
364.80
= Rp
341.00
= Rp
3,944.00
= Rp
5,625.00
= Rp
28,305.00
= Rp
= Rp
190.00 +
42,763.55
= Rp
14,605.00
= Rp
12,647.40
= Rp
8,010.02
= Rp
9,333.00
= Rp
= Rp
6,247.50 +
50,842.92
= Rp
93,606.47
= Rp.
1,098.00
= Rp.
23,324.00 +
24,422.00
= Rp.
260
= Rp
13,992.00
= Rp
= Rp.
222.60 +
61,960.60
= Rp
86,382.60
= Rp.
1,647.00
= Rp.
= Rp.
29,988.00 +
31,635.00
= Rp
13,992.00
= Rp
222.60 +
75,837.60
= Rp.
= Rp
107,472.60
261
= Rp.
1,647.00
= Rp.
= Rp.
33,320.00 +
34,967.00
= Rp
13,992.00
= Rp
= Rp.
222.60 +
14,214.60
= Rp
49,181.60
= Rp.
1,976.40
= Rp.
= Rp.
39,650.80 +
41,627.20
= Rp
13,992.00
= Rp
= Rp.
222.60 +
14,214.60
= Rp
55,841.80
= Rp.
2,086.20
= Rp.
= Rp.
42,816.20 +
44,902.40
= Rp
13,992.00
= Rp
= Rp.
222.60 +
14,214.60
= Rp
59,117.00
262
= Rp.
4,853.16
= Rp.
= Rp.
13,811.14 +
18,664.30
= Rp.
1,317.60
= Rp.
= Rp.
18,992.40 +
20,310.00
= Rp.
5,215.50
= Rp.
20,991.60 +
26,207.10
= Rp.
263
= Rp.
4,831.20
= Rp.
= Rp.
27,847.19 +
32,678.39
= Rp.
4,831.20
= Rp.
= Rp.
29,904.70 +
34,735.90
= Rp.
9,519.66
= Rp.
= Rp.
37,185.12 +
46,704.78
= Rp.
8,158.14
= Rp.
= Rp.
46,531.38 +
54,689.52
= Rp.
8,630.28
= Rp.
49,388.57 +
58,018.85
= Rp.
264
= Rp.
329.40
= Rp.
= Rp.
6,997.20 +
7,326.60
= Rp
7,632.00
= Rp
= Rp.
133.56 +
22,089.36
= Rp
29,415.96
= Rp.
494.10
= Rp.
8,996.40 +
9,490.50
= Rp.
265
= Rp
7,632.00
= Rp
= Rp.
133.56 +
26,252.46
= Rp
35,742.96
= Rp.
494.10
= Rp.
= Rp.
9,996.00 +
10,490.10
= Rp
7,632.00
= Rp
= Rp.
133.56 +
28,251.66
= Rp
38,741.76
= Rp.
592.92
= Rp.
= Rp.
11,895.24 +
12,488.16
= Rp
7,632.00
= Rp
= Rp.
133.56 +
32,148.96
= Rp
44,637.12
= Rp.
625.86
= Rp.
= Rp.
12,844.86 +
13,470.72
= Rp
7,632.00
= Rp
133.56 +
34,081.14
= Rp.
266
= Rp
47,551.86
= Rp.
263.52
= Rp.
= Rp.
5,597.76 +
5,861.28
= Rp.
395.28
= Rp.
5,697.72 +
6,093.00
= Rp.
267
= Rp.
395.28
= Rp.
= Rp.
7,996.80 +
8,392.08
= Rp.
474.34
= Rp.
= Rp.
9,521.19 +
9,995.53
= Rp.
500.69
= Rp.
10,270.89 +
10,771.58
= Rp.
= Rp.
5,468.04
= Rp.
= Rp.
9,804.41 +
15,272.45
= Rp.
7,246.80
= Rp.
= Rp.
11,153.87 +
18,400.67
= Rp.
7,246.80
= Rp.
11,203.85 +
268
= Rp.
18,450.65
= Rp.
1,098.00
= Rp.
= Rp.
8,330.00 +
9,428.00
= Rp.
1,098.00
= Rp.
9,996.00 +
11,094.00
= Rp.
269
= Rp.
1,098.00
= Rp.
= Rp.
11,662.00 +
12,760.00
= Rp.
1,317.60
= Rp.
= Rp.
13,911.10 +
15,228.70
= Rp.
1,427.40
= Rp.
= Rp.
14,994.00 +
16,421.40
= Rp.
4,831.20
= Rp.
= Rp.
51,312.80 +
56,144.00
= Rp.
5,709.60
= Rp.
= Rp.
61,058.90 +
66,768.50
= Rp.
6,258.60
= Rp.
65,973.60 +
72,232.20
= Rp.
270
= Rp.
1,317.60
= Rp.
= Rp.
7,996.80 +
9,314.40
= Rp.
1,317.60
= Rp.
= Rp.
10,329.20 +
11,646.80
= Rp.
1,317.60
= Rp.
13,161.40 +
14,479.00
= Rp.
271
= Rp.
1,998.36
= Rp.
= Rp.
15,660.40 +
17,658.76
= Rp.
2,152.08
= Rp.
= Rp.
16,909.90 +
19,061.98
= Rp.
1,383.48
= Rp.
= Rp.
8,413.30 +
9,796.78
= Rp.
1,383.48
= Rp.
= Rp.
10,829.00 +
12,212.48
= Rp.
1,317.60
= Rp.
= Rp.
13,494.60 +
14,812.20
= Rp.
1,647.00
= Rp.
16,826.60 +
18,473.60
= Rp.
272
= Rp.
1,778.76
= Rp.
18,159.40 +
19,938.16
= Rp.
= Rp.
109,800.00
= Rp.
999,600.00 +
1,109,400.00
= Rp.
273
= Rp.
109,800.00
= Rp.
= Rp.
1,332,800.00 +
1,442,600.00
= Rp.
109,800.00
= Rp.
= Rp.
1,666,000.00 +
1,775,800.00
= Rp.
141,202.80
= Rp.
= Rp.
2,165,800.00 +
2,307,002.80
= Rp.
6,921,008.40
= Rp.
219,600.00
= Rp.
= Rp.
1,999,200.00 +
2,218,800.00
= Rp.
219,600.00
= Rp.
= Rp.
2,665,600.00 +
2,885,200.00
= Rp.
219,600.00
274
= Rp.
= Rp.
3,332,000.00 +
3,551,600.00
= Rp.
219,600.00
= Rp.
= Rp.
4,331,600.00 +
4,551,200.00
= Rp.
54,900.00
= Rp.
499,800.00 +
554,700.00
= Rp.
275
= Rp.
54,900.00
= Rp.
= Rp.
666,400.00 +
721,300.00
= Rp.
83,448.00
= Rp.
= Rp.
847,994.00 +
931,442.00
= Rp.
87,840.00
= Rp.
= Rp.
1,091,230.00 +
1,179,070.00
= Rp.
87,840.00
= Rp.
= Rp.
1,091,230.00 +
1,179,070.00
= Rp
87,840.00
= Rp
1,091,230.00
= Rp
= Rp
+
1,179,070.00
= Rp.
276
= Rp.
164,700.00
= Rp.
= Rp.
1,499,400.00 +
1,664,100.00
= Rp.
164,700.00
= Rp.
= Rp.
1,832,600.00 +
1,997,300.00
= Rp.
164,700.00
= Rp.
2,165,800.00 +
2,330,500.00
= Rp.
277
= Rp.
208,620.00
= Rp.
= Rp.
2,748,900.00 +
2,957,520.00
= Rp.
274,500.00
= Rp.
= Rp.
2,832,200.00 +
3,106,700.00
= Rp.
274,500.00
= Rp.
= Rp.
3,498,600.00 +
3,773,100.00
= Rp.
274,500.00
= Rp.
= Rp.
4,165,000.00 +
4,439,500.00
= Rp.
351,360.00
= Rp.
5,331,200.00 +
5,682,560.00
= Rp.
278
= Rp.
87,840.00
= Rp.
= Rp.
666,400.00 +
754,240.00
= Rp.
109,800.00
= Rp.
= Rp.
833,000.00 +
942,800.00
= Rp.
109,800.00
= Rp.
999,600.00 +
1,109,400.00
= Rp.
279
= Rp.
109,800.00
= Rp.
= Rp.
1,249,500.00 +
1,359,300.00
= Rp.
109,800.00
= Rp.
= Rp.
1,249,500.00 +
1,359,300.00
= Rp.
109,800.00
= Rp.
= Rp.
1,499,400.00 +
1,609,200.00
= Rp.
109,800.00
= Rp.
= Rp.
1,666,000.00 +
1,775,800.00
= Rp.
109,800.00
= Rp.
2,165,800.00 +
2,275,600.00
= Rp.
280
= Rp.
22,091.76
= Rp.
= Rp.
489,887.30 +
511,979.06
= Rp.
37,386.90
= Rp.
= Rp.
703,885.00 +
741,271.90
= Rp.
192,237.84
= Rp.
3,135,986.77 +
3,328,224.61
= Rp.
281
= Rp.
109,800.00
= Rp.
= Rp.
4,248,300.00 +
4,358,100.00
= Rp.
39,088.80
= Rp.
= Rp.
732,248.65 +
771,337.45
= Rp.
50,980.14
= Rp.
= Rp.
974,610.00 +
1,025,590.14
= Rp.
109,800.00
= Rp.
= Rp.
4,581,500.00 +
4,691,300.00
= Rp.
109,800.00
= Rp.
= Rp.
5,914,300.00 +
6,024,100.00
= Rp.
= Rp.
= Rp.
4,062.60
10,412.50 +
14,475.10
= Rp
28,090.00 +
282
= Rp.
28,090.00
= Rp.
= Rp.
= Rp.
2,415.60
10,412.50 +
12,828.10
= Rp
= Rp.
42,135.00 +
42,135.00
= Rp.
933.30
= Rp.
5,664.40 +
6,597.70
= Rp.
283
= Rp.
933.30
= Rp.
= Rp.
6,497.40 +
7,430.70
= Rp.
933.30
= Rp.
= Rp.
7,080.50 +
8,013.80
= Rp.
933.30
= Rp.
= Rp.
9,079.70 +
10,013.00
= Rp.
2,196.00
= Rp.
= Rp.
13,328.00 +
15,524.00
= Rp.
4,392.00
= Rp.
26,656.00 +
284
= Rp.
31,048.00
= Rp.
4,392.00
= Rp.
= Rp.
34,986.00 +
39,378.00
= Rp.
2,415.60
= Rp.
14,660.80 +
17,076.40
= Rp.
285
= Rp.
4,831.20
= Rp.
= Rp.
29,321.60 +
34,152.80
= Rp.
4,831.20
= Rp.
= Rp.
38,484.60 +
43,315.80
= Rp.
3,294.00
= Rp.
= Rp.
25,323.20 +
28,617.20
= Rp.
6,588.00
= Rp.
44,982.00 +
51,570.00
= Rp.
80,187.20
0.3040
0.5400
= Rp.
6,588.00
= Rp.
49,980.00 +
56,568.00
= Rp.
0.6000
286
= Rp.
4,757.63
= Rp.
= Rp.
36,093.89 +
40,851.52
= Rp.
6,853.72
= Rp.
51,995.86 +
58,849.58
= Rp.
287
= Rp.
7,816.66
= Rp.
= Rp.
59,301.27 +
67,117.93
= Rp.
3,223.01
= Rp.
29,155.00
= Rp.
33,000.00
= Rp.
6,100.00
= Rp.
= Rp.
6,300.00 +
77,778.01
= Rp.
285.48
= Rp.
= Rp.
2,573.97 +
2,859.45
= Rp.
930.00
= Rp.
7,040.00 +
7,970.00
= Rp.
= Rp
10,829.45
288
= Rp.
285.48
= Rp.
= Rp.
3,048.78 +
3,334.26
= Rp.
985.00
= Rp.
7,900.00 +
8,885.00
= Rp.
= Rp
12,219.26
= Rp.
285.48
= Rp.
3,481.94 +
3,767.42
= Rp.
289
= Rp.
985.00
= Rp.
7,040.00 +
8,025.00
= Rp.
= Rp
11,792.42
= Rp.
285.48
= Rp.
= Rp.
4,581.50 +
4,866.98
= Rp.
985.00
= Rp.
7,040.00 +
8,025.00
= Rp.
= Rp
12,891.98
= Rp.
101,565.00
= Rp.
= Rp.
924,630.00 +
1,026,195.00
= Rp.
197,000.00
= Rp.
= Rp.
7,750.00 +
204,750.00
= Rp
204,750.00
290
= Rp.
101,565.00
= Rp.
= Rp.
1,232,840.00 +
1,334,405.00
= Rp.
197,000.00
= Rp.
7,750.00 +
204,750.00
= Rp.
= Rp
1,539,155.00
= Rp.
101,565.00
= Rp.
1,849,260.00 +
1,950,825.00
= Rp.
291
= Rp.
197,000.00
= Rp.
7,750.00 +
204,750.00
= Rp.
= Rp
2,155,575.00
= Rp.
101,565.00
= Rp.
= Rp.
2,432,360.00 +
2,533,925.00
= Rp.
197,000.00
= Rp.
7,750.00 +
204,750.00
= Rp.
= Rp
2,738,675.00
= Rp.
101,565.00
= Rp.
= Rp.
1,541,050.00 +
1,642,615.00
= Rp.
295,500.00
= Rp.
7,750.00 +
303,250.00
= Rp.
= Rp
1,945,865.00
292
= Rp.
101,565.00
= Rp.
= Rp.
2,157,470.00 +
2,259,035.00
= Rp.
295,500.00
= Rp.
7,750.00 +
303,250.00
= Rp.
= Rp
2,562,285.00
= Rp.
101,565.00
= Rp.
2,773,890.00 +
2,875,455.00
= Rp.
293
= Rp.
295,500.00
= Rp.
7,750.00 +
303,250.00
= Rp.
= Rp
3,178,705.00
= Rp.
101,565.00
= Rp.
= Rp.
3,656,870.00 +
3,758,435.00
= Rp.
295,500.00
= Rp.
7,750.00 +
303,250.00
= Rp.
= Rp
= Rp.
= Rp.
= Rp.
= Rp.
4,061,685.00
7,705.25 +
7,705.25
7,750.00 +
7,750.00
= Rp
15,455.25
= Rp.
30,821.00 +
21,275.00
= Rp.
294
= Rp.
= Rp.
= Rp.
774.69 +
774.69
= Rp.
7,750.00 +
7,750.00
= Rp
8,524.69
295
0.07
0.06
0.20
= Rp.
1,833.66
= Rp.
53,936.75 +
55,770.41
= Rp.
0.08
= Rp.
= Rp.
rek
1
3
7,750.00 +
7,750.00
= Rp
63,520.41
= Rp.
1,427.40
= Rp.
46,231.50 +
47,658.90
osong
0.20
L
2
3
= Rp.
= Rp.
= Rp.
7,750.00 +
7,750.00
= Rp
55,408.90
= Rp.
241.56
= Rp.
2,407.37 +
2,648.93
= Rp.
= Rp.
= Rp.
= Rp
7,750.00 +
7,750.00
10,398.93
296
= Rp.
713.70
= Rp.
5,564.44 +
6,278.14
= Rp.
= Rp.
= Rp.
7,750.00 +
7,750.00
= Rp
14,028.14
= Rp.
713.70
= Rp.
6,397.44 +
7,111.14
= Rp.
297
= Rp.
= Rp.
7,750.00 +
7,750.00
= Rp
14,861.14
= Rp.
944.28
= Rp.
8,429.96 +
9,374.24
= Rp.
= Rp.
= Rp.
7,750.00 +
7,750.00
= Rp
17,124.24
= Rp.
= Rp.
30,821.00 +
30,821.00
= Rp
30,821.00
= Rp.
168.63
= Rp.
= Rp.
999.60 +
1,168.23
= Rp.
252.95
= Rp.
1,666.00 +
298
= Rp.
1,918.95
= Rp
3,087.18
= Rp
52,500.00
= Rp
15,165.00
= Rp
8,211.00
= Rp
12,000.00
= Rp
1,705.00
= Rp
475.00
= Rp
14,790.00
= Rp
7,302.00
= Rp
84,240.00
= Rp
40,386.00 +
236,774.00
= Rp.
299
= Rp
21,960.00
= Rp
33,726.40
= Rp
33,726.40
= Rp
= Rp.
16,660.00 +
106,072.80
= Rp
33,700.00
= Rp
63,600.00 +
97,300.00
= Rp.
= Rp
440,146.80
= Rp
52,500.00
= Rp
15,165.00
= Rp
8,211.00
= Rp
12,000.00
= Rp
1,705.00
= Rp
475.00
= Rp
14,790.00
= Rp
7,302.00
= Rp
84,240.00
= Rp
= Rp.
40,386.00 +
236,774.00
= Rp
21,960.00
= Rp
33,726.40
= Rp
33,726.40
= Rp
= Rp.
16,660.00 +
106,072.80
= Rp
33,700.00
= Rp
63,600.00 +
97,300.00
= Rp.
= Rp
203,372.80
440,146.80
300
= Rp
15,165.00
= Rp
10,110.00
= Rp
11,400.00
= Rp
2,046.00
= Rp
190.00
= Rp
1,404.50
= Rp
7,395.00
= Rp
2,809.00
= Rp
2,809.00 +
53,328.50
= Rp.
= Rp
= Rp.
1,009,300.00 +
1,009,300.00
301
= Rp
27,450.00
= Rp
42,158.00
= Rp
42,158.00
= Rp
= Rp.
62,475.00 +
174,241.00
= Rp
33,700.00
= Rp
63,600.00 +
97,300.00
= Rp.
= Rp
1,334,169.50
= Rp
18,750.00
= Rp
7,600.00
= Rp
8,000.00
= Rp
682.00
= Rp
3,651.00
= Rp
9,860.00
= Rp
14,040.00
= Rp
40,386.00
= Rp
= Rp.
190.00 +
103,159.00
= Rp
10,980.00
= Rp
8,431.60
= Rp
8,431.60
= Rp
= Rp.
16,660.00 +
44,503.20
= Rp
16,850.00
= Rp
21,200.00 +
302
= Rp.
38,050.00
= Rp
185,712.20
= Rp
109,800.00
= Rp
= Rp
83,300.00 +
193,100.00
= Rp
18,672.50
= Rp
13,337.50
= Rp
365,100.00
303
= Rp
28,090.00
= Rp
91,275.00
= Rp
= Rp
842,700.00 +
1,359,175.00
= Rp
450,000.00
= Rp
190,000.00
= Rp
68,200.00
= Rp
6,750.00
= Rp
= Rp
7,155.00 +
722,105.00
= Rp
27,450.00
= Rp
54,900.00
= Rp
168,632.00
= Rp
168,632.00
= Rp
= Rp
333,200.00 +
752,814.00
= Rp
106,000.00
= Rp
168,500.00
= Rp
106,000.00
= Rp
83,300.00 +
463,800.00
= Rp
= Rp
1,409,714.00
= Rp
2,081,280.00
= Rp
3,490,994.00
= Rp
109,800.00
= Rp
83,300.00 +
193,100.00
= Rp
304
= Rp
37,345.00
= Rp
26,675.00
= Rp
730,200.00
= Rp
28,090.00
= Rp
182,550.00
= Rp
= Rp
1,685,400.00 +
2,690,260.00
= Rp
1,080,000.00
= Rp
456,000.00
= Rp
163,680.00
= Rp
16,200.00
= Rp
17,172.00 +
1,733,052.00
= Rp
305
= Rp
54,900.00
= Rp
109,800.00
= Rp
337,264.00
= Rp
337,264.00
= Rp
= Rp
666,400.00 +
1,505,628.00
= Rp
106,000.00
= Rp
168,500.00
= Rp
106,000.00
= Rp
333,200.00 +
580,000.00
= Rp
= Rp
1,825,000.00
= Rp
3,536,000.00
= Rp
5,361,000.00
= Rp
109,800.00
= Rp
= Rp
83,300.00 +
193,100.00
= Rp
74,690.00
= Rp
53,350.00
= Rp
1,460,400.00
= Rp
112,360.00
= Rp
365,100.00
= Rp
= Rp
3,370,800.00 +
4,839,000.00
= Rp
1,800,000.00
= Rp
760,000.00
= Rp
272,800.00
= Rp
27,000.00
= Rp
28,620.00 +
306
= Rp
1,902,500.00
= Rp
109,800.00
= Rp
219,600.00
= Rp
674,528.00
= Rp
674,528.00
= Rp
= Rp
1,332,800.00 +
2,200,000.00
= Rp
106,000.00
= Rp
168,500.00
= Rp
106,000.00
= Rp
333,200.00 +
713,700.00
= Rp
= Rp
3,106,800.00
= Rp
6,741,500.00
= Rp
9,848,300.00
307
= Rp
= Rp
= Rp
= Rp
= Rp
= Rp.
- +
-
=
=
=
=
Rp
Rp
Rp
Rp.
357,750.00
535.50
33.70 +
358,319.20
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp.
4,392.00
9,696.34
1,166.20
451.22 +
15,705.76
= Rp
= Rp.
- +
-
= Rp
2,250.90
= Rp
65,357.18 +
= Rp.
67,608.08
= Rp.
83,313.84
= Rp.
358,319.20
= Rp
441,633.04
ngkung dapat dilakukan pleh Tenaga Dinas
= Rp
3,513.60
= Rp
83,300.00 +
86,813.60
= Rp.
308
= Rp
8,235.00
= Rp
= Rp.
137,445.00 +
145,680.00
= Rp
203,520.00
= Rp
= Rp.
36,000.00 +
239,520.00
= Rp
385,200.00
309
= Rp
790.56
= Rp
= Rp.
5,622.75 +
6,413.31
= Rp
1,427.40
= Rp
1,740.97 +
3,168.37
= Rp.
= Rp
= Rp
= Rp.
75,437.38
7,155.00 +
7,155.00
= Rp
75,437.38
= Rp
54,900.00
= Rp
= Rp.
416,500.00 +
471,400.00
= Rp
7,155.00
= Rp
= Rp.
985.00 +
8,140.00
= Rp
541.27
= Rp
4,115.02
= Rp
542.41 +
310
= Rp.
5,198.70
= Rp
7,155.00
= Rp
985.00 +
8,140.00
= Rp.
= Rp
- +
-
= Rp.
= Rp
13,338.70
= Rp
= Rp
= Rp.
416,500.00
54,900.00 +
LAS
471,400.00
311
= Rp
95,400.00 +
= Rp.
95,400.00
= Rp
9,850.00 +
= Rp.
9,850.00
= Rp
576,650.00
= Rp
205.33
= Rp
=Rp.
16,660.00 +
16,865.33
= Rp
25,100.38
= Rp
=Rp.
125,501.88 +
150,602.25
= Rp
167,467.58
= Rp
345,495.08
= Rp
84,963.24 +
430,458.32
Rp.
= Rp
124,950.00
= Rp
Rp.
5,490.00 +
130,440.00
= Rp
27,489.00
= Rp
1,098.00 +
28,587.00
Rp.
312
= Rp
38,676.19
= Rp
Rp.
15,295.14 +
53,971.33
= Rp
1,556.42
= Rp
11,807.28 +
13,363.69
=Rp.
= Rp
309,618.05
= Rp
28,986.05
= Rp
936,564.15
= Rp
=Rp.
39,560.00 +
1,314,728.25
= Rp
1,314,728.25
= Rp
85,226.43
550000
/hari
68750
72875
313
= Rp
=Rp.
14,200.00 +
14,200.00
= Rp
3,300,000.00
= Rp
132,000.00
= Rp
878.40
= Rp
18,659.20 +
= Rp
19,537.60
= Rp
42,135.00
= Rp
11
6,700.00 +
= Rp
68,372.60
= Rp
87,910.20
314
315
= Rp
333,200.00
= Rp
168,632.00
= Rp
99,073.00 +
= Rp
600,905.00
= Rp
85,843.57
= Rp
666,400.00
= Rp
84,316.00
= Rp
99,073.00 +
= Rp
849,789.00
= Rp
84,978.90
= Rp
344,162.28
= Rp
176,152.99 +
= Rp
520,315.27
= Rp
43,359.61
= Rp
2,065,410.00
= Rp
484,787.88
= Rp
737,077.32
= Rp
33,606.72
= Rp
11,759.40 +
= Rp
3,332,641.32
Rp.
277,720.11
= Rp
321,079.72
316
= Rp
666,400.00
= Rp
168,632.00 +
= Rp
835,032.00
= Rp
46,390.67
= Rp
3,140,250.00
= Rp
606,000.00
= Rp
1,134,000.00
= Rp
50,400.00
= Rp
17,625.00
= Rp
554,835.60 +
= Rp
5,503,110.60
= Rp
305,728.37
= Rp
352,119.03
317
= Rp
= Rp
1,048,080.60
403,173.82 +
= Rp
1,451,254.42
= Rp
53,750.16
= Rp
4,572,045.00
= Rp
908,990.91
= Rp
1,360,817.01
= Rp
67,178.16
= Rp
23,476.50
= Rp
840,294.00
= Rp
679,779.00
= Rp
832,253.40 +
= Rp
9,284,833.98
= Rp
343,882.74
= Rp
397,632.90
= Rp
14,735.77 +
= Rp
14,735.77
= Rp
14,735.77
= Rp
416,500.00
= Rp
54,900.00
= Rp
471,400.00
= Rp
111,300.00 +
= Rp
111,300.00
318
= Rp
9,300.00 +
= Rp
9,300.00
= Rp
592,000.00
= Rp
541.27
= Rp
4,115.02
= Rp
542.41 +
5,198.70
= Rp.
= Rp
= Rp
= Rp.
930.00 +
930.00
= Rp
- +
= Rp
230000
319
= Rp
- +
= Rp
= Rp
6,128.70
= Rp
18,590,000.00
= Rp
314,600.00
= Rp
841,500.00
= Rp
216,250.00
= Rp
101,100.00
= Rp
101,100.00
= Rp
125,070.00
= Rp
75,800.00
= Rp
49,270.00
= Rp
5,590.00
= Rp
7,750.00
= Rp
40,100.00
= Rp
217,920.00
= Rp
10,380.00
= Rp
19,080.00
= Rp
101,100.00
= Rp
28,500.00
= Rp
26,700.00
= Rp
1,036,800.00
= Rp
8,700.00
= Rp
142,500.00
= Rp
187,500.00
= Rp
17,050.00
= Rp
2,035,200.00
= Rp
148,400.00 +
= Rp
24,447,960.00
= Rp
38,629,607.14 +
= Rp
38,629,607.14
= Rp
45,181,004.71
320
= Rp
33,049,775.00 +
= Rp
33,049,775.00
= Rp
33,049,775.00
= Rp
27,427,021.07 +
= Rp
27,427,021.07
= Rp
27,427,021.07
= Rp
36,354,752.50 +
= Rp
36,354,752.50
321
= Rp
16,830,000.00
= Rp
605,500.00
= Rp
566,280.00
= Rp
6,450,000.00
= Rp
202,200.00
= Rp
134,800.00
= Rp
75,800.00
= Rp
75,800.00
= Rp
75,800.00
= Rp
1,036,800.00
= Rp
43,500.00
= Rp
40,100.00
= Rp
31,000.00
= Rp
296,800.00
= Rp
4,500,000.00
= Rp
409,200.00
= Rp
237,500.00 +
= Rp
31,611,080.00
= Rp
171,687.14 +
= Rp
171,687.14
= Rp
241,100.00
= Rp
15,730.00
= Rp
4,300.00
= Rp
17,280.00
= Rp
1,604.00
= Rp
58.00
= Rp
2,968.00
= Rp
16,995.78 +
= Rp
300,035.78
= Rp
471,722.92
322
= Rp
127,477.70 +
= Rp
127,477.70
= Rp
199,277.27 +
= Rp
199,277.27
= Rp
22,048.00
= Rp
8,640.00
= Rp
1,484.00
= Rp
2,505.00 +
= Rp
34,677.00
= Rp
361,431.97
323
= Rp
257,530.71 +
= Rp
257,530.71
= Rp
257,530.71 +
= Rp
257,530.71
= Rp
33,072.00
= Rp
21,600.00
= Rp
3,710.00
= Rp
4,175.00 +
= Rp
62,557.00
= Rp
577,618.43
= Rp
343,374.29 +
= Rp
343,374.29
= Rp
429,217.86 +
= Rp
429,217.86
= Rp
41,340.00
= Rp
21,600.00
= Rp
3,710.00
= Rp
4,175.00 +
= Rp
70,825.00
= Rp
843,417.14
= Rp
343,374.29 +
= Rp
343,374.29
4,120,491.43
500,456.00
324
= Rp
253,500.00
30
= Rp
2,385.00
30
= Rp
10,800.00
30
= Rp
24,400.00
30
= Rp
4,300.00
30
= Rp
4,625.00
30
= Rp
3,340.00
30
= Rp
3,710.00 +
30
= Rp
307,060.00
= Rp
650,434.29
= Rp
858,435.71 +
= Rp
858,435.71
325
= Rp
1,716,871.43 +
= Rp
1,716,871.43
= Rp
165,360.00
= Rp
85,200.00
= Rp
95,500.00
= Rp
43,200.00
= Rp
7,420.00
= Rp
2,005.00
= Rp
25,800.00
= Rp
9,500.00 +
= Rp
433,985.00
= Rp
3,009,292.14
= Rp
401,215.68 +
= Rp
401,215.68
= Rp
108,960.00
= Rp
204,000.00
= Rp
400,000.00
= Rp
46,640.00
= Rp
7,500.00 +
= Rp
767,100.00
= Rp
900,748.01 +
= Rp
900,748.01
326
= Rp
2,069,063.69
= Rp
8,497,740.98 +
= Rp
8,497,740.98
= Rp
1,984,400.00
= Rp
157,200.00
= Rp
75,800.00
= Rp
113,700.00
= Rp
269,600.00
= Rp
129,000.00
= Rp
800,000.00
= Rp
275,600.00
327
= Rp
106,500.00
= Rp
82,820.00
= Rp
44,925.00
= Rp
172,800.00
= Rp
47,500.00
= Rp
8,350.00
= Rp
2,900.00
= Rp
1,134.00
= Rp
6,200.00
= Rp
2,680.00
= Rp
98,500.00
= Rp
14,840.00
= Rp
5,000.00
= Rp
3,900.00
= Rp
44,900.00
= Rp
28,050.00
= Rp
9,250.00
= Rp
50,550.00
= Rp
50,550.00
= Rp
33,700.00
= Rp
9,540.00
= Rp
8,020.00
= Rp
1,590,000.00
= Rp
300,000.00 +
= Rp
6,527,909.00
= Rp
15,025,649.98
= Rp
6,971,442.28 +
= Rp
6,971,442.28
= Rp
260,100.00
= Rp
471,900.00
= Rp
216,250.00
= Rp
992,200.00
328
= Rp
74,200.00
= Rp
71,550.00
= Rp
71,550.00
= Rp
101,100.00
= Rp
344,000.00
= Rp
320,000.00
= Rp
275,600.00
= Rp
106,500.00
= Rp
60,600.00
= Rp
35,940.00
= Rp
689,000.00
= Rp
20,400.00
= Rp
40,200.00
= Rp
34,980.00
= Rp
101,100.00
= Rp
19,080.00
329
= Rp
172,800.00
= Rp
47,500.00
= Rp
60,000.00
= Rp
17,050.00
= Rp
3,340.00
= Rp
2,900.00
= Rp
567.00
= Rp
1,340.00
= Rp
6,200.00
= Rp
1,340.00
= Rp
55,800.00
= Rp
14,840.00
= Rp
4,717.50
= Rp
1,950.00
= Rp
21,200.00
= Rp
13,250.00
= Rp
1,750.00
= Rp
10,110.00
= Rp
10,110.00
= Rp
20,220.00
= Rp
7,155.00
= Rp
74,466.00
= Rp
28,356.00
= Rp
4,010.00
= Rp
654.00
= Rp
20,560.00
= Rp
3,368.00
= Rp
375,000.00
= Rp
90,000.00 +
= Rp
5,376,803.50
= Rp
12,348,245.78
= Rp
63,734.18 +
= Rp
63,734.18
330
= Rp
PM
= Rp
PM
= Rp
PM
= Rp
PM
= Rp
PM
= Rp
PM
= Rp
392.00
= Rp
268.00
= Rp
620.00
= Rp
196.00
= Rp
1,728.00
= Rp
19.00
= Rp
17.80 +
= Rp
3,240.80
= Rp
66,974.98
331
= Rp
= Rp
11,495.40
1,317.60 +
Rp.
12,813.00
= Rp
1,113.00
= Rp
11.70
= Rp
43.20 +
= Rp
1,167.90
= Rp
13,980.90
= Rp
416,500.00
= Rp
43,920.00 +
Rp.
460,420.00
= Rp
842.50
= Rp
Err:509
= Rp
78.75
= Rp
390.00
= Rp
43.20 +
Rp.
Err:509
= Rp
Err:509
= Rp
124,950.00
= Rp
63,237.00
= Rp
7,430.48
= Rp
8,235.00 +
Rp.
203,852.48
= Rp
278,356.00
= Rp
100,395.00
= Rp
203,520.00 +
Rp.
582,271.00
332
= Rp
786,123.48
= Rp
24,990.00
= Rp
12,647.40
= Rp
1,486.10
= Rp
1,647.00 +
Rp.
40,770.50
= Rp
8,736.52
= Rp
2,484.00 +
Rp.
11,220.52
= Rp
51,991.02
333
= Rp
24,990.00
= Rp
12,647.40
= Rp
1,486.10
= Rp
1,647.00 +
Rp.
40,770.50
= Rp
10,715.33
= Rp
4,761.00 +
Rp.
15,476.33
= Rp
56,246.82
= Rp
11,897.05 +
= Rp
11,897.05
= Rp
= Rp
1,568.00
= Rp
2,160.00 +
Rp.
3,728.00
= Rp
15,625.05
= Rp
11,897.05 +
= Rp
11,897.05
= Rp
9,540.00
216
= Rp
1,568.00
87
= Rp
2,160.00
54
= Rp
775.00 +
Rp.
14,043.00
= Rp
25,940.05
54
334
= Rp
14,446.41 +
= Rp
14,446.41
= Rp
5,495.00 +
= Rp
5,495.00
= Rp
19,941.41
= Rp
64,974.00
= Rp
32,883.24
= Rp
3,604.65
= Rp
4,282.20 +
= Rp
105,744.09
= Rp
215,640.00
= Rp
60
65,232.00 +
335
= Rp
280,872.00
= Rp
326,565.00
= Rp
20,825.00
= Rp
2,745.00 +
= Rp
23,570.00
= Rp
216,000.00 +
= Rp
216,000.00
= Rp
239,570.00
= Rp
3,332.00
= Rp
1,098.00 +
= Rp
4,430.00
= Rp
9,600.00
= Rp
392.00 +
= Rp
14,422.00
= Rp
18,852.00
= Rp
524,790.00
= Rp
43,920.00 +
= Rp
568,710.00
= Rp
1,061.55
= Rp
Err:509
= Rp
99.23
= Rp
491.40
= Rp
1,137,420.00
54.43 +
336
= Rp
Err:509
= Rp
Err:509
Err:509
337
= Rp
83,300.00
= Rp
13,725.00 +
= Rp
97,025.00
= Rp
1,562.50
= Rp
7,812.50 +
Rp.
9,375.00
= Rp
106,400.00
= Rp
137,445.00
= Rp
21,079.00
= Rp
2,310.68
= Rp
8,784.00 +
= Rp
169,618.68
= Rp
300,404.00
= Rp
110,760.00
= Rp
205,320.00 +
= Rp
616,484.00
= Rp
610,260.00
= Rp
62,475.00
= Rp
31,618.50
= Rp
13,725.00 +
= Rp
107,818.50
= Rp
387,000.00
= Rp
246,400.00 +
= Rp
633,400.00
= Rp
741,218.50
338
= Rp
137,445.00
= Rp
23,186.90
= Rp
2,587.96
= Rp
9,113.40 +
= Rp
172,333.26
= Rp
179,011.70
= Rp
90,597.54
= Rp
58,984.56
= Rp
125,268.28 +
= Rp
453,862.08
339
= Rp
340,366.00
= Rp
132,213.36
= Rp
130,980.00 +
= Rp
603,559.36
= Rp
= Rp
159,460.00
= Rp
6,360.00
= Rp
33,600.00 +
= Rp
199,420.00
= Rp
1,429,174.70
= Rp
137,445.00
= Rp
23,186.90
= Rp
2,587.96
= Rp
9,113.40 +
= Rp
172,333.26
= Rp
179,011.70
= Rp
90,597.54
= Rp
58,984.56
= Rp
125,268.28 +
= Rp
453,862.08
= Rp
380,328.00
= Rp
125,974.38
= Rp
132,686.28 +
= Rp
638,988.66
= Rp
159,460.00
= Rp
6,000.00
= Rp
33,600.00 +
= Rp
199,060.00
= Rp
1,464,244.00
340
= Rp
137,445.00
= Rp
23,186.90
= Rp
2,587.96
= Rp
9,113.40 +
= Rp
172,333.26
= Rp
179,011.70
= Rp
90,597.54
= Rp
58,984.56
= Rp
125,268.28 +
= Rp
453,862.08
341
= Rp
412,022.00
= Rp
121,562.14
= Rp
133,340.00 +
= Rp
666,924.14
= Rp
159,460.00
= Rp
6,000.00
= Rp
33,600.00 +
= Rp
199,060.00
= Rp
1,492,179.48
= Rp
137,445.00
= Rp
23,186.90
= Rp
2,587.96
= Rp
9,113.40 +
= Rp
172,333.26
= Rp
179,011.70
= Rp
90,597.54
= Rp
58,984.56
= Rp
125,268.28 +
= Rp
453,862.08
= Rp
449,228.00
= Rp
115,628.75
= Rp
134,914.12 +
= Rp
699,770.87
= Rp
159,460.00
= Rp
6,000.00
= Rp
33,600.00 +
342
= Rp
199,060.00
= Rp
1,525,026.21
= Rp
137,445.00
= Rp
23,186.90
= Rp
2,587.96
= Rp
9,113.40 +
= Rp
172,333.26
= Rp
179,011.70
= Rp
90,597.54
= Rp
58,984.56
= Rp
125,268.28 +
= Rp
453,862.08
343
= Rp
511,238.00
= Rp
106,195.84
= Rp
137,273.41 +
= Rp
754,707.25
= Rp
159,460.00
= Rp
6,360.00
= Rp
33,600.00 +
= Rp
199,420.00
= Rp
1,580,322.59
= Rp
137,445.00
= Rp
23,186.90
= Rp
2,587.96
= Rp
9,113.40 +
= Rp
172,333.26
= Rp
179,011.70
= Rp
90,597.54
= Rp
58,984.56
= Rp
125,268.28 +
= Rp
453,862.08
= Rp
569,114.00
= Rp
103,609.59
= Rp
133,864.63 +
= Rp
806,588.22
= Rp
159,460.00
= Rp
6,000.00
= Rp
33,600.00 +
= Rp
199,060.00
344
= Rp
1,631,843.56
= Rp
174,930.00
= Rp
29,510.60
= Rp
3,234.95
= Rp
11,529.00 +
= Rp
219,204.55
= Rp
179,011.70
= Rp
90,597.54
= Rp
58,984.56
= Rp
125,268.28 +
= Rp
453,862.08
345
= Rp
617,344.00
= Rp
101,479.59
= Rp
131,112.16 +
= Rp
849,935.75
= Rp
159,460.00
= Rp
6,000.00
= Rp
33,600.00 +
= Rp
199,060.00
= Rp
1,722,062.38
= Rp
137,445.00
= Rp
21,079.00
= Rp
2,310.68
= Rp
8,784.00 +
= Rp
169,618.68
= Rp
319,696.00
= Rp
110,760.00
= Rp
184,080.00 +
= Rp
614,536.00
= Rp
784,154.68
= Rp
58,310.00
= Rp
59,021.20
= Rp
6,469.89
= Rp
4,392.00 +
= Rp
128,193.09
= Rp
1,281.93
346
= Rp
= Rp
1,680,000.00
27,750.00 +
= Rp
1,707,750.00
= Rp
17,077.50
= Rp
18,359.43
= Rp
58,310.00
= Rp
59,021.20
= Rp
6,469.89 +
= Rp
4,392.00
= Rp
128,193.09
= Rp
1,281.93
347
+
= Rp
1,680,000.00
= Rp
27,750.00
= Rp
1,707,750.00
= Rp
17,077.50
= Rp
18,359.43
= Rp
179,011.70
= Rp
90,597.54
= Rp
58,984.56
= Rp
125,268.28 +
= Rp
453,862.08
= Rp
159,460.00
= Rp
15,900.00
= Rp
30,600.00 +
= Rp
205,960.00
= Rp
659,822.08
= Rp
113,465.52
= Rp
51,490.00
= Rp
164,955.52
= Rp
680,793.12
= Rp
308,940.00
= Rp
989,733.12
12,000.00
348
= Rp
4,165.00 +
= Rp
4,165.00
= Rp
689.00
= Rp
17,303.30 +
= Rp
17,992.30
= Rp
22,157.30
= Rp
62,475.00
= Rp
2,745.00 +
= Rp
65,220.00
= Rp
65,220.00
349
= Rp
= Rp
74,970.00
4,941.00 +
= Rp
79,911.00
= Rp
79,911.00
= Rp
87,465.00
= Rp
7,356.60 +
= Rp
94,821.60
= Rp
94,821.60
= Rp
83,300.00
= Rp
3,513.60 +
= Rp
86,813.60
= Rp
86,813.60
= Rp
124,950.00
= Rp
6,588.00 +
= Rp
131,538.00
= Rp
131,538.00
= Rp
99,960.00
= Rp
84
4,941.00 +
= Rp
104,901.00
= Rp
104,901.00
= Rp
4,165.00
350
= Rp
549.00 +
= Rp
4,714.00
= Rp
4,714.00
= Rp
12,495.00
= Rp
823.50 +
= Rp
13,318.50
= Rp
13,318.50
= Rp
20,825.00
= Rp
1,372.50 +
= Rp
22,197.50
= Rp
22,197.50
351
= Rp
= Rp
27,489.00
1,098.00 +
= Rp
28,587.00
= Rp
28,587.00
= Rp
42,982.80
= Rp
= Rp
5,490.00 +
48,472.80
9,982.64
m
= Rp
9,982.64
= Rp
20,825.00
= Rp
915.00 +
= Rp
21,740.00
= Rp
21,740.00
= Rp
24,990.00
= Rp
1,098.00 +
= Rp
26,088.00
= Rp
231,600.00 +
= Rp
231,600.00
352
= Rp
257,688.00
= Rp
33,320.00
= Rp
10,980.00 +
= Rp
44,300.00
353
= Rp
99,000.00
= Rp
113,850.00 +
= Rp
212,850.00
= Rp
10,040.19
= Rp
- +
= Rp
10,040.19
= Rp
257,150.00
= Rp
355.20
= Rp
117.06 +
= Rp
472.26
= Rp
2,611.77
= Rp
22,778.18
= Rp
50,000.00 +
= Rp
75,389.95
= Rp
75,862.20
354
= Rp
177.68
= Rp
117.06 +
= Rp
294.74
= Rp
2,612.05
= Rp
53,621.75
= Rp
50,000.00 +
= Rp
106,233.80
= Rp
106,528.54
355
= Rp
355.20
= Rp
117.06 +
= Rp
472.26
= Rp
96,500.00 +
= Rp
96,500.00
= Rp
2,611.77
= Rp
2,538.03
= Rp
50,000.00 +
= Rp
55,149.80
= Rp
152,122.05
356
= Rp
= Rp
= Rp
= Rp
1,973.38
260.12 +
2,233.49
= Rp
193,000.00 +
= Rp
193,000.00
= Rp
5,803.88
= Rp
43,507.36
= Rp
50,000.00 +
= Rp
99,311.24
= Rp
294,544.73
357
= Rp
= Rp
= Rp
= Rp
3,552.00
390.16 +
3,942.16
-
= Rp
115,800.00 +
= Rp
115,800.00
= Rp
8,705.90
= Rp
43,507.50
= Rp
50,000.00 +
= Rp
102,213.40
= Rp
221,955.56
= Rp
416,811.78 +
= Rp
416,811.78
= Rp
64,800.00
= Rp
15,000.00
= Rp
2,728.00
= Rp
954.00
= Rp
5,055.00
358
= Rp
7,425.00 +
= Rp
95,962.00
= Rp
512,773.78
= Rp
335,604.00 +
= Rp
335,604.00
= Rp
335,604.00
= Rp
834,915.63 +
= Rp
834,915.63
359
= Rp
172,800.00
= Rp
30,000.00
= Rp
5,456.00
= Rp
954.00
= Rp
5,055.00
= Rp
13,320.00
= Rp
227,585.00 +
= Rp
1,062,500.63
= Rp
827,018.00
= Rp
2,097,525.00 +
= Rp
2,097,525.00
= Rp
172,800.00
= Rp
45,000.00
= Rp
8,866.00
= Rp
1,908.00
= Rp
8,088.00
= Rp
6,678.00
= Rp
- +
= Rp
243,340.00
= Rp
2,340,865.00
= Rp
1,006,812.00 +
= Rp
1,006,812.00
= Rp
86,400.00
= Rp
954.00
= Rp
5,055.00
= Rp
742.00 +
= Rp
93,151.00
= Rp
1,099,963.00
360
= Rp
209,752.50 +
= Rp
209,752.50
= Rp
1,696,000.00
= Rp
4,320.00
= Rp
2,968.00
= Rp
5,055.00
= Rp
= Rp
954.00 +
1,709,297.00
= Rp
20,975.25 +
= Rp
20,975.25
= Rp
1,940,024.75
361
= Rp
1,686.32
= Rp
198.15
= Rp
219.60 +
= Rp
2,104.07
= Rp
13,320.00
= Rp
2,250.00
= Rp
1,364.00
= Rp
2,968.00
= Rp
4,320.00 +
= Rp
24,222.00
= Rp
26,326.07
= Rp
383,180.00
= Rp
24,156.00 +
= Rp
407,336.00
= Rp
58,000.00
= Rp
39,200.00 +
= Rp
97,200.00
= Rp
504,536.00
= Rp
125,851.50 +
= Rp
125,851.50
= Rp
83,901.00 +
= Rp
83,901.00
= Rp
209,752.50
362
= Rp
30,000.00 +
= Rp
30,000.00
= Rp
239,752.50
= Rp
419,505.00 +
= Rp
419,505.00
= Rp
167,802.00 +
= Rp
167,802.00
= Rp
587,307.00
363
= Rp
61,356.80 +
= Rp
61,356.80
= Rp
27,267.83 +
= Rp
27,267.83
= Rp
98,860.00
= Rp
11,220.00 +
= Rp
110,080.00
= Rp
198,704.63
= Rp
167,802.00 +
= Rp
167,802.00
= Rp
125,851.50 +
= Rp
125,851.50
= Rp
251,680.00
= Rp
8,640.00 +
= Rp
260,320.00
= Rp
553,973.50
= Rp
315,526.49 +
= Rp
315,526.49
= Rp
155,812.55 +
= Rp
155,812.55
364
= Rp
= Rp
377,520.00
21,600.00 +
= Rp
399,120.00
= Rp
870,459.04
= Rp
922,911.00 +
= Rp
922,911.00
= Rp
167,802.00 +
= Rp
167,802.00
365
= Rp
365,100.00
= Rp
38,000.00
= Rp
21,306.00
= Rp
4,320.00
= Rp
111,234.00
= Rp
101,100.00
= Rp
86,400.00
= Rp
5,936.00
= Rp
30,000.00
= Rp
5,456.00
= Rp
954.00
= Rp
5,055.00 +
= Rp
774,861.00
= Rp
1,865,574.00
= Rp
564,829.92 +
= Rp
564,829.92
= Rp
218,142.60 +
= Rp
218,142.60
= Rp
222,472.00
= Rp
86,400.00 +
= Rp
308,872.00
= Rp
1,091,844.52
= Rp
189,507.50
= Rp
31,227.12 +
= Rp
220,734.62
= Rp
220,734.62
366
= Rp
89,131.00
= Rp
38,430.00 +
= Rp
127,561.00
= Rp
= Rp
190,000.00 +
= Rp
190,000.00
= Rp
317,561.00
= Rp
960,213.38 +
= Rp
960,213.38
367
= Rp
436,285.20 +
= Rp
436,285.20
= Rp
222,472.00
= Rp
14,025.00
= Rp
1,770.00
= Rp
86,400.00 +
= Rp
324,667.00
= Rp
1,721,165.58
= Rp
1,678,020.00 +
= Rp
1,678,020.00
= Rp
839,010.00 +
= Rp
839,010.00
= Rp
377,520.00
= Rp
22,440.00
= Rp
1,770.00
= Rp
194,400.00
= Rp
259,500.00
= Rp
29,680.00 +
= Rp
885,310.00
= Rp
3,402,340.00
= Rp
1,924,353.34 +
= Rp
1,924,353.34
= Rp
995,904.87 +
368
= Rp
995,904.87
= Rp
377,760.00
= Rp
22,440.00
= Rp
216,000.00
= Rp
259,500.00
= Rp
37,100.00
= Rp
1,425,308.57 +
= Rp
2,338,108.57
= Rp
5,258,366.78
= Rp
2,386,647.85 +
= Rp
2,386,647.85
369
= Rp
471,900.00
= Rp
326,000.00
= Rp
172,800.00
= Rp
216,250.00
= Rp
246,500.00
= Rp
16,115.00
= Rp
55,000.00 +
= Rp
1,504,565.00
= Rp
3,891,212.85
= Rp
2,854,144.22 +
= Rp
2,854,144.22
= Rp
471,900.00
= Rp
259,500.00
= Rp
366,750.00
= Rp
194,400.00
= Rp
275,500.00
= Rp
16,115.00
= Rp
60,500.00 +
= Rp
1,644,665.00
= Rp
4,498,809.22
= Rp
1,231,582.78 +
= Rp
1,231,582.78
= Rp
235,950.00
= Rp
97,312.50
= Rp
163,000.00
= Rp
86,400.00
370
= Rp
5,055.00
= Rp
954.00
= Rp
22,500.00
= Rp
835.00
= Rp
1,895.00 +
= Rp
613,901.50
= Rp
1,845,484.28
= Rp
1,328,488.43 +
= Rp
1,328,488.43
= Rp
251,680.00
= Rp
108,125.00
= Rp
179,300.00
371
= Rp
86,400.00
= Rp
5,055.00
= Rp
954.00
= Rp
22,500.00
= Rp
835.00
= Rp
1,895.00 +
= Rp
656,744.00
= Rp
1,985,232.43
= Rp
755,109.00 +
= Rp
755,109.00
= Rp
167,802.00 +
= Rp
167,802.00
= Rp
337,000.00
= Rp
8,350.00
= Rp
44,880.00 +
= Rp
2,236,052.00
= Rp
3,158,963.00
= Rp
1,678,020.00 +
= Rp
1,678,020.00
= Rp
587,307.00 +
= Rp
587,307.00
= Rp
505,500.00
= Rp
9,352.00
= Rp
86,400.00 +
372
= Rp
3,453,886.00
= Rp
5,719,213.00
= Rp
83,300.00
= Rp
5,490.00 +
= Rp
88,790.00
= Rp
992,200.00
= Rp
78,600.00
= Rp
5,610.00
= Rp
157.00
= Rp
77.50
373
= Rp
2,968.00
= Rp
17,280.00 +
= Rp
1,096,892.50
= Rp
1,185,682.50
= Rp
251,703.00 +
= Rp
251,703.00
= Rp
62,925.75 +
= Rp
62,925.75
= Rp
763,200.00
= Rp
83,250.00
= Rp
22,500.00 +
= Rp
868,950.00
= Rp
1,183,578.75
= Rp
358,374.73 +
= Rp
358,374.73
= Rp
206,455.19 +
= Rp
206,455.19
= Rp
1,526,400.00
= Rp
166,500.00
= Rp
45,000.00 +
= Rp
1,737,900.00
= Rp
2,302,729.92
= Rp
755,109.00 +
= Rp
755,109.00
374
= Rp
36,510.00
= Rp
7,600.00
= Rp
7,415.60
= Rp
40,440.00
= Rp
5,184.00
= Rp
5,936.00
= Rp
954.00
= Rp
4,770.00 +
= Rp
108,809.60
= Rp
863,918.60
= Rp
10,487.63 +
= Rp
10,487.63
375
= Rp
1,568.00
= Rp
133.50
= Rp
19.00
= Rp
25.44
= Rp
2,160.00
= Rp
190.00
= Rp
40.92
= Rp
= Rp
4,136.86
= Rp
14,624.49
= Rp
15,102.18 +
= Rp
15,102.18
= Rp
13,000.00
= Rp
294.00
= Rp
201.00
= Rp
232.50
= Rp
19.00
= Rp
44.50
= Rp
6.70 +
= Rp
13,797.70
= Rp
234,922.80 +
= Rp
234,922.80
= Rp
1,728.00
= Rp
91.20
= Rp
1,512.00 +
= Rp
3,331.20
= Rp
267,153.88
376
= Rp
15,941.19 +
= Rp
15,941.19
= Rp
14,950.00
= Rp
372.40
= Rp
254.60
= Rp
294.50
= Rp
19.00
= Rp
44.50
= Rp
6.70 +
= Rp
15,941.70
= Rp
260,093.10 +
= Rp
260,093.10
377
= Rp
2,160.00
= Rp
91.20
= Rp
1,512.00 +
= Rp
3,763.20
= Rp
295,739.19
= Rp
16,780.20 +
= Rp
16,780.20
= Rp
16,250.00
= Rp
392.00
= Rp
268.00
= Rp
310.00
= Rp
19.00
= Rp
44.50
= Rp
6.70 +
= Rp
17,290.20
= Rp
276,873.30 +
= Rp
276,873.30
= Rp
2,160.00
= Rp
91.20
= Rp
1,512.00 +
= Rp
3,763.20
= Rp
314,706.90
= Rp
205,071.43 +
= Rp
205,071.43
= Rp
26,000.00
= Rp
980.00
378
= Rp
670.00
= Rp
775.00
= Rp
47.50
= Rp
89.00
= Rp
13.40 +
= Rp
28,574.90
= Rp
205,071.43 +
= Rp
205,071.43
= Rp
4,320.00
= Rp
1,520.00
= Rp
1,890.00 +
= Rp
7,730.00
= Rp
317,593.50
379
= Rp
205,071.43 +
= Rp
205,071.43
= Rp
205,071.43 +
= Rp
205,071.43
= Rp
410,142.86
= Rp
205,071.43 +
= Rp
205,071.43
= Rp
205,071.43
= Rp
205,071.43 +
= Rp
205,071.43
= Rp
29,121.68
= Rp
1,921.50 +
= Rp
31,043.18
= Rp
14,817.00
= Rp
235.50 +
= Rp
15,052.50
= Rp
251,167.11
= Rp
205,071.43 +
380
= Rp
205,071.43
= Rp
205,071.43
= Rp
3,332.00
= Rp
1,686.32
= Rp
219.60 +
= Rp
5,237.92
= Rp
13,320.00
= Rp
2,250.00
= Rp
1,364.00 +
= Rp
16,934.00
= Rp
22,171.92
381
= Rp
299,946.08
50
= Rp
160,000.00 +
50
= Rp
459,946.08
= Rp
42,000.00
48
= Rp
135,150.00
48
= Rp
21,560.00 +
= Rp
198,710.00
= Rp
658,656.08
= Rp
86,644.56 +
= Rp
86,644.56
= Rp
254,400.00
= Rp
22,000.00
= Rp
48
= Rp
276,400.00
= Rp
363,044.56
= Rp
48,016.54 +
= Rp
48,016.54
= Rp
254,400.00
= Rp
18,000.00
= Rp
= Rp
272,400.00
= Rp
320,416.54
382
= Rp
39,341.18 +
= Rp
39,341.18
= Rp
50,880.00
= Rp
4,000.00
= Rp
= Rp
54,880.00
= Rp
39,341.18
= Rp
524,381.25
= Rp
251,703.00 +
= Rp
776,084.25
383
= Rp
101,100.00
= Rp
54,765.00
= Rp
11,400.00
= Rp
18,539.40
= Rp
48,943.84
= Rp
43,200.00 +
= Rp
277,948.24
= Rp
1,054,032.49
= Rp
11,746.14 +
= Rp
11,746.14
= Rp
560,800.00
= Rp
4,770.00
= Rp
1,011.00
= Rp
2,250.00
= Rp
674.00
= Rp
195.00
= Rp
1,460.00
= Rp
7,420.00 +
= Rp
578,580.00
= Rp
11,746.14 +
= Rp
11,746.14
= Rp
602,072.28
= Rp
74,770.08
= Rp
16,426.08 +
384
= Rp
91,196.16
= Rp
19,080.00
= Rp
101,100.00
= Rp
6,740.00
= Rp
1,170.00
= Rp
25,800.00
= Rp
= Rp
153,890.00
= Rp
245,086.16
= Rp
83,300.00
= Rp
16,470.00 +
= Rp
99,770.00
385
= Rp
44,900.00
= Rp
1,460.00
= Rp
21,600.00
= Rp
50,550.00
= Rp
674,000.00
= Rp
157,300.00
= Rp
15,900.00 +
= Rp
965,710.00
= Rp
1,065,480.00
= Rp
166,600.00
= Rp
32,940.00 +
= Rp
199,540.00
= Rp
44,900.00
= Rp
674.00
= Rp
195.00
= Rp
73,000.00
= Rp
43,200.00
= Rp
50,550.00
= Rp
9,540.00
= Rp
= Rp
674,000.00
= Rp
157,300.00 +
= Rp
1,053,359.00
= Rp
1,252,899.00
= Rp
83,300.00
= Rp
16,470.00 +
= Rp
99,770.00
386
= Rp
73,000.00
= Rp
43,200.00 +
= Rp
116,200.00
= Rp
215,970.00
= Rp
83.30
= Rp
3,294.00 +
= Rp
3,377.30
= Rp
45,000.00 +
= Rp
45,000.00
= Rp
48,377.30
387
= Rp
1,098.00
= Rp
11,662.00 +
= Rp
12,760.00
= Rp
12,760.00
= Rp
419,505.00
= Rp
167,802.00 +
= Rp
587,307.00
= Rp
238,500.00
= Rp
16,800.00 +
= Rp
255,300.00
= Rp
842,607.00
388
389
= Rp
137,445.00
= Rp
20,975.25
= Rp
2,310.68
= Rp
8,784.00 +
= Rp
169,514.93
= Rp
301,600.00
= Rp
104,520.00
= Rp
140,556.00 +
= Rp
546,676.00
= Rp
716,190.93
= Rp
24,064.02
= Rp
51,565.75
= Rp
17,188.58
347,209.36
= Rp
694,418.72
= Rp
= Rp
= Rp
58,310.00
= Rp
58,730.70
= Rp
6,469.89
= Rp
4,392.00 +
390
= Rp
127,902.59
= Rp
1,279.03
= Rp
1,680,000.00
= Rp
26,250.00 +
= Rp
1,706,250.00
= Rp
17,062.50
= Rp
16,414.50
= Rp
118,184.40
= Rp
39,394.80
1,300,028.40
= Rp
2,600,056.80
= Rp
549.00
= Rp
8,330.00 +
= Rp.
8,879.00
= Rp
88,790.00
391
= Rp
83,300.00
= Rp
3,513.60 +
= Rp
86,813.60
= Rp
41,670.53
= Rp
8,334.11
= Rp
441,707.60
= Rp.
2,799.90
= Rp.
9,558.68 +
= Rp.
12,358.58
= Rp.
146,848.13
= Rp.
215,953.13
= Rp.
21,301.20
= Rp.
93,296.00 +
= Rp.
114,597.20
= Rp.
14,324.65
= Rp.
143,246.50
= Rp.
9,003.60
= Rp.
37,943.15 +
392
= Rp.
46,946.75
= Rp.
5,868.34
= Rp.
58,683.44
= Rp
96,757.65
= Rp
176,110.01
393
= Rp.
21,301.20
= Rp.
93,296.00 +
= Rp.
114,597.20
= Rp.
27,503.33
= Rp
109,800.00
= Rp
2,665.60 +
= Rp
112,465.60
= Rp
39,362.96
= Rp
64,974.00
= Rp
30,631.77
= Rp
3,604.65
= Rp
4,282.20 +
= Rp
103,492.62
= Rp
203,520.00
= Rp
61,776.00 +
= Rp
265,296.00
= Rp
103,492.62
= Rp
36,222.42
= Rp.
2,745.00
= Rp.
62,475.00 +
65,220.00
= Rp.
394
= Rp.
15,652.80
= Rp.
1,098.00
= Rp.
= Rp.
27,489.00 +
28,587.00
= Rp
5,145.66
= Rp.
9,003.60
= Rp.
37,943.15 +
46,946.75
= Rp.
= Rp.
= Rp.
6,000.00 +
6,000.00
= Rp
17,267.22
= Rp
178,189.35
395
= Rp
375,000.00
= Rp
51,150.00
= Rp
426,150.00
= Rp
87,500.00 +
= Rp
87,500.00
= Rp
9,300.00 +
= Rp
9,300.00
= Rp
522,950.00
= Rp
15,000.00
= Rp
2,046.00
= Rp
17,046.00
396
= Rp
= Rp
2,775.00 +
= Rp
2,775.00
= Rp
19,821.00
= Rp
56,250.00
= Rp
2,557.50 +
= Rp
58,807.50
= Rp
58,807.50
= Rp
24,750.00
= Rp
1,023.00 +
= Rp
25,773.00
= Rp
25,773.00
= Rp
3,750.00
= Rp
511.50
= Rp
4,261.50
= Rp
4,261.50
397
= Rp
- +
= Rp
= Rp
= Rp
- +
= Rp
= Rp
= Rp
15,708.60
= Rp
39,271.50
= Rp
37,500.00
= Rp
10,230.00 +
= Rp
102,710.10
= Rp
= Rp
= Rp
- +
= Rp
= Rp
102,710.10
= Rp
600,000.00
= Rp
= Rp
102,300.00
= Rp
= Rp
= Rp
102,300.00 +
= Rp
804,600.00
= Rp
= Rp
= Rp
79,000.00
398
= Rp
= Rp
3,800,000.00 +
= Rp
3,879,000.00
= Rp
114,000.00
= Rp
= Rp
= Rp
= Rp
= Rp
= Rp
= Rp
- +
= Rp
114,000.00
= Rp
345,900.00
399
400
401