Anda di halaman 1dari 1

Project II TSM

BFC 32302 PROJECT INSTRUCTION SHEET


SEMESTER II SESSION 2015/2016
UNIVERSITI TUN HUSSEIN ONN MALAYSIA
Description:
The growth of commuter traffic between Batu Pahat and Kluang has caused severe
congestions on its road network and affected in our university and surrounding area.
Your group will have to select a specific area in UTHM or local community
(residential area) and conduct a traffic study. Then, propose transportation
system management (TSM) techniques in order to improve traffic conditions.
Your study should include the following:
1.
2.
3.
4.

Conduct a traffic volume study during peak hours.


Identify traffic and facilities problems.
Propose suitable TSM techniques (Non-motorist such cyclists and
pedestrians) to improvement to the existing conditions.
Show how the new design will improve the traffic conditions.

Your group will need to produce a full report and present your findings via video
presentation.
Assessment:
i) Full Report 75 marks
Introduction:
Methodology:
Results & Analysis:
Recommendation:
Conclusion:

5 marks
15 marks
40 marks
10 marks
5 marks

Technical Skills 1 (KT1): 5 %


Technical Skills 2 (KT2): 10 %

ii) Presentation 25 marks (Soft Skills: 5%)

Important Dates:
Submission of report and presentation softcopy:
19 MAY 2016 before 5.00 pm (IF LATE, IT WILL AFFECT THE MARKS!)

Anda mungkin juga menyukai