Pgina
S10
Presupuesto
Presupuesto
Subpresupuesto
Cliente
Lugar
0301032 CONSTRUCCIN DEL POLIDEPORTIVO MUNICIPAL DE LA ESPERANZA DEL DISTRITO DE LA ESPERANZA - TRUJILLO - LA
LIBERTAD / I ETAPA: CONSTRUCCIN DE PISCINA OLMPICA Y COLISEO MUNICIPAL DE LA ESPERANZA
002 ARQUITECTURA
Costo al
MUNICIPALIDAD DISTRITAL DE LA ESPERANZA
31/03/2012
LA LIBERTAD - TRUJILLO - LA ESPERANZA
Item
Descripcin
Und.
Metrado
Precio S/.
Parcial S/.
167,545.91
01
ALBAILERIA
01.01
m2
2,821.10
53.34
01.02
m2
197.46
86.44
02
150,477.47
17,068.44
459,555.39
02.01
m2
1,052.91
11.74
12,361.16
02.02
m2
4,061.73
14.76
59,951.13
02.03
m2
881.28
19.13
16,858.89
02.04
m2
4,789.12
26.07
124,852.36
02.05
m2
3,688.74
18.48
68,167.92
02.06
m2
3,240.91
33.12
107,338.94
02.07
3,213.87
11.81
37,955.80
02.08
m2
1,631.38
19.08
31,126.73
02.09
BRUAS
933.13
1.01
03
PISOS Y VEREDAS
03.01
CONTRAPISO DE 48 mm
m2
1,398.74
22.87
31,989.18
03.02
m2
948.20
54.63
51,800.17
03.03
m2
274.17
16.76
4,595.09
03.04
m2
3,679.21
30.93
113,797.97
03.05
m2
453.14
49.81
22,570.90
03.06
m2
625.15
50.68
31,682.60
03.07
m2
2,772.91
50.68
140,531.08
942.46
954,455.61
03.08
REVESTIMIENTO DE RAMPAS
m2
273.66
15.94
4,362.14
03.09
m2
1,458.32
243.49
355,086.34
03.10
m2
1,302.22
35.87
46,710.63
03.11
m2
91.44
48.99
4,479.65
03.12
m2
1,523.43
65.04
99,083.89
03.13
PAVIMENTO FLEXIBLE
03.13.01
m2
1,225.66
14.83
03.13.02
IMPRIMACION ASFALTICA
m2
1,255.66
0.40
502.26
03.13.03
m2
1,255.66
19.57
24,573.27
03.14
SEALIZACION
03.14.01
MARCAS EN EL PAVIMENTO
m2
43.75
13.48
589.75
03.14.02
SEALES REGULADORAS
5.00
784.83
3,924.15
43,252.07
18,176.54
4,513.90
60,481.28
04
ZOCALOS
04.01
m2
1,052.73
55.89
04.02
m2
108.60
15.14
05
CONTRAZOCALOS
05.01
1,759.73
11.61
05.02
6,421.60
14.01
06
COBERTURAS
58,837.08
1,644.20
110,397.09
20,430.47
89,966.62
1,362,171.29
06.01
COBERTURA PRINCIPAL
740,031.12
06.01.01
TIJERALES
366,791.40
u
36.00
10,188.65
36.00
713.89
25,700.04
06.01.02.02
36.00
545.29
19,630.44
06.01.02.03
36.00
451.46
16,252.56
06.01.02.04
36.00
350.81
12,629.16
06.01.02.05
1.00
2,055.98
06.01.03
ARRIOSTRE
06.01.03.01
06.01.01.01
TIJERAL TIPICO
06.01.02
ANILLO DE TIJERALES
06.01.02.01
366,791.40
76,268.18
2,055.98
47,060.28
36.00
391.09
14,079.24
Pgina
S10
Presupuesto
Presupuesto
Subpresupuesto
Cliente
Lugar
0301032 CONSTRUCCIN DEL POLIDEPORTIVO MUNICIPAL DE LA ESPERANZA DEL DISTRITO DE LA ESPERANZA - TRUJILLO - LA
LIBERTAD / I ETAPA: CONSTRUCCIN DE PISCINA OLMPICA Y COLISEO MUNICIPAL DE LA ESPERANZA
002 ARQUITECTURA
Costo al
MUNICIPALIDAD DISTRITAL DE LA ESPERANZA
31/03/2012
LA LIBERTAD - TRUJILLO - LA ESPERANZA
Metrado
Precio S/.
Parcial S/.
Item
Descripcin
Und.
06.01.03.02
36.00
338.66
12,191.76
06.01.03.03
36.00
288.74
10,394.64
06.01.03.04
36.00
288.74
06.01.04
VIGAS
10,394.64
79,779.96
06.01.04.01
36.00
1,004.40
36,158.40
06.01.04.02
36.00
601.99
21,671.64
06.01.04.03
36.00
374.48
13,481.28
06.01.04.04
36.00
146.24
5,264.64
06.01.04.05
36.00
89.00
06.01.05
TIRANTE EN CORREAS
06.01.05.01
BARRA DE 1/2"
06.01.06
MONTANTES EN TEATINA
06.01.06.01
TUBO 4"x4"x1/4"
06.01.07
06.01.07.01
TUBO 200x200x1/4"
06.01.08
COBERTURA LIVIANA
3,204.00
3,576.32
1.00
3,576.32
1.00
202.94
3,576.32
202.94
202.94
620.28
1.00
620.28
620.28
06.01.09
m2
1,669.18
53.31
88,983.99
06.01.10
m2
1,033.64
74.25
76,747.77
06.02
45,145.00
06.02.01
ARMADURA
34,431.18
06.02.01.01
06.02.02
VIGUETAS
06.02.02.01
6.00
5,738.53
34,431.18
VIG - 1
1.00
2,089.45
2,089.45
06.02.02.02
VIG - 2
1.00
648.91
648.91
06.02.03
TEMPLADORES
06.02.04
BARRA DE 1/2"
1.00
3,576.32
3,576.32
06.02.05
COBERTURA LIVIANA
06.02.06
82.52
53.31
06.03
COBERTURA AUTOPORTANTE
2,738.36
m2
4,399.14
566,913.57
06.03.01
m2
2,120.93
245.83
521,388.22
06.03.02
m2
353.54
128.77
45,525.35
06.04
m2
321.07
31.40
07
CARPINTERIA DE MADERA
10,081.60
38,472.90
07.01
08
CARPINTERIA METALICA
m2
191.77
200.62
38,472.90
08.01
PUERTA DE METAL
m2
199.66
530.15
105,849.75
08.02
539.71
46.26
24,966.98
08.03
243.81
46.26
11,278.65
08.04
m2
170.96
74.80
12,787.81
08.05
REJILLA DE 20X65cm
154.80
62.26
9,637.85
08.06
m2
0.36
73.00
26.28
08.07
7.20
30.07
216.50
08.08
ESCALERA DE MANTENIMIENTO
7.00
57.66
09
CERRAJERIA
09.01
pza
192.00
18.58
3,567.36
09.02
pza
158.00
18.58
2,935.64
09.03
pza
24.00
19.08
457.92
09.04
pza
70.00
62.34
4,363.80
09.05
pza
56.00
47.99
10
10.01
165,167.44
403.62
14,012.16
2,687.44
534,795.03
m2
341.76
372.96
127,462.81
Pgina
S10
Presupuesto
Presupuesto
Subpresupuesto
Cliente
Lugar
0301032 CONSTRUCCIN DEL POLIDEPORTIVO MUNICIPAL DE LA ESPERANZA DEL DISTRITO DE LA ESPERANZA - TRUJILLO - LA
LIBERTAD / I ETAPA: CONSTRUCCIN DE PISCINA OLMPICA Y COLISEO MUNICIPAL DE LA ESPERANZA
002 ARQUITECTURA
Costo al
MUNICIPALIDAD DISTRITAL DE LA ESPERANZA
31/03/2012
LA LIBERTAD - TRUJILLO - LA ESPERANZA
Metrado
Precio S/.
Parcial S/.
Item
Descripcin
Und.
10.02
m2
959.38
361.77
347,074.90
10.03
m2
164.43
361.77
59,485.84
10.04
p2
10.23
4.97
50.84
10.05
p2
148.28
4.86
720.64
213,969.15
11
PINTURA
11.01
m2
19,040.58
5.89
112,149.02
11.02
m2
16,411.04
4.88
80,085.88
11.03
m2
320.10
6.70
2,144.67
11.04
m2
108.60
6.70
727.62
11.05
386.75
11.90
4,602.33
11,742.45
11.06
11.06.01
m2
199.66
7.93
1,583.30
11.06.02
783.52
11.18
8,759.75
11.06.03
m2
169.01
8.28
11.07
1,399.40
2,517.18
12.90
2,517.18
12
VARIOS
12.01
m2
117.63
36.73
4,320.55
12.02
217.41
4.62
1,004.43
12.03
m2
28.88
65.65
1,895.97
12.04
m2
55.96
69.89
3,911.04
m2
142.93
51.18
7,315.16
73.75
17,798.83
19,124.86
12.05
m2
195.13
11.07.01
106,486.52
12.06
m2
241.34
12.07
m2
137.49
139.10
12.08
1.00
156.74
156.74
12.09
ESPEJOS EN BAOS
m2
53.93
37.15
2,003.50
12.10
SEMBRADO DE GRASS
m2
3,137.85
14.73
46,220.53
12.11
PLANTACION DE PALMERAS
8.00
47.31
378.48
12.12
PLANTACION DE ARBOLES
16.00
29.87
12.13
12.13.01
SEALES DE PROHIBICIN
17.00
5.45
92.65
12.13.02
SEALES DE OBLIGACIN
8.00
5.41
43.28
12.13.03
SEALES DE ADVERTENCIA
5.00
5.24
26.20
12.13.04
SEALES DE EMERGENCIA
278.00
5.45
1,515.10
12.13.05
37.00
5.44
COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDAD (5%)
==============================
SUB TOTAL
IGV (18%)
==============================
201.28
4,187,509.77
418,750.98
209,375.49
=====================
4,815,636.24
866,814.52
====================
5,682,450.76
TOTAL
SON :
477.92
1,878.51
CINCO MILLONES SEISCIENTOS OCHENTIDOS MIL CUATROCIENTOS CINCUENTA Y 76/100 NUEVOS SOLES