Anda di halaman 1dari 19

By D.

Nasrudin

GEOSTATISTIKA DAN
PERTAMBANGAN

PRODI TEKNIK PERTAMBANGAN

PRODI TEKNIK PERTAMBANGAN

PRODI TEKNIK PERTAMBANGAN

PRODI TEKNIK PERTAMBANGAN

PRODI TEKNIK PERTAMBANGAN

Red Mountain
Elev. 12,300 ft

Harrison Mountain
Elev. 12,300 ft

Red Mountain
Porphyry
Silver Plume
Granite

Shaft
Henderson
Orebody

Silver Plume
Granite

Urad Porphyry

1st Drill Hole


Primos

7500 Level

Porphyry

2nd Drill Hole

7065 Level

Access
Ramps
EarthLab/
Geoscience
Area

Henderson
Granite

Central Campus
Elev. 6800 ft, (4300 mwe)
Internal Shaft

Midway Campus
Elev. 5850 ft, (5100
mwe)
Lower Campus
Elev. 4900 ft. (5800
mwe)

PRODI TEKNIK PERTAMBANGAN

Ventilation Shaft

#2 Shaft

8100 Shop
(2500 mwe)
PC2 Conveyor
to Mill Site

7500 Level
(3300 mwe)

Mining
Area

Model Perhitungan Cadangan (Terukur)

Model-01

MODEL I = BERDASARKAN : LUAS PENGARUH


1

B-16

8
BASE LINE

= 9 Luas daerah pengaruh masing2 titik bor


6

Cadangan : Vol x BJ rata2 x MS rata2 x Kadar rata2 = .. ton


Blok

Volume
(m3)

Bobot isi
(ton/m3)

Crude sand
(ton)

MD
(%)

Konsentrat

Kadar
Fe2O3

Kadar
TiO2

159.435

4,5453

609.731,57

51- 52

240.980,65

198.509

28.814

Model-02

MODEL 2 : BERDASARKAN : LUAS SEGITIGA


1

B-16

B-19
B-01

8
BASE LINE

= 8 Luas daerah pengaruh segitiga yang


dipengaruhi 3 titik bor
6

Blok

Volume
(m3)

Bobot isi
(ton/m3)

Crude sand
(ton)

Konsentrat

Kadar
Ni

Kadar
Co

160.380

4,5453

620.205,4

239.440,65

196.975

28.451

Model-03

MODEL 3 = BERDASARKAN LUAS PENAMPANG

50 mt

BASE LINE B-16

200 mt

B-12

B-19

M3

M2

M1

B-13

Luas daerah penampang

B-20

B-15

Volume Cadangan : L/6 (M1 + 4 M2 + M3)


Berat Jenis Rata2 : (BJ1 + + BJ9 ) / 9 =
MS (Mag Degree)rata2 : (MS1 + .. + MS9) / 9 = (%)
Kadar Ni or Co rata2 : (K1 + + K9) / 9 = Co (%)
Cadangan : Vol x BJ rata2 x MS rata2 x Kadar rata2 = .. ton
Blok

Volume
(m3)

Bobot isi
(ton/m3)

Crude sand
(ton)

MD
(%)

Konsentrat

Kadar
Fe2O3

Kadar
TiO2

165.760

4,5453

635.722,8

51- 52

237.061,01

195.930

27.902

Penampang Bentang Alam dan Lokasi Pemboran (Hand-Auger),


daerah ..

Penampang Bentang Alam dan Lokasi Pemboran (Hand-Auger),


daerah ..i

Penampang Bentang Alam dan Lokasi Pemboran (Hand-Auger),


daerah Hamenteu, Cibalong, Pasirbesi

Penampang Bentang Alam dan Lokasi Pemboran (Hand-Auger),


daerah Hamenteu, Cibalong, Pasirbesi

PRODI TEKNIK PERTAMBANGAN

MANAJEMEN DATA LAPANGAN