Anda di halaman 1dari 2

DAFTARKUANTITASDANHARGA

Kegiatan

: PengembanganSistemDistribusiAirMinum

Pekerjaan
Lokasi
SumberDana
TahunAnggaran

:
:
:
:

No.
I.
1
2
3

PengembanganJaringanPipaAirBersihKawasanKecamatanLhoksukonKab.AcehUtara(MA)
KabupatenAcehUtara
APBA
2016

UraianKegiatan

PEKERJAANPERSIAPAN
MobilisasidanDemobilisasi(DireksiKeet/sewa,Tenagakerja,Alat, 1,00
Bahan)
SettingOut
5.064,00
Administrasi(Dok.Kontrak,AsuransidanJaminan,ShopDrawing 1,00
danAsbuiltDrawing,Sitemanagement,Dok.Proyek,K3,Fasilitas
Sementara)

II. PENGADAANPIPADANACCESSORIES
1 PengadaanPipa
PipaPVC,S12,5RRJdia.150mm
PipaPVC,S12,5RRJdia.100mm
PipaPVC,S12,5RRJdia.75mm
2

PengadaanAccessories
TeeAllSocketPVCRRJdia.200x100mm
TeeAllSocketPVCRRJdia.150x75mm
BendAllSocketPVCRRJdia.150x90
FlangeSocketPVCdia.100mm
ReducerSocketPVCRRJdia.150x100mm
GiboultJointdia.200mm
GateValveCIdia.100mm
DopPVCdia.100mm
DopPVCdia.75mm

III. PEKERJAANPEMASANGANPIPA,ACESSORIESTERMASUK
FITTINGVALVEDANPENGETESAN
1 PekerjaanTanah
GalianTanahKeras
MengurugKembaliGalian
UruganTanahBekasGalianTermasukPerataandan
Pemadatan(stamper)
2

Volume

Satuan

Analisa

HargaSatuan
(Rp)

JumlahHarga(Rp)

Ls

Ditaksir

15.000.000,00

15.000.000,00

M'
Ls

AHSPPUT.04.1
Ditaksir

1.403,00
16.500.000,00

7.104.792,00
16.500.000,00

JumlahI

38.604.792,00

2.508,00
2.016,00
540,00

M'
M'
M'

Ditaksir
Ditaksir
Ditaksir

197.500,00
82.500,00
61.500,00

495.330.000,00
166.320.000,00
33.210.000,00

1,00
2,00
1,00
3,00
1,00
1,00
1,00
2,00
2,00

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

Ditaksir
Ditaksir
Ditaksir
Ditaksir
Ditaksir
Ditaksir
Ditaksir
Ditaksir
Ditaksir

3.977.650,00
740.540,00
405.650,00
749.540,00
459.200,00
3.691.000,00
2.552.500,00
326.980,00
270.460,00

3.977.650,00
1.481.080,00
405.650,00
2.248.620,00
459.200,00
3.691.000,00
2.552.500,00
653.960,00
540.920,00

JumlahII

710.870.580,00

1.688,51
1.615,52
72,98

M3
M3
M3

AHSPPUA.2.3.1.4
AHSPPUA.2.3.1.9
AHSPPUT.14b

83.444,00
27.791,67
46.559,76

140.896.028,44
44.897.993,33
3.397.931,47

PemasanganPipaTermasukFittingdanValve
PipaPVC,S12,5RRJdia.150mm
PipaPVC,S12,5RRJdia.100mm
PipaPVC,S12,5RRJdia.75mm
PemasanganValvedia.200mm
PemasanganAccessoriesdia.50150mm

2.508,00
2.016,00
540,00
1,00
10,00

M'
M'
M'
Bh
Bh

AHSPPUA.8.4.1.4
AHSPPUA.8.4.1.3
AHSPPUA.8.4.1.2
AHSPPUA.8.4.3.2
AHSPPUA.8.4.3.15

15.691,75
14.035,75
12.448,75
227.625,25
14.116,25

39.354.909,00
28.296.072,00
6.722.325,00
227.625,25
141.162,50

KoneksidenganPipaEksisting
InterkoneksipipabarukePipaLamadia.200mm
InterkoneksipipabarukePipaLamadia.150mm

1,00
1,00

Bh
Bh

AHSPPUA.8.4.4.4
AHSPPUA.8.4.4.3

433.256,75
361.468,00

433.256,75
361.468,00

PengetesanPipa
PipaPVC,S12,5RRJdia.150mm
PipaPVC,S12,5RRJdia.100mm
PipaPVC,S12,5RRJdia.75mm

2.508,00
2.016,00
540,00

M'
M'
M'

AHSPPUA.8.4.5.4
AHSPPUA.8.4.5.3
AHSPPUA.8.4.5.2

2.603,60
2.028,60
1.798,60

6.529.828,80
4.089.657,60
971.244,00

JumlahIII

276.319.502,14

IV. PENGADAANDANPEMASANGANPIPAUNTUKPERLINTASAN
1 Pengadaan/PemasanganPerlintasanPipaSteeldia.150mmdan
AccessoriesL=15M
2 Pengadaan/PemasanganPerlintasanPipaSteeldia.150mmdan
AccessoriesL=612M
3 Pengadaan/PemasanganPerlintasanPipaSteeldia.100mmdan
Accessories,L=15M

1,00

Pkt

Lampiran1

76.450.954,05

76.450.954,05

1,00

Pkt

Lampiran2

39.705.895,16

39.705.895,16

1,00

Pkt

Lampiran3

27.708.233,19

27.708.233,19

JumlahIV

143.865.082,41

REKAPITULASI
I.
II.
III.
IV.
1
2
3
4

PEKERJAANPERSIAPAN
PENGADAANPIPADANACCESSORIES
PEKERJAANPEMASANGANPIPA,ACESSORIESTERMASUK
PENGADAANDANPEMASANGANPIPAUNTUKPERLINTASAN

38.604.792,00
710.870.580,00
276.319.502,14
143.865.082,41

JUMLAH
PPN10%
JUMLAHTOTAL
DIBULATKAN

1.169.659.956,55
116.965.995,65
1.286.625.952,20
1.286.625.000,00

TERBILANG

: SatuMilyarDuaRatusDelapanPuluhEnamJutaEnamRatusDuaPuluhLimaRibuRupiah
BandaAceh,04April2016
CV.LZBROTHER

MUHAMMADSHIDDIQ
WakilDirektur