INSPECTION CHECKLIST

Project Code: IQ347-BAZYAN Combined Cycle Power Plant Project


Completion Area:

Checklist Document Name:


Cable Conduits Installation

Completion System:

Checklist Document Number:


IQ347-300-EL-CHL-00005
Equipment Tag Description:

Equipment Taq #:
Taq Equipment Type:

No
1
2
3

Description of Item
Check for material in accordance to Project Specification, verify quality and
condition.
Check correct conduit size.

Check conduits are sloped towards the cable tray where their cables are to
enter - wherever this is not possible conduits must be sealed upon completion
of cable pulling.
Check that conduits enter the bottom of the devices wherever possible.

Check the conduit bend radius is as per requirements.

Check the conduit has no sharp edges where cables may be damaged and all
exposed ends have bushings installed.
Check the conduits are adequately supported.

7
8
9

Check to see flexible conduit used where equipment subject to vibration are
present.
Check all conduits laid as per the layout/drawings.

10

Touch up painting done as required.

OK

N/A

P/L

Remarks:

Name

Date

Signature

Owner / Owners Representative


ENKA QC

ENKA Construction