Anda di halaman 1dari 10

1.

Project
Year
System
Supply

:
:
:
:

Pembangunan Line Conveyor Dermaga VI di Area TUKS PT Krakatau Steel


2013-2014
PLC & AC Drive
Engineering, Installation, & Commissioning of PLC & Drive

2.

Project
Year
System
Supply

:
:
:
:

GLNG PLANT (Prefabricated Power House and Electrical Equipment)


2012-2013
LV & MV Switchgear
- Cable schedule & Asbuilt drawing
-

Precommissioning & Commissioning of LV MCC panel

3.

Project
Year
System
Supply

:
:
:
:

PLTU Paiton U50-U60 Electrical Upgrade


2013-2014
Generator Protection Relay
- Upgrade & testing Synchronize Relays
- Upgrade & testing Protection Relays
- Dismantle & Install AVR panel (Upgrade)

4.

Project
Year
System
Supply

:
:
:
:

RTGC (Rubber Tyre Gantry Crane) PT JICT


2013-2014
Festoon Cabling, Yaskawa PLC & Drive
- Dismantle and Install Festoon cable (15 unit)
- Installation of Hybrid System (8 unit)
- Retrofit PLC of new crane cabin (10 unit)

5.

Project
Year
System
Supply

:
:
:
:

Recondition PT Krakatau Daya Listrik (PLTU)


2014
MV Drive & Motor Protection Relay
Commissioning of MV Drive & Motor Protection Relay

6.

Project

Maintenance for calibration field instrument and control system PT Firmenich Aromatic

Year

2014-2015

System

Instrumantation & Automation

Supply

Weekly calibration field instrument, control system troubleshoting & on call service

Project

PLTU Seputih Operating & Maintenance

Year

2014

System
Supply

:
:

Electrical & Instrumentation


Function test and trouble shooting electrical & instrumentation system

Project

Recovery P10 PT Indocement Cibinong

Year
System

:
:

2014
Electrical & Instrumentation

Supply

Supervise pulling cable, termination LV Cable, wiring, cable testing

Project

RFCC PT Kaltim Prima Coal

Year

2014

System

Electrical

Supply

Setting parameter & testing protection relay

10. Project

GLNG

Year

2014

System
Supply

:
:

Electrical
Update configuration & setting parameter Siprotec for Train 1 & Train 2

7.

8.

9.

11. Project
Year
System
Supply

:
:
:
:

Retrofit Drive Stand #4 & Cooling Bed PT Interworld Steel Mill


2014
DC Drive
Engineering, renew wiring, upgrade DC Drive, load test

12. Project
Year
System
Supply

:
:
:
:

Retrofit Servo Drive & Motor - Extruder HSW PT Indolakto


2014
Motion Control
Engineering, renew wiring wiring component, upgrade & commissioning of Motion Control
System

13. Project
Year
System
Supply

:
:
:
:

PT Bekasi Power (Combined Cycle Power Plant)


2014
Instrumentation & Automation
Troubleshooting, PLC program modification, & commissioning ignition system

14. Project
Year
System
Supply

:
:
:
:

Shipunloader to Conveyor Interconection PT Krakatau Bandar Samudera


2014
PLC to PLC Communication
- Pulling & Splicing FO cable
- Modification program on PLC & SCADA HMI

15. Project
Year
System
Supply

:
:
:
:

Yamal LNG
2014-2016
LV & MV Switchgear
- Design drawing review, check, and correction
- Supervise electrical installation
- Modification of LV & MV Switchgear , and HV control panel
- Realization & programming protection relay for LV, MV, and HV
- Realization & programming LV MCC
- Performing test on FAT & IFAT
- Marked up drawing and produce as built

16. Project
Year
System
Supply

:
:
:
:

PLTU Paiton DCS Migration


2014
DCS
- Cable laying
- Installation server cabinet, thin client, & printer
- Installation GPS Antenna
- Retermination of PLC signals
- Replacement of PLC Racks & Modules

17. Project
Year
System
Supply

:
:
:
:

Ball Cleaning Unit 1 & 2 PLTU Indramayu


2014
PLC & HMI Ball Cleaning
- Design & Fabricate ball cleaning control panel unit 1 & 2
- Installation and commissioning ball cleaning control panel

18. Project
Year
System

:
:
:

HGPI North Duri Co-gen (Chevron)


2015
Turbine Instrumentation

Supply

Dismantle & Install turbine electrical & instrumentation equipments for turbine & generator
inspection

19. Project
Year
System
Supply

:
:
:
:

Petrobas P76
2015
LV & MV Switchgear
- Realization & programming protection relay for LV & LV Switchgear
- Performing test on IFAT

20. Project
Year
System
Supply

:
:
:
:

Upper Zakum 750


2015
LV Switchgear
- Design drawing review, check, and correction
- Supervise electrical installation
- Modification LV Switchgear
- Realization & programming protection relay for LV
- Realization & programming LV MCC
- Commissioning protection relay & LV MCC
- Marked up drawing and produce as built

Anda mungkin juga menyukai