Central Body Shop - Behbehani Motors Company

Plot No. 109A, Shuwaikh Industrial Area, Kuwait


March 01, 2016

PACKAGE 1

Analysis of Prices
INDEX

Division
No

Title

Page No

General Explanation

III/AP-1

Tendering and Contract Requirements

III/AP-2

General Requirements

III/AP1-1 to

Site Works

III/AP2-1 to

Concrete

III/AP3-1 to

Masonry

III/AP4-1 to

Metals

III/AP5-1 to

Thermal and Moisture Protection

III/AP7-1 to

15

Mechanical

III/AP15-1 to

Liwan Architectural Engineering Consultant in association


With Darwish and Mariano Design Associates
Document III-5 Analysis of Prices

DocIII5/AP1

Central Body Shop - Behbehani Motors Company


Plot No. 109A, Shuwaikh Industrial Area, Kuwait
March 01, 2016

PACKAGE 1

GENERAL EXPLANATION
Tenderers shall submit detailed price analysis of all items of the Bill of Quantities and Adjustment
Schedule, if any in accordance with the format shown in the attached Table. As many further pages as
necessary shall be added and all, including the first, paginated, as per the BQ pages.
Each item shall include the following:
Materials: Rates for materials are to be fully inclusive of all allowances for the delivery to the immediate
working area. Rates for imported materials are to be fully inclusive of all allowances for customs and
handling charges, import levies, any temporary storage warehousing and handling charges, and
transportation costs to the immediate work area.
Labour: Rates for labour are to be fully inclusive of all on costs whatsoever applicable to comply with
Labour Law in Kuwait, enhanced payments, etc., all non-mechanical plant, tools and site supervisory
costs.
Plant and Equipment: Rates for plant and equipment shall be inclusive of erection, dismantling,
maintenance and fuel costs, and operator where applicable.
Overheads and Profits: The term overheads shall mean both offices overhead and site overhead.
Rates for office overhead shall be fully inclusive of all personnel other than those employed at the job
site. Rates for site overhead shall be fully inclusive of all administrative personnel, office buildings and
supplies and all items required at the job site to carry out the Work.
Sub-contractor's overheads and Profits: Sub- Contractor's overheads and profits shall be shown
separately.
Contractor's overheads: Contractor's overheads shall be shown separately.
Contractor's Profits: Contractor's profits shall be shown separately.

Liwan Architectural Engineering Consultant in association


With Darwish and Mariano Design Associates
Document III-5 Analysis of Prices

DocIII5/AP2