CALENDARIO DE ADQUISICION

PROYECTO:

MEJORAMIENTO DEL JR. ALFREDO D. (DESDE AV. PASEO DE LA REPUB


ALFREDO DIAZ V. HASTA JR. 7 DE JUNIO), PSJE. JULIA E. (DESDE JR

DESCRIPCION
OPERARIO
OFICIAL
PEON
CAPACITADOR
TOPOGRAFO
TRANSPORTE DE MATERIALES, EQUIPOS Y HERRAMIENTAS
ALAMBRE NEGRO RECOCIDO N 8
ALAMBRE NEGRO RECOCIDO N 16
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60
CLAVOS PARA MADERA CON CABEZA DE 3"
ARENA
HORMIGON (PUESTO EN OBRA)
MATERIAL DE RELLENO
TIERRA ROJA
TIERRA ROJA PARA LIGANTE
MALLA DE SEALIZACION C/NARANJA
CEMENTO PORTLAND TIPO I (42.5 kg)
YESO BOLSA 20 kg
TUBO DE CONCRETO REFORZADO D=20" x 1.20 M
TUBO DE CONCRETO REFORZADO D=36" x 1.20 M
PEGAMENTO PARA PVC
ADITIVO DE CURADO DE CONCRETO MEMBRANIL
MADERA NACIONAL P/ENCOFRADO-CARP 2"X2"X12'
MADERA NACIONAL P/ENCOFRADO-CARP 1"X8"X12'
OFICINA, ALMACEN Y SS.HH.
MADERA UTUCURO DE 2" X 2" X 12"
ESTACAS DE MADERA UTUCURO DE 2"X2"
PINTURA ESMALTE
CINTA MASKINGTAPE DE 2"
TUBO PVC SAP S-25 16" LONG. 6.00 MTS
CASCO DE SEGURIDAD
GUANTES DE CUERO CROMADO
CHALECO REFLECTIVO
BOTAS DE JEBE
SOGA DE NYLON 3/4"
WINCHA.
BOTIQUIN DE PRIMEROS AUXILIOS
CONO DE SEALIZACION NARANJA DE 28" DE ALTURA

UND.
hh
hh
hh
hh
hh
hh
hh
kg
kg
kg
und
kg
GLB
m3
ml
ml
ml
gln
BOL
p2
GLB
p2
gln
gln
gln
gln
pln
ml
ml
sac
sac
sac
kg
kg
kg
kg
GLB
und

PRECIO
S/.
19.18
15.90
14.30
250.00
19.18
944.82
4.50
4.50
2.93
4.00
50.00
80.00
15.14
17.00
20.00
60.00
24.00
15.00
235.00
430.00
62.50
15.50
1.50
1.50
300.00
2.60
2.80
35.00
3.00
790.00
8.00
11.00
8.00
18.00
0.10
5.00
150.00
15.00

CALENDARIO DE ADQUISICION
PROYECTO:

MEJORAMIENTO DEL JR. ALFREDO D. (DESDE AV. PASEO DE LA REPUB


ALFREDO DIAZ V. HASTA JR. 7 DE JUNIO), PSJE. JULIA E. (DESDE JR

DESCRIPCION
CINTA DE SEGURIDAD
CALAMINA LISA GALVANIZADA
LAPICEROS
PLUMONES GRUESOS FABER CASTELL N 47
AGUA
PAPEL BOND A4 80 GRAMOS.
CARTEL DE OBRA TIPO BANNER (1.80 x 2.70) INC. ENTRAMADO Y COLOCADO
PAPEL SABANA
FOTOCOPIAS
TEODOLITO
MIRA TOPOGRAFICA
JALONES
EQUIPO TOPOGRAFICO
HERRAMIENTAS MANUALES
MOCHILA PULVERIZADORA
RODILLO LISO VIBR AUTOP 101-135HP 10-12T
COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP
CARGADOR FRONTAL CAT-966
RETROEXCAVADORA SOBRE ORUGAS 115 - 165 HP
TRACTOR DE ORUGAS DE 140-160 HP
MOTONIVELADORA 130 - 135 HP
CAMION VOLQUETE DE 15 m3
CAMION CISTERNA 4X2 (AGUA) 1500 GAL.
VIBRADOR DE CONCRETO 4 HP 1.25"
MEZCLADORA DE CONCRETO 9 - 11 P3
TOTALES
GASTOS GENERALES 10.00%
UTILIDADES 10.00%
PRESUPUESTO VALOR REFERENCIAL (SIN IGV)
FACTOR DE RELACIN (10%)
PRESUPUESTO CONTRATADO (SIN IGV)
AVANCE MENSUAL
AVANCE MENSUAL ACUMULADO

UND.
mll
und
und
est
und
%MO
hm
hm
hm
hm
hm
hm
hm

PRECIO
S/.
56.50
17.00
1.00
3.00
5.00
34.00
350.00
0.50
0.10
20.00
7.50
2.00
10.00

hm
hm
hm
hm
hm
hm
hm
hm
HE
hm
hm
GLB

5.00
160.00
20.00
220.00
250.00
220.00
220.00
150.00
110.00
15.00
25.00

QUISICION DE MATERIALES

DE LA REPUB. HASTA JR. PASTOR L. A.), PSJE. CORAZON DE YARINA (DESDE JR.
E. (DESDE JR. 7 DE JUNIO HASTA JR. UCAYA) A.H. CORAYARINA

PLAZO:

60 DAS CALENDARIO

MONTO REFERENCIAL SIN IGV: ###


MONTO CONTRATADO SIN IGV: ###
FECHA:
ABRIL 2016

PRESUPUESTO
CANT.

430.11
144.55
930.17
2.00
13.16
1.00
35.51
58.53
1,024.21
35.52
10.34
515.74
3.90
588.16
5.26
2.00
246.82
13.22
18.67
14.35
0.29
7.60
414.30
177.56
2.00
4.00
22.80
1.19
1.67
4.03
15.00
15.00
15.00
15.00
591.60
59.16
1.00
12.00

PRESUP. (S/.)

8,249.48
2,298.34
13,301.40
500.00
252.39
944.82
159.79
263.38
3,000.94
142.09
516.75
41,259.30
59.05
9,998.70
105.14
120.00
5,923.78
198.24
4,386.51
6,170.24
18.28
117.86
621.44
266.33
600.00
10.40
63.84
41.56
5.01
3,187.18
120.00
165.00
120.00
270.00
59.16
295.80
150.00
180.00

MES 01
CANT.

MES 02
PARCIAL

257.90
88.88
549.50
2.00
6.25
1.00
22.29
41.30
722.83
22.29
8.09
240.55
0.00
468.97
3.63
2.00
178.46
8.00
14.00
14.35
0.22
5.12
259.91
111.39
2.00
0.00
13.02
0.39
1.67
3.06
15.00
15.00
15.00
15.00
258.00
25.80
1.00
12.00

4,946.54
1,413.14
7,857.79
500.00
119.96
944.82
100.29
185.86
2,117.90
89.15
404.30
19,244.04
0.00
7,972.48
72.70
120.00
4,283.00
119.93
3,289.30
6,170.24
13.86
79.40
389.86
167.09
600.00
0.00
36.46
13.62
5.01
2,420.04
120.00
165.00
120.00
270.00
25.80
129.00
150.00
180.00

CANT.

172.21
55.67
380.67
0.00
6.90
0.00
13.22
17.23
301.38
13.23
2.25
275.19
3.90
119.19
1.62
0.00
68.37
5.22
4.67
0.00
0.07
2.48
154.39
66.16
0.00
4.00
9.78
0.80
0.00
0.97
0.00
0.00
0.00
0.00
333.60
33.36
0.00
0.00

PARCIAL

3,302.94
885.20
5,443.60
0.00
132.43
0.00
59.50
77.51
883.04
52.93
112.45
22,015.25
59.05
2,026.23
32.44
0.00
1,640.77
78.31
1,097.21
0.00
4.41
38.46
231.58
99.24
0.00
10.40
27.38
27.94
0.00
767.14
0.00
0.00
0.00
0.00
33.36
166.80
0.00
0.00

QUISICION DE MATERIALES

DE LA REPUB. HASTA JR. PASTOR L. A.), PSJE. CORAZON DE YARINA (DESDE JR.
E. (DESDE JR. 7 DE JUNIO HASTA JR. UCAYA) A.H. CORAYARINA

PLAZO:

60 DAS CALENDARIO

MONTO REFERENCIAL SIN IGV: ###


MONTO CONTRATADO SIN IGV: ###
FECHA:
ABRIL 2016

PRESUPUESTO
CANT.

2.00
3.00
15.00
5.00
104.63
0.25
1.00
58.00
350.00
11.83
11.83
11.83
1.33
1.17
27.32
116.74
31.75
2.40
2.40
67.77
23.63
13.51
12.10
15.00

PRESUP. (S/.)

113.00
51.00
15.00
15.00
523.17
8.50
350.00
29.00
35.00
236.64
88.74
23.66
13.27
720.51
5.85
4,370.94
2,334.73
6,985.86
600.00
528.00
14,909.53
3,544.65
1,486.25
181.51
374.97
S/.141,686.97
S/.14,168.70
S/.14,168.70
S/.170,024.37
S/.17,002.44
S/.187,026.81
100.00%
100.00%

MES 01
CANT.

MES 02
PARCIAL

2.00
0.00
15.00
5.00
47.47
0.25
1.00
58.00
350.00
5.20
5.20
5.20
1.14
0.84
14.29
74.44
20.84
2.40
2.40
33.52
12.37
7.04
8.76
11.39
S/.86,157.11
S/.8,615.71
S/.8,615.71
S/.103,388.53
S/.10,338.85
S/.113,727.38
60.81%
60.81%

113.00
0.00
15.00
15.00
237.34
8.50
350.00
29.00
35.00
103.93
38.97
10.39
11.38
440.23
4.18
2,287.12
1,488.81
4,583.90
600.00
528.00
7,374.61
1,856.15
773.91
131.36
284.74

CANT.

PARCIAL

0.00
3.00
0.00
0.00
57.17
0.00
0.00
0.00
0.00
6.64
6.64
6.64
0.19
0.33
13.02
42.30
10.92
0.00
0.00
34.25
11.26
6.48
3.34
3.61

0.00
51.00
0.00
0.00
285.83
0.00
0.00
0.00
0.00
132.71
49.77
13.27
1.90
280.28
1.67
2,083.82
845.92
2,401.96
0.00
0.00
7,534.92
1,688.50
712.35
50.15
90.23

S/.55,529.86
S/.5,552.99
S/.5,552.99
S/.66,635.84
S/.6,663.59
S/.73,299.43
39.19%
100.00%

CALENDARIO DE UTILIZACIN DE EQUIPO


PROYECTO:

MEJORAMIENTO DEL JR. ALFREDO D. (DESDE AV. PASEO DE LA REPUB. HASTA JR. PASTOR L. A.), PS
ALFREDO DIAZ V. HASTA JR. 7 DE JUNIO), PSJE. JULIA E. (DESDE JR. 7 DE JUNIO HASTA JR. UCAYA

DESCRIPCION

UND.

PRECIO
S/.

PRESUPUESTO
CANT.

PRESUP. (S/.)

EQUIPOS
TEODOLITO
MIRA TOPOGRAFICA
JALONES
EQUIPO TOPOGRAFICO
HERRAMIENTAS MANUALES
MOCHILA PULVERIZADORA
RODILLO LISO VIBR AUTOP 101-135HP 10-12T
COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP
CARGADOR FRONTAL CAT-966
RETROEXCAVADORA SOBRE ORUGAS 115 - 165 HP
TRACTOR DE ORUGAS DE 140-160 HP
MOTONIVELADORA 130 - 135 HP
CAMION VOLQUETE DE 15 m3
CAMION CISTERNA 4X2 (AGUA) 1500 GAL.
VIBRADOR DE CONCRETO 4 HP 1.25"
MEZCLADORA DE CONCRETO 9 - 11 P3
TOTALES

hm
hm
hm
hm

20.00
7.50
2.00
10.00

hm
hm
hm
hm
hm
hm
hm
hm
HE
hm
hm
GLB

5.00
160.00
20.00
220.00
250.00
220.00
220.00
150.00
110.00
15.00
25.00

11.83
11.83
11.83
1.33
1.17
27.32
116.74
31.75
2.40
2.40
67.77
23.63
13.51
12.10
15.00

236.64
88.74
23.66
13.27
720.51
5.85
4,370.94
2,334.73
6,985.86
600.00
528.00
14,909.53
3,544.65
1,486.25
181.51
374.97
S/.36,405.12

GASTOS GENERALES 10.00%


UTILIDADES 10.00%
PRESUPUESTO VALOR REFERENCIAL (SIN IGV)
PRESUPUESTO CONTRATADO CON FACTOR DE RELACIN (10%) (SIN IGV)
AVANCE MENSUAL
AVANCE MENSUAL ACUMULADO

S/.3,640.51
S/.3,640.51
S/.43,686.14
S/.48,054.75
100.00%
100.00%

DE UTILIZACIN DE EQUIPO

ASEO DE LA REPUB. HASTA JR. PASTOR L. A.), PSJE. CORAZON DE YARINA (DESDE JR.
ULIA E. (DESDE JR. 7 DE JUNIO HASTA JR. UCAYA) A.H. CORAYARINA

PLAZO:

60 DAS CALENDARIO

MONTO REFERENCIAL SIN IGV: S/.170,024.37


MONTO CONTRATADO SIN IGV: S/.187,026.81
FECHA:
ABRIL 2016

MES 01
CANT.

MES 02
PARCIAL

5.20
5.20
5.20
1.14
0.84
14.29
74.44
20.84
2.40
2.40
33.52
12.37
7.04
8.76
11.39
S/.20,517.67

103.93
38.97
10.39
11.38
440.23
4.18
2,287.12
1,488.81
4,583.90
600.00
528.00
7,374.61
1,856.15
773.91
131.36
284.74

CANT.

PARCIAL

6.64
6.64
6.64
0.19
0.33
13.02
42.30
10.92
0.00
0.00
34.25
11.26
6.48
3.34
3.61
S/.15,887.45

132.71
49.77
13.27
1.90
280.28
1.67
2,083.82
845.92
2,401.96
0.00
0.00
7,534.92
1,688.50
712.35
50.15
90.23

S/.2,051.77
S/.2,051.77
S/.24,621.21
S/.27,083.33
56.36%
56.36%

S/.1,588.75
S/.1,588.75
S/.19,064.95
S/.20,971.45
43.64%
100.00%