Anda di halaman 1dari 1

500

1100

3960
760

DINAS PEKERJAAN UMUM

500

9951

1100

900

900

600

939

3940

2440

2100

PEMBANGUNAN FLY OVER


JALAN KI MAJA - JALAN RATU DIBALAU
BANDAR LAMPUNG

WORKING DRAWING

9564

1200

1200

132
2

1200

JL. KI MAJA - JL.RATU DIBALAU


SIMPANG EMPAT
JL. KI MAJA - JL.RATU DIBALAU
BANDAR LAMPUNG

555

DIAJUKAN

2850

KONTRAKTOR

4424

4424

5624

2850

2850

Ir. ISMAIL ALI USMAN

DIPERIKSA/DITELITI
KONSULTAN

1000
3863

1000

4202

MULYONO, ST., MT.

1500

1500

DISETUJUI
PEJABAT PELAKSANA TEKNIS KEGIATAN
(PPTK)

LEAN CONCRETE T.10 cm

1000
1000

1400

500

1000
6800

1400

1000

1000

1000
2400

a
b

2400

2400

1000

SEPTA ZAHARA
Nip. 1969 0919 1992 03 1 006

DISAHKAN

(H)

AZWAR, ST., MT.


Nip. 1968 0803 1988 03 1 002

e
g

(G)

(I)

(E)
(C)

2400

1000

PEJABAT PEMBUAT KOMITMEN


(PPK)

(F)

(D)

1000

500

TIPE BENDING
(J)

1000

f
e

(A)

Anda mungkin juga menyukai