Anda di halaman 1dari 11

Contractor

Owner

Main Subcontractor

PROJECT NAME: Khabat Thermal Power Plant Units 1&2


OWNER: Ministry of Electricity of Kurdistan Regional Goverment
CONTRACTOR: POSCO Engineering & Construction Co. Ltd.
MAIN SUBCONTRACTOR: GAMA Power Systems Engineering &
Contracting Inc.
PROJE REFERENCE NO:
Re
v
A

Revision
Date
15.09.201
5

Description
For Review

Revision History
Created by
Checked by
A.E.
AKMAN

Emission
Status

Return
Status

B. GKCE

Vendor doc No.:

Vendor Logo

Approved by

Document Code :

Title, Subtitle

AUTO TRANSFORMER
TEST REPORT
(FOR PRIMARY)

Format
A4

Rev. A

Date
15.09.2015

Lang.
En

Date
15.09.2015

Project: Khabat Thermal Power Plant Units 1&2

Project No.

ISSUE DATE
15/09/2015

ENG. N
AUTO TRANSFORMER
TEST REPORTS

SH/OF
2 / 11

CLIENT N

REV.

Summary

INSULATION RESISTANCE AND POLARIZATION INDEX TEST

3.

WINDING RESISTANCE TEST

4.

TURN RATIO TEST

5.

VECTOR GROUP TEST

6.

%PF TEST

7.

BUSSHING TEST

10

8.

RATIO AND SATURATION TEST OF CURRENT

11

KESR Mh. Elektrik


ti.

Signature

A
X

TRANSFORMERS IN BUSHING

Name

Revision

LIST OF REQUIRED TEST EQUIPMENT S

Date

Page

Project No.

Project: Khabat Thermal Power Plant Units 1&2

ISSUE DATE
15/09/2015

ENG. N
AUTO TRANSFORMER
TEST REPORTS

SH/OF
3 / 11

CLIENT N

REV.

1. LIST OF REQUIRED TEST EQUIPMENTS


Test equipment
Designation / Manufacturer
DC Insulation tester/MEGER
Vanguart WRM-40
DV Power

Omicron CPC-100

KESR Mh. Elektrik


ti.
Name
Signature

Type / Serial Nr

X
X
X

Omicron CPC-100

Date

Test corresponding to paragraph

X
X

Project No.

Project: Khabat Thermal Power Plant Units 1&2

ISSUE DATE
15/09/2015

ENG. N
AUTO TRANSFORMER
TEST REPORTS

SH/OF
4 / 11

CLIENT N

REV.

2. INSULATION RESISTANCE DATA RECORD


TRANSFORMER SET
Trf Name :

Rat.Power (MVA) :

Vector Symbol :

Trf Type :

Serial No :

Year of Mfr. :

Top oil Temp.

Humidity :

Air Temp. :

TEST EQUIPMENT
NAME OF MANUFACTURER :

SERIAL NO :

CALIBRATION DUE DATE

MODEL

INSULATION RESISTANCE (MEGGER) DATA


GIGAOHMS READINGS
TEST
VOLTAGE

TIME
(SEC.)

HV+LV / Tank

LV+HV / TV

TV / Tank

(TV Guarded)

(Tank Guarded)

(HV+LV Guarded)

(Temp:
TEST
VOLTAGE

TIME
(SEC.)

5000 V

15

2500 V

15

5000 V

30

2500 V

30

5000 V

45

2500 V

45

5000 V

60

2500 V

60

5000 V

120

5000 V

180

5000 V

240

5000 V

300

5000 V

360

5000 V

420

5000 V

480

5000 V

540

5000 V

600

KESR Mh. Elektrik


ti.
Date
Name
Signature

C)
CORE / TANK

Project No.

Project: Khabat Thermal Power Plant Units 1&2

ISSUE DATE
15/09/2015

ENG. N
AUTO TRANSFORMER
TEST REPORTS

CLIENT N

SH/OF
5 / 11
A

REV.
COMMENT

INSULATION RESISTANCE (MEGGER) DATA (POLARIZATION INDEX)


GIGAOHMS READINGS
TEST
VOLTAGE
5000/2500

TIME
(SEC.)

HV+LV / Tank

LV+HV / TV

TV / Tank

(TV Guarded)

(Tank Guarded)

(HV+LV Guarded)

(Temp:

C)
CORE / TANK

600/60
VALUES

POLARIZATION INDEX

HV+LV / Tank

LV+HV / TV

TV / Tank

(TV Guarded)

(Tank Guarded)

(HV+LV Guarded)

COMMENT

KESR Mh. Elektrik


ti.
Date
Name
Signature

CORE / TANK

Project No.

Project: Khabat Thermal Power Plant Units 1&2

ISSUE DATE
15/09/2015

ENG. N
AUTO TRANSFORMER
TEST REPORTS

SH/OF
6 / 11

CLIENT N

REV.

3. WINDING RESISTANCE DATA RECORD


TRANSFORMER SET
Trf Name :

Trf Type :

Serial No :

Rat.Power (MVA) :

Vector Symbol :

Top oil Temp. :

Humidity :

TEST EQUIPMENT
NAME OF MANUFACTURER :

SERIAL NO :

CALIBRATION DUE DATE

MODEL

WINDING RESISTANCE DATA


TAP POSITION

R-N

R-r

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

KESR Mh. Elektrik


ti.
Date
Name
Signature

r-N

m.ohm
3r1-3r2

Year of Mfr. :

Air Temp. :

Project No.

Project: Khabat Thermal Power Plant Units 1&2

ISSUE DATE
15/09/2015

ENG. N
AUTO TRANSFORMER
TEST REPORTS

SH/OF
7 / 11

CLIENT N

REV.
20
21
Comments :

4. TURN RATIO TEST DATA RECORD


TRANSFORMER SET
Trf Name :

Trf Type :

Serial No :

Rat.Power (MVA) :

Vector Symbol :

Top oil Temp. :

Year of Mfr. :

Humidity :

Air Temp. :

TEST EQUIPMENT
NAME OF MANUFACTURER :

SERIAL NO :

CALIBRATION DUE DATE

MODEL

TURN RATIO TEST DATA


TAP
POSITI
ON

HV

LV

RATO
VOLTAGE

RATO
VOLTAGE

TERTIARY
RATO
VOLTAGE

THEORATICAL
TURN RATIO

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

KESR Mh. Elektrik


ti.
Date
Name
Signature

MEASURED TURN RATIO


RN/Rn

% ERR.

rN/3r13r2

% ERR

RN/3r13r2

% ERR

Project No.

Project: Khabat Thermal Power Plant Units 1&2

ISSUE DATE
15/09/2015

ENG. N
AUTO TRANSFORMER
TEST REPORTS

SH/OF
8 / 11

CLIENT N

REV.
18
19
20
21
COMMENTS

5. VECTOR GROUP DATA RECORD


TRANSFORMER SET
Trf Name :

Trf Type :

Serial No :

Year of Mfr. :

Rat.Power (MVA) :

Vector Symbol :

Top oil Temp. :

Humidity :

Air Temp. :

TEST EQUIPMENT
NAME OF MANUFACTURER :

SERIAL NO :

CALIBRATION DUE DATE

MODEL

VECTOR GROUP DATA


SKETCH

APPLIED VOLTAGES
R
r
3r1-3r2
MEASURED VALUES
R
r
3r1-3r2
VECTOR GROUP

COMMENTS

KESR Mh. Elektrik


ti.
Date
Name
Signature

VALUE

Project No.

Project: Khabat Thermal Power Plant Units 1&2

ISSUE DATE
15/09/2015

ENG. N
AUTO TRANSFORMER
TEST REPORTS

SH/OF
9 / 11

CLIENT N

REV.

6. %PF TEST DATA RECORD


TRANSFORMER SET
Trf Name :

Trf Type :

Rat.Power (MVA) :

Vector Symbol :

Top oil Temp. :

Serial No :

Year of Mfr. :

Humidity :

Air Temp. :

TEST EQUIPMENT
NAME OF MANUFACTURER :

SERIAL NO :

CALIBRATION DUE DATE

MODEL

%PF TEST DATA

HV
LV

TV

HV
LV
TV-UST
LV Cable
Graund

Name
Signature

Watts

Multipl

Reading

mA

Multipl.

Reading

Watts

Multipl

Reading

mA

Multipl.

Reading

TEST kV

%Pf

20
%Pf

Capacitance
(pF)

CH=

10

CT+CHT=

CT=

10

CHT=

10

CH+CT=

10

KESR Mh. Elektrik


ti.
Date

Calculated results

CH+CHT=

10

LV

LV
HV
LVTV

Guarded

HV

HV

Measured results

10

TV

LV
TV

TV

HV

Grounded

Energized

TEST NO.

Test Connections

Project No.

Project: Khabat Thermal Power Plant Units 1&2

ISSUE DATE
15/09/2015

ENG. N
AUTO TRANSFORMER
TEST REPORTS

SH/OF
10 / 11

CLIENT N

REV.
COMMENTS

7. BUSHING TEST
BUSHING TEST

10

10

Watts

Multipl

Reading

mA

Multipl.

Reading

Watts

Calculated results
Multipl

Reading

mA

Multipl.

Serial No

Reading

Measured results
TEST kV

Phases

Test Connections

C1

Floated

r,3r1

KESR Mh. Elektrik


ti.
Name
Signature

10

Multiplier

Grounded

3r2r

Reading

UST

Reading

Energized

Test kV

Measured

Tap. Pos.

IRN

COMMENTS

Date

Capacitances
(pF)

C1

EXCITING CURRENT MEASUREMENT

%Pf

mA

Project: Khabat Thermal Power Plant Units 1&2

Project No.

ISSUE DATE
15/09/2015

ENG. N
AUTO TRANSFORMER
TEST REPORTS

SH/OF
11 / 11

CLIENT N

REV.

8.RATIO AND SATURATION TEST OF CURRENT TRANSFORMERS IN BUSHING


Bushing CT

R
(CT3)
r
(CT2)
N
(CT1-1)
N
(CT1-1)
N
(CT1-2)
N
(CT1-2)
N
(CT4)
3r1-3r2
(CT-1)
3r1-3r2
(CT-2)
3r1-3r2
(CT-3)

Core

RATIO TEST
Secondary Applied
Primary Measured
Voltage
Voltage (mV)
(V)

S1-S2
S1-S2
S1-S2
S2-S3
S1-S2
S2-S3
S1-S2
S1-S2
S1-S2
S1-S2

KESR Mh. Elektrik


ti.
Date
Name
Signature

SATURATON TEST
Applied Voltage
(V)

Knee Amper
(mA)

Anda mungkin juga menyukai