REKAPITALASI BIAYA

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


PROYEK RUMAH SAKIT - SARI ASIH CIPUTAT, TANGERANG

NO.

URAIAN

BIAYA
(Rp)

A.
1
2
3
4

PEKERJAAN PERSIAPAN
Pekerjaan Persiapan
Perizinan PLN (1000 KVA)
Perizinan PT Telkom Indonesia
Perizinan PAL (Pembuangan air limbah)

B.
1
2
3
4
5
6

PEKERJAAN MEKANIKAL
Pekerjaan Sistem Tata Udara (Air Conditioning)
Pekerjaan Sistem Transportasi (Lift)
Pekerjaan Sistem Plumbing
Seawage Treatment Plant (STP)
Pekerjaan Sistem Fire Fighting
Pekerjaan Sistem Gas Medic

2,293,882,000
1,373,000,000
1,997,681,188
456,997,000
2,845,815,864
1,553,439,767

C.
1
2
3
4
5
6
7
8
9

PEKERJAAN ELEKTRIKAL
Pekerjaan Sistem Listrik
Pekerjaan Sistem Genset
Pekerjaan Sistem Penangkal Petir
Pekerjaan Sistem Telepon dan Data
Pekerjaan Sistem Tata Suara
Pekerjaan Fire Alarm
Pekerjaan Sistem MATV
Pekerjaan Sistem CCTV
Pekerjaan Sistem Nurse Call

4,512,322,298
1,914,503,750
41,400,000
294,710,000
141,120,000
372,454,520
112,926,000
288,495,320
1,651,986,275

Total A + B + C
Keuntungan Pemborong 10%
Sub total A + B + C + Keuntungan Pemborong
PPN 10 %
TOTAL

227,600,000
150,000,000
9,600,000
12,000,000

20,249,933,982
2,024,993,398
22,274,927,380
2,227,492,738
24,502,420,119

REKAPITALASI BIAYA
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
PROYEK RUMAH SAKIT - SARI ASIH CIPUTAT, TANGERANG

NO.

URAIAN

BIAYA
(Rp)

A.
1
2
3
4

PEKERJAAN PERSIAPAN
Pekerjaan Persiapan
Perizinan PLN (1000 KVA)
Perizinan PT Telkom Indonesia
Perizinan PAL (Pembuangan air limbah)

B.
1
2
3
4
5
6

PEKERJAAN MEKANIKAL
Pekerjaan Sistem Tata Udara (Air Conditioning)
Pekerjaan Sistem Transportasi (Lift)
Pekerjaan Sistem Plumbing
Seawage Treatment Plant (STP)
Pekerjaan Sistem Fire Fighting
Pekerjaan Sistem Gas Medic

2,293,882,000
( By Owner )
1,997,681,188
( By Owner )
2,845,815,864
( By Owner )

C.
1
8
2
3
4
5
6
7
9

PEKERJAAN ELEKTRIKAL
Pekerjaan Sistem Listrik
Pekerjaan Sistem Genset
Pekerjaan Sistem Penangkal Petir
Pekerjaan Sistem Telepon dan Data
Pekerjaan Sistem Tata Suara
Pekerjaan Fire Alarm
Pekerjaan Sistem MATV
Pekerjaan Sistem CCTV
Pekerjaan Sistem Nurse Call

4,512,322,298
( By Owner )
41,400,000
294,710,000
141,120,000
372,454,520
112,926,000
288,495,320
1,651,986,275

Total A + B + C
Keuntungan Pemborong 10%
Sub total A + B + C + Keuntungan Pemborong
PPN 10 %
TOTAL

227,600,000
150,000,000
9,600,000
12,000,000

14,951,993,465
1,495,199,347
16,447,192,812
1,644,719,281
18,091,912,093

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN
PEKERJAAN PERSIAPAN
No

Uraian
Pekerjaan Persiapan
Biaya -biaya pengadaan staf dan peralatan kantor yang akan
mengelola pelaksanaan pekerjaan dan mengurus segala hal
yang berhubungan dengan administrasi proyek (mobilisasi)

H.Sat
(Rp)

Total
(Rp)

Qty

Sat

lot

40,000,000

40,000,000

Biaya - Biaya pemindahan peralatan kantor dan staff yang


telah dipergunakan untuk pelaksanaan proyek (demobilisasi)

lot

25,000,000

25,000,000

Pemborong harus mengadakan peralatan kerja yang cukup,


jumlah kualitas dan kapasitasnya untuk melaksanakan pekerjaan yang dimaksudkan dalam dokumen tender ini.
Termasuk dalam biaya ini adalah pembuatan dan pembong karan serta perampihan kembali tempat penyimpanan barang.

lot

100,000,000

100,000,000

Pembuatan dan penggandaan dokumen kontrak lengkap gambar-gambar kontrak sebanyak lima (5) set, dimana 4(empat)
set diberikan kepada pemberi tugas.

lot

2,000,000

2,000,000

Pembuatan gambar- gambar pelaksanaan /shop drawing, gambar-gambar yang telah dilaksanakan /as built drawing yang harus diberikan kepada pemberi tugas dalam bentuk kalkir 1(satu)
set dan 2(dua) set blue print.

lot

5,000,000

5,000,000

Pengadaan contoh - contoh bahan yang dikehendaki oleh pemberi tugas atau wakilnya sesuai dengan spesifikasi tehnis yang
dipersyaratkan dalam dokumen tender harus segera diadakan
tanpa keterlambatan

lot

Pemborong harus mengangkat keluar lokasi proyek semua


sampah-sampah hasil pekerjaan secara teratur sehingga keadaan lapangan selalu bersih. Termasuk didalamnya pengadaan
tempat sampah sementara dan peralatan kebesihannya.

lot

15,000,000

15,000,000

Pemborong harus penyiapkan kantor proyek untuk wakil pemberi tugas termasuk didalamnya kantor pemborong lengkap
dengan lampu penerangan dan instalasinya.

lot

12,000,000

12,000,000

Pengadaan peralatan pencegahan terhadap bahan kebakaran


berupa APAR dan menyediakan tenaga-tenaga yang terlatih.

lot

600,000

600,000

10

Pemborong bertanggung jawab terhadap penjagaan / perlindungan peralatan kerja dan material kerja terhadap kehilangan
atau kerusakan yang sedang dipergunakan dalam proyek.

lot

4,000,000

4,000,000

11

Pengadaan Sepatu Safety, Handy talky (HT), Helm proyek,


jas hujan, payung untuk pemberi tugas dan pengawas lapangan

lot

9,000,000

9,000,000

12

Semua pekerja pemborong harus mendaftarkan seluruh pegawainya yang terlibat dalam proyek ini kepada asuransi JAMSOSTEK

lot

15,000,000

15,000,000

Sub Total

incl

227,600,000

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN
PEKERJAAN SISTEM TATA UDARA
No

Uraian

SAT

HARGA SATUAN
Rp.

Unit

16,100,000

32,200,000

QTY

JUMLAH HARGA
Rp.

PEKERJAAN PLUMBING

I
1

Peralatan Utama
Transfer Pump
Kapasitas : 475 l/m
Head
: 40 mtr
Speed
: 2900 rpm
Daya
: 7,5 kw/ 3/ 380 V/50 hz/3 ph
Jenis
: Pakaged (1set 2 pompa)
Berikut kabel electroda GWT dan Roof Tank

Booster Pump
Kapasitas : 150 l/m
Head
: 20 mH20
Speed
: 2900 rpm
Daya
: 3 kw/ 3/ 380 V/50 hz/3 ph
Jenis
: Pakaged (1set 2 pompa)
Spesifikasi Pompa :
1 Paket Booster Pump terdiri dari :
- 2 unit Pompa + Motor
- 1 unit Panel Control Automatic/ Alternate
- 1 unit Diagprahma Pressure Tank
- 1 lot Accessories

Unit

48,000,000

48,000,000

Pompa Deep Well


Kapasitas : 150 Lpm
Head
: 20 mH20
Speed
: 2900 rpm
Daya
: 3 kw/ 3/ 380 V/50 hz/3 ph

Unit

262,500,000

262,500,000

Sand Filter
Type
: Automatic Backwash
Kap
: 150 l/min

Unit

42,625,000

42,625,000

Carbon Filter
Type
: Automatic Backwash
Kap
: 150 l/min

Unit

48,625,000

48,625,000

Tanki Air Atas (Roof tank) , Lokasi Atap


Kapasitas : 20 m3
Bahan
: FRP
Lengkap dengan dudukan pondasi, dan pipa over,
flow dan sistem drain. Termasuk tangga pengontrol

set

83,125,000

83,125,000

Sump Pump 1 (Basement)


Kapasitas : 150 Lpm
Head
: 20 m H2O
Speed
: 1450 rpm
Daya
: 1,5 kW, 3, 380 V, 50 Hz
Jenis
: Submersible Pump, lengkap dengan
panel kontrol dan pengkabelannya dan Accessories

18

unit

15,312,000

275,616,000

Material bantu

lot

3,500,000

3,500,000

No
9

Uraian
Testing commissioning

QTY

SAT

lot

HARGA SATUAN
Rp.
7,500,000

Sub. Total I
II

Site Plan dan R. Pompa


- 100 mm ( Header )
- 65 mm
- 32 mm
- 25 mm
- 20 mm

JUMLAH HARGA
Rp.
7,500,000

803,691,000

1
131
70
196
210

lot
mtr
mtr
mtr
mtr

3,500,000
164,260
76,879
61,155
42,881

3,500,000
21,518,060
5,381,513
11,986,380
9,005,063

Water meter dia 65mm


Bak kontrol 40 x 40 x 40 cm

1
8

bh
bh

1,970,250
1,750,000

1,970,250
14,000,000

Gate valve , tekanan kerja 10 bar


- 150 mm
- 80 mm
- 20 mm

5
2
8

bh
bh
bh

3,787,500
1,413,750
156,603

18,937,500
2,827,500
1,252,821

bh

1,970,250

3,940,500

bh

1,833,750

3,667,500

Flexibel joint
- 80 mm
- 65 mm

2
2

bh
bh

993,750
861,250

1,987,500
1,722,500

Foot Valve
- 80 mm

bh

1,613,750

Pressure Gauge

bh

185,000

370,000

- 50 mm

bh

2,500,000

2,500,000

Kran Taman

bh

130,000

1,170,000

48
102

m
m

131,719
51,333

6,322,514
5,236,000

Check Valve, tekanan kerja 10 kg


- 65 mm
Strainer, tekanan kerja 10 bar :
- 80 mm

Floating Valve

Instalasi Air Kotor


(Pipa PVC Class AW, class 10 K) air kotor
dia. 150 mm
dia. 100 mm
Sub Total II
III

117,295,600

INSTALASI AIR HUJAN


Pipa PVC AW Class 10 K
Site Plan
200
150

150
67

m
m

289,200
197,710

43,380,000
13,246,570

Instalasi pipa tegak


50
80
150

28
56
168

m
m
m

33,384
55,650
197,710

934,752
3,116,400
33,215,280

73

197,710

14,432,830

Lantai-dasar
150

No

Uraian

QTY

SAT

HARGA SATUAN
Rp.

Lantai-dua
150
80

95
70

m
m

197,710
55,650

18,782,450
3,895,500

Roof drain
80

10

bh

162,750

1,627,500

Lantai-tiga
150

76

93,780

7,127,280

Lantai-empat
150

76

93,780

7,127,280

Lantai-lima
100

76

93,780

7,127,280

Lantai-atap
100

76

93,780

7,127,280

Roof drain
100

20

bh

187,250

3,745,000

Lantai-atap (ruang mesin)


80
100

41
20

m
m

51,333
93,780

2,104,667
1,875,600

Roof drain
80
100

5
4

bh
bh

162,750
187,250

813,750
749,000

Fitting-fitting

lot

12,500,000

12,500,000

Material bantu

lot

5,000,000

5,000,000

Testing commissioning

lot

4,500,000

4,500,000

Sub. Total III


IV

JUMLAH HARGA
Rp.

LANTAI BASEMENT
Instalasi Air Bersih
(Pipa Galvanized Iron Medium Class)
dia. 80 mm
dia. 50 mm
dia. 40 mm
dia. 32 mm
dia. 25 mm
dia. 20 mm
dia. 15 mm

192,428,419

30
30
55
85
75
120
300

mtr
mtr
mtr
mtr
mtr
mtr
mtr

210,825
119,550
87,345
76,879
61,155
42,881
33,608

6,324,750
3,586,500
4,803,975
6,534,694
4,586,625
5,145,750
10,082,250

Gate Valve
dia. 50 mm
dia. 40 mm
dia. 32 mm
dia. 25 mm

1
2
2
8

bh
bh
bh
bh

396,700
256,250
209,450
157,600

396,700
512,500
418,900
1,260,800

Fitting

lot

2,750,000

2,750,000

Material bantu

lot

1,375,000

1,375,000

No

Uraian
Pengetesan

QTY
1

SAT
lot

HARGA SATUAN
Rp.
2,500,000

JUMLAH HARGA
Rp.
2,500,000
47,778,444

INSTALASI AIR KOTOR, BEKAS DAN VENT


Instalasi Air Bekas
(Pipa PVC Class AW, class 10 K) air kotor
dia. 150 mm
dia. 100 mm
dia. 80 mm
dia. 65 mm
dia. 50 mm

8
88
100
72
30

m
m
m
m
m

197,710
93,780
55,650
44,295
33,384

1,581,680
8,252,640
5,565,000
3,189,240
1,001,520

Gate valve dia 80 mm


Check valve dia 80 mm

18
18

bh
bh

1,335,750
1,593,750

24,043,500
28,687,500

Instalasi Air Kotor


(Pipa PVC Class AW, class 10 K) air bekas
dia. 150 mm
dia. 100 mm

48
30

m
m

197,710
93,780

9,490,080
2,813,400

Instalasi Air Vent


dia. 50 mm
dia. 40 mm
dia. 32 mm

71
17
45

m
m
m

32,100
24,825
22,688

2,279,100
422,025
1,020,938

Floor Drain (FD)


dia. 50 mm

bh

147,650

1,328,850

Clean Out lantai (Co)


dia. 100 mm
dia. 50 mm

2
4

bh
bh

164,286
136,905

328,571
547,619

Fitting

lot

2,750,000

2,750,000

Material bantu

lot

1,350,000

1,350,000

Pengetesan

lot

2,500,000

2,500,000
97,151,663

LANTAI SATU
Instalasi Air Bersih
(Pipa Galvanized Iron Medium Class)
dia. 50 mm
dia. 40 mm
dia. 32 mm
dia. 25 mm
dia. 20 mm
dia. 15 mm

6
46
85
66
133
285

m
m
m
m
m
m

119,550
87,345
76,879
61,155
42,881
33,608

717,300
4,017,870
6,534,694
4,036,230
5,703,206
9,574,777

Gate Valve
dia. 50 mm
dia. 32 mm
dia. 25 mm
dia. 20 mm

1
2
2
3

bh
bh
bh
bh

396,700
209,450
157,600
120,000

396,700
418,900
315,200
360,000

Fitting

lot

1,250,000

1,250,000

lot

HARGA SATUAN
Rp.
750,000

25
75
90
115

m
m
m
m

93,780
55,650
44,295
44,295

2,344,500
4,173,750
3,986,550
5,093,925

22
85
12

m
m
m

93,780
55,650

7,971,300
667,800

92
54
120

m
m
m

32,100
24,825
22,688

2,953,200
1,340,550
2,722,500

15

bh

147,650

2,214,750

Clean out lantai (Co)


dia. 80 mm
dia. 65 mm

5
3

bh
bh

164,286
136,905

821,429
410,714

Fitting

lot

2,250,000

2,250,000

Material bantu

lot

1,450,000

1,450,000

Pengetesan

lot

2,500,000

2,500,000

No

Uraian
Material bantu
INSTALASI AIR KOTOR, BEKAS DAN VENT
Instalasi Air Bekas
(Pipa PVC Class AW, class 10 K) air kotor
dia. 100 mm
dia. 80 mm
dia. 65 mm
dia. 50 mm
Instalasi Air Kotor
(Pipa PVC Class AW, class 10 K) air bekas
dia. 150 mm
dia. 100 mm
dia. 80 mm
Pipa Vent PVC Class D Class 5 K
dia. 50 mm
dia. 40 mm
dia. 32 mm
Floor Drain (FD)
dia. 50 mm

QTY

SAT

JUMLAH HARGA
Rp.
750,000

74,975,845
VI

LANTAI DUA
Instalasi Air Bersih
(Pipa Galvanized Iron Medium Class)
dia. 50 mm
dia. 40 mm
dia. 32 mm
dia. 25 mm
dia. 20 mm
dia. 15 mm

3
65
36
45
68
265

mtr
mtr
mtr
mtr
mtr
mtr

119,550
87,345
76,879
61,155
42,881
33,608

358,650
5,677,425
2,767,635
2,751,975
2,915,925
8,905,988

Gate Valve
dia. 50 mm
dia. 32 mm
dia. 25 mm

1
2
2

bh
bh
bh

396,700
256,250
209,450

396,700
512,500
418,900

Fitting

lot

1,000,000

1,000,000

Material bantu

lot

650,000

650,000

150
20
25

mtr
m
m

93,780
55,650
44,295

14,067,000
1,113,000
1,107,375

Instalasi Air Bekas


(Pipa PVC Class AW, class 10 K) air kotor
dia. 100 mm
dia. 80 mm
dia. 65 mm

No

Uraian

QTY

SAT

HARGA SATUAN
Rp.
32,100

JUMLAH HARGA
Rp.
802,500

dia. 50 mm

25

Instalasi Air Kotor


(Pipa PVC Class AW, class 10 K) air bekas
dia. 100 mm
dia. 150 mm

14
14

mtr
mtr

93,780
197,750

1,312,920
2,768,500

Pipa Vent PVC Class D Class 5 K


dia. 50 mm
dia. 40 mm
dia. 32 mm

51
50
80

mtr
mtr
mtr

32,100
24,825
22,688

1,637,100
1,241,250
1,815,000

Floor Drain (FD)


dia. 50 mm
dia. 65 mm

5
2

bh
bh

147,650
175,000

738,250
350,000

Clean out lantai (Co)


dia. 50 mm
dia. 65 mm
dia. 150 mm

3
5
7

bh
bh
bh

32,100
136,905
197,750

96,300
684,524
1,384,250

Fitting

lot

2,738,095

2,738,095

Material bantu

lot

2,190,476

2,190,476

2,190,476

2,190,476

.
Pengetesan

VII

LANTAI TIGA
Instalasi Air Bersih
(Pipa Galvanized Iron Medium Class)
dia. 65 mm
dia. 40 mm
dia. 32 mm
dia. 25 mm
dia. 20 mm
dia. 15 mm

lot

62,592,714

20
65
64
60
60
205

mtr
mtr
mtr
mtr
mtr
mtr

164,260
87,345
76,879
61,155
42,881
33,608

3,285,200
5,677,425
4,920,240
3,669,300
2,572,875
6,889,538

Gate Valve
dia. 65 mm
dia. 40 mm
dia. 32 mm
dia. 25 mm
dia. 15 mm

1
2
2
5
3

bh
bh
bh
bh
bh

164,260
465,476
186,174
156,603
33,608

930,952
372,348
783,013
100,823

Fitting

lot

2,738,095

2,738,095

Material bantu

lot

2,190,476

2,190,476

Instalasi Air Bekas


(Pipa PVC Class AW, class 10 K) air kotor
dia. 80 mm
dia. 65 mm

230
230

m
m

55,650
44,295

12,799,500
10,187,850

Instalasi Air Kotor


(Pipa PVC Class AW, class 10 K) air bekas
dia. 100 mm
dia. 150 mm

329
91

m
m

93,780
55,650

30,853,620
5,064,150

Pipa Vent PVC Class D Class 5 K

45
60
132

m
m
m

HARGA SATUAN
Rp.
32,100
24,825
22,688

Floor Drain (FD)


dia. 50 mm
dia. 65 mm

32
6

bh
bh

147,650
175,000

4,724,800
1,050,000

Clean out lantai (Co)


dia. 100 mm
dia. 65 mm

4
22

bh
bh

164,286
136,905

657,143
3,011,905

Fitting

lot

3,500,000

3,500,000

Material bantu

lot

2,000,000

2,000,000

2,500,000

2,500,000

No

Uraian
dia. 50 mm
dia. 40 mm
dia. 32 mm

QTY

SAT

JUMLAH HARGA
Rp.
1,444,500
1,489,500
2,994,750

.
Pengetesan

lot

116,408,003
VIII

LANTAI EMPAT
Instalasi Air Bersih
(Pipa Galvanized Iron Medium Class)
dia. 65 mm
dia. 50 mm
dia. 40 mm
dia. 25 mm
dia. 20 mm
dia. 15 mm

20
6
65
60
60
205

mtr
mtr
mtr
mtr
mtr
mtr

164,260
119,550
87,345
61,155
42,881
33,608

3,285,200
717,300
5,677,425
3,669,300
2,572,875
6,889,538

1
2
16
3

bh
bh
bh
bh

485,587
465,476
156,603

485,587
930,952
2,505,642

Fitting

lot

2,738,095

2,738,095

Material bantu

lot

2,190,476

2,190,476

Instalasi Air Bekas


(Pipa PVC Class AW, class 10 K) air kotor
dia. 80 mm
dia. 65 mm

230
230

m
m

55,650
44,295

12,799,500
10,187,850

Instalasi Air Kotor


(Pipa PVC Class AW, class 10 K) air bekas
dia. 100 mm
dia. 150 mm

329
75

m
m

93,780
55,650

30,853,620
4,173,750

Pipa Vent PVC Class D Class 5 K


dia. 50 mm
dia. 40 mm
dia. 32 mm

45
60
132

m
m
m

32,100
24,825
22,688

1,444,500
1,489,500
2,994,750

32
6

bh
bh

147,650
175,000

4,724,800
1,050,000

Gate Valve
dia. 65 mm
dia. 40 mm
dia. 25 mm
dia. 15 mm

Floor Drain (FD)


dia. 50 mm
dia. 65 mm
Clean out lantai (Co)

29
31

bh
bh

HARGA SATUAN
Rp.
164,286
136,905

Fitting

lot

3,500,000

3,500,000

Material bantu

lot

2,000,000

2,000,000

2,500,000

2,500,000

No

Uraian
dia. 100 mm
dia. 65 mm

QTY

SAT

JUMLAH HARGA
Rp.
4,764,294
4,244,048

.
Pengetesan

lot

118,389,002
IX

LANTAI LIMA
(Pipa Galvanized Iron Medium Class)
dia. 32 mm
dia. 25 mm
dia. 20 mm
dia. 15 mm

60
75
220
245

mtr
mtr
mtr
mtr

76,879
61,155
42,881
33,608

4,612,725
4,586,625
9,433,875
8,233,838

16

bh

186,174

2,978,785

Fitting

lot

2,400,000

2,400,000

Material bantu

lot

1,250,000

1,250,000

INSTALASI AIR KOTOR, BEKAS DAN VENT


(Pipa PVC Class AW, class 10 K) air kotor
dia. 150 mm
dia. 100 mm
dia. 80 mm
dia. 65 mm
dia. 50 mm

6
48
6
6
6

m
m
m
m
m

197,710
93,780
55,650
44,295
33,384

1,186,260
4,501,440
333,900
265,770
200,304

(Pipa PVC Class AW, class 10 K) air bekas


dia. 150 mm
dia. 100 mm
dia. 80 mm
dia. 65 mm
dia. 50 mm

34
25
6
25
20

m
m
m
m
m

197,710
93,780
55,650
44,295
33,384

6,722,140
2,344,500
333,900
1,107,375
667,680

Pipa Vent PVC Class D Class 5 K


dia. 50 mm
dia. 40 mm
dia. 32 mm
dia. 50 mm

6
22
21
6

m
m
m
bh

32,100
24,825
22,688
147,650

192,600
546,150
476,438
885,900

Clean out lantai (Co)


dia. 100 mm
dia. 50 mm
Fitting

2
2
1

bh
bh
lot

164,286
136,905
2,000,000

328,571
273,810
2,000,000

Material bantu

lot

1,500,000

1,500,000

Pengetesan

lot

2,500,000

2,500,000

Gate Valve
dia. 32 mm

Lantai - Atap
(Pipa Galvanized Iron Medium Class)
dia. 100 mm
dia. 80 mm

59,862,585
12
189

mtr
mtr

279,145
210,825

3,349,740
39,845,925

dia. 65 mm
dia. 50 mm
dia. 40 mm

16
8
3

mtr
mtr
mtr

HARGA SATUAN
Rp.
164,260
119,550
87,345

Gate Valve
dia. 32 mm
dia. 25 mm

1
28

bh
bh

186,174
156,603

186,174
4,384,873

Fitting

lot

1,750,000

1,750,000

Material bantu

lot

1,500,000

1,500,000

Lantai- Atap
dia. 150 mm
dia. 100 mm
dia. 80 mm
dia. 65 mm
dia. 50 mm

6
48
6
6
6

m
m
m
m
m

197,710
93,780
55,650
44,295
33,384

1,186,260
4,501,440
333,900
265,770
200,304

(Pipa PVC Class AW, class 10 K) Air bekas


dia. 150 mm
dia. 100 mm
dia. 80 mm
dia. 65 mm
dia. 50 mm

34
6
6
6
20

m
m
m
m
m

197,710
93,780
55,650
44,295
33,384

6,722,140
562,680
333,900
265,770
667,680

Pipa Vent PVC Class D Class 5 K


dia. 65 mm
dia. 50 mm
dia. 40 mm
dia. 32 mm

6
6
6
21

m
m
m
m

44,295
32,100
24,825
22,688

265,770
192,600
148,950
476,438

Floor Drain (FD)


dia. 50 mm

bh

147,650

885,900

Clean out lantai (Co)


dia. 100 mm
dia. 50 mm

2
2

bh
bh

164,286
136,905

328,571
273,810

Fitting

lot

1,350,000

1,350,000

Material bantu

lot

750,000

750,000

Pengetesan

lot

2,500,000

2,500,000

No

Uraian

QTY

SAT

JUMLAH HARGA
Rp.
2,628,160
956,400
262,035

INSTALASI AIR KOTOR, BEKAS DAN VENT

77,075,190
Instalasi Air Bersih
dia 80 mm ( supplay ke Roof Tank )
dia 80 mm ( Gravitasi ke lt. B dan lt. 1 )

70
70

mtr
mtr

210,825
210,825

14,757,750
14,757,750

Instalasi Air Kotor & Air Bekas


dia 150 mm
dia 100 mm

50
50

mtr
mtr

197,710
93,780

9,885,500
4,689,000

Instalasi Ventilasi
dia 80 mm

50

mtr

71,888

3,594,375

No

Uraian
Testing commissioning

QTY
1

SAT
lot

HARGA SATUAN
Rp.
7,500,000

JUMLAH HARGA
Rp.
7,500,000
55,184,375

VI.

Instalasi Air Panas Sistem Water Heater


PERALATAN UTAMA
Pengadaan dan pemasangan matrial utama water
heater system Gas lengkap dengan matrial
Pendukung dan Accesoriesnya sehingga dapat
berpungsi dengan baik
Air Panas Sistem Electrical
GWH (Gas Water Heater) di lantai Basement
Model
: 25V30-7P
ENERGY : LPG/Nat Gas
Heat Input : 30.000 BTUH
Capacity
: 30 USG/114 Liter
Dray Weight : 44 Kg

unit

11,000,000

22,000,000

50
6

mtr
bh

24,900
175,000

1,245,000
1,050,000

unit

1,600,000

3,200,000

50
3

mtr
bh

24,900
175,000

1,245,000
525,000

13

unit

21,000,000

273,000,000

Instalasi pipa air panas dari Water heater solar panel


ke Outlet. Menggunakan pipa PPR Type PN - 20
Lantai Basement
dia 15 mm
Ball Valve dia 15 mm
Instalasi Air Panas Sistem Water Heater
PERALATAN UTAMA
Pengadaan dan pemasangan matrial utama water
heater system Electrical lengkap dengan matrial
Pendukung dan Accesoriesnya sehingga dapat
berpungsi dengan baik
Air Panas Sistem Electrical
EWH (Electric Water Heater) di lantai 2
Kapasitas 50 Liter
Daya1500 Watt
Instalasi pipa air panas dari Water heater solar panel
ke Outlet. Menggunakan pipa PPR Type PN - 20
Lantai Dua
dia 15 mm
Ball Valve dia 15 mm
PERALATAN UTAMA
Pengadaan dan pemasangan matrial utama water
heater system solar panel lengkap dengan matrial
Pendukung dan Accesoriesnya sehingga dapat
berpungsi dengan baik
Air Panas Sistem Solar Panel
SWH (Solar Water Heater) di lantai atap
Kapasitas 300 Liter
Type 300 LXC
Daya 1500 Watt
Instalasi pipa air panas dari Water heater solar panel
ke Outlet. Menggunakan pipa PPR Type PN - 20
Lantai 1

dia 20 mm
dia 15 mm
Ball Valve dia 15 mm

17
33
1

mtr
mtr
bh

HARGA SATUAN
Rp.
38,900
24,900
175,000

Lantai 2
dia 20 mm
dia 15 mm
Ball Valve dia 15 mm

22
65
2

mtr
mtr
bh

38,900
24,900
175,000

855,800
1,618,500
350,000

Lantai 3
dia 20 mm
dia 15 mm
Ball Valve dia 15 mm

22
90
3

mtr
mtr
bh

38,900
24,900
175,000

855,800
2,241,000
525,000

Lantai 4
dia 20 mm
dia 15 mm
Ball Valve dia 15 mm

8
40
2

mtr
mtr
bh

38,900
24,900
175,000

311,200
996,000
350,000

Lantai 5
PPR dia 20 mm
dia 15 mm
Ball Valve dia 15 mm

136
320
8

mtr
mtr
bh

38,900
24,900
175,000

5,290,400
7,968,000
1,400,000

Lantai Atap
dia 25 mm
Ball Valve dia 25 mm
Ball Valve dia 15 mm

120
1
13

mtr
bh
bh

62,600
225,000
175,000

7,512,000
225,000
2,275,000

Material bantu

lot

3,000,000

3,000,000

Testing commissioning

lot

7,500,000

7,500,000

No

Uraian

QTY

SAT

JUMLAH HARGA
Rp.
661,300
821,700
175,000

317,931,700

TOTAL

1,997,681,188

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN
PEKERJAAN SISTEM TATA UDARA
No
A.
1

Uraian

H.Sat
(Rp)

Total
(Rp)

Qty

Sat

IU/OU - B.1,B.2,B.3, B.9


Lokasi
:Rekam Medis, R.Dewasa, Lift Lobby
Kapasitas
:12200 BTUH
Air flow
:350 CFM
Daya
:1120 WATT
Type
:Split Wall
Power Suplai
:1P/220V/50HZ

Unit

6,150,000

66,500,000

IU/OU - B.4,B.7 B.8, B.11, B.12, B.14


Lokasi
:Ruangan I, Work Shop, R.Kebidanan,
R. Anak, Bank
Kapasitas
:8900 BTUH
Air flow
:311 CFM
Daya
:815 WATT
Type
:Split Wall
Power Suplai
:1P/220V/50HZ

Unit

4,950,000

29,700,000

IU/OU - B.6, B.15, B.16, B.17


Lokasi
:R.Dewasa,Gudang Apotik, Bank
Kapasitas
:18100 BTUH
Air flow
:572 CFM
Daya
:1650 WATT
Type
:Split Wall
Power Suplai
:1P/220V/50HZ

Unit

9,200,000

36,800,000

IU/OU - B.13
Lokasi
Kapasitas
Air flow
Daya
Type
Power Suplai

Unit

4,500,000

4,500,000

Unit

2,200,000

2,200,000

Unit

5,000,000

5,000,000

TATA UDARA LANTAI BASEMENT


Pengadaan dan Pemasangan peralatan utama AC & FAN
Lengkap dengan Instalasi pengkabelan, berikut Pipa Refrigran, Isolasi, Thermostat, hanger, suport,
vibration mounting, flexible joint,plenum box dan
accesoriesnya.sehingga dapat berpungsi dengan baik

:KA
:4500 BTUH
:240 CFM
:350 WATT
:Split Wall
:1P/220V/50HZ

Pengadaan dan Pemasangan exhaust fan lengkap


berikut hanger, suport, vibration mounting, plexible joint,
plenum box dan accesoriesnya sehingga dapat berpungsi
dengan baik.
EF - B.1
Lokasi
Air flow
Daya
Type
Power Suplai

:R.pompa
:1000 CFM
:150 WATT
:Wall Industrial
:3P/380V/50HZ

EF - B.2
Lokasi

:Parkir Basement

No

Uraian
Air flow
Daya
Type
Power Suplai

:3000 CFM
:350 WATT
:Wall Industrial
:3P/380V/50HZ

EF - B.3
Lokasi
Air flow
Daya
Type
Power Suplai

Toilet
:1000 CFM
:150 WATT
:Axial
:3P/380V/50HZ

EF - B.4
Lokasi
Air flow
Daya
Type
Power Suplai

:Parkir Basement
:3000 CFM
:350 WATT
:Wall Industrial
:3P/380V/50HZ

EF - B.5
Lokasi
Air flow
Daya
Type
Power Suplai

:Parkir Basement
:3000 CFM
:350 WATT
:Wall Industrial
:3P/380V/50HZ

EF - B.6
Lokasi
Air flow
Daya
Type
Power Suplai

:Loundry
:3000 CFM
:350 WATT
:Axial
:3P/380V/50HZ

EF - B.7
Lokasi
Air flow
Daya
Type
Power Suplai

:Dapur
:200 CFM
:150 WATT
:Axial
:1P/220V/50HZ

EF - B.8
Lokasi
Air flow
Daya
Type
Power Suplai

:Parkir Basement
:3000 CFM
:350 WATT
:Wall Industrial
:3P/380V/50HZ

EF - B.9
Lokasi
Air flow
Daya
Type
Power Suplai

:Gudang Apotik
:100 CFM
:30 WATT
:Ceilling
:1P/220V/50HZ

EF - B.10
Lokasi
Air flow
Daya
Type
Power Suplai

:R Jenazah
:100 CFM
:30 WATT
:Ceilling
:1P/220V/50HZ

H.Sat
(Rp)

Total
(Rp)

Qty

Sat

Unit

2,200,000

2,200,000

Unit

5,000,000

5,000,000

Unit

5,000,000

5,000,000

Unit

5,000,000

5,000,000

Unit

700,000

700,000

Unit

5,000,000

5,000,000

Unit

1,100,000

1,100,000

Unit

1,100,000

1,100,000

No

Uraian

H.Sat
(Rp)

Total
(Rp)

Qty

Sat

Unit

2,200,000

2,200,000

Unit

5,000,000

5,000,000

Unit

5,000,000

5,000,000

Unit

2,200,000

2,200,000

Grill Fan R Pompa ( EF=B.1) ukuran


500 x 500

Buah

450,000

450,000

Grill Fan Parkir Basement ( EF=B.2) ukuran


600 x 600

Buah

600,000

600,000

Ducting Exhaust Toilet ukuran


100 x 100
150 x 100
200 x 200
300 x 250
350 x 250
400 x 300
400 x 400

30
8
7
10
10
20
5

Meter
Meter
Meter
Meter
Meter
Meter
Meter

120,000
130,000
160,000
190,000
200,000
220,000
240,000

3,600,000
1,040,000
1,120,000
1,900,000
2,000,000
4,400,000
1,200,000

Exhaust Air Grill Toilet ukuran 250 x 250

Buah

105,000

840,000

Grill Fan Toilet (EF-B.3) ukuran 500 x 500

Buah

450,000

450,000

Ducting Intake Fan Kitchen ukuran 600 x 300

34

Meter

280,000

9,520,000

Grill Kitchen (IF=B.2) Hood ukuran 600 x 300

Buah

600,000

600,000

Suplay Air Grill Kitchen ukuran 500 x 250

Buah

400,000

1,600,000

EF - B.11
Lokasi
Air flow
Daya
Type
Power Suplai

Koridor
:1000 CFM
:150 WATT
:Axial
:3P/380V/50HZ

IF - B.1
Lokasi
Air flow
Daya
Type
Power Suplai

:Loundry
:3000 CFM
:350 WATT
:Axial
:3P/380V/50HZ

IF - B.2
Lokasi
Air flow
Daya
Type
Power Suplai

Kitchen
:3000 CFM
:350 WATT
:Axial
:3P/380V/50HZ

IF - B.3
Lokasi
Air flow
Daya
Type
Power Suplai

Koridor
:1000 CFM
:150 WATT
:Axial
:3P/380V/50HZ

Pengadaan dan Pemasangan Ducting exhaust fan lengkap


berikut hanger, suport, vibration mounting, plexible joint,
plenum box dan accesoriesnya sehingga dapat berpungsi
dengan baik.

Meter

H.Sat
(Rp)
280,000

Total
(Rp)
16,240,000

Set

6,500,000

13,000,000

Grill Kitchen (EF=B.4) Hood ukuran 600 x 600

Buah

600,000

600,000

Grill Fan Parkir Basement ( EF=B.5) Hood ukuran 600 x 600

Buah

600,000

600,000

Ducting Intake Fan Loundry ukuran

34

Meter

280,000

9,520,000

Grill Loundry (IF=B.1) ukuran 600 x 300

Buah

600,000

600,000

Suplay Air Grill Loundry ukuran 500 x 250

Buah

400,000

1,200,000

Ducting Exhaust Fan Loundry ukuran 600 x 300

58

Meter

280,000

16,240,000

Suplay Air Grill Loundry ukuran 500 x 250

Buah

400,000

1,200,000

Grill Fan Loundry (EF=B.6) Hood ukuran 600 x 600

Buah

600,000

600,000

Ducting Exhaust Dapur ukuran 200 x 200

Meter

160,000

1,120,000

Exhaust Air Grill Dapur ukuran 300 x 300

Buah

105,000

210,000

Grill Fan Dapur (EF-B.7) Hood ukuran 500 x 500

Buah

450,000

450,000

Grill Fan Parkir Basement ( EF=B.8) Hood ukuran 600 x 600

Buah

600,000

600,000

Ducting Exhaust Gudang Apotik ukuran 200 x 200

Meter

160,000

1,440,000

Grill Fan Gudang Apotik (EF-B.9) ukuran 250 x 250

Buah

105,000

105,000

Ducting Exhaust R jenazah ukuran 200 x 200

Meter

160,000

1,440,000

Grill Fan R jenazah (EF-B.10) ukuran 250 x 250

Buah

105,000

105,000

16
16
16
16
16
42

Meter
Meter
Meter
Meter
Meter
Meter

180,000
190,000
200,000
220,000
220,000
240,000

2,880,000
3,040,000
3,200,000
3,520,000
3,520,000
10,080,000

Buah

600,000

600,000

Buah

400,000

2,400,000

Buah

600,000

600,000

Buah

400,000

2,400,000

39
96
16

Meter
Meter
Meter

37,000
40,000
75,000

1,443,000
3,840,000
1,200,000

No

Uraian

Qty

Sat

Ducting Exhaust Fan Kitchen ukuran 600 x 300

58

Stove Hood Ukuran 5000 x 1500

Ducting Intake dan Exhaust Fan Koridor ukuran


250 x 250
300 x 250
300 x 300
350 x 300
350 x 350
400 x 400
Grill Fan Koridor (IF-B.3) ukuran
500 x 500
Suplay Air Grill Koridor ukuran
400 x 400
Grill Fan Koridor (EF-B.3) ukuran
500 x 500
Exhaust Air Grill Koridor ukuran
400 x 400
4

Pengadaan dan Pemasangan Pipa Drain AC, PVC Class AW


lengkap berikut Isolasi Class 1 APDM tebal 1,3mm dan
accesoriesnya sehingga dapat berfungsi dengan baik
Diameter 3/4"
Diameter 1"
Riser Diameter 2"

No

Uraian

Qty

Sat

H.Sat
(Rp)

Sub Total A
B
1

Total
(Rp)
317,513,000

TATA UDARA LANTAI 1 ( SATU )


Pengadaan dan Pemasangan peralatan utama AC & FAN
Lengkap dengan Instalasi pengkabelan, berikut Pipa Refrigran, Isolasi, Thermostat, hanger, suport,
vibration mounting, flexible joint,plenum box dan
accesoriesnya.sehingga dapat berpungsi dengan baik
IU/OU - 1.1,1.5,1.10, 1.11,1.12,1.13,1.14,1.16,1.21, 1.22,
1.23,1.24,1.25, 1.27,1.28,1.29,1.30,1.35,1.36,1.39
Lokasi
:Play room, Nursery, USG, Dokter,
Kapasitas
:6750 BTUH
Air flow
:296 CFM
Daya
:552 WATT
Type
:Split Wall
Power Suplai
:1P/220V/50HZ

20

Unit

4,750,000

95,000,000

IU/OU - 1.2,1.3,1.4 1.6, 1.7,1.8, 1.17,1.18,1.3.7, 1.4.4,1.4.5,1.4.6 12


Lokasi
:Alat, KA, Panoramic, Dokter, KA Lab,
:Sperma
Kapasitas
:4500 BTUH
Air flow
:240 CFM
Daya
:350 WATT
Type
:Split Wall
Power Suplai
:1P/220V/50HZ

Unit

4,500,000

54,000,000

IU/OU - 1.9,1.15,1.26,1.38, 1.62, 1.63, 1.64


Lokasi
:R.Tunggu Exutive, Locket, Rawat jalan,
:Pendaptaran, Bank
Kapasitas
:8900 BTUH
Air flow
:311 CFM
Daya
:815 WATT
Type
:Split Wall
Power Suplai
:1P/220V/50HZ

Unit

4,950,000

34,650,000

IU/OU - 1.19,1.20,1.40,1.41,1.42,1.43, 1.60, 1.61


Lokasi
:Racik, KA, IGD,
Kapasitas
:18100 BTUH
Air flow
:572 CFM
Daya
:1650 WATT
Type
:Split Wall
Power Suplai
:1P/220V/50HZ

Unit

9,200,000

73,600,000

IU/OU - 1.31,1.32,1.33,1.34,1.47,1.51, 1.65


Lokasi
:Rontgen, CT Scan, Lab, Minimarket
Kapasitas
:12200 BTUH
Air flow
:350 CFM
Daya
:1120 WATT
Type
:Split Wall
Power Suplai
:1P/220V/50HZ

Unit

6,150,000

43,050,000

IU/OU - 1.52
Lokasi
Kapasitas
Air flow
Daya
Type
Power Suplai

Unit

42,000,000

42,000,000

:Ruang tunggu Poliklinik


:90 000 BTUH
:
CFM
:9650 WATT
:Split Duct
:3P/380V/50HZ

No

Uraian
IU/OU - 1.53
Lokasi
Kapasitas
Air flow
Daya
Type
Power Suplai

:Ruang tunggu
:18100 BTUH
:572 CFM
:1650 WATT
:Split Wall
:1P/220V/50HZ

IU/OU - 1.54
Lokasi
Kapasitas
Air flow
Daya
Type
Power Suplai

:Ruang tunggu
:18100 BTUH
:572 CFM
:1650 WATT
:Split Wall
:1P/220V/50HZ

IU/OU - 1.55
Lokasi
Kapasitas
Air flow
Daya
Type
Power Suplai

:Poli Umum
:6750 BTUH
:296 CFM
:552 WATT
:Split Wall
:1P/220V/50HZ

IU/OU - 1.56
Lokasi
Kapasitas
Air flow
Daya
Type
Power Suplai

:Ruang tunggu, Koridor


:774 00 BTUH
:
CFM
:6500 WATT
:Split Duct
:3P/380V/50HZ

IU/OU - 1.57
Lokasi
Kapasitas
Air flow
Daya
Type
Power Suplai

:Koridor, Food Court


:115 000 BTUH
:
CFM
:9 800 WATT
:Split Duct
:3P/380V/50HZ

IU/OU - 1.58
Lokasi
Kapasitas
Air flow
Daya
Type
Power Suplai

:Lift Lobby
:126 000 BTUH
:
CFM
:10 000 WATT
:Split Duct
:3P/380V/50HZ

IU/OU - 1.59
Lokasi
Kapasitas
Air flow
Daya
Type
Power Suplai

:Ruang tunggu
:116 000 BTUH
:
CFM
:9 800 WATT
:Split Duct
:3P/380V/50HZ

Pengadaan dan Pemasangan exhaust fan lengkap


berikut hanger, suport, vibration mounting, plexible joint,
plenum box dan accesoriesnya sehingga dapat berpungsi

H.Sat
(Rp)

Total
(Rp)

Qty

Sat

Unit

9,200,000

9,200,000

Unit

9,200,000

9,200,000

Unit

4,750,000

4,750,000

Unit

39,000,000

39,000,000

Unit

46,500,000

46,500,000

Unit

48,000,000

48,000,000

Unit

46,500,000

46,500,000

No

Uraian

H.Sat
(Rp)

Total
(Rp)

Qty

Sat

Unit

1,100,000

1,100,000

Unit

1,400,000

1,400,000

Unit

1,100,000

1,100,000

EF - 1.4 dan EF 1.5


Lokasi
:R Racik Apotik
Air flow
:100 CFM
Daya
:30 WATT
Type
:Ceilling
Power Suplai
:1P/220V/50HZ

Unit

1,100,000

2,200,000

EF - 1.6 dan 1.7


Lokasi
Air flow
Daya
Type
Power Suplai

Unit

1,100,000

1,100,000

:Wastafel Lab
:100 CFM
:30 WATT
:Ceilling
:1P/220V/50HZ

EF - 1.8
Lokasi
Air flow
Daya
Type
Power Suplai

Unit

1,300,000

1,300,000

:Micro Biologi
:200 CFM
:30 WATT
:Ceilling
:1P/220V/50HZ

Flexible Duct c/w Isolasi dia 200 mm


200 x 200 bjls 50
250 x 200 bjls 50
250 x 250 bjls 50
300 x 250 bjls 50
300 x 300 bjls 50
350 x 300 bjls 50

35
80
30
40
16
22
7

Meter
Meter
Meter
Meter
Meter
Meter
Meter

95,000
148,000
185,000
231,000
277,000
333,000
388,000

3,325,000
11,840,000
5,550,000
9,240,000
4,432,000
7,326,000
2,716,000

SAD 250 x 250


RAG 250 x 250
FAG 250 x 250

34
15
5

Buah
Buah
Buah

147,500
105,000
165,000

5,015,000
1,575,000
825,000

dengan baik.

EF - 1.1
Lokasi
Air flow
Daya
Type
Power Suplai

:Toilet Poli
:100 CFM
:30 WATT
:Ceilling
:1P/220V/50HZ

EF - 1.2
Lokasi
Air flow
Daya
Type
Power Suplai

:Toilet Publik
:700 CFM
:100 WATT
:Axial
:1P/220V/50HZ

EF - 1.3
Lokasi
Air flow
Daya
Type
Power Suplai

:R Gelap
:100 CFM
:30 WATT
:Ceilling
:1P/220V/50HZ

Pengadaan dan Pemasangan Ducting AC Split Duct fan leng


kap berikut isolasi, hanger, suport, vibration mounting, plexible
joint,plenum box dan accesoriesnya sehingga dapat berpungsi
dengan baik.

H.Sat
(Rp)
200,000

Total
(Rp)
1,000,000

Meter

110,000

1,320,000

51
15
2
3

Meter
Meter
Meter
Meter

110,000
130,000
160,000
200,000

5,610,000
1,950,000
320,000
600,000

Ducting Exhaust R Gelap (EF-1.3) ukuran


100 x 100

Meter

110,000

330,000

Ducting Exhaust R Racik (EF-1.4dan EF-1.5) ukuran


200 x 200

26

Meter

160,000

4,160,000

Ducting Exhaust Wastafel Lab (EF-1.6) ukuran


PVC Type D 100

22

Meter

25,000

550,000

Ducting Exhaust R Lab (EF-1.7) ukuran


PVC Type D 100

20

Meter

25,000

500,000

Ducting Exhaust Micro Biologi (EF-1.7) ukuran


PVC Type D 150

15

Meter

30,000

450,000

11

Buah

105,000

1,155,000

Buah

105,000

105,000

Buah

180,000

180,000

Buah

105,000

105,000

Buah

180,000

180,000

Buah

105,000

105,000

Buah

105,000

105,000

Buah

180,000

180,000

320
112
90

Meter
Meter
Meter

37,000
40,000
75,000

11,840,000
4,480,000
6,750,000

No

Uraian

Qty

Sat

Plenum Box

Set

Pengadaan dan Pemasangan Ducting exhaust fan lengkap


berikut hanger, suport, vibration mounting, plexible joint,
plenum box dan accesoriesnya sehingga dapat berpungsi
dengan baik.
Ducting Exhaust Toilet Poli (EF-1.1) ukuran
100 x 100

12

Ducting Exhaust Toilet Publik (EF-1.2) ukuran


100 x 100
150 x 100
200 x 200
300 x 300

Exhaust Air Grill Toilet Publik ukuran


250 x 250
Grill fan Toilet Poli (EF-1.1) ukuran
250 x 250
Grill fan Toilet Publik (EF-1.2) ukuran
300 x 300
Grill fan R Gelap (EF-1.3) ukuran
250 x 250
Grill fan R Racik (EF-1.4 dan EF- 1.5) ukuran
300 x 300
Grill fan Wastafel Lab (EF-1.6) ukuran
250 x 250
Grill fan R Lab (EF-1.7) ukuran
250 x 250
Grill fan Micro Biologi (EF-1.8) ukuran
300 x 300
5

Pengadaan dan Pemasangan Pipa Drain AC, PVC Class AW


lengkap berikut Isolasi Class 1 APDM tebal 1,3mm dan
accesoriesnya sehingga dapat berpungsi dengan baik
Diameter 3/4"
Diameter 1"
Diameter 2"
Sub Total B

C
1

TATA UDARA LANTAI 2 ( DUA )


Pengadaan dan Pemasangan peralatan utama AC & FAN
Lengkap dengan Instalasi pengkabelan, berikut Pipa Refrigran, Isolasi, Thermostat, hanger, suport,

647,469,000

No

Uraian

H.Sat
(Rp)

Total
(Rp)

Qty

Sat

IU/OU - 2.1, 2.3, 2.6


Lokasi
:OK1, OK2, OK3 (Plasma Cluster)
Kapasitas
:18100 BTUH
Air flow
:572 CFM
Daya
:1650 WATT
Type
:PLASMA CLUSTER
Power Suplai
:1P/220V/50HZ

Unit

9,200,000

27,600,000

IU/OU - 2.7, 2.10, 2.18, 2.19, 2.24, 2.25, 2.32, 2.33, 2.34
2.36
Lokasi
:Resulasi,RR, Keuangan, PT, Hemodialisa,
NS, Meeteng Room 2
Kapasitas
:18100 BTUH
Air flow
:572 CFM
Daya
:1650 WATT
Type
:Split Wall
Power Suplai
:1P/220V/50HZ

10

Unit

9,200,000

92,000,000

IU/OU - 2.8,2.9,2.17,2.31,2.32
Lokasi
:Dirut, Fisio terafi, Meeting
:room 1, SPI
Kapasitas
:12200 BTUH
Air flow
:350 CFM
Daya
:1120 WATT
Type
:Split Wall
Power Suplai
:1P/220V/50HZ

Unit

6,150,000

24,600,000

IU/OU - 2.11,2.12,2.16, 2.21,2.22,2.23,2.28,2.29,2.36


Lokasi
:RR, NS, Meeting, EDP, SDM, Scre
:tary, Dokter, KA, RO
Kapasitas
:6750 BTUH
Air flow
:296 CFM
Daya
:552 WATT
Type
:Split Wall
Power Suplai
:1P/220V/50HZ

Unit

4,750,000

42,750,000

IU/OU - 2.13,2.14,2,15, 2.20, 2.26,2.30


Lokasi
:ODC, Dokter,R.Tunggu OK, Keuangan
Kapasitas
:8900 BTUH
Air flow
:311 CFM
Daya
:815 WATT
Type
:Split Wall
Power Suplai
:1P/220V/50HZ

Unit

4,950,000

29,700,000

Unit

2,200,000

2,200,000

Unit

1,300,000

1,300,000

vibration mounting, flexible joint,plenum box dan


accesoriesnya.sehingga dapat berpungsi dengan baik

Pengadaan dan Pemasangan exhaust fan lengkap


berikut hanger, suport, vibration mounting, plexible joint,
plenum box dan accesoriesnya sehingga dapat berpungsi
dengan baik.
EF - 2.1
Lokasi
Air flow
Daya
Type
Power Suplai
EF - 2.2

:OK1, OK2, OK3


:1000 CFM
:150 WATT
:Axial
:3P/380V/50HZ

No

Uraian
Lokasi
Air flow
Daya
Type
Power Suplai

Toilet
:250 CFM
:100 WATT
:Axial
:1P/220V/50HZ

EF - 2.3
Lokasi
Air flow
Daya
Type
Power Suplai

:Toilet
:100 CFM
:30 WATT
:Axial
:1P/220V/50HZ

EF - 2.4
Lokasi
Air flow
Daya
Type
Power Suplai

:Koridor
:1000 CFM
:250 WATT
:Axial
:3P/380V/50HZ

EF - 2.5
Lokasi
Air flow
Daya
Type
Power Suplai

:Hemodialisa
:100 CFM
:30 WATT
:Axial
:1P/220V/50HZ

EF - 2.6
Lokasi
Air flow
Daya
Type
Power Suplai

:Hempdialisa
:100 CFM
:30 WATT
:Axial
:1P/220V/50HZ

EF - 2.7
Lokasi
Air flow
Daya
Type
Power Suplai

:Alat
:100 CFM
:30 WATT
:Axial
:1P/220V/50HZ

IF - 2.1
Lokasi
Air flow
Daya
Type
Power Suplai

:Koridor
:1000 CFM
:250 WATT
:Axial
:3P/380V/50HZ

H.Sat
(Rp)

Total
(Rp)

Qty

Sat

Unit

1,100,000

1,100,000

Unit

2,200,000

2,200,000

Unit

1,100,000

1,100,000

Unit

1,100,000

1,100,000

Unit

1,100,000

1,100,000

Unit

2,200,000

2,200,000

Buah

400,000

1,200,000

1
3

Buah
Set

400,000
2,000,000

400,000
6,000,000

Pengadaan dan Pemasangan Ducting exhaust fan lengkap


berikut hanger, suport, vibration mounting, plexible joint,
plenum box dan accesoriesnya sehingga dapat berpungsi
dengan baik.
Exhaust Air Grill OK1, OK2, OK3 ukuran
400 x 400
Grill fan (EF-2.1) OK1, OK2, OK3) ukuran
400 x 400
Filter
Ducting Exhaust Fan Toilet ukuran

Meter
Meter
Meter

H.Sat
(Rp)
110,000
130,000
160,000

Total
(Rp)
3,960,000
1,950,000
1,920,000

20
10

Meter
Meter

130,000
160,000

2,600,000
1,600,000

Buah

105,000

630,000

Buah

105,000

105,000

Buah

105,000

105,000

Ducting Exhaust (EF-2.5 dan EF-2.6) Hemodialisa ukuran


100 x 100

Meter

110,000

880,000

Grill fan (EF-2.5 dan EF-2.6) Hemodialisa ukuran


250 x 250

Buah

105,000

210,000

20
20
20
20
20
20
40

Meter
Meter
Meter
Meter
Meter
Meter
Meter

180,000
190,000
200,000
210,000
220,000
230,000
240,000

3,600,000
3,800,000
4,000,000
4,200,000
4,400,000
4,600,000
9,600,000

Buah

600,000

600,000

Buah

400,000

2,800,000

Buah

600,000

600,000

Buah

400,000

2,400,000

328
80

Meter
Meter

37,000
75,000

12,136,000
6,000,000

No

Uraian

Qty

Sat

100 x 100
150 x 150
200 x 200

36
15
12

Ducting Exhaust Fan OK ukuran


300 x 200
300 x300
Exhaust Air Grill Toilet Publik ukuran
250 x 250
Grill fan (EF-2.2) Toilet Publik ukuran
300 x 300
Grill fan (EF-2.3) Toilet Hemodilisa ukuran
250 x 250

Ducting Intake dan Exhaust Fan Koridor ukuran


250 x 250
300 x 250
300 x 300
350 x 300
350 x 350
400 x 350
400 x 400
Grill Fan Koridor (IF=2.1) ukuran
500 x 500
Suplay Air Grill Koridor ukuran
400 x 400
Grill Fan Koridor (EF=2.4) ukuran
500 x 500
Return Air Grill Koridor ukuran
400 x 400
4

Pengadaan dan Pemasangan Pipa Drain AC, PVC Class AW


lengkap berikut Isolasi Class 1 APDM tebal 1,3mm dan
accesoriesnya sehingga dapat berpungsi dengan baik
Diameter 3/4"
Diameter 2"
Sub Total C

D
1

309,246,000

TATA UDARA LANTAI 3 ( TIGA )


Pengadaan dan Pemasangan peralatan utama AC & FAN
Lengkap dengan Instalasi pengkabelan, berikut Pipa Refrigran, Isolasi, Thermostat, hanger, suport,
vibration mounting, flexible joint,plenum box dan
accesoriesnya.sehingga dapat berpungsi dengan baik
IU/OU - 3.1,3.5,3.13,3.17,3.20,3.21,3.22,3.24,3.26, 3.29,3.30
Lokasi
:Dokter, Isolasi, Karu, menyusui, mandi
:bayi, kala
Kapasitas
:6750 BTUH
Air flow
:296 CFM
Daya
:552 WATT

11

Unit

4,750,000

52,250,000

No

Uraian

H.Sat
(Rp)

Total
(Rp)

Qty

Sat

IU/OU - 3.2, 3.6, 3.15, 3.16, 3.18,3.25,3.28, 3.31, 3.33


Lokasi
:ICU VIP, R tunggu VK, NICU, Kala,
:Lounge, Preinatologi, Nurse
(OK, VK pakai AC Plasma Cluster)
Kapasitas
:8900 BTUH
Air flow
:311 CFM
Daya
:815 WATT
Type
:Split Wall
Power Suplai
:1P/220V/50HZ

Unit

4,950,000

44,550,000

IU/OU - 3.6, 3.7,3.8,3.9,3.10,3.11,3.12, 3.19,


3.27,3.34,3.35,3.36,3.37,3.38
Lokasi
:Kelas I, II, III, VTP, NICU, Primatologi
:Kala, Bayi VIP,
Kapasitas
:12200 BTUH
Air flow
:350 CFM
Daya
:1120 WATT
Type
:Split Wall
Power Suplai
:1P/220V/50HZ

13

Unit

4,150,000

53,950,000

IU/OU - 3.14,3.23, 3.32, 3.33, 3.34, 3.39


Lokasi
:High Care, VK, Bayi, TCU
Kapasitas
:18100 BTUH
Air flow
:572 CFM
Daya
:1650 WATT
Type
:Split Wall
Power Suplai
:1P/220V/50HZ

Unit

9,200,000

55,200,000

Unit

2,200,000

2,200,000

EF - 3.2 s/d EF-3.21


Lokasi
:Toilet
Air flow
:100 CFM
Daya
:30 WATT
Type
:Axial
Power Suplai
:1P/220V/50HZ

20

Unit

1,100,000

22,000,000

IF - 3.1
Lokasi
Air flow
Daya
Type
Power Suplai

Unit

2,200,000

2,200,000

:Koridor
:1000 CFM
:250 WATT
:Axial
:3P/380V/50HZ

CF - 3.1
Lokasi
Air flow

Unit

700,000

700,000

:Mushola
:200 CFM

Type
Power Suplai

:Split Wall
:1P/220V/50HZ

2
berikut hanger, suport, vibration mounting, plexible joint,
plenum box dan accesoriesnya sehingga dapat berpungsi
dengan baik.
EF -.3.1
Lokasi
Air flow
Daya
Type
Power Suplai

:Koridor
:1000 CFM
:250 WATT
:Axial
:3P/380V/50HZ

No

Uraian
Daya
Type
Power Suplai

Pengadaan dan Pemasangan Ducting exhaust fan lengkap


berikut hanger, suport, vibration mounting, plexible joint,
plenum box dan accesoriesnya sehingga dapat berpungsi
dengan baik.
Ducting Exhaust Toilet ukuran
100 x 100

82

Meter

110,000

9,020,000

32
32
32
32
20

Meter
Meter
Meter
Meter
Meter

180,000
190,000
200,000
220,000
240,000

5,760,000
6,080,000
6,400,000
7,040,000
4,800,000

Buah

600,000

600,000

Buah

400,000

3,200,000

Buah

600,000

600,000

Buah

400,000

3,600,000

Pengadaan dan Pemasangan Pipa Drain AC, PVC Class AW


lengkap berikut Isolasi Class 1 APDM tebal 1,3mm dan
accesoriesnya sehingga dapat berfungsi dengan baik
Diameter 3/4"
Diameter 1"
Diameter 2"

280
10
80

Meter
Meter
Meter

37,000
40,000
75,000

10,360,000
400,000
6,000,000

Sub Total D

E
1

Total
(Rp)

Sat

:100 WATT
:Ceilling
:1P/220V/50HZ

Ducting Intake dan Exhaust Fan Koridor ukuran


250 x 250
300 x 250
300 x 300
350 x 300
400 x 400
Grill Fan Koridor (IF=3.1) ukuran
500 x 500
Suplay Air Grill Koridor ukuran
400 x 400
Grill Fan Koridor (EF=3.1) ukuran
500 x 500
Return Air Grill Koridor ukuran
400 x 400
4

H.Sat
(Rp)

Qty

296,910,000

TATA UDARA LANTAI 4 ( EMPAT )


Pengadaan dan Pemasangan peralatan utama AC & FAN
Lengkap dengan Instalasi pengkabelan, berikut Pipa Refrigran, Isolasi, Thermostat, hanger, suport,
vibration mounting, flexible joint,plenum box dan
accesoriesnya.sehingga dapat berpungsi dengan baik
IU/OU - 4.1,4.2,4.8,4.9,4.25,
Lokasi
:Kelas III, Rtunggu,
Kapasitas
:18100 BTUH
Air flow
:572 CFM
Daya
:1650 WATT
Type
:Split Wall
Power Suplai
:1P/220V/50HZ

Unit

9,200,000

46,000,000

IU/OU - 4.3,4.4,4.5,4.6,4.7,4.10,4.11,4.12,4.13,4.14,4.15,
4.16,4.17,4.18,4.19,4.23,4.24,4.27,4.28,4.29,4.30
4.31,4.34
Lokasi
:Kelas II, Nurse
Kapasitas
:12200 BTUH
Air flow
:350 CFM
Daya
:1120 WATT
Type
:Split Wall

23

Unit

6,150,000

141,450,000

No

Uraian

IU/OU - 4.20,4.21,4.32,4.33,4.36
Lokasi
:Observasi, Karu, Kelas II, obat, Kon
sultasi
Kapasitas
:6750 BTUH
Air flow
:296 CFM
Daya
:552 WATT
Type
:Split Wall
Power Suplai
:1P/220V/50HZ

Unit

4,750,000

23,750,000

IU/OU - 4.22
Lokasi
Kapasitas
Air flow
Daya
Type
Power Suplai

Unit

4,950,000

4,950,000

Unit

2,200,000

2,200,000

EF - 4.2 s/d EF-4.30


Lokasi
:Toilet
Air flow
:100 CFM
Daya
:30 WATT
Type
:Axial
Power Suplai
:1P/220V/50HZ

29

Unit

1,100,000

31,900,000

IF - 4.1
Lokasi
Air flow
Daya
Type
Power Suplai

Unit

2,200,000

2,200,000

Pengadaan dan Pemasangan Ducting exhaust fan lengkap


berikut hanger, suport, vibration mounting, plexible joint,
plenum box dan accesoriesnya sehingga dapat berpungsi
dengan baik.
Ducting Exhaust Toilet ukuran
100 x 100

75

Meter

110,000

8,250,000

Ducting Exhaust Toilet (Riser) ukuran


300 x 300

108

Meter

200,000

21,600,000

Ducting Intake dan Exhaust Fan Koridor ukuran


250 x 250
300 x 250
300 x 300
350 x 300

16
16
16
16

Meter
Meter
Meter
Meter

180,000
190,000
200,000
220,000

2,880,000
3,040,000
3,200,000
3,520,000

:1P/220V/50HZ

:Nurse
:8900 BTUH
:311 CFM
:815 WATT
:Split Wall
:1P/220V/50HZ

Pengadaan dan Pemasangan exhaust fan lengkap


berikut hanger, suport, vibration mounting, plexible joint,
plenum box dan accesoriesnya sehingga dapat berpungsi
dengan baik.
EF -.4.1
Lokasi
Air flow
Daya
Type
Power Suplai

Total
(Rp)

Sat

Power Suplai

H.Sat
(Rp)

Qty

:Koridor
:1000 CFM
:250 WATT
:Axial
:3P/380V/50HZ

:Koridor
:1000 CFM
:250 WATT
:Axial
:3P/380V/50HZ

No

Uraian
350 x 350
400 x 350
400 x 400
450 x 400
Grill Fan Koridor (IF=4.1) ukuran
500 x 500
Suplay Air Grill Koridor ukuran
400 x 400
Grill Fan Koridor (EF=4.1) ukuran
500 x 500
Return Air Grill Koridor ukuran
400 x 400

Pengadaan dan Pemasangan Pipa Drain AC, PVC Class AW


lengkap berikut Isolasi Class 1 APDM tebal 1,3mm dan
accesoriesnya sehingga dapat berpungsi dengan baik
Diameter 3/4"
Diameter 1"
Diameter 2"

Meter
Meter
Meter
Meter

H.Sat
(Rp)
220,000
230,000
240,000
250,000

Total
(Rp)
3,520,000
3,680,000
3,840,000
4,000,000

Buah

600,000

600,000

Buah

400,000

3,600,000

Buah

600,000

600,000

Buah

400,000

3,200,000

260
4
80

Meter
Meter
Meter

37,000
40,000
75,000

9,620,000
160,000
6,000,000

Qty

Sat

16
16
16
16

Sub Total E
F
1

333,760,000

TATA UDARA LANTAI 5 ( LIMA )


Pengadaan dan Pemasangan peralatan utama AC & FAN
Lengkap dengan Instalasi pengkabelan, berikut Pipa Refrigran, Isolasi, Thermostat, hanger, suport,
vibration mounting, flexible joint,plenum box dan
accesoriesnya.sehingga dapat berpungsi dengan baik
IU/OU - 5.1,5.2,5.3,5.4,5.5,5.6,5.7,5.8,5.9,5.10,5.11,5.12,
5.13,5.14,5.15,5.16,5.17,5.18,5.19,5.20,5.21,5.22,
5.23,5.24,5.25,5.26,5.27,5.28,5.29,5.30,5.31,
5.32,5.36
Lokasi
:VIP, R TUNGGU,Kelas I, Obat, NS
Kapasitas
:12200 BTUH
Air flow
:350 CFM
Daya
:1120 WATT
Type
:Split Wall
Power Suplai
:1P/220V/50HZ

33

Unit

6,150,000

202,950,000

IU/OU - 5.33,5.34,5.37
Lokasi
:Konsultasi, Karu,
:sultasi
Kapasitas
:6750 BTUH
Air flow
:296 CFM
Daya
:552 WATT
Type
:Split Wall
Power Suplai
:1P/220V/50HZ

Unit

4,750,000

14,250,000

Unit

2,200,000

2,200,000

Pengadaan dan Pemasangan exhaust fan lengkap


berikut hanger, suport, vibration mounting, plexible joint,
plenum box dan accesoriesnya sehingga dapat berpungsi
dengan baik.
EF -.5.1
Lokasi
Air flow
Daya

:Koridor
:1000 CFM
:250 WATT

No

Uraian

EF - 5.2 s/d EF-5.33


Lokasi
:Toilet
Air flow
:100 CFM
Daya
:30 WATT
Type
:Axial
Power Suplai
:1P/220V/50HZ

32

Unit

1,100,000

35,200,000

IF - 5.1
Lokasi
Air flow
Daya
Type
Power Suplai

Unit

2,200,000

2,200,000

Pengadaan dan Pemasangan Ducting exhaust fan lengkap


berikut hanger, suport, vibration mounting, plexible joint,
plenum box dan accesoriesnya sehingga dapat berpungsi
dengan baik.
Ducting Exhaust Toilet ukuran
100 x 100

92

Meter

110,000

10,120,000

Ducting Exhaust Toilet (Riser) ukuran


300 x 300

120

Meter

200,000

24,000,000

16
16
16
16
16
16
16
16

Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter

180,000
190,000
200,000
220,000
220,000
230,000
240,000
250,000

2,880,000
3,040,000
3,200,000
3,520,000
3,520,000
3,680,000
3,840,000
4,000,000

Buah

600,000

600,000

Buah

400,000

3,600,000

Buah

600,000

600,000

Buah

400,000

3,200,000

250
8
80

Meter
Meter
Meter

37,000
40,000
75,000

9,250,000
320,000
6,000,000

:Axial
:3P/380V/50HZ

:Koridor
:1000 CFM
:250 WATT
:Axial
:3P/380V/50HZ

Ducting Intake Fan Koridor ukuran


250 x 250
300 x 250
300 x 300
350 x 300
350 x 350
400 x 350
400 x 400
450 x 400
Grill Fan Koridor (IF=5.1) ukuran
500 x 500
Suplay Air Grill Koridor ukuran
400 x 400
Grill Fan Koridor (EF=5.1) ukuran
500 x 500
Return Air Grill Koridor ukuran
400 x 400
4

Pengadaan dan Pemasangan Pipa Drain AC, PVC Class AW


lengkap berikut Isolasi Class 1 APDM tebal 1,3mm dan
accesoriesnya sehingga dapat berpungsi dengan baik
Diameter 3/4"
Diameter 1"
Diameter 2"
Sub Total F

G
1

Total
(Rp)

Sat

Type
Power Suplai

H.Sat
(Rp)

Qty

TATA UDARA LANTAI A ( ATAP )


Pengadaan dan Pemasangan peralatan utama AC & FAN
Lengkap dengan Instalasi pengkabelan, berikut Pipa Refrigran, Isolasi, Thermostat, hanger, suport,
vibration mounting, flexible joint,plenum box dan

342,170,000

No

Uraian

H.Sat
(Rp)

Total
(Rp)

Qty

Sat

Unit

4,950,000

14,850,000

Unit

14,000,000

14,000,000

Meter

440,000

1,760,000

Buah

480,000

960,000

Pengadaan dan Pemasangan Pipa Drain AC, PVC Class AW


lengkap berikut Isolasi Class 1 APDM tebal 1,3mm dan
accesoriesnya sehingga dapat berpungsi dengan baik
Diameter 3/4"

12

Meter

37,000

444,000

Grill tangga kebakaran 600 x 300

Buah

400,000

2,400,000

accesoriesnya.sehingga dapat berpungsi dengan baik


IU/OU - A.01,A.02,A.03
Lokasi
:R mesin Lift
Kapasitas
:8900 BTUH
Air flow
:311 CFM
Daya
:815 WATT
Type
:Split Wall
Power Suplai
:1P/220V/50HZ
2

Pengadaan dan Pemasangan Presh Air fan lengkap


berikut hanger, suport, vibration mounting, plexible joint,
plenum box dan accesoriesnya sehingga dapat berfungsi
dengan baik.(Interpace to Fire Alarm)
PAF - A..1
Lokasi
Air flow
Daya
Type
Power Suplai

:Lantai Tangga kebakaran


:11000 CFM
:3000 WATT
:Axial
:3P/380V/50HZ

Pengadaan dan Pemasangan Ducting/Hood PAF lengkap


berikut hanger, suport, vibration mounting, flexible joint,
plenum box dan accesoriesnya sehingga dapat berfungsi
dengan baik.
Ducting Presh air fan ukuran
800 x 800
Presh air fan grill
800 x 800

Sub Total G
H
1

34,414,000

TATA UDARA R. GENSET DAN TRAFO


Pengadaan dan Pemasangan peralatan utama FAN
Lengkap dengan Instalasi pengkabelan, berikut accesoriesnya.sehingga dapat berpungsi dengan baik
EF - G.1/ EF - G.2
Lokasi
:R. Genset
Air flow
:2000 CFM
Daya
:250 WATT
Type
:Wall Industrial
Power Suplai
:3P/380V/50HZ

Unit

3,800,000

7,600,000

EF - T1
Lokasi
Air flow
Daya
Type
Power Suplai

Unit

4,800,000

4,800,000

:R. Trafo
:7000 CFM
:700 WATT
:Wall Industrial
:3P/380V/50HZ

No

Uraian
Sub Total H
Total A - H

Qty

Sat

H.Sat
(Rp)

Total
(Rp)
12,400,000
2,293,882,000

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN
PEKERJAAN SISTEM PEMADAM KEBAKARAN
QTY

SAT

HARGA SATUAN
Rp.

JUMLAH HARGA
Rp.

1.1 Pompa Elektrik Hydrant (Ruang pompa lt, B )


- Kapasitas : 500 GPM
- Head
: 100 meter
- Put
: 2900 Rpm
- Type
: splite case
- Operation : start automatik,
stop manual

unit

104,000,000

104,000,000

1.2 Pompa Diesel Hydrant (Ruang pompa lt, B )


- Kapasitas : 500 GPM
- Head
: 100 meter
- Put
: 2900 Rpm
- Type
: splite case
- Operation : start automatik,

unit

200,000,000

200,000,000

1.3 Pompa Jokey


- Kapasitas
- Head
- Put
- Type
- Operation

(Ruang pompa lt, B )


: 25 GPM
: 100 meter
: 2900 Rpm
: Vertikal
: start/stop automatik

unit

25,794,500

25,794,500

1.4 Panel Kontrol Pompa Kebakaran Mengacu ke


Standard NFPA
- Lengkap dengan Pressure tank dan acce
sories Dan dapat interface dengan MCFA

set

lot

12,500,000

12,500,000

set

7,352,500

14,705,000

54
30

m
m

781,128
470,400

42,180,912
14,112,000

No

Uraian
Pekerjaan Pemadam Kebakaran
1

Pekerjaan Equipment Utama

1.5 Assesories instalasi pompa


Material Bantu
Termasuk pondasi pompa, support,hangger,
Vibration mounting , dan tanki solar harian kap200 ltr , berikut instalasinya + pengecatan

INCLUDE

sub total 1
2

Instalasi Pemadam Kebakaran


di Ruang Pompa

2.1 Pengadaan dan pemasangan Pipa Black Steel


Sch 40 (ASTM A53) berikut Support, penge
catan Blind Flange dan Accessories
Header dia. 200 mm termasuk support,
blind flanges fitting weldolet,air realease dia
25 mm2dan pengecatan.
Pipa dia. 150 mm
Pipa dia. 100 mm

Pipa dia. 50 mm

30

HARGA SATUAN
Rp.
185,400

Knalpot pipa dia 80 mm


termasuk isolasi panas (asbes type) dan diberi
metal Jakecting

75

375,000

28,125,000

10
2

bh
bh

10,459,980
824,380

104,599,800
1,648,760

- Check valve
Dia. 150 mm
Dia. 50 mm

2
1

bh
bh

6,940,020
631,060

13,880,040
631,060

- Fleksible joint
Dia. 150 mm
Dia. 50 mm

4
2

bh
bh

1,927,500
533,800

7,710,000
1,067,600

- Strainer
Dia. 150 mm
dia. 50 mm

2
1

bh
bh

6,070,620
639,940

12,141,240
639,940

- Foot Valve ( lihat diimeter pipa


pompa)
Dia. 150 mm
dia. 50 mm

2
1

bh
bh

3,421,140
2,165,740

6,842,280
2,165,740

- Flow meter dia 150 mm

bh

21,156,250

21,156,250

- Pressure Gauge
- Pressure Switch

3
3

bh
bh

211,250
2,131,250

633,750
6,393,750

- Main Control Valve (MCV) dia. 150 mm


c/w Alarm gong, dan acesoriesnya

set

55,875,000

55,875,000

Pressure Reducing Valve (PRV) dia 150 mm


c/w stainer, valve , presurre gauge dan pemi
paan

set

46,815,000

46,815,000

2.4 Safety Valve dia 150 mm

bh

21,156,550

21,156,550

2.5 FE 10 kg (gas)

bh

5,282,000

5,282,000

2.6 Fiting- fitting

lot

16,562,500

16,562,500

2.7 Material bantu termasuk pengecatan

lot

6,625,000

6,625,000

2.8 Pengetesan

lot

9,375,000

9,375,000

No

Uraian

2.2 Assesories
- Gate valve
Dia. 150 mm
Dia. 50 mm

2.3

sub total 2
3

Instalasi Pipa Kebakaran


(Dari R Pompa dan dalam Shaft)

QTY

SAT

JUMLAH HARGA
Rp.
5,562,000

445,886,172

No

Uraian
3.1 Instalasi Pipa Hydrant dan Sprinkler
dalam Shaft s/d Lantai Atap
Pengadaan dan pemasangan Pipa Black Steel
Sch 40 (ASTM A53) berikut Support
dia. 150 mm
air realease valve dia 40mm dan Accessories

QTY

SAT

HARGA SATUAN
Rp.

JUMLAH HARGA
Rp.

90
2

m
bh

799,120
1,831,250

71,920,764
3,662,500

3.2 Fitting- fiting

lot

16,875,000

16,875,000

3.3 Material bantu


Termasuk suport pipa tegak, klem pipa dan
pengecatan.

lot

6,937,500

6,937,500

3.4 Pengetesan

lot

3,125,000

3,125,000

sub total 3
Instalasi Pipa Kebakaran
di Site Plan
Sprinkler
4.1 Instalasi pemadam kebakaran
Pengadaan dan pemasangan Pipa Black Steel
Sch 40 (ASTM A53) berikut Support
Isolasi pipa dalam tanah (Wrapping) &
Primer Coating dan Accessories
dan Accessories
dia. 150 mm
dia. 100 mm

102,520,764

Galian Tanah
4.2 Gate valve
dia. 100 mm
4.3 Check valve
dia. 150 mm
4.5 Siamisse conection
4.6 Outdoor hyhdrant Pilar c/w Box
Pilar Hidrand
4.7 Fitting- fiting
4.8 Material Bantu termasuk bak kontrol
pondasi siamesse dan pilar hydrant
4.9 Pengetesan

437
40

meter
meter

781,128
471,360

341,196,710
18,972,240

477

meter

20,000

9,541,000

bh

6,322,160

31,610,800

1
1
6
6
1

bh
bh
bh
bh
lot

6,940,020
3,073,500
3,242,410
3,024,250
18,125,000

6,940,020
3,073,500
19,454,460
18,145,500
18,125,000

lot

6,750,000

6,750,000

lot

6,250,000

6,250,000

sub total 4
5

480,059,230

Instalasi Pemadam Kebakaran


Lantai Basement

5.1 Instalasi Sprinkler


1 Head sprinkler
2 Branch Control Valve dia 100 "
lengkap dengan pressure gauge
3 Flow Switch dia. 80 mm
4 Gate valve
dia. 100 mm

291
1

ttk
bh

60,375
9,334,000

17,569,125
9,334,000

bh

1,171,250

1,171,250

bh

6,322,160

6,322,160

3
1
1

bh
bh
bh

HARGA SATUAN
Rp.
308,500
931,250
241,250

69
178
46
20
66
288
242
522

m
m
m
m
m
m
m
m

799,128
470,400
343,704
258,240
186,000
132,138
117,030
88,728

55,139,832
83,543,040
15,810,384
5,164,800
12,276,000
38,055,744
28,262,745
46,316,016

bh

3,770,410

7,540,820

bh

1,218,750

2,437,500

72
125
33

m
m
m

799,128
471,360
343,704

57,137,652
58,920,000
11,342,232

dia. 100 mm
dia. 65 mm

1
5

bh
bh

6,322,160
4,399,590

6,322,160
21,997,950

Fitting- fiting

lot

21,087,500

21,087,500

Material Bantu

lot

7,237,500

7,237,500

No

Uraian
5
7
6

dia. 25 mm
Sight Glass dia. 25 mm
Pressure Gauge
Pengadaan dan pemasangan Pipa Black Steel
Sch 40 (ASTM A53) berikut Support
dan Accessories
dia. 150 mm
dia. 100 mm
dia. 80 mm
dia. 65 mm
dia. 50 mm
dia. 40 mm
dia. 32 mm
dia. 25 mm

5.2 Instalasi Hydrant


1 Indoor hydrant box lenkap dengan
2

Pemadam Api Ringan (PAR)


FE 2 KG (Klas ABC)
Pengadaan dan pemasangan Pipa Black Steel
Sch 40 (ASTM A53) berikut Support
dan Accessories + pengecatan
dia. 150 mm
dia. 100 mm
dia. 80 mm

QTY

SAT

Gate valve

sub total 5

JUMLAH HARGA
Rp.
925,500
931,250
241,250

515,086,410

Instalasi Pemadam Kebakaran


Lantai Satu

8.1 Instalasi Sprinkler


1 Head sprinkler
2 Branch Control Valve dia 100mm
lengkap dengan pressure gauge
3 Flow Switch dia. 100 mm
4 Gate valve
dia. 150 mm
dia. 100 mm
dia. 25 mm
5 Sight Glass dia. 25 mm
Pressure Gauge
Pengadaan dan pemasangan Pipa Black Steel
Sch 40 (ASTM A53) berikut Support

165
1

ttk
bh

60,375
9,334,000

9,961,875
9,334,000

bh

1,171,250

1,171,250

1
1
3
2
1

bh
bh
bh
bh
bh

10,459,980
6,322,160
308,500
931,250
241,250

10,459,980
6,322,160
925,500
1,862,500
241,250

HARGA SATUAN
Rp.

JUMLAH HARGA
Rp.

m
m
m
m
m
m
m

470,400
341,904
258,240
186,000
132,138
117,030
88,728

7,526,400
9,573,312
11,879,040
10,230,000
11,892,420
14,043,600
52,172,064

bh

3,770,410

7,540,820

bh

1,218,750

3,656,250

dia. 100 mm
dia. 80 mm
dia. 65 mm

16
55
8

m
m
m

471,360
343,704
258,240

7,541,760
18,903,720
2,065,920

Gate valve
dia. 100 mm
dia. 65 mm

1
2

bh
bh

6,322,160
4,399,590

6,322,160
8,799,180

Fitting- fiting

lot

23,912,500

23,912,500

Material Bantu

lot

9,937,500

9,937,500

No

Uraian

QTY

SAT

16
28
46
55
90
120
588

dan Accessories + pengecatan


dia. 100 mm
dia. 80 mm
dia. 65 mm
dia. 50 mm
dia. 40 mm
dia. 32 mm
dia. 25 mm
8.2 Instalasi Hydrant
1 Indoor hidran box
2

Pemadam Api Ringan (PAR)


FE 2 KG (Klas ABC)
Pengadaan dan pemasangan Pipa Black Steel
Sch 40 (ASTM A53) berikut Support
dan Accessories + pengecatan

sub total 8( lantai Satu )


11

Instalasi Pemadam Kebakaran


Lantai 2 ( dua )

11.1 Instalasi Sprinkler


1 Head sprinkler
2 Branch Control Valve dia 100mm
lengkap dengan pressure gauge
3 Flow Switch dia. 100 mm
Sight Glass dia. 25 mm
Pressure Gauge
4

246,275,161

Gate valve
dia. 100 mm
dia. 25 mm

125
1

ttk
bh

60,375
9,334,000

7,546,875
9,334,000

1
1
1

bh
bh
bh

1,171,250
931,250
241,250

1,171,250
931,250
241,250

1
4

bh
bh

6,322,160
308,500

6,322,160
1,234,000

18
12
42
78

mtr
mtr
mtr
mtr

471,360
343,704
258,240
185,400

8,484,480
4,124,448
10,846,080
14,461,200

Pengadaan dan pemasangan Pipa Black Steel


Sch 40 (ASTM A53) berikut Support
dan Accessories + pengecatan
dia. 100 mm
dia. 80 mm
dia. 65 mm
dia. 50 mm

mtr
mtr
mtr

HARGA SATUAN
Rp.
139,338
117,030
88,728

JUMLAH HARGA
Rp.
11,425,716
15,916,080
52,810,906

bh

3,770,410

7,540,820

3
1

bh
bh

1,218,750
5,521,850

3,656,250
5,521,850

14
45
8

m
m
m

470,400
343,704
258,240

6,585,600
15,466,680
2,065,920

Gate valve
dia. 100 mm
dia. 65 mm

1
2

bh
bh

6,322,160
4,399,590

6,322,160
8,799,180

Fitting- fiting

lot

22,923,500

22,923,500

Material Bantu

lot

23,328,000

23,328,000

No

Uraian
dia. 40 mm
dia. 32 mm
dia. 25 mm
11.2 Instalasi Hydrant
1 Indoor hidrant box
2

Pemadam Api Ringan (PAR)


FE 5 KG (Klas ABC)
FE 10 KG (Gas)
Pengadaan dan pemasangan Pipa Black Steel
Sch 40 (ASTM A53) berikut Support
dan Accessories + pengecatan
dia. 100 mm
dia. 80 mm
dia. 65 mm

QTY

SAT

82
136
595

sub total 11 (lantai tiga )


12

Instalasi Pemadam Kebakaran


Lantai 3 ( tiga )

12.1 Instalasi Sprinkler


1 Head sprinkler
2 Branch Control Valve dia 100mm
lengkap dengan pressure gauge
3 Flow Switch dia. 100 mm
Sight Glass dia. 25 mm
4 Pressure Gauge
Gate valve
dia. 100 mm
dia. 25 mm

247,059,655

94
1

ttk
bh

60,375
9,334,000

5,675,250
9,334,000

1
1
1

bh
bh
bh

1,171,250
931,250
241,250

1,171,250
931,250
241,250

1
4

bh
bh

6,322,160
553,500

6,322,160
2,214,000

18
10
38
55
55
20
538

mtr
mtr
mtr
mtr
mtr
mtr
mtr

471,360
343,704
258,240
185,400
139,338
117,030
88,728

8,484,480
3,437,040
9,813,120
10,197,000
7,663,590
2,340,600
47,700,173

bh

3,770,410

7,540,820

Pengadaan dan pemasangan Pipa Black Steel


Sch 40 (ASTM A53) berikut Support
dan Accessories + pengecatan
dia. 100 mm
dia. 80 mm
dia. 65 mm
dia. 50 mm
dia. 40 mm
dia. 32 mm
dia. 25 mm

12.2 Instalasi Hydrant


1 Indoor hidran box

No

Uraian
2

Pemadam Api Ringan (PAR)


FE 5 KG (Klas ABC)
Pengadaan dan pemasangan Pipa Black Steel
Sch 40 (ASTM A53) berikut Support
dan Accessories + pengecatan

QTY

SAT

HARGA SATUAN
Rp.

JUMLAH HARGA
Rp.

bh

1,218,750

3,656,250

dia. 100 mm
dia. 80 mm
dia. 65 mm

16
55
8

mtr
mtr
mtr

471,360
343,704
258,240

7,541,760
18,903,720
2,065,920

Gate valve
dia. 100 mm
dia. 65 mm

1
2

bh
bh

6,322,160
4,399,590

6,322,160
8,799,180

Fitting- fiting

lot

17,748,125

17,748,125

Material Bantu

lot

9,802,500

9,802,500

sub total 12 (lantai tiga )


13

Instalasi Pemadam Kebakaran


Lantai 4 ( empat )

13.1 Instalasi Sprinkler


1 Head sprinkler
2 Branch Control Valve dia 100mm
lengkap dengan pressure gauge
3 Flow Switch dia. 100 mm
Pressure Gauge
Sight Glass dia. 25 mm
4

Gate valve
dia. 100 mm
dia. 25 mm
Pengadaan dan pemasangan Pipa Black Steel
Sch 40 (ASTM A53) berikut Support
dan Accessories + pengecatan
dia. 150 mm
dia. 100 mm
dia. 80 mm
dia. 65 mm
dia. 50 mm
dia. 40 mm
dia. 32 mm
dia. 25 mm

13.2 Instalasi Hydrant


1 Indoor hidran box
2
3

197,905,598

Pemadam Api Ringan (PAR)


FE 5 KG (Klas ABC)
Pengadaan dan pemasangan Pipa Black Steel
Sch 40 (ASTM A53) berikut Support
dan Accessories + pengecatan
dia. 100 mm
dia. 80 mm

98
1

ttk
bh

60,375
9,334,000

5,916,750
9,334,000

1
1
1

bh
bh
bh

1,171,250
241,250
931,250

1,171,250
241,250
931,250

1
4

bh
bh

6,322,160
308,500

6,322,160
1,234,000

20
32
44
39
78
42
598

mtr
mtr
mtr
mtr
mtr
mtr
mtr

471,360
343,704
258,240
185,400
139,338
117,030
88,728

9,427,200
10,998,528
11,362,560
7,230,600
10,868,364
4,915,260
53,023,853

bh

3,770,410

7,540,820

bh

1,218,750

3,656,250

14
48

m
m

471,360
343,704

6,599,040
16,497,792

dia. 65 mm

HARGA SATUAN
Rp.
258,240

Gate valve
dia. 100 mm
dia. 65 mm

1
4

bh
bh

6,322,160
4,399,590

6,322,160
17,598,360

Fitting- fiting

lot

19,632,500

19,632,500

Material Bantu

lot

9,847,500

9,847,500

No

Uraian

QTY

SAT

sub total 13 (lantai empat )


14

Gate valve
dia. 65 mm
dia. 25 mm
Pengadaan dan pemasangan Pipa Black Steel
Sch 40 (ASTM A53) berikut Support
dan Accessories + pengecatan
dia. 150 mm
dia. 100 mm
dia. 80 mm
dia. 65 mm
dia. 50 mm
dia. 40 mm
dia. 32 mm
dia. 25 mm

14.1 Instalasi Hydrant


1 Indoor hidran box
- Hose rack , selang 30 m + Nozzle
- Vander hydarnt dia 2 1/2 & 1 1/2
2
Pemadam Api Ringan (PAR)
FE 5 KG (Klas ABC)
3 Pengadaan dan pemasangan Pipa Black Steel
Sch 40 (ASTM A53) berikut Support
dan Accessories + pengecatan
dia. 150 mm
dia. 100 mm
dia. 80 mm
dia. 65 mm
4 Gate valve
dia. 100 mm
dia. 65 mm
5

222,737,367

Instalasi Pemadam Kebakaran


Lantai 5 ( lima )

14.1 Instalasi Sprinkler


1 Head sprinkler
2 Branch Control Valve dia 100mm
lengkap dengan pressure gauge
3 Flow Switch dia. 80 mm
Pressure Gauge
Sight Glass dia. 25 mm
4

JUMLAH HARGA
Rp.
2,065,920

Fitting- fiting

110
1

ttk
bh

60,375
9,334,000

6,641,250
9,334,000

1
1
1

bh
bh
bh

1,171,250
241,250
931,250

1,171,250
241,250
931,250

2
4

bh
bh

4,399,590
308,500

8,799,180
1,234,000

6
25
32
44
36
77
35
504

mtr
m
m
m
m
m
m
m

471,360
471,360
343,704
258,240
185,400
139,338
117,030
88,728

2,828,160
11,784,000
11,136,010
11,362,560
6,674,400
10,729,026
4,096,050
44,718,912

bh

3,770,410

7,540,820

bh

2,700,000

8,100,000

6
14
45
8

mtr
m
m
m

471,360
471,360
343,704
258,240

2,828,160
6,599,040
15,466,680
2,065,920

1
2

bh
bh

6,322,160
4,399,590

6,322,160
8,799,180

lot

18,490,000

18,490,000

No

Uraian
6

Material Bantu
sub total 14 (lantai lima )

TOTAL PEKERJAAN PEMADAM

QTY
1

SAT
lot

HARGA SATUAN
Rp.

JUMLAH HARGA
Rp.

9,245,000

9,245,000
217,138,258

2,845,815,864

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


PROYEK RS. SARI ASIH CIPUTAT, TANGERANG, BANTEN
PEKERJAAN SISTEM LISTRIK
No

Uraian

PEKERJAAN SYSTEM TEGANGAN MENENGAH


Pengadaan Panel Tegangan Menengah lengkap dengan komponen
busbar, metering, kontrol dan pemasangan (komponen
dan accessories) dipasang/ diadakan oleh kontraktor tidak terbatas
pada jumlah yang tercantum di bawah ini).

MVMDB (20 kV )
Spesifikasi Panel:
Free Standing- metal enclosed cubicle, fixed type,
Galvanized metal sheet.
Rated voltage
: 24 kV
Serviced voltage
: 20 kV
Short time wistand current : 26 kA
Insulation voltage level
:
a. 50 Hz- 1 minute : 50 kVrms
b. Impulse 1,2/50 mS
: 125 kVpeak
Elektrodynamic withstand current : 36,5 kA
Phase: 3
Arc extinguishing media : SF6
Cubicle thickness
: min 2.0 mm
In/out cable entry
: bottom
Busbar rated current
: 630 A

Qty

Sat

H.Sat
(Rp)

Total
(Rp)

Incoming Cubicle
Pengadaan dan pemasangan harus sesuai gambar rencana
dan spesifikasi teknis sehingga berfungsi dengan baik
Incoming cubicle SM 6, Type : IM 630A
Rated Voltage 20 kV, 14.5A / 1 sec.
LBS 3P 400 A, 16 kA/1s, internal Erthing switch, manual, Arrester
3 Phase Busbar 630 A
Voltage Indicator, Earthing Switch, Heater, Shunt Trip

Unit

51,600,000

51,600,000

Out Going cubicle SM 6, Type : QM 630A


Rated Voltage 20 kV, 16kA / 1 sec.
LBS 3P 400A, 16 kA/1s, internal Erthing switch, manual
3 Phase Busbar 630 A
Voltage Indicator, Earthing Switch, Heater, Shunt Trip
Solfiuse 630A / 1000 kVA

Unit

80,606,250

80,606,250

Trafo 1000 kVA,20 kV/400 V, 3 ph, 50 Hz


5,5 % lengkap dengan peralatan kontrol yang dihubungkan
ke MVMDP
Type : Indoor, Oil Immersed, Total Filled
Hermetically Sealed, IEC Std, SPLN
Primery Voltage
: 20kV
Secondary Voltage
: 400 V
Impedance Voltage
: 5.5%
Perlengkapan Standar : Wheel, Earth
Terminal, Lifting Eye, Oil Filiing Hole, Drain
Plug Rating Plate dan Sertifikat Test Pabrik
Perlengkapan Tambahan : Elastimold MV
Bushing, DCMR

Unit

180,000,000

180,000,000

Grounding Cubicle
Grounding Body Trafo
Grounding Titik Netral Trafo
Bak kontrol

1
1
1
3

ttk
ttk
ttk
bh

2,500,000
2,500,000
3,500,000
300,000

2,500,000
2,500,000
3,500,000
900,000

No

Uraian

Qty

Sat

H.Sat
(Rp)

Total
(Rp)

Grounding PUTR/LVMDP
Bak kontrol

1
1

ttk
bh

2,500,000
300,000

2,500,000
300,000

Material Bantu

Ls

3,000,000

3,000,000

Testing & Commissioning

Ls

6,000,000

6,000,000

SUB TOTAL I

333,406,250

II

PEKERJAAN PANEL DAYA


Pengadaan, pemasangan dan pengetesan Panel Daya
lengkap dengan Accesoriesnya, Sehingga dapat
berpungsi dengan baik.

1
2

PUTR/LVMDP
PANEL KAPASITOR BANK 350 KVAR

1
1

Unit
Unit

536,970,000
297,810,000

536,970,000
297,810,000

3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

LP BS - A
LP BS - B
P - AC.BS
LP BNK BS
PP - LOUNDRY
PP - HYDRANT
PP - POMPA AB
PP - SP (AIR KOTOR/ HUJAN)
CP - SP1 (PARKIR BASEMENT)
CP - SP2 (PARKIR BASEMENT)
CP - SP3 (PARKIR BASEMENT)
CP - SP4 (PARKIR SITE)
CP - SP5 (PARKIR SITE)
CP - GREASE TRAP (KITCHEN)
CP - SUMPIT (LOUNDRY)
CP - SEAWAGE
CP - GREASE TRAP (DAPUR)
PP - KITCHEN
PP - STP
LP - OL
LP - G

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

5,530,000
9,850,000
12,510,000
5,260,000
7,800,000
14,420,000
20,750,000
9,600,000
2,000,000
2,000,000
2,000,000
2,000,000
2,000,000
2,000,000
2,000,000
2,000,000
2,000,000
8,000,000
11,160,000
8,630,000
3,610,000

5,530,000
9,850,000
12,510,000
5,260,000
7,800,000
14,420,000
20,750,000
9,600,000
2,000,000
2,000,000
2,000,000
2,000,000
2,000,000
2,000,000
2,000,000
2,000,000
2,000,000
8,000,000
11,160,000
8,630,000
3,610,000

24
25
26
27
28
29
30
31
32
33

LP 1A
LP 1B
PP - AC.1
PP - LAB
LP BNK 1
LP FC
PP - ATM
PP - PRI
PP - SCAN
PP - RONTGEN

1
1
1
1
1
1
1
1
1
1

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

9,550,000
8,610,000
24,190,000
3,350,000
4,290,000
3,610,000
3,830,000
20,740,000
5,010,000
4,270,000

9,550,000
8,610,000
24,190,000
3,350,000
4,290,000
3,610,000
3,830,000
20,740,000
5,010,000
4,270,000

34
35
36
37
38

PP - OK
LP - 2A
LP - 2B
PP - AC.2
PP - HD

1
1
1
1
1

Unit
Unit
Unit
Unit
Unit

6,960,000
7,460,000
8,400,000
14,850,000
6,710,000

6,960,000
7,460,000
8,400,000
14,850,000
6,710,000

39
40
41
42
43
44

LP - 3A
LP - 3B
PP - AC.3
PP - PR.3
PP - ICU
PP - NICU

1
1
1
1
1
1

Unit
Unit
Unit
Unit
Unit
Unit

10,140,000
13,950,000
14,850,000
20,160,000
8,200,000
6,680,000

10,140,000
13,950,000
14,850,000
20,160,000
8,200,000
6,680,000

45 PP - PN
46 PP - HC

1
1

Unit
Unit

H.Sat
(Rp)
5,700,000
6,690,000

47 LP - 4A
48 LP - 4B
49 PP - AC.4

1
1
1

Unit
Unit
Unit

9,850,000
10,790,000
14,250,000

9,850,000
10,790,000
14,250,000

50 LP - 5A
51 LP - 5B
52 PP - AC.5

1
1
1

Unit
Unit
Unit

7,550,000
9,680,000
13,520,000

7,550,000
9,680,000
13,520,000

53
54
56
57

1
1
1
1

Unit
Unit
Unit
Unit

6,920,000
6,920,000
6,180,000
7,030,000

6,920,000
6,920,000
6,180,000
7,030,000

44 Grounding Panel OK, ICU, NICU, PR-3, PN, HC dan HD.


Bak kontrol

1
1

ttk
bh

2,500,000
300,000

2,500,000
300,000

45 Material Bantu

Ls

3,000,000

3,000,000

46 Testing & Commissioning

Ls

5,000,000

5,000,000

No

Uraian

P - LIFT 1
P - LIFT 2
PP - FAN / ATAP
LP - ATAP

Qty

Sat

SUB TOTAL II

Total
(Rp)
5,700,000
6,690,000

1,291,590,000

III KABEL FEEDER


1

KABEL TEGANGAN MENENGAH


Pengadaan, pemasangan dan pengetesan Kabel TM
lengkap dengan Ceilling End, Elastimold dan
Accesoriesnya, sehingga dapat berpungsi dengan baik.
Kabel dari Gardu PLN ke Incomonig Cubicle NXSEFGBY 3 x 120 mm2

110

600,000

66,000,000

15

500,000

7,500,000

Kabel Feeder Dari Trafo ke PUTR NYY 3 x 4 x (1 x 300 mm2)

16

3,750,000

60,000,000

Kabel Feeder Dari PKG ke PUTR NYY 3 x 4 x (1 x 300 mm2)


Kabel Sensing Dari PKG ke PUTR NYY 4 x 2.5 mm2
Kabel Kontrol Dari Trafo (DGPT-2) ke PUTR NYY 3 x 2.5 mm2
Kabel Kontrol Dari Trafo (DGPT-2) ke Cubicle (Shunt Trip)
NYY 3 x 2,5 mm2

15
15
15
15

m
m
m
m

3,750,000
20,000
15,000
15,000

56,250,000
300,000
225,000
225,000

54
54
54
99
96
96
96
78
80
60
60

m
m
m
m
m
m
m
m
m
m
m

86,000
106,000
106,000
47,000
86,000
425,000
143,000
86,000
47,000
47,000
47,000

4,644,000
5,724,000
5,724,000
4,653,000
8,256,000
40,800,000
13,728,000
6,708,000
3,760,000
2,820,000
2,820,000

Kabel dari Outgoing Cubicle ke Trafo N2XSY 3 x 1x 95 mm2


2

KABEL TEGANGAN RENDAH


Pengadaan, pemasangan dan pengetesan Kabel Feeder
lengkap dengan Cable Gland, Suport dan Accesoriesnya,
sehingga dapat berpungsi dengan baik.

Kabel Feeder Dari PUTR ke :


Lantai Basement
LP BS - A. NYY 4 x 16 mm2 + BC 10 mm2
LP BS - B. NYY 4 x 25 mm2 + BC 16 mm2
P - AC.BS. NYY 4 x 25 mm2 + BC 16 mm2
LP BNK BS NYY 4 x 6 mm2 + BC 4 mm2
PP - LOUNDRY. NYY 4 x 16 mm2 + BC 10 mm2
PP - HYDRANT. FRC 4 x 1 x 120 mm2 + BC 50 mm2
PP - POMPA AB. NYY 4 x 35 mm2 + BC 25 mm2
PP - KITCHEN. NYY 4 x 16 mm2 + BC 10 mm2
PP - STP. NYY 4 x 6 mm2 + BC 4 mm2
LP - OL. NYY 4 x 6 mm2 + BC 4 mm2
LP - G. NYY 4 x 6 mm2 + BC 4 mm2

No

Uraian
Lantai 1
LP 1A. NYY 4 x 35 mm2 + BC 25 mm2
LP 1B. NYY 4 x 25 mm2 + BC 16 mm2
PP - AC.1. NYY 4 x 120 mm2 + BC 50 mm2
PP - LAB. NYY 4 x 10 mm2 + BC 6 mm2
LP BNK 1. NYY 4 x 6 mm2 + BC 4 mm2
LP FC. NYY 4 x 6 mm2 + BC 4 mm2
PP - ATM. NYY 4 x 6 mm2 + BC 4 mm2
PP - PRI. NYY 4 x 16 mm2 + BC 10 mm2
Kabel Dari PP - PRI Ke :
PP - SCAN. NYY 4 x 10 mm2 +BC 6 mm2
PP - RONTGEN. NYY 4 x 10 mm2 + BC 6 mm2

Qty

Sat

H.Sat
(Rp)

Total
(Rp)

58
58
58
70
95
102
113
58

m
m
m
m
m
m
m
m

143,000
106,000
468,000
74,000
47,000
47,000
47,000
86,000

8,294,000
6,148,000
27,144,000
5,180,000
4,465,000
4,794,000
5,311,000
4,988,000

18
35

m
m

74,000
74,000

1,332,000
2,590,000

110
72
72
72
118

m
m
m
m
m

106,000
106,000
106,000
190,000
86,000

11,660,000
7,632,000
7,632,000
13,680,000
10,148,000

66
66
66
16

m
m
m
m

106,000
106,000
190,000
143,000

6,996,000
6,996,000
12,540,000
2,288,000

32
67
61
79

m
m
m
m

74,000
74,000
74,000
74,000

2,368,000
4,958,000
4,514,000
5,846,000

Lantai 4
LP - 4A. NYY 4 x 25 mm2 + BC 16 mm2
PP - AC.3. NYY 4 x 50 mm2 +BC 35 mm2
PP - AC.4. NYY 4 x 50 mm2 + BC 35 mm2

70
70
70

m
m
m

106,000
190,000
190,000

7,420,000
13,300,000
13,300,000

Lantai 5
LP - 5A. NYY 4 x 25 mm2 + BC 16 mm2
LP - 5B. NYY 4 x 25 mm2 + BC 16 mm2
PP - AC.5. NYY 4 x 50 mm2 + BC 35 mm2

74
74
74

m
m
m

106,000
106,000
190,000

7,844,000
7,844,000
14,060,000

90
136
106
100
100

m
m
m
m
m

150,000
150,000
74,000
86,000
86,000

13,500,000
20,400,000
7,844,000
8,600,000
8,600,000

20

17,000

340,000

20

13,000

260,000

40

13,000

520,000

16
16

m
m

30,000
360,000

480,000
5,760,000

7
7
16

m
m
m

220,000
200,000
50,000

1,540,000
1,400,000
800,000

Lantai 2
PP - OK. NYY 4 x 25 mm2 + BC 16 mm2
LP - 2A. NYY 4 x 25 mm2 + BC 16 mm2
LP - 2B. NYY 4 x 25 mm2 + BC 16 mm2
PP - AC.2. NYY 4 x 50 mm2 + BC 35 mm2
PP - HD. NYY 4 x 16 mm2 + BC 10 mm2
Lantai 3
LP - 3A. NYY 4 x 25 mm2 + BC 16 mm2
LP - 3B. NYY4 x 25mm2 + BC 16 mm2
PP - AC.3. NYY 4 x 50 mm2 +BC 35 mm2
PP - PR.3. NYY 4 x 35 mm2 + BC 25 mm2
Kabel Dari PP - PR3 Ke :
PP - ICU. NYY 4 x 10 mm2 + BC 6 mm2
PP - NICU. NYY 4 x 10 mm2 + BC 6 mm2
PP - PN. NYY 4 x 10 mm2 + BC 6 mm2
PP - HC. NYY 4 x 10 mm2 + BC 6 mm2

Lantai Atap
P - LIFT 1. FRC 4 x 35 mm2 + BC 25 mm2
P - LIFT 2. FRC 4 x 35 mm2 + BC 25 mm2
PP - P. BOOSTER. NYY 4 x 10 mm2 + BC 6 mm2
PP - FAN / ATAP. NYY 4 x 16 mm2 + BC 10 mm2
LP - ATAP. NYY 4 x 16 mm2 + BC 10mm2
Kabel Dari PP - Loundry Ke Water Heater 300 L (Loundry)
NYM 4 x 2,5 mm2
Kabel Dari PP - Kitchen Ke Water Heater 100 L (Kitchen)
NYM 3 x 2,5 mm2
Kabel Dari PP - Kitchen Ke Water Heater 100 L (Dapur)
NYM 3 x 2,5 mm2
Kabel Dari PP - Hydrant Ke :
CP - Diesel Pump FRC 5 x 1 x 2,5 mm2
CP - Electric Pump FRC 4 x 1 x 95 mm2 + BC 50 mm2
Kabel Dari CP - Electric Pump Ke Motor Pump
FRC 3 x 1 x 50 mm2 + BC 50
FRC 3 x 1 x 50 mm2
CP - Electric Jokey FRC 4 x 1 x 6 mm2 + BC 4 mm2

No

Uraian
Kabel Dari CP - Jokey Pump Ke Motor Pump
FRC 4 x 1 x 2,5 mm2

Qty

Sat

H.Sat
(Rp)

Total
(Rp)

30,000

210,000

47
64
110
82
74
82
104
150
190

m
m
m
m
m
m
m
m
m

35,000
35,000
35,000
35,000
35,000
35,000
35,000
35,000
35,000

1,645,000
2,240,000
3,850,000
2,870,000
2,590,000
2,870,000
3,640,000
5,250,000
6,650,000

Kabel Dari PP - A.B Ke :


Pompa Transfer 1 dan 2 NYY 4 x 4 mm2
Pompa Transfer 1 dan 2 NYY 3 x 4 mm2
CP - Deep Wheel NYFGBY 4 x 4 mm2 + BC 4mm2
PP - SP (AIR KOTOR/HUJAN) NYY 4 x 16 mm2 + BC 10 mm2

15
15
80
50

m
m
m
m

35,000
23,000
35,000
86,000

525,000
345,000
2,800,000
4,300,000

Kabel dari LP - 2 Ke Auto Cluv NYY 3 x 6 mm2

84

32,000

2,688,000

Material Bantu

Ls

10,000,000

10,000,000

Testing & Commissioning

Ls

5,000,000

5,000,000

Kabel Dari PP - SP (AIR KOTOR/HUJAN) Ke :


CP - PS-1 NYY 4 x 4 mm2 + BC 4 mm2
CP - PS-2 NYY 4 x 4 mm2 + BC 4 mm2
CP - PS-3 NYY 4 x 4 mm2 + BC 4 mm2
CP - PS-4 NYY 4 x 4 mm2 + BC 4 mm2
CP - PS-5 NYY 4 x 4 mm2 + BC 4 mm2
CP - PS-6 NYY 4 x 4 mm2 + BC 4 mm2
CP - PS-7 NYY 4 x 4 mm2 + BC 4 mm2
CP - PS-8 NYY 4 x 4 mm2 + BC 4 mm2
CP - PS-9 NYY 4 x 4 mm2 + BC 4 mm2

SUB TOTAL III

648,926,000

IV LIGHTING & SOCKET OUTLET INSTALLATION


Instalasi Penerangan dan Stop Kontak menggunakan kabel
NYM 3 x 2.5 mm2, Inconduit PVC High Impact 20 mm2
beserta assesorisnya sehingga dapat berfungsi dengan baik.
1

LANTAI BASEMENT & SITE


Down Light 1 x 13 W
Down Light 1 x 13 W c/w Battery
Down Light 2 x 13 W
TL 1 x 36 W TKO
TL 1 x 36 W TKO + Battery
TL 2 x 36 W TKI + Battery
TL 2 x 36 W TKI + Battery
TL 2 x 18 W TKI
TL 1 x 18 W TKI + Battery
Exit 2 x 10 W + Battery
Stop Kontak 1Phase 10 A 200 Watt

60
5
19
117
9
16
1
66
10
2
118

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

195,750
907,000
260,000
235,550
899,450
515,313
1,159,375
515,313
515,313
949,375
45,625

11,745,000
4,535,000
4,940,000
27,559,350
8,095,050
8,245,000
1,159,375
34,010,625
5,153,125
1,898,750
5,383,750

Instalasi Penerangan, NYM 3x2,5 mm2 (In Conduit PVC dia. 20)
Instalasi Stop Kontak, NYM 3x2,5 mm2 (In Conduit PVC dia. 20)

305
118

ttk
ttk

211,250
241,250

64,431,250
28,467,500

77
16
4
77

bh
bh
bh
ttk

663,750
5,714,280
1,083,750
350,000

51,108,750
91,428,480
4,335,000
26,950,000

175
13
2
131
16
3
185

bh
bh
bh
bh
bh
bh
bh

187,000
875,000
223,050
296,190
947,910
897,750
45,625

32,725,000
11,375,000
446,100
38,800,890
15,166,560
2,693,250
8,440,625

Lampu Taman Mercury 1 x 80 W


Lampu Jalan SON 1 x 150 W
Lampu Sorot
Instalasi Penerangan Luar, NYYGBY 4x4 mm2
2

LANTAI SATU
Down Light 1 x 13 W
Down Light 1 x 13 W c/w Battery
TL 1 x 36 W TKI
TL 2 x 18 W TKI
TL 2 x 18 W TKI + Battery
Exit 2 x 10 W + Battery
Stop Kontak 1Phase 10 A 200 Watt

No

Uraian

Qty

Sat

H.Sat
(Rp)

Total
(Rp)

Instalasi Penerangan, NYM 3x2,5 mm2 (Inconduit PVC dia. 20)


Instalasi Stop Kontak, NYM 3x2,5 mm2 (Inconduit PVC dia. 20)

340
185

ttk
ttk

211,250
241,250

71,825,000
44,631,250

LANTAI DUA
Down Light 1 x 13 W
Down Light 1 x 13 W c/w Battery
TL 1 x 36 W TKI
TL 4 x 18 W TKI (Acrillic)
TL 2 x 18 W TKI
TL 2 x 18 W TKI (Acrillic)
TL 2 x 18 W TKI + Battery
Wall Lamp 13 Watt
Exit 2 x 10 W + Battery
Stop Kontak 1Phase 10 A 200 Watt

120
8
2
12
64
21
21
4
2
151

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

187,000
907,000
223,050
916,000
296,190
572,000
947,910
150,000
897,750
45,625

22,440,000
7,256,000
446,100
10,992,000
18,956,160
12,012,000
19,906,110
600,000
1,795,500
6,889,375

Instalasi Penerangan, NYM 3x2,5 mm2 (Inconduit PVC dia. 20)


Instalasi Stop Kontak, NYM 3x2,5 mm2 (Inconduit PVC dia. 20)

250
151

ttk
ttk

211,250
241,250

52,812,500
36,428,750

LANTAI TIGA
Down Light 1 x 13 W
Down Light 1 x 13 W c/w Battery
Down Light 2 x 13 W
TL 1 x 36 W TKI
TL 2 x 18 W TKI
TL 2 x 18 W TKI (Acrillic)
TL 2 x 18 W TKI + Battery
TL 2 x 18 W TKI Acrillic + Battery.
Wall Lamp PL C 1 x 13 w
Exit 2 x 10 W + Battery
Stop Kontak 1Phase 10 A 200 Watt
Receptacle 1Phase 3000 Watt (ICU dan NICU)

112
8
27
3
44
47
11
4
4
2
286
2

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

20,944,000
7,256,000
7,020,000
669,150
13,032,360
26,884,000
10,427,010
4,982,000
600,000
1,795,500
13,048,750
280,000

Instalasi Penerangan, NYM 3x2,5 mm2 (Inconduit PVC dia. 20)


Instalasi Stop Kontak, NYM 3x2,5 mm2 (Inconduit PVC dia. 20)
Instalasi Receptacle 1Phase 3000 Watt

258
286
2

ttk
ttk
ttk

187,000
907,000
260,000
223,050
296,190
572,000
947,910
1,245,500
150,000
897,750
45,625
140,000
3
211,250
241,250
241,250

LANTAI EMPAT
Down Light 1 x 13 W
Down Light 1 x 13 W c/w Battery
Down Light 2 x 13 W
TL 1 x 36 W TKI
TL 2 x 18 W TKI
TL 2 x 18 W TKI + Battery
Exit 2 x 10 W + Battery
Stop Kontak 1Phase 10 A 200 Watt

134
7
83
2
28
2
2
220

bh
bh
bh
bh
bh
bh
bh
bh

187,000
907,000
260,000
223,050
296,190
947,910
897,750
45,625

25,058,000
6,349,000
21,580,000
446,100
8,293,320
1,895,820
1,795,500
10,037,500

Instalasi Penerangan, NYM 3x2,5 mm2 (Inconduit PVC dia. 20)


Instalasi Stop Kontak, NYM 3x2,5 mm2 (Inconduit PVC dia. 20)

262
220

ttk
ttk

211,250
241,250

55,347,500
53,075,000

Down Light 1 x 13 W
Down Light 1 x 13 W c/w Battery
Down Light 2 x 13 W
TL 1 x 36 W TKI
TL 2 x 18 W TKI
TL 2 x 18 W TKI + Battery
Wall Lamp PL C 1 x 13 w
Exit 2 x 10 W + Battery
Stop Kontak 1Phase 10 A 200 Watt

158
6
60
1
11
1
38
2
194

bh
bh
bh
bh
bh
bh
bh
bh
bh

187,000
907,000
260,000
223,050
296,190
947,910
150,000
897,750
45,625

29,546,000
5,442,000
15,600,000
223,050
3,258,090
947,910
5,700,000
1,795,500
8,851,250

Instalasi Penerangan, NYM 3x2,5 mm2 (Inconduit PVC dia. 20)

266

ttk

211,250

56,192,500

54,502,500
68,997,500
482,500

LANTAI LIMA

194

ttk

H.Sat
(Rp)
241,250

Lampu Sorot
Wall Lamp 13 Watt
TL 1 x 36 W TKO
TL 1 x 36 W TKO + Battery
Stop Kontak 1Phase 10 A 200 Watt

12
17
27
4
13

bh
bh
bh
bh
bh

1,083,750
150,000
235,550
899,450
45,625

13,005,000

Instalasi Penerangan, NYM 3x2,5 mm2 (In Conduit PVC dia. 20)
Instalasi Stop Kontak, NYM 3x2,5 mm2 (In Conduit PVC dia. 20)

60
13

ttk
bh

211,250
241,250

12,675,000
3,136,250

Material Bantu

lot

12,500,000

12,500,000

Testing & Commissioning

lot

7,500,000

7,500,000

No

Uraian
Instalasi Stop Kontak, NYM 3x2,5 mm2 (Inconduit PVC dia. 20)

Qty

Sat

LANTAI ATAP

SUB TOTAL IV

Total
(Rp)
46,802,500

UPS
Pengadaan, pemasangan dan pengetesan UPS 12000 VA
lengkap dengan Battry, Instalasi pengkabelan dan Accesoriesnya,
sehingga dapat berpungsi dengan baik.

1,444,609,010

Unit

Material Bantu

Testing & Commissioning

80,700,000

242,100,000

lot

500,000

500,000

lot

500,000

500,000

SUB TOTAL V
VI KABEL TRAY
Pengadaan dan pemasangan Rak Kabel lengkap dengan jointing
Suport, Hanger rood, dan Accesoriesnya sehingga dapat berpungsi
dengan baik.
1 LANTAI BASEMENT & SITE
a. Straight
W = 600
W = 500
W = 300
W = 200
b. Elbow
200 x 300
300 x 300
c Tee
600 x 600 x 300
300 x 600 x 300
300 x 200 x 200
300 x 300 x 200
2 LANTAI 1
a. Straight
W = 400
W = 300
W = 200
b. Elbow
300 x 300
300 x 200
200 x 200
c Tee
300 x 400 x 300
300 x 300 x 200
300 x 200 x 200

6,359,850
3,597,800
593,125

243,100,000

Unit

80,700,000

242,100,000

20
30
200
65

m
m
m
m

578,125
495,625
330,625
247,500

11,562,500
14,868,750
66,125,000
16,087,500

1
1

bh
bh

431,250
431,250

431,250
431,250

2
1
1
1

bh
bh
bh
bh

1,111,875
1,111,875
583,125
583,125

2,223,750
1,111,875
583,125
583,125

4
67
75

m
m
m

413,125
330,625
247,500

1,652,500
22,151,875
18,562,500

2
1
4

bh
bh
bh

431,250
431,250
303,750

862,500
431,250
1,215,000

1
1
1

bh
bh
bh

731,250
583,125
583,125

731,250
583,125
583,125

No
3 LANTAI 2
a. Straight
W = 400
W = 300
W = 200
b. Elbow
400 x 400
c Tee
300 x 400 x 200
4 LANTAI 3
a. Straight
W = 300
W = 200
b. Elbow
400 x 400
300 x 300
300 x 200
200 x 200
c Tee

Uraian

Qty

Sat

H.Sat
(Rp)

Total
(Rp)

14
40
35

m
m
m

413,125
330,625
247,500

5,783,750
13,225,000
8,662,500

bh

555,000

555,000

bh

731,250

731,250

46
45

m
m

330,625
247,500

15,208,750
11,137,500

2
1
1
1

bh
bh
bh
bh

555,000
431,250
431,250
303,750

1,110,000
431,250
431,250
303,750

No

Uraian
300 x 400 x 300
300 x 200 x 200

5 LANTAI 4
a. Straight
W = 400
W = 300
b. Elbow
400 x 400
c Tee
300 x 400 x 300
6 LANTAI 5
a. Straight
W = 400
W = 300
b. Elbow
400 x 400
c Tee
300 x 400 x 300
d

Cable Tray Vertikal


Straight
w = 600
Material Bantu

1
1

bh
bh

H.Sat
(Rp)
731,250
583,125

15
75

m
m

449,721
283,461

6,745,819
21,259,594

bh

555,000

555,000

bh

731,250

731,250

15
75

m
m

413,125
330,625

6,196,875
24,796,875

bh

555,000

555,000

bh

731,250

731,250

30

578,125

17,343,750

lot

10,000,000

10,000,000

Qty

Sat

Total
(Rp)
731,250
583,125

SUB TOTAL VI

550,691,038

TOTAL I s.d VI

4,512,322,298

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN
PEKERJAAN SISTEM GENSET

No

Uraian

Qty

Sat

H.Sat

Total

(Rp)

(Rp)

PERALATAN UTAMA

Pengadaan Generator-set dengan kapasitas 1050 KVA


dengan putaran 1500 rpm, 220 volt / 380 volt - 400 volt
3 phase, lengkap dengan panel control, vibration
mounting dan industrial silincer

Unit

1,475,000,000

1,475,000,000

Pengadaan dan pemasangan panel genset lengkap


dengan AMF

Unit

115,000,000

115,000,000

Instalasi Genset
- Pekerjaan persiapan
- Mobilisasi matrial dan alat-alat kerja
- Dokumentasi shop drawing
- Kebersihan tempat kerja

Lot

15,000,000

15,000,000

Setting dan Levelling Genset dan PKG diatas pondasi

Lot

18,000,000

18,000,000

rator ke PKG, NYY 4 x 3 x 1 x 300mm2


4 Kabel Ladder 400 x 100

15
15

Meter
Meter

4,275,000
325,000

64,125,000
4,875,000

5 Pengadaan dan pemasangan sound attenuator dan


louvre grill
- Intake attenuator ukuran 2500 x 2000 x 1500 mm
- Exhaust attenuator ukuran 3500 x 1500 x 1500 mm
- Intake grill ukuran 2500 x 2000 mm
- Exhaust grill ukuran 2500 x 1500 mm

1
1
1
1

Unit
Unit
Unit
Unit

21,562,500
19,406,250
7,500,000
6,750,000

21,562,500
19,406,250
7,500,000
6,750,000

6 Pengadaan dan pemasangan ducting radiator lengkap


dengan seng dengan ketebalan BJLS 100

Unit

4,500,000

4,500,000

7 Pompa bahan bakar dengan kapasitas 30 Lpm Ebara

Unit

18,250,000

18,250,000

8 Pengdaan dan pemasangan instalasi bahan bakar


lengkap dengan pipa black steel valve dan stainer

Lot

18,875,000

18,875,000

9 Pengdaan dan pemasangan piompa tangan (hand pump)

Unit

1,500,000

1,500,000

10 Pengdaan dan pemasangan tangki harian 1000 liter

Unit

9,500,000

9,500,000

11 Pengdaan dan pemasangan tangki bulanan 10000 liter

Unit

45,000,000

45,000,000

188

Meter

195,000

36,660,000

13 Grounding sytem dengan BC 50mm2

Lot

10,000,000

10,000,000

14 Pengdaan dan pemasangan kabel kontrol

Lot

4,500,000

4,500,000

15 Testing dan Commisioning

Lot

15,000,000

15,000,000

16 Izin Depnaker

Unit

3,500,000

3,500,000

B
1

3 Pengadaan dan pemasangan kabel power dari Gene -

12 Pengdaan dan pemasangan Rock wool density 80 kg/cm


tebal 2" lengkap dengan waremesh

TOTAL

1,914,503,750

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN
PEKERJAAN SISTEM ELEKTRIKAL
No
1

Uraian

H.Sat
(Rp)

Total
(Rp)

Qty

Sat

Pengadaan dan pemasangan batang penangkal petir


menggunakan pipa galvanis diameter 2" dan 3 " dilengkapi
Head protector merk EF dengan radius pengamanan
100 m 2.

set

18,000,000

18,000,000

Pengadaan dan pemasangan batang pentanahan meng gunakan elektroda tembaga dengan diameter 3/4", pipa
galvanis dengan BC 50 mm2 dengan minimal keda laman 12 meter

unit

3,000,000

3,000,000

Pembuatan bak kontrol 40 x 40 x 40 cm komplit dengan


cover

unit

400,000

400,000

Pengadaan dan pemasangan kabel Coaxial Diameter


2x 35 mm2 didalampipa PVC diameter 1 "
pada kolom terpasang rapi.

40

meter

450,000

18,000,000

Testing & Commisioning

lot

2,000,000

2,000,000

Total

41,400,000

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN
PEKERJAAN SISTEM TELEPON DAN DATA
No
A

Uraian

Qty

Sat

H.Sat
(Rp)

Total
(Rp)

PERALATAN UTAMA
Pengadaan dan Pemasangan peralatan, sehingga dapat
berfungsi dengan baik, termasuk pengadaan support suport yang dibutuhkan

Pengurusan Perizinan pemasangan line telepon

16

Pengadaan dan Pemasangan MDF150 Pair,


Attenden Console.
PABX Kapasitas 24/120 Extention, Billing System Battery + Charger
Komputer Pentium 4, Hard disc 20 GB, Ram 128.

Material Bantu

600,000

9,600,000

set

135,000,000

135,000,000

Ls

3,000,000

3,000,000

Testing & Comissioning

lot

2,000,000

2,000,000

PANEL DISTRIBUSI ( TB - TP )
Lantai Basement ( B) 10 pair
Lantai Satu ( 1 ) 40 pair
Lantai Dua ( 2 ) 30 pair
Lantai Tiga ( 3 ) 20 pair
Lantai Empat ( 4 ) 20 pair
Lantai Lima ( 5 ) 30 pair

1
1
1
1
1
1

unit
unit
unit
unit
unit
unit

1,400,000
3,800,000
2,600,000
2,600,000
2,600,000
2,600,000

1,400,000
3,800,000
2,600,000
2,600,000
2,600,000
2,600,000

57
67
77
87
97
107

mtr
mtr
mtr
mtr
mtr
mtr

25,000
100,000
75,000
50,000
50,000
75,000

1,425,000
6,700,000
5,775,000
4,350,000
4,850,000
8,025,000

Kabel distribusi ITC 3 x 0.8 mm dari MDF menuju lantai


Lantai Basement ( B ) 10 pair
Lantai Satu ( 1 ) 40 pair
Lantai Dua ( 2 ), 30 pair
Lantai Tiga ( 3 ), 20 pair
Lantai Empat ( 4 ), 20 pair
Lantai Lima ( 5 ), 30 pair
Sub Total I

196,325,000

PEKERJAAN INSTALASI TELEPON


Pemasangan isntalasi kabel telepon menggunakan kabel ITC 3 x 0.6 mm didalam conduit PVC high impact
diameter 20 mm komplit dengan sok, clamp, T- Dos
dan Outlet Telepon, merk Clipsal, MK, Legrand,

5.1. Lantai Basement


1
Pengadaan dan pemasangan instalasi Extention telephone

buah

290,000

1,740,000

5.2. Lantai Satu


1
Pengadaan dan pemasangan instalasi line telephone
2
Pengadaan dan pemasangan instalasi Extention telephone

6
31

buah
buah

290,000
290,000

1,740,000
8,990,000

5.3
1
2
3
4

Lantai Dua
Pengadaan dan pemasangan instalasi line telephone
Pengadaan dan pemasangan instalasi Extention telephone
Pengadaan dan pemasangan instalasi Public telepon Card
Pengadaan dan pemasangan instalasi Faximile

1
19
1
2

buah
buah
buah
buah

290,000
290,000
290,000
290,000

290,000
5,510,000
290,000
580,000

5.4

Lantai Tiga

1
2
3

Pengadaan dan pemasangan instalasi Public telephone coin


Pengadaan dan pemasangan instalasi Extention telephone
Pengadaan dan pemasangan instalasi Public telepon Card

1
11
1

buah
buah
buah

H.Sat
(Rp)
290,000
290,000
290,000

5.5
1
2
3

Lantai Empat
Pengadaan dan pemasangan instalasi Public telephone coin
Pengadaan dan pemasangan instalasi Extention telephone
Pengadaan dan pemasangan instalasi Public telepon Card

1
4
1

buah
buah
buah

290,000
290,000
290,000

290,000
1,160,000
290,000

5.6
1
2
3

Lantai Lima
Pengadaan dan pemasangan instalasi Public telephone coin
Pengadaan dan pemasangan instalasi Extention telephone
Pengadaan dan pemasangan instalasi Public telepon Card

1
21
1

buah
buah
buah

290,000
290,000
290,000

290,000
6,090,000
290,000

5.7
1

Lantai Atap ( R. Mesin Lift )


Pengadaan dan pemasangan instalasi Extention telephone

buah

290,000

290,000

5.8
1
2

HANDSET
Hand set telepon digital
Hand set telepon digital dan display

90
1

unit
unit

250,000
1,440,000

22,500,000
1,440,000

5.9

Testing & Comissioning

lot

6,000,000

6,000,000

No

Uraian

Qty

Sat

Sub Total II

61,550,000

Total I-II

Total
(Rp)
290,000
3,190,000
290,000

257,875,000

PEKERJAAN SISTEM DATA


PERALATAN UTAMA

Pengadaan dan Pemasangan peralatan, Utama sehingga


dapat berfungsi dengan baik, termasuk pengadaan support suport yang dibutuhkan

Pengadaan dan Pemasangan SERVER lengkap


dengan software dan Accesoriesnya sehingga dapat ber
pungsi dengan baik

set

125,000,000

125,000,000

Hub Switch 60 port

unit

23,000,000

23,000,000

PEKERJAAN INSTALASI

5.1. Lantai Basement


1
Pengadaan dan pemasangan instalasi Data

Titik

430,000

860,000

5.2. Lantai Satu


1
Pengadaan dan pemasangan instalasi Data

22

Titik

430,000

9,460,000

5.3
1

Lantai Dua
Pengadaan dan pemasangan instalasi Data

20

Titik

430,000

8,600,000

5.4
1

Lantai Tiga
Pengadaan dan pemasangan instalasi Data

Titik

430,000

1,720,000

5.5
1

Lantai Empat
Pengadaan dan pemasangan instalasi Data

Titik

430,000

1,720,000

Pemasangan instalasi kabel telepon menggunakan kabel


Data CAT 5 didalam conduit PVC high impact
diameter 20 mm komplit dengan sok, clamp, T- Dos
dan Outlet Telepon, merk Clipsal, MK, Legrand,

No

Uraian

5.6
1

Lantai Lima
Pengadaan dan pemasangan instalasi Data

5.6

Grounding Arus Lemah (semua panel arus lemah)


Bak kontrol

Qty

Sat

Titik

H.Sat
(Rp)

Total
(Rp)

430,000

2,150,000

1
1

ttk
bh

2,500,000
300,000

2,500,000
300,000

BC 1 x 25mm2

35

mtr

15,000

525,000

Material Bantu

Ls

3,000,000

3,000,000

lot

6,000,000

6,000,000

Testing & Comissioning


Sub Total I

36,835,000

294,710,000

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN
PEKERJAAN SISTEM TATA SUARA

No

A.

1
2
3
4
5
6
7
8
9
10
11
12

Uraian

PERALATAN UTAMA
Pengadaan dan Pemasangan peralatan utama
pada ruang control sehingga berfungsi dengan
baik, sbb:
Tape cassette player
CD Player
Paging Mikrophone
Mixer
Power Amplifier 240 Watt
Cabinet Rack
Pengadaan dan pemasangan terminal box TB-B
Pengadaan dan pemasangan terminal box TB-1
Pengadaan dan pemasangan terminal box TB-2
Pengadaan dan pemasangan terminal box TB-3
Pengadaan dan pemasangan terminal box TB-4
Pengadaan dan pemasangan terminal box TB-5

Qty

Sat

1
1
1
1
2
1
1
1
1
1
1
1

buah
buah
buah
buah
buah
set
unit
unit
unit
unit
unit
unit

H.Sat

Total

(Rp)

(Rp)

5,400,000
4,560,000
1,800,000
14,400,000
9,600,000
7,800,000
960,000
960,000
960,000
960,000
960,000
960,000

Sub Total I
B.

1
2
3
4
5
6

PERALATAN CAR CALL


Pengadaan dan Pemasangan peralatan Car Call
pada ruang reception sehingga berfungsi dengan
baik, sbb:
Paging Mikrophone
Premixer
Power Amplifier 240 Watt
Cabinet Rack
Pengadaan dan pemasangan terminal box TB-B
Pengadaan dan pemasangan Horn speaker 30 Watt
lengkap dengan tiang dan fondasi serta pengkabelan
nya dan berfungsi dengan baik. ( Site )
Pengadaan dan pemasangan Coloumn speaker leng
kap dengan pengkabelannya dan berfungsi dengan
baik.( Lantai Basement ).
Instalasi Horn speaker dan Coloumn speaker

58,920,000

1
1
1
1
1

unit
unit
unit
unit
unit

1,800,000
6,000,000
9,600,000
12,000,000
960,000

1,800,000
6,000,000
9,600,000
12,000,000
960,000

set

240,000

960,000

3
7

buah
titik

240,000
192,000

720,000
1,344,000

Sub Total II
C.

PEKERJAAN INSTALASI
Pemasangan Instalasi Sound System dengan meng
gunakan kabel NYMHY 2x1,5 mm2 di dalam conduit
PVC high impact diameter 20 mm2 komplit dengan
sok, clamp, Tee dos, dan matrial bantu lainnya, se
sehingga dapat berfungsi dengan baik.

C.1
1
2

Lantai Basement ( B )
Pengadaan dan pemasangan ceilling speaker
Instalasi ceilling speaker

C.2
1
2

Lantai Satu ( 1 )
Pengadaan dan pemasangan ceilling speaker
Pengadaan dan pemasangan wall speaker pada
tangga kebakaran

5,400,000
4,560,000
1,800,000
14,400,000
19,200,000
7,800,000
960,000
960,000
960,000
960,000
960,000
960,000

33,384,000

15
15

buah
buah

180,000
192,000

2,700,000
2,880,000

31

buah

180,000

5,580,000

buah

240,000

480,000

No
3
4
C.3
1
2
3
4
C.4
1
2
3
4
C.5
1
2
3
4
C.6
1
2
3
4
C.7
1
2
3
4
C.8

Uraian
Instalasi ceilling speaker
Instalasi wall speaker pada tangga kebakaran
Lantai dua ( 2 )
Pengadaan dan pemasangan ceilling speaker
Pengadaan dan pemasangan wall speaker pada
tangga kebakaran
Instalasi ceilling speaker
Instalasi wall speaker pada tangga kebakaran
Lantai Tiga ( 3 )
Pengadaan dan pemasangan ceilling speaker
Pengadaan dan pemasangan wall speaker pada
tangga kebakaran
Instalasi ceilling speaker
Instalasi wall speaker pada tangga kebakaran
Lantai Empat ( 4 )
Pengadaan dan pemasangan ceilling speaker
Pengadaan dan pemasangan wall speaker pada
tangga kebakaran
Instalasi ceilling speaker
Instalasi wall speaker pada tangga kebakaran
Lantai Lima ( 5 )
Pengadaan dan pemasangan ceilling speaker
Pengadaan dan pemasangan wall speaker pada
tangga kebakaran
Instalasi ceilling speaker
Instalasi wall speaker pada tangga kebakaran
Lantai Atap ( A )
Pengadaan dan pemasangan wall speaker pada
Ruang mesin lift
Pengadaan dan pemasangan wall speaker pada
tangga kebakaran
Instalasi wall speaker pada Ruang mesin Lift
Instalasi wall speaker pada tangga kebakaran
Testing & Comissioning
Sub Total III
Total I-III

H.Sat

Total

titik
titik

(Rp)
192,000
192,000

(Rp)
5,952,000
384,000

14

buah

180,000

2,520,000

2
14
2

buah
titik
titik

240,000
192,000
192,000

480,000
2,688,000
384,000

16

buah

180,000

2,880,000

2
16
2

buah
titik
titik

240,000
192,000
192,000

480,000
3,072,000
384,000

12

buah

180,000

2,160,000

2
12
2

buah
titik
titik

240,000
192,000
192,000

480,000
2,304,000
384,000

12

buah

180,000

2,160,000

2
12
2

buah
titik
titik

240,000
192,000
192,000

480,000
2,304,000
384,000

buah

240,000

480,000

1
2
1

buah
titik
titik

240,000
192,000
192,000

240,000
384,000
192,000

lot

6,000,000

6,000,000

Qty

Sat

31
2

48,816,000
141,120,000

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN
PEKERJAAN SISTEM CCTV

No

H.Sat

Total

(Rp)

(Rp)

Qty

Sat

unit

87,550,000

87,550,000

unit

14,875,000

14,875,000

unit

6,375,000.00

6,375,000

Ruang Kontrol Lt 2
Pengkabelan untuk peralatan utama CCTV

lot

1,487,500

1,487,500

Pekerjaan grounding sistem untuk peralatan utama CCT

lot

3,612,375

3,612,375

Unit

4,462,500

22,312,500

Unit

4,462,500

22,312,500

Unit

7,225,000

21,675,000

Uraian

PERALATAN UTAMA

V.1 PERALATAN UTAMA DAN KABEL UTAMA


Peralatan Utama
Ruang Kontrol Basement
1
2
4

Digital Multiplexer Recorder hard disk 320 Gb, 16


Canel lengkap dengan controler eternet.
LCD monitor 21"
UPS 1KVA lengkap dengan back up battery, rectifier
dan line arester

V.2 KABEL UTAMA

V.3 PERALATAN
1 LT. BASEMENT
2
3

Camera Fix Dome


LT.SATU
Camera Fix Dome
SITE PLAN
Camera Fix Dome Night Day + Housing
Camera Fix Dome Night Day
LT.DUA

Unit

4,462,500

13,387,500

Camera Fix Dome


LT.TIGA

Unit

4,462,500

13,387,500

Camera Fix Dome


LT.EMPAT
Camera Fix Dome

Unit

4,462,500

22,312,500

Unit

4,462,500

13,387,500

Unit

4,462,500

13,387,500

6
7

LT.LIMA
Camera Fix Dome

V.4 INSTALASI
1

LT. BASEMENT
Kabel Power NYM 3x1.5mm + conduit untuk camera
Coaxial Cable RG - 6 7 Ohm + conduit untuk camera
LT. SATU
Kabel Power NYM 3x1.5mm + conduit untuk camera

100

21,038

2,103,800

91

17,531

1,595,321

100

21,038

2,103,800

Coaxial Cable RG - 6 7 Ohm + conduit untuk camera


LT. SITE PLAN

127

17,531

2,229,943

Kabel Power NYM 3x1.5mm + conduit untuk camera


Coaxial Cable RG - 6 7 Ohm + conduit untuk camera

100
225

m
m

21,038
17,531

2,103,800
3,944,475

No
4

Uraian

H.Sat

Total

(Rp)

(Rp)

Qty

Sat

Kabel Power NYM 3x1.5mm + conduit untuk camera


Coaxial Cable RG - 6 7 Ohm + conduit untuk camera

100
95

m
m

21,038
17,531

2,103,800
1,665,445

LT. TIGA
Kabel Power NYM 3x1.5mm + conduit untuk camera

LT. DUA

105

21,038

2,208,990

Coaxial Cable RG - 6 7 Ohm + conduit untuk camera


LT. EMPAT

167

17,531

2,927,677

Kabel Power NYM 3x1.5mm + conduit untuk camera


Coaxial Cable RG - 6 7 Ohm + conduit untuk camera

119
119

m
m

21,038
17,531

2,503,522
2,086,189

LT. LIMA
Kabel Power NYM 3x1.5mm + conduit untuk camera
Coaxial Cable RG - 6 7 Ohm + conduit untuk camera

120
133

m
m

21,038

2,524,560

17,531

2,331,623

TOTAL

288,495,320

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN
PEKERJAAN SISTEM MATV

No

Uraian

A.

PERALATAN UTAMA

1
2

Pengadaan dan pemasangan head end amplifier


Pengadaan dan pemasangan antene YAGI -UHF
untuk program lokal
Pengadaan dan pemasangan antene YAGI -VHF
untuk program lokal
Instalasi peralatan utama
Pengadaan dan pemasangan line amplifier
Pengadaan dan pemasangan Box panel TB - TV
Pengadaan dan pemasangan TV Monitor 14", digital
merk Toshiba, Sony
Kabel dari antena UHF dan VHF ke ruang kontrol lt 2

3
4
5
6
7
8

H.Sat

Total

(Rp)

(Rp)

Qty

Sat

unit

4,560,000

4,560,000

21

unit

600,000

12,600,000

1
1
2
6

unit
lot
unit
buah

480,000
5,400,000
7,200,000
960,000

480,000
5,400,000
14,400,000
5,760,000

1
40

unit
meter

1,500,000
30,000

1,500,000
1,200,000

Sub Total I
B.

45,900,000

PEKERJAAN INSTALASI
Pekerjaan ini termasuk pemasangan kabel coaxial didalam pipa conduit dengan diameter 20 mm, high impact
lengkap dengan accesoriesnya.

B.1. Lantai Basement


1 Pengadaan dan pemasangan kabel coaxial type 7-C
atau RG -11, merk Juri, Belden, Hansen
2 Pengadaan dan pemasangan kabel coaxial type 5-C
atau RG -9, merk Juri, Belden, Hansen
3 Pengadaan dan pemasangan outlet TV, termasuk T-Dos
merk MK, Clipsal
B.2. Lantai Satu
1 Pengadaan dan pemasangan kabel coaxial type 7-C
atau RG -11, merk Juri, Belden, Hansen
2 Pengadaan dan pemasangan kabel coaxial type 5-C
atau RG -9, merk Juri, Belden, Hansen
3 Pengadaan dan pemasangan splitter 4 way
4 Pengadaan dan pemasangan outlet TV, termasuk T-Dos
merk MK, Clipsal
5 Pengadaan dan pemasangan kabel RCA
merk Juri, Belden, Hansen
6 Pengadaan dan pemasangan outlet RCA, termasuk
T-Dos merk MK, Clipsal
B.3. Lantai Dua
1 Pengadaan dan pemasangan kabel coaxial type 7-C
atau RG -11, merk Juri, Belden, Hansen
2 Pengadaan dan pemasangan kabel coaxial type 5-C
atau RG -9, merk Juri, Belden, Hansen
3 Pengadaan dan pemasangan splitter 4 way
4 Pengadaan dan pemasangan outlet TV, termasuk T-Dos
merk MK, Clipsal
B.4. Lantai Tiga
1 Pengadaan dan pemasangan kabel coaxial type 7-C

55

meter

30,000

1,650,000

63

meter

18,000

1,134,000

buah

126,000

126,000

65

meter

30,000

1,950,000

240
5

meter
buah

18,000
228,000

4,320,000
1,140,000

14
16

buah
meter

126,000
30,000

1,764,000
480,000

buah

126,000

252,000

75

meter

30,000

2,250,000

160
6

meter
buah

18,000
228,000

2,880,000
1,368,000

13

buah

126,000

1,638,000

No
2
3
4

Uraian
atau RG -11, merk Juri, Belden, Hansen
Pengadaan dan pemasangan kabel coaxial type 5-C
atau RG -9, merk Juri, Belden, Hansen
Pengadaan dan pemasangan splitter 4 way
Pengadaan dan pemasangan outlet TV, termasuk T-Dos
merk MK, Clipsal

B.5. Lantai Empat


1 Pengadaan dan pemasangan kabel coaxial type 7-C
atau RG -11, merk Juri, Belden, Hansen
2 Pengadaan dan pemasangan kabel coaxial type 5-C
atau RG -9, merk Juri, Belden, Hansen
3 Pengadaan dan pemasangan splitter 4 way
4 Pengadaan dan pemasangan outlet TV, termasuk T-Dos
merk MK, Clipsal
B.6. Lantai Lima
1 Pengadaan dan pemasangan kabel coaxial type 7-C
atau RG -11, merk Juri, Belden, Hansen
2 Pengadaan dan pemasangan kabel coaxial type 5-C
atau RG -9, merk Juri, Belden, Hansen
3 Pengadaan dan pemasangan splitter 4 way
4 Pengadaan dan pemasangan outlet TV, termasuk T-Dos
merk MK, Clipsal
B.7 Testing & Comissioning
Sub Total II
Total I-II

H.Sat

Total

meter

(Rp)
30,000

(Rp)
2,850,000

102
2

meter
buah

18,000
1,428,000

1,836,000
2,856,000

buah

126,000

756,000

95

meter

30,000

2,850,000

368
7

meter
buah

18,000
228,000

6,624,000
1,596,000

26

buah

126,000

3,276,000

105

meter

30,000

3,150,000

437
11

meter
buah

18,000
228,000

7,866,000
2,508,000

31

buah

126,000

3,906,000

lot

6,000,000

6,000,000

Qty

Sat

95

67,026,000
112,926,000

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN
PEKERJAAN SISTEM FIRE ALARM

No

Uraian

Qty

Sat

H.Sat

Total

(Rp)

(Rp)

A.

PERALATAN UTAMA

1.

Pengadaan dan Pemasangan Master Control


fire alarm (MCFA) type conventional dengan kapasitas 16 zone komplit dengan batteray ditem patkan pada ruang Kontrol

unit

81,000,000

81,000,000

Pengadaan dan Pemasangan MDF

unit

2,160,000

2,160,000

Pengadaan dan pemasangan kabel distribusi dari


MDF ke MCFA, Annunciator dan TB - FA perlantai
terpasang pada kabel tray dengan lebar 40 cm

lot

15,552,000

15,552,000

Pengadaan panel Terminal box (TB - FA)

unit

1,620,000

9,720,000

5.

Pengadaan dan pemasangan Annunciator yang


ditempatkan pada ruang keamanan

unit

43,200,000

43,200,000

Sub Total I
B.

151,632,000

PEKERJAAN INSTALASI
Pemasangan isntalasi detektor, menggunakan ka
bel NYA diameter 1 x 1,5mm2 didalam conduit high
impact diameter 20 mm2 lengkap dengan acceso
riesnya.

B.1

B.2

1
2
3
4
5
B.3

1
2
3
4
5
6
B.4.

Interface
Pengadaan dan Pemasangan Instalasi Interface ke :
Sound System, Dial DPK, Flow Switch, Tampre
Switch, Panel AC, Panel Penerangan, Panel Lift,
Presh Air fan, MATV, Hydrant/ Sprinkler dll.

lot

5,175,000

5,175,000

Pengadaan dan Pemasangan Rate OF Rise (ROR)


Pengadaan dan Pemasangan heat detektor
Instalasi detektor

87
10
97

buah
buah
titik

174,960
216,000
270,000

15,221,520
2,160,000
26,190,000

Pengadaan dan Pemasangan alarm bell, lampu


indicator, break glass, jack telepon dan instalasinya

set

432,000

864,000

Pengadaan dan pemasangan instalasi flow switch

titik

270,000

270,000

Pengadaan dan Pemasangan Rate OF Rise (ROR)


Pengadaan dan Pemasangan Smoke detektor

102
1

buah
buah

216,000
378,000

22,032,000
378,000

Pengadaan dan Pemasangan heat detektor


Instalasi detektor
Pengadaan dan Pemasangan alarm bell, lampu

1
104

buah
titik

216,000
270,000

216,000
28,080,000

2
1

set
titik

480,000
270,000

960,000
270,000

Lantai Basement ( B )

Lantai Satu ( 1 )

indicator, break glass, jack telepon dan instalasinya


Pengadaan dan pemasangan instalasi flow switch
Lantai Dua ( 2 )

No

1
2
3
4
5
6
B.5.

1
2
3
4
5
6
B.6.

1
2
3
4
5
B.7.

1
2
3
4
5
6
B.8

1
2
3
4
B.9.

Uraian

H.Sat

Total

Qty

Sat

Pengadaan dan Pemasangan Rate OF Rise (ROR)


Pengadaan dan Pemasangan Smoke detektor

61
4

buah
buah

216,000
278,000

13,176,000
1,112,000

Pengadaan dan Pemasangan heat detektor


Instalasi detektor

4
69

buah
titik

216,000
270,000

864,000
18,630,000

Pengadaan dan Pemasangan alarm bell, lampu


indicator, break glass, jack telepon dan instalasinya

set

432,000

864,000

Pengadaan dan pemasangan instalasi flow switch

titik

270,000

270,000

Pengadaan dan Pemasangan Rate OF Rise (ROR)


Pengadaan dan Pemasangan Smoke detektor

69
3

buah
buah

216,000
378,000

14,904,000
1,134,000

Pengadaan dan Pemasangan heat detektor


Instalasi detektor

2
74

buah
titik

216,000
27,000

432,000
1,998,000

Pengadaan dan Pemasangan alarm bell, lampu


indicator, break glass, jack telepon dan instalasinya

set

432,000

864,000

Pengadaan dan pemasangan instalasi flow switch

titik

270,000

270,000

Pengadaan dan Pemasangan Rate OF Rise (ROR)


Pengadaan dan Pemasangan heat detektor

52
5

buah
buah

216,000
240,000

11,232,000
1,200,000

Instalasi detektor
Pengadaan dan Pemasangan alarm bell, lampu

57

titik

270,000

15,390,000

indicator, break glass, jack telepon dan instalasinya


Pengadaan dan pemasangan instalasi flow switch

2
1

set
titik

432,000
270,000

864,000
270,000

Lantai Lima ( 5 )
Pengadaan dan Pemasangan Rate OF Rise (ROR)

50

buah

216,000

10,800,000

Pengadaan dan Pemasangan Smoke detektor


Pengadaan dan Pemasangan heat detektor

1
3

buah
buah

378,000
216,000

378,000
648,000

Instalasi detektor
Pengadaan dan Pemasangan alarm bell, lampu
indicator, break glass, jack telepon dan instalasinya

54

titik

270,000

14,580,000

set

432,000

864,000

Pengadaan dan pemasangan instalasi flow switch

titik

270,000

270,000

Lantai Atap ( A )
Pengadaan dan Pemasangan Rate OF Rise (ROR)
Pengadaan dan Pemasangan Smoke detektor

3
1

buah
buah

216,000
378,000

648,000
378,000

Pengadaan dan Pemasangan heat detektor


Instalasi detektor

1
5

buah
titik

216,000
270,000

216,000
1,350,000

Testing & Commissioning

lot

5,400,000

5,400,000

(Rp)

(Rp)

Lantai Tiga ( 3 )

Lantai Empat ( 4 )

Sub Total II

220,822,520

Total I-II

372,454,520

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN
PEKERJAAN SISTEM NURSE CALL

No

A.

Uraian

H.Sat

Total

(Rp)

(Rp)

Qty

Sat

unit

40,837,600

40,837,600

Batery Back up for IP8000 to operate file boat


Mode when mains power is off ( typical 4 hour )

buah

7,150,000

7,150,000

Pengadaan dan pemasangan 1 gang (94x54x43mm)


Australian Std Range, flush mounting box (inbow)

lot

3,600,000

3,600,000

13

buah

1,210,000

15,730,000

13
3

buah
buah

715,000
935,000

9,295,000
2,805,000

buah

1,430,000

4,290,000

buah

121,000

363,000

buah

4,537,600

13,612,800

Unit

12,375,000

12,375,000

PERALATAN UTAMA
CENTRAL PROCESSOR UNIT
Pengadaan dan Pemasangan peralatan utama nurse call
dan Accesoriesnya sehingga dapat berpungsi dengan baik.

3.

B.

AE4000 System Suport Hardware with interface to Dim;


stor up 250 vigil rooms
AE402

157/1

PEKERJAAN INSTALASI
Pengadaan dan pemasangan Nurse call push button,
lampu indicator, Pull cord, Reset push button.Mikropho
ne, dan instalasi pengkabelannya di dalam conduit PVC
high impact diameter 20 mm2 lengkap dengan acceso
riesnya sehingga dapat berfungsi dengan baik.

B.1 Lantai Basement ( B )


1 Ruang Kebidanan @ 3 Tempat tidur 1 kamar mandi
1 Ruang Anak @ 3 Tempat tidur 1 kamar mandi
1 Ruang Dewasa @ 7 Tempat tidur 1 kamar mandi
1 ACQ 121 Call cancel station with Assurance LED
(with pendan socket) Vertical Mounting
2 AP3301 3 Metre Single button PendanT Cord for ACQ
Series Call Station
3 ALL402 Over door light with green and yelow globe
4 ASQ01P Ceilling pull switch slave wet area station with
LED assurance light (with 3 metre heavy duty
detachable pull cord and anchors)
5 ACQ023 Presence/Cancel station with assurance LED
(No Pendant Socket/Splashproof) vertical
mounting
6 ANQ401 Data interface Moduler - 16 inputs
RJ Connected (Configurable)
7 ADIC13 12 Character 50 mm single sided 3 Colour
Full Alpha Annunciator with ding sound
Central and Multiple Address Capability
Total I
B.2 Lantai 3 ( Tiga )
2 Ruang VIP @ 1 Tempat tidur 1 kamar mandi
2 Ruang Kls I @ 2 Tempat tidur 1 kamar mandi
4 Ruang Kls II @ 3 Tempat tidur 1 kamar mandi
1 Ruang Kls III @ 7 Tempat tidur 1 kamar mandi
1 Ruang ICU, @ 5 Tempat Tidur.
1 Ruang High Care, @ 4 Tempat Tidur
1 Ruang VK, @ 4 Tempat Tidur 2 Kamar Mandi
1 Ruang VK, @ 1 Tempat Tidur 1 Kamar Mandi

58,470,800

No
1
2

Uraian
ACQ 121 Call cancel station with Assurance LED
(with pendan socket) Vertical Mounting
AP3301 3 Metre Single button PendanT Cord for ACQ

Qty

Sat

39

buah

H.Sat

Total

(Rp)

(Rp)

1,210,000

47,190,000

No
3
4

6
7

Uraian
Series Call Station
ALL402 Over door light with green and yelow globe
ASQ01P Ceilling pull switch slave wet area station with
LED assurance light (with 3 metre heavy duty
detachable pull cord and anchors)
ACQ023 Presence/Cancel station with assurance LED
(No Pendant Socket/Splashproof) vertical
mounting
ANQ401 Data interface Moduler - 16 inputs
RJ Connected (Configurable)
ADIC13 12 Character 50 mm single sided 3 Colour
Full Alpha Annunciator with ding sound
Central and Multiple Address Capability

B.3 Lantai 4 ( Empat )


3 Ruang Kls III @ 13 Tempat tidur 2 kamar mandi
21 Ruang Kls I I @ 6 Tempat tidur 2 kamar mandi
2 Ruang observasi @ 4 Tempat tidur @ 2 kamar mandi
1 ACQ 121 Call cancel station with Assurance LED
(with pendan socket)Vertical Mounting
2 AP3301 3 Metre Single button PendanT Cord for ACQ
Series Call Station
3 ALL402 Over door light with green and yelow globe
4 ASQ01P Ceilling pull switch slave wet area station with
LED assurance light (with 3 metre heavy duty
detachable pull cord and anchors)
5 ACQ023 Presence/Cancel station with assurance LED
(No Pendant Socket/Splashproof) vertical
mounting
6 ANQ401 Data interface Moduler - 16 inputs
RJ Connected (Configurable)
7 ADIC13 12 Character 50 mm single sided 3 Colour
Full Alpha Annunciator with ding sound
Central and Multiple Address Capability
B.4 Lantai 5 ( Lima )
19 Ruang VIP @ 1 Tempat tidur @ 1 kamar mandi
11 Ruang Kls I @ 2 Tempat tidur @ 1 kamar mandi
1 ACQ 121 Call cancel station with Assurance LED
(withpendan socket) Vertical Mounting
2 AP3301 3 Metre Single button PendanT Cord for ACQ
Series Call Station
3 ALL402 Over door light with green and yelow globe
4 ASQ01P Ceilling pull switch slave wet area station with
LED assurance light (with 3 metre heavy duty
detachable pull cord and anchors)
5 ACQ023 Presence/Cancel station with assurance LED
(No Pendant Socket/Splashproof) vertical
mounting
6 ANQ401 Data interface Moduler - 16 inputs
RJ Connected (Configurable)
7 ADIC13 12 Character 50 mm single sided 3 Colour
Full Alpha Annunciator with ding sound
Central and Multiple Address Capability

H.Sat

Total

Qty

Sat

39
17

buah
buah

(Rp)
715,000
935,000

(Rp)
27,885,000
15,895,000

17

buah

1,430,000

24,310,000

17

buah

121,000

2,057,000

buah

4,537,600

9,075,200

Unit

12,375,000

12,375,000

88

buah

1,210,000

106,480,000

88
26

buah
buah

715,000
935,000

62,920,000
24,310,000

26

buah

1,430,000

37,180,000

26

buah

121,000

3,146,000

buah

4,537,600

36,300,800

Unit

12,375,000

12,375,000

41

buah

1,210,000

49,610,000

41
30

buah
buah

715,000
935,000

29,315,000
28,050,000

30

buah

1,430,000

42,900,000

30

buah

121,000

3,630,000

buah

4,537,600

27,225,600

Unit

12,375,000

12,375,000

No

H.Sat

Total

(Rp)

(Rp)

Qty

Sat

Instalasi Nurse Call

lot

103,175,000

103,175,000

B.6 Testing & Commissioning

lot

10,000,000

10,000,000

B5

1
a.

b.
c

2
a.

b.

3
a.

b.
c

4
a.

b.

Uraian

Total II

727,779,600

Total I-II

786,250,400

KABEL TRAY ARUS LEMAH


Pengadaan dan pemasangan Rak Kabel lengkap dengan Jointing, Suport, Hanger rood, dan Accesoriesnya sehingga
dapat berpungsi dengan baik.
LANTAI BASEMENT
Straight
W = 300
W = 200
Elbow
300 x 300
Tee
300 x 300 x 300
300 x 200 x 200
LANTAI 1
Straight
W = 400
W = 300
W = 200
Elbow
300 x 300
200 x 200
Tee
400 x 300 x 200
300 x 200 x 200
LANTAI 2
Straight
W = 400
W = 300
W = 200
Elbow
400 x 400
Tee
400 x 400 x 300
300 x 400 x 200
300 x 200 x 200
LANTAI 3
Straight
W = 300
W = 200
Elbow
300 x 300
200 x 200
Tee
300 x 200 x 200

3 Unit

80,700,000

242,100,000

72
48

m
m

330,625
247,500

23,805,000
11,880,000

bh

431,250

431,250

1
1

bh
bh

583,125
583,125

583,125
583,125

4
16
96

m
m
m

413,125
330,625
247,500

1,652,500
5,290,000
23,760,000

1
2

bh
bh

431,250
303,750

431,250
607,500

1
1

bh
bh

731,250
583,125

731,250
583,125

20
2
72

m
m
m

413,125
330,625
247,500

8,262,500
661,250
17,820,000

bh

555,000

555,000

1
1
1

bh
bh
bh

731,250
731,250
583,125

731,250
731,250
583,125

16
75

m
m

330,625
247,500

5,290,000
18,562,500

1
2

bh
bh

431,250
303,750

431,250
607,500

bh

583,125

583,125

No
5
a.

b.
c

6
a.

b.
c

Uraian
LANTAI 4
Straight
W = 300
W = 200
Elbow
300 x 300
Tee
300 x 200 x 200
LANTAI 5
Straight
W = 300
W = 200
Elbow
300 x 300
Tee
300 x 200 x 200
Cable Tray Vertikal
Straight
w = 600
Material Bantu

Qty

Sat

H.Sat

Total

(Rp)

(Rp)

22
72

m
m

330,625
247,500

7,273,750
17,820,000

bh

431,250

431,250

bh

583,125

583,125

22
72

m
m

330,625
247,500

7,273,750
17,820,000

bh

431,250

431,250

bh

583,125

583,125

30

578,125

17,343,750

lot

10,000,000

10,000,000

SUB TOTAL VI

446,816,875

TOTAL I s.d VI

1,651,986,275

No

Uraian

Qty

Sat

H.Sat

Total

(Rp)

(Rp)