No.
U RAIAN
MATERIAL
1
2
3
4
5
6
7
8
9
10
Bensin
Solar
Agregat Kasar
Agregat Halus
-
KODE
M06
M07
M08
M09
M08
M01
M02
1.51
1.72
1.35
1.40
1.40
ton/m3
ton/m3
ton/m3
kg/liter
kg/liter
ton/M3
ton/M3
=
=
JENIS PEKERJAAN
: MOBILISASI
No.
JENIS ALAT
B.
KODE
ALAT
SATUAN
E01
E02
E03
E04
E05
E06
E07
E08
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
VOL.
PERALATAN
1
2
3
4
5
6
7
8
BULLDOZER D-65
DUMP TRUCK MITSUBISHI FE 73 HD
EXCAVATOR CAT 320 C
MOTOR GRADER CAT 120H
WHEEL LOADER WA 180-3
VIBRATORY ROLLER BOMAG BW 211 D-40
WATER TANKER 3000 - 4500 LITER
3 WHEEL ROLLER BARATA MG-6
1
5
2
1
2
1
1
1
Lembar 1.2-2
HARGA
SATUAN
JUMLAH
HARGA
(Rp.)
(Rp.)
200,000,000
500,000
100,000
500,000
150,000
100,000
150,000
150,000
200,000,000
2,500,000
200,000
500,000
300,000
100,000
150,000
150,000
:
:
:
M16 - Sirtu
Quarry
Lokasi Pekerjaan
No.
URAIAN
I.
1
2
3
4
5
6
7
II.
1
2
3
III.
ASUMSI
Menggunakan alat berat
Kondisi Jalan : baik
Jarak Quarry 2 ke lokasi Quarry 1
Harga satuan Sirtu di Quarry 1
Harga Satuan Dasar Excavator
Harga Satuan Dasar Dump Truck
Berat volume sirtu
KODE
L
RpM07
RpE03
RpE02
Bil
URUTAN KERJA
Sirtu digali dengan Excavator
Excavator sekaligus memuat sirtu hasil
galian ke dalam Dump Truck
Dump Truck mengangkut sirtu ke lokasi
Base Camp
PERHITUNGAN
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus
- Menggali / memuat
- Lain-lain
Kap. Prod. / jam =
V x Fb x Fa x 60
Ts1
Biaya Excavator / M3 = (1 : Q1) x RpE03
E03
V
Fb
Fa
Ts1
T1
T2
Ts1
Q1
Rp1
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat = (V x 60)/(Q1 x Bil)
- Waktu tempuh isi = (L/v1) x 60
- Waktu tempuh kosong = (L/v2) x 60
- Lain-lain
E02
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
:
:
:
M16 - Sirtu
Quarry
Lokasi Pekerjaan
No.
IV.
URAIAN
KODE
Q2
Rp2
M16
Dibulatkan :
M16
ATUAN BAHAN
KOEF.
SATUAN
HARGA
SATUAN
(Rp.)
1.80
1.00
1.00
1.00
1.72
Km
M3
Jam
Jam
ton/m3
1.10
0.70
0.83
M3
-
0.50
0.50
1.00
menit
menit
menit
38.346
M3 / Jam
13,136.98
Rupiah
62,500.00 4m3 =
503,750.60
302,539.17
Rp250,000
6.00
0.83
20.00
30.00
ton
KM/Jam
KM/Jam
5.46
5.40
3.60
1.00
15.46
menit
menit
menit
menit
menit
Bersambung
ATUAN BAHAN
Lanjutan
KOEF.
SATUAN
HARGA
SATUAN
(Rp.)
11.24
M3 / Jam
26,920.93
Rupiah
102,557.91
Rupiah
102,600.00
Rupiah
1100 M
700M
No.
URAIAN
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
5.
B.
1.
2.
3.
a.
b.
c.
a.
b.
c.
i x (1 + i)^A'
(1 + i)^A' - 1
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)
( B' - C ) x D
W'
0.20 x C
W'
(E+F)
1.
2.
3.
Workshop
4.
Sparepart
5.
6.
Operator
Pembantu Operator
(H+I+J+K+L+M)
E.
1.
2.
3.
4.
5.
6.
7.
Note
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator
Upah Pembantu Operator
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
:
(*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
No.
URAIAN
A.
1.
2.
3.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
4.
Alat Baru
a. Umur Ekonomis
b.
c.
a.
b.
c.
5.
B.
1.
2.
3.
i x (1 + i)^A'
(1 + i)^A' - 1
( B' - C ) x D
W'
0.20 x C
W'
(E+F)
1.
2.
3.
Workshop
4.
Sparepart
5.
6.
Sopir
Pembantu Sopir
Biaya Operasi per Jam
D.
(H+I+J+K+L+M)
E.
1.
2.
3.
4.
5.
6.
7.
Note
LAIN - LAIN
Tingkat Suku Bunga
Upah Sopir
Upah Pembantu Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
:
(*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
No.
A.
1.
URAIAN
URAIAN PERALATAN
Jenis Peralatan
2.
3.
4.
Tenaga
Kapasitas
Alat Baru
5.
B.
1.
2.
3.
a.
b.
c.
a.
b.
c.
i x (1 + i)^A'
(1 + i)^A' - 1
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)
( B' - C ) x D
W'
0.20 x C
W'
(E+F)
1.
2.
3.
Workshop
4.
Sparepart
5.
6.
Operator
Pembantu Operator
Biaya Operasi per Jam
D.
E.
1.
2.
3.
4.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator
Upah Pembantu Operator
Bahan Bakar Bensin
(H+I+J+K+L+M)
5.
6.
7.
Note
(*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
No.
URAIAN
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
5.
B.
1.
2.
3.
a.
b.
c.
a.
b.
c.
i x (1 + i)^A'
(1 + i)^A' - 1
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)
( B' - C ) x D
W'
0.20 x C
W'
(E+F)
3.
Workshop
4.
Sparepart
5.
6.
Operator
Pembantu Operator
Biaya Operasi per Jam
D.
(H+I+J+K+L+M)
E.
1.
2.
3.
4.
5.
6.
7.
Note
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator
Upah Pembantu Operator
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
:
(*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
No.
URAIAN
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
5.
B.
1.
a.
b.
c.
a.
b.
c.
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)
2.
i x (1 + i)^A'
(1 + i)^A' - 1
3.
( B' - C ) x D
W'
0.20 x C
W'
(E+F)
1.
2.
3.
Workshop
4.
Sparepart
5.
6.
Operator
Pembantu Operator
Biaya Operasi per Jam
D.
(H+I+J+K+L+M)
E.
1.
2.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator
3.
4.
5.
6.
7.
Note
(*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
No.
URAIAN
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
5.
B.
1.
2.
3.
a.
b.
c.
a.
b.
c.
i x (1 + i)^A'
(1 + i)^A' - 1
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)
( B' - C ) x D
W'
0.20 x C
W'
(E+F)
1.
2.
3.
Workshop
4.
Sparepart
5.
6.
Operator
Pembantu Operator
Biaya Operasi per Jam
D.
(H+I+J+K+L+M)
E.
1.
2.
3.
4.
5.
6.
7.
Note
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator
Upah Pembantu Operator
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
:
(*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
No.
URAIAN
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
5.
B.
1.
2.
3.
a.
b.
c.
a.
b.
c.
i x (1 + i)^A'
(1 + i)^A' - 1
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)
( B' - C ) x D
W'
0.20 x C
W'
(E+F)
C.
1.
2.
3.
Workshop
4.
Sparepart
5.
6.
Operator
Pembantu Operator
Biaya Operasi per Jam
D.
(H+I+J+K+L+M)
E.
1.
2.
3.
4.
5.
6.
7.
Note
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator
Upah Pembantu Operator
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
:
(*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
No.
A.
1.
2.
3.
4.
URAIAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c.
a.
b.
c.
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)
5.
B.
1.
2.
3.
i x (1 + i)^A'
(1 + i)^A' - 1
( B' - C ) x D
W'
0.20 x C
W'
(E+F)
1.
2.
3.
Workshop
4.
Sparepart
5.
6.
Operator
Pembantu Operator
Biaya Operasi per Jam
D.
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
(H+I+J+K+L+M)
Note
(*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
No.
U RAIAN
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
B.
1.
2.
3.
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
i x (1 + i)^A
(1 + i)^A - 1
b. Asuransi, dll =
(B-C)xD
W
0.002 x B
W
(E+F)
1.
2.
Pelumas
Biaya bengkel
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
3.
4.
5.
Perawatan dan =
perbaikan
Operator
Pembantu Operator
Biaya Operasi per Jam
(12,5 % - 17,5 %) x B
W
= ( 1 Orang / Jam ) x U1
= ( 1 Orang / Jam ) x U2
=
D.
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
(H+I+K+L+M)
KODE
KOEF.
SATUAN
Pw
Cp
A
W
B
A'
W'
B'
BULLDOZER D-65
190.0
5.0
2,000.0
3,721,295,000
5.0
2,000.0
3,721,295,000
Rupiah
HP
M3
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah
372,129,500
Rupiah
0.26380
441,750.71
Rupiah
37,212.95
Rupiah
478,963.66
Rupiah
H
I
135,660.00
166,250.00
Rupiah
Rupiah
116,290.47
Rupiah
232,580.94
Rupiah
L
M
19,586.00
13,029.00
Rupiah
Rupiah
683,396.41
Rupiah
1,162,360.07
Rupiah
i
U1
U2
Mb
Ms
Mp
10.00
19,586.00
13,029.00
7,150.00
5,950.00
35,000.00
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
KODE
Pw
Cp
KOEF.
SATUAN
HP
Ton
5.0
Tahun
W
B
A'
W'
B'
2,000.0
426,686,400
5.0
2,000.0
426,686,400
Jam
Rupiah
Tahun
Jam
Rupiah
42,668,640
Rupiah
0.26380
50,651.46
Rupiah
Rupiah
4,266.86
Rupiah
54,918.32
Rupiah
H
I
78,540.00
96,250.00
Rupiah
Rupiah
13,333.95
Rupiah
26,667.90
Rupiah
L
M
19,686.00
13,143.00
Rupiah
Rupiah
247,620.85
Rupiah
302,539.17
Rupiah
i
U1
U2
Mb
Ms
Mp
10.00
19,686.00
13,143.00
7,150.00
5,950.00
35,000.00
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
KODE
KOEF.
SATUAN
Pw
Cp
A
W
B
A'
W'
B'
138.0
1.10
5.0
2,000.0
1,132,135,600
5.0
2,000.0
1,132,135,600
HP
M3
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah
113,213,560
Rupiah
0.26380
134,394.53
Rupiah
11,321.36
Rupiah
145,715.89
Rupiah
H
I
98,532.00
120,750.00
Rupiah
Rupiah
35,379.24
Rupiah
70,758.48
Rupiah
L
M
19,586.00
13,029.00
Rupiah
Rupiah
358,034.71
Rupiah
503,750.60
Rupiah
i
U1
U2
Mb
10.00
19,586.00
13,029.00
7,150.00
% / Tahun
Rp./Jam
Rp./Jam
Liter
Rupiah
Ms
Mp
5,950.00
35,000.00
Liter
Liter
KODE
Pw
Cp
A
W
B
A'
W'
B'
KOEF.
SATUAN
HP
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah
232,367,670
Rupiah
0.26380
275,841.03
Rupiah
23,236.77
Rupiah
299,077.79
Rupiah
H
I
89,250.00
109,375.00
Rupiah
Rupiah
72,614.90
Rupiah
145,229.79
Rupiah
L
M
19,586.00
13,029.00
Rupiah
Rupiah
449,084.69
Rupiah
748,162.48
Rupiah
i
U1
U2
Mb
Ms
Mp
10.00
19,586.00
13,029.00
7,150.00
5,950.00
35,000.00
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
KODE
Pw
Cp
A
W
B
A'
W'
B'
KOEF.
SATUAN
HP
M3
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah
Rupiah
0.26380
94,978.83
Rupiah
8,000.99
Rupiah
102,979.82
Rupiah
H
I
85,680.00
105,000.00
Rupiah
Rupiah
25,003.09
Rupiah
50,006.18
Rupiah
L
M
19,586.00
13,029.00
Rupiah
Rupiah
298,304.27
Rupiah
401,284.09
Rupiah
i
U1
10.00
19,586.00
13,029.00
7,150.00
5,950.00
35,000.00
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
U2
Mb
Ms
Mp
KODE
Pw
Cp
A
W
B
A'
W'
B'
KOEF.
SATUAN
0.31547
189,547.39
Rupiah
13,351.99
Rupiah
202,899.39
Rupiah
H
I
94,248.00
115,500.00
Rupiah
Rupiah
41,724.98
Rupiah
83,449.96
Rupiah
L
M
19,586.00
13,029.00
Rupiah
Rupiah
367,537.94
Rupiah
570,437.33
Rupiah
i
U1
U2
Mb
Ms
Mp
10.00
19,586.00
13,029.00
7,150.00
5,950.00
35,000.00
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
KODE
Pw
Cp
A
W
B
A'
W'
B'
KOEF.
SATUAN
HP
Liter
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah
22,800,000
Rupiah
0.26380
27,065.62
Rupiah
2,280.00
Rupiah
29,345.62
Rupiah
H
I
71,400.00
87,500.00
Rupiah
Rupiah
7,125.00
Rupiah
14,250.00
Rupiah
L
M
19,586.00
13,029.00
Rupiah
Rupiah
212,890.00
Rupiah
242,235.62
Rupiah
i
U1
U2
Mb
Ms
Mp
10.00
19,586.00
13,029.00
7,150.00
5,950.00
35,000.00
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
KODE
Pw
Cp
A
W
KOEF.
SATUAN
HP
Ton
Tahun
Jam
B
A'
W'
B'
437,697,400
5.0
2,000.0
437,697,400
Rupiah
Tahun
Jam
Rupiah
43,769,740
Rupiah
0.26380
51,958.56
Rupiah
4,376.97
Rupiah
56,335.54
Rupiah
H
I
24,276.00
29,750.00
Rupiah
Rupiah
13,678.04
Rupiah
27,356.09
Rupiah
L
M
19,586.00
13,029.00
Rupiah
Rupiah
127,675.13
Rupiah
184,010.67
Rupiah
i
U1
U2
Mb
Ms
Mp
10.00
19,586.00
13,029.00
7,150.00
5,950.00
35,000.00
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
Rupiah
KODE
Pw
Cp
A
W
B
KOEF.
SATUAN
BLENDING EQUIPMENT
50
30.00
10.0
1,500.0
0
HP
Ton
Tahun
Jam
Rupiah
Rupiah
0.16275
0.00
Rupiah
0.00
Rupiah
0.00
Rupiah
0.00
Rupiah
0.00
Rupiah
Rupiah
0.0000
Rupiah
L
M
19,586.00
13,029.00
Rupiah
Rupiah
32,615.00
Rupiah
32,615.00
Rupiah
i
U1
U2
Mb
Ms
Mp
10.00
19,586.00
13,029.00
7,150.00
5,950.00
35,000.00
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
KET.
E01
Alat baru
Alat baru
Alat baru
No.
JENIS PERALATAN
KET.
2
3
4
E02
Alat baru
Alat baru
Alat baru
5
6
7
8
9
KETERANGAN :
1.
Tingkat Suku Bunga
2.
Upah Operator
3.
Upah Pembantu Operator
4.
Harga Bahan Bakar Bensin
5.
Harga Bahan Bakar Solar
6.
Minyak Pelumas
7.
Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lem
8.
Khusus AMP, biaya bahan bakar ditambah (untuk peman
KET.
E03
Alat baru
Alat baru
Alat baru
KET.
E04
Alat baru
Alat baru
Alat baru
KET.
E05
Alat baru
Alat baru
Alat baru
KET.
E06
Alat baru
Alat baru
Alat baru
KET.
E07
Alat baru
Alat baru
Alat baru
KET.
E08
Alat baru
Alat baru
Alat baru
KET.
E09
JENIS PERALATAN
TENAGA
ALAT
KAPASITAS
ALAT
(HP)
HP
Cp
KODE
ALAT
2a
BULLDOZER D-65
E01
190.0 -
E02
E03
110.0
138.0
E04
125.0 -
E05
E06
E07
E08
E09
120.0
132.0
100.0
34.0
50.0
6.0
1.1
1.9
8.0
4,000.0
8.0
30.0
ANALISA BIAYA S
KAPASITAS
ALAT
HARGA
ALAT
UMUR
ALAT
( BARU )
HARGA
ALAT
( Rp. )
(Tahun)
(Jam)
(Rp.)
Cp
B'
M3
3,721,295,000
5.0
2,000.0
3,721,295,000
TON
M3
426,686,400
1,132,135,600
5.0
5.0
2,000.0
2,000.0
426,686,400
1,132,135,600
2,323,676,700
5.0
2,000.0
2,323,676,700
M3
TON
L
TON
TON
800,098,900
1,335,199,400
228,000,000
437,697,400
0
5.0
4.0
5.0
5.0
10.0
2,000.0
2,000.0
2,000.0
2,000.0
1,500.0
800,098,900
1,335,199,400
228,000,000
437,697,400
0
=
=
=
=
=
=
10.00
19,586.00
13,029.00
7,150.00
5,950.00
35,000.00
% per-tahun
Rupiah per-orang/jam
Rupiah per-orang/jam
Rupiah per-liter
Rupiah per-liter
Rupiah per-liter
Upah Sopir
Upah Pembantu Sopir
NILAI
SISA
ALAT
FAKTOR
PENGEMBALIAN
MODAL
(Rp.)
BIAYA
PENGEMBALIAN
MODAL
(Rp.)
TOTAL
BIAYA
PASTI / JAM
(Rp.)
(Rp.)
Lt/HP/Jam
(10% X B)
i(1+i)^A
------
(B' - C) x D
-------
0.20 x C
-----
(e1 + e2)
0.12
s/d
(1+i)^A-1
e1
e2
f1
10
11
12
13
14
0.15
372,129,500
0.26380
441,750.71
37,212.95
478,963.66
0.1200
42,668,640
113,213,560
0.26380
0.26380
50,651.46
134,394.53
4,266.86
11,321.36
54,918.32
145,715.89
0.1200
0.1200
232,367,670
0.26380
275,841.03
23,236.77
299,077.79
0.1200
80,009,890
133,519,940
22,800,000
43,769,740
0
0.26380
0.31547
0.26380
0.26380
0.16275
94,978.83
189,547.39
27,065.62
51,958.56
0.00
8,000.99
13,351.99
2,280.00
4,376.97
0.00
102,979.82
202,899.39
29,345.62
56,335.54
0.00
0.1200
0.1200
0.1200
0.1200
0.1200
=
=
BIAYA
KOEF.
BIAYA
(Rp.)
(Rp.)
0.025
s/d
(Rp.)
f1 x HP x
Harga BBM
+
0.0625
s/d
(g1 x B')
-----
0.125
s/d
(h1 x B')
-----
0.030
f2 x HP x
0.0875
0.175
f2
Harga Olie
F
g1
h1
15
16
17
18
19
20
0.0250
301,910.00
0.0625
116,290.47
0.1250
232,580.94
0.0250
0.0250
174,790.00
219,282.00
0.0625
0.0625
13,333.95
35,379.24
0.1250
0.1250
26,667.90
70,758.48
0.0250
198,625.00
0.0625
72,614.90
0.1250
145,229.79
0.0250
0.0250
0.0250
0.0250
0.0250
190,680.00
209,748.00
158,900.00
54,026.00
79,450.00
0.0625
0.0625
0.0625
0.0625
0.0625
25,003.09
41,724.98
7,125.00
13,678.04
0.00
0.1250
0.1250
0.1250
0.1250
0.1250
50,006.18
83,449.96
14,250.00
27,356.09
0.00
A
UPAH
OPERATOR
/ SOPIR
(Rp.)
1 Orang
Per
Jam Kerja
PEMBANTU
OPERATOR
/ SOPIR
(Rp.)
1 Orang
Per
Jam Kerja
Rp19,586.00
I
21
Rp13,029.00
J
22
TOTAL
BIAYA
OPERASI
/ JAM
(Rp.)
TOTAL
BIAYA
SEWA ALAT
PER
JAM KERJA
(Rp.)
F+G+H+I+J
E+K
23
24
25
1,162,360.07
KET.
19,586.00
13,029.00
683,396.41
Alat baru
19,686.00
19,586.00
13,143.00
13,029.00
247,620.85
358,034.71
19,586.00
13,029.00
449,084.69
19,586.00
19,586.00
19,586.00
19,586.00
19,586.00
13,029.00
13,029.00
13,029.00
13,029.00
13,029.00
298,304.27
367,537.94
212,890.00
127,675.13
112,065.00
401,284.09
570,437.33
242,235.62
184,010.67
112,065.00
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
1,162,360.07
302,539.17
503,750.60
748,162.48
401,284.09
570,437.33
242,235.62
184,010.67
32,615.00
HARGA DA
K
No.
U RAIAN
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
U RAIAN
16
17
18
19
20
Jenis Alat
BULLDOZER D-65
DUMP TRUCK MITSUBISHI FE 73 HD
EXCAVATOR CAT 320 C
MOTOR GRADER CAT 120H
WHEEL LOADER WA 180-3
VIBRATORY ROLLER BOMAG BW 211 D-40
WATER TANKER 3000 - 4500 LITER
1
2
3
4
5
6
7
8
9
No.
Jenis Alat
1 Ganco
2 Cangkul
3
4
5
6
7
8
9
10
11
12
13
Sekop
Sabit
Sapu lidi
Cikrak/Pengki
Kereta Dorong
Cetok
Ember
Garu
Sikat ijuk
Tripod
Hammer
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
Parang
Palu
Linggis
Kereta Dorong Besar
Alat Perata
Tempat Penggorengan Aspal
Kuas
Ampelas
Sikat Baja
Gunting Potong Baja
Kunci Pembengkok
Rambu Pengaman
Saringan
Lampu Mercury
Batu Bata
Rambu Scholite ukuran 2,4 x 1,2 m t=1,5 mm
Pekerja
Tukang
Mandor
Operator
Pembantu Operator
Sopir / Driver
Pembantu Sopir / Driver
Mekanik
Pembantu Mekanik
KODE
SATUAN
(L01)
(L02)
(L03)
(L04)
(L05)
(L06)
(L07)
(L08)
(L09)
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Agregat Kasar
Agregat Halus
Filler
Agregat Base Kelas A
Agregat Base Kelas B
Agregat Base Kelas C
Material Pilihan (Sirtu)
Material Tanah Timbunan
Batu Pecah Mesin 0,5-1 cm
Batu Pecah Mesin 1-2 cm
Solar
Bensin
Minyak Pelumas/Oli
KODE
SATUAN
M01
M02
M03
M04
M05
M06
M07
M08
M08
M09
M08
M09
M10
M3
M3
Kg
M3
M3
M3
M3
Kg
M3
M3
L
L
L
HP
E01
E02
E03
E04
E05
E06
E07
E08
E09
190
110
138
125
120
132
100
Cp
3.7
6
1.1
1.9
8
4000
8
30
34
50
Harga
Satuan
Harga Alat
(rp/jam)
Jumlah
alat
(1 tahun)
19.84
50,000.00
17.86
45,000.00
9.92
9.92
8.93
0.40
119.05
9.92
11.90
13.89
14.88
3.97
2.98
25,000.00
25,000.00
7,500.00
1,000.00
300,000.00
25,000.00
15,000.00
35,000.00
7,500.00
10,000.00
7,500.00
1
1
3
1
1
1
2
1
5
1
1
3.97
9.92
4.96
218.25
3.97
119.05
29.76
29.76
11.90
47.62
23.81
23.81
3.97
200,000.00
295.00
1,300,000.00
10,000.00
25,000.00
12,500.00
550,000.00
10,000.00
300,000.00
15,000.00
7,500.00
15,000.00
60,000.00
30,000.00
60,000.00
5,000.00
200,000.00
295.00
1,300,000.00
1
1
1
1
1
1
5
10
2
2
2
1
2
TENAGA KERJA
R 2016
HARGA
SATUAN
HARIAN
HARIAN + K3
( Rp/jam)
(OH)
(OH)
9,309.00
10,007.00
12,315.00
19,586.00
13,029.00
19,686.00
13,143.00
19,686.00
13,143.00
HARGA
SATUAN
65,163.00
70,049.00
86,205.00
137,102.00
91,203.00
137,802.00
92,001.00
137,802.00
92,001.00
KETERANGAN
( Rp.)
260,000.00
246,000.00
1,250.00
146,400.00
142,700.00
110,000.00
69,000.00
265,000.00
250,000.00
5,950.00
7,150.00
35,000.00
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Base Camp
Base Camp
Base Camp
Pertamina
Pertamina
Pertamina
65,225.50
70,111.50
86,267.50
137,164.50
91,265.50
137,864.50
92,063.50
137,864.50
92,063.50
Cp
Harga Alat
(Rp)
M3
TON
M3
M3
TON
L
TON
TON
(Rp/jam)
3,721,295,000
426,686,400
1,132,135,600
2,323,676,700
800,098,900
1,335,199,400
228,000,000
437,697,400
1,162,360.07
302,539.17
503,750.60
748,162.48
401,284.09
570,437.33
242,235.62
184,010.67
112,065.00
Keterangan
Masa Konstruksi
360
Catatan :
Alternatif lain untuk harga
Harga alat x jumlah alat ya
bahan
bahan
bahan
KETERANGAN
: 3.1.1
: Galian Quarry 2
: M3
No.
U RAIAN
I.
1
2
3
4
5
6
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : Quarry 2
Kondisi Jalan : sedang
Jam kerja efektif per-hari
Faktor pengembangan bahan
Berat volume tanah (lepas)
1
2
3
URUTAN KERJA
Tanah yang digali adalah tanah gumuk quarry 2
Penggalian dilakukan dengan menggunakan Excavator
Excavator menuangkan material hasil galian
II.
III.
1.
BAHAN
Tidak ada bahan yang diperlukan
2.
2.a.
ALAT
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Faktor konversi , kedalaman < 40 %
Waktu siklus
- Menggali , memuat
- Lain lain
Waktu siklus = T1 x Fv
Kap. Prod. / j
Koefisien Ala = 1 : Q1
V x Fb x Fa x 60
Ts1 x Fk
2.b.
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat
= (V x 60)/(D x Q1 x Fk)
- Waktu tempuh isi
- Waktu tempuh kosong
= (L : v1) x 60
= (L : v2) x 60
- Lain-lain
V x Fa x 60
D x Fk x Ts2
Koefisien Ala = 1 : Q2
2.d.
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop
- Keranjang
: 3.1.1
: Galian Quarry 2
: M3
No.
3.
U RAIAN
TENAGA
Produksi menentukan : EXCAVATOR
Produksi Galian / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3 :
- Pekerja
- Mandor
4.
= (Tk x P) : Qt
= (Tk x M) : Qt
5.
43,612.31 / M3
6.
7.
Analisa EI-311
URAIAN ANALISA HARGA SATUAN
KODE
KOEF.
SATUAN
Tk
Fk
D
7.00
1.25
1.72
Jam
ton/m3
1.80
Km
1.10
0.70
0.83
0.90
M3
-
E03
V
Fb
Fa
Fv
Ts1
T1
T2
Ts1
0.55
menit
menit
menit
menit
Q1
55.78
M3/Jam
E03
0.0179
Jam
KETERANGAN
1.40 - 1.80
pemuatan sedang
baik
Faktor konversi
dihapus, masuk
dalam waktu siklus
disesuaikam
(L : v1) x 60
(L : v2) x 60
(Tk x P) : Qt
(Tk x M) : Qt
E02
V
Fa
v1
v2
Ts2
T1
T2
T3
6.00
0.83
20.00
30.00
3.00
5.40
3.60
ton
KM/Jam
KM/Jam
menit
menit
menit
menit
T4
1.00
menit
Ts2
13.00
menit
Q2
10.69
M3/Jam
E02
0.0936
Jam
Lump Sump
Analisa EI-311
URAIAN ANALISA HARGA SATUAN
Lanjutan
KODE
KOEF.
Q1
Qt
55.78
390.43
P
M
2.00
1.00
(L01)
(L03)
0.0359
0.0179
SATUAN
M3/Jam
M3
orang
orang
Jam
Jam
KETERANGAN
PROYEK
#REF!
NAMA PAKET
#REF!
.
#REF!
: 3.1.1
JENIS PEKERJAAN
: Galian Quarry 2
SATUAN PEMBAYARAN
: M3
NO.
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
SATUAN
(L01)
(L03)
Jam
Jam
PERKIRAAN
KUANTITAS
0.0359
0.0179
JUMLAH HARG
B.
BAHAN
JUMLAH HAR
C.
PERALATAN
1.
2.
Excavator
Dump Truck
E03
E02
Jam
Jam
0.0179
0.0936
3.
Alat Bantu
Ls
1.0000
JUMLAH HARGA P
D.
E.
F.
Note: 1
SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, vo
berat untuk bahan-bahan.
Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (teta
yang dibayar dari kontrak) dan biaya-biaya lainnya.
3
4
Analisa EI-311
.
PERKIRAAN VOL. PEK.
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
9,309.00
12,315.00
333.80
220.79
554.59
0.00
503,750.60
302,539.17
9,031.67
28,304.21
33.28
N (A+B+C)
33.28
37,369.16
37,923.75
5,688.56
43,612.31
: 3.1.1
: Galian Biasa
: M3
No.
U RAIAN
I.
1
2
3
4
5
6
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan : sedang
Jam kerja efektif per-hari
Faktor pengembangan bahan
Berat volume tanah (lepas)
1
2
3
URUTAN KERJA
Tanah yang digali adalah tanah gumuk quarry 1
Penggalian dilakukan dengan menggunakan Excavator
Excavator menuangkan material hasil galian
II.
III.
1.
BAHAN
Tidak ada bahan yang diperlukan
2.
2.a.
ALAT
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Faktor konversi , kedalaman < 40 %
Waktu siklus
- Menggali , memuat
- Lain lain
Waktu siklus = Ts1 x Fv
Kap. Prod. / j
V x Fb x Fa x 60
Ts1 x Fk
Koefisien Ala = 1 : Q1
2.b.
WHEEL LOADER
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi Alat
Waktu sklus
- Muat dan angkut
V x Fb x Fa x 60
Fk x Ts1
Koefisienalat / = 1 : Q1
: 3.1.1
: Galian Biasa
: M3
No.
2.c.
3.
U RAIAN
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop
- Keranjang
TENAGA
Produksi menentukan : EXCAVATOR
Produksi Galian / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3 :
- Pekerja
- Mandor
= (Tk x P) : Qt
= (Tk x M) : Qt
4.
5.
17,308.24 / M3
6.
7.
Analisa EI-311
URAIAN ANALISA HARGA SATUAN
KODE
KOEF.
SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
Tk
Fk
D
7.00
1.25
1.72
Jam
ton/m3
1.40 - 1.80
SATUAN PEMBAYARAN
NO.
2.20
Km
A.
1.
2.
E03
V
Fb
Fa
Fv
Ts1
T1
T2
Ts1
Q1
B.
1.10
0.70
0.83
0.90
M3
-
0.55
menit
menit
menit
menit
55.78
M3/Jam
pemuatan sedang
baik
Faktor konversi
dihapus, masuk
dalam waktu siklus
disesuaikam
C.
E03
E05
V
Fb
Fa
Ts1
T1
Ts1
Q1
0.0179
Jam
1.90
0.80
0.83
M3
-
0.44
menit
menit
78.20
1.
2.
3.
pemuatan ringan
D.
E.
M3
F.
Note: 1
E05
0.0128
Jam
2
3
4
Analisa EI-311
URAIAN ANALISA HARGA SATUAN
Lanjutan
KODE
KOEF.
SATUAN
KETERANGAN
Lump Sump
Q1
Qt
P
55.78
390.43
2.00
M3/Jam
M3
orang
(L01)
(L03)
1.00
0.0359
0.0179
orang
Jam
Jam
#REF!
o. PAKET KONTRAK
:
#REF!
.
#REF!
EM PEMBAYARAN NO.
: 3.1.1
ENIS PEKERJAAN
: Galian Biasa
ATUAN PEMBAYARAN
: M3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
TENAGA
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
0.0359
0.0179
PERALATAN
Excavator
E03
Jam
0.0179
Wheel Loader
E05
Jam
0.0128
Alat Bantu
Ls
1.0000
Analisa EI-311
STANDAR UNTUK
.
PERKIRAAN VOL. PEK.
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
9,309.00
12,315.00
333.80
220.79
554.59
0.00
503,750.60
401,284.09
332.76
9,031.67
5,131.62
332.76
14,496.05
15,050.64
2,257.60
17,308.24
ITEM PEMBAYARAN
JENIS PEKERJAAN
SATUAN PEMBAYARAN
No.
U RAIAN
2
3
4
ASUMSI
Bahan Agregat Halus & Kasar diterima di lokasi
Base Camp
Jarak dari stockpile ke alat blending
Jam kerja effektif perhari
Kegiatan dilakukan di dalam lokasi Quarry 1
6
8
II
URUTAN PEKERJAAN
1
2
III.
1.
2.
2.a.
V x Fb x Fa x 60
(Bip/Bil) x Ts1
= 1 : Q1
Koefisien Alat / M3
2.b.
BLENDING EQUIPMENT
Kapasitas
Faktor effesiensi alat
Kap. Prod. / jam =
V x Fa
Koefisien Alat / M3
3.
= 1 : Q2
TENAGA
Produksi menentukan : WHEEL LOADER
Produksi Agregat / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3
:
- Pekerja
- Mandor
= (Tk x P) : Qt
= (Tk x M) : Qt
AIAN
Mesin 20 - 30 mm
Mesin 5 - 10 & 10 - 20 mm
Mesin 20 - 30 mm
Mesin 5 - 10 & 10 - 20 mm
KODE
KOEFISIEN
SATUAN
l
Tk
20.00
7.00
Bip
1.81
Tk
20-30
St
7.00
27.00
48.00
25.00
jam
%
%
%
Bil
1.51
ton/m3
Fh1
Fh2
Fh3
1.05
1.05
1.05
M93
M92
M16
0.2835
0.5040
0.2625
M3
M3
M3
(E15)
V
Fb
Fa
1.90
0.80
0.83
M3
-
T1
0.80
menit
5-10&10-20
M
jam
campuran menjadi
" x 1 M3 x Fh2
(Tk x P) : Qt
(Tk x M) : Qt
Ts1
0.80
menit
Q1
94.62
M3
(E15)
0.0106
jam
(E52)
V
Fa
25.00
0.83
M3/jam
Q2
20.75
M3
0.0482
jam
Q1
Qt
94.62
662.34
M3/Jam
M3
P
M
2.00
1.00
(L01)
(L03)
0.0211
0.0106
orang
orang
Jam
Jam
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
Gradasi harus
memenuhi
Spesifikasi
NO.
A.
1.
2.
B.
1.
2.
3
(lepas)
kondisi sedang
jarak 20 meter
C.
1.
2.
3
D.
padat
:
:
: ..
:
: AGREGAT KELAS B (kondisi lepas)
: PENGADAAN AGREGAT KELAS B
: M3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
TENAGA
Pekerja
Mandor
(L01)
(L03)
jam
jam
0.0211
0.0106
Aggregat 20-30
Agg 5 - 10 & 10 - 20
Sirtu
M93
M92
M16
M3
M3
M3
0.2835
0.5040
0.2625
(E15)
(E52)
jam
jam
Ls
0.0106
0.0482
1.0000
TUK
G HARGA SATUAN
:
:
:
HARGA
SATUAN
(Rp.)
9,309.00
12,315.00
250,000.00
265,000.00
110,000.00
401,284.09
112,065.00
19.62
JUMLAH
HARGA
(Rp.)
196.77
130.15
326.92
70,875.00
133,560.00
28,875.00
233,310.00
4,241.01
5,400.72
19.62
9,661.35
243,298.26
No.
U RAIAN
I.
1
2
3
4
5
6
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp (Quarry 1) ke lokasi pekerjaan
Tebal lapis agregat padat
Berat isi padat
Proporsi Campuran :
II.
1
2
3
4
5
III.
1.
2.
2.a.
URUTAN KERJA
Wheel Loader mencampur dan memuat Agregat ke
dalam Dump Truck di Base Camp
Dump Truck mengangkut Agregat ke lokasi
pekerjaan dan dihampar dengan Motor Grader
Hamparan Agregat dibasahi dengan Water Tank Truck
sebelum dipadatkan dengan Vibrator Roller
Selama pemadatan, sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan Alat Bantu
Pada tahapan ahir pemadatan menggunakan 3 Wheel Roller
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Agregat B
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor Efisiensi alat
Waktu Siklus :
- Memuat dan lain-lain
DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus :
- Waktu memuat = V x 60/Q1 x Bil
- Waktu tempuh isi = (L : v1) x 60 menit
- Waktu tempuh kosong = (L : v2) x 60 menit
- dan lain-lain
No.
2.c.
U RAIAN
MOTOR GRADER
Panjang hamparan
Lebar efektif kerja blade
Faktor Efisiensi alat
Kecepatan rata-rata alat
Jumlah lintasan
Lajur lintasan
Lebar Overlap
Waktu Siklus :
- Perataan 1 lintasan = Lh : (v x 1000) x 60
- Lain-lain
Koefisien Alat / M3
2.d.
VIBRATORY ROLLER
Kecepatan Rata-rata
Lebar Efektif Pemadatan
Jumlah Lintasan
Faktor Efisiensi Alat
Kap. Prod. / Jam
Koefisien Alat / M3
2.e.
2.f.
Koefisien Alat / M3
2.g.
ALAT BANTU
Diperlukan :
- Kereta dorong
- Sekop
- Garpu
No.
3.
U RAIAN
TENAGA
Produksi menentukan : WHEEL LOADER
Produksi agregat / hari = Tk x Q1
Kebutuhan tenaga :
Koefisien tenaga / M3 :
4.
5.
6.
7.
:
: Lapis Pondasi Agregat Kelas B
: M3
U RAIAN
URAIAN A
KODE
KOEF.
L
t
Bip
2.20
0.20
1.81
Tk
7.00
20-30
St
Bil
27.00
48.00
25.00
1.51
Fh1
1.05
Fh2
Fh3
1.05
1.05
M05
1.2586
5-10&10-20
n memuat Agregat ke
egat ke lokasi
an Motor Grader
engan Water Tank Truck
Vibrator Roller
pok pekerja akan
level permukaan
DAN TENAGA
= 1 M3 x (Bip/Bil) x Fh
E05
V
Fb
Fa
Ts1
T1
1.90
0.80
0.83
0.63
V x Fb x Fa x 60
Ts1
= 1 : Q1
Ts1
0.63
Q1
120.15
E05
0.0083
E02
60 menit
: v2) x 60 menit
V x Fa x 60
Ts2 x Bip
= 1 : Q2
6.00
Fa
v1
v2
0.83
20.00
30.00
T1
T2
T3
T4
Ts2
1.98
6.60
4.40
2.00
14.98
Q2
11.02
E02
0.0908
:
: Lapis Pondasi Agregat Kelas B
: M3
U RAIAN
URAIAN A
KODE
E04
Lh
b
Fa
v
n
N
bo
Ts3
T1
T2
Ts3
v x 1000) x 60
Lh x (n(b-bo)+bo) x t x Fa x 60
N x n x Ts3
Q3
KOEF.
1,400.00
3.20
0.80
3.00
6.00
3.00
0.30
28.00
1.00
29.00
455.72
= 1 : Q3
(v x 1000) x b x t x Fa
n
= 1 : Q4
pa x Fa x 60
Wc x 1000
= 1 : Q6
(v x 1000) x b x t x Fa
n
= 1 : Q4
= 2 buah.
= 3 buah.
= 2 buah.
E04
0.0022
E06
v
b
n
Fa
4.00
1.93
8.00
0.83
Q4
160.19
E06
0.0062
E07
V
Wc
pa
Fa
4.00
0.07
100.00
0.83
Q6
71.14
E07
0.0141
E08
v
b
n
Fa
2.00
1.93
8.00
0.83
Q4
80.10
E08
0.0125
:
: Lapis Pondasi Agregat Kelas B
: M3
URAIAN A
U RAIAN
KODE
EL LOADER
- Pekerja
- Mandor
- Pekerja
- Mandor
= (Tk x P) : Qt
= (Tk x M) : Qt
PEKERJAAN
MULIR STANDAR UNTUK
ING-MASING HARGA
NG DIPERLUKAN
............
255,291.66 / M3.
bulan
G DIPERLUKAN
0.00 M3
KOEF.
Q1
Qt
120.15
841.07
P
M
7.00
1.00
0.0583
0.0083
0
URAIAN ANALISA HARGA SATUAN
SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
KM
M
jam
%
%
%
ton/m3
Gradasi harus
memenuhi
Spesifikasi
NO.
A.
1.
2.
B.
1.
M3
M3
menit
lepas
kondisi sedang
panduan
C.
1.
2.
3.
4.
5.
menit
6.
7.
M3
jam
D.
E.
ton
F.
KM/jam
KM/jam
Note: 1
2
menit
menit
menit
menit
menit
3
4
M3
jam
0
URAIAN ANALISA HARGA SATUAN
Lanjutan
SATUAN
M
M
KM/jam
lintasan
M
menit
menit
menit
M3
KETERANGAN
1 x pp
jam
Km / Jam
M
Lintasan
M3
Jam
M3
M3
liter/menit
M3
jam
Km / Jam
M
Lintasan
M3
Jam
Lump Sum
0
URAIAN ANALISA HARGA SATUAN
Lanjutan
SATUAN
M3/jam
M3
orang
orang
jam
jam
KETERANGAN
FORMULIR
PEREKAMAN ANALISA MA
KOMPONEN
TENAGA
Pekerja
Mandor
BAHAN
Aggregat B
PERALATAN
Wheel Loader
Dump Truck
Motor Grader
Vibrator Roller
Water Tanker
Analisa EI-512
UNTUK
:
:
: ..
.
:
:
TOTAL HARGA
: M3
SATUAN
(L01)
(L03)
jam
jam
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
0.0583
0.0083
9,309.00
12,315.00
M05
M3
1.2586
142,700.00
E05
E02
E04
E06
E07
jam
jam
jam
jam
jam
0.0083
0.0908
0.0022
0.0062
0.0141
401,284.09
302,539.17
748,162.48
570,437.33
242,235.62
JUMLAH
HARGA
(Rp.)
E08
0.0125
jam
Ls
1.0000
184,010.67
38.69
15.0 % x D
Analisa EI-512
0.00
271,131.42
0.01
JUMLAH
HARGA
(Rp.)
542.34
102.49
644.83
179,603.54
179,603.54
3,339.79
27,460.86
1,641.70
3,561.00
3,404.92
2,297.41
38.69
41,744.37
221,992.75
33,298.91
255,291.66