INSPECTION CHECKLIST

Project Code: IQ347-BAZYAN Combined Cycle Power Plant Project


Completion Area:

Checklist Document Name:


Power Distribution Board

Completion System:

Checklist Document Number:


IQ347-300-EL-CHL-00012
Equipment Tag Description:

Equipment Taq #:
Taq Equipment Type:

No
1

Description of Item
Verify name plate details against data sheet.

Visually inspect equipment for external damage.

Check equipment fixings and mountings are secure.

Check interior for damage, cleanliness and remove packing/preservation.

Check earthing conforms to design requirements.

6
7

Check all connections are correct, tight and cable markings are fitted.(Internal
cabling).
Check all equipment carries the correct circuit identification.

Check ratings of MCB's etc against drawings.

9
10

Confirm distribution board schedule is correct and a copy is included within the
board.
Check open/close mechanical operation of isolators/MCB's etc.

11

Confirm phasing is correct.

12

Check gaskets and seals are not damaged.

13

Confirm padlocking facilities of board.

14

Perform busbar insulation tests using 1000V Megger (minimum reading


10megohms).
Verify equipment IP rating is suitable for location.

15

OK

N/A

P/L

Remarks:

Name

Date

Signature

Owner / Owners Representative


ENKA QC

ENKA Construction

2015 ENKA naat ve Sanayi A.. Contents Confidential