INSPECTION CHECKLIST

Project Code: IQ347-BAZYAN Combined Cycle Power Plant Project


Completion Area:

Checklist Document Name:


Small Power Circuit

Completion System:

Checklist Document Number:


IQ347-300-EL-CHL-00009
Equipment Tag Description:

Equipment Taq #:
Taq Equipment Type:

No
1

Description of Item
Check equipment IP rate is suitable for the location where it is installed.

Check tag is correct and undamaged.

Check to see no external damage.

Check earthing conforms to design requirements.

Check installation of circuit complete as per approved drawings.

Check fixings and mountings are secure.

Check equipments are internally clean and dry.

Check no internal damage to outlets and JB's.

Check all cable checklists complete.

10

Check gaskets/seals not damaged.

11

Check correct circuit identifications are installed.

OK

N/A

P/L

Remarks:

Name

Date

Signature

Owner / Owners Representative


ENKA QC

ENKA Construction