INSPECTION CHECKLIST

Project Code: IQ347-BAZYAN Combined Cycle Power Plant Project


Completion Area:

Checklist Document Name:


Generator Installation

Completion System:

Checklist Document Number:


IQ347-300-EL-CHL-00030
Equipment Tag Description:

Equipment Taq #:
Taq Equipment Type:

No

Description of Item

OK

Equipment installed is undamaged.

Location, orientation and alignment correct.

Auxiliary items installed as per general arrangement drawing.

Correct anchorage and equipment properly secured.

Verify nameplate details against data sheet.

Tag number correct.

Control panel installed in accordance with installation details.

System free from leaks and spillage.

Space heaters provided in enclosures , where applicable.

10

Earthing connections correct as per installation details.

11

Unused cable entries blanked off with correct type of plugs.

12

No undue accumulation of dust and dirt.

13

Where applicable, sealing of trunking , ducts, pipes , and /or conduit are
satisfactory.

14

Main/auxiliary terminal box lids are satisfactory with suitable gasket (where
applicable ) and fixing screws/ bolts tightened and ensure that IP rating is
maintained.

N/A

P/L

Remarks:

Name

Date

Signature

Owner / Owners Representative


ENKA QC

ENKA Construction

2015 ENKA naat ve Sanayi A..


All Rights Reserved. Contains confidential information proprietary to ENKA and may not be disclosed to a third-party without ENKA's prior written
permission.