Anda di halaman 1dari 235

DATA MATERIAL

No.

U RAIAN

MATERIAL

1
2
3
4
5
6
7
8
9
10

Agregat Base Kelas C


Material Pilihan (Sirtu)
Material Tanah Timbunan

Bensin
Solar
Agregat Kasar
Agregat Halus
-

ANALISIS VOLUME BAHAN

KODE

M06
M07
M08
M09
M08
M01
M02

BERAT VOLUME (BERAT

BERAT VOLUME (BERAT ISI)

1.51
1.72
1.35
1.40
1.40

ton/m3
ton/m3
ton/m3
kg/liter
kg/liter
ton/M3
ton/M3

Berat Jenis Material


BERAT ISI

=
=

2.61 (data olahan)


1.72

JENIS PEKERJAAN

: MOBILISASI

No.

JENIS ALAT

B.

KODE
ALAT

SATUAN

E01
E02
E03
E04
E05
E06
E07
E08

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

VOL.

PERALATAN
1
2
3
4
5
6
7
8

BULLDOZER D-65
DUMP TRUCK MITSUBISHI FE 73 HD
EXCAVATOR CAT 320 C
MOTOR GRADER CAT 120H
WHEEL LOADER WA 180-3
VIBRATORY ROLLER BOMAG BW 211 D-40
WATER TANKER 3000 - 4500 LITER
3 WHEEL ROLLER BARATA MG-6

1
5
2
1
2
1
1
1

Lembar 1.2-2
HARGA
SATUAN

JUMLAH
HARGA

(Rp.)

(Rp.)

200,000,000
500,000
100,000
500,000
150,000
100,000
150,000
150,000

200,000,000
2,500,000
200,000
500,000
300,000
100,000
150,000
150,000

ANALISA HARGA DASAR SATUAN BAHAN


Jenis
Lokasi
Tujuan

:
:
:

M16 - Sirtu
Quarry
Lokasi Pekerjaan

No.

URAIAN

I.
1
2
3
4
5
6
7
II.
1
2
3

III.

ASUMSI
Menggunakan alat berat
Kondisi Jalan : baik
Jarak Quarry 2 ke lokasi Quarry 1
Harga satuan Sirtu di Quarry 1
Harga Satuan Dasar Excavator
Harga Satuan Dasar Dump Truck
Berat volume sirtu

KODE

L
RpM07
RpE03
RpE02
Bil

URUTAN KERJA
Sirtu digali dengan Excavator
Excavator sekaligus memuat sirtu hasil
galian ke dalam Dump Truck
Dump Truck mengangkut sirtu ke lokasi
Base Camp
PERHITUNGAN
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus
- Menggali / memuat
- Lain-lain
Kap. Prod. / jam =
V x Fb x Fa x 60
Ts1
Biaya Excavator / M3 = (1 : Q1) x RpE03

E03
V
Fb
Fa
Ts1
T1
T2
Ts1
Q1

Rp1

DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat = (V x 60)/(Q1 x Bil)
- Waktu tempuh isi = (L/v1) x 60
- Waktu tempuh kosong = (L/v2) x 60
- Lain-lain

E02
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2

ANALISA HARGA DASAR SATUAN BAHAN


Jenis
Lokasi
Tujuan

:
:
:

M16 - Sirtu
Quarry
Lokasi Pekerjaan

No.

IV.

URAIAN

KODE

Kapasitas Produksi / Jam =


V x Fa x 60
Ts2 x Bil

Q2

Biaya Dump Truck / M3 = (1 : Q2) x RpE02

Rp2

HARGA SATUAN DASAR BAHAN


DI BASE CAMP
Harga Satuan Dasar Sirtu =
( RpM07 + Rp1 + Rp2 )

M16

Dibulatkan :

M16

ATUAN BAHAN

KOEF.

SATUAN

HARGA
SATUAN
(Rp.)

1.80
1.00
1.00
1.00
1.72

Km
M3
Jam
Jam
ton/m3

1.10
0.70
0.83

M3
-

0.50
0.50
1.00

menit
menit
menit

38.346

M3 / Jam

13,136.98

Rupiah

62,500.00 4m3 =
503,750.60
302,539.17

Rp250,000

6.00
0.83
20.00
30.00

ton
KM/Jam
KM/Jam

5.46
5.40
3.60
1.00
15.46

menit
menit
menit
menit
menit
Bersambung

ATUAN BAHAN

Lanjutan
KOEF.

SATUAN

HARGA
SATUAN
(Rp.)

11.24

M3 / Jam

26,920.93

Rupiah

102,557.91

Rupiah

102,600.00

Rupiah

1100 M

700M

URAIAN ANALISA ALAT

No.

URAIAN

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:

5.

Alat Yang Dipakai :

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

a.
b.
c.
a.
b.
c.

i x (1 + i)^A'
(1 + i)^A' - 1

b. Asuransi dan Lain-lain

Biaya Pasti per Jam


C.

Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)

( B' - C ) x D
W'
0.20 x C
W'
(E+F)

BIAYA OPERASI PER JAM KERJA

1.
2.

Bahan Bakar = (0.12-0.15 Ltr/HP/Jam) x Pw x Ms


Pelumas
= (0.025-0.030 Ltr/HP/Jam) x Pw x Mp

3.

Workshop

4.

Sparepart

5.
6.

Operator
Pembantu Operator

(6,25 % - 8,75 %) x B'


W'
(12,5 % - 17,5 %) x B'
W'
= ( 1 Orang / Jam ) x U1
= ( 1 Orang / Jam ) x U2

Biaya Operasi per Jam


D.

(H+I+J+K+L+M)

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

Note

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator
Upah Pembantu Operator
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
:

(*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).

URAIAN ANALISA ALAT

No.

URAIAN

A.
1.
2.
3.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas

4.

Alat Baru

a. Umur Ekonomis
b.
c.
a.
b.
c.

Jam Kerja Dalam 1 Tahun


Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)

5.

Alat Yang Dipakai :

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

i x (1 + i)^A'
(1 + i)^A' - 1
( B' - C ) x D
W'

b. Asuransi dan Lain-lain

Biaya Pasti per Jam


C.

0.20 x C
W'

(E+F)

BIAYA OPERASI PER JAM KERJA

1.
2.

Bahan Bakar = (0.12-0.15 Ltr/HP/Jam) x Pw x Ms


Pelumas
= (0.025-0.030 Ltr/HP/Jam) x Pw x Mp

3.

Workshop

4.

Sparepart

5.
6.

Sopir
Pembantu Sopir
Biaya Operasi per Jam

D.

(H+I+J+K+L+M)

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

Note

(6,25 % - 8,75 %) x B'


W'
(12,5 % - 17,5 %) x B'
W'
= ( 1 Orang / Jam ) x U1
= ( 1 Orang / Jam ) x U2

LAIN - LAIN
Tingkat Suku Bunga
Upah Sopir
Upah Pembantu Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
:

(*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).

URAIAN ANALISA ALAT

No.

A.
1.

URAIAN

URAIAN PERALATAN
Jenis Peralatan

2.
3.
4.

Tenaga
Kapasitas
Alat Baru

5.

Alat Yang Dipakai :

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

a.
b.
c.
a.
b.
c.

i x (1 + i)^A'
(1 + i)^A' - 1

b. Asuransi dan Lain-lain

Biaya Pasti per Jam


C.

Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)

( B' - C ) x D
W'

0.20 x C
W'

(E+F)

BIAYA OPERASI PER JAM KERJA

1.
2.

Bahan Bakar = (0.12-0.15 Ltr/HP/Jam) x Pw x Ms


Pelumas
= (0.025-0.030 Ltr/HP/Jam) x Pw x Mp

3.

Workshop

4.

Sparepart

5.
6.

Operator
Pembantu Operator
Biaya Operasi per Jam

D.

E.
1.
2.
3.
4.

(6,25 % - 8,75 %) x B'


W'
(12,5 % - 17,5 %) x B'
W'
= ( 1 Orang / Jam ) x U1
= ( 1 Orang / Jam ) x U2
=

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator
Upah Pembantu Operator
Bahan Bakar Bensin

(H+I+J+K+L+M)

5.
6.
7.

Note

Bahan Bakar Solar


Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
:

(*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).

URAIAN ANALISA ALAT

No.

URAIAN

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:

5.

Alat Yang Dipakai :

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

a.
b.
c.
a.
b.
c.

i x (1 + i)^A'
(1 + i)^A' - 1

b. Asuransi dan Lain-lain

Biaya Pasti per Jam


C.
1.
2.

Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)

BIAYA OPERASI PER JAM KERJA


Bahan Bakar = (0.12-0.15 Ltr/HP/Jam) x Pw x Ms
Pelumas
= (0.025-0.030 Ltr/HP/Jam) x Pw x Mp

( B' - C ) x D
W'
0.20 x C
W'
(E+F)

3.

Workshop

4.

Sparepart

5.
6.

Operator
Pembantu Operator
Biaya Operasi per Jam

D.

(H+I+J+K+L+M)

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

Note

(6,25 % - 8,75 %) x B'


W'
(12,5 % - 17,5 %) x B'
W'
= ( 1 Orang / Jam ) x U1
= ( 1 Orang / Jam ) x U2

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator
Upah Pembantu Operator
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
:

(*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).

URAIAN ANALISA ALAT

No.

URAIAN

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:

5.

Alat Yang Dipakai :

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

a.
b.
c.
a.
b.
c.

Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)

2.

Faktor Angsuran Modal

i x (1 + i)^A'
(1 + i)^A' - 1

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi dan Lain-lain

Biaya Pasti per Jam


C.

( B' - C ) x D
W'

0.20 x C
W'

(E+F)

BIAYA OPERASI PER JAM KERJA

1.
2.

Bahan Bakar = (0.12-0.15 Ltr/HP/Jam) x Pw x Ms


Pelumas
= (0.025-0.030 Ltr/HP/Jam) x Pw x Mp

3.

Workshop

4.

Sparepart

5.
6.

Operator
Pembantu Operator
Biaya Operasi per Jam

D.

(H+I+J+K+L+M)

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator

3.

Upah Pembantu Operator

4.
5.
6.
7.

Note

(6,25 % - 8,75 %) x B'


W'
(12,5 % - 17,5 %) x B'
W'
= ( 1 Orang / Jam ) x U1
= ( 1 Orang / Jam ) x U2

Bahan Bakar Bensin


Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
:

(*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).

URAIAN ANALISA ALAT

No.

URAIAN

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:

5.

Alat Yang Dipakai :

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

a.
b.
c.
a.
b.
c.

i x (1 + i)^A'
(1 + i)^A' - 1

b. Asuransi dan Lain-lain

Biaya Pasti per Jam


C.

Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)

( B' - C ) x D
W'

0.20 x C
W'

(E+F)

BIAYA OPERASI PER JAM KERJA

1.
2.

Bahan Bakar = (0.12-0.15 Ltr/HP/Jam) x Pw x Ms


Pelumas
= (0.025-0.030 Ltr/HP/Jam) x Pw x Mp

3.

Workshop

4.

Sparepart

5.
6.

Operator
Pembantu Operator
Biaya Operasi per Jam

D.

(6,25 % - 8,75 %) x B'


W'
(12,5 % - 17,5 %) x B'
W'
= ( 1 Orang / Jam ) x U1
= ( 1 Orang / Jam ) x U2
=

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

(H+I+J+K+L+M)

E.
1.
2.
3.
4.
5.
6.
7.

Note

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator
Upah Pembantu Operator
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
:

(*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).

URAIAN ANALISA ALAT

No.

URAIAN

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:

5.

Alat Yang Dipakai :

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

a.
b.
c.
a.
b.
c.

i x (1 + i)^A'
(1 + i)^A' - 1

b. Asuransi dan Lain-lain

Biaya Pasti per Jam

Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)

( B' - C ) x D
W'
0.20 x C
W'
(E+F)

C.

BIAYA OPERASI PER JAM KERJA

1.
2.

Bahan Bakar = (0.12-0.15 Ltr/HP/Jam) x Pw x Ms


Pelumas
= (0.025-0.030 Ltr/HP/Jam) x Pw x Mp

3.

Workshop

4.

Sparepart

5.
6.

Operator
Pembantu Operator
Biaya Operasi per Jam

D.

(H+I+J+K+L+M)

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

Note

(6,25 % - 8,75 %) x B'


W'
(12,5 % - 17,5 %) x B'
W'
= ( 1 Orang / Jam ) x U1
= ( 1 Orang / Jam ) x U2

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator
Upah Pembantu Operator
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
:

(*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).

URAIAN ANALISA ALAT

No.

A.
1.
2.
3.
4.

URAIAN

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:

a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun

c.
a.
b.
c.

Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)

5.

Alat Yang Dipakai :

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

i x (1 + i)^A'
(1 + i)^A' - 1

b. Asuransi dan Lain-lain

Biaya Pasti per Jam


C.

( B' - C ) x D
W'

0.20 x C
W'

(E+F)

BIAYA OPERASI PER JAM KERJA

1.
2.

Bahan Bakar = (0.12-0.15 Ltr/HP/Jam) x Pw x Ms


Pelumas
= (0.025-0.030 Ltr/HP/Jam) x Pw x Mp

3.

Workshop

4.

Sparepart

5.
6.

Operator
Pembantu Operator
Biaya Operasi per Jam

D.

E.
1.
2.
3.
4.
5.
6.
7.

(6,25 % - 8,75 %) x B'


W'
(12,5 % - 17,5 %) x B'
W'
= ( 1 Orang / Jam ) x U1
= ( 1 Orang / Jam ) x U2
=

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

(H+I+J+K+L+M)

Note

(*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).

URAIAN ANALISA ALAT

No.

U RAIAN

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

i x (1 + i)^A
(1 + i)^A - 1

b. Asuransi, dll =

Biaya Pasti per Jam


C.

(B-C)xD
W
0.002 x B
W

(E+F)

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

2.

Pelumas
Biaya bengkel

= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W

3.
4.
5.

Perawatan dan =
perbaikan
Operator
Pembantu Operator
Biaya Operasi per Jam

(12,5 % - 17,5 %) x B
W
= ( 1 Orang / Jam ) x U1
= ( 1 Orang / Jam ) x U2
=

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

(H+I+K+L+M)

URAIAN ANALISA ALAT

KODE

KOEF.

SATUAN

Pw
Cp
A
W
B
A'
W'
B'

BULLDOZER D-65
190.0
5.0
2,000.0
3,721,295,000
5.0
2,000.0
3,721,295,000
Rupiah

HP
M3
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

372,129,500

Rupiah

0.26380

441,750.71

Rupiah

37,212.95

Rupiah

478,963.66

Rupiah

H
I

135,660.00
166,250.00

Rupiah
Rupiah

116,290.47

Rupiah

232,580.94

Rupiah

L
M

19,586.00
13,029.00

Rupiah
Rupiah

683,396.41

Rupiah

1,162,360.07

Rupiah

i
U1
U2
Mb
Ms
Mp

10.00
19,586.00
13,029.00
7,150.00
5,950.00
35,000.00

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

ami depresiasi (dengan declining methode).

URAIAN ANALISA ALAT

KODE

Pw
Cp

KOEF.

SATUAN

DUMP TRUCK MITSUBISHI FE 73 HD


110.0
6.0

HP
Ton

5.0

Tahun

W
B
A'
W'
B'

2,000.0
426,686,400
5.0
2,000.0
426,686,400

Jam
Rupiah
Tahun
Jam
Rupiah

42,668,640

Rupiah

0.26380

50,651.46

Rupiah

Rupiah

4,266.86

Rupiah

54,918.32

Rupiah

H
I

78,540.00
96,250.00

Rupiah
Rupiah

13,333.95

Rupiah

26,667.90

Rupiah

L
M

19,686.00
13,143.00

Rupiah
Rupiah

247,620.85

Rupiah

302,539.17

Rupiah

i
U1
U2
Mb
Ms
Mp

10.00
19,686.00
13,143.00
7,150.00
5,950.00
35,000.00

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

ami depresiasi (dengan declining methode).

URAIAN ANALISA ALAT

KODE

KOEF.

EXCAVATOR CAT 320 C

SATUAN

Pw
Cp
A
W
B
A'
W'
B'

138.0
1.10
5.0
2,000.0
1,132,135,600
5.0
2,000.0
1,132,135,600

HP
M3
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

113,213,560

Rupiah

0.26380

134,394.53

Rupiah

11,321.36

Rupiah

145,715.89

Rupiah

H
I

98,532.00
120,750.00

Rupiah
Rupiah

35,379.24

Rupiah

70,758.48

Rupiah

L
M

19,586.00
13,029.00

Rupiah
Rupiah

358,034.71

Rupiah

503,750.60

Rupiah

i
U1
U2
Mb

10.00
19,586.00
13,029.00
7,150.00

% / Tahun
Rp./Jam
Rp./Jam
Liter

Rupiah

Ms
Mp

5,950.00
35,000.00

Liter
Liter

ami depresiasi (dengan declining methode).

URAIAN ANALISA ALAT

KODE

Pw
Cp
A
W
B
A'
W'
B'

KOEF.

SATUAN

MOTOR GRADER CAT 120H


125.0
5.0
2,000.0
2,323,676,700
5.0
2,000.0
2,323,676,700
Rupiah

HP
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

232,367,670

Rupiah

0.26380

275,841.03

Rupiah

23,236.77

Rupiah

299,077.79

Rupiah

H
I

89,250.00
109,375.00

Rupiah
Rupiah

72,614.90

Rupiah

145,229.79

Rupiah

L
M

19,586.00
13,029.00

Rupiah
Rupiah

449,084.69

Rupiah

748,162.48

Rupiah

i
U1
U2
Mb
Ms
Mp

10.00
19,586.00
13,029.00
7,150.00
5,950.00
35,000.00

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

ami depresiasi (dengan declining methode).

URAIAN ANALISA ALAT

KODE

Pw
Cp
A
W
B
A'
W'
B'

KOEF.

WHEEL LOADER WA 180-3


120.0
1.9
5.0
2,000.0
800,098,900
5.0
2,000.0
800,098,900
Rupiah
80,009,890

SATUAN

HP
M3
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

Rupiah

0.26380

94,978.83

Rupiah

8,000.99

Rupiah

102,979.82

Rupiah

H
I

85,680.00
105,000.00

Rupiah
Rupiah

25,003.09

Rupiah

50,006.18

Rupiah

L
M

19,586.00
13,029.00

Rupiah
Rupiah

298,304.27

Rupiah

401,284.09

Rupiah

i
U1

10.00
19,586.00
13,029.00
7,150.00
5,950.00
35,000.00

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

U2
Mb
Ms
Mp

ami depresiasi (dengan declining methode).

URAIAN ANALISA ALAT

KODE

Pw
Cp
A
W
B
A'
W'
B'

KOEF.

SATUAN

VIBRATORY ROLLER BOMAG BW 211 D-40


132.0
HP
8.0
Ton
4.0
Tahun
2,000.0
Jam
1,335,199,400
Rupiah
4.0
Tahun
2,000.0
Jam
1,335,199,400
Rupiah
Rupiah
BIAYA PASTI PER JAM KERJA
133,519,940
Rupiah

0.31547

189,547.39

Rupiah

13,351.99

Rupiah

202,899.39

Rupiah

H
I

94,248.00
115,500.00

Rupiah
Rupiah

41,724.98

Rupiah

83,449.96

Rupiah

L
M

19,586.00
13,029.00

Rupiah
Rupiah

367,537.94

Rupiah

570,437.33

Rupiah

i
U1
U2
Mb
Ms
Mp

10.00
19,586.00
13,029.00
7,150.00
5,950.00
35,000.00

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

ami depresiasi (dengan declining methode).

URAIAN ANALISA ALAT

KODE

Pw
Cp
A
W
B
A'
W'
B'

KOEF.

SATUAN

WATER TANKER 3000 - 4500 LITER


100.0
4,000.0
5.0
2,000.0
228,000,000
5.0
2,000.0
228,000,000
Rupiah

HP
Liter
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

22,800,000

Rupiah

0.26380

27,065.62

Rupiah

2,280.00

Rupiah

29,345.62

Rupiah

H
I

71,400.00
87,500.00

Rupiah
Rupiah

7,125.00

Rupiah

14,250.00

Rupiah

L
M

19,586.00
13,029.00

Rupiah
Rupiah

212,890.00

Rupiah

242,235.62

Rupiah

i
U1
U2
Mb
Ms
Mp

10.00
19,586.00
13,029.00
7,150.00
5,950.00
35,000.00

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

ami depresiasi (dengan declining methode).

URAIAN ANALISA ALAT

KODE

Pw
Cp
A
W

KOEF.

3 WHEEL ROLLER BARATA MG-6


34.0
8.0
5.0
2,000.0

SATUAN

HP
Ton
Tahun
Jam

B
A'
W'
B'

437,697,400
5.0
2,000.0
437,697,400

Rupiah
Tahun
Jam
Rupiah

43,769,740

Rupiah

0.26380

51,958.56

Rupiah

4,376.97

Rupiah

56,335.54

Rupiah

H
I

24,276.00
29,750.00

Rupiah
Rupiah

13,678.04

Rupiah

27,356.09

Rupiah

L
M

19,586.00
13,029.00

Rupiah
Rupiah

127,675.13

Rupiah

184,010.67

Rupiah

i
U1
U2
Mb
Ms
Mp

10.00
19,586.00
13,029.00
7,150.00
5,950.00
35,000.00

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

Rupiah

ami depresiasi (dengan declining methode).

URAIAN ANALISA ALAT

KODE

Pw
Cp
A
W
B

KOEF.

SATUAN

BLENDING EQUIPMENT
50
30.00
10.0
1,500.0
0

HP
Ton
Tahun
Jam
Rupiah

Rupiah

0.16275

0.00

Rupiah

0.00

Rupiah

0.00

Rupiah

0.00

Rupiah

0.00

Rupiah

Rupiah

0.0000

Rupiah

L
M

19,586.00
13,029.00

Rupiah
Rupiah

32,615.00

Rupiah

32,615.00

Rupiah

i
U1
U2
Mb
Ms
Mp

10.00
19,586.00
13,029.00
7,150.00
5,950.00
35,000.00

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

KET.

E01

Alat baru
Alat baru
Alat baru

No.

JENIS PERALATAN

KET.

2
3
4

E02

Alat baru
Alat baru
Alat baru

5
6
7
8
9

KETERANGAN :
1.
Tingkat Suku Bunga
2.
Upah Operator
3.
Upah Pembantu Operator
4.
Harga Bahan Bakar Bensin
5.
Harga Bahan Bakar Solar
6.
Minyak Pelumas
7.
Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lem
8.
Khusus AMP, biaya bahan bakar ditambah (untuk peman

KET.

E03

Alat baru
Alat baru
Alat baru

KET.

E04

Alat baru
Alat baru
Alat baru

KET.

E05

Alat baru
Alat baru
Alat baru

KET.

E06

Alat baru
Alat baru
Alat baru

KET.

E07

Alat baru
Alat baru
Alat baru

KET.

E08

Alat baru
Alat baru
Alat baru

KET.

E09

JENIS PERALATAN

TENAGA
ALAT

KAPASITAS
ALAT

(HP)

HP

Cp

KODE
ALAT

2a

BULLDOZER D-65

E01

190.0 -

DUMP TRUCK MITSUBISHI FE 73 HD


EXCAVATOR CAT 320 C

E02
E03

110.0
138.0

MOTOR GRADER CAT 120H

E04

125.0 -

WHEEL LOADER WA 180-3


VIBRATORY ROLLER BOMAG BW 211 D-40
WATER TANKER 3000 - 4500 LITER
3 WHEEL ROLLER BARATA MG-6
BLENDING EQUIPMENT

E05
E06
E07
E08
E09

120.0
132.0
100.0
34.0
50.0

6.0
1.1
1.9
8.0
4,000.0
8.0
30.0

ngkat Suku Bunga


pah Operator
pah Pembantu Operator
arga Bahan Bakar Bensin
arga Bahan Bakar Solar
inyak Pelumas
jak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
husus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM

ANALISA BIAYA S

KAPASITAS
ALAT

HARGA
ALAT

UMUR
ALAT

( BARU )

ALAT YANG DIPAKAI


JAM
KERJA
1 TAHUN

HARGA
ALAT

( Rp. )

(Tahun)

(Jam)

(Rp.)

Cp

B'

M3

3,721,295,000

5.0

2,000.0

3,721,295,000

TON
M3

426,686,400
1,132,135,600

5.0
5.0

2,000.0
2,000.0

426,686,400
1,132,135,600

2,323,676,700

5.0

2,000.0

2,323,676,700

M3
TON
L
TON
TON

800,098,900
1,335,199,400
228,000,000
437,697,400
0

5.0
4.0
5.0
5.0
10.0

2,000.0
2,000.0
2,000.0
2,000.0
1,500.0

800,098,900
1,335,199,400
228,000,000
437,697,400
0

=
=
=
=
=
=

10.00
19,586.00
13,029.00
7,150.00
5,950.00
35,000.00

Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 15)

% per-tahun
Rupiah per-orang/jam
Rupiah per-orang/jam
Rupiah per-liter
Rupiah per-liter
Rupiah per-liter

Upah Sopir
Upah Pembantu Sopir

ANALISA BIAYA SEWA PERALATAN PER JAM KERJA

NILAI
SISA
ALAT

FAKTOR
PENGEMBALIAN
MODAL

(Rp.)

BIAYA
PENGEMBALIAN
MODAL
(Rp.)

BIAYA PASTI PER JAM


ASURANSI
DAN
LAIN-LAIN

TOTAL
BIAYA
PASTI / JAM

(Rp.)

(Rp.)

Lt/HP/Jam

(10% X B)

i(1+i)^A
------

(B' - C) x D
-------

0.20 x C
-----

(e1 + e2)

0.12
s/d

(1+i)^A-1

e1

e2

f1

10

11

12

13

14

BAHAN BAKAR &


BAHAN
BAKAR

0.15

372,129,500

0.26380

441,750.71

37,212.95

478,963.66

0.1200

42,668,640
113,213,560

0.26380
0.26380

50,651.46
134,394.53

4,266.86
11,321.36

54,918.32
145,715.89

0.1200
0.1200

232,367,670

0.26380

275,841.03

23,236.77

299,077.79

0.1200

80,009,890
133,519,940
22,800,000
43,769,740
0

0.26380
0.31547
0.26380
0.26380
0.16275

94,978.83
189,547.39
27,065.62
51,958.56
0.00

8,000.99
13,351.99
2,280.00
4,376.97
0.00

102,979.82
202,899.39
29,345.62
56,335.54
0.00

0.1200
0.1200
0.1200
0.1200
0.1200

=
=

19,686.00 Rupiah per-orang/jam


13,143.00 Rupiah per-orang/jam

BAHAN BAKAR & PELUMAS


MINYAK
PELUMAS
BIAYA
Ltr/HP/Jam

BIAYA OPERASI PER JAM KERJA


WORKSHOP
SPAREPART
KOEF.

BIAYA

KOEF.

BIAYA

(Rp.)

(Rp.)

0.025
s/d

(Rp.)
f1 x HP x
Harga BBM
+

0.0625
s/d

(g1 x B')
-----

0.125
s/d

(h1 x B')
-----

0.030

f2 x HP x

0.0875

0.175

f2

Harga Olie
F

g1

h1

15

16

17

18

19

20

0.0250

301,910.00

0.0625

116,290.47

0.1250

232,580.94

0.0250
0.0250

174,790.00
219,282.00

0.0625
0.0625

13,333.95
35,379.24

0.1250
0.1250

26,667.90
70,758.48

0.0250

198,625.00

0.0625

72,614.90

0.1250

145,229.79

0.0250
0.0250
0.0250
0.0250
0.0250

190,680.00
209,748.00
158,900.00
54,026.00
79,450.00

0.0625
0.0625
0.0625
0.0625
0.0625

25,003.09
41,724.98
7,125.00
13,678.04
0.00

0.1250
0.1250
0.1250
0.1250
0.1250

50,006.18
83,449.96
14,250.00
27,356.09
0.00

A
UPAH
OPERATOR
/ SOPIR
(Rp.)
1 Orang
Per
Jam Kerja

PEMBANTU
OPERATOR
/ SOPIR
(Rp.)
1 Orang
Per
Jam Kerja

Rp19,586.00
I
21

Rp13,029.00
J
22

TOTAL
BIAYA
OPERASI
/ JAM
(Rp.)

TOTAL
BIAYA
SEWA ALAT
PER
JAM KERJA
(Rp.)

F+G+H+I+J

E+K

23

24

25

1,162,360.07

KET.

19,586.00

13,029.00

683,396.41

Alat baru

19,686.00
19,586.00

13,143.00
13,029.00

247,620.85
358,034.71

302,539.17 Alat baru


503,750.60 Alat baru

19,586.00

13,029.00

449,084.69

748,162.48 Alat baru

19,586.00
19,586.00
19,586.00
19,586.00
19,586.00

13,029.00
13,029.00
13,029.00
13,029.00
13,029.00

298,304.27
367,537.94
212,890.00
127,675.13
112,065.00

401,284.09
570,437.33
242,235.62
184,010.67
112,065.00

Alat baru
Alat baru
Alat baru
Alat baru
Alat baru

1,162,360.07
302,539.17
503,750.60
748,162.48
401,284.09
570,437.33
242,235.62
184,010.67
32,615.00

HARGA DA
K
No.

U RAIAN

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

HARGA DASAR SATU


KABUPATEN JEMB
No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

U RAIAN

16
17
18
19
20

HARGA DASAR SATUAN SEWA


KABUPATEN JEMBER 201
No.

Jenis Alat

BULLDOZER D-65
DUMP TRUCK MITSUBISHI FE 73 HD
EXCAVATOR CAT 320 C
MOTOR GRADER CAT 120H
WHEEL LOADER WA 180-3
VIBRATORY ROLLER BOMAG BW 211 D-40
WATER TANKER 3000 - 4500 LITER

1
2
3
4
5
6
7
8
9

3 WHEEL ROLLER BARATA MG-6


BLENDING EQUIPMENT

No.

Jenis Alat

1 Ganco
2 Cangkul
3
4
5
6
7
8
9
10
11
12
13

Sekop
Sabit
Sapu lidi
Cikrak/Pengki
Kereta Dorong
Cetok
Ember
Garu
Sikat ijuk
Tripod
Hammer

14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

Parang
Palu
Linggis
Kereta Dorong Besar
Alat Perata
Tempat Penggorengan Aspal
Kuas
Ampelas
Sikat Baja
Gunting Potong Baja
Kunci Pembengkok
Rambu Pengaman
Saringan
Lampu Mercury
Batu Bata
Rambu Scholite ukuran 2,4 x 1,2 m t=1,5 mm

HARGA DASAR SATUAN UPAH TENAGA KERJA


KABUPATEN JEMBER 2016

Pekerja
Tukang
Mandor
Operator
Pembantu Operator
Sopir / Driver
Pembantu Sopir / Driver
Mekanik
Pembantu Mekanik

KODE

SATUAN

(L01)
(L02)
(L03)
(L04)
(L05)
(L06)
(L07)
(L08)
(L09)

Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam

HARGA DASAR SATUAN BAHAN


KABUPATEN JEMBER 2016

Agregat Kasar
Agregat Halus
Filler
Agregat Base Kelas A
Agregat Base Kelas B
Agregat Base Kelas C
Material Pilihan (Sirtu)
Material Tanah Timbunan
Batu Pecah Mesin 0,5-1 cm
Batu Pecah Mesin 1-2 cm
Solar
Bensin
Minyak Pelumas/Oli

KODE

SATUAN

M01
M02
M03
M04
M05
M06
M07
M08
M08
M09
M08
M09
M10

M3
M3
Kg
M3
M3
M3
M3
Kg
M3
M3
L
L
L

GA DASAR SATUAN SEWA ALAT


KABUPATEN JEMBER 2016
Kode Alat

HP

E01
E02
E03
E04
E05
E06
E07
E08
E09

190
110
138
125
120
132
100

Cp

3.7
6
1.1
1.9
8
4000
8
30

34
50

Harga
Satuan

Harga Alat

(rp/jam)

Jumlah
alat
(1 tahun)

19.84

50,000.00

17.86

45,000.00

9.92
9.92
8.93
0.40
119.05
9.92
11.90
13.89
14.88
3.97
2.98

25,000.00
25,000.00
7,500.00
1,000.00
300,000.00
25,000.00
15,000.00
35,000.00
7,500.00
10,000.00
7,500.00

1
1
3
1
1
1
2
1
5
1
1

3.97
9.92
4.96
218.25
3.97
119.05
29.76
29.76
11.90
47.62
23.81
23.81
3.97
200,000.00
295.00
1,300,000.00

10,000.00
25,000.00
12,500.00
550,000.00
10,000.00
300,000.00
15,000.00
7,500.00
15,000.00
60,000.00
30,000.00
60,000.00
5,000.00
200,000.00
295.00
1,300,000.00

1
1
1
1
1
1
5
10
2
2
2
1
2

TENAGA KERJA
R 2016
HARGA
SATUAN

HARIAN

HARIAN + K3

( Rp/jam)

(OH)

(OH)

9,309.00
10,007.00
12,315.00
19,586.00
13,029.00
19,686.00
13,143.00
19,686.00
13,143.00

HARGA
SATUAN

65,163.00
70,049.00
86,205.00
137,102.00
91,203.00
137,802.00
92,001.00
137,802.00
92,001.00

KETERANGAN

( Rp.)
260,000.00
246,000.00
1,250.00
146,400.00
142,700.00
110,000.00
69,000.00
265,000.00
250,000.00
5,950.00
7,150.00
35,000.00

Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Base Camp
Base Camp
Base Camp
Pertamina
Pertamina
Pertamina

65,225.50
70,111.50
86,267.50
137,164.50
91,265.50
137,864.50
92,063.50
137,864.50
92,063.50

Cp

Harga Alat

Harga Sewa Alat

(Rp)

M3
TON
M3
M3
TON
L
TON
TON

(Rp/jam)

3,721,295,000
426,686,400
1,132,135,600
2,323,676,700
800,098,900
1,335,199,400
228,000,000
437,697,400

1,162,360.07
302,539.17
503,750.60
748,162.48
401,284.09
570,437.33
242,235.62
184,010.67
112,065.00

Keterangan

Masa Konstruksi
360

Catatan :
Alternatif lain untuk harga
Harga alat x jumlah alat ya

bahan
bahan
bahan

KETERANGAN

natif lain untuk harga satuan


a alat x jumlah alat yang digunakan / volume pekerjaan

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN
SATUAN PEMBAYARAN

: 3.1.1
: Galian Quarry 2
: M3

No.

U RAIAN

I.
1
2
3
4
5
6

ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : Quarry 2
Kondisi Jalan : sedang
Jam kerja efektif per-hari
Faktor pengembangan bahan
Berat volume tanah (lepas)

1
2
3

URUTAN KERJA
Tanah yang digali adalah tanah gumuk quarry 2
Penggalian dilakukan dengan menggunakan Excavator
Excavator menuangkan material hasil galian

II.

galian ke dalam Dump Truck


4

III.

Dump Truck mengangkut material hasil galian ke lokasi


gumuk quarry 1 sejauh
PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.

BAHAN
Tidak ada bahan yang diperlukan

2.
2.a.

ALAT
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Faktor konversi , kedalaman < 40 %
Waktu siklus
- Menggali , memuat
- Lain lain
Waktu siklus = T1 x Fv
Kap. Prod. / j

Koefisien Ala = 1 : Q1

V x Fb x Fa x 60
Ts1 x Fk

2.b.

DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat
= (V x 60)/(D x Q1 x Fk)
- Waktu tempuh isi
- Waktu tempuh kosong

= (L : v1) x 60
= (L : v2) x 60

- Lain-lain

Kapasitas Produksi / Jam =

V x Fa x 60
D x Fk x Ts2

Koefisien Ala = 1 : Q2
2.d.

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN
SATUAN PEMBAYARAN

ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop
- Keranjang

: 3.1.1
: Galian Quarry 2
: M3

No.

3.

U RAIAN

TENAGA
Produksi menentukan : EXCAVATOR
Produksi Galian / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3 :
- Pekerja
- Mandor
4.

= (Tk x P) : Qt
= (Tk x M) : Qt

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :
Rp.

43,612.31 / M3

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksa. . . . . . . . . . . .
bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerj
0.00 M3

Analisa EI-311
URAIAN ANALISA HARGA SATUAN

KODE

KOEF.

SATUAN

Tk
Fk
D

7.00
1.25
1.72

Jam
ton/m3

1.80

Km

1.10
0.70
0.83
0.90

M3
-

E03
V
Fb
Fa
Fv
Ts1
T1
T2
Ts1

0.55

menit
menit
menit
menit

Q1

55.78

M3/Jam

E03

0.0179

Jam

KETERANGAN

1.40 - 1.80

pemuatan sedang
baik
Faktor konversi
dihapus, masuk
dalam waktu siklus
disesuaikam

(L : v1) x 60
(L : v2) x 60

(Tk x P) : Qt
(Tk x M) : Qt

E02
V
Fa
v1
v2
Ts2
T1
T2
T3

6.00
0.83
20.00
30.00
3.00
5.40
3.60

ton
KM/Jam
KM/Jam
menit
menit
menit
menit

T4

1.00

menit

Ts2

13.00

menit

Q2

10.69

M3/Jam

E02

0.0936

Jam

Lump Sump

Berlanjut ke halaman berikut

Analisa EI-311
URAIAN ANALISA HARGA SATUAN
Lanjutan

KODE

KOEF.

Q1
Qt

55.78
390.43

P
M

2.00
1.00

(L01)
(L03)

0.0359
0.0179

SATUAN

M3/Jam
M3
orang
orang

Jam
Jam

KETERANGAN

FORMULIR STANDAR UNTUK

PEREKAMAN ANALISA MASING-MASING HARG

PROYEK

#REF!

No. PAKET KONTRAK

NAMA PAKET

#REF!
.

PROP / KAB / KODYA

#REF!

ITEM PEMBAYARAN NO.

: 3.1.1

JENIS PEKERJAAN

: Galian Quarry 2

SATUAN PEMBAYARAN

: M3

NO.

KOMPONEN

A.

TENAGA

1.
2.

Pekerja
Mandor

SATUAN

(L01)
(L03)

Jam
Jam

PERKIRAAN
KUANTITAS

0.0359
0.0179

JUMLAH HARG
B.

BAHAN

JUMLAH HAR

C.

PERALATAN

1.
2.

Excavator
Dump Truck

E03
E02

Jam
Jam

0.0179
0.0936

3.

Alat Bantu

Ls

1.0000

JUMLAH HARGA P
D.
E.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


OVERHEAD & PROFIT
15.0 % x D

F.

HARGA SATUAN PEKERJAAN ( D + E )

Note: 1

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, vo
berat untuk bahan-bahan.
Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (teta
yang dibayar dari kontrak) dan biaya-biaya lainnya.

3
4

Analisa EI-311

ULIR STANDAR UNTUK

SA MASING-MASING HARGA SATUAN

.
PERKIRAAN VOL. PEK.

TOTAL HARGA (Rp.)

% THD. BIAYA PROYEK

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

9,309.00
12,315.00

333.80
220.79

JUMLAH HARGA TENAGA

554.59

JUMLAH HARGA BAHAN

0.00

503,750.60
302,539.17

9,031.67
28,304.21

33.28

JUMLAH HARGA PERALATAN

N (A+B+C)

naga Kerja dan Peralatan, volume dan/atau ukuran

mponen untuk menyelesaikan satu satuan pekerjaan


ampaikan Penyedia Jasa tidak dapat diubah kecuali
uai ketentuan dalam Instruksi Kepada Peserta Lelang
akar, bahan habis dipakai dan operator.
uh pajak yang berkaitan (tetapi tidak termasuk PPN

33.28

37,369.16
37,923.75
5,688.56
43,612.31

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN
SATUAN PEMBAYARAN

: 3.1.1
: Galian Biasa
: M3

No.

U RAIAN

I.
1
2
3
4
5
6

ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan : sedang
Jam kerja efektif per-hari
Faktor pengembangan bahan
Berat volume tanah (lepas)

1
2
3

URUTAN KERJA
Tanah yang digali adalah tanah gumuk quarry 1
Penggalian dilakukan dengan menggunakan Excavator
Excavator menuangkan material hasil galian

II.

ke tempat timbunan sementara


4
5

III.

Wheel Loader memuat material di timbunan sementara


dibawa menuju stockpile pencampuran
Selanjutnya Wheel Loader melakukan pencampuran
pada material hasil galian Quarry 2 dan Quarry 1
secara manual
PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.

BAHAN
Tidak ada bahan yang diperlukan

2.
2.a.

ALAT
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Faktor konversi , kedalaman < 40 %
Waktu siklus
- Menggali , memuat
- Lain lain
Waktu siklus = Ts1 x Fv
Kap. Prod. / j

V x Fb x Fa x 60
Ts1 x Fk

Koefisien Ala = 1 : Q1
2.b.

WHEEL LOADER
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi Alat
Waktu sklus
- Muat dan angkut

Kapasitas Produksi / Jam =

V x Fb x Fa x 60
Fk x Ts1

Koefisienalat / = 1 : Q1

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN
SATUAN PEMBAYARAN

: 3.1.1
: Galian Biasa
: M3

No.

2.c.

3.

U RAIAN

ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop
- Keranjang
TENAGA
Produksi menentukan : EXCAVATOR
Produksi Galian / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja

- Mandor
Koefisien tenaga / M3 :
- Pekerja
- Mandor

= (Tk x P) : Qt
= (Tk x M) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :
Rp.

17,308.24 / M3

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksa. . . . . . . . . . . .
bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerj
0.00 M3

Analisa EI-311
URAIAN ANALISA HARGA SATUAN

KODE

KOEF.

SATUAN

KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA

Tk
Fk
D

7.00
1.25
1.72

Jam
ton/m3

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN

1.40 - 1.80

SATUAN PEMBAYARAN

NO.

2.20

Km

A.

1.
2.

E03
V
Fb
Fa
Fv
Ts1
T1
T2
Ts1
Q1

B.
1.10
0.70
0.83
0.90

M3
-

0.55

menit
menit
menit
menit

55.78

M3/Jam

pemuatan sedang
baik
Faktor konversi
dihapus, masuk
dalam waktu siklus
disesuaikam

C.

E03
E05
V
Fb
Fa
Ts1
T1
Ts1
Q1

0.0179

Jam

1.90
0.80
0.83

M3
-

0.44

menit
menit

78.20

1.
2.
3.
pemuatan ringan

D.
E.

M3

F.
Note: 1
E05

0.0128

Jam
2

3
4

Berlanjut ke halaman berikut

Analisa EI-311
URAIAN ANALISA HARGA SATUAN
Lanjutan

KODE

KOEF.

SATUAN

KETERANGAN

Lump Sump

Q1
Qt
P

55.78
390.43
2.00

M3/Jam
M3
orang

(L01)
(L03)

1.00

0.0359
0.0179

orang

Jam
Jam

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

#REF!

o. PAKET KONTRAK

:
#REF!
.

ROP / KAB / KODYA

#REF!

EM PEMBAYARAN NO.

: 3.1.1

ENIS PEKERJAAN

: Galian Biasa

ATUAN PEMBAYARAN

: M3

KOMPONEN

SATUAN

PERKIRAAN
KUANTITAS

TENAGA

Pekerja
Mandor

(L01)
(L03)

Jam
Jam

0.0359
0.0179

JUMLAH HARGA TENAGA


BAHAN

JUMLAH HARGA BAHAN

PERALATAN

Excavator

E03

Jam

0.0179

Wheel Loader

E05

Jam

0.0128

Alat Bantu

Ls

1.0000

JUMLAH HARGA PERALATAN


JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
OVERHEAD & PROFIT
15.0 % x D
HARGA SATUAN PEKERJAAN ( D + E )
SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-311

STANDAR UNTUK

SING-MASING HARGA SATUAN

.
PERKIRAAN VOL. PEK.

TOTAL HARGA (Rp.)

% THD. BIAYA PROYEK

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

9,309.00
12,315.00

333.80
220.79

JUMLAH HARGA TENAGA

554.59

JUMLAH HARGA BAHAN

0.00

503,750.60

401,284.09
332.76

JUMLAH HARGA PERALATAN

Peralatan, volume dan/atau ukuran

enyelesaikan satu satuan pekerjaan


dia Jasa tidak dapat diubah kecuali
lam Instruksi Kepada Peserta Lelang
bis dipakai dan operator.
erkaitan (tetapi tidak termasuk PPN

9,031.67
5,131.62
332.76

14,496.05
15,050.64
2,257.60
17,308.24

ITEM PEMBAYARAN
JENIS PEKERJAAN
SATUAN PEMBAYARAN

: AGREGAT KELAS B (kondisi lepas)


: PENGADAAN AGREGAT KELAS B
: M3

No.

U RAIAN

2
3
4

ASUMSI
Bahan Agregat Halus & Kasar diterima di lokasi
Base Camp
Jarak dari stockpile ke alat blending
Jam kerja effektif perhari
Kegiatan dilakukan di dalam lokasi Quarry 1

Berat isi padat

6
8

Jam kerja efektif per-hari


Proporsi Campuran :

Berat volume agregat (lepas)

- Agregat Pecah Mesin 20 - 30 mm


- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm
- Sirtu
- Agregat Pecah Mesin 20 - 30 mm
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm
- Sirtu

II

URUTAN PEKERJAAN
1
2

III.
1.

2.
2.a.

Wheel Loader memuat material bahan campuran tanah gumuk dari


stockpile ke alat blending
Blending equipment melakukan pencampuran (blending)
Aggregat kasar, aggregat halus dan tanah gumuk campuran menjadi
Aggregat B
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
- Agr 20-30
= "20-30" x 1 M3 x Fh1
- Agr 5 - 10 & 10 - 20
= "5-10 & 10-20" x 1 M3 x Fh2
- Sirtu
= St x 1 M3 x Fh3
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor Efisiensi alat
Waktu Siklus :
- Waktu pemuatan alat belending

Kap. Prod. / jam =

V x Fb x Fa x 60
(Bip/Bil) x Ts1
= 1 : Q1

Koefisien Alat / M3
2.b.

BLENDING EQUIPMENT
Kapasitas
Faktor effesiensi alat
Kap. Prod. / jam =

V x Fa

Koefisien Alat / M3
3.

= 1 : Q2

TENAGA
Produksi menentukan : WHEEL LOADER
Produksi Agregat / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3

:
- Pekerja
- Mandor

= (Tk x P) : Qt
= (Tk x M) : Qt

ELAS B (kondisi lepas)


AGREGAT KELAS B

AIAN

Mesin 20 - 30 mm
Mesin 5 - 10 & 10 - 20 mm

Mesin 20 - 30 mm
Mesin 5 - 10 & 10 - 20 mm

KODE

KOEFISIEN

SATUAN

l
Tk

20.00
7.00

Bip

1.81

Tk
20-30
St

7.00
27.00
48.00
25.00

jam
%
%
%

Bil

1.51

ton/m3

Fh1
Fh2
Fh3

1.05
1.05
1.05

M93
M92
M16

0.2835
0.5040
0.2625

M3
M3
M3

(E15)
V
Fb
Fa

1.90
0.80
0.83

M3
-

T1

0.80

menit

5-10&10-20

M
jam

tanah gumuk dari

campuran menjadi

" x 1 M3 x Fh2

(Tk x P) : Qt
(Tk x M) : Qt

Ts1

0.80

menit

Q1

94.62

M3

(E15)

0.0106

jam

(E52)
V
Fa

25.00
0.83

M3/jam

Q2

20.75

M3

0.0482

jam

Q1
Qt

94.62
662.34

M3/Jam
M3

P
M

2.00
1.00

(L01)
(L03)

0.0211
0.0106

orang
orang

Jam
Jam

URAIAN ANALISA HARGA SATUAN

KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN

Gradasi harus
memenuhi
Spesifikasi

NO.

A.
1.
2.

B.
1.
2.
3

(lepas)
kondisi sedang

jarak 20 meter

C.
1.
2.
3

D.
padat

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

:
:
: ..
:
: AGREGAT KELAS B (kondisi lepas)
: PENGADAAN AGREGAT KELAS B
: M3

KOMPONEN

SATUAN

PERKIRAAN
KUANTITAS

TENAGA
Pekerja
Mandor

(L01)
(L03)

jam
jam

0.0211
0.0106

JUMLAH HARGA TENAGA


BAHAN

Aggregat 20-30
Agg 5 - 10 & 10 - 20
Sirtu

M93
M92
M16

M3
M3
M3

0.2835
0.5040
0.2625

JUMLAH HARGA BAHAN


PERALATAN
Wheel Loader
Blending Equpment
Alat Bantu

(E15)
(E52)

jam
jam
Ls

0.0106
0.0482
1.0000

JUMLAH HARGA PERALATAN


JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

TUK

G HARGA SATUAN

:
:
:

HARGA
SATUAN
(Rp.)

9,309.00
12,315.00

JUMLAH HARGA TENAGA

250,000.00
265,000.00
110,000.00

JUMLAH HARGA BAHAN

401,284.09
112,065.00
19.62

JUMLAH
HARGA
(Rp.)

196.77
130.15

326.92

70,875.00
133,560.00
28,875.00

233,310.00

4,241.01
5,400.72
19.62

MLAH HARGA PERALATAN

9,661.35
243,298.26

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN
SATUAN PEMBAYARAN

No.

U RAIAN

I.
1
2
3
4
5
6

ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp (Quarry 1) ke lokasi pekerjaan
Tebal lapis agregat padat
Berat isi padat

Jam kerja efektif per-hari

Proporsi Campuran :

Berat volume agregat (lepas)


Faktor kehilangan
Faktor kehilangan
Faktor kehilangan

II.
1
2
3
4

5
III.
1.

2.
2.a.

URUTAN KERJA
Wheel Loader mencampur dan memuat Agregat ke
dalam Dump Truck di Base Camp
Dump Truck mengangkut Agregat ke lokasi
pekerjaan dan dihampar dengan Motor Grader
Hamparan Agregat dibasahi dengan Water Tank Truck
sebelum dipadatkan dengan Vibrator Roller
Selama pemadatan, sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan Alat Bantu
Pada tahapan ahir pemadatan menggunakan 3 Wheel Roller
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Agregat B
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor Efisiensi alat
Waktu Siklus :
- Memuat dan lain-lain

Kap. Prod. / jam =


Koefisien Alat / M3
2.b.

DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus :
- Waktu memuat = V x 60/Q1 x Bil
- Waktu tempuh isi = (L : v1) x 60 menit
- Waktu tempuh kosong = (L : v2) x 60 menit
- dan lain-lain

Kap. Prod. / jam =


Koefisien Alat / M3

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN
SATUAN PEMBAYARAN

No.

2.c.

U RAIAN

MOTOR GRADER
Panjang hamparan
Lebar efektif kerja blade
Faktor Efisiensi alat
Kecepatan rata-rata alat
Jumlah lintasan
Lajur lintasan
Lebar Overlap
Waktu Siklus :
- Perataan 1 lintasan = Lh : (v x 1000) x 60
- Lain-lain

Kap. Prod. / jam =

Koefisien Alat / M3

2.d.

VIBRATORY ROLLER
Kecepatan Rata-rata
Lebar Efektif Pemadatan
Jumlah Lintasan
Faktor Efisiensi Alat
Kap. Prod. / Jam

Koefisien Alat / M3

2.e.

WATER TANK TRUCK


Volume tanki air
Kebutuhan air / M3 agregat padat
Kapasitas pompa air
Faktor Efisiensi alat
Kap. Prod. / jam =
Koefisien Alat / M3

2.f.

THREE WHEEL ROLLER


Kecepatan Rata-rata
Lebar Efektif Pemadatan
Jumlah Lintasan
Faktor Efisiensi Alat
Kap. Prod. / Jam

Koefisien Alat / M3
2.g.

ALAT BANTU
Diperlukan :
- Kereta dorong
- Sekop
- Garpu

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN
SATUAN PEMBAYARAN

No.

3.

U RAIAN

TENAGA
Produksi menentukan : WHEEL LOADER
Produksi agregat / hari = Tk x Q1
Kebutuhan tenaga :

Koefisien tenaga / M3 :

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :
Rp.

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan :

7.

VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan :

:
: Lapis Pondasi Agregat Kelas B
: M3

U RAIAN

Quarry 1) ke lokasi pekerjaan

URAIAN A

KODE

KOEF.

L
t
Bip

2.20
0.20
1.81

Tk

7.00

20-30
St
Bil

27.00
48.00
25.00
1.51

- Agregat Pecah Mesin 20 - 30 mm

Fh1

1.05

- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm


- Sirtu

Fh2
Fh3

1.05
1.05

M05

1.2586

- Agregat Pecah Mesin 20 - 30 mm


- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm
- Sirtu

5-10&10-20

n memuat Agregat ke

egat ke lokasi
an Motor Grader
engan Water Tank Truck
Vibrator Roller
pok pekerja akan
level permukaan

n menggunakan 3 Wheel Roller

DAN TENAGA
= 1 M3 x (Bip/Bil) x Fh

E05
V
Fb
Fa
Ts1
T1

1.90
0.80
0.83
0.63

V x Fb x Fa x 60
Ts1
= 1 : Q1

Ts1

0.63

Q1

120.15

E05

0.0083

E02

60 menit
: v2) x 60 menit

V x Fa x 60
Ts2 x Bip
= 1 : Q2

6.00

Fa
v1
v2

0.83
20.00
30.00

T1
T2
T3
T4
Ts2

1.98
6.60
4.40
2.00
14.98

Q2

11.02

E02

0.0908

:
: Lapis Pondasi Agregat Kelas B
: M3

U RAIAN

URAIAN A

KODE

E04
Lh
b
Fa
v
n
N
bo
Ts3
T1
T2
Ts3

v x 1000) x 60

Lh x (n(b-bo)+bo) x t x Fa x 60
N x n x Ts3

Q3

KOEF.

1,400.00
3.20
0.80
3.00
6.00
3.00
0.30
28.00
1.00
29.00
455.72

= 1 : Q3

(v x 1000) x b x t x Fa
n
= 1 : Q4

pa x Fa x 60
Wc x 1000
= 1 : Q6

(v x 1000) x b x t x Fa
n
= 1 : Q4

= 2 buah.
= 3 buah.
= 2 buah.

E04

0.0022

E06
v
b
n
Fa

4.00
1.93
8.00
0.83

Q4

160.19

E06

0.0062

E07
V
Wc
pa
Fa

4.00
0.07
100.00
0.83

Q6

71.14

E07

0.0141

E08
v
b
n
Fa

2.00
1.93
8.00
0.83

Q4

80.10

E08

0.0125

:
: Lapis Pondasi Agregat Kelas B
: M3

URAIAN A

U RAIAN

KODE

EL LOADER

- Pekerja
- Mandor

- Pekerja
- Mandor

= (Tk x P) : Qt
= (Tk x M) : Qt

AH, BAHAN DAN ALAT

PEKERJAAN
MULIR STANDAR UNTUK
ING-MASING HARGA

NG DIPERLUKAN
............

255,291.66 / M3.

bulan

G DIPERLUKAN
0.00 M3

KOEF.

Q1
Qt

120.15
841.07

P
M

7.00
1.00

0.0583
0.0083

0
URAIAN ANALISA HARGA SATUAN

SATUAN

KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA

KM
M

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN
SATUAN PEMBAYARAN

jam
%
%
%
ton/m3

Gradasi harus
memenuhi
Spesifikasi

NO.

A.
1.
2.

B.
1.

M3

M3
menit

lepas
kondisi sedang
panduan

C.
1.
2.
3.
4.
5.

menit

6.
7.

M3
jam
D.
E.
ton

F.

KM/jam
KM/jam

Note: 1
2

menit
menit
menit
menit
menit

3
4

M3
jam

Berlanjut ke hal. berikut

0
URAIAN ANALISA HARGA SATUAN
Lanjutan

SATUAN

M
M
KM/jam
lintasan
M
menit
menit
menit
M3

KETERANGAN

1 x pp

jam

Km / Jam
M
Lintasan

M3
Jam

M3
M3
liter/menit
M3
jam

Km / Jam
M
Lintasan

M3
Jam
Lump Sum

Berlanjut ke hal. berikut

0
URAIAN ANALISA HARGA SATUAN
Lanjutan

SATUAN

M3/jam
M3
orang
orang

jam
jam

KETERANGAN

FORMULIR

PEREKAMAN ANALISA MA

KOMPONEN

TENAGA
Pekerja
Mandor

BAHAN
Aggregat B

PERALATAN
Wheel Loader
Dump Truck
Motor Grader
Vibrator Roller
Water Tanker

Three Wheel Roller


Alat Bantu

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


OVERHEAD & PROFIT
HARGA SATUAN PEKERJAAN ( D + E )
SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-512

UNTUK

SING HARGA SATUAN

:
:
: ..
.
:
:

PERKIRAAN VOL. PEK.

: Lapis Pondasi Agregat Kelas B

TOTAL HARGA

: M3

% THD. BIAYA PROYEK

SATUAN

(L01)
(L03)

jam
jam

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

0.0583
0.0083

9,309.00
12,315.00

JUMLAH HARGA TENAGA

M05

M3

1.2586

142,700.00

JUMLAH HARGA BAHAN

E05
E02
E04
E06
E07

jam
jam
jam
jam
jam

0.0083
0.0908
0.0022
0.0062
0.0141

401,284.09
302,539.17
748,162.48
570,437.33
242,235.62

JUMLAH
HARGA
(Rp.)

E08

0.0125

jam
Ls

1.0000

184,010.67
38.69

JUMLAH HARGA PERALATAN

15.0 % x D

Analisa EI-512

0.00
271,131.42
0.01

JUMLAH
HARGA
(Rp.)

542.34
102.49

644.83

179,603.54

179,603.54

3,339.79
27,460.86
1,641.70
3,561.00
3,404.92

2,297.41
38.69
41,744.37
221,992.75
33,298.91
255,291.66