Anda di halaman 1dari 4

CONTENTS

CHAPTER 01:Itroduction to the training organisation

1-

1.1.1Sierra CONSTRUCTION LIMITED

1.1.2 COMPANY STRUCTURE

1.1.3 CIVIL ENGINEERING DIVISION

CHAPTER 02 : Training Experience

7-^^

2.1.1 LOCATION OF THE SITE

2.1.2 DETAILS OF THE PROJECT

2.1.3 SITE MANAGEMENT

2.1.4 SITE ADMINISTRATION AND RELATIONS

10

2.1.4.1.1. PROJECT MANAGER

11

2.1.4.1.2. SITE ENGINEERS

11

2.1.4.1.3. ENGINEERING ASSISTANTS

11

2.1.4.1.4. QUANTITY SURVEYOR

11

2.1.4.1.5. STOREKEEPER

12

2.1.4.2 CO ORDINATION AND COMMUNICATION

12

2.1.4.3. MAINTENANCE OF SITE RECORDS

12

2.1.4.4. PROGRESS CONTROL

13

2.1.4.5. SPECIAL REPORTS3

13

2.1.4.5.1. DELIVERY SHEET

13

2.1.4.5.2. PROGRASS REPORT

14

2.1.4.5.3. DAILY REPORT

14

2.1.4.5.4. GOOD RECEIVED NOTE

14

2.1.4.5.5. STOCK BOOK

14

2.1.4.5.6. GOOD TRANSFER NOTE

15

2.1.4.5.7. SUBCONTRACTOR BILL

15

2.2 MOBILIZATION WORK

15

2.3 EXCAVATION WORK

16

2.3.1 METHOD STATEMENT OF EXCAVATION

16

2.3.2 METHOD OF EXCAVATION

16

2.3.2.1. MANUAL EXCAVATION

17

2.3.2.2. MACHINE EXCAVATION

17

2.3.3 PROBLEM ENCOUNTERED WHEN EXCAVATING

18

2.4 FORMWORK

19

2.4.1. INTRODUCTION

19

2.4.2. FORMWORK MATERIAL & DEVICES

20

2.4.3. FORMWORK ARRANGEMENT OF THE 450 M3


GROUND RESERVOIR WALL

21

2.4.4. FORMWORK ARRANGEMENT OF THE COLUMN

21

2.4.5 CIRCULAR SHAPE FORMWORK

24

2.4.6. REMOVING FORMWORK

25

2.4.7. PROBLEM ENCOUNTERED WHEN MAKING FORM WORK

25

2.5. SCAFFOLDING

27

2.5.1 PUTLOG SCAFFOLD

28

2.5.2 INDEPENDENT SCAFFOLD

28

2.5.3. SCAFFOLDING FITTINGS

29

2.5.4. SCAFFOLDING SAFETY CHECK LIST

29

2.6. LADDERS

30

2.7. REINFORCEMENT

32

2.7.1.INTRODUCTION

32

2.7.1.1 TYPES OF STEEL

32

2.7.1.2. TYPES OF BARS USED

32

2.7.2. BAR NOTATIONS

33

2.7.3. PREPARATION OF BAR SCHEDULES

33

2.7.4. CUTTING & BENDING OF BARS

34

2.7.5. FIXING OF REINFORCEMENT

34

2.7.6.

35

CHECKING OF REINFORCEMENTS

2.7.7. PROBLEM ENCOUNTERED WHEN MAKING RAINFORCEMENT

36

2.8.

37

CONCRETE WORK

2.8.1 INTRODUCTION

37

2.8.1.1. QUALITY OF CONCRETE DEPENDS,

38

2.8.1.2. CEMENT

38

2.8.1.2.1. IMPORTANT PROPERTIES OF CEMENT

39

2.8.1.3. AGGREGATES

39

2.8.1.4. WATER

40

2.8.1.

40

2.8.2.
2.8.3.1.

WORKABILITY
ADMIXTURES
TYPES OF ADMIXTURES

40
40

2.8.3.1.1. ACCELERATING ADMIXTURES

41

2.8.3.1.2. RETARDING ADMIXTURES

41

2.8.3.1.3. WATER- REDUCING ADMIXTURE

41

2.8.3.2. RHEOBUILT 1000

41

2.8.4. BONDING AGENTS FOR CONCRETE AND MORTAR

42

2.8.4.1. BARRA EMULSION

42

2.8.5.

43

PREPARATION BEFORE CONCRETING

2.8.6. MIXING OF CONCRETE

44

2.8.6.1. MACHINE MIXING

44

2.8.6.2. BATCHING OF CONCRETE

44

2.8.6.2.1.

VOLUMETRIC BATCHING

44

2.8.6.2.2.

WEIGHT BATCHING

45

2.8.6.3.

BATCHING PLANT

45

2.8.7. TRANSPORTING AND PLACING OF CONCRETE

45

2.8.7.1. READY MIX CONCRETE

46

2.8.7.2.

46

READY MIX PUMPING PROCESS.

2.8.7.2.1. ARRANGING THE PUMP CAR

46

2.8.8. COMPACTING OF THE CONCRETE

47

2.8.9. GREEN CUTTING

48

2.8.10. CONCRETE CHIPPING

48

2.8.11. CURING OF CONCRETE

48

2.8.12. DEFECTS IN CONCRETE

49

2.8.13. TEST ON CONCRETE

49

2.8.13.1. SLUMP TEST

49

2.8.13.2. COMPRESSIVE STRENGTH CUBE TEST

50

2.8.14. CONSTRUTION GROUT

51

2.8.15. PROBLEM ENCOUNTERED WHEN CONCRETING

52

2.9.

53

PRINCIPALS OF SAFETY MANAGEMENT

2.9.1. INTRODUCTION

53

2.9.2 CHAIN OF EVENTS

54

2.9.3. ACCIDENT COST

54

2.9.4. ACCIDENT PREVENTION

55

2.9.5

55

RISK MANAGEMENT

2.9.5.1. If the risk is acceptable

55

2.9.5.2. If the risk is unacceptable

55

2.9.6.. MOST ACCIDENTS AND INJURIES ARE RESULT OF FOLLOWING


2.9.6.1. FALLING FROM HEIGHTS

56
56

2.9.6.2. HOUSE- KEEPING

56

2.9.6.3.

56

2.9.6.4

FALLING OF MATERIALS ONTO PERSONS BELOW


WEARING GLOVES

56

2.9.6.5. BOOTS AND SAFETY SHOES

57

2.9.6.6. EYE PROTECTION

57

2.9.6.7. EAR PROTECTION

57

2.10. PLANT & MACHINERY

59

2.10.1. BACKHOE LOADER

59

2.10.2. EXCAVATOR

59

2.10.3. PNEUMATIC RAMMER.

60

2.10.4

DOUBLE DRUM VIBRO ROLLER

61

2.10.5

10 TON VIBRO ROLER

61

2.10.6

CONCRETE MIXER

62

2.10.7

POKER VIBRATOR.

62

2.10.8

ELECTRIC HAMMER DRILL

63

2.10.9

CIRCULAR POWER SAW

63

2.10.10

DUMP TRUCKS

64

2.10.11

CONCRETE MIXER

64

2.10.12

ROUGH TERRAIN CRANE

66

2.10.13

ALL TERRAIN CRANE

2.10.14

TRUCK CRAIN

66

2.10.15

TRUCK LOADER CRANE (CARGO CRANE)

67

2.10.16

LATTICE BOOM CRAWLER CRANE

67

2.10.17 PUMP CAR

66

68

Anda mungkin juga menyukai