00
DINAS PEKERJAAN UMUM
PROVINSI SULAWESI TENGGARA
1000.00
460.00
URUGAN BIASA
URUGAN BIASA
KEGIATAN
+100.00
URUGAN PILIHAN T : 20 CM
URUGAN BIASA
URUGAN PILIHAN T : 20 CM
URUGAN BIASA
GALIAN
+99.00
PEKERJAAN
91.00
84.00
+98.00
147.00
154.00
247.00
CATATAN / REVISI
+97.00
AB
PATOK (STA)
JARAK TITIK (cm)
CD
P6 (0+300)
98.47
98.54
ELEVASI EXISTING
99.47
97.91
97.84
1000
ELEVASI RENCANA
KEMIRINGAN EXISTING (%)
KEMIRINGAN RENCANA (%)
2%
2%
2%
2%
MENGETAHUI / MENYETUJUI
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK)
DINAS PEKERJAAN UMUM
PROVINSI SULAWESI TENGGARA
+101.00
1000.00
460.00
+100.00
GALIAN
URUGAN PILIHAN T : 20 CM
URUGAN BIASA
URUGAN BIASA
URUGAN PILIHAN T : 20 CM
URUGAN BIASA
GALIAN
HAMKA, ST
NIP. 19770630 201001 1 010
+99.00
249.00
KONSULTAN PERENCANA
+98.00
76.00
86.00
232.00
62.00
1000
ELEVASI RENCANA
KEMIRINGAN EXISTING (%)
KEMIRINGAN RENCANA (%)
SIPIL
JASMAN, ST
CD
P7 (0+350)
97.76
97.86
ELEVASI EXISTING
AB
99.49
PATOK (STA)
JARAK TITIK (cm)
99.32
97.62
+97.00
TEAM PERENCANA
SURVEYOR
RIJAL ANSAPUTRA, ST
MUH. SAID, ST
DIREKTUR
DRAFTER
IRFAN M. MANOPPO, ST
NAMA GAMBAR
PROFIL MELINTANG PROFIL SEGMEN 1
STA. 0+300 - 0+350
2%
2%
2%
2%
NO. LEMBAR
06
SKALA
H = 1 : 20
V = 1 : 10