What Is A Scaffold?
An elevated, temporary work platform
Three basic types:
Supported scaffolds -- platforms
supported by rigid, load bearing
members, such as poles, legs, frames, &
outriggers
Suspended scaffolds -- platforms
suspended by ropes or other non-rigid,
overhead support
Aerial Lifts -- such as cherry pickers
or boom trucks

Hazards
Employees working on scaffolds are
exposed to these hazards:
Falls from elevation caused
by slipping, unsafe access, and
the lack of fall protection
Struck by falling tools / debris
Electrocution from overhead
power lines
Scaffold collapse - caused by
instability or overloading
Bad planking giving way


 :
25 .
 :
50
)(.
 :
75
) .(


 Wood Scaffolds
 Frame Scaffolds
 Tube and Clamp :
 Modular System :
. Scaffolds
 Rolling Scaffolds :
 Suspended Scaffolds :

 Frame Scaffolds

.

.

.

Frame Scaffold
OSHA refers to frame

scaffolds as sectional
steel scaffold.
There are two basic
parts to a frame
scaffolds The frame
and the cross brace.

 Tube and Clamp





.

.

.

.


Modular System Scaffolds


.


.

 Rolling Scaffolds


.



.





 Suspended Scaffolds

.
6


.



 

.
 4:1 4
.

.

30 ) (overlapping
15
.


 
.
 .
 6
.
10 ) 3(
.
 10 )3
( .
) (4
26 30 .


.

.

.

Mudsill
9
2
10

Scaffold Support Examples


Base
plate

Mud sills
Good support

Inadequate support
in danger of collapse?

Bracing


 .

.


.

 6
6.

 TIES


.
4
26 30 .
4
26.
% 50 
.

Securing
1926.451(c)(ii)
If the base width is wider than 3,

the first tie will be a vertical


distance of 4 times that (from the
ground), and every 26 thereafter.
Example:
base width = 5
first vertical tie will be (5 x 4)
20 from the ground

Securing
1926.451(c)(ii)
Guys, ties, and braces shall be installed at

each end of the scaffold and at horizontal


intervals not to exceed 30.
For example, on
this scaffolding
which extends the
length of the
hotel, horizontal
braces will be
installed at the red
marks.

x
30

x
<30

x
<30

x
30


Through Ties (+ ve)
Reveal Ties (- ve)
Box Ties (+ ve)
Anchor Bolt (+ ve)

Through Ties (+ ve)- 1



)(

.


.

Reveal Ties



)(




.

Box Ties

Anchor Bolt




800
1200 1600
)  (


2 10
10  8
 6  .

6
12.
 1
Toe Board
4 ) 10(
18 ) 45(

Scaffold Platform Construction

No large gaps in front


edge of platforms
Each abutted end of plank
must rest on a separate
support surface
Overlap platforms at least
12 inches over supports,
unless restrained to
prevent movement

Planks not properly


overlapped

Platform Ends
Each end of a
platform, unless
cleated or otherwise
restrained by hooks,
must extend over its
support by at least 6
inches
No Cleats


14

Scaffold Inspection

Scaffold Labeling