ISO 9001: 2008 Construction Quality

Management System
Sample - Selected pages (not a complete plan)
Part 1: Project-Specific Quality Plan
Part 2: Company Quality Manual
Part 3: Submittal Forms
Part 4: Standard Operating Procedures

Contact:
First Time Quality
410-451-8006

Pat
[Pick the date]

Questions? Call Ed Caldeira 410-451-8006

PROJECTQUALITYCONTROLPLAN
TABLEOFCONTENTS
A.BackgroundInformation...................................................................................................................8

ge
s

Projectname..............................................................................................................................................8
ProjectNumber..........................................................................................................................................8
Projectlocation...........................................................................................................................................8
Projectdescription......................................................................................................................................8
PlanScope..................................................................................................................................................8
PlanOverview.............................................................................................................................................8
B.QualityManagementOrganization,Responsibilities,andAuthority.................................................10

Pa

ProjectQCOrganizationChart..................................................................................................................11
PersonnelQualifications...........................................................................................................................12
QualityResponsibilities............................................................................................................................12

ct
ed

C.ContractReviewandSubmittals......................................................................................................22

Se

le

ContractReviewandApproval.................................................................................................................22
Submittals.................................................................................................................................................22
SubmittalScheduleandLog.....................................................................................................................22
SubmittalReviewandApproval...............................................................................................................22
SubmissiontoCustomer...........................................................................................................................23
CustomerApprovedSubmittals................................................................................................................23
ContractSubmittalSchedule....................................................................................................................23
ContractWarranty....................................................................................................................................23
D.DesignControl................................................................................................................................26
DesignPlan...............................................................................................................................................26
DesignReviews.........................................................................................................................................26
E.ProjectQualitySpecifications..........................................................................................................31
ContractSpecifications.............................................................................................................................31
ApplicableBuildingCodes.........................................................................................................................31
IndustryQualityStandards.......................................................................................................................32
[CompanyName]QualityStandards.........................................................................................................32
ApplicationOfMultipleSourcesOfSpecifications...................................................................................32
F.SubcontractorandSupplierPurchasing............................................................................................34
QualificationofSubcontractorsandSuppliers.........................................................................................34
PurchaseOrderApproval.........................................................................................................................34
QualificationofTestingLaboratories.......................................................................................................35
G.ControlofCustomersuppliedProduct............................................................................................38
H.ProductIdentificationandTraceability............................................................................................39
IdentificationofLotControlledMaterials................................................................................................39

Page5
Quality Assurance/Quality Control Plan Sample
Copyright 2011 All Rights Reserved - Caldeira Quality, LLC | First Time Quality, LLC | 1814 Harewood Ln., Crofton, MD 21114

Questions? Call Ed Caldeira 410-451-8006

I.ProcessControls...............................................................................................................................41
ListingofQualityControlledConstructionTasks......................................................................................41
TaskProcessControls...............................................................................................................................41
ProcessControlCoordinationandCommunication.................................................................................42
J.RequiredInspectionsforQualityControlledTasks...........................................................................48

Pa

ge
s

PreparatorySiteInspection......................................................................................................................48
Materialqualityinspections.....................................................................................................................48
TaskreadyInspections.............................................................................................................................48
WorkinProcessQualityInspections........................................................................................................49
Taskcompletionqualityinspections........................................................................................................49
HoldPointsforIndependentInspections.................................................................................................49
InspectionStatusofConstructionTasks...................................................................................................49
DailyQualityControlReport.....................................................................................................................49
K.RequiredTests................................................................................................................................53
InspectionandTestRegister....................................................................................................................53

ct
ed

L.ControlofInspection,Measuring,andTestEquipment....................................................................56
M.InspectionandTestStatus.............................................................................................................58

le

InspectionandTestStatusofQualityControlledMaterials.....................................................................58
InspectionandTestStatusofProductionTasks.......................................................................................58
InspectionandTestStatus........................................................................................................................58
N.ControlofNonconformances..........................................................................................................61

Se

MarkingofNonconformancesandObservations.....................................................................................61
ControltheContinuationofWork............................................................................................................61
RecordingofNonconformances...............................................................................................................61
QualityManagerDispositionofNonconformanceReports.....................................................................61
O.CorrectiveandPreventiveAction....................................................................................................65
CorrectiveActions....................................................................................................................................65
PreventiveActions....................................................................................................................................65
P.ControlofQualityRecordsandDocuments.....................................................................................67
DocumentControls...................................................................................................................................67
ProjectQualityRecordPlan......................................................................................................................67
Q.QualityAudits.................................................................................................................................72
ProjectAuditPlan.....................................................................................................................................72
ProjectAuditRequirements.....................................................................................................................72
R.Training..........................................................................................................................................75
ProjectQualityTraining............................................................................................................................75
CustomerTrainingonUseandMaintenance...........................................................................................75
S.ProjectCompletionInspections.......................................................................................................79

Page6
Quality Assurance/Quality Control Plan Sample
Copyright 2011 All Rights Reserved - Caldeira Quality, LLC | First Time Quality, LLC | 1814 Harewood Ln., Crofton, MD 21114

Questions? Call Ed Caldeira 410-451-8006

PunchOutQCInspection.........................................................................................................................79
PreFinalCustomerInspection.................................................................................................................79
FinalAcceptanceCustomerInspection....................................................................................................79
T.ServicingandWarranty...................................................................................................................83
U.StatisticalMethods.........................................................................................................................84
V.Forms.............................................................................................................................................85
W.Attachments................................................................................................................................109
X.AdditionalQualityControlRequirements......................................................................................110

ge
s

Se

le

ct
ed

Pa

Page7
Quality Assurance/Quality Control Plan Sample
Copyright 2011 All Rights Reserved - Caldeira Quality, LLC | First Time Quality, LLC | 1814 Harewood Ln., Crofton, MD 21114

Questions? Call Ed Caldeira 410-451-8006

C. CONTRACTREVIEWANDSUBMITTALS
(Ref.ISO10005QualityPlanRequirement5.3)
Thecontractforthisproject,[ProjectName][ProjectNumber],hasbeenreviewed,approved,andsignedbythe
President,ProjectManager,andtheQualityManager.
Fulfillingcustomercontractexpectationsisaprimaryobjectiveofthe[CompanyName]QualitySystem.Toensure
thatcustomerexpectationswillbefulfilled,[CompanyName]clearlydefinestherequirementsforeachcontract
beforeitisapproved.

ge
s

TheProjectManagerensuresthattheinformationincustomercontractsclearlydefinescustomerexpectations
andthatthenecessarydetailsareprovidedtosetrequirementsforConstruction.

Pa

CONTRACTREVIEWANDAPPROVAL

ThePresidentconductscustomercontractreviewstoensurethat:

Customerrequirementsandspecificationsarecomplete
Customerrequirementsandspecificationsarecompatiblewiththerelevantregulations,[CompanyName]
qualitystandards,andQualitySystemrequirements
[CompanyName]hasthecapabilitytodeliverthecompletedprojectinthetimeallotted

ct
ed

Se

SUBMITTALS

le

BeforeConstructionbegins,thePresidentmakessurethatallcontractrequirementsareclearlyunderstood,all
discrepanciesareresolved,andallrequirementsareagreedupon.Oncetheserequirementsaremet,thePresident
signsthecontract.

ListsofdocumentsandrecordsthatwillbesubmittedtothecustomerappearontheSubmittalScheduleandLog
form.TheSubmittalScheduleandLogFormexhibitisincludedinthissubsection.

SUBMITTALSCHEDULEANDLOG
TheProjectManageridentifiessubmittalsthatapplytoaspecificcontractandwhentheyshouldbesubmitted,
including:

Contractrequirementreference(ifapplicable)
Submittaltype:Shopdrawing,productdata,qualityinspectionandtestplan,requestforinformation,or
allowancesandunitprices
Description
Duedateforsubmissiontocustomerby[CompanyName]
Duedateforapprovalbythecustomer.Duedatesmaybeanumberofdaysafteraprojectplan
milestone.
Approvaldate

SUBMITTALREVIEWANDAPPROVAL
TheQualityManagerpreparessubmittalsthatprovideadditionaldetailsofhow[CompanyName]planstocarry
outqualityrelatedaspectsofthecustomercontract,contracttechnicalspecifications,andcontractdrawingsand
reportingofqualityrecordstothecustomer.

Page22
Quality Assurance/Quality Control Plan Sample
Copyright 2011 All Rights Reserved - Caldeira Quality, LLC | First Time Quality, LLC | 1814 Harewood Ln., Crofton, MD 21114

Questions? Call Ed Caldeira 410-451-8006

TheQualityManagerlists,schedules,andapprovesallqualityrelatedsubmittalsthatarerequiredbytheproject
includingsubmittalspreparedbysubcontractorsandsuppliers.TheQualityManagermustreviewallsubmittalsfor
compliancewiththerequirementsofthe[CompanyName]QualitySystem.TheQualityManagermustsign
approvalofeachcontractsubmittal.
[CompanyName]extendscompliancetocontractspecificationstoallcustomerapprovedsubmittals.All
[CompanyName]activitiescomplywithcustomerapprovedsubmittals.

SUBMISSIONTOCUSTOMER

ge
s

SeeSubmittalFormsexhibitsinthissubsectionforalltheformsthatwillbeusedtosubmitsubmittalsonthis
project.

CUSTOMERAPPROVEDSUBMITTALS

Pa

TheProjectManagerobtainsthesignatureofanauthorizedcustomerrepresentativeonthesubmittalform.
[CompanyName]extendscompliancetocontractspecificationstocustomerapprovedsubmittals.

ct
ed

Workintheaffectedareaofapendingsubmittalrequirementdoesnotstartuntilthecustomerapprovesthe
submittal.
Additionaldetailon[CompanyName]policiesandproceduresformanagingsubmittalsappearinQualityManual
section3ContractSpecifications.

le

CONTRACTSUBMITTALSCHEDULE

Se

TheProjectManageridentifiessubmittalsthatapplytoaspecificcontractandwhentheyshouldbesubmitted,
including:
Contractrequirementreference(ifapplicable)
Submittaltype:Shopdrawing,productdata,qualityinspectionandtestplan,requestforinformation,or
allowancesandunitprices
Description
Duedateforsubmissiontocustomerby[CompanyName]
Duedateforapprovalbythecustomer.Duedatesmaybeanumberofdaysafteraprojectplan
milestone.
Approvaldate

CONTRACTWARRANTY
TheProjectmanagerensuresthatcustomercontractsclearlyspecifywarrantycoverageincluding:

Scope
Startingdate
Duration

TheProjectManagerensuresthatcustomercontractsalsoclearlyspecifyownerresponsibilityfor:

Restrictionsofuse
Maintenancerequirements
Exclusionsforcustomersuppliedmaterialsorequipment
Timelynotificationofproblems

Page23
Quality Assurance/Quality Control Plan Sample
Copyright 2011 All Rights Reserved - Caldeira Quality, LLC | First Time Quality, LLC | 1814 Harewood Ln., Crofton, MD 21114

Questions? Call Ed Caldeira 410-451-8006

VersionSeptember28,2011

ge

[ProjectManagerName]

Type/DescriptionofSubmittal

Version
/Date

Pa

Technical
Specification
Reference/
VersionDate

Notes

Required
Submittal
Date

Date
Submitted
to
Customer

Required
Customer
Approval
Date

Contract
Section
ActivityID

Date

te

[ProjectName]

Preparer

le
c

[ProjectNumber]

ContractName

Se

ContractID

[CompanyName]
Project Submittals Schedule and Log

Page25
Quality Assurance/Quality Control Plan Sample
Copyright 2011 All Rights Reserved - Caldeira Quality, LLC | First Time Quality, LLC | 1814 Harewood Ln., Crofton, MD 21114

Customer
Approval
Date

Questions? Call Ed Caldeira 410-451-8006

D. DESIGNCONTROL
(Ref.ISO10005QualityPlanRequirement5.4)
Designcontrolsareinplacetoassurethequalityofdesignsforthisproject.Adesignplanisusedto
documentthedesigncontrolprocess.TheDesignPlanisincludedasanexhibitinthissubsection.

ge
s

Thefirstcontrolpointwillbeofthereviewofdesigninputs.TheDesignManagerwillassurethatall
necessaryinformationisavailabletoperformtherequireddesignwork.TheDesignManagerwillalso
assurethatexpectationsfordesignoutputsarewelldefined.
Intermediatereviewswillbecarriedoutasindicatedonthedesigncontrolplan.Thelastreviewisthe
designoutputreview.

Pa

ArecordofallreviewswillberecordedontheDesignReviewform.ADesignReviewformexhibitis
includedinthissubsection.

DESIGNPLAN

ct
ed

ThePresidenthasappointed[DesignManagerName]astheDesignManager.[DesignManagerName]will
controlthedesignprocesswithspecificqualityresponsibilities,duties,andtheauthoritytocarrythem
out.ArecordoftheDesignManagersappointmentappearsinthisplanasanexhibitinsubsectionB
QualityManagementOrganization,Responsibilities,andAuthority.

Alistingofkeyprojectpersonnel,specificdesignresponsibilities,andauthority
Appointmentandthequalificationofkeydesignpersonneltoperformassigneddesign
responsibilities.
Whowillverifyandapprovethedesigninputspecificationsbeforedesignworkbegins
Alistingofcompanyandcustomerstakeholders,reviewstheywillparticipatein,andhowtheir
inputwillbeusedtoamendeddesignrequirements.TheprojectorganizationchartIncludes
interfacesbetweenvariousgroupsandpersonnelforproducingandreviewingthedesign.
Designoutputspecifications,includingrequireddrawings,andengineeringcalculations
Identificationofwhowillperformdesignoutputverificationactivitiesandthecriteriatheywill
use.
ThesequenceofdesignworkTasksandschedule

Se

le

TheDesignManagerpreparesaprojectspecificplanthatincludes:

TheDesignManagerreviewsthedesignprocessprojectplanwiththecustomerandotherinterested
parties.Thecustomerapprovestheplanafteranydiscrepanciesareresolvedandtheplanisagreedupon.
Designworkmaybeginonlyafterthecustomerapprovestheplan.

DESIGNREVIEWS
DESIGNINPUTREQUIREMENTSREVIEW
TheDesignManagerensuresthattheinformationindesigninputsclearlydefinescustomerexpectations
andthatthenecessarydetailsareprovidedtosetrequirementsfordesign.
TheDesignManagerobtainsdesignspecificationsfromthecustomerandconductsacustomerdesign
inputreviewtoensurethat:

Page26
Quality Assurance/Quality Control Plan Sample
Copyright 2011 All Rights Reserved - Caldeira Quality, LLC | First Time Quality, LLC | 1814 Harewood Ln., Crofton, MD 21114

Questions? Call Ed Caldeira 410-451-8006

Customerdesigninputrequirementsandspecificationsarecomplete
Designprocessreviewmilestonesarespecifiedwhennecessary
Customerdesignoutputrequirementsandspecificationsarecompleteforreviewmilestonesas
wellasthecompleteddesign
Customerdesignrequirementsandspecificationsarecompatiblewiththerelevantregulations,
[CompanyName]qualitystandards,andQualitySystemrequirements
[CompanyName]hasthecapabilitytodeliverthecompleteddesigninthetimeallotted

TheDesignManageridentifiessupplementaldesignspecificationsthatsupplementcustomer
specificationswhentheyareneededtoensureaqualitydesign.

ge
s

Beforedesignworkbegins,theDesignManagermakessurethatalldesignrequirementsareclearly
understood,alldiscrepanciesareresolved,andallrequirementsareagreedupon.Oncethese
requirementsaremet,theDesignManagerapprovesthedesigninput.

Designinputspecificationareapprovedbyacustomerauthority
Designinputspecificationsarecomplete
Designinputrequirementsandspecificationsarecompatiblewiththerelevantregulations,
[CompanyName]qualitystandards,andQualitySystemrequirements
[CompanyName]hasthecapabilitytodeliverthecompletedprojectinthetimeallotted

ct
ed

Pa

TheDesignManagerensuresthatdesigninputdocumentsareverifiedbyqualifiedpersonnel.Theperson
responsiblemustverify:

DESIGNPROGRESSREVIEWS

Se

le

TheDesignManagerholdsreviewmeetingswithinterestedpartiesatkeydesignmilestones.TheDesign
Manageridentifiesthekeydesignmilestones,thedesignoutputrequiredforthereview,andalistof
reviewers.
Twodesignreviewsarerequired:oneisaninputdesignreviewandtheotheristhefinaldesignreview.
TheDesignManageridentifiesotherdesignreviewsnecessarytoensureaqualityresult.Designreviews
maybespecifiedatthecompletionofdesignworktasks,siteassessments,preliminaryengineering,
preliminarydesign,percentagecompletionstages,andonacalendarschedule.
TheDesignManageridentifiescustomerandcompanyreviewersappropriateforeachdesignmilestone.
Reviewersmayincludepersonsthathaveastakeinanyofthefollowing:quality,safety,constructability,
scheduling,maintenance,purchasing,estimating,orcostcontrol.
Ateachreview,theDesignManagerreviewsreviewerrecommendationsforamendmentstothedesign
specifications.TheDesignManagersubmitsselecteddesignamendmentsforcustomerapproval(see
section3.4ContractSubmittals).Customerapproveddesignamendmentsaredesignrequirements.

DESIGNOUTPUTREVIEWS
TheDesignManagerensuresthatdesignoutputdocumentsareverifiedbyqualifiedpersonnel
independentofthepersonperformingthework.Thepersonresponsiblemustverify:

Thecompleteddesignmeetsrequirementsspecifiedbythedesigninput
Thecompleteddesignmeetsapproveddesignamendments
Engineeringcalculationsarecorrect
CompletenessofrecordspertheDesignProjectQualityControlPlanincludinginputs,reviews,
communications,andverificationactivities.

Page27
Quality Assurance/Quality Control Plan Sample
Copyright 2011 All Rights Reserved - Caldeira Quality, LLC | First Time Quality, LLC | 1814 Harewood Ln., Crofton, MD 21114

Questions? Call Ed Caldeira 410-451-8006

[CompanyName]
Project Design Process Plan Form
VersionSeptember28,2011

ProjectID

ProjectName

Preparer

Date

[ProjectNumber]

[ProjectName]

ge
s

Name:

Designer(s)

Name/ScopeofWork:

Designinputverifier

Name:

Designoutputverifier

Name:

ct
ed

DesignManager

DesignReviews

Requiredoutputforreview:
(includingrequireddrawings,
andengineeringcalculations)

Intermediatereview:

Finaldesignreview:

Se

Predesignreview:

le

Reviewmilestone/
description:

Pa

Qualificationandappointments

Reviewacceptance
criteria

Reviewparticipants

DesignProcessPlanandSchedule

Task

Output

Scheduleddate/milestone

Page29
Quality Assurance/Quality Control Plan Sample
Copyright 2011 All Rights Reserved - Caldeira Quality, LLC | First Time Quality, LLC | 1814 Harewood Ln., Crofton, MD 21114

Questions? Call Ed Caldeira 410-451-8006

P. CONTROLOFQUALITYRECORDSAND
DOCUMENTS
(Ref.ISO10005QualityPlanRequirement5.16)
Onthisproject,[CompanyName]willkeepspecificdocumentsandrecordsofqualityactivitiesthatoccur
throughoutthedurationoftheproject.

ge
s

Projectqualityrecordswillbestoredintheprojectfieldoffice.Asabackup,copiesofrecordswillbeheld
offsite.Theexactlocationwillbedeterminedatqualitycoordinationmeeting.
The[CompanyName]QualityManualreferencedinthisqualityplanisincludedasanappendixtothis
plan.

Pa

ARecordofcurrentversionofprojectdocumentsislistedontheDocumentControlFormincludedasan
exhibitinthissubsection.Whennewversionapproved,theQualityManagerupdatestheProject
DocumentControlform.

ct
ed

ARecordofrecordsislistedontheProjectRecordsControlFormincludedasanexhibitinthissubsection.

DOCUMENTCONTROLS

TheDirectorofQualitycontrolsdocumentsrelatedtothe[CompanyName]QualitySystemincluding:

le

QualitySystemManual
QualitySystemProcedures
ProjectManagementProcedures(includinginterfaceandcoordinationwithcustomersand
regulatoryagencieswithjurisdictionoverjobsites)
Governmentregulations
Industrystandards
Procurementspecifications

Se

TheDirectorofQualityensuresthatrecordsofthedistributionofQualitySystemdocumentsarekept.
Whennewversionsaredistributed,obsoleteversionsaredestroyedorcontrolledtopreventinadvertent
use.
TheProjectManagercontrolsdocumentsrelatedtospecificcustomercontractsincluding:

Customercontracts
Contracttechnicalspecifications
Contractdrawings
Shopdrawingsubmittalsandapprovals
Productdatasubmittalsandapprovals
Allowancesandunitpricesubmittalsandapprovals
Requestsforinformationandcustomerresponses
Subcontracts
Inspectionandtestplans

PROJECTQUALITYRECORDPLAN

Page67
Quality Assurance/Quality Control Plan Sample
Copyright 2011 All Rights Reserved - Caldeira Quality, LLC | First Time Quality, LLC | 1814 Harewood Ln., Crofton, MD 21114

Questions? Call Ed Caldeira 410-451-8006

TheQualityManageridentifiesthequalityrecordsthatwillbemaintainedduringtheplanningand
executionoftheproject.Considerationsinclude:
Contractrequirementsformaintainingrecords
Thesizeoftheproject
Typesofactivities
Thecomplexityofprocessesandtheirinteractions
Thecompetenceofpersonnel
Thedurationoftheproject
Theneedtodemonstratecompletionofwork
Theneedtodemonstrateduediligenceforqualitysystemrelatedactivities
Balancingthecostandbenefitsofmaintainingtherecord

ge
s

DOCUMENTCONTROLPROCEDURE

4.

ct
ed

3.

5.
6.
7.

TheResponsiblePersondesignatesoneormoredirectoryfolderswhereallfilesinthefolderare
designatedaseitherapproveddocuments,currentversionsorcontrolleddocuments.Accessto
changeordeletethefilesisrestrictedtotheResponsiblePersonbypassword.
TheResponsiblePersonremovesobsoleteversionsofcontrolleddocumentsfromthedirectory
folder.

Computerizedrecordsofcontrolleddocumentsarebackedupdaily.Retrievalofbackupscanrecover
allcontrolleddocumentsineffectasofanyselectedday.
ControlleddocumentsstoredoncomputermediaaremarkedUncontrolledCopyWhenPrintedas
theResponsiblePersondeemspractical.
Forthedistributionofhardcopiesofcontrolleddocuments:

8.
9.

le

2.

TheResponsiblePersonreviewsandapprovesallcontrolleddocumentspriortoreleaseandis
responsibleforfuturecontrolofthedocument.TheResponsiblePersonrecordsthetitleofthe
document,approvaldate,name,jobposition,andthemethodofdocumentcontrol:eitherhard
copyorcomputerfile.ArecordismaintainedontheProjectDocumentControlFormcontainedin
thisprocedure.
Whencontrolleddocumentsarerevised,theResponsiblePersonrecordsthetitleofthedocument,
theversion,anddate.Eachsubsequentdocumentversioncancelsthepreviousversionsofthe
document.ThestatusofanycontrolleddocumentcanbeverifiedbytheResponsiblePerson.
TheResponsiblePersonensuresthatcurrentissuesofalldocumentsarereadilyavailableatlocations
whereactivitiesessentialtotheeffectivefunctioningofthequalitysystemareperformed.
Fordistributionofcontrolleddocumentsstoredoncomputermedia:

Se

1.

Pa

Procedure:

OnlytheQualityManagerisauthorizedtocopycontrolleddocuments.
WhentheQualityManagerdistributescopiesofcontrolleddocuments,thefollowingrecordis
madeofthedocument:theversiondate,towhichpersonitwasdistributed,andthedocuments
location.

UncontrolledcopiesaremarkedUncontrolledCopy
Whenacontrolleddocumentissuperseded:

ThefirstpageofsupersededdocumentsisdestroyedormarkedVOID.Thesuperseded
documentisremovedfromareaswherequalityinspection,test,orworkisinprogress.
Thesupersededdocumentisreplacedwithacurrentlyapprovedversionofthedocument

10. Qualitydocumentsarestoredintheiroriginalcondition,inasuitableenvironmenttoprevent
damage,deteriorationandloss.QualityRecordsarereadilyretrievableforreviewuponrequest.
AccesstoQualitysystemdocumentsisnotlimitedbutissubjecttonormalbuildingsecurity.

Page68
Quality Assurance/Quality Control Plan Sample
Copyright 2011 All Rights Reserved - Caldeira Quality, LLC | First Time Quality, LLC | 1814 Harewood Ln., Crofton, MD 21114

Questions? Call Ed Caldeira 410-451-8006

11. Qualitydocumentsarestoredforaperiodofsevenyearstodemonstrateconformancetospecified
requirementsandtheeffectiveoperationofthequalitysystem.Noqualitysystemdocumentis
destroyedwithoutwrittenapprovaloftheQualityManager.

PROJECTDOCUMENTANDRECORDCONTROLPROCEDURE
Procedure:

ge
s

Projectrecordscompletedbythepersonresponsibleforcompletingthem,qualityrecordsare
collectedandfiled.Anyqualifiedpersoninthelocationidentifiedonsection5.6oftheProject
QualityControlPlanmayfiletherecords.
QualityRecordsarestoredintheiroriginalcondition,inasuitableenvironmenttoprevent
damage,deterioration,andloss.QualityRecordsarereadilyretrievableforreviewuponrequest.
AccesstoQualityRecordsisnotlimitedbutissubjecttonormalbuildingsecurity.
QualityRecordsarestoredforaperiodofsevenyearstodemonstrateconformancetospecified
requirementsandtheeffectiveoperationofthequalitysystem.Noqualityrecordisdestroyed
withoutwrittenapprovaloftheQualityManager.
Qualityrecordsarekeptprimarilyashardcopy.Whenqualityrecordsarekeptonacomputer
storagedevice,abilitytoenterinformationispasswordcontrolledandthecomputerizedrecords
arebackeduponaregularbasis.

Pa

Se

le

ct
ed

Additionaldetailon[CompanyName]policiesandproceduresthatapplytodocumentandrecordcontrols
appearinQualityManualsections12.3DocumentControls12.4RecordControls.

Page69
Quality Assurance/Quality Control Plan Sample
Copyright 2011 All Rights Reserved - Caldeira Quality, LLC | First Time Quality, LLC | 1814 Harewood Ln., Crofton, MD 21114

Questions? Call Ed Caldeira 410-451-8006

QUALITYMANUAL
TABLEOFCONTENTS

1.QualitySystemManagementandResponsibilities...........................................................................12

Pa

ge
s

1.1.Overview............................................................................................................................................12
1.2.[CompanyName]QualityPolicy.........................................................................................................12
1.3.QualityDuties,Responsibilities,andAuthority.................................................................................12
1.4.QualitySystemPerformanceMeasures............................................................................................15
1.5.CustomerSatisfactionPerformanceMeasures.................................................................................16
1.6.Exceptions..........................................................................................................................................16
2.ProjectQualityControlPlan.............................................................................................................17

Se

le

ct
ed

2.1.Overview............................................................................................................................................17
2.2.[CompanyName]ProjectLicenseandQualificationRequirements..................................................17
2.3.ProjectPersonnelandQualifications................................................................................................18
2.4.ProjectQualityControlPlan..............................................................................................................19
2.5.IdentificationofQualityControlledTasks.........................................................................................19
2.6.ProjectQualityInspectionandTestPlan...........................................................................................19
2.7.ProjectQualityCommunicationsPlan...............................................................................................19
2.8.ProjectQualityTrainingPlan.............................................................................................................20
2.9.CustomerTrainingOnOperationAndMaintenance.........................................................................20
2.10.ProjectRecordsandDocumentationPlan.......................................................................................20
2.11.ProjectAuditPlan............................................................................................................................21
3.ContractSpecifications....................................................................................................................22
3.1.Overview............................................................................................................................................22
3.2.ContractTechnicalSpecifications......................................................................................................22
3.3.ContractDrawings.............................................................................................................................22
3.4.ContractSubmittals...........................................................................................................................22
3.5.CustomerSubmittalApproval...........................................................................................................24
3.6.ContractWarranty.............................................................................................................................25
3.7.ContractReviewandApproval..........................................................................................................25
4.DesignControl.................................................................................................................................26
4.1.Overview............................................................................................................................................26
4.2.DesignInputReview..........................................................................................................................26
4.3.ProjectDesignQualityControlPlan..................................................................................................26
4.4.DesignProgressReviews...................................................................................................................27
4.5.DesignOutputVerificationandApproval..........................................................................................27
5.ProjectSpecificQualityStandards...................................................................................................28
5.1.Overview............................................................................................................................................28

Page2
QualityManual
VersionSeptember28,2011Copyright

Quality Assurance/Quality Control Plan Sample


Copyright 2011 All Rights Reserved - Caldeira Quality, LLC | First Time Quality, LLC | 1814 Harewood Ln., Crofton, MD 21114

Questions? Call Ed Caldeira 410-451-8006

5.2.RegulatoryCodes...............................................................................................................................28
5.3.IndustryQualityStandards................................................................................................................28
5.4.MaterialandEquipmentSpecifications.............................................................................................28
5.5.WorkProcessSpecifications..............................................................................................................29
5.6.ControlledMaterialIdentificationandTraceability..........................................................................29
5.7.MeasuringDeviceControlandCalibration........................................................................................30
5.8.[CompanyName]QualityStandards..................................................................................................30
5.9.ApplicationofMultipleSourcesofSpecifications.............................................................................30

ge
s

6.ProjectPurchasing...........................................................................................................................32

Pa

6.1.Overview............................................................................................................................................32
6.2.QualificationofSuppliers,Subcontractors,andDepartments..........................................................32
6.3.SourceofSupplyForm.......................................................................................................................33
6.4.PurchaseOrderRequirements..........................................................................................................33
6.5.ProjectPurchaseOrderApprovals....................................................................................................34
7.ProcessControls..............................................................................................................................35

le

ct
ed

7.1.Overview............................................................................................................................................35
7.2.ProjectStartupandQualityControlCoordinationMeeting..............................................................35
7.3.PreparatoryProjectQualityControlPlanning...................................................................................35
7.4.WeeklyQualityPlanningandCoordinationMeetings.......................................................................36
7.5.ProcessControlStandards.................................................................................................................36
7.6.DailyQualityControlReport..............................................................................................................37
7.7.MonthlyQualityControlReport........................................................................................................38

Se

8.InspectionsandTests.......................................................................................................................39
8.1.Overview............................................................................................................................................39
8.2.RequiredTaskQualityInspectionsandTests....................................................................................39
8.3.AdditionalInspectionRequirementsforProcessTasks.....................................................................40
8.4.InspectionofSpecialProcesses.........................................................................................................41
8.5.IndependentMeasurementandTests..............................................................................................41
8.6.CommissioningFunctionalAcceptanceTests....................................................................................41
8.7.HoldPointsforCustomerInspection.................................................................................................41
8.8.QualityInspectionandTestSpecifications........................................................................................41
8.9.InspectionAndTestAcceptanceCriteria...........................................................................................41
8.10.InspectionandTestStatus...............................................................................................................42
8.11.IndependentQualityAssuranceInspections...................................................................................42
8.12.InspectionandTestRecords............................................................................................................42
8.13.ProjectCompletionandCloseoutInspection..................................................................................43
9.NonconformancesandCorrectiveActions........................................................................................45
9.1.Overview............................................................................................................................................45
9.2.Nonconformances.............................................................................................................................45
9.3.CorrectiveActions.............................................................................................................................46
10.PreventiveActions.........................................................................................................................48

Page3
QualityManual
VersionSeptember28,2011Copyright

Quality Assurance/Quality Control Plan Sample


Copyright 2011 All Rights Reserved - Caldeira Quality, LLC | First Time Quality, LLC | 1814 Harewood Ln., Crofton, MD 21114

Questions? Call Ed Caldeira 410-451-8006

10.1.Overview..........................................................................................................................................48
10.2.IdentifyPreventiveActionsforImprovement.................................................................................48
10.3.TrainPreventiveActionsforImprovement.....................................................................................48
11.QualitySystemAudits....................................................................................................................50
11.1.Overview..........................................................................................................................................50
11.2.ProjectQualitySystemAudit...........................................................................................................50
11.3.CompanywideQualitySystemAudit..............................................................................................50

ge
s

12.RecordandDocumentControls......................................................................................................52

Pa

12.1.Overview..........................................................................................................................................52
12.2.QualitySystemDocuments.............................................................................................................52
12.3.DocumentControls..........................................................................................................................52
12.4.RecordControls...............................................................................................................................53
13.Appendix.......................................................................................................................................55

Se

le

ct
ed

13.1.DefinitionsofTerms........................................................................................................................55

Page4
QualityManual
VersionSeptember28,2011Copyright

Quality Assurance/Quality Control Plan Sample


Copyright 2011 All Rights Reserved - Caldeira Quality, LLC | First Time Quality, LLC | 1814 Harewood Ln., Crofton, MD 21114

Questions? Call Ed Caldeira 410-451-8006

CROSSREFERENCES
The[CompanyName]QualitySystemcomplieswithANSI/ISO/ASQQ90012008:Qualitymanagement
systemsRequirements

ISO9001:2008Requirement

[CompanyName]QualityManualSection

4Qualitymanagementsystem
KeyElementsoftheQualitySystem

4.2Documentationrequirements

12RecordandDocumentControls

ge
s

4.1Generalrequirements

5Managementresponsibility

Pa

[CompanyName]QualityPolicy
1.3 QualityDuties,Responsibilities,andAuthority
11.3CompanywideQualitySystemAudit

5.1Managementcommitment

[CompanyName]QualityPolicy

ct
ed

5.2Customerfocus

[CompanyName]QualityPolicy

5.3Qualitypolicy

1.4QualitySystemPerformanceMeasures
11QualitySystemAudits

5.4Planning

1.3QualityDuties,Responsibilities,andAuthority
2.3.2AppointmentofKeyProjectPersonnel

le

5.5Responsibility,authorityandcommunication

11QualitySystemAudits

5.6Managementreview

Se

6Resourcemanagement

2ProjectQualityControlPlan
6ProjectPurchasing

6.1Provisionofresources

2.8ProjectQualityTrainingPlan

6.2Humanresources
6.3Infrastructure

2.4ProjectQualityControlPlan

6.4Workenvironment

7ProcessControls

7Productrealization
7.1Planningofproductrealization

3ContractSpecifications
2ProjectQualityControlPlan

7.2Customerrelatedprocesses

3ContractSpecifications
5ProjectSpecificQualityStandards
2.7ProjectQualityCommunicationsPlan

7.3Designanddevelopment

4DesignControl

7.4Purchasing

6ProjectPurchasing

7.5Productionandserviceprovision

5ProjectSpecificQualityStandards
7ProcessControls

7.6Controlofmonitoringandmeasuringequipment

5.7MeasuringDeviceControlandCalibration

Page10
QualityManual
VersionSeptember28,2011Copyright

Quality Assurance/Quality Control Plan Sample


Copyright 2011 All Rights Reserved - Caldeira Quality, LLC | First Time Quality, LLC | 1814 Harewood Ln., Crofton, MD 21114

Questions? Call Ed Caldeira 410-451-8006

8Measurement,analysisandimprovement
8InspectionsandTests
10PreventiveActions

8.2Monitoringandmeasurement

1.4QualitySystemPerformanceMeasures
8.12InspectionandTestRecords
11QualitySystemAudits

8.3Controlofnonconformingproduct

9NonconformancesandCorrectiveActions

8.4Analysisofdata

10PreventiveActions
11QualitySystemAudits

8.5Improvement

10PreventiveActions

Se

le

ct
ed

Pa

ge
s

8.1General

Page11
QualityManual
VersionSeptember28,2011Copyright

Quality Assurance/Quality Control Plan Sample


Copyright 2011 All Rights Reserved - Caldeira Quality, LLC | First Time Quality, LLC | 1814 Harewood Ln., Crofton, MD 21114

Questions? Call Ed Caldeira 410-451-8006

7. PROCESSCONTROLS
HOWWORKISCARRIEDOUT
7.1. OVERVIEW

Pa

ge

TheConstructionprocessplandefineshowprojectworkistobedoneandapprovedfortheoverall
project.TheConstructionprocessplaniscommunicatedtoallkeypersonnel,subcontractorsand
suppliersinastartupmeeting.Astheprojectproceeds,Taskplansprovideadditionaldetailsofhoweach
individualTaskiscarriedout.TaskplanningmeetingsareusedtocommunicateexpectationsoftheTask
plantokeypersonnelresponsibleforcarryingouttheTask.

7.2. PROJECTSTARTUPANDQUALITYCONTROLCOORDINATIONMEETING

le

Keyrequirementsoftheproject
TheProjectQualityControlPlan
Requiredqualityinspectionsandtests
Theprojectsubmittalschedule
Qualitypoliciesandheightenedawarenessofcriticalqualityrequirements
Projectorganizationchartandjobresponsibilities
Methodsofcommunicationandcontactinformation
Locationofprojectdocumentsandrecords

Se

ct
ed

Priortothecommencementofwork,theProjectManagerholdsameetingtodiscussandcoordinatehow
projectworkwillbeperformedandcontrolled.Keypersonnelfrom[CompanyName],subcontractors,and
suppliersmeettoreviewexpectationsforprojectqualityresultsaswellasqualityassuranceandquality
controlpoliciesandproceduresincluding:

7.3. PREPARATORYPROJECTQUALITYCONTROLPLANNING
7.3.1. TASKREQUIREMENTSREVIEW
InpreparationforthestartofanupcomingTask,theSuperintendentreviewsanintegratedand
coordinatedsetofdocumentsthatcollectivelydefinequalityrequirementsfortheTaskincluding:

ObjectivesandacceptancecriteriaoftheTask
QualitystandardsthatapplytotheTask
Workinstructions,processsteps,andproductinstallationinstructionsthatapplytotheTask
Shopdrawings
Submittals
Toolsandequipmentnecessarytoperformthework
License,certification,orotherqualificationrequirementsofpersonnelassignedtowork
Requiredrecordsoftheprocessandresultingproduct
Thesubcontractorcontractedtoperformthework,ifapplicable
Customercontractrequirements
Requiredqualityinspectionsandtests
Methodforclearlymarkingnonconformancestopreventinadvertentuse
Locationofqualitysystemrecordsanddocuments

Page34
QualityManualSample
VersionSeptember14,2011CopyrightCaldeiraQuality,LLCFirstTimeQuality,LLC1814HarewoodLn.,Crofton,MD,21114.

Questions? Call Ed Caldeira 410-451-8006

Personneltraining

7.3.2. PREPARATORYSITEINSPECTION
TheSuperintendentalsoperformsaqualityinspectionoftheworkareaand:
Assessescompletionofrequiredpriorwork
Verifiesfieldmeasurements
Assuresavailabilityandreceivingqualityinspectionstatusofrequiredmaterials
IdentifiesanynonconformancestotherequirementsfortheTasktobegin
Identifiespotentialproblems

ge

7.3.3. TASKPREPARATORYQUALITYPLANNINGMEETINGS

Pa

PriortothestartofaTask,theSuperintendentconductsameetingwithkeycompany,subcontractor
personnelresponsibleforcarryingout,supervising,orinspectingthework,andinterestedcustomer
representatives.
Duringthemeeting,theSuperintendentcommunicatestheTaskqualityrequirementsandreinforces
heightenedawarenessforcriticalrequirements.TopicsforaTaskqualityplanmeetinginclude:

ct
ed

le

Taskqualityrequirementsasidentifiedinsection7.3.1
FindingsoftheTaskpreparatoryqualityinspectioninsection7.3.2
Conflictsthatneedresolution
Requiredqualitydocumentsandaverificationofavailabilitytopersonnelcarryingout,
supervising,orinspectingtheTask
Recordkeepingrequirementsandtheavailabilityofnecessaryforms
Reviewmethodsandsequencesofinstallation
Specialdetailsandconditions
Standardsofworkmanship
Heightenedawarenessofcriticalqualityrequirements
Qualityrisks
Taskqualityinspectionform

Se

7.4. WEEKLYQUALITYPLANNINGANDCOORDINATIONMEETINGS
TheSuperintendentconductsameetingwithkeycompany,supplier,andsubcontractorpersonnel
responsibleforcarryingout,supervising,orinspectingthework,andinterestedcustomerrepresentatives.
Themeetingisheldonanominalweeklyschedule.Duringthemeeting,theSuperintendentfacilitates
coordinationamongtheparticipants,communicationamongtheparticipants,andreinforcesheightened
awarenessforcriticalrequirements.
TheSuperintendentmaintainsarecordofthemeetingeventontheDailyQualityControlReport.

7.5. PROCESSCONTROLSTANDARDS
7.5.1. JOBREADYSTARTWORKSTANDARDS
WorkonaTaskstartsonlywhenconditionsdonotadverselyimpactquality,complywithgovernment
regulations,contracttechnicalspecifications,industrystandards,orproductinstallationinstructions.

Page35
QualityManualSample
VersionSeptember14,2011CopyrightCaldeiraQuality,LLCFirstTimeQuality,LLC1814HarewoodLn.,Crofton,MD,21114.

Questions? Call Ed Caldeira 410-451-8006

ListofIncludedForms

MilitaryForms:

PreparatoryPhaseChecklist
InitialPhaseChecklistForm
ContractorProductionReport
ContractorQualityControlReport
TestingPlanandLog

StandardForms:

ProjectOrganizationChartForm
QualityManagerAppointmentForm
ProjectManagerAppointmentForm
ProjectSuperintendentAppointmentForm
ProjectDesignManagerAppointmentForm
ProjectPersonnelQualificationForm
PersonnelCertificationsandLicensesForm
QualityControlledTaskListForm
QualityInspectionandTestPlanForm
ProjectQualityCommunicationsPlanForm
PointOfContactListForm
ProjectQualityTrainingPlanForm
TaskTrainingPlanandLogForm
ProjectQualityRecordsPlanForm
ProjectSubmittalForm
ChangeOrderForm
ProjectDesignProcessPlanForm
DesignReviewMeetingParticipantForm
DesignReviewForm
ProjectRegulatoryBuildingCodesForm
TestEquipmentCalibrationForm
LotControlledMaterialsForm
ProjectSubcontractororSupplierQualificationForm
SubcontractorandSupplierCertificationsandLicensesForm
SourceofSupplyForm
PreconstructionMeetingForm
TaskProjectQualityControlPlanForm
TaskProjectQualityControlPlanningMeetingForm

Questions? Call Ed Caldeira 410-451-8006

DailyQualityControlReportForm
MonthlyQualityControlReportForm
TaskInspectionForm
ProjectCompletionInspectionForm
InspectionandTestReportForm
NonconformanceReportForm
NonconformanceReportControlLogForm
TrainingRecordForm
ProjectQualitySystemAuditForm
QualitySystemAuditForm
ProjectDocumentControlForm

Questions? Call Ed Caldeira 410-451-8006

QUALITYSYSTEMSOP
3.5CUSTOMERSUBMITTALAPPROVAL
Version

Approvedby:

September8,2011

QualityManager

Purpose:

Toprovideaconsistentmethodforpresentingandrecordingkeysubmittalinformationinacoversheet
foreachsubmittal.

ge

Scope:
Allprojects

Pa

Definitions:
None:

ResponsiblePerson(s):

ct
ed

TheProjectManagerhasoverallresponsibility

TheQualityManagermustapproveallsubmittals

References:
ContractSubmittals

le

QualityManualSection3.5CustomerSubmittalApproval

Se

QualityManualSection12.4.2ProjectRecordsControl

Procedure:
1.

2.
3.
4.

UsetheContractSubmittalFormcontainedinthisprocedureunlessthecustomercontractorProject
QualityControlPlanspecifiestheuseofamodifiedorcustomersuppliedform.Inthatcase,the
specifiedformreplacesthestandardformforthatcontract.
Foreachproject,theResponsiblePersoncompletestheProjectSubmittalsForm(containedinthis
procedure)withinformationasrequiredbytheQualityManual.
TheResponsiblePersonupdatestheProjectSubmittalFormasnecessarywithactualdateof
submittalandactualdateofcustomersubmittalapprovaldate.
TheResponsiblePersonstoresthecompletedforminthefieldprojectofficeasrequiredbyQuality
ManualSection12.4.2ProjectRecordsControl

Page32
StandardOperatingProcedures
VersionSeptember14,2011CopyrightCaldeiraQuality,LLCFirstTimeQuality,LLC1814HarewoodLn.,Crofton,MD,21114.

Questions? Call Ed Caldeira 410-451-8006

[CompanyName]
Project Submittal Form
VersionSeptember28,2011

SubmittalID#

ProjectID

ProjectName

[ProjectNumber]

[ProjectName]

From:[CompanyName]
Location:

TypeofSubmittal:

Descriptionofsubmittal:

ge
s

To:

Date

Pa

Shopdrawing
Productdata
Requestforinformation
Completedformorqualityrecord

ct
ed

Qualitysystemdocument

Other:

Remarks:

Se

le

Listofattachments:

SubmittalPreparedby:
[CompanyName]

Name:

Title:

Signature/Date:

SubmittalApprovedby[CompanyName]QualityManager:

Name:

Title:

Signature/Date:

CustomerDisposition:

CustomerRepresentative:

Name:

Title:

Signature/Date:

Approved
Conditionallyapproved,resubmissionnotrequired(see
comments)
Disapproved,resubmissionrequired

Other:
Comments:

Page24
Quality Assurance/Quality Control Plan Sample
Copyright 2011 All Rights Reserved - Caldeira Quality, LLC | First Time Quality, LLC | 1814 Harewood Ln., Crofton, MD 21114

Questions? Call Ed Caldeira 410-451-8006

For More Information:


Contact:EdCaldeira
4104518006
www.firsttimequality.com
EdC@FirstTimeQuality.com

ForMoreInformation,contact:EdCaldeiraCaldeiraQuality,LLCFirstTimeQuality
4104518006www.firsttimequality.comEdC@FirstTimeQuality.com

Anda mungkin juga menyukai