DAFTAR KEBUTUHAN BAHAN

NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45

BAHAN
Pasir Urug
Pasir Pasang
Pasir Beton
Split Pecah Mesin 2/3
Batu Belah
Bata Merah
PC (50 Kg)
Semen Warna
Plamir Tembok
Cat Tembok Vinilex
Rol Cat
Kwas 3"
Oker
Spirtus
Sirlax Ex. India
Ampelas
Dempul
Lem Putih (FOX)
Papan Terentang
Kayu Borneo Super
Reng Kayu 2/3 Kamper Banjar
Gypsum Board
Kayu Jati Jabar
Profil Gypsum 5/5
Keramik 20/20
Keramik 30/30
Keramik 20/25
Keramik 10/20
Besi beton rata-rata
Kawat Beton
Paku 5-7
Paku 8 - 12
Pipa PVC 1/2"
Pipa PVC 3"
Sambungan 1/2"
Sambungan 3"
Lem Paralon
Genteng
Genteng Bubungan genteng ex Jatiwangi
Pompa Sanyo 200 Watt
Kran air
Kran Leher Angsa
Closet jongkok
Closet duduk
Hand Shower

VOLUME
9.74
108.75
21.69
36.04
79.59
58,443.00
752.02
4.48
228.91
368.02
14.31
1.41
4.24
28.30
28.30
729.50
4.24
2.06
6.41
16.25
0.55
117.63
2.17
225.00
17.42
260.68
66.66
3.33
6,425.29
61.19
416.82
18.01
5.00
10.00
25.00
120.00
9.85
2,514.52
136.00
1.00
16.00
1.00
2.00
2.00
2.00

m3
m3
m3
m3
m3
bh
zak
kg
kg
kg
bh
bh
KG
LT
/ Kg
/ Kg
/ Kg
/ Kg
m3
m3
m3
lbr
m3
M'
m2
m2
m2
m2
kg
kg
kg
kg
BTG
BTG
bh
bh
bh
bh
bh
unit
bh
bh
bh
bh
bh

NO
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75

BAHAN
Septicktank
Floordrain
Shoap Holder
Besi Tempa u Tangga dan Teras
Pemasangan Handle Pintu Utama
Pemasangan Kunci Pintu
Pemasangan Kunci Pintu Rumah Utama
Handel Pintu KM/WC Rumah (Utama)
Kunci Pintu KM/WC
Handel Pintu KM/WC Pembantu
Engsel Pintu Utama
Engsel Pintu Ruangan
Engsel Jendela
Hak Angin Jendela
Selot Angin Jendela
Daun pintu jalusi kayu jati jabar garage
Daun pintu panel kayu jati jabar Utama
Daun pintu panel kayu jati jabar l = 80 cm
Daun pintu panel kayu jati jabar l = 70 cm
Daun pintu jalusi kayu jati jabar teras belakang
Daun jendela jalusi kayu jati jabar
Pasang kaca polos
Pemasangan List kaca
Instalasi titik lampu
Instalasi stop kontak
Stopkontak
Armatur lampu XL 25 Watt
Lampu Taman
Pagar keliling taman
Batu pearlstone

VOLUME
1.00
4.00
2.00
8.50
1.00
1.00
9.31
2.00
2.00
2.00
6.00
783.34
16.25
16.25
16.25
6.00
1.00
8.00
6.00
4.00
19.00
34.36
129.80
36.00
15.00
15.00
36.00
2.00
30.60
38.00

unit
unit
unit
m'
unit
unit
unit
unit
unit
unit
bh
bh
bh
bh
bh
bh
unit
bh
bh
bh
bh
m2
m
bh
bh
bh
bh
bh
m'
krg

BAHAN

H. SATUAN
185,000.00
245,000.00
275,000.00
250,000.00
220,000.00
550.00
70,000.00
10,000.00
7,000.00
8,500.00
25,000.00
8,000.00
20,000.00
4,500.00
75,000.00
2,000.00
45,000.00
9,000.00
3,000,000.00
4,000,000.00
8,000,000.00
50,000.00
12,000,000.00
7,500.00
36,000.00
38,000.00
38,000.00
31,500.00
8,500.00
15,000.00
15,000.00
15,000.00
18,500.00
145,000.00
1,500.00
8,500.00
7,500.00
2,500.00
7500
3,250,000.00
95,000.00
215,000.00
85,000.00
1,350,000.00
265,000.00

JUMLAH
1,801,992.50
26,643,505.00
5,964,964.84
9,010,265.63
17,509,910.00
32,143,650.00
52,641,724.17
44,804.50
1,602,384.00
3,128,148.75
357,675.00
11,319.86
84,898.98
127,348.47
2,122,474.50
1,458,999.66
191,022.71
18,568.44
19,230,507.91
64,984,799.12
4,400,414.57
5,881,650.00
25,995,816.00
1,687,500.00
627,210.00
9,905,878.00
2,533,080.00
104,989.50
54,614,940.60
917,898.16
6,252,289.01
270,124.20
92,500.00
1,450,000.00
37,500.00
1,020,000.00
73,875.00
6,286,306.53
1,020,000.00
3,250,000.00
1,520,000.00
215,000.00
170,000.00
2,700,000.00
530,000.00

H. SATUAN
1,500,000.00
75,000.00
55,000.00
500,000.00
750,000.00
375,000.00
350,000.00
375,000.00
175,000.00
75,000.00
75,000.00
22,500.00
15,000.00
55,000.00
45,000.00
500,000.00
850,000.00
450,000.00
450,000.00
500,000.00
250,000.00
85,000.00
3,000.00
60,000.00
60,000.00
35,000.00
35,000.00
450,000.00
350,000.00
25,000.00

JUMLAH
1,500,000.00
300,000.00
110,000.00
4,250,000.00
750,000.00
375,000.00
3,257,838.15
750,000.00
350,000.00
150,000.00
450,000.00
17,625,107.41
243,693.00
893,540.99
731,078.99
3,000,000.00
850,000.00
3,600,000.00
2,700,000.00
2,000,000.00
4,750,000.00
2,920,600.00
389,400.00
2,160,000.00
900,000.00
525,000.00
1,260,000.00
900,000.00
10,710,000.00
950,000.00
439,987,194.14

DAFTAR UPAH PEKERJA


KOTA BANDUNG

NO

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

URAIAN PEKERJA

MANDOR
PEKERJA
PEKERJA TERAMPIL
PEKERJA SETENGAH TERAMPIL
TUKANG GALI
KEPALA TUKANG KAYU
TUKANG KAYU TERAMPIL
TUKANG KAYU SETENGAH TERAMPIL
KEPALA TUKANG BATU
TUKANG BATU TERAMPIL
TUKANG BATU SETENGAH TERAMPIL
TUKANG BESI PROFIL SETENGAH TERAMPIL
TUKANG BESI PROFIL TERAMPIL
KEPALA TUKANG BESI PROFIL
TUKANG BESI BETON SETENGAH TERAMPIL
TUKANG BESI BETON TERAMPIL
KEPALA TUKANG BESI BETON
TUKANG CAT SETENGAH TERAMPIL
TUKANG CAT TERAMPIL
KEPALA TUKANG CAT
OPERATOR ALAT BESAR
PEMBANTU OPERATOR/MEKANIK
SUPIR TRUCK
KENEK TRUCK
PENJAGA MALAM

HARGA
UPAH
Rp
125,000.00
60,000.00
70,000.00
65,000.00
80,000.00
90,000.00
85,000.00
80,000.00
90,000.00
85,000.00
80,000.00
80,000.00
85,000.00
90,000.00
80,000.00
85,000.00
90,000.00
80,000.00
85,000.00
90,000.00
150,000.00
95,000.00
100,000.00
65,000.00
100,000.00

JA

SATUAN

ORG/HR/8JAM
ORG/HR/8JAM
ORG/HR/8JAM
ORG/HR/8JAM
ORG/HR/8JAM
ORG/HR/8JAM
ORG/HR/8JAM
ORG/HR/8JAM
ORG/HR/8JAM
ORG/HR/8JAM
ORG/HR/8JAM
ORG/HR/8JAM
ORG/HR/8JAM
ORG/HR/8JAM
ORG/HR/8JAM
ORG/HR/8JAM
ORG/HR/8JAM
ORG/HR/8JAM
ORG/HR/8JAM
ORG/HR/8JAM
ORG/HR/8JAM
ORG/HR/8JAM
ORG/HR/8JAM
ORG/HR/8JAM
ORG/HR/8JAM

KET

DAFTAR HARGA SATUAN MATERIAL

NO

NAMA MATERIAL

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

AGREGAT KASAR, BAHAN PEREKAT


DAN BAHAN LAINNYA
Pasir Urug
Pasir Pasang Kali
Pasir Beton Kls I
Abu Batu
Batu gosok apung
Sirtu
Tanah merah
Kerikil ( batu koral beton kali )
Batu Pecah Mesin 1/2
Batu Pecah Mesin 2/3
Batu Pecah Mesin 3/5
Batu Pecah Mesin 5/7
Batu Belah Pondasi
Batu Palimanan 20/20
Bata Merah Ex. Jatiwangi Kls I
Aspal
Hotmix jadi
Ready Mix K-225
Kansteen 1 = 60 cm
Semen PC Tiga roda ( 50 Kg)
Semen Warna

B
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

BAHAN FINISHING
Plamir Tembok
Plamir Kayu
Cat Tembok Vinilex
Cat Kayu SEIV
Cat Besi SEIV
Rol Cat Tembok
Solignem 1 blek
Kwas 3"
Oker
Oyan
Spirtus
Bahan Plitur Sirlax Ex. India
Terpentin
Thiner A
Thiner B
Amplas
Dempul Kayu Cap Kucing
Wood filler INFRA
Meni Kayu/ Besi
Zincromat
Lem Kuning

NO
43

NAMA MATERIAL
Lem FOX

NO

NAMA MATERIAL

C
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62

BAHAN KAYU BERIKUT BAHAN JADINYA


Kayu Terentang
Kayu bakar
Kayu Balok Borneo Super
Kayu Papan Borneo Super
Kayu Balok Kamper Medan (Kruing)
Kayu Papan Kamper Medan (Kruing)
Kayu Balok Kamper Banjar
Kayu Papan Kamper Banjar
Kayu Balok Kamper Samarinda Oven
Kayu Papan Kamper Samarinda Oven
Kayu Balok Jati Jabar
Kayu Papan Jati Jabar
Dolken 7 s/d 10
List Kayu Profil Kamper 1X1
List Kayu Profil Kamper 2X1
List Kayu Profil Kamper 4X1
List Kayu Profil Kamper 5X1
List Kayu Profil Kamper 10X1,5
Kayu Reng 3/4 Kamper Banjar

D
63
64
65
66
67

BAHAN PENUTUP RANGKA PLAFOND


Bahan Plafond Asbes Semen 5 mm
Bahan Plafond Hardflex 5 mm 120 x 240 mm
Bahan Plafond Gypsum 120 x 240 mm t = 9 mm DN
List Profil Gypsum 3/3
List Profil Gypsum 5/5

E
68
69
70
71
72
73
74

BAHAN KAYU LAPIS


Tripleks 3 mm 120 x 240 mm
Tripleks 4 mm 120 x 240 mm
Multipleks 6 mm 120 x 240 mm
Multipleks 9 mm 120 x 240 mm
Teakwoood 3 mm 120 x 240 mm
Teakwoood 4 mm 120 x 240 mm
Formika

F
75
76
77
78
79
80
81
82
83
84

BAHAN LANTAI DAN PELAPIS DINDING


Keramik 20/20 (KM) KW I Warna/Corak
Keramik 20/25 (KM) KW I Warna/Corak
Keramik 30/30 KW I Warna/Corak
Keramik 30/30 KW I Putih polos
Keramik 40/40 KW I Warna/Corak
Keramik 10/20 KW1 Warna/Corak
Bahan Waterprofing coating Weldecrete
Karpet Kelas Sedang LN
Stairnousing fiber
Stairnousing Keramik 10/20

G
85
86

BAHAN SALURAN AIR KOTOR/BERSIH


Grafel U 20 cm
Grafel U 30 cm

NO

NAMA MATERIAL

NO

NAMA MATERIAL

H
87
88
89
90
91
92
93
94
95
96
97
98
99
100

BAHAN LOGAM DAN BAHAN JADINYA


Besi Beton U-24 Rata-rata
Besi Beton U-39 Rata-rata
Baja IWF Ex. DN SII
Besi profil DN SII
Besi Lip Chanel
Kawat Beton
Kawat Las Listrik
Kusen Alumunium Warna 1.3 mm
Daun Pintu Alumunium Warna 1.3 mm
Daun Jendela Alumunium Warna 1.3 mm
Handle Alumunium
Kait Angin Jendela
Karet Assecories Kusen / Pintu Alumunium
Pipa Stainless Steel 2"

I
101
102
103
104

BAHAN KACA
Kaca Polos 5 mm
Kaca Polos 3 mm
Glasblok DN 20x20 ( kedawung )
Kaca Es

J
105
106
107

BAHAN PAKU DAN MUR BAUT


Paku 4 s/d 7 cm
Paku 8 s/d 12 cm
Angkur Mur Baut L = 60 cm

J
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122

BAHAN PEMIPAAN
Pipa Paralon Dia. 1/2"
Pipa Paralon Dia. 1 1/2"
Pipa Paralon Dia. 3"
Pipa Paralon Dia. 4"
Macam-macam Sambungan 1/2 "
Macam-macam Sambungan 1 1/2 "
Macam-macam Sambungan 3 "
Macam-macam Sambungan 4 "
Lem Paralon
Pipa PVC 4" Berlobang Jenis AW
Pipa BSP Dia. 2" (12 m')
Pipa GIP Dia. 1/2"
Pipa GIP Dia. 3/4"
Pipa GIP Dia. 1 1/2"
Pipa GIP Dia. 2"

NO

NAMA MATERIAL

G
123
124
125
126
127
128
129
130
131
132
133

BAHAN SANITAIR DAN ASSECORIES


Gate Valve 1/2"
Floor Drain Stainless Steel
Kran Tembok 1/2"
Tempat Sabun Porselen
Wastafel Lengkap TOTO Standard Putih
Closet Duduk Lengkap TOTO Standard Putih
Bak mandi fiberglass
Closet Jongkok Lengkap TOTO Standard Putih
Urinoar Lengkap TOTO Standard Putih
Penyekat Porslin Urinoar TOTO
Kitchen Zink Stainless Standard

G
134
135
136
137
138
139
140

BAHAN PENUTUP ATAP


Alumunium Foil
Atap Genteng Beton Warna 14.5/ m2
Atap Genteng MORANDO Warna
Genteng Bubungan morando
Seng Gelombang BJLS 30 dia 60 cm
Seng Gelombang BJLS 30 dia 90 cm
Seng Datar BJLS

H
141
142
143
144
145

ALAT
Buldozer
Excafator
Vibro Roller
Dump truk
Water tank Truk

GA SATUAN MATERIAL
HARUS DI COCOKAN DENGAN HARGA CIREBON

HARGA
SATUAN
Rp

KETERANGAN

185,000.00
245,000.00
275,000.00
150,000.00
12,000.00
150,000.00
100,000.00
250,000.00
250,000.00
250,000.00
250,000.00
250,000.00
220,000.00
55,000.00
550.00
4,150.00
510,000.00
750,000.00
20,000.00
70,000.00
10,000.00

/ m3
/ m3
/ m3
/ m3
/kg
/ m3
/ m3
/ m3
/ m3
/ m3
/ m3
/ m3
/ m3
/ m2
/ bh
/ Kg
/ ton
/m3
/ bh
/ zak
/ Kg

7,000.00
13,000.00
12,000.00
50,000.00
50,000.00
25,000.00
11,000.00
8,000.00
20,000.00
11,000.00
4,500.00
75,000.00
3,000.00
15,000.00
20,000.00
2,000.00
45,000.00
45,000.00
13,500.00
15,000.00
8,500.00

/ Kg
/ Kg
/ Kg
/ Kg
/ Kg
/ bh
/ 5 lt
/ bh
/ Kg
/ Kg
/ lt
/ Kg
/ lt
/ lt
/ lt
/ lbr
/ Kg
/ Kg
/ Kg
/ Kg
/ Kg

HARGA
SATUAN
Rp
9,000.00 / Kg

KETERANGAN

HARGA
SATUAN
Rp

KETERANGAN

3,000,000.00
175,000.00
4,000,000.00
4,000,000.00
8,000,000.00
8,000,000.00
8,000,000.00
8,000,000.00
8,500,000.00
8,500,000.00
12,000,000.00
12,000,000.00
14,000.00
2,000.00
2,900.00
4,300.00
11,000.00
13,500.00
3,400.00

/ m3
/ m3
/ m3
/ m3
/ m3
/ m3
/ m3
/ m3
/ m3
/ m3
/ m3
/ m3
/ btg
/ m'
/ m'
/ m'
/ m'
/ m'
/ m'

12,000.00
42,000.00
50,000.00
12,500.00
17,500.00

/ m2
/ lbr
/ lbr
/ m'
/ m'

50,000.00
65,000.00
100,000.00
175,000.00
100,000.00
125,000.00
150,000.00

/ lbr
/ lbr
/ lbr
/ lbr
/ lbr
/ lbr
/ lbr

36,000.00
38,000.00
38,000.00
45,000.00
62,500.00
31,500.00
42,000.00
205,000.00
10,500.00
6,900.00

/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/m
/ bh

17,500.00 / m'
19,000.00 / m'

HARGA
SATUAN
Rp

KETERANGAN

HARGA
SATUAN
Rp

KETERANGAN

8,500.00
8,500.00
9,500.00
8,500.00
8,500.00
15,000.00
20,000.00
100,000.00
85,000.00
85,000.00
55,000.00
65,000.00
3,000.00
275,000.00

/ Kg
/ Kg
/ Kg
/ Kg
/ Kg
/ Kg
/ Kg
/ m'
/ m'
/ m'
/ bh
/ ps
/ m'
/ 6 m'

85,000.00
60,000.00
14,500.00
71,500.00

/ m2
/ m2
/bh
/ m2

15,000.00 / Kg
15,000.00 / Kg
25,000.00 / bh

18,500.00
60,000.00
145,000.00
185,000.00
1,500.00
4,200.00
8,500.00
12,500.00
7,500.00
16,800.00
116,500.00
22,500.00
31,000.00
47,000.00
52,000.00

/ btg
/ btg
/ btg
/ btg
/ bh
/ bh
/ bh
/ bh
/ tb
/ kg
/ bt
/ m'
/ m'
/ m'
/ m'

HARGA
SATUAN
Rp

KETERANGAN

25,000.00
55,000.00
38,500.00
20,000.00
620,000.00
1,600,000.00
175,000.00
143,000.00
1,250,000.00
517,000.00
550,000.00

/ bh
/ bh
/ bh
/ bh
/ unit
/ unit
/ unit
/ unit
/ unit
/ unit
/ unit

10,000.00
40,000.00
1,950.00
3,900.00
18,500.00
28,000.00
28,600.00

/ m2
/ m2
/bh
/ bh
/ m'
/ m'
/ m'

150,000.00
150,000.00
175,000.00
75,000.00
75,000.00

/jam
/jam
/jam
/jam
/jam

RENCANA ANGGARAN BIAYA (RAB) & RENCANA ANGGARAN PELAK


RUMAH KOS BONJOT - KARANGANYAR (REV2)
NO

URAIAN PEKERJAAN

VOLUME

1
A
I
I.1
I.2
I.3
I.4

LANTAI 1
PEKERJAAN PERSIAPAN
Pek. Persiapan
Pek. Bouwplank
Pek. Gudang dan barak pekerja
Pek. Pembersihan lahan

II
II.1
II.2

PEKERJAAN TANAH
Pekerjaan galian tanah pondasi Batu kali & Pondasi telapak
Pekerjaan urugan tanah kembali

M3
M3

III
III.1
III.2

PEKERJAAN PONDASI
Pek. Urugan pasir bawah pondasi 10 cm
Pek. Pondasi Batu Belah 1:5
Pek. Beton Pondasi telapak 0.8m x 0.8m
Pek. Beton Pondasi telapak 1m x 1m
Pek. Beton Pondasi telapak 1.2m x 1.2m

M3
M3
M3
M3
M3

IV
IV.1
IV.2
IV.3

PEKERJAAN DINDING
Pek. Bata Merah
Pek. Plesteran + Acian
Pas. Keramik Dinding 20x30
Pas. Keramik Dinding 20x20

M2
M2
M2
M2

V
V.1

PEKERJAAN BETON
Pek. Kolom 40/40
Pek. Kolom Praktis 15/15
Pek. Kolom 20/20
Pek. Kolom 30/30
Pek. Beton Sloof 12/20
Pek. Beton Sloof 15/20
Pek. Beton Sloof 20/20
Pek. Balok beton 20/30
Pek. Balok beton 25/45
Pek. Balok ANAK 15/20
Pek. Balok Latei 12/20
Pek. Balok Latei 15/15
Pek. Balok Latei 15/20
Pek. Ringbalk 20/30
Pek. Ringbalk 15/20
Pek. Ringbalk 15/25
Pek. Plat beton lantai tbl 10cm

III.3

V.2

V.4

V.5
VI
VI.1
VI.2

VI.3
VI.4

PEKERJAAN LANTAI
Pek. Urugan Pasir bawah Lantai Kerja 5 cm
Pek. Lantai Kerja Bawah Keramik T=5Cm
Pas. Keramik Lantai Uk. 60x60 Putih
Pas. Keramik Lantai Uk. 40x40 Putih
Pas. Keramik Lantai Uk. 30x30 Putih
Pas. Keramik Lantai Uk. 20x20 Putih
Pas. Plint warna Putih

1.00 Ls
M'
M2
m2

29.44
23.11
4.84
14.40
7.87
16.83
7.81

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

M3
M2
M2
M2
M2
M2
M'

NO
1
VII
IV.1

URAIAN PEKERJAAN

VOLUME

PEKERJAAN LANGIT - LANGIT


Pas. Plafond + Rangka hollow

M2

VIII
VIII.1
VIII.2
VIII.3
VIII.4
VIII.5
VIII.6
VIII.7
VIII.8
VIII.9

PEKERJAAN PINTU & JENDELA


Pek. Kusen Alumunium
Pas. Daun Pintu Alumnium
Pek. Daun Jendela Alumunium
Pas. Pintu Galvalume
Pas. Handle Kunci Pintu
Pas. Kunci Slot Jendela
Pas. Kaca Bening 5mm
Pas. Engsel Pintu
Pas. Engsel Jendela

M'
Unit
Unit
Unit
Bh
Bh
M2
Bh
Bh

IX
IX.1
IX.2
IX.3
IX.4
IX.5
IX.6
IX.7

PEKERJAAN ATAP

IX
IX.1
IX.2
IX.3
IX.4
IX.5
IX.6
IX.7

PEKERJAAN SANITAIR
Pek. Saluran Pipa PVC 3/4"
Pek. Saluran Air Kotor PVC 3"
Pek. Saluran Air Kotor PVC 4"
Pek. Saluran Air Kotor PVC 6"
Pek. Closet Jongkok
Pas. Kran Dinding
Pas. Floor Drain Stainless

M'
M'
M'
M'
Bh
Bh
Bh

X
X.1
X.2
X.3
X.4
X.5
X.6
X.7
X.8

PEKERJAAN ELEKTRIKAL
Pek. Box Panel Induk
Pek. Instalasi Penerangan
Pek. Instalasi Saklar
Pek. Instalasi Stop Kontak
Pas. Saklar lampu ex. Panasonic
Pas. Stop Kontak ex. Panasonic
Pas. Down Light + lampu
Pas. Grounding

Unit
Ttk
Ttk
Ttk
Bh
Bh
Bh
Ls

XI
XI.1
XI.2
XI.3

PEKERJAAN FINISHING
Pek. Pengecatan Dinding Ex. Dulux
Pek. Pengecatan Plafond Ex. Dulux
Pek. Melamik Daun Pintu Teakwood PJ1

M2
M2
Unit

XII
XII.1
XII.2
XII.3
XII.4
XII.5
XII.6

PEKERJAAN LAIN-LAIN
Pek. Pagar Bata & Pintu Geser Gerbang
Pek. Railling tangga
Pek. Bor Sumur Air + Pompa
Pek. Sumur Resapan
Pek. Septictank
Pas. Paving Block

M'
M'
Ls
Ls
Ls
m2

M'
M'
M'
M'
Bh
Bh
Bh

JUMLAH A (LANTAI 1)

NO

URAIAN PEKERJAAN

VOLUME

A
B
C

BIAYA BANGUNAN
LUAS BANGUNAN ( 2 LANTAI )
HARGA PERMETER PERSEGI BANGUNAN

348.68 M2

B) & RENCANA ANGGARAN PELAKSANAAN (RAP)


ONJOT - KARANGANYAR (REV2)
RAB
HARGA SATUAN
( Rp. )
4

500,000.00
43,800.00
2,657,545.00
14,575.00
Sub Total 1

JUMLAH HARGA
( Rp. )
5

500,000.00
500,000.00

66,632.50
17,396.50
Sub Total 2

268,675.00
810,100.50
3,570,165.50
3,570,165.50
3,570,165.50
Sub Total 3

234,822.50
53,000.75
141,603.00
139,403.00
Sub Total 4

5,178,472.93
10,270,841.29
12,333,654.30
7,059,843.02
8,610,460.10
8,770,700.64
8,964,620.87
8,014,599.39
6,078,299.17
8,770,700.64
8,610,460.10
10,270,841.29
8,770,700.64
8,014,599.39
6,826,235.68
7,912,452.34
6,826,235.68
Sub Total 5
268,675.00
126,808.00
322,116.85
181,937.25
191,856.50
172,999.20
56,008.15
Sub Total 6

152,454,243.16
237,333,465.08
59,694,886.81
101,661,739.52
67,791,874.46
147,637,203.95
70,031,618.21
836,605,031.19
-

RAB
HARGA SATUAN
( Rp. )
4

JUMLAH HARGA
( Rp. )
5

120,000.00
Sub Total 7

#REF!

114,895.00
94,270.00
94,270.00
400,000.00
292,943.75
49,637.50
119,618.13
55,103.13
44,068.75
Sub Total 8

Sub Total 9

23,100.00
36,100.00
44,100.00
75,000.00
350,000.00
35,000.00
85,000.00
Sub Total 9

1,000,000.00
225,000.00
225,000.00
225,000.00
25,000.00
25,000.00
85,000.00
1,000,000.00
Sub Total 10

35,900.00
39,700.00
750,000.00
Sub Total 11

1,500,000.00
500,000.00
5,000,000.00
2,500,000.00
6,847,400.00
135,000.00
Sub Total 12

#REF!

RAB
HARGA SATUAN
( Rp. )
4

JUMLAH HARGA
( Rp. )
5
#REF!
#REF!

DIMENSI DAN BERAT BATANG TULANGAN BAJA


STANDAR INDUSTRI INDONESIA ( SII 0136-80 )
No

Diameter
nominal
(mm)

Luas
nominal
(cm2)

D6
D8
D9
D10
D12
D13
D14
D16
D18
D19
D20
D22
D25
D28
D29
D32

6
8
9
10
12
13
14
16
18
19
20
22
25
28
29
32

0.283
0.503
0.636
0.786
1.131
1.328
1.540
2.011
2.546
2.836
3.143
3.803
4.911
6.160
6.608
8.046

0.222
0.395
0.499
0.617
0.888
1.040
1.210
1.580
2.000
2.230
2.470
2.980
3.850
4.830
5.190
6.310

17

D36

36

10.183

7.990

18

D40

40

12.571

9.870

19

D50

50

19.643

15.400

Panjang
per m3

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

No

kode

Tulangan Baja
Polos
Deform

P6
P8
P9
P10
P12
P13
P14
P16
P18
P19
P20
P22
P25
P28
P32

Nama

Ukuran ( m )
b

STORY 1
K 40/40

0.4

0.4

6.25

K 30/30

0.3

0.3

11.11

K 20/20

0.2

0.2

25.00

K 15/15

0.15

0.15

44.44

S 12/20

0.12

0.2

41.67

S 15/20

0.15

0.2

33.33

S 20/20

0.2

0.2

25.00

Berat
nominal
(kg/m)

Tulangan
pokok

16
1.580
16
1.580
16
1.580
12
0.888
12
0.888
12
0.888
12

jumlah

8.0
8.0
8.0
4.0
4.0
6.0
8.0

B 15/20

0.15

0.2

33.33

B 20/30

0.2

0.3

16.67

B 25/45

0.25

0.45

8.89

BL

BL 12/20

0.12

0.2

41.67

BL

BL 15/15

0.15

0.15

44.44

BL

BL 15/20

0.15

0.2

33.33

RB

RB 20/30

0.2

0.3

16.67

RB

RB 15/25

0.15

0.25

26.67

RB

RB 15/20

0.15

0.2

33.33

0.1

10.00

10

Po

1.2

0.3

2.78

11

PELAT
LANTAI
PELAT
PONDASI
PELAT
TANGGA

0.15

6.67

STORY 2
B 15/15

0.15

0.15

44.44

B 20/30

0.2

0.3

16.67

B 12/20

0.12

0.2

41.67

K1

0.25

0.4

10.00

K2

0.2

0.35

14.29

K3

0.15

0.15

44.44

0.888
12
0.888
16
1.580
16
1.580
12
0.888
12
0.888
12
0.888
16
1.580
12
0.888
12
0.888
10
0.617
16
1.580
16
1.580

12
0.888
16
1.580
12
0.888
19
2.230
16
1.580
12
0.888

6.0
8.0
10.0
4.0
4.0
6.0
8.0
6.0
6.0
10.0
8.0
6.7

4.0
8.0
4.0
8.0
8.0
4.0

Tulangan
Montase

12
0.888
12
0.888
12
0.888
12
0.888
10
0.617
10
0.617
10

jumlah

sengkang

10
0.617
10
0.617
10
0.617
8
0.395
6
0.222
8
0.395
8

Jarak rata2
sengkang

panjang
sengkang

Berat besi
kg

Bekesting
m2

0.15

66.67

120.13

10.00

0.15

88.89

195.29

13.33

0.1

200.00

439.40

20.00

0.15

177.78

228.09

26.67

0.15

177.78

187.47

21.67

0.15

155.56

239.04

18.33

0.15

133.33

230.27

20.00

0.617
10
0.617
12
0.888
12
0.888
10
0.617
10
0.617
10
0.617
12
0.888
10
0.617
10
0.617
10
0.617
10
0.617
16
1.580

0.395
8
0.395
8
0.395
8
0.395
6
0.222
8
0.395
8
0.395
8
0.395
8
0.395
8
0.395
10
0.617
16
1.58
10
0.617

12
0.888
8
0.395
12
0.888
8
0.395
8
0.395
8
0.395

8
0.395
8
0.395
6
0.222
10
0.617
10
0.617
8
0.395

0.15

155.56

239.04

18.33

0.15

111.11

254.56

13.33

0.15

82.96

173.21

10.22

0.15

177.78

187.47

21.67

0.15

177.78

228.09

26.67

0.15

155.56

239.04

18.33

0.15

111.11

254.56

13.33

0.15

142.22

198.26

17.33

0.15

155.56

239.04

18.33

0.1

220.00

197.44

12.00

0.15

55.56

122.89

5.00

0.15

102.22

133.29

8.67

0.15

177.78

228.09

26.67

0.15

111.11

254.56

13.33

0.15

177.78

187.47

21.67

0.15

86.67

231.87

10.50

0.15

104.76

245.21

12.86

0.2

133.33

210.53

26.67

6.25

Stootwerk
m2

10

Harga
besi /kg

bekesting/m2

Stoot werk/m2

beton/m3

2.08

16,590.00

148,300.00

181,000.00

1,048,000.00

2.08

16,590.00

148,300.00

181,000.00

1,048,000.00

2.08

16,590.00

148,300.00

181,000.00

1,048,000.00

2.08

16,590.00

148,300.00

181,000.00

1,048,000.00

16,590.00

148,300.00

181,000.00

1,048,000.00

16,590.00

148,300.00

181,000.00

1,048,000.00

16,590.00

148,300.00

181,000.00

1,048,000.00

8.33

16,590.00

148,300.00

181,000.00

1,048,000.00

5.83

16,590.00

148,300.00

181,000.00

1,048,000.00

4.22

16,590.00

148,300.00

181,000.00

1,048,000.00

16,590.00

148,300.00

181,000.00

1,048,000.00

16,590.00

148,300.00

181,000.00

1,048,000.00

16,590.00

148,300.00

181,000.00

1,048,000.00

16,590.00

148,300.00

181,000.00

1,048,000.00

16,590.00

148,300.00

181,000.00

1,048,000.00

16,590.00

148,300.00

181,000.00

1,048,000.00

16,590.00

148,300.00

181,000.00

1,048,000.00

16,590.00

148,300.00

181,000.00

1,048,000.00

6.67

16,590.00

148,300.00

181,000.00

1,048,000.00

26.67

16,590.00

148,300.00

181,000.00

1,048,000.00

10.00

16,590.00

148,300.00

181,000.00

1,048,000.00

25.00

16,590.00

148,300.00

181,000.00

1,048,000.00

2.08

16,590.00

148,300.00

181,000.00

1,048,000.00

2.08

16,590.00

148,300.00

181,000.00

1,048,000.00

2.08

16,590.00

148,300.00

181,000.00

1,048,000.00

10.00

2 nd floor
3 th floor
4 th floor
5 th floor
6 th floor

Total
harga /M3

volume
panjang/m

1.09
1.12
1.14
1.16
1.20

Koefisien lantai
m3

1.00

4,901,095.33

325

52

254,856,957.33

6,642,259.33

175

15.75

104,615,584.50

11,680,729.33

120

4.8

56,067,500.80

9,163,744.67

250

5.625

51,546,063.75

7,371,238.67

101

2.424

17,867,882.53

7,732,580.67

55

1.65

12,758,758.10

7,834,124.00

65

2.6

20,368,722.40

1.09

1.12

9,240,914.00

45

1.35

12,475,233.90

8,304,243.33

45

2.7

22,421,457.00

6,201,811.56

45

5.0625

31,396,671.00

7,371,238.67

45

1.08

7,960,937.76

8,786,661.33

45

1.0125

8,896,494.60

7,732,580.67

45

1.35

10,438,983.90

7,248,410.00

45

2.7

19,570,707.00

6,907,629.87

45

1.6875

11,656,625.40

7,732,580.67

45

1.35

10,438,983.90

7,913,129.60

55

5.5

43,522,212.80

3,828,226.67

120

43.2

165,379,392.00

5,751,269.73

30

4.5

25,880,713.80

13,613,328.00

325

7.3125

9,058,410.00

175

10.5

11,896,238.67

175

4.2

6,829,011.93

55

5.5

7,399,823.62

65

4.55

8,872,498.00

45

1.0125

888,119,882.47

1.140

1.160

1.200

NO.
A

URAIAN

KOEF

SAT

0.100
0.050

Oh
Oh

1 m' Pek. Pengukuran kembali (site) & Pemasangan Bowplank


Bahan
Kayu Kaso 5 / 7 (borneo)
0.012
Paku Biasa 2" - 5"
0.020

m3
Kg

B
Membersihkan Lapangan dan Perataan
Tenaga
Perkerja
Mandor
Total
Keuntungan (10%)
Harga Total

Kayu Papan 3 / 20 borneo


Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor
Total
Keuntungan (10%)
Harga Total
1 m Pembuatan Bedeng Buruh
Bahan
Dolken Kayu
Kayu Balok Borneo
Paku
Semen Portland
Pasir Beton
Koral Beton
Seng Gelombang
Plywood 4 mm
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor
Total
Keuntungan (10%)

0.007

m3

0.100
0.100
0.010
0.005

Oh
Oh
Oh
Oh

1.250
0.186
0.300
18.000
0.030
0.050
1.500
1.350

btg
m3
Kg
Kg
m3
m3
lbr
lbr

2.000
1.000
0.200
0.050

Oh
Oh
Oh
Oh

Harga Total
1 m Pembuatan Gudang Semen dan Alat - alat
Bahan
Dolken Kayu 8 - 10/400 cm
Kayu Balok Borneo
Paku
Semen Portland
Pasir Beton
Koral Beton
Seng Gelombang BJLS 32
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor

1.700
0.210
0.300
10.500
0.030
0.050
1.500

btg
m3
Kg
Kg
m3
m3
lbr

2.000
1.000
0.200
0.050

Oh
Oh
Oh
Oh

Total
Keuntungan (10%)
Harga Total
1 m3 Pek. Galian Tanah Biasa Max Kedalaman 3 m'
Tenaga
Perkerja
Mandor

0.735
0.073

Oh
Oh

Total
Keuntungan (10%)
Harga Total
1 m3 Urugan Tanah Kembali
Tenaga
Perkerja
Mandor

0.192
0.019

Oh
Oh

1.200

m3

0.300
0.010

Oh
Oh

Total
Keuntungan (10%)
Harga Total
1 m3 Pek. Urugan Pasir
Bahan
Pasir Urug
Tenaga
Perkerja
Mandor
Total
Keuntungan (10%)

Harga Total
1 m3 Pasangan Batu kali 1 Pc : 5Ps
Bahan
Batu Belah 15 / 20
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Total
Keuntungan (10%)
Harga Total
1 m2 Pasangan Bata Merah 1Pc : 3Ps 1 Bata
Bahan
Bata merah kelas I
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Total
Keuntungan (10%)
Harga Total
1 m2 Plesteran Dinding 1 : 3 + ACIAN
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Total
Keuntungan (10%)
Harga Total
1 m Pasang Dinding Keramik 20 x 20 cm
Bahan

1.100
136.000
0.544

m3
Kg
m3

1.500
0.600
0.060
0.075

Oh
Oh
Oh
Oh

140.000
32.950
0.091

bh
Kg
m3

0.650
0.200
0.020
0.030

Oh
Oh
Oh
Oh

8.0000
0.0260

kg
m3

0.2250
0.1525
0.0100
0.0080

org
org
org
org

Keramik 20 x 20 cm
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Total
Keuntungan (10%)
Harga Total
1 m Pasang Dinding Keramik 20 x 30 cm
Bahan
Keramik 20 x 30 cm
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

25.000
9.300
0.018
1.500

Bh
Kg
m3
Kg

0.6000
0.100
0.0450
0.0300

Oh
Oh
Oh
Oh

17.000
9.300
0.018
1.500

Bh
Kg
m3
Kg

0.6000
0.100
0.0450
0.0300

Oh
Oh
Oh
Oh

Total
Keuntungan (10%)
Harga Total
1 m Membuat Pondasi Beton Bertulang ( 150 Kg + bekisting )
Bahan
Kayu Terentang
0.200
Paku Biasa 2" - 5"
1.500
Minyak Bekisting
0.400
Besi Beton Polos
150.000
Kawat Beton
2.250
Semen Portland
323.000
Pasir Beton
0.520
Koral Beton
0.780
Tenaga
Perkerja
3.900
Tukang Batu
0.350
Tukang Kayu
1.040
Tukang Besi
1.050
Kepala Tukang
0.245

m3
Kg
Lt
Kg
Kg
Kg
m3
m3
Oh
Oh
Oh
Oh
Oh

Mandor

0.165

Oh

0.400
4.000
2.000
300.000
4.500
323.000
0.520
0.780
0.150
3.500
20.000

m3
Kg
Lt
Kg
Kg
Kg
m3
m3
m3
lbr
btg

7.300
0.350
3.300
2.100
0.570
0.250

Oh
Oh
Oh
Oh
Oh
Oh

Total
Keuntungan (10%)
Harga Total
1 m2 Membuat Lantai Kerja Beton Tumbuk 1 Pc : 3 Ps : 5 Kr
Bahan
Semen Portland
10.000
Pasir Beton
0.026
Koral Beton
0.044
Tenaga
Perkerja
1.150
Tukang Batu
0.020
Kepala Tukang
0.002
Mandor
0.006

Kg
m3
m3

Total
Keuntungan (10%)
Harga Total
1 m Membuat Beton Bertulang ( 300 Kg + bekisting )
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok Borneo
Plywood 9 mm
Dolken
Tenaga
Perkerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

Total
Keuntungan (10%)
Harga Total
1 m Membuat Beton Bertulang 1 Pc : 2Ps : 3 Splt

Oh
Oh
Oh
Oh

Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Total
Keuntungan (10%)
Harga Total
1 Kg Pembesian dengan Besi Polos atau Besi Ulir
Bahan
Besi Beton ( Polos / Ulir )
Kawat Beton
Tenaga
Perkerja
Tukang Besi
Kepala Tukang
Mandor
Total
Keuntungan (10%)
Harga Total
1 m2 Pasang Bekisting
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Plywood 9 mm
Dolken Kayu Galam 8 - 10 / 4m
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
Total
Keuntungan (10%)
Harga Total
1 m2 Pasang Bekisting untuk Pondasi
Bahan

336.000
0.540
0.810

Kg
m3
m3

2.000
0.350
0.035
1.000

Oh
Oh
Oh
Oh

1.050
0.015

Kg
Kg

0.036
0.016
0.0110
0.0050

Oh
Oh
Oh
Oh

0.040
0.400
0.200
0.350
2.000

m3
Kg
Lt
lbr
btg

0.300
0.330
0.0330
0.0060

Oh
Oh
Oh
Oh

Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
Total
Keuntungan (10%)
Harga Total
1 m2 Pasang Bekisting untuk Sloof
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
Total
Keuntungan (10%)
Harga Total
1 m2 Pasang Bekisting untuk Kolom
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu Borneo
Plywood 9 mm
Dolken Kayu Galam 8 - 10 / 4m
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
Total 1x pakai
Keuntungan (10%)
Harga Total
1 m2 Pasang Bekisting untuk Balok

0.040
0.300
0.100

m3
Kg
Lt

0.300
0.260
0.0260
0.0050

Oh
Oh
Oh
Oh

0.020
0.300
0.100

m3
Kg
Lt

0.300
0.260
0.0260
0.0050

Oh
Oh
Oh
Oh

0.020
0.400
0.100
0.015
0.350
2.000

m3
Kg
Lt
m3
lbr
btg

0.300
0.330
0.0330
0.0060

Oh
Oh
Oh
Oh

Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu Borneo
Plywood 9 mm
Dolken Kayu Galam 8 - 10 / 4m
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

0.020
0.400
0.100
0.015
0.350
2.000

m3
Kg
Lt
m3
lbr
btg

0.320
0.330
0.0330
0.0060

Oh
Oh
Oh
Oh

0.040
0.400
0.200
0.015
0.350
6.000

m3
Kg
Lt
m3
lbr
btg

0.320
0.330
0.033
0.006

Oh
Oh
Oh
Oh

Total
Keuntungan (10%)
Harga Total
1 m Pasang Lantai Keramik 20 x 20 cm
Bahan
Keramik Ukuran 20 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna

25.000
11.380
0.042
1.500

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang

0.6200
0.350
0.0350

Oh
Oh
Oh

Total
Keuntungan (10%)
Harga Total
1 m2 Pasang Bekisting untuk Lantai
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu Borneo
Plywood 9 mm
Dolken Kayu Galam 8 - 10 / 4m
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Mandor

0.0300

Oh

Total
Keuntungan (10%)
Harga Total
1 m Pasang Lantai Keramik 30 x 30 cm
Bahan
Keramik ukuran 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna

12.000
14.150
0.039
2.000

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.6200
0.350
0.0350
0.0300

Oh
Oh
Oh
Oh

Total
Keuntungan (10%)
Harga Total
1 m Pasang Lantai Keramik ukuran 60 x 60 cm
Bahan
Keramik ukuran 60 x 60 cm
Semen Portland
Pasir Pasang
Semen Warna

3.000
8.190
0.0450
1.0000

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.2500
0.120
0.0120
0.0125

Oh
Oh
Oh
Oh

Total
Keuntungan (10%)
Harga Total
1 m Pasang Lantai Keramik ukuran 40 x 40 cm
Bahan
Ubin Teralux Marmer 40 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna

6.250
8.800
0.0215
1.3000

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.6720
0.224
0.0220
0.0340

Oh
Oh
Oh
Oh

5.000
1.650
0.0032
0.1000

bh
Kg
m3
Kg

0.0900
0.090
0.0090
0.0045

Oh
Oh
Oh
Oh

Cor Beton
Besi Beton
Bekisting
Total
Keuntungan (10%)
Harga Total
1 m3 Cor Kolom 30x30

1.000
120.133
10.0000

m3
Kg
m2

Cor Beton
Besi Beton
Bekisting
Total
Keuntungan (10%)
Harga Total
1 m3 Cor Kolom 20x20

1.000
195.289
13.3333

m3
Kg
m2

1.000

m3

Total
Keuntungan (10%)
Harga Total
1 m' Pasang Plint Keramik ukuran 10 x 20 cm
Bahan
Plint Keramik Artistik 10 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Total
Keuntungan (10%)
Harga Total
1 m3 Cor Kolom 40x40

Cor Beton

Besi Beton
Bekisting
Total
Keuntungan (10%)
Harga Total
1 m3 Cor Kolom 15x15

439.400
20.0000

Kg
m2

Cor Beton
Besi Beton
Bekisting
Total
Keuntungan (10%)
Harga Total
1 m3 Cor Sloof 12x20

1.000
228.089
26.6667

m3
Kg
m2

Cor Beton
Besi Beton
Bekisting
Total
Keuntungan (10%)
Harga Total
1 m3 Cor Sloof 15x20

1.000
187.467
21.6667

m3
Kg
m2

Cor Beton
Besi Beton
Bekisting
Total
Keuntungan (10%)
Harga Total
1 m3 Cor Sloof 20x20

1.000
239.044
18.3333

m3
Kg
m2

Cor Beton
Besi Beton
Bekisting
Total
Keuntungan (10%)
Harga Total
1 m3 Cor Balok 15x20

1.000
230.267
20.0000

m3
Kg
m2

Cor Beton
Besi Beton
Bekisting
Total
Keuntungan (10%)

1.000
239.044
18.3333

m3
Kg
m2

Harga Total
1 m3 Cor Balok 20x30
Cor Beton
Besi Beton
Bekisting
Total
Keuntungan (10%)
Harga Total
1 m3 Cor Balok 25x45

1.000
254.556
13.3333

m3
Kg
m2

Cor Beton
Besi Beton
Bekisting
Total
Keuntungan (10%)
Harga Total
1 m3 Cor Balok Latei 12x20

1.000
173.215
10.2222

m3
Kg
m2

Cor Beton
Besi Beton
Bekisting
Total
Keuntungan (10%)
Harga Total
1 m3 Cor Balok Latei 15x15

1.000
187.467
21.6667

m3
Kg
m2

Cor Beton
Besi Beton
Bekisting
Total
Keuntungan (10%)
Harga Total
1 m3 Cor Balok Latei 15x20

1.000
228.089
26.6667

m3
Kg
m2

Cor Beton
Besi Beton
Bekisting
Total
Keuntungan (10%)
Harga Total
1 m3 Cor Ringbalk 15x20

1.000
239.044
18.3333

m3
Kg
m2

1.000

m3

Cor Beton

Besi Beton
Bekisting
Total
Keuntungan (10%)
Harga Total
1 m3 Cor Ringbalk 15x25

197.440
12.0000

Kg
m2

Cor Beton
Besi Beton
Bekisting
Total
Keuntungan (10%)
Harga Total
1 m3 Cor Ringbalk 20x30

1.000
198.258
17.3333

m3
Kg
m2

Cor Beton
Besi Beton
Bekisting
Total
Keuntungan (10%)
Harga Total
1 m3 Plat Lantai 10cm

1.000
254.556
13.3333

m3
Kg
m2

Cor Beton
Besi Beton
Bekisting
Total
Keuntungan (10%)
Harga Total
1 m Kusen Alumunium
Kusen Alumunium Warna 1.3 mm
Karet Assecories Kusen Alumunium
Ongkos Pasang
Alat Bantu
Total
Keuntungan (10%)
Harga Total
1 m Daun Pintu Alumunium
Daun Pintu Alumunium Warna 1.3 mm
Ongkos Pasang
Alat Bantu
Total
Keuntungan (10%)
Harga Total

1.000
197.440
12.0000

m3
Kg
m2

1.0000
1.0000
0.1250
0.0200

1.0000
0.0500
0.0200

m'
m'
ls
lot

m'
ls
lot

1 m Kusen Alumunium
Kusen Alumunium Warna 1.3 mm
Karet Assecories Kusen Alumunium
Ongkos Pasang
Total
Keuntungan (10%)
Harga Total
1 m2 Pasang Kaca 5mm
Bahan
Kaca Polos
Tenaga
Perkerja
Tukang
Kepala Tukang
Mandor
Total
Keuntungan (10%)
Harga Total
1 Buah Engsel Pintu
Bahan
Engsel Pintu
Tenaga
Perkerja
Tukang
Kepala Tukang
Mandor
Total
Keuntungan (10%)
Harga Total
1 Buah Engsel Jendela
Bahan
Engsel Jendela
Tenaga
Perkerja
Tukang
Kepala Tukang
Mandor
Total
Keuntungan (10%)
Harga Total
1 Buah Handle Pintu+Kunci

1.0000
0.0500
0.0200

m'
m'
ls

1.100

m2

0.0150
0.150
0.0150
0.0008

Oh
Oh
Oh
Oh

1.000

Bh

0.0150
0.150
0.0150
0.0008

Oh
Oh
Oh
Oh

1.000

Bh

0.0100
0.100
0.0100
0.0005

Oh
Oh
Oh
Oh

Bahan
Handle Pintu+Kunci
Tenaga
Perkerja
Tukang
Kepala Tukang
Mandor
Total
Keuntungan (10%)
Harga Total
1 Kunci Slot Jendela
Bahan
Kunci Selot
Tenaga
Perkerja
Tukang
Kepala Tukang
Mandor
Total
Keuntungan (10%)
Harga Total

1.000

Bh

0.0500
0.500
0.0500
0.0025

Oh
Oh
Oh
Oh

1.000

Bh

0.0200
0.200
0.0200
0.0010

Oh
Oh
Oh
Oh

HARGA SAT matrial

HARGA SAT upah

JUMLAH matrial

G=(CXE)

70,000.00
125,000.00

4,000,000.00
15,000.00

48,000.00
300.00

4,000,000.00

28,000.00
76,300.00
85,000.00
70,000.00
90,000.00
125,000.00

14,000.00
4,000,000.00
15,000.00
1,400.00
275,000.00
250,000.00
28,000.00
65,000.00

17,500.00
744,000.00
4,500.00
25,200.00
8,250.00
12,500.00
42,000.00
87,750.00
941,700.00
85,000.00
70,000.00
90,000.00
125,000.00

14,000.00
4,000,000.00
15,000.00
1,400.00
275,000.00
250,000.00
28,000.00

23,800.00
840,000.00
4,500.00
14,700.00
8,250.00
12,500.00
42,000.00
945,750.00
85,000.00
70,000.00
90,000.00
125,000.00

70,000.00
125,000.00

70,000.00
125,000.00

185,000.00

222,000.00
222,000.00
70,000.00
125,000.00

220,000.00
1,400.00
245,000.00

242,000.00
190,400.00
133,280.00
565,680.00
70,000.00
85,000.00
90,000.00
125,000.00

550.00
1,400.00
245,000.00

77,000.00
46,130.00
22,295.00
145,425.00
70,000.00
85,000.00
90,000.00
125,000.00

1,400.00
245,000.00

11,200.00
6,370.00
17,570.00
70,000.00
85,000.00
90,000.00
125,000.00

1,440.00
1,400.00
245,000.00
10,000.00

36,000.00
13,020.00
4,410.00
15,000.00
68,430.00
70,000.00
85,000.00
90,000.00
125,000.00

2,235.29
1,400.00
245,000.00
10,000.00

38,000.00
13,020.00
4,410.00
15,000.00
70,430.00
70,000.00
85,000.00
90,000.00
125,000.00

3,000,000.00
15,000.00
2,700.00
8,500.00
15,000.00
1,400.00
275,000.00
250,000.00

600,000.00
22,500.00
1,080.00
1,275,000.00
33,750.00
452,200.00
143,000.00
195,000.00
2,722,530.00
70,000.00
85,000.00
85,000.00
85,000.00
90,000.00

125,000.00

3,000,000.00
15,000.00
2,700.00
8,500.00
15,000.00
1,400.00
275,000.00
250,000.00
4,000,000.00
175,000.00
14,000.00

1,200,000.00
60,000.00
5,400.00
2,550,000.00
67,500.00
452,200.00
143,000.00
195,000.00
600,000.00
612,500.00
280,000.00
6,165,600.00
70,000.00
85,000.00
85,000.00
85,000.00
90,000.00
125,000.00

1,400.00
275,000.00
250,000.00

14,000.00
7,150.00
11,000.00
32,150.00
70,000.00
85,000.00
90,000.00
125,000.00

1,400.00
275,000.00
250,000.00

470,400.00
148,500.00
202,500.00
821,400.00
70,000.00
85,000.00
90,000.00
125,000.00

8,500.00
15,000.00

8,925.00
225.00
9,150.00
70,000.00
85,000.00
90,000.00
125,000.00

3,000,000.00
15,000.00
2,700.00
175,000.00
14,000.00

120,000.00
6,000.00
540.00
61,250.00
28,000.00
215,790.00
70,000.00
85,000.00
90,000.00
125,000.00

3,000,000.00
15,000.00
2,700.00

120,000.00
4,500.00
270.00
124,770.00
70,000.00
85,000.00
90,000.00
125,000.00

3,000,000.00
15,000.00
2,700.00

60,000.00
4,500.00
270.00
64,770.00
70,000.00
85,000.00
90,000.00
125,000.00

3,000,000.00
15,000.00
2,700.00
4,000,000.00
175,000.00
14,000.00

45,000.00
6,000.00
270.00
30,000.00
61,250.00
14,000.00
156,520.00
35,000.00
42,500.00
45,000.00
62,500.00

3,000,000.00
15,000.00
2,700.00
4,000,000.00
175,000.00
14,000.00

45,000.00
6,000.00
270.00
30,000.00
61,250.00
14,000.00
156,520.00
35,000.00
42,500.00
45,000.00
62,500.00

3,000,000.00
15,000.00
2,700.00
4,000,000.00
175,000.00
14,000.00

120,000.00
6,000.00
540.00
60,000.00
61,250.00
84,000.00
331,790.00
35,000.00
42,500.00
45,000.00
62,500.00

1,440.00
1,400.00
245,000.00
10,000.00

36,000.00
15,932.00
10,290.00
15,000.00
77,222.00
70,000.00
85,000.00
90,000.00

125,000.00

3,750.00
1,400.00
245,000.00
10,000.00

45,000.00
19,810.00
9,555.00
20,000.00
94,365.00
70,000.00
85,000.00
90,000.00
125,000.00

76,666.67
1,400.00
245,000.00
10,000.00

230,000.00
11,466.00
11,025.00
10,000.00
262,491.00
70,000.00
85,000.00
90,000.00
125,000.00

10,000.00
1,400.00
245,000.00
10,000.00

62,500.00
12,320.00
5,267.50
13,000.00

93,087.50
70,000.00
85,000.00
90,000.00
125,000.00

6,300.00
1,400.00
245,000.00
10,000.00

31,500.00
2,310.00
784.00
1,000.00
35,594.00
70,000.00
85,000.00
90,000.00
125,000.00

1,119,300.00
14,645.00
182,905.00

1,119,300.00
1,759,352.67
1,829,050.00

1,119,300.00
14,645.00
182,905.00

1,119,300.00
2,860,005.78
2,438,733.33

1,119,300.00

1,119,300.00

14,645.00
182,905.00

6,435,013.00
3,658,100.00

1,119,300.00
14,645.00
182,905.00

1,119,300.00
3,340,361.78
4,877,466.67

1,119,300.00
14,645.00
182,905.00

1,119,300.00
2,745,449.33
3,962,941.67

1,119,300.00
14,645.00
182,905.00

1,119,300.00
3,500,805.89
3,353,258.33

1,119,300.00
14,645.00
182,905.00

1,119,300.00
3,372,255.33
3,658,100.00

1,119,300.00
14,645.00
182,905.00

1,119,300.00
3,500,805.89
3,353,258.33

1,119,300.00
14,645.00
182,905.00

1,119,300.00
3,727,966.11
2,438,733.33

1,119,300.00
14,645.00
182,905.00

1,119,300.00
2,536,730.96
1,869,695.56

1,119,300.00
14,645.00
182,905.00

1,119,300.00
2,745,449.33
3,962,941.67

1,119,300.00
14,645.00
182,905.00

1,119,300.00
3,340,361.78
4,877,466.67

1,119,300.00
14,645.00
182,905.00

1,119,300.00
3,500,805.89
3,353,258.33

1,119,300.00

1,119,300.00

14,645.00
182,905.00

2,891,508.80
2,194,860.00

1,119,300.00
14,645.00
182,905.00

1,119,300.00
2,903,485.16
3,170,353.33

1,119,300.00
14,645.00
182,905.00

1,119,300.00
3,727,966.11
2,438,733.33

1,119,300.00
14,645.00
182,905.00

1,119,300.00
2,891,508.80
2,194,860.00

100,000.00
3,000.00
10,000.00
10,000.00

100,000.00
3,000.00
1,250.00
200.00

85,000.00
10,000.00
10,000.00

85,000.00
500.00
200.00

85,000.00
10,000.00
10,000.00

85,000.00
500.00
200.00

85,000.00

93,500.00
93,500.00
70,000.00
85,000.00
90,000.00
125,000.00

35,000.00

35,000.00
35,000.00
70,000.00
85,000.00
80,000.00
125,000.00

30,000.00

30,000.00
30,000.00
70,000.00
85,000.00
80,000.00
125,000.00

216,000.00

216,000.00
216,000.00
70,000.00
85,000.00
80,000.00
125,000.00

25,000.00

25,000.00
25,000.00
70,000.00
85,000.00
80,000.00
125,000.00

JUMLAH upah

TOTAL harga

H = (C X F )

I=(G+H)

7,000.00
6,250.00
13,250.00
13,250.00
1,325.00
14,575.00

8,500.00
7,000.00
900.00
625.00
17,025.00
93,325.00
9,332.50
102,657.50

170,000.00
70,000.00
18,000.00
6,250.00
264,250.00
1,205,950.00
120,595.00

1,326,545.00

170,000.00
70,000.00
18,000.00
6,250.00
264,250.00
1,210,000.00
121,000.00
1,331,000.00

51,450.00
9,125.00
60,575.00
60,575.00
6,057.50
66,632.50

13,440.00
2,375.00
15,815.00
15,815.00
1,581.50
17,396.50

21,000.00
1,250.00
22,250.00
244,250.00
24,425.00

268,675.00

105,000.00
51,000.00
5,400.00
9,375.00
170,775.00
736,455.00
73,645.50
810,100.50

45,500.00
17,000.00
1,800.00
3,750.00
68,050.00
213,475.00
21,347.50
234,822.50

15,750.00
12,962.50
900.00
1,000.00
30,612.50
48,182.50
4,818.25
53,000.75

42,000.00
8,500.00
4,050.00
3,750.00
58,300.00
126,730.00
12,673.00
139,403.00

42,000.00
8,500.00
4,050.00
3,750.00
58,300.00
128,730.00
12,873.00
141,603.00

273,000.00
29,750.00
88,400.00
89,250.00
22,050.00

20,625.00
523,075.00
3,245,605.00
324,560.50
3,570,165.50

511,000.00
29,750.00
280,500.00
178,500.00
51,300.00
31,250.00
1,082,300.00
7,247,900.00
724,790.00
7,972,690.00

80,500.00
1,700.00
180.00
750.00
83,130.00
115,280.00
11,528.00
126,808.00

140,000.00
29,750.00
3,150.00
125,000.00
297,900.00
1,119,300.00
111,930.00
1,231,230.00

2,520.00
1,360.00
990.00
625.00
5,495.00
14,645.00
1,464.50
16,109.50

21,000.00
28,050.00
2,970.00
750.00
52,770.00
268,560.00
26,856.00
295,416.00

21,000.00
22,100.00
2,340.00
625.00
46,065.00
170,835.00
17,083.50
187,918.50

21,000.00
22,100.00
2,340.00
625.00
46,065.00
110,835.00
11,083.50
121,918.50

10,500.00
14,025.00
1,485.00
375.00
26,385.00
182,905.00
18,290.50
201,195.50

11,200.00
14,025.00
1,485.00
375.00
27,085.00
183,605.00
18,360.50
201,965.50

11,200.00
14,025.00
1,485.00
375.00
27,085.00
358,875.00
35,887.50
394,762.50

43,400.00
29,750.00
3,150.00

3,750.00
80,050.00
157,272.00
15,727.20
172,999.20

43,400.00
29,750.00
3,150.00
3,750.00
80,050.00
174,415.00
17,441.50
191,856.50

17,500.00
10,200.00
1,080.00
1,562.50
30,342.50
292,833.50
29,283.35
322,116.85

47,040.00
19,040.00
1,980.00
4,250.00
72,310.00
165,397.50
16,539.75
181,937.25

6,300.00
7,650.00
810.00
562.50
15,322.50
50,916.50
5,091.65
56,008.15

4,707,702.67
470,770.27
5,178,472.93

6,418,039.11
641,803.91
7,059,843.02

11,212,413.00
1,121,241.30
12,333,654.30

9,337,128.44
933,712.84
10,270,841.29

7,827,691.00
782,769.10
8,610,460.10

7,973,364.22
797,336.42
8,770,700.64

8,149,655.33
814,965.53
8,964,620.87

7,973,364.22
797,336.42

8,770,700.64

7,285,999.44
728,599.94
8,014,599.39

5,525,726.52
552,572.65
6,078,299.17

7,827,691.00
782,769.10
8,610,460.10

9,337,128.44
933,712.84
10,270,841.29

7,973,364.22
797,336.42
8,770,700.64

6,205,668.80
620,566.88
6,826,235.68

7,193,138.49
719,313.85
7,912,452.34

7,285,999.44
728,599.94
8,014,599.39

6,205,668.80
620,566.88
6,826,235.68

104,450.00
10,445.00
114,895.00

85,700.00
8,570.00
94,270.00

85,700.00
8,570.00
94,270.00

1,050.00
12,750.00
1,350.00
93.75
15,243.75
108,743.75
10,874.38
119,618.13

1,050.00
12,750.00
1,200.00
93.75
15,093.75
50,093.75
5,009.38
55,103.13

700.00
8,500.00
800.00
62.50
10,062.50
40,062.50
4,006.25
44,068.75

3,500.00
42,500.00
4,000.00
312.50
50,312.50
266,312.50
26,631.25
292,943.75

1,400.00
17,000.00
1,600.00
125.00
20,125.00
45,125.00
4,512.50
49,637.50

DIMENSI DAN BERAT BATANG TULANGAN BAJA


STANDAR INDUSTRI INDONESIA ( SII 0136-80 )
No

Diameter
nominal
(mm)

Luas
nominal
(cm2)

D6
D8
D9
D10
D12
D13
D14
D16
D18
D19
D20
D22
D25
D28
D29
D32

6
8
9
10
12
13
14
16
18
19
20
22
25
28
29
32

0.283
0.503
0.636
0.786
1.131
1.328
1.540
2.011
2.546
2.836
3.143
3.803
4.911
6.160
6.608
8.046

0.222
0.395
0.499
0.617
0.888
1.040
1.210
1.580
2.000
2.230
2.470
2.980
3.850
4.830
5.190
6.310

17

D36

36

10.183

7.990

18

D40

40

12.571

9.870

19

D50

50

19.643

15.400

Panjang
per m3

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

No

kode

Tulangan Baja
Polos
Deform

P6
P8
P9
P10
P12
P13
P14
P16
P18
P19
P20
P22
P25
P28
P32

Nama

Ukuran ( m )
b

STORY 1
B 15/20

0.15

0.2

33.33

B 25/45

0.25

0.45

8.89

S 15/20

0.15

0.2

33.33

S 20/40

0.2

0.4

12.50

B 20/30

0.2

0.3

16.67

K1

0.4

0.4

6.25

K2

0.3

0.3

11.11

Berat
nominal
(kg/m)

Tulangan
pokok

12
0.888
16
1.580
12
0.888
12
0.888
16
1.580
16
1.580
16

jumlah

6.0
10.0
4.0
6.0
5.0
8.0
8.0

K3

0.2

0.2

25.00

K4

0.15

0.15

44.44

0.12

8.33

10

Po

0.3

3.33

11

PELAT
LANTAI
PELAT
PONDASI
PELAT
TANGGA

0.15

6.67

STORY 2
B 15/15

0.15

0.15

44.44

B 20/30

0.2

0.3

16.67

B 12/20

0.12

0.2

41.67

K1

0.25

0.4

10.00

K2

0.2

0.35

14.29

K3

0.15

0.15

44.44

1.580
16
1.580
12
0.888
12
0.888
16
1.580
16
1.580

12
0.888
16
1.580
12
0.888
19
2.230
16
1.580
12
0.888

8.0
4.0
8.0
6.7
6.7

4.0
8.0
4.0
8.0
8.0
4.0

Tulangan
Montase

10
0.617
16
1.580
10
0.617
12
0.888
12
0.888
16
1.580
16

jumlah

2.0
2.0

2.0
2.0

sengkang

8
0.395
8
0.395
6
0.222
6
0.222
10
0.617
8
0.395
10

Jarak rata2
sengkang

panjang
sengkang

Berat besi
kg

Bekesting
m2

0.15

155.56

280.18

18.33

0.15

82.96

201.30

10.22

0.2

116.67

144.30

18.33

0.175

85.71

107.83

12.50

0.2

83.33

212.68

13.33

0.15

66.67

105.33

10.00

0.15

88.89

195.29

13.33

1.580
16
1.580
16
1.580
12
0.888
10
0.617
16
1.580

12
0.888
8
0.395
12
0.888
8
0.395
8
0.395
8
0.395

0.617
10
0.617
8
0.395
8
0.395
16
1.58
10
0.617

2.0

8
0.395
8
0.395
6
0.222
10
0.617
10
0.617
8
0.395

0.1

200.00

439.40

20.00

0.15

177.78

228.09

26.67

0.15

124.44

108.36

10.33

0.15

57.78

126.40

5.33

0.15

102.22

133.29

8.67

0.15

177.78

307.02

26.67

0.15

111.11

254.56

13.33

0.15

177.78

187.47

21.67

0.15

86.67

231.87

10.50

0.15

104.76

245.21

12.86

0.2

133.33

210.53

26.67

Stootwerk
m2

Harga
besi /kg

bekesting/m2

Stoot werk/m2

beton/m3

8.33

16,590.00

148,300.00

181,000.00

1,048,000.00

4.22

16,590.00

148,300.00

181,000.00

1,048,000.00

16,590.00

148,300.00

181,000.00

1,048,000.00

16,590.00

148,300.00

181,000.00

1,048,000.00

5.83

16,590.00

148,300.00

181,000.00

1,048,000.00

2.08

16,590.00

148,300.00

181,000.00

1,048,000.00

2.08

16,590.00

148,300.00

181,000.00

1,048,000.00

2.08

16,590.00

148,300.00

181,000.00

1,048,000.00

2.08

16,590.00

148,300.00

181,000.00

1,048,000.00

8.33

16,590.00

148,300.00

181,000.00

1,048,000.00

16,590.00

148,300.00

181,000.00

1,048,000.00

6.67

16,590.00

148,300.00

181,000.00

1,048,000.00

26.67

16,590.00

148,300.00

181,000.00

1,048,000.00

10.00

16,590.00

148,300.00

181,000.00

1,048,000.00

25.00

16,590.00

148,300.00

181,000.00

1,048,000.00

2.08

16,590.00

148,300.00

181,000.00

1,048,000.00

2.08

16,590.00

148,300.00

181,000.00

1,048,000.00

2.08

16,590.00

148,300.00

181,000.00

1,048,000.00

2 nd floor
3 th floor
4 th floor
5 th floor
6 th floor

Total
harga /M3

volume
panjang/m

1.09
1.12
1.14
1.16
1.20

Koefisien lantai
m3

1.00

9,923,316.00

325

9.75

96,752,331.00

6,667,806.22

175

19.6875

131,272,435.00

6,160,770.33

120

3.6

22,178,773.20

4,690,626.00

250

20

93,812,520.00

7,609,583.17

101

6.06

46,114,073.99

4,655,563.33

55

8.8

40,968,957.33

6,642,259.33

65

5.85

38,857,217.10

1.09

1.12

11,680,729.33

45

1.8

21,025,312.80

9,163,744.67

45

1.0125

9,278,291.48

5,886,385.33

55

6.6

38,850,143.20

3,935,909.33

120

36

141,692,736.00

5,751,269.73

30

4.5

25,880,713.80

14,922,832.00

325

7.3125

9,058,410.00

175

10.5

11,896,238.67

175

4.2

6,829,011.93

55

5.5

7,399,823.62

65

4.55

8,872,498.00

45

1.0125

706,683,504.90

1.140

1.160

1.200

1 m3 kolom 40 x 40
A
t
V
luas kayu 1sisi

luas plywood
lembar

0.16
6.25
1
5
5.125
10.125 m2
2.9768
3.401303

0
KEBUTUHAN BESI
K 40/40
K 30/30
K 20/20
K 15/15
S 12/20
S 15/20
S 20/20
B 15/20
B 20/30
B 25/45

6.25

79

1.6 84.24107

11.11111 140.4444

1.2 111.1697

25

316

0.8 247.7872

BL 12/20
BL 15/15
BL 15/20
RB 20/30
RB 15/25
RB 15/20

Analisa Volume Beton


K40/40
K30/30
K20/20

0.4
0.3
0.2

0.4
0.3
0.2

K15/15

0.15

0.15

S12/20

0.12

0.2

S15/20

0.15

0.2

S20/20

0.2

0.2

KRAMIK 60X60
KRAMIK 40X40
KRAMIK 30X30
KRAMIK 20X20

239.36
297.4569
168.7487
170.7958
392.725

jml
8
10
5.5
5.5
4.4
5.5
5.5
2.5
5

78
207.55
42.5
209.2
351.9
71.6
123.7

23
16
10
12
100
14
30
138
50

v
29.44
14.4
2.2
2.64
9.9
1.7325
3.7125
7.7625
5.625
1.872
4.9812
1.02
6.276
10.557
2.864
4.948
32.5182

1 m2 Pasang Bekisting untuk Kolom


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu Borneo
Plywood 9 mm
Dolken Kayu Galam 8 - 10 / 4m
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
Total
Keuntungan (10%)
Harga Total

163.2410666667
251.6141333333
563.7872

0.04 m3
0.4 Kg
0.2 Lt
0.015 m3
3.5 lbr
2 btg
0.3 Oh
0.33 Oh
0.033 Oh
0.006 Oh

3000000
15000
2700
4000000
175000
14000
70000
85000
90000
125000

PST CNDERAMATA + DROPOFF


MASJID
minimarket
pasar sayur dan buah
KIOS KULINER
minimarket
pasar sayur dan buah
TOILET
MASJID
PST CNDERAMATA + DROPOFF
MASJID
DROPOFF
KIOS KULINER
TOILET
MINIMARKET
KIOS BUAH

PUSAT CINDEERAMATA
MASJID
MINIMARKET
PASAR SAYUR DAN BUAH
KIOS KULINER

120000
6000
540
60000
61250
28000
275790
21000
28050
2970
750
52770
328560
32856
361416

FOOT PLAT
1 PANJANG
LEBAR
TINGGI
VOLUME
JUMLAH
VOLUME TOTAL

1.2 M
0.3 M
0.3 M
0.108 M3
16 EA
1.728 M3

2 PANJANG 1
PANJANG 2
LEBAR
TINGGI
VOLUME
JUMLAH
VOLUME TOTAL

1M
0.3 M
0.05 M
1M
0.0325 M3
16 EA
0.52 M3

3 PANJANG
LEBAR
TINGGI
VOLUME
JUMLAH
VOLUME TOTAL

1M
0.25 M
1M
0.25 M3
16 EA
4 M3

4 PANJANG
LEBAR
TINGGI
VOLUME
JUMLAH
VOLUME TOTAL

1M
0.1 M
1M
0.1 M3
16 EA
1.6 M3

LANTAI KERJA

5 PANJANG
LEBAR
TINGGI
VOLUME
JUMLAH
VOLUME TOTAL

1M
0.1 M
1M
0.1 M3
16 EA
1.6 M3

PASIR URUG

PONDASI BATU KALI


PAJANG

110.4 M
18.5 M
8.6 M
45.4 M
22.375 M
10.2 M
2.75 M
67.2 M

TOTAL

285.425 M

1 PANJANG 1
PANJANG 2
TINGGI
VOLUME
PANJANG PONDASI
VOLUME TOTAL

0.3 M
0.6 M
0.7 M
0.126 M3
285.425 M
35.96355 M3

2 PANJANG
LEBAR
PANJANG PONDASI
VOLUME TOTAL

0.6 M
0.1 M
285.425 M
17.1255 M3

SLOOF 12 X 20
PANJANG
LEBAR
TINGGI
VOLUME TOTAL
KERAMIK LANTAI
LUAS AREA 60 X 60
LUAS AREA 20 X 20

0.2
0.12
285.425
6.8502

297.395
51.92625

KOLOM 30 X 30
1 PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME TOTAL

0.3
0.3
5.4
12
5.832

2 PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME TOTAL

0.3
0.3
9
12
9.72

ALUMUNIUM
PANJANG

90
110
15
8
2.8
3.9
1.9
9.6
3.2

5.4
3
5.6
4
25.2
6
24
9.6
327.2