PORTIONS OF A BRIDGE
1.
FOUNDATION
2.
SUBSTRUCTURE
3.
BEARINGS
4.
SUPERSTRUCTURE
5.
PROTECTIVE
WORKS
SUPER
STRUCTURE
BEARINGS
SUB STRUCTURE
Bed
Level
FOUNDATION
IR-RASTA
COMPONENTS OF A BRIDGE
Parapet
Kerb
Foot path
Drainage spout
Expansion Joint
Wearing coat
Decking structure
Bearings
Bearing seat
Pier
Abutment
Returns
Well cap/Pile cap
Foundations
Protective Works
IR-RASTA
COMPONENTS OF A BRIDGE
(contd)
Foundation
Open
Well
Pile
Protective Works
Bank Protection
Embankment
Floor Protection
Guide Bunds
*****
IR-RASTA
MAINTANANCE
IS DEFINED AS THE WORK NEEDED TO PRESERVE THE
INTENDED LOAD CARRYING CAPACITY OF THE BRIDGE AND
ENSURE THE CONTINUED SAFETY OF THE ROAD USERS.
REHABILITATION
REHABILITATION OPERATIONS AIM AT RESTORING THE
BRIDGE TO THE SERVICE LEVEL IT ONCE HAD AND HAS
NOW LOST OR WHICH WAS NOT ACHIEVED DUE TO
DEFICIENCES IN ORIGINAL DESIGN OR CONSTRUCTION.
RETROFITTING
STRENGTHENING, WIDENING, RAISING ETC., AIMING AT
IMPROVING THE LEVEL OF SERVIE BY
a. LOAD CARRYING CAPAICTY
b. WIDTH OF CARRIAGE WAY
IR-RASTA
MAINTENANCE
BRIDGES FORM VITAL LINK IN ANY
ROAD NETWORK. BRIDGES HAVE TO
BE MAINTAINED TO KEEP IT IN TRAFFIC
WORTHY CONDITION TO ENABLE
UNINTERRUPTED FLOW OF TRAFFIC
SYSTEMATIC MAINTENANCE IS
ESSENTIAL TO ENSURE LONG TERM
DURABILITY OF BRIDGES
IR-RASTA
OBJECTIVE OF MAINTENANCE
TO KEEP BRIDGES IN SOUND
STRUCTURAL CONDITION AND SAFE
FOR TRAFFIC
WATER MUST FLOW FREELY AT ALL
FLOOD LEVELS WITHOUT DAMAGING
THE BRIDGE OR WATER WAY
IR-RASTA
MAINTENANCE CONSISTS OF
1. ROUTINE MAINTENANCE ACTIVITIES
2. PERIODIC MAINTENANCE ACTIVITIES
IR-RASTA
ROUTINE ACTIVITIES
CLEANING / CLEARING
MINOR REPAIRS LIKE
POINTING OF MASONRY
PAINTING
REPAIR TO PARAPET
REPLACE DAMAGED FOOTPATH SLABS
CLEARING DRAINAGE SPOUTS
CLEARING EXPANSION JOINTS
IR-RASTA
PERIODIC ACTIVITIES
RETAINING WALL
BED PROTECTION
RESETTING OF APRONS/PITCHING
REPLACING BEARINGS
REPLACING EXPANSION JOINTS
IR-RASTA
DEFECTS
DEFECTS SHOULD BE DETECTED EARLY.
NEGLECTING CAUSES DAMAGE AND IF
UNATTENDED MAY LEAD TO COLLAPSE
OF STRUCTURE OR VERY EXPENSIVE
REPAIRS
DEFECTS ARE AGAIN CLASSIFIED
1. MINOR DEFECTS
2. MAJOR DEFECTS
IR-RASTA
MINOR DEFECTS
1. NON-STRUCTURAL
ACCUMULATION OF DIRT AND SOIL ON DECK
BLOCKING OF DRAINAGE SPOUT
STONE,SOIL,DIRT IN EXPANSION JOINTS
DIRT AROUND BEARINGS
VEGETATION
CRACKING OR MOVEMENT OF APPROACH SLAB
SOIL IN WEEPHOLES
FLOOD DEBRIS UNDER BRIDGE
DEFECTS IN CONCRETE POST AND HANDRAIL
SCOUR AT FOOTING, SLOPE FAILURE
MAIN CAUSE
POOR ROUTINE MAINTENANCE
IR-RASTA
DEVELOPMENT IF NEGLECTED
SLIPPERY ROAD SURFACE WHEN WET ACCIDENTS
PONDING OF WATER ATTACKING THE STRUCTURE BY
PENETRATION
DECK PREVENTED FROM DESIRED EXPANSION
CONTRACTION
BUILDING OF PORE PRESSURE BEHIND ABUTMENTS
-SETTLEMENT OF FILL
FIRE HAZARD IN DRY SEASON
EROSION OF RIVER BED
REMEDIES
CLEANING / CLEARING
IR-RASTA
IR-RASTA
DEVELOPMENT IF NEGLECTED
LOSS OF SENSE OF SAFETY
ACCIDENT
FURTHER DAMAGE BY CORROSION
UNCOMFORTABLE RIDE
DAMAGE TO TYRES
LOCAL SETTLEMENT OF MASONRY
SETTLEMENT OF APPROACHES
REMEDIES
REPLACE MISSING FOOT PATH SLAB AND PARAPET
PAINTING
POINTING MASONRY
REPAIR LOOSE OR MISSING CONNECTORS
IR-RASTA
MAJOR DEFECTS
IR-RASTA
REMEDIES
REHABILITATION / RECONSTRUCTION
IR-RASTA
IR-RASTA
IR-RASTA
IR-RASTA
SETTLEMENT OF FOUNDATION
IR-RASTA
SETTLEMENT OF FOUNDATION
IR-RASTA
SETTLEMENT OF FOUNDATION
IR-RASTA
SETTLEMENT OF FOUNDATION
IR-RASTA
SETTLEMENT OF FOUNDATION
(AFTER RESTORATION)
IR-RASTA
IR-RASTA
IR-RASTA
IR-RASTA
IR-RASTA
IR-RASTA
IR-RASTA
IR-RASTA
VEGETATION GROWTH
IR-RASTA
VEGETATION GROWTH
IR-RASTA
VEGETATION GROWTH
IR-RASTA
VEGETATION GROWTH
IR-RASTA
DISPLACEMENT OF GIRDER
IR-RASTA
IR-RASTA
CORROSION OF REINFORCEMENT
IR-RASTA
DAMAGED PARAPET
IR-RASTA
DAMAGED PARAPET
IR-RASTA
DAMAGED PARAPET
IR-RASTA
IR-RASTA
IR-RASTA
IR-RASTA
IR-RASTA
IR-RASTA
IR-RASTA
LAPPING OF REINFORCEMENT IN
MID SPAN
IR-RASTA
IR-RASTA
IR-RASTA
IR-RASTA
IR-RASTA
IR-RASTA
SETTLEMENT OF APPROACHES
IR-RASTA
IR-RASTA
IR-RASTA
IR-RASTA
IR-RASTA
IR-RASTA
INSPECTION
INDIA HAS THE SECOND LARGEST NETWORK OF ROADS
IN THE WORLD NEXT ONLY TO THE UNITED STATES OF
AMERICA
BRIDGES FORM THE VITAL LINKS OF THE NETWORK
SIGNIFICANT PROPORTION OF NATIONAL RESOURCES IS
SPENT ON ROADS AND BRIDGES
DURABILITY OF INVESTMENT OF SUCH MAGNITUDE AND
IMPORTANCE IS OF PRIME CONCERN TO ALL ENGINEERS
AND PLANNERS
THEREFORE IT IS NECESSARY THAT PERIODIC
INSPECTIONS ARE CARRIED OUT BY RESPONSIBLE
OFFICERS SO THAT TIMELY STEPS ARE TAKEN
IR-RASTA
IR-RASTA
INSPECTION (contd)
ORIGINAL BRIDGE REPORT TO BE MAINTAINED FOR ALL
BRIDGES ON THE BASIS OF COMPLETED DRAWINGS
FOR OLD BRIDGES BASED ON THE INSPECTION OF
RESPONSIBLE OFFICER REPORT TO BE COMPILED
FOR MAJOR BRIDGES ENGINEERS ASSOCIATED WITH
CONSTRUCTION OF PROJECT SHOULD ALSO PREPARE
MAINTENANCE MANUAL INDICATING CRITICAL POINTS
NEEDING SPECIAL ATTENTION FOR GUIDANCE OF
SUBSEQUENT ENGINEERS WHO WILL BE INCHARGE OF
MAINTENANCE
IR-RASTA
TYPES OF INSPECTION
THE TYPES OF INSPECTION ARE
1. ROUTINE INSPECTION
2. PRINCIPAL INSPECTION
3. SPECIAL INSPECTION
IR-RASTA
IR-RASTA
PRINCIPAL INSPECTION
THIS IS MORE INTENSIVE AND DETAILED
CLOSE VISUAL INSPECTION OF ALL COMPONENTS OF
BRIDGE
SUPPLEMENTED BY STANDARD INSTRUMENTATION AID
INCLUDES UNDER WATER INSPECTION
FREQUENCY
FIRST PRINCIPAL INSPECTION TO BE CONDUCTED BEFORE THE
EXPIRY OF DEFECT LIABILITY PERIOD BUT NOT LATER THAN
6 MONTHS AFTER COMPLETION
THEREAFTER NOT MORE THAN 3 YEARS
SHALL BE CARRIED OUT BY SENIOR LEVEL ENGINEER
IR-RASTA
SPECIAL INSPECTION
UNDERTAKEN IN THE EVENT OF UNUSUAL
OCCURANCES SUCH AS
STRONG EARTHQUAKE
ACCIDENTS
PASSAGE OF UNUSUAL FLOODS OR UNUSUAL LOADS
HEAVY IMPACT OF FLOATING BARGES OR FLOOD
DEBRIS
MAJOR WEAKNESS NOTICED DURING ROUTINE OR
PRINCIPAL INSPECTION
SUCH INSPECTIONS REQUIRE GOOD DEAL OF
SUPPLEMENTARY TESTING AND STRUCTURAL
ANALYSIS
GENERALLY CARRIED OUT BY EXPERTS IN THE FIELD
AND SENIOR LEVEL ENGINEERS
INSPECTING OFFICERS
LENGTH OF BRIDGE
STATUS OF OFFICER
UPTO 30 m
30 m to 60 m
JUNIOR ENGINEER
ASST. ENGINEER/ASST. EX
ENGINEER
EXECUTIVE ENGINEER
60 m to 200 m
ABOVE 200 m AND ALL
PRESTRESSED CONCRETE,
CONTINUOUS BRIDGES,
SUSPENSION BRIDGES, CABLE
STAYED BRIDGES AND SPECIAL
STRUCTURES
SUPERINTENDING ENGINEER IN
ALL CASES AND IN ADDITION
CHIEF ENGINEER FOR BRIDGES
ABOVE 500 m IN LENGTH
IR-RASTA
INSPECTION PROCEDURE
ACTIVITIES SCHEDULED SHOUD BE PROPERLY PLANNED IN DETAIL
INCLUDING SEQUENCE OF INSPECTION
SHOULD CAUSE MINIMUM INCONVENIENCE TO TRAFFIC
IR-RASTA
SUSPENDED LADDER
CATWALK
SCAFFOLDING PLANKING
PLATFORM
MOBILE ACCESS
SKY LADDER
INSPECTION GANTRY
BARGES
MOBILE INSPECTION UNIT
IR-RASTA
SKY LADDER
IR-RASTA
IR-RASTA
INSPECTION BARGE
IR-RASTA
IR-RASTA
IR-RASTA
IR-RASTA
IR-RASTA
IR-RASTA
IR-RASTA
INSPECTION GANTRY
IR-RASTA
IR-RASTA
REHABILITATION
BRIDGE STRUCTURES DURING THEIR SERVICE LIFE MUST
HAVE A SPECIFIED LEVEL OF SAFETY AND SERVICE ABILITY
UNDER DESIGN LOADS AND ANTICIPATED CONDITIONS OF
USE
BRIDGES, HOWEVER, GENERALLY DETERIORATE WITH
PASSAGE OF TIME DUE TO
AGING AND WEATHERING
INADEQUATE MAINTENANCE
INADEQUACIES IN DESIGN AND DETAILING
MISHAPS AND ACCIDENTS
CHANGE OF HYDRAULIC AND LIVE LOAD PARAMETERS
DURING SERVICE
DAMAGES DUE TO EXTERNAL CAUSES LIKE FLOOD, FIRE,
EARTHQUAKE AND FOUNDATION SETTLEMENT
REHABILITATION AIMS AT RESTORING THE
BRIDGE TO THE SERVICE LEVEL IT ONCE
HAD AND HAS NOW LOST
IR-RASTA
TYPES OF BRIDGES
IR-RASTA
ARCH BRIDGES
CHANGE IN PROFILE OF ARCH
LOOSENESS OF MORTAR
MOVEMENT OF ABUTMENT/PIER
LONGITUDINAL CRACKS
LATERAL AND DIAGONAL CRACKS
CRACKS BETWEEN ARCH RING SPANDREL OR PARAPET WALL
VERTICAL CRACK IN THE RETRUN WALL
BULGING OF WALL
R.C.C BRIDGES
CRACKING
SCALING
DELAMINATION
SPALLING
LEACHING
STAINS
HOLLOW OR DEAD SOUND
DEFORMATIONS
HOLE IN DECK SLAB
PRESTRESSED CONCRETE BRIDGES
CRACKING
LEACHING
STAINS
SPALLING
DEFORMATION
ABNORMAL VIBRATION
IR-RASTA
IR-RASTA
IR-RASTA
EVOLUTION OF REHABILITATION
TECHNIQUES
IR-RASTA
IR-RASTA
1.
2.
DIMENSIONAL MEASUREMENT
OF ALL ELEMENTS OF BRIDGE
STRUCTURE
PURPOSE
TO OBTAIN ACCURATE
MEASUREMENTS OF ALL
COMPONENTS AND TO PREPARE
DRAWING REQUIRED FOR ARRIVING
AT METHODS OF RESTORATION
TO ASSESS THE STRENGTH OF
INSITU CONCRETE AND FOR
VERIFICATION OF RESULTS OF
OTHER METHODS OF NON
DESTRUCTIONVE TESTING
IR-RASTA
STUDY
PURPOSE
3.
4.
IR-RASTA
STUDY
PURPOSE
5.
6.
7.
ENDOSCOPIC STUDY
MEASURED IN TERMS OF
MILLIVOLTS WITH REFERENCE TOA
REFERENCE ELECTRODE. TO
DETERMING THE RATE OF
CORROSION OF REINFORCEMENT
WORKS ON THE PRICIPLE OF
LIGHT SOURCE THROUGH OPTIC
FIBRES. TO STUDY CAVITY,
PITTING OF EMBEDDED
REINFORCEMENT GROUTING
QUALITY OF H.T.CABLES
IR-RASTA
STUDY
PURPOSE
8.
CARBONATION TEST
9.
CHLORIDE DETERMINATION
TEST
IR-RASTA
STUDY
11.
LEVEL OF pH IN CONCRETE
PURPOSE
LEVEL OF pH IN FRESH
CONCRETE IS GENERALLY 12 TO
14. IF THE pH VALUE OF
HARDENED CONCRETE REDUCES
IT INDICATES THAT CONCRETE IS
CARBONATED WHEN pH VALUE
FALLS BELOW 10 ALKALANITY WILL
NOT BE ADEQUATE TO PROTECT
AGAINST CORROSION
IR-RASTA
IR-RASTA
IR-RASTA
IR-RASTA
IR-RASTA
IR-RASTA
IR-RASTA
PROFOMETER TEST
IR-RASTA
PROFOMETER TEST
IR-RASTA
ULTRASONIC TESTS
IR-RASTA
IR-RASTA
IR-RASTA
ENDOSCOPE TEST
IR-RASTA
IR-RASTA
REPAIRS TO FOUNDATIONS
FOUNDATION REPAIRS HAVE TO BE TREATED ON CASE TO CASE
BASIS. EACH CASE HAS TO BE ANALYSED INDIVIDUALLY AND MAY
REQUIRE SPECIAL INVESTIGATIONS
SOME EXAMPLES
SCOUR AND EROSION PROTECTION REPAIR OF PROTECTIVE WORKS
REPAIR OF FOUNDATION BUILT ON SOFT GROUND SUBJECT TO
EROSION
STRENGTHENING OF FOUNDATIONS
EXTENDING EXISTING FOUNDATIONS
REPAIR OF UNDER WATER STRUCTURES
REPAIR OF SERRATIONS ON THE SURFACE CAUSED BY HIGH VELOCITY
OF PARTICLES IN THE WATER
IR-RASTA
IR-RASTA
IR-RASTA
RESTORATION MATERIALS
Several restoration materials have been developed
in the recent past,which ensure safe and durable
restorations. A few of them are Modified Mortars.
Epoxy Mortars.
Cementitious/Epoxy Grouts.
Membrane/Protective Coatings.
Glass Fiber / Carbon Fiber wrappings
Free Flow Micro Concrete.
(Super Fluid Micro Concrete)
Free Flow Micro Concrete is an ideal material for
encasement / Substitution systems
*****
IR-RASTA
Repair materials
Application / purpose
Speciality chemicals
Corrosion protection
Bonding aids
Cement based
Prepacked mortars
Shrinkage compensating
microconcrete
Injection grouts for sealing
cracks, pores
Underwater repairs
Sealing compounds
Instant plugging mortar
IR-RASTA
Repair materials
Application / purpose
Speciality chemicals
Putties
Anchoring grouts
Underwater putty
Epoxy based
Epoxy based
Mortars / concretes
Anticarbonation coatings
Electrochemical range of products like sacrificial zinc anodes, Life jackets, Electrochemical chloride
extraction and Realkalisation etc.
Strengthening of structures
Special concretes
IR-RASTA
IR-RASTA
Repair Techniques
Sl.No.
Repair
Technique
Injection grouting
Guniting / shotcreting
Jacketing
Distress addressed
Materials used
Stitching
External prestressing
Microconcrete
encasement
Strengthening weakened
members. Reduce deflection
IR-RASTA
Repair Techniques
8
Underwater repairs
9.
Patch repairs
10.
Strengthening of distress /
weakened concrete members,
seismic retrofitting
11.
E-chem repairs
12.
General grouting
IR-RASTA
STRENGTHENING OF CONCRETE
STRUCTURES
DESIGN ASPECTS
SHOULD BE DESIGNED AND CONSTRUCTED AS PER APPROPRIATE
CODES
TYPICAL PROBLEMS WILL BE
TRANSFER OF SHEAR FORCES BETWEEN OLD AND NEW CONCRETE
POST TENSIONING OF EXISTING STRUCTURE WHICH IS SLIGHTLY
DIFFERENT FROM POST TENSIONING OF NEW STRUCTURE
IR-RASTA
STRENGTHENING OF REINFORCEMENT
STRENGTHENING OF REINFORCEMENT SUBJECT
TO TENSILE FORCE CAN BE ACHIEVED BY
REPLACING REINFORCEMENT SEVERELY
DAMAGED BY CORROSION
ADDITIONAL REINFORCEMENT
PLACED IN THE OLD CROSS SECTION
PLACED IN AN ADDITIONAL CONCRETE LAYER
IR-RASTA
STRENGTHENING TO INCREASE
LOAD CARRYING CAPACITY
IR-RASTA
IR-RASTA
IR-RASTA
IR-RASTA
IR-RASTA
IR-RASTA
STRENGTHENING WITH
SUPPLEMENTARY PRESTRESSING
IR-RASTA
IR-RASTA
ANCHORAGE OF SUPPLEMENTARY
PRESTRESSING ELEMENTS WITH
ADDITIONAL SUPPORTS
IR-RASTA
ANCHORAGE OF SUPPLEMENTARY
PRESTRESSING ELEMENTS AT THE END
OF THE GIRDER
IR-RASTA
IR-RASTA
PROFILE OF EXTERNAL
PRESTRESSED CABLE
IR-RASTA
IR-RASTA
IR-RASTA
MONITORING
IT IS ESSENTIAL TO KEEP THE REHABILITATED STRUCTURE UNDER
OBSERVATION AND ITS CONDITION MONITORED REGULARLY ON A
SPECIFIED FORM AND INSPECTIONS ARE CARRIED OUT
ACCORDING TO A CALENDER
MONITORING ALSO INVOLVES CARRYING OUT CERTAIN
LABORATORY AND FIELD TESTS AS WELL AS CONDITION SURVEYS
AND MEASUREMENTS TO DETECT EVEN SMALL STRAINS,
MOVEMENTS, CHANGES IN REACTION AND DEFORMATIONS
FREQUENT PRINCIPAL INSPECTIONS SHOULD BE CARRIED OUT
SPECIAL ATTENTION SHOULD BE GIVEN TO CORROSION
MONITORING
AFTER COMPLETION OF EACH JOB OF REHABILITATION, ENGINEER
MUST PREPARE A DOCUMENT TO ENABLE DRAWING LESSONS FOR
THE FUTURE AND TO IMPROVE BRIDGE TECNOLOGY
IR-RASTA
IR-RASTA
BRIDGE MAINTENANCE(CONTD.)
IR-RASTA
BRIDGE MAINTENANCE(CONTD.)
WHEN PROBLEMS ARISE, ENGINEERS WITH KNOWLEDGE
AND EXPERIENCE WILL BE ABLE TO ACCURATELY
ANALYSE THE STRUCTURAL CONDITION AND
FORMULATE CORRECTIVE STRATEGIES
TECHNOLOGY WILL GREATLY ENHANCE THEIR ABILITY
TO MAKE THESE ASSESSMENTS
IR-RASTA
IR-RASTA
FUTURE APPROACH
APPROACH TO BRIDGE MAINTENANCE IS INCREASINGLY
INFLUENCED BY BRIDGE MANAGEMENT SYSTEMS. FUTURE
STRATEGY INCLUDES LIFE-CYCLE COST ANALYSIS AND
INCORPORATION OF USER COST INTO MAINTENANCE DECISIONS
BRIDGE MAINTENANCE ENGINEERS WILL USE AN ARRAY OF
INCRESINGLY SOPHISTICATED INSTRUMENTS PROCEDURES AND
SYSTEMS TO EVALUATE, REPAIR AND REHABILITATE
STURCTURES
RESEARCH IN MATERIALS WILL CONTINUE WITH EMPHASIS ON
PRODUCTS SUCH AS NON CORRODING REINFORCEMENTS,
IMPERMEABLE CONCRETE SUPERIOR COATINGS THAT WILL
DRASTICALLY BRING DOWN MAINTENANCE REQUIREMENTS
WHEN USED IN NEW CONSTRUCTION
FRIENDSHIP
MAINTAIN IT
THANK YOU