Anda di halaman 1dari 10

230KV OHTL SUB -10 CUT OVER PLAN

230 KV OHTL
SAFANIYAH BSP TO
SUB 10

OHTL ACTIVITIES DURING SHUTDOWN

FIRST OUTAGE FOR LINE-B


SCOPE OF WORK FOR LINE-B
ERECTION OF TOWER AT LOCATION NO. 15
WITH ONE SIDE CROSS ARM
CUT AND FIX THE EXISTING CONDUCTOR
RETROFITTING OF OPGW FROM TOWER
NO15 TO SUBSTATION SUB-10 AT GANTRY
FIBER OPTIC CABLE WORK AT SUB-10 SS
SPLICING & END TO END TESTING OF OPGW

OHTL ACTIVITIES DURING SHUTDOWN

SECOND OUTAGE FOR LINE-A


SCOPE OF WORK FOR LINE-A
ERECTION OF TOWER NO 15 ONE SIDE CROSS
ARM
CUT AND FIX THE EXISTING CONDUCTOR
RETROFITTING OF OPGW FROM T.NO.15 TO
SUB-10 GANTRY
FO CABLE WORK AT SUB-10 SS
SPLICING TESTING OF OPGW

230KV OHTL SUB -10 CUT OVER WORK TOWER ERECTION CRANE POSITION

SCHEDULE OF 230KV OHTL SUB -10 CUT OVER WORK

L&T

230KV OHTL SUB -10 CUT OVER WORK DAY WISE ACTIVITY

230KV OHTL SUB -10 CUT OVER WORK DAY WISE ACTIVITY

SAFANIYAH BSP TO SUB-10 ROUTE MAP

L&T

SLD FOR SAFANIYAH PP TO SUB -10 MODIFY TO SAFANIYAH BSP TO SUB-10


AFTER MODIFICATION