Anda di halaman 1dari 2

APTI_TS_A_RAB_5140821001_Septian Aprelly

NO.
1
2
3
4
5
6
7
8
9
10

ITEM PEKERJAAN
Pek. Pondasi
Pek. Sloof 10/15
Pek. Dinding Bata
Pek. Kolom 30/30
Pek. Balok 10/15
Pek. Dak Tebal 15 cm

L
1
2
2
0.3
10
4

T
1
0.15
1
0.3
0.1
3

0.5
0.1
1
3
0.15
0.15

JUMLAH
2
1
1
2
1
1

HARGA KESELURUHAN

VOLUME
1
0.03
2
0.54
0.15
1.8

HARGA SATUAN
Rp800,000
Rp4,000,000
Rp100,000
Rp4,000,000
Rp4,000,000
Rp4,000,000

TOTAL
Rp800,000
Rp120,000
Rp200,000
Rp2,160,000
Rp600,000
Rp7,200,000

Rp11,080,000

Anda mungkin juga menyukai