Completion System:
Equipment Taq #:
Taq Equipment Type:
No
Description of Item
OK
4
5
Check equipment fixings and mountings are secure and no external damage
exists.
Check equipment IP rating.
Check all connections are correct, tight and cable markings are fitted.
10
Unused cable entries are blanked off with correct type of plugs.
11
12
13
14
Check terminal box gaskets and seals are present and have been fitted
correctly.
Confirm all bolts are correct and none are missing.
15
On completion of all cable glanding confirm spare entires are correctly plugged.
16
N/A
P/L
Remarks:
Name
Date
Signature
ENKA Construction