Pozo: DRO-X1001
Programa Perforacin
Pozo: DRO-X1001
Programa Perforacin
DRO-X1001
Preparado por:
_______________________
Marcelo Salazar
___________
Fecha
Revisado por:
______________________
Apolinar Hidalgo
___________
Fecha
Aprobado por:
______________________
Mario Raimondeau
___________
Fecha
VB:
______________________
Carlos Sanchez
___________
Fecha
Pgina
4
4-5
6-7
8-9
10
11-12
13
14
15
16-24
25-26
27
28
29
30
31-39
40
40-41
41
41-43
44
44
45
45-51
51-52
52-53
54-63
63-64
64
65
66
67
67-68
68
68-75
75-77
Mitigacin
6. Notas Pre-Drill
7. Secuencia Operativa
8. Lodo Polytraxx
9. Diagrama de Cabezal & BOPs
10. Trpanos e Hidrulica
12. Desviacin Survey
INTRVALO IV
HUECO 8 Liner 7
1. Resumen Seccin Hueco-Objetivos
2. Informacin Geolgica
3. Informacin General
4. Problemas Propios de la Perforacin del Tramo y medidas de
Mitigacin
5. Offset Experiencia & Informacin
6. Notas Pre-Drill
7. Secuencia Operativa
8. Lodo Polytraxx
9. Diagrama de Cabezal & BOPs
10. Trpanos e Hidrulica
11. Desviacin Survey
INTRVALO V
HUECO 6 Liner 5
1. Resumen Seccin Hueco-Objetivos
2. Informacin Geolgica
3. Informacin General
4. Problemas Propios de la Perforacin del Tramo y medidas de
Mitigacin
5. Offset Experiencia & Informacin
6. Notas Pre-Drill
7. Secuencia Operativa
8. Lodo Polytraxx HP-HT
9. Diagrama de Cabezal & BOPs
10. Trpanos e Hidrulica
11. Desviacin Survey
TERMINACIN CORRIDA Y CEMENTACIN LINER 5
1. Resumen Seccin Terminacin
2. Problemas Propios de la Perforacin del Tramo y medidas de
Mitigacin
3. Informacin General
4. Secuencia Operativa
5. Lodo: Polytraxx HP-HT
6. Diagrama de cabezal & BOPs
ANEXOS
77-78
79-90
90-91
92
92-93
93
94
94
95
95-96
96-105
105
106-116
116-117
117
118
118
119
119
119
120
120-125
125-126
127-131
131-132
133
134
134
135
135
135
135-142
142-143
144
145-146
Introduccin
El tiempo estimado para perforar este pozo esta en 90.04 das (P10), 111.59 das (P70)
y 120.05 das (P90), ms 60.0 das para la completacin dual con Tubera Standard de
3 , para completar en Fm. Iquiri y Fm. Los Monos. El AFE estimado es de $us.
18.287.892,0 sin/IVA.
1.2.
A. OBJETIVOS ESTRATEGICOS
1.1 Evaluar el potencial hidrocarburfero de la Formacin Iquiri
(Arenisca Guanacos).
1.2 Evaluar el potencial hidrocarburfero de la Formacin Los Monos
(Arenisca 0, 1 & 2).
1.3 Poner en pozo en produccin en Septiembre 20, 2015.
1.4 Produccin inicial un caudal de 7.1 MMpcd de gas y 242.4 bpd de
condensado y gasolina.
1.5 Aportar volumen a la capacidad de proceso de la Planta Criognica
de Percheles.
B. OBJETIVOS TECNICOS
2.1 Perforar el pozo vertical desde una nueva planchada, ingresando al
rea objetivo rectngular de tolerancia 50 m N-S y 20 m E-O, con
restriccin en sentido Oeste y Este por riesgo de perder altura
estructural y/o atravesar la Falla El Dorado.
2.2 Asentar y cementar CSG 13 3/8 a +/- 1100 m, asegurando el
atravesar posibles zonas de prdida e integridad formacional.
2.3 Asentar y cementar CSG 9 5/8 +/- 3450 m ingresando y
avanzando en la form Tarija.
2.4 Correr y cementar Liner de 7 atravesando el resto del Carbonfero
(Tarija, Tupambi), el Devnico (Iquiri) hasta la roca sello de la zona
anormal, atravesando el Reservorio Principal Ar. Guanacos &
Mora.
2.5 Correr y cementar Liner de 5 cubriendo Los Monos y las
Areniscas 0, 1 & 2.
2.6 El TD final del pozo establecido por la cota de -4213 m TVDss
(4660 m MD).
2.7 Obtencin de registros de buena calidad de informacin de los
reservorios.
2.8 Minimizar el dao a la productividad, empleando el tipo de lodo y lal
densidad apropiado para el reservorio.
2.9 Asegurar la integridad del equipo superficial y de completacin para
mnimo cinco (5) aos.
2.10 Aplicar las lecciones aprendidas en los pozos DRO-X1002, DRD-X3,
DRD-X3 ST, DRD-1005, DRD-X1004, DRD-X1001, DRS-1003D &
DRS-103D ST, DRS-1001, DRS-1002, DRS-1004 & DRS-1005.
C. OBJETIVOS OPERACIONALES
3.1 Cumplir con el target definido al reservorio box Rectangular 50 m NS x 20 m E-O a la Arenisca Guanacos.
3.2 Llegar a +/-10% de CAPEX.
3.3 Alcanzar a:
1.3.
Bloque
: El Dorado Oeste
Pozo
Operador
Locacin Superficie
: X: 487,145.00 m E
: Y: 7'955,985.00 m N
: Zt: 437.0 m
Elevacin
: Coordenadas
: X:
487,145.00 m E
: Y:
7'955,985.00 m N
: MD = 4.343 m; TVD = 4.343 m
- 3896 m TVDss
: Coordenadas
: X:
487,145.00 m E
: Y:
7'955,985.00 m N
: MD = 4.429 m; TVD = 4.429 m
- 3982 m TVDss
: Coordenadas
: X:
487,145.00 m E
: Y:
7'955,985.00 m N
: MD = 4.540 m; TVD = 4.540 m
- 4093 m TVDss
Locacin a TD
Tolerancia al Target
Clasificacin Pozo
: Exploratorio de Avanzada.
Objetivo
Objetivos Secuendarios
Profundidad Objetivo
Profundidad Total
KB a Nivel Tierra
GL Elevacin sobre MSL
RKB Elevacin sobre MSL
: + 10.4 m
: 447.4 m
: 437 m
Drilling Rig
Tipo
: YPFB - 02
: 2000 HP con TDS Canrig
500 TN800 HP
5 m TVD; 5 m MD
1100 m TVD; 1100 m MD
3450 m TVD; 3450 m MD
4300 m TVD; 4300 m MD
4660 m TVD; 4660 m MD
1.4.
Formulario 46
10
1.5.
Formulario 850
11
12
1.6.
13
1.7.
14
1.8.
15
1.9.
Prognosis Geolgica
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
Profundidad:
Caera:
Resumen Seccin I
Objetivos:
Proteger el antepozo de erosin y conseguir sello de circulacin en
prevencin a generar una brecha en superficie mientras se perfora el
intervalo de 17 .
Pozo: DRD-X1001
Superficie 150 m Hueco 26
Leve admisin a formacin en tramos de arenas inconsolidadas.
Pozo: DRD-1005
Superficie 677 m Hueco 17
Canalizacin antepozo y hueco ratn
Arma y Baja Trpano 17.1/2" + BS + Shock Sub 9.1/2" + 1 DC 9.1/2" + 2 XO + HW DP 5" @ 12.61 m
donde apoya 5 Klbs. Perfora hasta 13.41 m, donde observa canalizacin y retorno de lodo por lado
externo ante pozo (cerca a hueco ratn). Bombeo 5 Bbls Pldora, resultado negativo. Saca BHA # 1 a
superficie. BJ bombea 28 Bbls de lechada de cemento para controlar la canalizacin de lodo., resultado
positivo.
Pozo: DRS-1001
Superficie
Observaciones Prueba Equipo SINOPEC
Durante pruebas recepcin equipo: (1) Variacin en manmetros presin de consola perforador y
manifold/stand pipe de @ 400 psi. Se cambia aceite hidrulico a manmetro manifold/ stan pipe. (2) En
prueba B-1 se observa cada presin, desrarma vlvulas y empaquetaduras "quebrajeadas y viejas", se
cambia y reinicia prueba.(3) Durante prueba de bombas en paralelo, generador N1sufre
sobrecalentamiento, se activa paro ememrgencia. Se trabaja slo con 2 generadores. Se espera a Tec.
Generador Cartepillar. Se habilita temporalmente bomba transferencia combustible (coloca arandela para
lograr mayor presin). Cambia bomba de transferencia de combustible en Generador N 1.
Pozo: DRS-1002
Superficie
Perdida Empaquetadura Raiser 20".
Armando raiser 20" y enchufe a cao gua 20", llena con agua y observa fuga entre enchufe raiser y cao
gua, llena nuevamente @ salida flow line observndo prdida por empaquetadura de empalme. Intenta
reparar con nueva empaquetadura, sin xito, por rotura inmediata al asentar el peso del raiser. Fabrica e
instala empaquetadura de empalme nueva.
Pozo: DRS-1005
Superficie
40
Medida de Mitigacin
Raiser con 3 sellos
Contingencia
Back up sellos.
Notas Pre-Drill
1. Reunin del Technical Limit: ser realizado con la totalidad del Equipo:
Empresas Servicios y YPFB Chaco S.A, en SCZ, para lo cual se considera 1
da intgro para este evento.
2. Principal fuente de agua del pozo de agua del DRD-X3 ST, perforado por
Neptuno (misma planchada del DRD-X3). Para la perforacin se utilizar 2
cisternas de 20.000 litros c/u (YPFB 02). A su vez, se requerir agua en la
planchada del DRD-X3 ST para el campamento central de SINOPEC que
ser tomada de la misma fuente. Se dispondr de 2 tanques de acumulacin
de agua (+/- 600 bbl). Produccin actual del pozo es de 8.000 L/hr (+/- 50
BPH). La segunda fuente de agua ser del pozo de agua del DRD-X1004,
41
42
43
INTERVALO II
Hueco:
17
Profundidad:
+/- 1100 m
Caera:
Informacin Geolgica.
Formacin
Descripcin
Chaco
Tariqua
44
Informacin general:
Perforar vertical con 17 hasta +/- 1100 m, atravesando la zona debl de los +/450 y 900 m que muestra sensibilidad a prdida de lodo. La profundidad de este
tramo esta definido por el ingreso a una zona peltica. Se iniciar con un BHA
convensional para atravesar los conglomerados, para luego perforar con MF y
trpano PDC. Correr caera 13 3/8, J-55, 61 #/ft, BTC a TD, conectado a la
Seccin A, con el sistema de brida compaera. Cementar con Stinger a
superficie, para cuyo objeto se debe utilizar el zapato flotador con doble vlvula
donde se deber utilizar centralizadores de caera de flejes y bajar dos cestas en
la caera de 13 3/8 en una profundidad de +/- 30 y 60 mts. La cementacin
deber ser hasta superficie con dos lechadas. En caso de no tener retorno en
superficie se debe realizar top job. Tipo de lodo WBM Bentnito extendido de
8.6 9.2 ppg.
DRD-X1002
Tramo 0 220 & 220 1600 m. Hueco 22 & 14 CSG 16 & 11
Perdida total circulacin:
A los 22 m, se observa primeros indicios de prdida, despus de perder +/- 100 Bbl se sella
naturalmente. A los 58 metros, prdida total +/- 160 BPH, controla la misma con 46 ppb de Mil Seal y
Check Loss.
Reinicia perforacin, observa perdida parcial.
Contina perforando con esas
condiciones, en 59 m, observa prdida total, cont. perforando hasta 74 m sin retorno, a los 79 m,
observa retorno parcial por antepozo, contina bombeando baches sellantes, perfora hasta 220 m
con retorno intermitente, pierde total 4762 Bbl de lodo.
Vibracin intercalaciones arenisca-arcilla:
Fuerte vibracin en intercalaciones arenisca-arcilla. A consecuencia de esto, trepano PDC sale
con varios cortadores rotos, adems, fuerte desgaste en las aletas de NB STB
Arenas No Consolidada Deleznable
Tramos arenosos bastante permeables. A partir de 1235 m, se presenta paquetes de arena suelta
muy fina, ROP 43 mph c/ 0 Klbs WOB, incrementa torque por acumulacin de arena, trabaja con
BV. Decide continuar perforacin con ROP controlada +/- 10 mph hasta 1600 m. Maniobras bastante
dificultosa tramo 1077-1433 m, alto torque errtico, posible revoque grueso en zona de areniscas
permeables, y constante embotamiento del trpano y los STB
Perdida total en cementacin
Durante la cementacin,el pozo entra en prdida total con incremento repentino de presin (de
870 Psi a 4100 m), decide abortar operacin de cementacin con 39 BBl de lechada principal
bombeados, desplaza lechada con 146 Bbl de agua y lodo, los primeros 51Bbl de desplazamiento sin
retorno. La prdida se genera posiblemente por el bombeo de lodo de baja reologa por delante de la
cementacin (desestabilizacin de revoque, por ende derrumbe y admisin)
45
DRD-1004
Hueco 17 & 12 Tramo 0 501 m & 501 1660 m
Tendencia a la desviacin:
Entre 0 501 m, perforando con MF cuadrado (15 ), se presenta fuerte tendencia a la desviacin
llegando a 2.5, pese a que se us MF cuadrado cuyo diseo debera permitir mantener la
verticalidad.
Perdidas por permeabilidad & parcial
Tramo 804-973 m con prdidas por permeabilidad (1.5-3 BPM 90-180 BPH), total perdido 126
Bbl. Controla admisin con el agregado de CaCO3 + MIX II.
Presencia Conglomerados:
En tramo 501 560 m conglomerados @ 30%, entre 750 990 m entre 5 30 %.
Fuerte Incremento MBT
Perforando con MF cuadrado de 8 entre los 501 1660 m se presenta fuerte incremento del MBT
en el lodo, por trituracin de los cortes por el MF cuadrado. Se manifiesta el carcter dispersivo de las
arcillas en este tramo.
DRD-X3 (YPFB)
Hueco 12 Tramo 501 2945 m Hueco
Perdida total circulacin
Perforando con 12 y a 808.3 m, observa fuerte resistencia al TQ, presentndose PERDIDA
TOTAL DE LODO (200 bbl) con MW 9.1 ppg. Bombea obturante (Kwik Seal F-M-G + Micatex), pierde
70 bbl adicionales. Perfora @ 911 m sin zarandas y con material obturante. En tramos observa
prdida lenta, logrando normalizar.
DRD-1005
Hueco 17 & 12 0 677 m & 677 3004 m.
Canalizacin y retorno lodo por lado externo antepozo.
Perforando de 12.61 13.41 m se presenta canalizacin y retorno de lodo/lado externo del
antepozo (cerca del hueco ratn). Se tienen que bombear 28 bbl de cemento, consiguiendo sellar
esta filtracin superficial.
Perdida parcial lodo:
En hueco 17 perforando de 448 a 679 m se observa el mayor rgimen de prdida en formacin @
42 bbl. En hueco de 12 , a 2261 m con la mayor prdida de 161 bbl de lodo perforando desde 2220
a 2261 m.
Vibracin herramienta
Tramo 100 211 observa Vibracin de Sarta por presencia de conglomerados.
Perdidas por permeabilidad
Tramo 682 850 m, observa admisin de fluido a formacin por permeabilidad, agrega CaCO3
M/G para sellar tramos arenosos
DRS-1003D
Hueco 17 0 914 m
DESBORDE - TAPONAMIENTO MALLAS ZARANDAS
46
DRS-1001
Hueco 17 0 914 m
Vibracin herramienta- Conglomerados
Tramo 45 - 50, 55 - 105 m se observa vibracin intermitente de herramienta por presencia
conglomerados, control con bajada de parmetros de perforacin
Prdidas parciales admisin
Perforando de 205 - 452 m se presenta intercalaciones de conglomerados @ un 50% y arenas de
grano suelto de grano medio, grueso a muy grueso. En circulacin a 452 m, se realiza flow check
observando admisin de 5 BPH. Perforando de 452 a 514 m se registra incremento de admisin
puntual por permeabilidad 5 - 15 - 25 BPH. Se incrementa adicin de material sellante 4-8 Sx/hr
CO3Ca M/G y Mica F. Perforando de 514 - 768 m bombea BV's c/LCM de 8.7 ppg y 300 vis.,
mantiene agregado al sistema de OM-500, OM -800 & mica, mantiendo regimen admisin en 8
BPH. En Flow check observa 7.0 BPH de admisin. En este tramo la litologa muestra un paquete de
arena de grano suelto de fino, medio a grueso @ 100% entre 615 - 720 m. De 768 - 914 m con
admision de 7- 10 BPH perforando. Luego de maniobra corta, bombea y desplaza 200 bbl de
Bache/sellante preparado sobre el mismo lodo de perforacin con 8.8 ppg tramo 600 - 400 m.
Durante corrida CSG 13 3/8" admisin solo de 4.0 BPH
Embotamiento
En maniobras de 108 y 205 m se observa embotamiento. Mud log muestra tramo de mayor
presencia de arcillas. En viaje de 914 m trpano completamente embotado. Con perforacin con
incrmento paulatino de caudal 255 @ 688 GPM, si regimen de admisin lo permita.
Cementacin
Se utiliz 2 canastos de cementacin. Se bombeo un Flow Guard para control de prdida durante la
cementacin. MW de lodo 8.8 ppg. Volumen admitido durante la cementacin slo 14
bbl.Cementacin a superficie, no necesit Top Job.
Instalacin Rams Ciego - Dao BOP Rams Doble - Tiempo Espera
En BOP doble 13 5/8" 5K (SINOPEC) la configuracin mostraba el rams ciego arriba y rams de
medida 5" abajo, no adecuada para las Polticas de YPFB Chaco, por lo que se solicit cambiar de
posicin o invertir (rams de medida arriba 5" y rams ciego abajo). En el intento de cambio se
present la imposibilidad de poder extraer un perno del rams superior, dificultad que llev a
tomar en alquiler una BOP doble 13 5/8" 5K de SAI, por lo que signific tiempo de espera (NPT).
47
Panel de control de BOP's (cierre y apertura) no guarda relacin con la posicin del momento (rams
ciego real arriba y en panel abajo - rams de medida abajo real y en panel arriba.
DRS-1002
Hueco 17 0 1030 m
Prdida Total Circulacin & Filtracin Superficial
Perforando c/lodo Drilplex (8.6 ppg) c/300 gpm & 70 rpm a 36 m observa fuerte vibracin lateral de
hta., y prdida total circulacin, baja Q a 150 gpm & 30 rpm, sin lograr restituir circulacin, observa
filtracin superficial de fluido perforacin en rea de patines colindante c/circuito lodos. Bombea 1er
Bache de 15 bbl c/LCM sobre Gelplex (8.6 ppg), no observa filtracin, nivel en raiser 20" baja a +/- 4
m del Flow Line. Bombea 2do Bache c/LCM de 30 bbl de nuevo sobre Gelplex (8.6 ppg), observa
filtracin de bache en el lado de las bombas de lodo. Bombea 3er Bache de 15 bbl c/LCM (8.6 ppg),
observa filtracin en rea de patines colindante a minicampamento. Bombea 30 bbl de 4to Bache
c/LCM (8.6 ppg), observa incremento presin @ 500 psi, se observa taponamiento de boquillas. Baja
trpano circulando y rotacin @ 36 m, bombea 5to Bache c/LCM, observa apreciable filtracin
debajo de la subestructura en rea circundante de las bombas. Deside realizar cementacin.
Cambia fluido pozo Drilplex x Bentontico 8.6 ppg.
Baja DP 5" liso @ 36 m. Nivel mantiene a +/- 1 m del Flow Line y se observa filtracin en rea
colindante al minicampamento. Bombea 10 bbl de Agua + 21 bbl lechada cemento 15.6 ppg,
desde inicio de bombeo se observa filtracin de lodo Bentontico y agua dulce, a los 20.3 bbl de
lechada bombeada se observa filtracin de lechada cementoy fisuras en area circundante al
antepozo, lado de las bombas.Al bombear los 21 bbl de lechada, se observa rotura de 1 tensor del
Raiser y luego hundimiento del patn del lado del minicampamento, quedando raiser descentrado y
DP apoyado en el mismo. Con trpano + BHA rota cemento de 13 a 36 m sin admisin. Cambia lodo
Bentontico x Drilplex 8.6 ppg. Perfora a 78.8 m, en ltimos 3 m, perfora sin WOB y admisin a 60
BPH. Se agrega LCM al circuito, normaliza admisin.Observa lneas de succin y descarga B #1, 2 &
3 taponadas c/LCM, habilta bombas. Perfora @ 110 m c/350 gpm, 60 rpm. Saca & aparta trpano c/2
boquillas de 13 taponadas c/LCM.
Arma & baja BHA perforacin @ 98 m, circula, incrementa Q de 100 a 350 gpm, profundiza a 110 m,
ltimos 2 metros se observa vibracin hta., intenta perforar, observa perdida total circulacin,
baja Q a 150 gpm, intenta restituir circulacin negativo (a los 29 bbl bombeados observa filtracin en
el lateral de los patines). Baja DP 5" liso @ 109 m, bombea 80 bbl BVP 12 ppg, saca a 35 m, cambia
lodo Drilplex x Bentontico, no observa filtracin en superficie. Bombea 10 bbl agua + 67 bbl
Lechada cemento 15.6 ppg, no observa filtracin de lodo bentonitico ni agua. A los 64 bbl de
lechada, se observa circular lechada p/Flow Line y lechada en superficie p/fisuras baja subestructura
y patn. C/BHA rota cementode 15 a 46 m, sin admisin, baja a 110 mrepasando c/150 gpm.
Perfora de 110 a 210 m c/BHA convencional 30-60' c/parmetros controlados WOB 0-5 Klb, 40-60
rpm & 200-400-450 gpm, ROP 5.6-5.9 m/hr y admisin 2.4 BPH, para observar regimen admisin.
Mud Logging muestra: (1) a 36 - 40 m Conglomerados 5% & Arenisca grano suelto, medio, grueso a
muy grueso, (2) a los 55 - 64 m Conglomerados 10%, (3) a 70 - 74 m Conglomerados 20%. (4)
coincidencia de profundidades de perdida totales con tramos de conglomerados. (5) Lodo Drlplex
c/LCM NO mostr efectividad en control de prdida (Drilplex slo p/zonas de alta permeabilidad,
muy friables - facilmente erosivas, para mejorar capacidad limpieza por altas ROP's, forma una capa
superficial alrededor del hueco, no permite acarreo del LCM hacia las zonas de prdidas totales. (6)
Zonas de filtracin superficial corresponden a zonas dbiles afectadas por corte posterior durante
construccin de antepozo, reas sin integridad.(7) Luego de cementar CSG 13 3/8", SINOPEC
"lainea" mstil.
Baja ROP Perforacin c/Q Mnimo.
Perforacin de 210 m a 1025 m c/BHA c/MF + AKO 1.15 m + MWD, incrementando Q de 450 - 500 600 - 650 gpm, por evitar erosin tramo superficial que llev a filtracin superficial. ROP fluctu entre
11.5 - 7.2 m/hr, muy por debajo de lo esperado (20 - 8 m/hr). Fue necesario BV intermedios
p/mejorar limpieza c/40-50 m de avance. Dimetro promedio hueco c/cortes +/- 19.43".
Observaciones: (1) ROP afectada por Q mnimo, RPM's MF + TDS @ solo 123 (programa @ 168
rpm (108 MF + 60 TDS). (2) ROP afectada por bajas RPM's. (3) Limpieza c/BV frecuentes,
48
c/retornos de apreciable cantidad de cortes. (4) Constantes circulaciones BV, reducieron el tiempo
de rotacin/perforacin neto. (5) Dimetro promedio hueco +/- 19.43".
Conglomerados/Arenas Grano Suelto medio/Grueso - Vibracion Hta.
Tramo de 36 - 145 m con mayor frecuencia de intercalaciones de Conglomerados entre 10 - 20 &
30 %. De 250 a 1000 m con intercalaciones menos frecuentes de Conglomerados entre 10 - 30 &
10 %. Presencia intercalaciones de areniscas de grano suelto de grano medio a grueso. En BVL
recupera abundante arena formacin de +/- 726 m (tramo 100% arena)
Mantener Verticalidad
Perforando con MF + AKO 1.15 + MWD + 3 STB (0-30'-60'), @ 380 m slo llega a 0.7 desv., NO
muestra tendencia a incremento desv.importante. Entre 380 - 594 m slo se realiza 4 "slide", para
adecuacin rumbo, luego 100 % rotando de 594 @ 1000 m inclinacin slo llega a 0.75.
Prdida Parcial Lodo
Perforando c/lodo de 8.8 ppg (Drilplex) a 838 m c/600 gpm observa admisin de 40 BPH (total
admitido 16 bbl). Levanta y baja Q a 400 gpm, pozo sin admisin. Bombea 40 bbl BV Obturante,
desplaza a EA , saca encima de BV Obturante 790 m, circula @ 650 gpm c/admisin 20 bph,
disminuye Q a 450 gpm admisin a 4bph. Continua perforacin @ 1025 m incrementando Q a 650
gpm, c/admisin 2.2 BPH. A los 1025 m bombea 40 bbl Bache c/LCM (60 ppb LCM), desplaza a EA,
saca encima de Bache y circula c/diferentes Q's @ 500 - 650 gpm c/3-6 - 6.0 BPH admisin; luego
flow check CE admisin 0.7 BPH. Luego carrera calibracin c/BHA 0-30', balancea en 840 m Bache
c/material sellante p/tramo prdida.Durante corrida CSG 13 3/8" admisin 3.3 BPH.Durante
cementacin 5 BPH admisin. Descripcin litolgica muestra 100% arena de grano fino, medio,
grueso conglomerdico. Volumen admitido durante bajada CSG 40 bbl (3.3 BPH); en cementacin 15
bbl (5 BPH). En la cementacin observa en superficie la lechada de relleno (+/- 30 bbl). No fue
necesario Top Job.
DRS-1005
Hueco 17 0 1093 m
Vibracin Herramienta p/ Conglomerados
Perforando tramo 16 - 128 m observa fuerte vibracin, no permite optimizar normas perforacin,
reduce efecto bajando rotacin y WOB. Vibracin genera prdida de lodo en flow line, tiene que parar
circulacin, cambia empaquetadura y pernos. Mud log, muestra, @ 105 m presencia de
conglomerados (@ 10%) y arenas de grano grueso. Presencia conglomerados llega hasta 830 m,
con presencia mnima y muy espordico.
Incremento Brusco Presin - Taponamiento Boquillas
En 175 m, sube abruptamente presin de circulacin con 500 GPM de 1000psi a 1500 psi, perfora
hasta 277 m en estas condiciones. A 277 m cae presin de circulacin a valores normales. La causa
fue el taponamiento de boquillas. Mud log muestra banco de arena suelta (friable) del 100% entre
90 - 130 m.
Regimen Admisin
Inicia perforacin c/0.75 BPH admisin. A los 128 m se incrementa a 1 - 3 BPH, a 357 m 11.3 BPH,
407 m 30 BPH (en CE 9.5 BPH), a 477 - 499 m 32.8 BPH, luego de 708 m disminuye a 13.8 - 8.8 7.5 BPH al TD del tramo. La perforacin fue continua.
Comportamiento TQ Perforacin
Perforacin de 16 a +/- 712 m, TQ fluctua entre 1-2 Klb.ft, bajo constante, coincidiendo con
predominio de bancos de arena con intercalaciones de poco espesor de arcillas entre 10 - 20 - 50 %,
tambin, se presenta pocos y espordicos tramos de conglomerados hasta 800 m. De los 712 a 1093
m el TQ sube abruptamente a un rango entre 3 - 4 - 6 Klb.ft, coincidiendo con el ingreso a una
zona de predominio de tramos de arcilla. La penetracin ROP toma picos al ingresar a la arcilla. La
ROP se hace muy varible por las intercalaciones de arena (rapido) - arcilla (lento). Trpano PDC
SDi519 con avance de 521 - 1093 m sale con calificacin 3-4-BT-A-X-2-ER-TD, mostrndo efecto de
desgaste al calibre y erosin.
49
Conexin Niple Maniobra Safa durante bajada CSG 13 3/8" + Secin "A"
Procede a levantar pieza corta CSG 13 3/8" (2.75 m) + Seccin "A" + Brida Compaera + Pieza
bajante (que se hizo maquinar el pin en SCZ, conexin 8RD), ya que la que se recuper de DRS1002 se encontraba en mal estado) + Cupla enviada de SCZ. Al momento de enroscar el Niple de
maniobra a la cupla 8RD de la pieza bajante, se observa que no ingresa todos los hilos de la
rosca, pero que si se llega a tener un TQ 4 - 6.2 Klb.ft, con Weatherford. Tensiona CSG @ 10 Klb,
para proceder a liberar Spider, observa safar la conexin del Niple de maniobra de la cupla 8RD.
No se liber el peso de CSG del Spider (afortunadamente).
Se procede a cambiar la cupla 8RD por una 2da (back up, enviaron 2 de SCZ), se enrosca a Niple de
maniobra , enrosca 100% dentro de cupla, pero la conexin de la pieza bajante , maquinada nueva,
faltaba 1" para enroscar con 12 Klb.ft de TQ. Deside continuar bajada CSG. Causa raz, 1era cupla de
libraje diferente al libraje del CSG, no compatibilidad.
DRS-1004
Hueco 17 0 1031 m
Conglomerados - Picos de TQ.
Presencia conglomerados desde 35 - 550 m con intercalaciones regularmente frecuentes de 10 20 %. En los tramos de predominio de arcilla, donde existe presencia de conglomerados genera picos
de lectura de TQ. De 550 - 900 m con intercalaciones menos frecuentes entre 10 - 20%, que,
tambin, generan picos de TQ, cuando los mismos estn en paquetes de arcilla. Tramo de 900 - 1029
m, resalta mayor frecuencia de conglomerados, gererandose picos de TQ altos @ 8-12 Kl.ft, al
estar presentes en paquetes de arcilla.
Problema Bomba Hidrulica TDS
En maniobra corta de 324 a 125 , presenta problema bomba hidrulica TDS. Consola del
perforador bloqueada. Hta en cua, rotando con mesa rotaria.
Admisin
Inicia perforacin c/admisin dinmica entre 5-8 BPH y esttico @ 3 BPH. Observa incremento
admisin 8 - 35 BPH entre 506 - 609 m, luego mantiene entre 8 - 25 BPH @ el TD (1031 m),
coincidiendo con tramos o bancos de arena y conglomerados.Durante bajada CSG admite 43.3 bbl a
un regimen de 4.6 BPH. Durante cementacin 1.4 BPH, retorn superficie lechada removedora +/- 55
bbl.
Taponamiento Flow Line Lodo Contaminado c/Cemento
Stinger (1029 m) se desconecta y levanta a 990 m, circula 20 bbl bache Cscara Nuez, desplaza @
punta stinger, luego hasta superficie, retorno lodo floculado c/cemento. Baja BHA limpieza c/trpano
12 1/4" a 953 m P/R 5 Klb, profundiza c/circulacin & rotacin @ 972 m, donde observa
taponamiento de flow line c/lodo.Limpia flow line y continua profundizando @ 991 m P/R firme 10
Klb. Circula, reciproca, de f.p. recupera lodo contaminado 80% cemento blando, 20% cascara Nuez +
lodo floculado c/ cemento.
DRO-X1002
Hueco 17 0 1031 m
Vibracion intermitente -Conglomerados & Cantos Rodados
Durante la perforacin se observa vibracin intermitente de hta. por presencia de conglomerados.
Minima vibracin controlando parmetros de perforacin. Mud log: muestra conglomerados, con
recuperacin de fragmentos cuarciticos < 0.5 cm, desde inicio hasta +/- 390 m, luego se tiene
intercalaciones de conglomerados y cantos rodados, de cuarzo fragmentados de 1.5 - 2.75 cm,
fluctuando entre 40 - 10% hasta +/- 490 m.
Rebalze lodo Zarandas - lodo bent. Ext. 8.7 ppg
50
Perforando con Q 365 - 469 GPM, se observa rebalze de lodo por zarandas, vindose el efecto de
anteriores pozos cuando se utilizaban mallas Derrick Chinas. Se cambi a mallas Swaco. Incrementa
Q paulatinamente de 469 a 729 GPM.
Perdida por permeabilidad
La presencia de conglomerados, cantos rodaos e intercalaciones de arenas de grano grueso suelto
gener perdidas por permebilidad. Inici con admisiones de 5.0 BPH, luego a los 523 m 8.19 BPH, a
757 m a 14.0 BPH, llegando a los 1031 m con 6.9 BPH.
Bancos Arenas friables - Resistencias firmes
Tramos coinciden con bancos de arena de grano grueso suelto. Dimetro estimado por cortes indican
entre 19.03" - 20.06", denotando lavado excesivo. En carreras cortas y viajes se observa resitencias
firmes de 15-20 Klb en estos tramos, con TDS sin rotacin y solo circulacin, negativo; con mnima
rotacin logra pasar puntoa de resistencias. Se comenta posible formacin de "cuello de botella" en
los tramos de arcilla. Por las resistencias observadas, en el fondo (1033 m), se densifica lodo de 8.8
ppg a 9.0 ppg, para luego densificar hasta 9.2 ppg. Del la grfica de TQ, se aprecia,
coincidentemente que en los tramos de arena friable (bancos) el TQ subre abruptamente de una
tendencia normal 2-3 Klb.ft a 5-7 Klb.ft, luego baja a valores normales de 3-4 Klb.ft cuando se ingresa
a una arcilla, nuevamente se genera TQ alto ingresando al paquete de arena friable tomando valores
de 5-7 Klb.ft.
Caida Sonda Totco
Luego de circular BVP, Al momento de recueprar totco en superficie se observa soltarse del punto
libre y caer sonda totco hacia el fondo (se suelta el alambre del casquete donde conecta).
Problemas
Canalizacin y retorno de lodo por
lado externo del antepozo.
Coincidiendo presencia de
conglomedaros a nivel superficial.
Perdida total circulacin y filtracin
superficial
Medida de Mitigacin
Cao gua de 20 debe ser instalado a 5
m de profundidad, 2 m incado y 3 m con
excavacin.
Contingencia
Disponer de cemento en boca
pozo.
51
Notas Pre-Drill
Programar que especialista de las zarandas tipo Derrick para que realice
la inspeccin tcnica, y verifique el inicio de procesamiento, como medida de
aseguramiento de funcionamiento eficiente.
Todas las medidas deberan ser tomadas desde la Rotary Table (RT).
Para los primeros metros mantener un caudal reducido para evitar la erosin
del antepozo. A medida que se profundice utilizar el caudal adecuado que
52
garantice una buena limpieza del pozo sin causar mucha erosin del tramo,
para facilitar la cementacin del mismo. NOTA: Se observa intercalaciones
de areniscas de grano fino muy friable (deleznable) como itercalacin de
paquetes de arcilla.
Control desviacin ser con lectura de Totco electrnico/Single Shot & MWD.
1
25/4/06
AHM
2
26/4/06
AHM
Tpico
Principal:
Descripcin en Detalle de la
Leccin Aprendida (sujeta
revisin):
Descripcin,
causas, solucin, NPT y
Leccin
aprendida
&
Acciones Futuro.
X1001
Revisin por el
Equipo
Si / No:
Documento a
Incorporarse Leccin
Aprendida:
Estado
Actual
Comentarios:
Inestabilida
d derrumbe
Si
Programa perforacin
Difundido
Falla MWD
No
1.- Programa
Perforacin
2.- Procedimiento
Intergas
Incorporado
a KNT FW2H
Nota: Este formulario permitir registrar lecciones aprendidas por parte del Company Man, facilitando el
registro diario de eventos, problemas, observacin, prcticas o procedimientos que resultaron adecuados o
que redujeron tiempos de operacin.
53
Secuencia Operativa
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
54
7.9
Perforar hasta +/- 110 m con BHA sin estabilizadores, con Shock Sub 9
+ DC 9 + XOs + HWDP 5.
Nota:
Iniciar con caudal mnimo e incrementar paulatinamente.
Establecer rgimen de admisin en condiciones estticas (CE) y
en dimmicas (CD), para referencia.
7.10
7.11
7.12
55
7.13
7.14
7.15
7.16
Realizar viaje corto @ tope DCs 8 +/- 110 m. Bajar BHA a fondo pozo
con repaso si necesario.
7.17
7.18
7.19
7.20
7.21
56
7.22
7.23
7.24
7.25
Realizar viaje corto de 700 a 500 m. Sacar con reaming & back reaming
si necesario. Bajar hasta fondo con repaso si es necesario.
7.26
7.27
7.28
Realizar viaje corto de 900 a 700 m. Sacar con reaming & back reaming
si es necesario. Bajar BHA a fondo pozo con repaso si necesario.
7.29
57
7.31
7.32
7.33
7.34
7.35
7.36
7.37
Circular @ zarandas
sellante/lubricante.
7.38
7.39
Apartar Melas, aflojar tensores & desconectar flow line & raiser 20".
Limpieza antepozo.
limpias.
Bombear
BVP.
Balancear
Bache
Nota:
58
7.41
Notas:
PROPIEDADES CAERA 13 3/8
Peso
ID
Grado
(in)
Conex
OD
(in)
Espesor
Pared
Min. Resist
Tensin B/J
Resistencia
Reventamiento
Resistencia
Colapso
(in)
(Klb)
(psi)
(psi)
(in)
Conexin
54.5, ppf
Drift
Torque
Ajuste:
Min/Opt/Mx
(lb.ft)
12.615
14.375
12.459
0.38
853
K-55
2734
1130
Aplique
Procedimiento
1025
BTC
API
Disponer de:
1. Brida compaera 13 5/8 5K psi, Casing Niple 13 3/8 +
Landing Joint 13 3/8 para bajar con la Seccin A.
2. Solicitar a Weatherford el registro o visualizacin del TQ de
ajuste a cada conexin BTC.
3. Tomar servicio del Fill Up Tool (Weatherford) slo para llenar
CSG.
59
7.42
7.43
7.44
7.45
60
7.47
REQUERIMIENTO DE CONTINGENCIA:
Se bombear volumen definido de las lechadas de relleno & principal para alcanzar
tericamente superficie (50% exceso para la de relleno y principal), de no lograr circular
cemento en superficie de inmediato proceder a Top Job.
PARMETROS DE DISEO:
61
TVD/MD RT
1100 m /1100 m
BHST /BHCT
120F / 95 F
Lechada con cemento clase A. Exceso 50% la cual estar en funcin del volumen de
recortes a ser reportado por PFM Tuboscope / Unidad Mud Logging.
Tipo de lodo Bentontco Extendido., programado para disminuir riesgo de prdida total
y otros.
Propiedades
Principal
Relleno o Removedora
Densidad, ppg
15.6
13.0
Tipo cemento
Clase A
Clase A
Volumen, bbl
183
487
Altura cemento
300
800
5:16/6:08 hrs
5:46/6:43 hrs
Resistencia Compresiva
Agua libre, %
0.3
Filtracin, ml/30min
171
N/A
Bombeabilidad
BC
50/100
OBSERVACIONES TCNICAS:.
Asegurar el casing contra la estructura del equipo para evitar la flotacin del casing.
7.48
7.49
7.50
7.51
7.52
brida
62
7.53
Instalar tapn de prueba. Probar con presin conjunto BOPs, Stand Pipe,
Vlvulas del TDS, Lnea de matar, Vlvulas manuales + HCR, Coflexip y
Choque Manifiold, con 300/4000 psi. BOP anular con 300/3000 psi.
Retirar tapn de prueba.
7.54
8.6 9.2
YP, lpcpc
30 40
VP, cp
12 15
Lect ( R3/R6)
12/20 20/-28
14 - 18
Sin Control
MBT, ppb
< 28
Drilling Solids, %
35
pH
9.0 10.5
Sin Control
CONCENTRACIN PRODUCTOS
Bent. Extend.
Bentonita, ppb
14
Gelex, ppg
0.02
0.25
63
0.75
17
0.75
15
Serflufibra M, ppb
2.0
1.0
64
10
Trpanos e Hidrulica
TREPANOS 17 1/2
IADC
Tipo
Lnea
Caracterstica
Conexin
Observaciones
115
XR + CPS
Smith
Smith
(nuevo)
SDi519MHBPX
PDC
Mx. Pres.
Descarga
SPM (stk./
min)
120
110
100
90
1
180 mm Liner
170 mm Liner
160 mm Liner
150 mm Liner
140 mm Liner
3.292 psi.
3.699 psi
4.177 psi
4.743 psi
4.975 psi
Descarga
Mxima (Gpm)
738
676
615
553
6.14
Descarga
Mxima (Gpm)
658
603
548
493
5.48
Descarga
Mxima (Gpm)
583
534
486
437
4.85
Descarga
Mxima (Gpm)
512
469
427
384
4.26
Descarga
Mxima (Gpm)
446
409
372
334
3.71
Nota: Se calcula con el valor 100% del rendimiento volumtrico & 90% de la eficiencia
mecnica.
Las bombas RGF-1600 deben ser instaladas con camisas 170 mm (6.69)
TABLA PARMETROS PERFORACIN
ROP
Horas
Target, m/h
Avance
WOB
Klb
5 - 15
7.2 @ 110 m
13.3
95
8.2 @ 300 m
23.3
190
10.0 @ 500 m
20.0
200
10.6 @ 700 m
18.8
200
10.3 @ 900 m
19.4
200
9.9 @ 1100 m
20.1
200
RPM
Caudal
HSI
Boquillas
gpm
90
300 - 800
Presin
Stand Pipe
3.40
3x13 + 1x14
800 - 1800
TFA = 0.539
5 20
*102 + 70
*115 + 70
800- 900
2.40-3.0
8x9 + 2x10
2000 2500
TFA =
0.650
65
11
Desviacin Survey:
Objetivo: Mantener verticalidad, generando un mnimo desplazamiento de la
vertical, para reducir el trabajo de correccin en el siguiente tramo y facilitar el
ingresoa box objetivo a nivel de la Ar. Guanacos.
Frecuencia & Instrumentos: Lecturas de totco a los 110, 300 & 500 m. Luego
continuar con lecturas de MWD haciendo la correccin de la desviacin y direccin
hacia el box objetivo.
66
INTERVALO III
Hueco:
12
Profundidad:
Caera:
Informacin Geolgica.
Formacin
Descripcin
Tariqua
Inferior
Yecua
Petaca
Arenisca Gris verdosa, grano fino sub angular de buena seleccin con matrix
arcilloso cemento calcreo con intercalaciones de arcilla.
Cajones
Yantata
Arenisca gris claro con leve tono amarillento, escasa gris verdoso claro,
cuarzosa grano fino, menos medio y grueso.
Ichoa
Arenisca gris claro con leve tono naranja, cuarzosa suelta grano medio escaso
grueso.
Cangapi
Arenisca gris claro verdoso, cuarzosa suelta de grano grueso a medio escaso
muy grueso, subangular a sub redondeado.
67
San Telmo
Escarpment Arenisca gris rojiso a rojiso plido bandeado con gris blanquecina, granos de
cuarzo hialino translucido, bastante intercalacin de arcillita.
Ingreso
Tarija
3
Informacin General
Perforar con MF c/AKO 0.78 y trpano 12 + MWD realizando la correccin de
la trayectoria hacia la vertical orientado hacia el box del objetivo de la Ar.
Guanacos. La perforacin llegar a 3450 m MD, asegurndo el ingreso a la
formacin Tarija. Con wireline, realizar la carrera de registros elctricos. Correr
caera de produccin 9 5/8, P-110, 47.0 #/ft, UPJ. Cementar en una etapa con
dos lechadas desde el fondo hasta +/- 1600 m (TOC), dejar 600 m libres para
inyeccin de desechos lquidos entre el anular de la caera de 13.3/8 y 9.5/8.
Tipo de lodo WBM Polytraxx hasta los 3450 m, con MW de 8.8 9.4. ppg.
DRD-X3 YPFB
Tramo: 501 2945 m
APRISIONAMIENTO
Bajando BHA a 2027 m encuentra punto resistencia, intenta sacar observando aprisionamiento.
Maniobra v/v con tensin - rotacin y circulacin, logrando librar con tensin de 250 Klb. Repasa
tramo 1962 2054 m con puntos de fuerte resistencia al TQ. Observa en zaranda pelcula lodo y
recorte de formacin.
DRD-X1001
Tramo 1554 4000
BHA EMPACADO
Perfora con 13 Carreras de Trpanos, todas utilziando BHA Empacado, registrando ROPs muy
bajas a lo largo del tramo. El problema de utilizar este tipo de BHA era que se debea tratar de
mantener la Inclinacin del pozo para no ganar ngulos. RECOMENDACIONES: Perforar Este
Tramo con Trpanos PDC Direccionales, MF que nos ayude a realziar un pozo lo ms direccional
posible y MWD para ir tomando lecturas de survey a medida que se vaya perforando.
AMAGOS DE APRISIONAMIENTO
El problema ms relevante durante la perforacin de ste tramo fueron los amagos de
aprisionamiento constantes registrados a diferentes profundidades. La rigidez del BHA de
perforacin, especialmente los STBs generaron un importante rea de contacto con las paredes del
pozo, los cual ha incrementado la posibilidad de pega diferencial. Perforando el Tramo de 2066 &
3596
m
se
registraron
los
amagos
de
aprisionamiento
ms
importantes.
RECOMENDACIONES: Perforar este tramo con solo 2 STBs uno Near Bit y Otro de Sarta esto para
no tener una sarta muy rgida y la finalidad es que se pueda construir la curva direccional y sea
maniobrable la Hta.
RESISTENCIA PUNTUALES
Durante las maniobras POH & RIH siempre se tuvo problemas de presencia de resistencias
puntuales. RECOMENDACIONES: Durante la perforacin repasar cada tiro perforado 2 a 3 veces
para no tener este tipo de problemas de resistencias y estn previstos realizar carreras cortas cada
200 m con al finalidad de conformar el agujero.
MINIMA TENDENCIA A LEVANTAR NGULO:
68
Durante la perforacin de este tramo se observa mnima tendencia a levantar ngulo 2 @ 3997 m,
teniendo una mxima inclinacin registrada en 3880 m, 2.7 & 263 Az. RECOMENDACIONES: Se
utilziar MF para perforar este trmao ya que es el principal donde se generar la curva direccional.
PERDIDAS DE LODO:
No se registraron prdidas de lodo importantes durante la perforacin del tramo.
RECOMENDACIONES: Durante el agregado de material qumico tomar en cuenta el uso de material
Sellante para evitar prdidas por permeabilidad y en caso de prdida de cirualcin total tomar en
cuenta el rbol de decisiones del qumico para encarar la prdida con materiales sellantes.
DRD-1005
Tramo 677 3004
Prdida Parcial & Total:
Sacando herramienta de 2261 m, en la profundidad de 1446 m, reciproca con circulacin con 570 gpm
2100 psi, observa incremento de presin @ 2500 psi, reduce caudal a 400 gpm, registra PERDIDA
PARCIAL de circulacin 80 bbls en 10 min. Calibre muestra a +/- 1446 m hueco lavado @ 17 del
hueco de 12 . El total de lodo perdido en el tramo de 12 (677 3004 m) fue de 1312 bbl de lodo
con lodo de MW de 8.8 a 9.0 ppg
Prdida por PermeabilidadPerforando a la profundidad de 2760 m incrementa el rgimen de
admisin de 2.5 BPH a 10 BPH con lodo de 9.0 ppg. Con agregado de CO3Ca de 4-10 sacos por
hora controla la admisin.
Corrida y Cementacin CSG 9 5/8
Durante la corrida de CSG 9 5/8 y la cementacin se perdieron +/- 662 bbl de lodo (9.0 ppg). Se
mantiene un rgimen de 4BPH de admisin terminado de perforar. Durante la bajada de CSG 9
5/8 se baj hasta 1580 m con desplazamiento normal, luego se pierde retorno, reduce velocidad de
bajada, consiguiendo desplazamiento mnimo desde 1580 a 2683 m, donde tiende a normalizar
retorno. Contina bajando con desplazamiento parcial de 2683 hasta 3004 m. Total perdido en
bajada CSG 241 bbl. Conecta FUT bombea B/sellante de CO3Ca (F/M/G 50 ppb) con caudal de 100
200 gpm observando perdida parcial, volumen perdido 75 bbl dando un rgimen de 150 BPH. Corta
circulacin. Cementacin con prdida parcial 104 bbl, con MW 9.0 ppg
Baja ROP & Incremento Presin:
Desde 1608 m observa niveles con lenta ROP. Litologa Tramo Peltico y Calcreo con presencia de
Limolita + Arcilita + Caliza. Perfora Tramo 12.1/4" hasta 2261 m. Saca Hta por lento avance e
incremento de presin. Trpano & Estabilizador embolado por arcilla plstica masiva dura, con dos
boquillas taponadas por material disgregado de formacin, 2 insertos astillados y 1 perdido frontal de
refuerzo.
DRD-X1002
Tramo 220 1600 m
Vibracin en Intercalaciones de Arenisca-Arcilla
A consecuencia de esto, trepano PDC sale con varios cortadores rotos, adems, fuerte desgaste en
las aletas de NB STB.
Amagos de Empaquetamiento
Tramo con amagos de empaquetamiento producto del embotamiento de la hta de perforacin.
Paquetes de Arena Suelta muy fina
Tramos arenosos bastante permeables. A partir de 1235 m, incrementa torque por acumulacin de
arena, trabaja con BV. Decide continuar perforacin con ROP controlada +/- 10 mph hasta 1600 m.
Maniobras bastante dificultosa tramo 1077-1433 m, alto torque errtico, posible revoque grueso
en zona de areniscas permeables, y constante embotamiento del trpano y los STB.
Cementacin
Durante la cementacin, el pozo entra en prdida total con incremento repentino de presin (de 870
Psi a 4100 m), decide abortar operacin de cementacin con 39 BBl de lechada principal bombeados,
69
desplaza lechada con 146 Bbl de agua y lodo, los primeros 51Bbl de desplazamiento sin retorno. La
prdida se genera posiblemente por el bombeo de lodo de baja reologa por delante de la
cementacin (desestabilizacin de revoque, por ende derrumbe y admisin).
DRD-X1004
Tramo 12 501 1660 m
Prdidas por PermeabilidadTramo 804-973 m con prdidas por permeabilidad (1.5-3 BPM 180
BPH), total perdido 126 Bbl. Controla admisin con el agregado de CaCO3 + MIX II.
Incremento MBT
Fuerte incremento del MBT debido a la trituracin de recortes con el MF cuadrado.
70
DRS-1003D
Tramo 12 914 3031 m
ZONA ALTA COMPRESIBILIDAD
A partir 1700 m hasta 1880 m (formacin Cajones) se observa presencia de Caliza compacta,
duro, con fuerte reaccin calcrea entre 50 - 10%. Corresponde a puntos de alta compresibilidad de
roca > 10 Kpsi, que genera impacto y deterioro cortadores PDC. Generando puntos de muy lenta
penetracin.
PERDIDAS POR PERMEABILIDAD
Tramo Chaco inferior inicia (914 m) con 2 - 2.5 BPH durante perforacin, manteniedo ese rgimen @
ingreso Yecua (1570 m), con lodo 8.7 - 9.0 ppg. A partir de 2010 m observa incremento rgimen de
admisin a 2.5 BPH ingresando al Yantata y manteniendo en el Ichoa, con MW 9.0 ppg. A partir del
Cangapi y parte superior y media del Tarija con admisiones < 1.0 BPH. A los 2939 m (formacin
Tarija) se observa incremento importante admisin de 4 BPH, correspondeindo a la Falla El Dorado
(+/- 2946 m), luego a los 2980 m nuevo descenso de nivel de 4 BPH, siendo necesario el agregando
material LCM al sistema.
ESPIRALAMIENTO HUECO
Registro de caliper muestra Espiralamiento del hueco de 12 1/4" en los tramos de arenas
(paquetes arenosos). Inicia en +/- 1750 m hasta los 2750 m, cubriendo las formaciones Cajones,
Ichoa, Cangapi, Escarpment y Tarija. Con BHA convencional 0-30' de calibracin, previo a los
registros elctricos, repasando, encuentra resistencia desde los 1859 m, con continua
resistencia la TQ @ 12-13 Kl.ft, con paros de TDS, en intentos de bajar BHA sin rotacin
observa enchufe de hta., a los 3030 m paro TDS y amago aprisionamiento, tiene liberar con 140 175 Klb de sobretensin. Tiempo de repaso lleg a 114 horas (4.75 das).
COMPORTAMIENTO TORQUE
Hueco 12 1/4" inicia con un torque de 2-3 klb.ft a los 914 m. Mantinen un comportamiento con
tendencia normal de incremento por profudidad @ los +/- 1750 m, llegando a 3-4 Klb.ft. Se presenta
un cambio brusco a los +/- 1770 m de 7 Klb.ft inicial (ingreso Cajones - caliza), con incremento
mayor en tendencia superando los 10 klb.ft a los 1800 m, continua incrementando con tendencia
importante hasta un promedio entre 14 -15 Klb.ft y puntuales de @ 18-19 Klb.ft. hasta los 2750 m
(tope Tarija). Ingreso en Tarija con TQ's altos de 15-19 Klb.ft entre 2750-2850 m, posible debido a
la dureza de las diamictitas. De 2800 m a 3029 m TQ durante rotacin 100% fluctua entre 12 - 13
Klb.ft. Desde los 1700 m @ 2750 m la litologa muestra con 50% arenasen Cajones, luego incrementa
100% en Yantata e Ichoa, y 80 - 100% arenas en San telmo y Escarpment.
DRS-1002
Tramo 12 1025 3420 m
Prueba Integridad Formacin - FITLuego de cambiar fluido Drilplex x Klashield 8. 8ppg, perfora de
1025 a 1030 m. Realiza FIT, bombeando a 0.35 BPM, incrementa presin a 200 psi (DE = 10.62 ppg),
71
estabiliza en 110 psi (DE = 9.43 ppg). Repite bombea a 0.35 BPM, incrementa @ 320 psi (DE = 10.62
ppg), estabiliza en 110 psi (DE = 9.43 ppg). Litolgicamente, tramo 1025 - 1030 m) muestra presencia
de arena entre 40 - 100 % de arenisca grano suelto fino, medio a grueso conglomerdico. Zapato
expuesto a zona de % importante de arenas. FIT alcanzado es muy bajo.
Dimensionamiento Inapropiado P/ Conexin de MWD a Aligment Sub.
Al armar BHA inicial c/MF 9 5/8", intenta posicionar MWD, sin xito. Saca sonda, verifica problema.
Desconecta Monel, Aligment Sub y revisa camisa de Aligment Sub. Guiador de High Side del MWD
ml calibrado (sobredimensionamiento), se cambio por otro usad, luego se posicion MWD.
Hueco Lavado Arcillas Formaciones Tariqua Inferior - Yecua - Petaca & Cajones
Registros muestra en hueco lavado excntrico correspondiente a lecturas de GR altos (arcillas),
desde los 1360 - 1720 m. En Chaco Inferior: @ > 20" ( en maniobra corta a zapato, luego de llegar a
TD final, en repaso tramo 1353 a 1353 m, circula por salida abundante recorte), en Yecua @ 18";
Petaca, especialmente en su base, @ > 20"; en Cajones, parte superior, @ 18". Todos fueron
perforados c/MW de 8.8 ppg. Realiza carreras cortas c/ +/- 200 m, desplaza BVP de 60 bbl c/60 - 80 m
avance p/ verificar condiciones de hueco y menojar limpieza. En BVP's se observa variacin de
presin de bomba +/- 300 psi, recuperacin desde abundante, apreciable, regular cantidad de cortes.
Grfica TQ muestra picos puntuales @ 6 Klb.ft coincidiendo con tramos lavados.
Limpieza Lodo UCS
Realiza limpieza UCS tres en uno, desarenador-desilter-Zaranda. Mecnico desarma bomba
centrfuga del desarenador, en el encuentra pedazo de madera, alambres obstruyendo funcionamiento
impeller y caracol de la bomba centrfuga.
Caliper hueco - Respuesta Tipo Lodo - MW Programado
Registro caliper muestra hueco en calibre homogneo entre 1720 - 3400 m (Cajones - Icloa Cangapi - Escarpment - Tarija. Mud Log muestra predominio de arena entre 50 - 100 %, con mnima
intercalacin espordica de limolitas - arcillas. Penetraciones muy homegneas bajas, resaltando
incremento en zonas puntuales donde se reporta limolita - arcillas. Se inicia con MW 8.8 ppg,
incrementa a 9.0 en +/- 2030 m, incrementa a 9.1 ppg a +/- 2680 m, incrementa a 9.4 ppg a +/- 3200
m (p/atravezar zona de lectura de GR ms alto p/ Limolita & Diamictita, de 3185 - 3225 m, c/1516" de lavado; BVP muestra trazas derrumbe; c/Back reaming c/TQ 5-12 Klb.ft)); termina tramo c/9.4
ppg.
Generacin Hueco Espiral
Los BHA's que se emple p/perforar 12 1/4" fue con un AKO de 0.78, p/mantener verticalidad;
realizando perforacin en modo "slide" entre 5 - 10 m, sin dificultad. Litologa muestra que las
formaciones Cajones, Yantata, Ichoa, Cangapi y Escarpment, existe un predominio de % de arenas
desde un 50 - 100%. De los registros de calibre se aprecia: (1) entre 1700 - 2430 m : Cajones,
Yantata, Ichoa y parte superior del Cangapi, indicios mnimos de hueco con geometra espiral, de
paso largo. Resalta hueco en calibre en parte inferior de Cajones, Yantata, en su parte superior y
media del Ichoa (parte inferior 2180 - 2430 m tramos de hueco lavado excntrico @ 16". (2) De los
2430 m hasta 2930 m con geometra de de hueco en calibre con una espiral de paso largo, ms
evidente formaciones Cangapi parte inferior, Ichoa y Escarpment. Carrera calibracin, previo a
registros, con BHA de 2 puntos baja hasta casi f.p; de 3400 m y repasa a 3420 m. Antes de carrera de
CSG 9 5/8", se baja BHA c/3 puntos apoyo 0-30-60', @ 3318 m, repasando a f.p 3420 m, observando
slo un punto resistencia a 3414 mde 12 Klb. Conclusin: geometra de hueco espiral fue mnimo, que
no necesit de trabajo de conformacin del hueco, pese a lograr un hueco en calibre en tramos donde
predomina las arenas.
Calidad Hueco - Tipo Lodo MW
De registro de calibre se aprecia: (1) en Tariqua Superior hueco en calibre correspondiente a los
espesores de arena o GR bajo, y hueco lavado-ensanchado solo en tramos de arcillas o GR alto,
llegando hueco @ 16"(1025 - 1360 m). MW 8.8 ppg (2) En Tariqua Inferior, 1360 - 1570 m misma
caracterstica, en tramos de GR alto hueco lavado @ > 20", tramos arena en calibre. MW 8.8 ppg. (3)
En Yecua, Petaca y Cajones parte superior con hueco lavado-ensanchado correspondiente solo a
GR alto (arcillas) @ > 18". MW 8.8 ppg. (4) Parte inferior de Cajones, Yantata e Ichoa parte
Superior y Media hueco en calibre (1725 - 2180 m). MW 9.0 ppg. (5) Parte inferior del Ichoa con
hueco de cierto lavado-ensanche correspondiente a incrementos en GR (pelitas) @ 16" (2180 - 2315
m). MW 9.0 ppg (6) Parte superior e inferior del Cangapi hueco en calibre. Parte Media con
72
lavado/ensanche mnimo. MW 9.0 - 9.1 ppg. (2315 - 2842 m). (7) En Escarpment y Tarija con hueco
en calibre, con tramos puntuales de lavado/ensanchado correspondiente a lecturas de GR alto
(2842 - 3400 m) @ 14-16" . MW 9.1 - 9.4 ppg.
Tiempo Espera Unidad Registros (Schlumberger)
Se instruy la movilizacin de la unidad de registros c/24 horas de anticipacin p/los registros en
hueco abierto 12 1/4". No ixisti claridad en la disponibilidad de la unidad (unidad sale de otro servicio,
presenta problemas mecnicos, no se tienen otra unidad disponible). El arribo a locacin gener un
NPT de 3 horas, como espera de arribo de la unidad, se realiz una operacin NO programada, para
cubrir tiempo de espera. El programa consensuado con E&D indicaba que cable de la unidad debera
ser de carga segura de trabajo de 9705 lbs, pero la unidad que arrib al pozo fue de +/- 8300 lbs.
Cementacin CSG 9 5/8" Deficiente Taponamiento
En la cementacin, luego de largar el tapn superior, desplaza +/- 360 bbl de agua observa 1er
incremento presin instantneo de +/- 200 psi a +/- 2100 psi, continua bombeo c/200 psi, luego a los
+/- 430 bbl nuevo incremento brusco a +/- 900 psi, para luego mostrar una tendencia sostenida
brusca de presin @ 3100 psi c/494 bbl de agua.Desconecta cabeza cementacin circula instalacin
superficial sin taponamiento. Nuevamente conecta cabeza y trata de circular c/2BPM, presin
incrementa @ 3200 psi, sin observar circulacin. Ingresa a EA (CSG-hueco) +/- 107 bbl lechada
cemento relleno (+/- 440 m). Cancelo continuar cementacin. Tensiona CSG @ 560 Klb (peso CSG
535 Klb) p/colgar CSG, mostrando CSG libre. Recuperacin total de viruta metlica +/- 7963 gr.
Conclusin de evento: taponamiento interno CSG p/restos de tapn inferior en CF & Zapato,
relacionado a fragilidad y mala calidad de tapn inferior. Arma y baja BHA c/PDC + MF
p/reperforar cemento, P/R a 2045.5 m c/5 Klb y zapateo hta. Inicia rotacin CMT de 2045.5 a 2050 m,
bombea BV, observa cortes de CMT de reg. consistencia c/pedazos goma negra (Tapn
Superior).Rota TC @ 2279 m donde observa cada presin bomba, cheque circuito lodos, observa
cortes CMT en canaleta, cajon succin y bombas 1 & 3 (accin inapropiada QMC). Continua rotando
CMT con dureza variable no uniforme (duro 17 m/hr, mod. duro 30 m/hr, duro consistente 35 m/hr,
duro mod. consistente 41 m/hr, blando 79 m/hr) @ 3374.5 m tope CF. Desde 3210 m ROP mayor +/40 m/hr, por ingreso a lechada relleno. Continua rotando CMT @ 3414 m (3 m encima de zapato).
Cada 4 tiros rotando CMT bombea BV 30 bbl. Registro calidad cementacin muestra: CBL < 10 mV de
3405 @ 3030 m, indicando aderencia caera-cemento; USIT indica CMT @ 3030 m; bonded - lquido
- espordico micro debonding. Registro confirma cemento c/lechada relleno de calidad aceptable.
Interferencia restos metlicos y cemento en registro cementacin USIT
Registro se toma en ambiente de lodo Agua/Bentonita 8.4 ppg. Con carrera previa de escareador. Con
sonda en fondo pozo se observa anomalas con la hta. USIT, no deteccin de amplitud de echos e
incoherencia con los radios int. y ext., por basura dentro del pozo. Slo se registra 100 m. Se continu
registrando p/obtener datos de CBL-VDL. Saca sonda a superficie sin observar anormalidad.
Reemplaza hta. USIT por otra de backup, baja a fondo procede a registrar, observa anteriores
anomalas de 1era carrera, aunque en menor medida.Se logra registro continuo @ 2800 m, luego se
solicita un nuevo intento llegandoo a fondo y registrando nuevamente a 2800 m, esta pasada final c/
menos efecto de las anomalias. Sonda sale a superficie c/ restos de cemento en centralizadores de
sonda, excesiva cantidad de viruta metlica en magnetos del CCL. Conclusin: en las 2 carreras se
observaron las mismas anomalas con la hta. USIT, anomalas debidas a condiciones en fondo
pozo, por excesiva cantidad de viruta metlica y restos de cemento.
Intento Cambio Rams 5" x 9 5/8"
Intenta cambiar rams 5" x 9 5/8" en conjunto BOP, en la seccin de los rams de medida de 5",
negativo. Se observa dificultad p/desenroscar pernos de ajuste. Instala rams p/CSG 9 5/8" en la
seccin del rams ciego, al no poder abrir compuerta de la seccin de rams de medida superior
DRS-1005
Tramo 12 1093 3425 m
FIT
Realiza FIT presurizando sarta @ 338 psi c/2.75 bbl de lodo 8.8 ppg , DEC = 10.6 ppg.
Exceso TQ Barra Pesca Sonda MW
73
Asienta sonda MWD dentro monel, observa exceso TQ en barra de pesca de la misma. No se puede
desconectar sonda dentro del monel. Retira sonda a rampla y verifica TQ . OK.
Presencia Trazas Conglomerados
A partir de los 1130 a 1500 m se reporta trazas de Conglomerados.
Aglomerados Pelticos - Hueco Cerrado Tramos Arcilla
En carrera corta de 1753 a 1468 m (Parte superior Cajones, Petaca, Yecua, base Tariqua), saca
c/elevador c/P's/R de 10-20 klb; en 1665 m (Petaca) observa resistencia firme de 30 Klb, intenta
nuevamente (-), conecta TDS, saca con Back Reaming de 1695 - 1468 m, enva BVP y recupera
Aglomerados de masa peltica @ de 3.5 cm, con inclusiones de areniscas, limolitas TZ de
caliza. En maniobra corta de 2009 - 1096 m (zapato), sacando con elevador a 1426 m @ 20 Klb
(Tariqua inferior), maniobra v/v (-); tiene que realizar Back reaming c/TQ's errticos 5 - 8Klb.ft
(posible acumulacin de cortes sobre hombros de STB y/o embotamiento BHA), en BVP recupera
Aglomerados de msa peltica. Registros muestra que en parte superior Cajones, Petaca, Yecua y
parte inferior Tariqua, los tramos de GR alto (arcillas) estn cerradas, por lo que los aglomerados
corresponden al revoque o arrastre en las zonas de arcilla. No se observan hueco lavado.
Salida de aglomerados se observa hasta +/- 2355 m tope Cangapi. Registros muestra hueco en
calibre hasta tope Tarija.En maniobra corta de 2872 m, se tiene que usar back reaming de 1730 a
1124 m, luego en 1105 m con BVP recupera Aglomerados pelticos con inclusiones de areniscas +
limolitas.
Trpano coroneado - 2da carrera
La 2da carrera SDi519HBPX, de 2323 3324 m, fue perforada con las siguientes caractersticas:(1)
Perfor este tramo con mayor predominio de material Peltico (Diamictita & Limolita),
comparativamente al pozo DRS-1002. En el DRS-1005 slo se aprecia un slo pequeo canal fluvial
(arena), comparada con el DRS-1002 donde se tiene 2 canales de mayor extensin, con una
perforabilidad mayor. Ver correlacin litolgica. (2) Atraves un nivel peltico/diamicttico entre 3091
3145 m que no se present en DRS-1002, con compactacin, dureza y abrasividad conocida
(Diamictitas), por el WOB necesario aplicado entre 10-12 Klb, comparado con el DRS-1002 donde
slo se aplic WOB de 4 7 Klb. Ver correlacin Geolgica luego de los registros elctricos. Ver
comparativa de parmetros. (3) Perfor con un caudal mayor de 720 gpm, comparativamente mayor al
que se emple en DRS-1002 de 700 690 gpm. Las RPMs del motor + TDS en el DRS-1002 fue 89 +
50 = 139 RPM, comparado al del DRS-1005 de 92 + 60 = 152 RPM mayor. (4) El TQ de perforacin
fue siempre bajo. Ingresando al Tarija por debajo de 4.5 Klb.ft y antes del evento < a 4 Klb.ft, con slo
un pico de 4.5 Klb.ft a 3264 m. Denotando una perforacin normal. Ver grafica TQ. (5)
Comparativamente al DRS-1002, en la formacin Escarpment se ve cambios bruscos en penetracin
mayores y ms frecuentes ( por ejemplo, de 4 25 4 - 13 5 m/hr). En el Tarija, a partir de los 3099
m @ 3300 m se observa cambios bruscos mucho mayores y mucho ms frecuentes en penetracin
(por ejemplo, 10 20 8 22 4 24 10 m/hr). Generando impactos sobre el trpano o
cortadores, efecto directo a la estructura de corte (rotura). (6) El anillado observado como dao en el
trepano, se gener en la perforacin de los 8 ltimos metros (3315-3324 m) donde se logr una ROP
se slo 1.4 m/hr.
Anillamiento en el rea del hombro y el calibre, perdiendo 19 cortadores y parte del cuerpo del
trpano. Fue necesario armar y bajar un BHA de limpieza de fondo pozo con trpano dientes + cesta,
recuperando 187 gr de metal.
Conclusiones: El trpano SDi519HBPX (1) Realiz una buena carrera (1001 m) con una ROP de un
34% ms rpida comparada con la que se consigui en el DRS-1002. (2) El dao sufrido fue efecto
de: Impactos, por los cambios bruscos en penetracin, por intercalaciones de niveles blando duro
(impacto sobre la estructura de corte). Atravesar un cuerpo pelitico de +/- 50 m, que no se present en
el DRS-1002, acompaado con su dureza y abrasividad importante (asociado a mayor desgaste).
Atravesar una secuencia general ms peltico (diamictita/limolita) con slo un pequeo canal fluvial,
comparado con el DRS-1002 ms arenoso (con 2 canales de extensin importante). Procesos
erosivos que llevan a que se tenga caractersticas litolgicas muy distintas de pozo a pozo (asociado a
mayor desgaste). Aplicacin de mayores parmetros de perforacin, > Q & > WOB, comparativamente
al DRS-1002 (asociado a mayor desgaste).
Calidad Hueco 12 1/4"
Tariqua: hueco en calibre, con tramos en calibre o algo menor, correspondiendo a las arcillas,
especialmente en la base (desde +/- 1300 m). Yecua hueco en calibre, tramo de arcilla algo lavado y
excntrico. MW 8.8 ppg. Petaca, hueco lavado excntrico @ 15" en tramos de arcilla (GR alto).
74
Cajones, tramo superior arcilloso con hueco lavado excntrico, luego el resto en calibre.MW 8.8 ppg.
Yantata, Ichoa, hueco en calibre. MW 8.8 - 9.0 ppg. En la base del Ichoa 2335 - 2428 m mnimo
indicios de "espiral", que obliga a ser repasado con TQ errtico 5-8-12-14 Klb,ft, con ambos BHA's
de calibracin (0-30' & 0-30-60'). Cangapi, slo en tramos con presencia de arcilla con lavado, las
arenas en calibre. MW 9.0 ppg. Escarpment, hueco en calibre. MW 9.0 ppg. Tarija slo en los tramos
de GR alto (pelitas) el hueco se hace lavado excntrico importante @ 15" - 16" - 20". MW 9.0 - 9.4
ppg. Durante perforacin y repaso se observa TQ's erraticos 4-7-12-14 Klb.ft y salida de cortes de 1.5
cm (diamictita), y trazas de derrumbe.
DRS-1004
Tramo 12 1031 3380 m
FIT Bajo
Perfor 5 m formacin (1036 m). Realiza FIT con lodo 8.8 ppg y 650 psi, cae a 130 psi en 20 min.
(Deq. = 9.54 ppg). Volumen admitido en FIT 10 bbl lodo.
Falla Funcionamiento Rotacin TDS
En maniobra corta de 1348 m, sacando a 1087 m por resistencia intenta conectar TDS negativo,
observa falla en el funcionamiento de la rotacin del TDS. Revisa consola de fiuncionamiento de TDS.
Fue necesario, conectar cabeza circulacin, rotar mesa rotaria, manteniendo herramienta en cuas
c/20 RPM's y 190 GPM.
Incremento Admisin Ingreso Yantata - Ichoa Cangapi
De una admisin de 2 BPH, antes de Yantata, c/ agregado de 2-3 sx/hr CO3 M/G + G-Seal 1-2 sx/hr,
incrementa admisin a 2.7 BPH. De 2195 m incrementa admisin a 3.0 - 3.2 - 3.3 BPH, agrega a 4-4
sx/hr CO3 M/G y G-seal 3sx/hr. Durante registros admisin 2.5 BPH. Durante corrida CSG 9 5/8" 2.1
BPH admisin. Cementacin admisin 2.8 BPH.
Rotura Manguera Hidrulica rams Ciego - Derrame Lquido HidrulicaLuego de armar BHA
calibracin 12 1/4", previo registros, intenta abrir rams ciego, sin xito. Observa prdida de lquido
hidrulico por manguera 2" a Kommey que acciona rams inferior. Cambia manguera. Carga lquido
hidrulico al Kommey. Prueba apertura cierre BOP's.
Calidad Hueco 12 1/4"
De registros: (1) @ +/- 1400 m Tariqua caracterstica arenas cierto lavado y arcillas hueco en calibre,
por ser arenas friables.(2) parte inferior Tariqua (1400 m), Yecua y Petaca (@ 1705 m),
caracterstica tramos arcilla cierto lavado y arenas en calibre, arcillas ms reactivas. (3) de 1705 2320 m Cajones, Yantata e Ichoa, hueco en calibre, por prodomino bancos de arena, emplea MW de
8.8 ppg a 8.9 - 9.0 ppg. (4) de 2320 - 4380 m, Cangapi, San Telmo, Escarpment y Tarija,
caracterstica tramos de GR alto (pelitico: arcilla, limolita & diamictita) hueco con lavado
excntrico moderado, bancos de arena con hueco en calibre. Efecto mayor lavado excntrico en
formacin Tarija (limolitas y diamictita) MW entre 9.0 - 9.4 ppg. TQ errtico 3-6 Klb.ft, recueprando
cortes de 1 cm, en repaso en tramos de hueco excntrico (GR alto). En BVP 11 ppg, recuepra cortes
(limolita, diamictita, arenisca en forma tabular de 0-5 - 2.5 cm.
Falta Certificacin Slingas 9/16".
Weatherford dispone de eslingas 9/16" usadas sin certificacin, monta eslingas certificadas
transferidas del pozo DRS-1005.
No Consigue Tope Tapn Cementacin - Mal funcionamiento Accesorios Flotacin.
Desplazamiento de cemento con 817 bbl lodo de 9.4 ppg, a 7-2 BPM y 340-1550 psi, sin lograr arrivo
de tapn inferior a Collar Flotador. Desfoga a 1200 psi, devuelve 4 bbl, bombea los 4 bbl devueltos.
Verifica mal funcionamiento de accesorios flotacin, desfoga a 860 psi, devuelve 20 bbl, bombea los
20 bbl devueltos.cierra pozo c/1250 psi (diferencial terico 1245 psi). Cierra pozo en frague
cemento.Luego de 8:25 horas de frague, abre pozo, registra 700 psi, desfoga lentamente, devuelve 2
bbl. Del registro de USIT, se aprecia 65 m de cemento con CBL de 30 mV, como resultado de la
devolucin de los 20 bbl. El USIT por encima muestra un CBL < a 5 mV, con buen cemento.
Problemas
Medida de Mitigacin
Contingencia
75
Presencia de conglomerados de
menor espesor.
Pegamiento Diferencial
Aprisionamiento pozo
estructuralmente ms bajo que
DRO-X1002 (+/- 100 m)
76
Optimizar parmetros de
perforacin.
En la Reunin de los Deafos del tramo 12 , revisar los eventos del tramo
17 , haciendo incapi en las lecciones Aprendidas.
Nmero:
Fecha:
Autor:
Tpico
Principal:
Descripcin en Detalle de
la
Leccin
Aprendida
(sujeta
revisin):
Descripcin,
causas,
solucin, NPT y Leccin
aprendida
&
Acciones
Futuro.
Revisin por el
Equipo
Si / No:
X1001
Documento a
Incorporarse
Leccin
Aprendida:
Estado
Actual
Comentarios:
77
1
25/4/06
AHM
2
26/4/06
AHM
Inestabilida
d derrumbe
Si
Programa
perforacin
Difundido
Falla MWD
No
1.- Programa
Perforacin
2.- Procedimiento
Intergas
Incorpora
do a KNT
FW-2H
Nota: Este formulario permitir registrar lecciones aprendidas por parte del Company Man,
facilitando el registro diario de eventos, problemas, observacin, prcticas o procedimientos que
resultaron adecuados o que redujeron tiempos de operacin.
78
Secuencia Operativa
7.1
7.2
7.3
7.5
7.6
7.7
Perforar tapn cemento (TC) + Perforar zapato. Cambiar lodo Bent Ext. por
lodo Polytraxx con MW de 8.8 ppg de acuerdo a plan de NOV.
Nota:
Utilizar baches separadores (NOV) para el cambio de fluido.
Cuando el lodo nuevo llegue a trpano, reiniciar perforacin, ya que el
metro de cemento no afectar el sistema.
7.8
7.9
7.10
Levantar BHA dentro del zapato caera. Cerra BOP. Realizar FIT
(Formation Integrity Test) a una densidad equivalente de 12.5 ppg).
Registrar volumen vs presin.
79
7.11
7.12
7.13
Armar BHA N 5 c/MF 9 5/8 c/AKO 0.78 c/12 1/8 STB + Float Sub
c/vlvula + 12 1/8 STB + Aligment Sub + Monel MWD + Pony Monel + XO +
6 x 8 DC + Jar 8 + 3 x 8 DC + XO + 9 x 5 HWDP. Probar
funcionamiento MF & MWD. Conectar Trpano PDC 12 1/4". Bajar BHA
hasta +/- 207 m.
Nota:
A inicio de perforacin con cada nuevo trpano o BHA
reportar: peso sarta @ arriba, peso @ abajo, peso @ arriba y
abajo rotando, peso fuera de fondo. Torque en el fondo y
fuera de fondo, registrar presiones reducidas.
Aplicar Recomendaciones de Practicas Operativas para
hueco de 12 de alto dimetro en cuanto a Caudal, Motor
de Fondo, Rotacin, Conexiones (antes & despus), ROP,
Control de recortes, Parmetros Crticos del Lodo, Limpieza
del pozo, Pldoras y Materiales de Puenteo, tapones Previos a
la maniobra y carrera CSG, Empaquetamiento del MF.
Mantener un caudal constante de flujo para asegurar limpieza del
pozo y requerimiento de HSI en previsin a embotamiento del
trpano. La apropiada limpieza sera la clave para una perforacin
satisfactoria del intervalo.
Usar la prctica de perforacin de tiro perforado tiro repasado,
bombear baches pesados de monitoreo de limpieza.
Instruir a NOV y PFM el control de la recuperacin de recortes de
tal forma de ir monitoreando el calibre del pozo.
80
7.15
7.16
7.17
Realizar viaje corto hasta 1105 m. Si necesario, sacar con reaming & back
reaming. Bajar BHA a fondo pozo con repaso si necesario.
Nota:
Aplicar el procedimiento consolidado resultado de
experiencia de los ltimos pozos para los viajes de trpanos
en caso de presentarse resistencias o arrastres:
Reciprocar.
Rotacin Intermitente & rotacin continua.
Backreaming.
Cuando se haga backreaming, sacando herramienta, a una
profundidad intermedia, circular fondo arriba para eliminar
acumulacin o material arrastrado (revoque, embotamiento,
cortes, etc), esto evitar que acumulaciones o camas se
escurran hacia abajo y generen puntos de resistencia o punto
de golpe de presin cuando se este repasando.
7.18
7.19
7.20
Realizar viaje corto hasta 1305 m. Si necesario, sacar con reaming & back
reaming. Bajar BHA a fondo pozo con repaso si necesario.
7.21
7.22
7.23
Realizar viaje corto hasta 1100 m (zapato CSG 13 3/8). Si necesario, sacar
con reaming & back reaming. Circular en zapato para eliminar cortes del
back reaming. Bajar BHA a fondo pozo con repaso si necesario.
7.24
7.25
7.26
Realizar viaje corto hasta 1705 m. Si necesario, sacar con reaming & back
reaming. Bajar BHA a fondo pozo con repaso si necesario.
7.27
7.28
81
7.29
7.30
7.31
Armar BHA N 6 c/MF 9 5/8 c/AKO 0.78 c/12 1/8 STB + Float Sub
c/vlvula + 12 1/8 STB + Aligment Sub + Monel MWD + Pony Monel + XO +
6 x 8 DC + Jar 8 + 3 x 8 DC + XO + 9 x 5 HWDP. Probar funcionamiento
MF & MWD. Conectar Trpano PDC 12 . Bajar BHA hasta +/- 210 m.
(Misma configuracin que BHA N 5).
7.32
7.33
7.34
7.35
7.36
7.37
Realizar viaje corto hasta 2187 m. Si necesario, sacar con reaming & back
reaming. Bajar BHA a fondo pozo con repaso si necesario.
7.38
7.39
7.40
Realizar viaje corto hasta 1100 m (zapato CSG 13 3/8). Si necesario, sacar
con reaming & back reaming. Bajar Hta a fondo pozo con repaso si
necesario.
7.41
82
7.42
7.43
Realizar viaje corto hasta 2587 m. Si necesario, sacar con reaming & back
reaming. Bajar Hta a fondo pozo con repaso si necesario.
7.44
7.45
7.46
Realizar Viaje Corto hasta 1100 m (zapato CSG 13 3/8"). Si necesario, sacar
con reaming & back reaming. Circular en zapato p/eliminar cortes de back
reaming. Bajar BHA a fondo pozo con repaso si necesario.
7.47
7.48
7.49
7.50
Realizar Prueba de BOPs con 300 4000 psi y 300 3000 psi.
7.51
Armar BHA N 7 c/MF 9 5/8" AKO 0.78 w/ 12 1/8" STB + Float Sub
c/vlvula + 12 1/8" STB + Aligment Sub + Monel MWD + Pony Monel + XO +
6 x DC 8" + Jar + 3 x 8" DC + X-Over + 9 x 5.5" HWDP. Probar
funcionamiento DHM & MWD. Conectar trpano 12 " PDC (Cuerpo de
Matrix). Bajar BHA c/MF hasta +/- 210 m. (Misma Configuracin que BHA
anterior).
7.52
7.53
83
7.54
7.55
7.56
7.57
Realizar viaje corto hasta 3136 m. Si necesario, sacar con reaming & back
reaming. Realizar flow check. Bajar Hta a fondo pozo con repaso si
necesario.
7.58
7.59
7.60
7.61
7.62
7.63
7.64
7.65
84
7.66
Realizar viaje corto hasta +/- 1100 m. Si necesario, sacar con reaming &
back reaming. Realizar flow check. Bajar Hta a fondo pozo con repaso si
necesario.
7.67
7.68
7.69
7.70
7.71
7.72
7.73
7.74
7.75
7.76
7.77
85
7.78
Realizar viaje corto hasta +/- 2284 m (tope Ichoa). Si necesario, sacar con
reaming & back reaming. Realizar flow check. Bajar Hta a fondo pozo con
repaso si necesario.
7.79
7.80
7.81
7.82
7.83
7.84
pre-instalados en
Notas:
PROPIEDADES CAERA 9 5/8
Peso
ID
Conex. OD
Drift
Grado
(in)
(in)
(in)
(in)
Conexin
47.0, ppf
Espesor
Pared
Min.
Resistencia
Tensin B/J
Resistencia
Reventamiento
Resistencia
Colapso
(psi)
(psi)
Torque
Ajuste:
Min/Opt/Mx
(Klb)
8.681
10.625
8.525
0.472
1493
(lb.ft)
9440
5300
14309
P-110
UPJ
15932
1500
9440
5300
17554
86
Una vez en el fondo conectar FUT. Llenar CSG, romper circulacin. Circular.
Instalar cabeza de cementacin. Apartar herramientas de corrida de CSG.
7.86
7.87
7.88
Cubrir con cemento la caera de 9 5/8 para lograr integridad del zapato y el aislamiento
adecuado de las zonas ms dbiles ya que con el siguiente dimetro se ingresar a
zonas de alta presin. Con 2 lechadas, lechada removedora y la principal que llevar
control de prdida.
REQUERIMIENTO DE CONTINGENCIA:
PARMETROS DE DISEO:
TVD/MD RT
3450 m /3450 m
BHST /BHCT
204 F / 159 F
Lechada con cemento clase G. Volumen definido por la altura del tope de cemento a
+/- 2200 m lechada principal (+/- 1250 m) y a 1600 m (600 m) lechada relleno .
Propiedades
Principal
Relleno o Removedora
Densidad, ppg
15.6
13.0|
Tipo cemento
Clase G + control de
gas
Clase G
87
Volumen, bbl
343
165
Altura cemento
1250 m
600 m
3:12/3:20 hrs
6:03/7:06 hrs
Resistencia Compresiva
Agua libre, %
Filtracin, ml/30min
36
48
Bombeabilidad
BC @ 159F
50/100
OBSERVACIONES TCNICAS:
7.89
7.90
Instalar colgador & colgar CSG 9 5/8. Colgar la caera con +/- 245.000 lb
(+ 15 %).
7.91
7.92
Realizar corte grueso CSG 9 5/8 & levantar y retirar caera sobrante.
Energizarsellos colgador. Probar sellos.
7.93
7.94
Realizar el corte final + biselar. Instalar & probar Seccin C 13 5/8" 10K x
11 10K.
7.95
7.96
7.97
88
7.98
Bajar por tiros DP 5 para desarmar por piezas (@ +/- 3500 m).
7.99
7.103 Bajar BHA N 10 c/4 DP p/tiros (23 Trs +/- 634 m) @ 844 m.
7.104 Continuar bajando BHA N10 armando DP 5" pieza x pieza @ (Disponible
+/- 93 tiros 2600 m) @ TC (+/- 3411 m).
7.105 Circular, para normalizar lodo.
7.106 Perforar Collar Flotador (CF) + Tapn Cemento (TC) hasta +/- 3444 m.
Circular hasta zarandas limpias.
7.107 Sacar BHA N 10 de limpieza hasta 210 m.
7.108 Sacar y desarmar BHA en superficie.
7.109 Armar y bajar BHA N 11 c/Trpano 8 1/2" + Scrapper 9 5/8" + BS + 15 x
DC's 6 1/2"+ 6 1/2" Jar + 6 x 6 1/2" DC @ +/- 210 m.
89
7.110 Bajar Scrapper c/DP 4 1/2" (+/- 633 m) + XO + DP 5.5" (2600 m) @ 3444
m. Realizar maniobras escariado c/ circulacin.
7.111 Bombear BVP. Circular @ zarandas limpias.
7.112 Instalar lneas. Cerrar rams. Realizar prueba integridad CSG (CIT) c/ 3000
psi x 10 min. Desfogar. Apartar lneas. Abrir Rams.
7.113 Sacar BHA N 11 con Scrapper hasta 210 m.
7.114 Sacar BHA hasta superficie. Desarmar trpano + Scrapper.
7.115 Armar y probar herramientas de registros elctricos.
7.116 Con wire line, correr registros evaluacin cemento CSG 9 5/8" (USIT-CBLVDL-GR-CCL). Desarmar Herramientas corrida registros.
8
LODO: Polytraxx
El tramo de 12 ser un sistema Polimrico Plytraxx, nuevo preparado.
PROPIEDADES GENERALES LODO
1000 - 3450
Peso Lodo, ppg
8.8 9.4
YP, lpcpc
30 - 35
VP, cp
15 - 20
10 15/12 20
46
9 - 13
90
MBT, ppb
< 20
Drilling Solids, %
3-4
pH
9.5 10.0
< 15
CONCENTRACIONES (Lb/Bbl)
Bentonita, ppb
8.0
1.0
Xan-Vis, ppb
0.5
2.0
4.0
6.0
5.0
LUBE-EXP-01, ppb
4.0
20.0
Baritina, ppb
45
0.5
3.0
5.0
2.0
NOV Xan-D,ppb
0.75
3.0
91
10
Trepanos e Hidraulica
TREPANOS 12 1/4
IADC
Tipo
Lnea
Caracterstica
Conexin
Observaciones
117
FDS + CPS
Smith
De dientes
6 5/8 API
Reg
Perforar acc. y
acondicionar
pozo
M223
MDSi519BPX
Smith
6 5/8 API
Reg
Opcin para
1era & 2da
carrera
6 5/8 API
Reg
Opcin para
3era carrera
(reparado)
Cortadores 19 mm.
Longitud calibre 3
S223
MSi516BPX
(reparado)
Smith
92
Longitud calibre 3
Las bombas RGF-1600 deben ser instaladas con camisas 160 mm (6.299)
TABLA PARMETROS PERFORACIN
ROP
Horas
Target, m/h
Avance
WOB
Klb
10 - 20
15.6 @ 1305 m
12.8
200
12.8 @ 1505 m
15.6
200
12.6 @ 1705 m
15.9
200
10.7 @ 1905 m
18.6
200
8.7 @ 2187 m
32.5
282
8.2 @ 2387 m
24.3
200
8.5 @ 2587 m
23.4
200
6.4 @ 2787 m
31.2
200
6.3 @ 2987 m
31.5
200
6.4 @ 3136 m
23.2
149
5.4 @ 3336 m
37.0
200
4.0 @ 3450 m
28.2
114
RPM
Caudal
HSI
Boquillas
Gpm
102-89 + 70
700-800
Presin
Stand Pipe
2.819
5 x 13
2200 - 2400
TFA = 0.648
10 - 20
102-96 + 70
750-800
2.819
5 x 13
2500 - 2900
TFA = 0.648
10 20
70-80
700-800
2.819
5 x 13
2600 2900
TFA = 0.648
Desviacin Survey:
Objetivo: mantener la vertical @ los 3450 m, realizando trabajo de correccin de
acuerdo al comportamiento de la desviacin y azimut.
Frecuencia & Instrumentos: Las lecturas de desviacin sern tomadas con el
MWD. Frecuencia el registro debe ser cada 28 m (Tiro/Tiro)
93
INTERVALO IV
Hueco:
8 Productor Intermedio
Profundidad:
Caera:
Iquiri,
las
Recomendaciones
de
las
Prcticas
Informacin Geolgica.
Formacin
Descripcin
Tarija
Tupambi
Iquiri
Guanacos
94
Informacin General
Perforar agujero 8 vertical orientada hacia el box 50 m N-E y 20 m O-S,
atravesando las formaciones Tarija Tupambi Iquiri Ar. Guanacos hasta los +/4300 m. Previa carrera de calibracin & limpieza, se tomar 2 carreras de registros
elctricos con wireline. Asi mismo, previa carrera de calibracin & limpieza se
correr Liner 7, P-110, 29 #/ft, conexin WSP-3T hasta profundidad programada.
Cementar hasta boca Liner con tope de cemento hasta 3360 m. Tipo de Lodo
WBM Polytraxx con densidades de 11.3 11.5 ppg
Problemas
Medida de Mitigacin
Contingencia
Maniobras de repaso-limpieza
tramos de Diamictita.
95
Registros elctricos.
DRD-X3 ST
DRD-X3 ST, al atravesar la Falla N 1 a 3834 m NO se registra rgimen de prdida importante,
indicando un mximo de 12 bbl a 3952 m, con lodo de 10.2 ppg, para luego observar lodo de 11.0
ppg.DRD-X3 ST, slo a 4050 m se registra una perdida de 40 bbl por permeabilidad, con lodo de
10.8 ppg, posteriormente se incrementa hasta 11.0 ppg y no se registra prdida de lodo importante.
La Falla N 2??esta a 4045 m.
DRD-X1001
Tramo 1554 - 4000 m Hueco 14
Maniobras POH & RIH con arrastres y resistencias puntuales. Perforando en 2066 m & 3596 m se
registraron los amagos de aprisionamiento ms importantes. Mnima tendencia a levantar ngulo,
2 @ 3997 m. Mx. Inclinacin registrada en 3880 m, 2.7 & 263 Az. Carrera de RREE normal,
carrera de calibracin para bajada de Casing normal, bajada de caera normal, cementacin normal.
No se registraron prdidas de lodo importantes durante la perforacin del tramo.
DRD-X1002
Tramo 1600 - 4020 m Hueco 9 7/8
A partir de 1640 m, observa altos torque c/stick slips durante la perforacin. Se trabaja con
parmetros (incrementa WOB y reduce RPM), se consigue mejor respuesta y ROP. Similar
comportamiento ocurre en tramo 1810-1855 m que corresponde arena con alto contenido de caliza
(bastante duro).
96
97
reducen los DC 4 de 17 pzas a 4 pzas, lo cual hace que la herramienta de perforacin sea ms
flexible. Este cambio redujo el riesgo de pega por presin diferencial, pero favoreci de
sobremanera a la desviacin del pozo que termin con un ngulo de inclinacin de 33 y un Az
88 en 4550 m.
DRD-X1004
Tramo 1660 4235 m Hueco 8 1/2
Perfora tramo 8 c MF Cuadrado, trep. PDC c/BHA 30-60. Perforando en 2288 m observa amago
de empaquetamiento (incrementa torque & presin).En 2435 m, lectura de inclinacin 3. Reduce
WOB, incrementa RPM en el TD. Contina perforando hasta 2641 m. Observa fuerte cada de
presin (+/- 600 Psi), saca hta a superficie, deja en pesca Trepano y parte del MF. Realiza
operaciones de pesca con xito.Cont. perf. c/MF cuadrado, trep. PDC c/BHA 30-75 desde 2641 m
hasta 2885 m, continua fuerte tendencia de incremento de ngulo, juega con parmetros (peso
mnimo, ms RPM) sin xito. Incl @ 2885 m 4.15. Saca hta para cambio de conf. BHA. Cont. perf.
c/MF cuadrado, trep. PDC c/BHA 0-30-60. 2885 a 3274 m. Minimiza tendencia de incremento de
ngulo, para 3092 m, Incl 4.25.Tramo 3264 -3274 m, perfora con torques > 15 Klbs-ft, saca hta a
superficie, trepano con calificacin 6-8-RO-N/S-X-3/16-JD-TQ. Baja mismo BHA c/Trep. TCI. Durante
la bajada, se pierde 30 Bbl de lodo. Cont. perf hasta 3460 m. ltimos 2 metros con torques 15-17
Klbs-ft. En 3460 m, observa prdida (+/- 4 BPH), total perdido 72 Bbl. Saca hta a superficie por alto
torque, calificacin trpano 3-3-WT-A-E-I-RG-TQ. Baja BHA con MF Cuadrado, trep TCI c/BHA 0-45,
perfora hasta 3714 m, observa nuevamente incremento de ngulo, 6.25 Incl en 3693 m. Tramo
3627-3688 perfora con prdida +/- 3-4 BPH. Saca hta para cambio de BHA, calif. trep 5-7-WT-A-E-IRG/CT-BHA. Baja BHA c/MF cuadrado, trep. TCI c/BHA 0-30-60. Se registra 45 Bbl de admisin.
Desde 3468 m, baja repasando con alto torque. Inc. MW de 9.2 a 9.4 ppg. 31 Bbl de Lodo perdido
durante el repaso. Perfora hasta 3833 m. En 3714 m, amago de aprisionamiento, trabaja con 100
Klbs over pull, 3 golpes tijera, libera hta. Bombea BV, en zarandas observa derrumbe (cortes
1x1.25x0.75). Saca hta a superficie por constante amagos de aprisionamiento/empaquetamiento y
baja ROP (<1 mph). Durante la perf. de este intervalo, prdida constante +/- 2.2 bph. Baja anterior
BHA c/TCI nuevo, leve incremento ROP (2-3 mph). Perfora hasta 3908 m. Incrementa MW de 9.4 9.6 ppg por ingreso a Iquiri. Mantiene prdida constante durante la perforacin. En 3908 m, ROP
cae a +/- 1 mph. Saca hta a superficie. Baja anterior BHA c/PDC repasando desde 3718 m, en
zaranda observa bastante cantidad de recortes. Perfora con velocidad controlada hasta 4170 m.
Saca hta. corre RREE, amago de aprisionamiento sonda en 4170 m. Baja mismo BHA hasta 4026
m, cont. bajando repasando hasta 4035 m, observa incremento de la prdida parcial +/- 55-75 BPH.
Realiza trabajos de control de prdida bombeando baches con LCM en diferentes profundidades,
reestablece circulacin con +/- 2 bph de prdida. Cont. perforando hasta 4210 m. Saca hta a sup.,
corre RREE (2 carreras) con varios amagos de aprisionamiento. Baja anterior BHA c/PDC, perfora
hasta 4233 m c/ngulo de 8.7 Incl, 74 Az. En 4214 m observa drilling break, ROP sube de 2 mph a
24 mph. Admisin persiste. Saca hta a superfiicie. Baja diverter, balancea tapn anti prdida FormA-Plig en tramo 4014-3917 m y Form-A-Set en tramo 3200-2939 m. Pierde 92 bbl de lodo durante la
maniobra de balanceo de tapones. Baja Casing 7 con admisin a formacin 0-3 0.8 Bbl/Jt, en
3216 m, asienta 20 Klbs peso, circula y maniobra CSG, prdida incrementa a 1.2 BPM, continua
bajando CSG 7 hasta 3525 m, asienta 30 Klbs peso, maniobra CSG, prdida incrementa a 3.7 BPM,
observa CSG aprisionado, trata de liberar e mismo, sin xito. Cementa con prdida total CSG
c/zap. en 3525 m. Limpia cemento CSG 7 + hueco 8 hasta llegar a fondo de pozo (4233 m).
Admisin mnima (0.5 BPH), Baja Liner de 5, admisin incrementea a 0.75 BPH durante la bajada.
En 4174 m asienta 15 Klbs de peso, maniobra CSG, observa Liner aprisionado, trata de liberar
la misma, sin xito. Cementa Liner 5 con zap. en 4174 m. Limpia cemento, prueba boca liner
negativo. Realiza CF en Boca Liner.
DRS-1003D
Tramo 3031 - 4218 m Hueco 8
CAIDA OBJETO METLICO HUECO 12 1/4": Luego de los registros elctricos y en la preparacin
del BHA convencional para la calibracin del hueco, se reporta que cuadrante para el plato de ajuste
de trpano pierde una pata mazisa 3 1/4" x 11 cm. Se comprueba, durante la carrera del trpano de 8
1/2" PDC, que la pata cay al fondo del hueco de 12 1/4". Con trpano PDC 8 1/2" de inicio se logra
perforar solo 6 m, observando incremento de TQ + Presin, paro de TDS, muy baja ROP 1.1 m/hr.
Trpano PDC sale completamente deteriorado en sus cortadores por impacto sobre material metlico.
98
Fue necesario operacion de pesca c/canguro loghrando recueprar trozo metlico y una nueva carrera
con trpano de dientes + BHA convencional c/cesta para limpieza de fondo pozo.
ESPIRALAMIENTO - COMPORTAMIENTO TORQUE: Registro de USIT en hueco 8 1/2" ST muestra
indicios de hueco "espiralado" entre 3100 m a 3500 m, . Coincide con los tramos con presencia de
mayor % de arenas en formacin Tarija. El comportamiento del TQ muestra una tendencia de
incremento con mayor pendiente entre 3100 - 3500 m, entre 10 - 14 Klb.ft , para luego continuar el
incremento con profundidad normal entre 3500 - 3800 m, entre 13 - 14 Klb.ft, finalmente muestra un
incremento con mayor pendiente entre 3800 - 4100 m, entre 14 - 18 Klb.ft . TQ's mayores entre 4100 4150 m, entre 16 - 18 Klb-ft. En el Hueco original, a los +/- 3800 m muestra un cambio brusco de TQ
desde +/- 12 Klb.ft a 16 Klb.ft, para luego entre 3800 - 4100 m, ser alto entre 16-18 Klb.ft, y en tramo
4100-4150 m muy errtico entre 14 - 18 Klb.ft.
INESTABILIDAD DERRUMBE: Hueco original muestra indicios de derrumbe a 3675 m, levantando
c/circ. y rotacin, observa sobretensin 25Klb y incremento presin @ 3000 psi, TQ @ para TDS,
c/amago aprisionamiento, libera hacia abajo, de muestra recuperada de 3640 m recupera trazas de
derrumbe. Lleg perforando a 3818 m, bajando nuevo BHA, baja a 3453 m, apoya 20Klb, maniobra
con circ. y sobre tensiin @ 70 Klb, sin xito, observa Amago Aprisionamiento, intenta liberar con TQ
observa alto TQ y paro TDS. En el Iquiri observa alto TQ c/paro TDS, maniobra para librar hta &
dificultad p/deslizar En hueco Sidetrack, de los registros de calibre se observa en tramos pelticos
c/GR alto zonas lavadas y excntricas desde 3625 m; pricipal tramo lavado @ 16" excntrico entre
3755 m a 3835 m (Tarija), correspondiendo a un paquete masivo de pelitas (GR alto) y litologa 1010
% pelita (limolita, diamictita). Tramo de 3835 - 4110 m(tope Iquiri), existen tramos lavados
coincidiendo con lecturas espordicas de GR altos (peliticas). Hueco Sidetrack en base a registros
muestra hueco ensanchado desde tope Iquiri 4110 - 4200 m, denotando derrumbe, con cavernas @
15" menos excntrica.
Falla N 1 INESTABILIDAD - PRDIDA LODO: Hueco Original: Al terminar perforar a 3818 m
observa en Flow Check admisin 2 BPH, bombea y balancea BV c/LCM. Con nuevo BHA direccional
baja a 3453 m, apoya 20 Klb, maniobra c/circ. c/sobre tensin 70 Klb (-), c/A:A., c/tensin y peso,
libera. Repasa de 3456 m a 3510 m, observa brusco descenso nivel de 120 BPH, c/MW 10.7 ppg,
bombea BV c/LCM y baja regimen a 72 BPH, saca BHA a 3042 m, circula a 117 GPM, c/admisin de
94 BPH, bombea BV c/LCM, luego en flow check pozo esttico. C/BHA liso s/ ESTB, baja a 3818 m
observa cada brusca volumen de 140 BPH, bombea BV c/LCM, levanta a 3015 m, presuriza p/EA @
650 psi (DE 12.0 ppg), logra sello. Perforando a 3828 m observa descenso nivel brusco instantneo
320 BPM, agrega sellante, continua perforando. Recupera fragmentos triturados laminados de
Limolita (derumbe??).Hueco sidetrack: registro electrico muestra hueco ensanchado @ 16" entre
3750 - 3835 m, coincidiendo con tramo de lectura GR alto. Admisin en tramo de Falla N 1 < 1 BPH
(no observa admisin), MW 11 ppg. Perfor tramo Falla 1 con BHA convencional. En Hueco original:
Falla muestra incidencia en cada de la desviacin (de 20 a 18 y cambio de rumbo (de 24 a 22),
en Hueco Sidetrack mismo comportamiento en cada desviacin (de 19 a 16) y en rumbo (de 21 a
25).
PROTECTORES GOMA CSG 9 5/8": Desde 3907 m se observa fragmentos de goma 10x5 cm de
protector CSG, continua salida de restos protectores. A 4039 m recupera fragmentos triangular 15x8
cm, continua salida a 4059 m. Coincidentemente observa altos TQ's durante perforacin, dificultad de
deslizar por acuamiento de las gomas de los protectores. Sacando BHA de 4088 m, recuepr 18
protectores, slo la mitad y la otra (descascarados y/o quebrajeados) perdida en el pozo, se recupera
todas los pasadores y las mallas metlicas.
Falla N 2 INESTABILIDAD - PERDIDA LODO: Hueco original: Perforando a 4188 m, observa
perdida lodo brusco de 480 BPH, bombea BV c/LCM, saca prueba admicin CD c/140 - 540 GPM,
observando admisiones de @ 240-440 BPH, luego baja admisin a 2.3 BPH. Arma y baja BHA liso
p/atravesar falla,a 3039 m circula c/diferentes Q's@ 499 GPM y regimen baja a 12 BPH.Bajando
circulando a 4185 m p/resistencia y A.A, c/alto TQ @ 20 Klb.ft parando TDS, varios intentos libra. En
4120 m circula c/diferentes Q's 50 - 363 GPM @ que admisin baje de 480 BPH a 14 BPH. A 3018 m
realiza prueba de inyectividad c/530 psi (MW 11.0 ppg), esbilizando presin a 290 psi. Perforando a
4189.7 m incrementa admisin bruscamente 300 BPH, bombea BV c/LCM. Perforando a 4197 m,
observa admisin de 140 a 5 BPH, perfora c/circuito cortoagrega LCM y sin zarandas. Baja BHA liso
p/TC a 4166 m y repasa a 4196 m, observando admisin entre 5-20 BPH, saca a 4186 m, conecta 1
PJ + reunin seguridad, observa A.A, tensiona 560 Klb, bombea 73 bbl de TC de 13.4 ppg, balancea
y observa 84 bbl admisin (+/- 75 bbl desde paso CMT p/trpano. limpia CMT de 4023 - 4197 m,
circula admisin 2-3 BPH. Bajando BHA direccional a 4158 m, repasando incrementa admisin de 4.5
99
- 50.0 BPH, bombea BV c/LCM, Con BHA liso, baja y a 3800 m y a 4158 m, circula c/diferentes Q's,
observando disminuir admisin @ <1 BPH, perfora a 4205 m. Hueco Sidetrack: Bajando BHA
convencional p/atravesar Falla N 2, se repasa de 3854 m a 4176 m, por lapso de 41.5 horas, c/alto
TQ @ 18 Klb.ft, circulando fondo recuepra @ 10% ms de corte derrumbe Lutitas. Perforando c/BHA
convencional, la admisin fue @ 1.0 BPH atravesando la Falla N 2 de 4176 - 4240 m. Hueco
Original: Falla muestra incidencia en cada de la desviacin (de 18 a 16 y cambio de rumbo (de 22
a 20). Hueco Sidetrack mismo comportamiento en cada desviacin (de 20 a 17) y en rumbo (de
24 a 26).
APRISIONAMIENTO SIDETRACK: Perforando direccional a 4211 a 4218 m, se tienen dificultad de
perforar en modo Slide, observando colgamiento, repasa v/v, en 4218 m no observa movimiento del
Tool Pase, maniobra, circula,, intenta rotar y tensiona @ 600 Klb, observando Aprisionamiento. De
grfica de parmetros perforacin, +/- 4 horas se intent deslizar, con inminente riesgo de pega
(colgamiento, sobretensin p/despegar, alto TQ), perfora en rotacin sin observacin, finalmente
intentando perforar deslizando, se genera un "enchufe", generndose el Aprisionamiento, con
circulacin franca.. Se bombeo BVP p/limpieza. Se bombeo BVP p/impieza, balanceo B/Surfactante,
deja en remojo, tensiona s/xito. Recupera MWD. Realiza registro punto libre a 3504 m 1.95 % libre
tensn y 0.74 % a TQ, en 3005 m 82 % libre (dentro de CSG), back off, tubing puncher, severing
colliding tool tipo 1 & 3, nuevo back off, y un otro punto libre c/3060 m con 2.96 % libre a tensin y
0.11 % a TQ. Finalmente con un severing collinding tool a 3098 m recupera desenroscando en esa
conexin.
TAPONES CEMENTO P/SIDETRACK: Baja DP 5" liso hasta tope boca pesca +/- 3099 m, circula y
acondiciona lodo. Bombea y balancea 1er TC 3095 - 2975 m de 17 ppg.limpia cemento hasta 3039 m
observando cemento de consistencia blanda. Con BHA direccional baja a 3039 m TOC, perfora hueco
direccional deslizando p/generar sidetrack de 3039 - 3095 m, recuperando cemento + LCM + trazas
de formacin. Baja DP 5" liso para ubicar 2do TC p/sidetrack hasta 3095 m, circula a 454 gpm,
acondiciona lodo, bombea y balancea TC de 17 ppg de 3095 - 2946 m. Con BHA convencional, rota
cemento @ 3030 m observando LCM, cemento muy blandoy de moderada consistencia. Con BHA
direccional @ 3077 mdonde apoya 3 Klb, rotando cemento hasta 3081 m observando cemento muy
blando a semi consistente. Para 3er TC, arma y baja Diverter 3 1/2" de 7.55 m c/88 orificios de 3/4" y
DP 5", baja circulando y rotando en hueco abierto, variando caudal de 91 - 454 gpm, removiendo lodo
gelificado en cavernas, recupera cemento contaminado, LCM y restos formacin. Bombea 3er TC de
17 ppg balanceando entre 3081-2929 m, durante despalzamiento genera contrapresin 300-400 psi
en Ck manifold. Con BHA convencional limpia TC hasta 3030 m con cemento duro (4.8 m/hr ROP).
Con BHA direccional, KOP a los 3039 m sale a formacin.
APRISIONAMIENTO LINER 7": Baja Liner 7" en hueco abierto 8 1/2" de 3048 a 3621 m llenando
c/10 tiros. Desconecta TDS, agrega tiro DP 5" e intenta bajar negativo llegando a 3622.7 m. observa
Liner 7" pegado/aprosionada. Manibra con tensin @ 5000 Klb (-), mantinen circulacin franca.
Balancea 60 bbl bache Surfactante Pipe Lax de 11 ppg, deja en romojo +/- 24 horas, maniobrabdo
con tensin @ 570 Klb, sin lograr liberar Liner. Circula y elimina Surfactante. procede a
cementar.Liner 7" a los 3622 m, dejando un hueco abierto de 8 1/2" de 618 m. registro de Mud Log
muestra un paquete de arena entre 3200 - 3430 m. Por las caractersticas del pegamiento (luego de
CE) y condiciones existentes (paquete arenoso) y MW 11 ppg, se concluye que pegamiento fue por
diferencial.
DRS-1001
Tramo 3014 - 4155 m Hueco 8
Falla Motor Fondo Taponamiento Filtros MWD: A 3321 m, durante repaso observa
incremento brusco de presin de 2850 a 3600 psi. Revisa observando restos de bolsas
plasticas en filtro MWD (DP 5"). Se circula a traves de zarandas lodo del circuito superficial,
no se observa restos de bolsas o suciedad.Saca herramienta y observa Drive Shaft de MF
descolgado y trabado.
Hueco Espiral: Registro de calibre muestra hueco homogeneo en calibre desde 3014 m
hasta 3440 m (formacin Tarija). Tramo que muestra intercalaciones de arenas hasta de un
90%. Con BHA con Corona Saca testigo 8 1/2" solo baja hasta 3047 m donde asienta 12
Klb, repasa hasta 3064 m con T's errticos 5-15 Klb.ft, intenta bajar sin rotacin y sin
circulacin sin xito encontrando puntos de asentamiento de 5-10-15 Klb, en retorno con
100
mnima cantidad de recortes. Arma y baja BHA de calibracin 0-30', inicia repaso a los
3044 m con TQ's erraticos @ 13 - 15 Klb.ft, repasando 59 horas para alcanzar a 4150 m
f.p, realiza carreras cortas, acondicionando configuracin de hueco. BHA muestra en
superficie un desgaste de los estabilizadores 1/8" Superior & 1/16" inferior. Nuevamente
baja Corona Saca Testigo 8 1/2", logrando bajar hasta 3133 m donde asienta 20 Klb,
maniobra intentado profundizar con circulacin sin xito. Profundiza hasta 3265 m con
resistencias puntuales de 10-20-30-40 Klb, intenta sacar con requerimiento de sobre
tensin hasta de 65 Klb. Deside sacar Corona a superficie. Baja nuevo BHA calibracin 030', encontrando P/R a 3709 m, repasando hasta 4150 m con TQ's erraticos hasta 12 Klb.ft.
Finalmente baja Saca testigo de 6" logrando testigo de 8.1 m (90% recueprado).
Inestabilidad Hueco: Calibre muestra de 3440 - 3510 m hueco excntrico @ 14",
coincidiendo con lecturas de GR altos En tramos de GR bajos (arenas) hueco en calibre,
con lodo MW 10.1 ppg. De 3525 - 3579 m hueco lavado excntrico @ 15" coincidiendo con
lecturas de GR altos- Nuevamete hueco en calibre en tramos de arenas. De 3630 - 3715 m
hueco lavado excntrico @ 16", con lecturas de GR altos, MW 10.2 ppg, mostrando puntos
de tensin durante registros. Tramo de arena en calibre. De 3745 - 3810 m hueco lavado
excntrico@ 14-15", con lecturas de GR altos, mostrando puntos de tensin durante
registros, con MW 10.4 ppg, base de la formacin Tarija. Formacin Iquiri ingresa con MW
10.4 ppg, mustra calibre relativamente lavado @ 13-14-16", densificando a 10.4 ppg a los
4150 m donde se presenta mayor lavado (16"), coincide con lecturas de GR altos a muy
altos. Luego de testigo, se incrementa MW a 11.0 ppg para perforar hasta 4205 m,
mostrando mejor calibre.
DRS-1002
Tramo 3420 - 4230 m Hueco 8
Intento Prueba Integridad FIT
Rota TC + Zapato 9 5/8", Perfora hueco 8 1/2" de 3420 - 3427 m, paralelo cambia lodo
lodo/bentonita x Klashield de 11.0 ppg. Posiciona BHA a 3413 m, abre valvula seccin "B"
observa fuerte flujo de lodo, luego queda esttico.Intenta realizar FIT CSG 9 5/8" en 3
oportunidades con flujo franco por vlvula Seccin "B" (apertura de valvula incorrecta,
comunicada directamente a pozo, debera abrirse valvula de seccin "A" para ver
comportamiento de EA entre CSG 9 5/8" - 13 3/8" durante FIT). Realiza pruebas de
hermeticidad de cabezales, confirmando incorrecta apertura de vlvula Seccin "B".
Cancela prueba de FIT.
Descuido Filtro MWD Usado en Llenado Sarta
Bajando BHA c/PDC 8 1/2" + MF @ 2010 m, antes de llenar sarta personal SINOPEC
informa que olvidarton apartar filtro de MWD en anterior llenado de sarta y prueba de
MWD. Saca hta. a/c Intergas hasta 1522 m. recupera filtro MWD.
Inestabilidad Derrumbe - Caliper Hueco
Registros muestra en formacin Tarija (2955 - 3805 m) hueco ensanchado/lavado @ >
16", correspondiendo a lecturas de GR altos (peltico) y hueco en calibre en tramos de GR
bajos (arena). Durante perforacin no se muestra indicativos de TQ alto; sin embargo,
durante maniobras cortas c/back reaming y repasos se presenta altos TQ's @ 12 - 15
Klb.ft. Con BVP se recupera cortes de derrumbe entre moderado, apreciable a gran
cantidad, confirmando inestabilidad. Con fondo pozo en 3980 m, bajando BHA con trpano
nuevo, se encuentra resistencia en 3489 m @ 12 Klb, continua repasando c/altos TQ's
puntuales de 12-15 Klb.ft. En 3524 m se observa paro del TDS c/incremento de presin @
4000 psi, rompiendo clavos de seguridad de bombas 3 y 2 alineadas. En 3826 m nuevo
incremento de TQ 10-15 Klb.ft puntuales y presin @ 3700 psi, rompiendo clavo de bomba
3. En 3858 m TQ @ 15 Klb.ft, c/paro TDS. Bombeando BVP observa abundante cantidad
101
de recortes. Mud log muestra tramo 3500 - 3825 m predominio de pelitas entre 90 - 100%
(diamictita, limolitas, intromisin de lutita, diamictita, limolita). MW 11.0 ppg.
En formacin Iquiri (3910 -4152 m), los registros muestran, hueco ligeramente lavado @
10-11" correspondiendo a GR altos (limolitas-lutitas) y hueco en calibre correspondiendo
a GR bajo, por ejemplo, la Ar. Guanacos (4152 - 4199 m). Bombeando BVP no se observa
signos de inestabilidad o derrumbe, con recuperacin mnima. MW 11.0 ppg.
En carrera de calibracin de hueco c/BHA de 2 puntos, previo a registros, se observa
resistencia de 10-12 Klb entre 3505 - 3840 m con TQ's puntuales de 10 - 15 Klb.ft. En fondo
pozo se bombea 2 BVP (uno tras otro) y recupera abundante cantidad de cortes. Realiza
carreras cortas con back reaming se observa puntos de incremento de tensin 5-10 Klb y
TQ0's 5-10 Klb.ft. Se desice incremnentar MW a 11.3 ppg.
Durante los registros electricos (resitividad, GR, Neutron, GR espectral) baja a 4230 m,
realiza registro tramo 4230 - 3418 m, con Amago Aprisionamiento sonda en 3572 y 3553
, logra librar c/9800 & 10.000 lb de tensin. Se tiene que cerra patines, sin registro de
calibre en tramos 3572 a 3418 m. Cancela 2da carrera por el riesgo de aprisionamiento
e informacin de 1era carrera suficiente.
La carrera de calibracin, previo a corrida Liner 7", baja BHA c/3 puntos de apoyo. Repasa
desde 3645 ma 4230 m c/TQ's erraticos de 3-10 Klb.ft y bombea BVP recuperando
moderada cantidad de cortes. Realiza maniobra corta a zapato. Limpiando con BVP.
Interferencia en Seal MWD
Se presenta interferencia en seal de MWD por ruidode bomba. Levanta hta. Cambia B
#2 x B # 1, verifica de MWD normal.Continua perforacin modo slide.
Trabajo Direccional c/BHA c/AKO 0.78
Programa estableca que BHA c/PDC + MF sea con AKO 1.15, que genere 4 / 30 m "S"
c/2 STB. Valorando el riesgo de generar hueco en espiral y el efecto mecnico del bend
sobre el hueco, generando derrumbe mecnico; se decide bajar el BHA c/AKO 0.78, que
genera 1 / 30 m "S" c/2 STB. Los resultados: (1) La perforacin en modo "slide" sin
dificultad y sin observacin. (2) promedio de tramo deslizado entre 8-10 m, con efecto
menor en ROP. (3) DL generado "S" mximo lleg a 1.36, DL generado "S" promedio
0.46. Tramo perforado con 8 1/2" con predominio en pelitas. No existe indicativos de
hueco en espiral.
DRS-1005
Tramo 3425 - 4245 m Hueco 8
Inestabilidad Tarija - Tupambi Iquiri
En BVP 13.0 ppg a 3522 m recupera 5% (+) c/trazas de derrumbe (morfologa L=4.5 cm,
A=2.5 cm y E=0.5 cm), tramo lavado @ 16". Desde 3573 m perfora c/TQ errtico 4-8-10
Klb.ft, densifica MW a 11.2 ppg, coincide calibre > 16" excntrico.Tramo 3433-3643 m TQ
errtico intermitente 5-10 Klb.ft, intenta deslizar 3643-3644 m c/dificultad p/colgamiento,
tiene que continuar rotando. De 3710-3740 m derrumbe Limolita-Diamictita-Lutita L=5
cm, A=2.5 cm, E=<1 cm, coincide con hueco lavado excntrico 16". En viaje a 4100 m p/R
a 3595 m firme 20 Klb, repasando @ 3660 m c/TQ's errticos 5-15 Klb y paros TDS,
continua bajando c/elevador s/R a 3801 m, repasa y pasa; continua bajando s/R @ 3993 m
donde hay p/R firme 20 Klb. Repaso llev 13.25 horas.
En 4100 m bombea 80 bbl BVP 13.5 ppg y desplaza 500 bbl lodo Klashield RDF de 11.3
ppg, retorno BVP derrumbe planar, laminar L=7 cm, A=2.5 cm, E= <0.5 cm.
102
Baja BHA (0-30') calibracin p/registros, baja a 3635 m p/R 15 klb, repasa a 3648 m c/TQ
erratico 12 Klb.ft, baja libre hasta 3736 m, donde p/R 20 Klb, repasa a 3764 m. Baja a 3921
m p/R de 20 Klb. baja a f.p y encuentra relleno 3 m.Repaso dur 6 hrs.
Con BHA (0-30-60') calibracion p/Liner 7", baja @ 4200 m p/R de 10 Klb, repasa a f.p c/TQ
@ 12Klb.ft. Repaso por slo 1.5 horas. En BVP's recupera mnimo cortes L=5 cm, A=3
cm, E=<0.75 cm.
De regitros: en Tarija hueco lavado excntrico tramos c/GR alto (Limolita-Diamictita) @
> 16", "con cuellos de botella" en las intercalaciones limolita/diamictita - arenas; en Arenas
hueco en calibre. En Tupambi predominio de arenas en calibre y en tramos de lectura
GR alto lavado excntrico @15". En Iquiri lavado excntrico @ 15" uniforme continuo,
solo en Ar Guancos en calibre.
Corrida Liner 7" @ 4222 m, baja c/circulacin y reciprocado @ 4241 m c/2.5-3.5 BPM y
900-950 psi, luego observa incremento presin a 1694 psi a los +/- 155 bbl (volumen EA
hasta colgador +/- 108 bbl). Circula incrementando Q's 1.2 -1.8 BPM y presin 1120 psi.
Observa paro TDS, reduce caudal a 1 BPM, asienta peso 20 Klb, hta sin movimiento.
Circula tratando restablecer circulacin franca por +/- 25 horas, solo logra 2.4 BPM y
presin 1050 psi.Deside cementar c/50 bbl de lechada principal 15.8 ppg. En setting tool
recupera restos de limolita-diamictita-lutita. Confirmado obstruccin a la altura del
colgador por cortes de derrumbe.
En setting Tool se observa en parte de sub-ensambalje del cilindro mutiplicador de fuerza
con restos de lutita, limolita, diamictita y trazas de areniscas.
DRS-1004
Tramo 3380 - 4255 m Hueco 8
Regimen Admisin
Inicia c/0.75 BPH @ +/- 3640 m, donde incrementa a 1.7 BPH, luego se mantiene de 1.5 1.8 ppg @ TD final. De acuerdo al mud logging el tramo de incremento de admisin
corresponde a la intromisin de lutita (falla ?).
ROP MF c/PDC vrs Convencional Dientes.
Con BHA c/MF + PDC las ROP's llegaron entre 4.9 - 3.7 m/hr, aplicando 450 GPM, 176
RPM's, 3-7 Klb WOB, comparando con un BHA convencional con trpao de dientes,
aplicando 450 GPM, 90 RPM, 8-15 Klb WOB, la ROP lleg a 1.33 m/hr, significando un 1/3
de la ROP lograda con MF + PDC.
Calidad Hueco
De los registros: (1) Tarija, entre 3380 - 3785 m, tramos pelticos (GR altos) con hueco
excntrico lavado @ 16", tramos de arenas y menor % de pelitas, en calibre. Tramo con
intromisin de Lutita 3720 - 3733 m, muestra hueco lavado 15-16" por encima y
principalmente por debajo, posible a presencia de fisuras, fracturas, mostrando
caracterstica de zona peltica, con GR alto. En repaso TQ's 2 - 10 Klb.ft errticos coinciden
con zonas lavadas. MW 11.3 ppg (2) Tupambi, por su caracterstica de bancos de arena,
muestra hueco en calibre, con muestra de reboque en zonas ms permeables. MW 11. 3
ppg (3) Iquiri hueco lavado excntrico @ 16" uniforme, el lavado es mayor por debajo de
la base de la Ar. Guanacos @ 17 - 18". Durante repasos el tramo entre 4175 - 4255 m con
TQ errtico, confirmando signos de inestabulidad. En fondo se encontr 3 - 2 - 0.5 m
de relleno . MW 11.4 ppg. Cortes recuperados forma tubular de 2 - 5.0 cm largo
xancho 1 cm x 0.5 cm espesor.
DRO-X1002
Tramo 3421 - 4205 m Hueco 8
103
Aprisionamiento
Posterior a perforar "S" tramo 3421-3427 m (normal), se levanta 1 m observa arrastre,
intenta levantar hta sin xito, hta. aprisionada, observa incremento de presin de 2700 a
3270 psi y resistencia a la tensin @ 25 Klb, maniobra v/v . Carga TJ tensionando @ 510
Klb (200 klb OP) libera hta.
De registro de calibre, se observa que el "S" se realiz en el tramo de GR alto (DiamictitaLimolita), hueco lavado (excntrico @ 12"), encima de 3419 m el hueco esta en calibre e
incluso muestra algo menor al calibre.
Survey indica: 3367 m 3.92 (mxi angulo)DL 1.07, luego baja 3400 m 3.05 DL 0.95, a
3429 m 2.03, DL 1.06.
La perforacin en "S" se realiz con el mismo Q que el de "R", 443 gpm.
Conclusin: Aprionamiento debido a ingresar a un cuello de botella invertido, hueco lavado
en Diamictita (3425-3419m), luego pasa a un tramo de arena de +/- 3419 - 3417 m con GR
ms bajo, coincidiendo el hueco en calibre o menor al calibre. Tramo del BHA esta en la
zona de mayor desviacin 3.92.
Caracterstica Hueco 8 1/2" Formacin Tarija - lavado en Diamictitas/limolitas cerrado en Arenas.
De registros: Tramos donde GR es ms alto, se da hueco lavado excntrico (@ 14"),
coincidiendo con la presencia de Limolita o Diamictita. En tramos donde el % entre LimolitaDiamictita se hace @ 100%, hueco es excesivamente lavado excntrico. las lecturas de GR
confirma bancos de pelitas con hueco lavado-excntrico @ > 16". En los bancos de pelitas
el hueco es lavado excesivo uniforme en todo el banco.
Durante la perforacin se observa reduccin de la ROP en los tramos de presencia de
Limolita-Diamictita, mejorando en los tramos de arena. El la grfica de TQ se muestra
golpes de lectura altos coincidiendo con los tramos pelticos (Diamictita-Limolita). En los
BVP's se presenta derrumbe por efecto "mecnico ?" de areniscas, limolitas y diamictita. En
los viajes de retorno al f.p se tienen que repasar con frecuentes paros de TDS y amagos
de empaquetamiento.
Intromisin Lutitas+ limolitas (Devnico) en el Tarija (Carbonfero).
Mud log muestra una descripcin de Lutitas verdosas + limolitas, en la base del Tarija.
Secuencia que es diferente a lo que corresponde al Carbonfero, dando a entender que
existe una "falla" que hace que haya intromisin sea del Devnico. Posible este
acompaada por fisuras, fracturas, que llevan a esta conformacin de un hueco
excesivamente lavado.
Los registros muestran un hueco excesivamente lavado @ > 16", que acompaa lecturas
de GR altos como un gran banco de pelitas. Sacando registros se encuentra resistencias
firmes a la tensin de 3659 - 3584 m, teniendo que cerra el brazos del Caliper (zonas de
cavernas).
Durante las maniobras de viaje se observa incremento de presin, Tq errtico de 10-18
Kl.ft, paro de TDS, coincidiendo con los tramos de la intromisin.
Caracterstica Hueco 8 1/2" Formacin Tupambi - hueco en calibre y algo cerrado en
Arenas-limolitas arenosas.
De los registros, en los tramos de 100% arena-limolita arenosa (GR bajo) dentro del
Tupambi, el hueco esta en calibre hasta incluso menor o cerrado. Por ejemplo, en la carrera
de calibracin con trpano de dientes, se encuentr puntos de resistencia firmes, se tiene
que repasar v/v, observando TQ errtico @ 10Klb.ft. Slo en ciertos intrvalos donde
aparece Diamictita o GR alto, el hueco se hace lavado excntrico, con comportamiento
similar al Tarija, pero en mucho menor proporcin.
104
Se utilizar un lodo WBM Polytraxx hasta +/- 4300 m (MD), con peso
de 11.3 11.5 ppg.
Nota:
Tpico
Principal:
1
25/4/06
AHM
2
26/4/06
AHM
Inestabilidad
derrumbe
Falla MWD
No
Documento a
Incorporarse Leccin
Aprendida:
Estado
Actual
Programa perforacin
Difundido
Incorpora
do a KNT
FW-2H
Nota: Este formulario permitir registrar lecciones aprendidas por parte del Company Man, facilitando el registro
diario de eventos, problemas, observacin, prcticas o procedimientos que resultaron adecuados o que redujeron
tiempos de operacin
105
Secuencia Operativa
7.1
7.2
Armar BHA N 12 Direccional c/MF 6 3/4" AKO 0.78 w/ 8 3/8" STB + Float
Sub c/vlvula + XO + 8 3/8" STB + XO + 6 Aligment Sub + XO mag. +
Monel MWD + Pony Monel + 15 x DC 6 + 6 Jar + 6 x 6 DC .
Probar funcionamiento DHM. Conectar trpano 8 . Bajar BHA direccional
hasta +/- 240 m.
7.3
7.4
7.5
7.6
7.7
Sacar trpano dentro del zapato caera y realizar FIT (Formation Integrity
Test) a una densidad equivalente de 14.5 ppg, usando el procedimiento
establecido (ver anexo). Registrar volumen vs presin. Desmontar lneas
superficiales.
106
7.8
7.9
7.10
Realizar viaje corto hasta 3455 m. Si necesario, sacar con reaming & back
reaming. Bajar BHA a fondo pozo con repaso si necesario.
7.11
7.12
7.13
7.14
7.15
7.16
Armar BHA N 13 Direccional c/MF 6 3/4" AKO 0.78 w/ 8 3/8" STB + Float
Sub c/vlvula + X-Over + 8 3/8" STB + X-Over + 6 Aligment Sub + XOver NM + Monel MWD (LWD - GR) + Pony Monel + 15 x DC 6 + 6
Jar + 6 x 6 DCs. Probar funcionamiento DHM. Conectar trpano 8 .
Bajar BHA Direccional hasta +/- 240 m.
7.17
7.18
107
7.19
7.20
7.21
Realizar viaje corto hasta +/- 3875 m. Si necesario, sacar con reaming &
back reaming. Bajar BHA a fondo pozo con repaso si necesario.
7.22
7.23
7.24
7.25
7.26
7.27
7.28
7.29
108
7.30
Realizar viaje corto hasta +/- 3450 m. Si necesario, sacar con reaming &
back reaming. Bajar BHA a fondo pozo con repaso si necesario.
7.31
Circular @ zarandas limpias. Bombea BVP 13.5 ppg. Flow check. Bombear
y desplazar bache lubricante & sellante mecnico p/registros elctricos.
7.32
7.33
7.34
7.35
7.36
7.37
7.38
7.39
7.40
109
7.41
Realizar viaje corto hasta +/- 3450 m. Si necesario, sacar con reaming &
back reaming. Bajar BHA a fondo pozo con repaso si necesario.
7.42
7.43
7.44
7.45
Levantar & Armar Niple 7" & Hta Registro Presin + Bajar FMT-GR-TTRM
c/WL + Toma presiones 20 puntos Ar. Guanacos + Sacar hta registro a
superficie + Desarmar Hta.
7.46
7.47
7.48
7.49
7.50
Realizar viaje corto hasta 3450 m. Si necesario, sacar con reaming & back
reaming. Bajar BHA a Fondo Pozo con repaso si necesario.
110
Nota:
7.51
7.52
7.53
7.54
7.55
7.56
Armar & bajar Liner 7": zapato + collar flotador + landing collar + 1 pza. CSG
7 @ +/- 60 m. Instalar centralizadores. Probar equipo de flotacin.
Zapato flotador reperforable con PDC, P-110, 29 #/ft, WSP-3T.
Dos piezas de caera 7, P-110, 29 #/ft, WSP-3T (+/- 26 m).
Collar Flotador perforable con PDC, P-110, 29 #/ft, WSP-3T.
Una pieza de caera 7, P-110, 29 #/ft, WSP-3T (+/- 13 m).
Landing Collar perforable con PDC, P-110, 29 #/ft, WSP-3T.
+/- 67 joints (+/- 871 m) caera 7, P-110, 29 #/ft, WSP-3T.
Correr centralizadores Centek de 7 x 8.3/8 y stops ring,
instaldos en superficie (caballetes).
7.57
Peso
ID
Conex. OD
Drift
Grado
(in)
(in)
(in)
(in)
Conexin
29 , ppf
Espesor
Pared
Min.
Resistencia
Tensin B/J
Resistencia
Reventamiento
Resistencia
Colapso
(psi)
(psi)
Torque
Ajuste:
Min/Opt/Mx
(Klb)
6.184
P-110
6.059
0.408
927
(lb.ft)
11220
9.736 Mn.
8530
10.842 opt.
7.177
WSP-3T
6.099
6.059
953
11220
11.948 Mx.
8530
111
7.59
7.60
7.61
7.62
7.63
7.64
7.65
Cubrir con cemento la caera de 7 para lograr integridad del zapato y el aislamiento
adecuado del objetivo principal (Ar. Guanacos) Con 2 lechadas, lechada removedora y la
principal que llevar control de gas y material de control anti prdida. .
REQUERIMIENTO DE CONTINGENCIA:
PARMETROS DE DISEO:
TVD/MD RT
4300m /4300 m
BHST /BHCT
231F / 184 F
Lechada con cemento clase G. Volumen definido por la altura del tope de cemento a
hasta cubrir la BL 7 x 9.5/8.
Propiedades
Principal
Relleno o Removedora
Densidad, ppg
15.8
14.0
Tipo cemento
Clase G + control de
gas
Clase G
Volumen, bbl
73
22
Altura cemento
700 m
240 m
12:46/13:07 hrs
4:15/5:02 hrs
Resistencia Compresiva
1066psi @ 130 F @ 36
hrs
Agua libre, %
0.3
0.5
Filtracin, ml/30min
20
175
Bombeabilidad
BC @ 109F
50/100
112
OBSERVACIONES TCNICAS:
Efectuar tope tapn con 500 1000 psi por encima de la mxima presin de bombeo. |
7.66
7.67
7.68
7.69
7.70
Armar y bajar BHA N 17: Trp. Tricono 8 Boq: 3x18; TFA: 0,746) + Csg.
Scraper 9-5/8" + BS + 15 DC 6-1/2" + Drilling Jar 6-1/2" + 6 DC 6-1/2". Long.
Total BHA: +/- 210 m.
113
7.71
Profundizar BHA N 17 de 210 a +/- 3360 m (TOL 7") c/ DP 4 1/2" (+/- 548
m) + XO + DP 5" (disponible +/- 2600 m). Asentar con 2 klb.
7.72
7.73
Sacar DP 5" + 4 1/2" & BHA N 17 desde +/- 3360 m @ 210 m. Sacar &
desarmar BHA N 17.
7.74
7.75
7.76
7.77
7.78
7.79
Circular hasta zarandas limpias. Probar lnea de bombeo con 3000 psi.
7.80
7.81
114
7.82
7.83
7.84
Armar y Bajar BHA N 19 de Limpieza c/ CSG Scraper 7" + Bit Sub 4 3/4"
c/vlvula + Magno Star + 9 Piezas DC 4 3/4" + 9 Piezas HW DP 3 1/2" +
Drilling Jar 4 3/4" + 6 Piezas HW DP 3 1/2" @ +/- 250 m.
7.85
7.86
Cambiar elementos 3 x 4 .
7.87
Profundizar BHA N 19 c/DP 5" a 3360 m (BL) p/ tiros. Llena sarta cada 500
m con lodo de 11.5 ppg. Desplazamiento Normal.
7.88
Ingresar Liner 7". Escariar tramo de Cemento c/CSG Scrapper 7" + Magno
Star @ 4294 m.
7.89
Bombear BVP Limpieza 13.0 ppg. Circular inversa hasta zarandas limpias
reciprocando Hta.
7.90
7.91
Cambiar elementos 4 x 3 .
7.92
7.93
115
7.94
7.95
7.96
Instalar Tapn de Prueba - Probar Stack BOP's 11" 10K + Stand Pipe + Vl.
TDS + KL + HCR + Manguera + CK Manifold (300/7500 psi rams medida
/ciego & 300/4000 anular & Stand Pipe). Instalar rams inferior a 3 Retirar Tapn de Prueba.
7.97
LODO: Polytraxx HT
El tramo de 8 ser un sistema Polimrico Plytraxx HT, en base al fluido
recuperado del tramo anterior 12 acondicionado a la densidad
programada.
PROPIEDADES GENERALES LODO
3450 - 4300
Peso Lodo, ppg
11.3 11.5
YP, lpcpc
30 - 45
VP, cp
20 - 25
10 15/16 30
34
9 - 10
MBT, ppb
< 20
Drilling Solids, %
<3
pH
10.0 11.0
<5
CONCENTRACIONES (Lb/Bbl)
Bentonita, ppb
8.0
1.5
1.5
2.0
5.0
5.0
3.0
4.0
7.0
116
15.0
BARITINA, ppb
156.0
0.75
Carbonato de Potasio,ppb
1.0
4.0
3.0
2.0
117
10
Trpanos e Hidrulica
TREPANOS 8
IADC
Tipo
Lnea
Caracterstica
Conexin
Observaciones
117
XR+ PS
Dientes
Smith
4 API Reg
Para limpieza
acc., cement., y
calibracin
PDC
MSi516MUBPX
Smith
5 aletas
4 API Reg
4 API Reg
Contingencia
(reparados)
Cortadores 16 mm.
Plano ligeramente cono
profundo, para
aplicaciones direccional.
Longitud calibre 2
MSi616MUBPX
PDC
Smith
(reparado)
6 aletas
Cortadores 16 mm.
Plano ligeramente cono
profundo, para
aplicaciones direccional.
Longitud calibre 0
Horas
Target,
Avance
WOB
Klb
10 20
RPM
Caudal
HSI
Boquillas
gpm
Presin
Stand Pipe
m/h
3.9 @ 3655 m
51.4
200
3.2 @ 3875 m
69.2
220
3.3 @ 4075 m
61.2
200
3.2 @ 4300 m
69.6
225
90 - 128
450
2.6
5 x 12
2600 - 3000
TFA = 0.552
10 20
90 - 128
450
2.6
5 x 12
2800 - 3100
TFA = 0.552
Desviacin Survey:
Objetivo: mantener la vertical realizando trabajo de correccin ingresando y
mantenindose en box objetivo.
Frecuencia & Instrumentos: Las lecturas de desviacin sern tomadas con el
MWD. Frecuencia el registro debe ser cada 28 m (Tiro/Tiro).
118
INTERVALO V
Hueco:
6 Productor
Profundidad:
Caera:
Informacin Geolgica.
Formacin
Descripcin
Arenisca 0
Arensicas-1
&2
Informacin General
Perforar hueco vertical de 6 manteniendo la trayectoria dentro del box objetivo,
ingresando a la Formacin Los Monos, atravesar las Arenisca- 0, Arenisca-1 & 2
hasta 4660 m (MD) & 4660 m (TVD). Previa carrera de calibracin, se tomaran 2
carreras de registro elctrico con wire line. Asi mismo, previa carrera de
calibracin, se correra Liner 5, P-110, 18 #/ft, conexin VAM SLIJ-II hasta
profundidad total. Cementar hasta boca de Liner con tope de cemento hasta +/4240 m. Tipo de lodo WBM Polytraxx HP-HT densidades de 14.9 a 15.3 ppg
119
Problemas
Inestabilidad Derrumbe (Calidad
de hueco)
Medida de Mitigacin
Iniciar perforacin c/ lodo de densidad de
14.9 ppg. Antes conexin normalizar TQ
errtico. Analizar/evaluar porcentajes de
derrumbes derrumbe, acondicionar lodo a
lecturas 3/6 rpm altas. Adicionar material
estabilizante (asfalto).
Viajes en hueco abierto y Liner de 7 a
velocidad controlada y con circulacin,
realizar Surge and Swab. Flow checks
intermedios durante viajes.
Monitorear ROP
Diseo de caeras adecudo para soportar
este tipo de cargas. Monitoreo rgimen de
admisin. Correlacin geolgica permanente.
Bombear bache con LCM de reaccin
inmediata.
Contingencia
Repaso c/tiro o pieza, uso BVPs
16 PPG. Maniobras con back
reaming. Incremento de MW sujeto
a problemas de derrumbe.
DRD-X3 ST
Desde 4144 m perfora con derecciones de Gas de formacin. Mx. Deteccin de Gas 109 UGT
con 3 componentes. Desde 4192 m con 5 Componentes Mx. Deteccin de Gas 159 UGT. En
4260 m observa Deteccin de Gas 1500 UGT. Deriva Flujo de Pozo por Manifold de Control a
Golpeador, observa corte de gas 10.4 lpg. Densifica lodo de 11.0 a 12.2 lpg observa incremento
continuo de gas. Incrementando Densidad Lodo de 0.2 lpg. Una vez incrementado la Densidad de
lodo hasta 12.2 lpg, se logra controlar flujo de gas pero se observa una leve admisin de fluido
con tendencia a incrementar. Agrega Carbonato de Calcio F/M/G. Incrementa Densidad de Lodo
de 12.2 a 12.4 lpg volumen de admisin 2 BPH. Realiza Viaje Corto de 4260 a 3825 m (Tope
Formacin Iquiri 3692 m MD), observa resistencia en 4174 m hasta 15 Klbs Tensin, intenta librar
negativo, reciproca hta sin lograr pasar. Conecta TD y saca con rotacin. Baja Hta hasta 4260 m
sin resistencia al peso. En Fondo circula pozo y se observa incremrento deteccin de Gas 310 648 UGT. Corta densidad lodo de 12.4 a 12.2 lpg. En 4260 m Incrementa Densidad de Lodo de
12.4 a 12.6 lpg debido a la presencia de Gas.
DRD-X1001
Tramo 4000 - 5215 m Hueco 12
Se perfora el tramo con lodo OBM, realiza un agujero piloto 10 5/8, baja hta. RWD 12 c/trep. 8
, perfora y ensancha agujero piloto a 12 , perfora hasta 5215 m con un solo trpano y
ensanchador.
A partir de 4213 m, el excesivo gas de conexin fue contnuo, densifica lodo hasta 15.1 ppg.
Se registraron importantes cortes de gas (de 13.5 a 10 ppg).
En 4407 m, observa prdida de parcial de lodo, controla la misma con LCM, total perdido 668
bbl.
Realiza una carrera de RREE en 4911 m, luego contina perforando hasta 5212 m.
120
Mnima tendencia a levantar ngulo, para 4000 m Incl. 2, para 5215 m Incl 3.25. La
direccin del pozo tuvo un giro importante (Oeste a Este), Az 278 en 4000 m, Az 106 para
5215 m, Max inclinacin 4.1 en 4750 m.
La corrida de liner tuvo algunos inconvenientes, no se pudo asentar el colgador de liner. La
cementacin tampoco fue buena, hubo bastante contaminacin de cemento con lodo.
DRD-X1002
Tramo 4020 4550 m Hueco 7
Perforando en 4312 m (Los Monos), se presenta prdida a +/- 1.3 bpm, controla admisin con el
agregado de 30 ppb de CaCO3, total perdido 105 Bbl de lodo.
Perforabilidad Iquiri-Los Monos, buen performance trpano PDC bicntrico cortadores de 19 &
13 mm. Iquiri ROP promedio 1 - 3 mph, los monos 1 - 3.5 mph, tramos con predominio de limolita
sobre lutita presenta efecto rebote por altas presiones (+/- 4300 Psi), ROPs caen a +/- 07-08
mph, baja caudal de 250 gpm a 200 gpm, ROP sube a 2 mph.
Perforando en 4418 m, observa drilling break con 6000 UGT de gas de fondo, densifica lodo de
13.8 ppg a 14.2 ppg. En 4434 m observa prdida parcial de lodo, controla la misma con
baches sellantes 30 ppb de concentracin.
En maniobra de viaje corto al zapato, observa aprisionamiento de la herramienta en 4418 m,
despus de varias maniobras libera herramienta aprisionada. Posible pega diferencial por
remocin de revoque en las arenas permeables del Iquiri.
Desde el inicio de la perforacin del tramo 7, hubo una fuerte tendencia de cambio de azimuth
(de Oeste a Este). Tramo 4313 4376 m juega con parmetros de perforacin tratando de
conseguir mejores ROPs, se trabaja con WOB de 15-18 Klbs, esto hace que el ngulo incremente
hasta 9 en direccin 107
A causa del aprisionamiento de la herramienta en 4418 m, se trata de conseguir menor rea de
contacto en la herramienta, para ello se reducen los DC 4 de 17 pzas a 4 pzas, lo cual hace
que la herramienta de perforacin sea ms flexible. Este cambio redujo el riesgo de pega por
presin diferencial, pero favoreci de sobremanera a la desviacin del pozo que termin con
un ngulo de inclinacin de 33 y un Az 88 en 4550 m
DRD-X1004
Tramo 1660 4235 m Hueco 8 1/2
Perfora tramo 8 c MF Cuadrado, trep. PDC c/BHA 30-60.
Perforando en 2288 m observa amago de empaquetamiento (incrementa torque & presin).
En 2435 m, lectura de inclinacin 3. Reduce WOB, incrementa RPM en el TD. Contina
perforando hasta 2641 m. Observa fuerte cada de presin (+/- 600 Psi), saca hta a superficie,
deja en pesca Trepano y parte del MF. Realiza operaciones de pesca con xito.
Cont. perf. c/MF cuadrado, trep. PDC c/BHA 30-75 desde 2641 m hasta 2885 m, continua fuerte
tendencia de incremento de ngulo, juega con parmetros (peso mnimo, ms RPM) sin xito.
Incl @ 2885 m 4.15. Saca hta para cambio de conf. BHA
Cont. perf. c/MF cuadrado, trep. PDC c/BHA 0-30-60. 2885 a 3274 m. Minimiza tendencia de
incremento de ngulo, para 3092 m, Incl 4.25.
Tramo 3264 -3274 m, perfora con torques > 15 Klbs-ft, saca hta a superficie, trepano con
calificacin 6-8-RO-N/S-X-3/16-JD-TQ.
Baja mismo BHA c/Trep. TCI. Durante la bajada, se pierde 30 Bbl de lodo. Cont. perf hasta 3460
m. ltimos 2 metros con torques 15-17 Klbs-ft. En 3460 m, observa prdida (+/- 4 BPH), total
perdido 72 Bbl. Saca hta a superficie por alto torque, calificacin trpano 3-3-WT-A-E-I-RG-TQ.
Baja BHA con MF Cuadrado, trep TCI c/BHA 0-45, perfora hasta 3714 m, observa nuevamente
incremento de ngulo, 6.25 Incl en 3693 m. Tramo 3627-3688 perfora con prdida +/- 3-4
BPH. Saca hta para cambio de BHA, calif. trep 5-7-WT-A-E-I-RG/CT-BHA.
Baja BHA c/MF cuadrado, trep. TCI c/BHA 0-30-60. Se registra 45 Bbl de admisin. Desde 3468
m, baja repasando con alto torque. Inc. MW de 9.2 a 9.4 ppg. 31 Bbl de Lodo perdido durante el
repaso. Perfora hasta 3833 m. En 3714 m, amago de aprisionamiento, trabaja con 100 Klbs over
pull, 3 golpes tijera, libera hta. Bombea BV, en zarandas observa derrumbe (cortes
1x1.25x0.75).
Saca
hta
a
superficie
por
constante
amagos
de
aprisionamiento/empaquetamiento y baja ROP (<1 mph). Durante la perf. de este intervalo, prdida
constante +/- 2.2 bph.
Baja anterior BHA c/TCI nuevo, leve incremento ROP (2-3 mph). Perfora hasta 3908 m.
Incrementa MW de 9.4 - 9.6 ppg por ingreso a Iquiri. Mantiene prdida constante durante la
perforacin. En 3908 m, ROP cae a +/- 1 mph. Saca hta a superficie.
121
Baja anterior BHA c/PDC repasando desde 3718 m, en zaranda observa bastante cantidad de
recortes. Perfora con velocidad controlada hasta 4170 m. Saca hta. corre RREE, amago de
aprisionamiento sonda en 4170 m. Baja mismo BHA hasta 4026 m, cont. bajando repasando
hasta 4035 m, observa incremento de la prdida parcial +/- 55-75 BPH. Realiza trabajos de control
de prdida bombeando baches con LCM en diferentes profundidades, reestablece circulacin con
+/- 2 bph de prdida. Cont. perforando hasta 4210 m. Saca hta a sup., corre RREE (2 carreras)
con varios amagos de aprisionamiento.
Baja anterior BHA c/PDC, perfora hasta 4233 m c/ngulo de 8.7 Incl, 74 Az. En 4214 m observa
drilling break, ROP sube de 2 mph a 24 mph. Admisin persiste. Saca hta a superfiicie. Baja
diverter, balancea tapn anti prdida Form-A-Plig en tramo 4014-3917 m y Form-A-Set en tramo
3200-2939 m. Pierde 92 bbl de lodo durante la maniobra de balanceo de tapones.
Baja Casing 7 con admisin a formacin 0-3 0.8 Bbl/Jt, en 3216 m, asienta 20 Klbs peso,
circula y maniobra CSG, prdida incrementa a 1.2 BPM, continua bajando CSG 7 hasta 3525 m,
asienta 30 Klbs peso, maniobra CSG, prdida incrementa a 3.7 BPM, observa CSG aprisionado,
trata de liberar e mismo, sin xito. Cementa con prdida total CSG c/zap. en 3525 m.
Limpia cemento CSG 7 + hueco 8 hasta llegar a fondo de pozo (4233 m). Admisin mnima
(0.5 BPH), Baja Liner de 5, admisin incrementea a 0.75 BPH durante la bajada. En 4174 m
asienta 15 Klbs de peso, maniobra CSG, observa Liner aprisionado, trata de liberar la
misma, sin xito. Cementa Liner 5 con zap. en 4174 m.
Limpia cemento, prueba boca liner negativo. Realiza CF en Boca Liner.
DRS-X1002
Tramo 4260 4560 m Hueco 6
Interferencia en Seal MWD
En 4260 m se intenta sacar survey sin xito por seal de MWD interferida. Cambia filtro, repite
prueba cambiando bomba con mismo resultado negativo. Repara bombas, revisa sistema
electrnico del equipo, aislamiento y nuevo cableado. Logra eliminar interferencia.
Desarenador c/Desperfecto Con Funcionamiento Intermitente
Unidad de desarenador opera en intervalos por sobrecalentamiento de su centrfuga de
alimentacin.
Falla MF 4 3/4" - Con Rotura de Gomas Estator
Armando en superficie el BHA c/MF 4 3/4" + MWD + GR, se prueba funcionamiento del MF.
Realiza prueba del MF + LWD c/100gpm, observa 1500 psi de presin (anormal), repite prueba,
c/mismo resultado. Levanta BHA observa Drive Sub rotar c/10-15 epm. Retira LWD y prueba MF
c/20 epm generando presin elevada de 950 psi. Retira MF y prueba slo Pony Monel, Monel, XO,
A. Sub y STB c/30 epm, genera presin normal de 60 psi. Nuevamente prueba MF c/19 epm
generando una presin muy elevada de 2000 psi. Concluye problemas en el interior del MF
(gomas del stator.) Desarmando MF se confirma que la causa fue rotura y fragmentamiento de
las gomas del stator.
Influjo/Ganancia/Alta deteccin gas en Viaje BHA Incremento MW
Con MW 14.3 ppg termina perforacin 4560 m, circula 5.25 horas BVP, c/mn. cortes. Realiza viaje
c/BR @ zapato liner 7" 4227 m, en liner 7" saca c/veloc.controlada @ 3348 m. Flow check 30 min,
OK. Saca @ 1715 m c/llenado continuo, a partir 1830 m observa ganancia en 8 min 2.4 bbl en trip
tank. Se baja BHA @ 2083, flow check OK, saca @ 1541 m observa incremento en trip tank 1.5
bbl, circula pensando en el bache pesado de maniobra (2 UGT), flow check c/mnimo flujo, baja
BHA @ 4268 m, circula y observa 2 picos de gas, 1era 650 UGT, lodo corte a 12.1 ppg, 2do pico
c/809 UGT, corte lodo a 13.0 ppg. Circula y densifica a 14.7 ppg, luego baja a f.p @ 4560 m,
circula y sale 3 picos de gas 60, 321 y 155 UGT, corte gas a 14.6 ppg. Saca BHA@ superficie.
Bajando BHA calibracin 3 puntos p/corrida liner 5", luego de CE +/- 78.25 horas, circula en zapato
Liner 7" 4227 m, com mxima gas 701 UGT de 2791 m, 404 UGT de 3164 m c/corte gas a 13.9
ppg. Continua bajando a f.p @ 4560 , circula y observa 664 UGT de 3315 m y corte lodo a 13.9
ppg. Realiza viaje corto a zapato Liner 7" con veloc. controlada (simula sacada c/elevador), baja a
fondo, circula, mx. deteccin gas 1220 UGT de 3075 m, corta lodo a 13.6 ppg, circulo
temporalmente p/golpeador. Realiza una 2da carrera corta c/BR y veloc. controlada zapato Liner
7", circula y observa 739 UGT de 4156 m, cort lodo a 13.8 ppg.
Mal funcionamiento Seal Sensor Peso Unidad Mud jogging
122
En viaje de 4560 m a los 3559 m con circulacin a velocidad controlada (15 min cua-cua)
observa mal funcionamiento seal de sensor de peso de Unidad mud Logging. Reajusta
sensor de peso de lnea muerta, normaliza seal.
Descenso MW Lodo Por Agua Lluvia
Bajando BHA calibracin de 3 puntos, previo a la corrida Liner 5", a los 4223 m circulando observa
que densidad de entrada/salida es de 14.4/14.5 ppg ???, manteniendo gas 60 UGT en forma
continua. Densidad de circuito debera ser 14.9 ppg. Qumico acondiciona densidad y propiedades
del lodo @ densidad entrada/salida 14.9 ppg. Durante acondicionado registra picos de deteccin
de gas de 235 UGT & 200 UGT. De las posibles causas: (1) manibra de viaje a superficie sacando
coincide con torrencial lluvia. (2) Ingreso de agua de lluvia en plataforma y en circuito de lodos
(cajones). (3) Falta de monitoreo - asegurameinto densidades entrada & salida durante lluvia.
Taponamiento succin tanque colchones Espaciadores Cementacin
Luego de preparar colchones pasados de cementacin, de 15.5 & 15.0 ppg, se observa problemas
en la unidad de bombeo al succionar los colchones espaciadores, con taponamiento de la
lnea de succin en tanque de BJ. Intenta solucionar taponamiento, sin xito. Recurre a bomba
neumtica para transferir colchones de tanque BJ a cajon camin cementador. Preparacin de
colchones pesados en sistema inapropiado por la baja velocidad de corte & agitacin, haciendo
que baritina asentada sea la causa del taponamiento.
Influjo Gas Boca Liner 5"
Luego de expandir liner top packer 5", prueba c/1000 psi sello packer/tope liner 5", positivo. Aparta
cabeza cementacin y circula inversa, p/eliminar exceso cemento, circulando p/inversa observa
160 UGT, cortando MW a 14.8 ppg, normaliza en 1 UGT. Con BHA c/trpano 6", limpieza p/BL 5",
circulando a 4208.5 m, observa en retorno deteccin gas 8 UGT con 14.9 ppg entrada/salida.
Posteriormente baja BHA p/armar sarta de prueba c/tub. 3 1/2" W-563 + tubing tester, circula a
4202 m observando mxima deteccin de gas 88 UGT c/cada MW a 14.8 ppg. Bajando BHA
p/prueba negativa c/ PCK HD 7", circula inversa a 4233 m, observabdo gas @ 275 UGT, cortando
MW a 14.6 ppg. Se confirma falta integridad de sello con Liner Top Packer. Del registro de
cementacin USIT se observa cemento slo hasta +/- 4325 m, por encima lecturas de CBL
indicando caera libre c/77 mV.
NO Disponibilidad Htas. & TQ Ajuste Tubera 2 7/8" & 3 1/2"
SINOPEC no dispone de herramientas de ajuste para tubera 2 7/8", de acuerdo a lo estipulado en
el contrato. Se recurre al alquiler de Weatherford con cargo a SINOPEC. Llaves de ajuste para
tubera de 3 1/2" con un torqumetro en escala no apropiada, en unidades KNnxm y no Klb.ft
(unidades estndar en nuestras operaciones) con una escala de mayor rango para mejor
visualizacin del valor de ajuste. DC's, HWDP, Moneles, trpanos afectados por valores de torque
de ajuste no correctos, con dao en las roscas. Se realiz una evaluacin comparativa de ajuste
con las llaves con torqumetro de Weatherford versus torqumetro de SINOIPEC, indicando
diferencias.
Prueba ajuste - desenrosque llave SINOPEC vrs Weatherord, luego de que se calibr torqumetro
de SINOPEC
Enrosque 3 1/2" SEC enrosque ptimo 5.690 lbs.ft x 1.3449 = 7.952 N.m en unidad de SINOPEC
Enrosc SINOPEC 3 1/2" SEC con 7.652 N.m. Desenrosc con Weatherford 4.538 lbs.ft
Enrosc Weatherford tub 3 1/2" SEC con 5.690 lbs.ft. Desenrosc Weatherford c 5.159 lbs.ft
Enrosc SINOPEC tub. 3 1/2" SEC con 7.652 N.m, coloc marca entre las 2 uniones, enrosc
Weatherfpord con 5808 lbf.ft sin movimiento.
Repiti anterior prueba en otra unin con mismo resultado. Los valores se aproximan para
desenrosque no hay problema.
DRS-1005
Tramo 4245 4418 m Hueco 6
Falta Limpieza DP 3 1/2" en Alquiler
Al armar la sarta de DP 3 1/2", todas las piezas son golpeadas con combo y se limpia las
conexiones por encontrase cubiertas con lodo (salmuera) en ratonera. El proceso de limpieza
afecta en los tiempos de armado.
Integridad Liner 7" CIT
123
BHA de limpieza c/ trpano 6" se baja a 4195 m. Circula y recuepra lodo contaminado con
cemento. Levanta BHA a 4178 m, cierra rmas superior 3 1/2", prueba CIT integridad CSG 7" con
4000 psi por 10 min OK.
FIT Bajo P/ comunicacin c/ Ar. Mora.
Reperfora TC del rat hole 8 1/2" @ 4242 - 4245 m, en retorno cemento duroo + trazas formacin.
Bombea BVP, circula. Realiza FIT con 0.3 BPM, MW 11.4 ppg, incrementa a 1003 psi, observa
10 min, cae presin a 733 psi (10 psi/min); sube a 1018 psi, observa 10 min, cae a 828 psi (8
psi/min); presuriza a 2012 psi, cae en 20 min a 1424 psi (11 psi/min); presuriza a 3047 psi, observa
20 min, cae a 2341 psi (13 psi/min); presuriza a 3703 psi, observa 90 min, cae a 2431 psi (6
psi/min). Con ltimo dato DE = 14.75 ppg. FIT NO representativo, por posble comunicacin
con Ar. Mora, por cementacin insuficiente.
Perforabilidad Hueco 6" Los Monos
Se perfor con sarta de 3 1/2" en su totalidad, por CSG 7" hasta superficie. Cada de presin
importante en DP 3 1/2". Q de trabajo slo hasta 170 GPM con presiones de 3600 - 3750 psi.
Perforablidad 0.78 - 1.0 m/hr, afectada por : RPM's slo 60 + 87 = 147 (TDS + MF), comparativo al
que se logra, 2.5 - 1.2 con DP combinado 5" - 3 1/2", hasta Q's de 223 GPM con presiones de
3100 - 3250 psi, RPM's 50 + 130 = 180 (TDS + MF).
Influjo gas - Gas maniobra - Velocidad migracin
Ingresando la AR. 1 se presenta 529 UGT con lodo MW 14.5, en 4413 m nuevamente presenta 83
UGT, deside incrementar lodo a 14.7 pg. A los 4418 m, realiza maniobra de viaje a superficie.
Inicia sacando con circulacin 42 GPM (21 RPM MF) hasta 4241 m, circula con 180 GPM un fondo
arriba, continua sacando de 4241 - 3700 m con circulacin 42 GPM 5-10 min/tiro; luego de 3700 a
3350 m con una velocidad de 5 min/tiro, c/42 GPM. Realiza flow check de 30 min a 3350 m, OK.
Luego saca con elevador de 3350 a 2993 m con velocidad controlada 8-5 min/tir, continua sacando
con elevador de 2393 a 1285 m con velocidad 1 min/tiro cua - cua, observa ganancia lodo
+2.7 bbl en el trip tank, realiza flow check 10 min con ganacia de 2.3 BPH, baja con elevador @
3143 m, en los 2 ultimos tiros observa devolucin continua en el trip tank.
Cierra rams superior, registra presin cierre EA 100 psi. Circula x Ck @ golpeador c/107 GPM,
precin inicial circulacin SIPP 1100 psi, SICP 160 psi. Mxima presin SIPP 1750 psi, SICP 430
psi, eliminando gas a fosa de quema. Mx. deteccin gas despus del golpeador 430 UGT,
densidad salida 14.9 ppg. Densifica lodo a 14.9 ppg. Total 5 horas circulacin.
Para circulacin. Cierra CK. Regitra SICP 520-580 psi, SIPP 0 psi, en 5 min. Desfoga presin.
Registra presin SICP 0-120 psi, SIPP 0 psi, sin observar devolucin.
Abre rams. Observa burbujeo en boca pozo. baja con elevador de 3143 a 4241 m. Observa +3.6
bbl de volumen adicional del desplazamiento terico.. Ceirra rams. Circula x CK c/110 GPM, inicial
SIPP 1950 - 2060psi, SICP 230 - 340 psi, eleiminado gas por golpeador a fosa quema. despus d
egolpeador 753 UGT, densidad salida 14.6 ppg. Continua circulando por golpeador y luego abre
rams y circula por flow line. Total circulacin 21.25 horas adicionales.
Saca BHA c/circ. c/42 GPM, 21 RPM MF, 15-13 min/tiro de 4418 - 4240 m. Continua sacando con
13-10 min/tiro a 283 m. Total horas de viaje @ desarmar BHA 47.25 horas.
Baja BHA c/MF + GR @ 4418 m. Circula, a los 605 Stks se observa 650 UGT. Migracin lleg muy
proximo a la superficie. Teimpo entre maniobra a superficie y retorno a fondo pozo +/- 72 horas
Calidad Hueco Los Monos
De registros de calibre, el hueco muestra buen calibre homogno, perforado con lodo MW entre
14.0 14.9 15.3 ppg, no existen signos de inestabilidad entre ambos extremos de MW
empleado durante la perforacin. Acciones: (1) Iniciar perforacin con MW 14.9 ppg, por
requerimiento en presiones. (2) Valorar gases de viaje, conexin, sistema aplicado en maniobras
de viaje(circulacin elevador) para incrementar MW a 15.3.
DRO-X1002
Tramo 4205 4390 m Hueco 6
FIT - Falla repite Ar. Guanacos y Mora
Luego de perforar 5 m fe formacin, se realiza FIT, con MW 11.5 ppg, presuriza 4 v/v con presin
entre 1852 - 1076 psi, cayendo @ +/- 1312 - 1076 psi, dando una DEC entre 14.1 - 13.0 ppg, con
un volumen bombeado de 13.75 bbl, devuelto 4 bbl, admitido 9.75 bbl. El FIT obtenido es bajo
124
respecto a o programado y respecto a la histrtatica y DEC que se usara con lodo de 14.9 ppg
para ingresar a Los Monos.
Pese a obtener bajo FIT, se procede al cambio de fluido de 11.5 ppg x 14.9 ppg , a los 718 bbl
bombeados (vol pozo 816 bbl), se observa prdida de retorno, se disminuye Q y se consigue
retorno prcial, hasta NO observar retorno. Detienen circulacin y registra 90 bbl admitidos a
formacin. Bombea baches cn LCM, presuriza con BOP cerrada @ 400 psi, sin logra sello efectivo.
Con pata de mula + DP 5" & 3 1/2", y lodo de 14.9 ppg, bombeo lechada de cemento 50 bbl,
levanta hta e inyecta a formacin 69 bbl (25 bbl Seal Bond Plus + 44 bbl lechada 15 ppg) con 0.4
bpm @ 530 psi, desfoga, devuelve 2 bbl con 0.4 bpm. Con BHA de limpieza, encuentra punto
resistencia a 2.2 m encima del fondo. Circula para evaluar admisin, sin lograr sello, mantiene
admisin y retorno parcial @ 74%. Balancea 2do TC con 40 bbl de 15 ppg, cierra rams, bombea a
formacin 40 bbl ( 15 seal bond + 15 bbl lechada) c/0.7-0.8 bpm y 800-900 psi, queda 15 bbl de
lechada en tuebera. Bombea 3er TC de 25 bbl de cemento de 15 ppg, levanta hta y hesita con
presin@ 550 psi, continua hesitando @ 775 psi. Logra controlar admisin.
Perforacin Ar. Guanacos & Mora BB c/ MW 14.9 ppg
De los registros: el calibre muestra hueco en calibre en la zona de GR alto (lutitas y limolitas).
Entre el tope torico de la Ar. "0" 4221 m a la Falla 4300 m se presenta hueco lavado excntrico
denotando inestabilidad @ 11" de diamtro. En las Ar. Guanacos BB el hueco esta cerrado, con
dimetro menor. Durante los registros de tuvo que cerra caliper para maniobrar.
Conclusin: el MW alto (14.9 ppg) observado por las Ar. del Guanacos y tramos de limolita + lutita
mostraron estabilidad, muy diferente a lo observado en 12 1/4" con lodo de 11.5 ppg. En zonas
permeables, arenas, la hidrosttica elevada gener que el reboque sea mayor, reduciendo el
diamtro del pozo.
Resistencias Hueco calibre
Baja BHA con 2 puntos de apoyo p/calibracin previo a registros, llega a f.p sin resistencia.
Bajando el BHA calibracin de 3 puntos, para Liner 5", encuentra P/R a los 4228, 4258 y 4328 m,
donde asienta 5-7 Klb. Repasa con TQ errtico 6-7 Klb.ft y resitencia WOB 3-5 KLb en 4229, 4240,
4257, 4262, 4285, 4288, 4357 , Tramo con resistencia al peso constante 3-5 Klb y TQ errtico 6-7
Klb.ft 4328-4345 m. Bajando a fondo encuentra 1 m de rrelleno, tiene que limpiar relleno.
125
Tpico
Principal:
1
25/4/06
AHM
2
26/4/06
AHM
Inestabilidad
derrumbe
Falla MWD
No
Documento a
Incorporarse Leccin
Aprendida:
Estado
Actual
Programa perforacin
Difundido
Incorpora
do a KNT
FW-2H
Nota: Este formulario permitir registrar lecciones aprendidas por parte del Company Man, facilitando el registro
diario de eventos, problemas, observacin, prcticas o procedimientos que resultaron adecuados o que redujeron
tiempos de operacin.
126
Secuencia Operativa
7.1
7.2
7.3
Levantar & armar BHA N 20 direccional c/ 4 3/4" DHM, 0.78 AKO, 5 7/8"
STB + Float Sub c/Vlvula Flotadora + 5 7/8" String STB + 4 Alignment
Sub + 4 XO Non Magnetic + 4 Monel c/LWD (GR) + 4 XO Non
Magnetic + 4 Pony Monel + XO. Probar MWD & sincronizar MWD-GR.
Conectar Trpano PDC 6". Continuar armando BHA c/9 DC 4 + 9 HWDP
3 + Jar 4 + 6 HDWP 3 @ +/- 260 m.
7.4
7.5
7.6
7.7
7.8
Levantar Hta. Cerrar Rams de medida, alinear por EA. Probar integridad
CSG 7" por EA, incrementando la presin @ 4000 Psi. Desconecta lneas
de bombeo.
127
7.9
7.10
7.11
Levantar hta. Cerrar Rams --- Efecta FIT c/lodo 14.9 ppg @ alcanzar EMW
16.5ppg. Desmonta lneas superficiales.
7.12
Perforar Agujero vertical 6" de 4305 a 4480 m registrando con LWD + GR,
repasando c/tiro perforado y tomando survey (Form. Los Monos).
7.13
7.14
7.15
7.16
7.17
Armar y bajar BHA N 21 Direccional c/4 3/4" DHM, 0.78 AKO, 5 7/8" STB
+ Float Sub c/Vlvula Flotadora + 5 7/8" String STB + 4 3/4" Alignment Sub
+ 4 3/4" XO Non Magnetic + 4 3/4" Monel c/LWD (GR) + 4 3/4" XO Non
Magnetic + 4 3/4" Pony Monel + XO. Probar MWD & sincronizar MWD-GR.
Conectar Trpano PDC 6". Continuar armando BHA c/9 DC 4 3/4" + 9
HWDP 3 1/2" + Jar 4 3/4" + 6 HWDP 3 1/2" @ +/- 260 m. (Igual a BHA
N20).
128
7.18
7.19
7.20
7.21
7.22
7.23
7.24
7.25
7.26
7.27
7.28
129
7.29
7.30
Cambiar elementos 4 x 3 .
7.31
7.32
7.33
7.34
7.35
7.36
7.37
Continuar bajando BHA N 22 de calibracin con DP 4 1/22 ( +/- 607 m) XOver + DP 5 (disponible +/- 2600 m) @ +/- 4300 m zapato liner 7.
7.38
7.39
7.40
130
7.41
Realizar viaje corto hasta 4300 m (zapato 7). Sacar con circulacin +
reaming & Back reaming y velocidad controlada. Bajar con elevador a 4660
m verfificando condiciones del hueco abierto.
7.42
7.43
7.44
7.45
Cambiar elementos 4 x 3 .
7.46
7.47
7.48
Acondicionar piso. Instalar equipo de presin a brida 11" x 10K. Probar con
presin. Armar y probar herramientas registros elctricos.
7.49
4253 4503 m
14.9 15.3
YP, lpcpc
25 - 35
VP, cp
20 - 30
12-15/16-30
3-4
8 - 10
MBT, ppb
< 10
Drilling Solids, %
< 3.0
pH
PPT, sport loss
10.0 10.5
<5
131
CONCENTRACIONES
XAN VIS, ppb
1.0
1.5
2.0
5.0
12.0
Baritina, ppb
350
10
4.0
4.0
5.0
1.0
7.0
5.0
2.0
3.0
132
10
Trpanos e Hidrulica
TREPANOS 6
IADC
Tipo
Lnea
Caracterstica
Conexin
Observaciones
117
XR+ PS
Smith
Dientes Nuevo.
Cojinetes Dual Bullet
Seals.
3 API
Reg
Limpieza y carr.
calibracin
PDC
MSi613WBPX
Smith
6 aletas.Cortadores 13
mm.Plano ligeramente
cono profundo.Longitud
calibre 2
3 API
Reg.
Contingencia
reparado
133
Las bombas RGF-1600 deben ser instaladas con camisas 150 mm (5.905)
TABLA PARMETROS PERFORACIN
ROP
Horas
Target,
Avance
WOB
Klb
175
10 20
RPM
Caudal
HSI
Boquillas
gpm
Presin
Stand Pipe
m/h
1.1 @ 4480 m
152.2
105 + 60
150 - 280
0.942
6 x 10
2600 3000
TFA = 0.460
1.1 @ 4660 m
156.3
180
10 20
105 + 60
150 - 280
1.37
6 x 10
2600 3100
TFA = 0.460
Desviacin Survey:
Objetivo: Mantener dentro del box hasta llegar la TD Final del Pozo 4660 m (MD) &
4660m (TVD), 50 m N-E & 20 m O-S
Frecuencia & Instrumentos: Las lecturas de desviacin sern tomadas con la
herramienta MWD. Frecuencia el registro debe cada 9 28 m hasta el TD.
134
6 Productor - Liner 5
Profundidad:
Caera:
Problemas
Influjo de gas durante maniobras.
Medida de Mitigacin
Viajes en hueco abierto y Liner de 7 a
velocidad controlada, realizar Surge and
Swab. Flow checks intermedios durante
viajes.
Contingencia
En caso de influjo bajar hta y
realizar procedimiento de Well
control. Aumentar densidad de
lodo.
Informacin General
Previa carrera de calibracin, se correra Liner 5, P-110, 18 #/ft, conexin VAM
SLIJ-II hasta profundidad total. Cementar hasta boca de Liner con tope de cemento
hasta +/- 4240 m. Luego de una carrera de limpieza de los accesorios de
cementacin y tapn de cemento se correra el registro de calidad de cementacin
del liner 5. Proceder al TCP/DST de la Ar. Guanacos y TCP/DST de la Arenas de
los Monos.Tipo de lodo WBM Polytraxx HP-HT densidades de 14.9 a 15.3 ppg.
Secuencia Operativa
4.1
4.2
Armar BHA N 23 calibracin p/corrida Liner 5" c/ Trpano 6" + Near Bit 5
7/8" + DC 4 + STB 5 7/8" + DC 4 + STB 5 7/8" + 9 DC's 4 + 9
HWDP 3 + Jar 4 + 6 HWDP 3 @ +/- 260 m.
135
4.3
4.4
4.5
4.6
4.7
4.8
4.9
Realizar viaje corto hasta 4300 m (zapato 7"). Si necesario sacar con
Circulacin + Reaming & Back Reaming. Bajar con elevador a 4660 m
verificando condiciones hueco abierto.
4.10
4.11
4.12
Continuar sacando BHA N 23 con elevador desarmando x piezas DP 5" (+/1304 m & DP 4 (+/- 596 m) @ 1460 m. Llenado continuo. Flow check.
136
4.13
4.14
4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
Peso
ID
Conex. OD
Drift
Grado
(in)
(in)
(in)
(in)
Conexin
18 , ppf
Espesor
Pared
Min.
Resistencia
Tensin B/J
Resistencia
Reventamiento
Resistencia
Colapso
(psi)
(psi)
Torque
Ajuste:
Min/Opt/Mx
(Klb)
4.276
5.178
4.151
0.362
580
(lb.ft)
13940
3400 Mn.
13470
P-110
VAM SLIJ-II
N/A Target.
4.191
412
13940
4000 Mx.
13470
137
4.26
Continuar bajando Liner 5" @ 4300 m (zapato Liner 7") con DP 3 a +/- x
min/tiro. Circulacin intermedia p/romper geles.
4.27
4.28
4.29
4.30
4.31
Cementar Liner 5" c/2 lechadas. Largar tapn PDP, desplazar, lograr presin
cierre, desfogar. Verifica funcin accesorios cementacin.
LNEAS GUIA DE CEMENTACIN LINER 5.
Cubrir con cemento el Liner de 5 para lograr el aislamiento adecuado de las zonas de
presin anormal e interes productiva, logrando una cementacin del 100%. Con 2
lechadas, una principal y una de relleno (colgador), que llevarn control de gas.
REQUERIMIENTO DE CONTINGENCIA:
PARMETROS DE DISEO:
TVD/MD RT
4660m / 4660 m
BHST /BHCT
250F /201 F
Principal
Relleno
Densidad, ppg
18.0
17.0
Tipo cemento
Clase G + control de
gas
Clase G + control de
gas
Volumen, bbl
19
138
Altura cemento
340 m
99 m
7:44/7:45 hrs
8:12/8:33 hrs
Resistencia Compresiva
Agua libre, %
Filtracin, ml/30min
40
30
Bombeabilidad
BC @ 109F
50/100
OBSERVACIONES TCNICAS:
Efectuar tope tapn con 500 1000 psi por encima de la mxima presin de bombeo.
4.32
4.33
4.34
Sacar hta desde +/- 4231 m hasta superficie. Destorquear y retirar setting
tool. Levantar cabeza cementacin & destorquear XO's y pup joint.
4.35
139
4.36
4.37
4.38
4.39
4.40
Retirar wear bushing + Instalar tapn prueba. Probar BOP's c /300 - 7500,
300 - 4000 psi. Retirar tapn prueba + Instalar wear bushing.
4.41
4.42
140
4.43
4.44
4.45
4.46
4.47
4.48
141
4.49
4.50
4.51
4.52
4.53
4.54
4.55
Con wire line, correr registros evaluacin cemento Liner 5" (GR-CCL-CBLVDL-USIT). Sacar & desmontar herramientas corrida registros.
4660 m
14.9 15.3
YP, lpcpc
25 - 35
VP, cp
20 - 30
142
12-15/16-30
3-4
8 - 10
MBT, ppb
< 10
Drilling Solids, %
< 3.0
pH
10.0 10.5
<5
CONCENTRACIONES
1.0
1.5
2.0
5.0
12.0
Baritina, ppb
350
10
4.0
4.0
5.0
1.0
7.0
5.0
2.0
3.0
143
144
ANEXOS
SECCIN C LICENCIA AMBIENTAL (Ver Anexo YPFB Chaco)
SECCIN D SOR & PROPUESTA GEOLGICA
Chaco).
Smith)
(Ver anexo -
Tuboscope)
(ver
Anexo -
Halliburton)
(Ver anexo
YPFB Chaco).
(Ver anexo
YPFB Chaco).
145
(Ver
Chaco)
146
Requerimiento de E&D
POZO DRO-X1001
Fecha
SOR Versin #
29 de Julio de 2014
1
1) Informacin general
Nombre de pozo
Objetivo
Clasificacin del pozo
Tipo de pozo
Nmero de AFE
Equipo
2) Objetivos
Primario
Evaluar el potencial de la Arenisca Guanacos (Fm. Iquiri) al sur del pozo DRO-X1002 dentro de los limites del
Bloque Exploratorio El Dorado Oeste
Evaluar el potencial hidrocarburfero de los niveles arenosos de la Formacin Los Monos
Secundarios
3) Puntos crticos
1
Perforar con lodo base agua y con una diferencial adecuada tratando de minimizar el dao a
los posibles niveles de inters.
Mantener en cero Accidentes con Das de Impedimento, Derrames e Incidentes Vehiculares
Ingreso a zona con sobrepresin
Mantener la verticalidad del pozo
2
3
4
Este
Norte
437
487.145
7.955.985
MD
Este
4237
487.145
4650
487.145
50 m N-S y 20 m E-O
4650
Norte
7.955.985
7.955.985
Inline
Xline
Inline
Xline
(~) la cota terreno fue obtenida del mapa topogrfico empleado en la adquisicin ssmica
* En sentido N-S el target puede ser mas flexible. En sentido O y E, no se amplia por perder altura estructural y/o atravesar la Falla El Dorado antes de atravesar las areniscas de la
formacin Los Monos
7) Topes formacionales
FORMACION
Buz. ()
Acimut ()
Aprox.
Aprox.
Grupo Chaco
YECUA
PETACA
CAJONES
YANTATA
ICHOA
CANGAPI
SAN TELMO
ESCARPMENT
TARIJA
TUPAMBI
IQUIRI
Tope Arenisca Guanacos
Base Arenisca Guanacos
LOS MONOS
Tope Arenisca 0
Base Arenisca 0
Tope Arenisca 1
Arenisca 1
Base Arenisca 1
Tope Arenisca 2
Base Arenisca 2
TD FINAL
7 - 9
260 - 280
Profundidad
medida
Esperado MD
Superficie
1839
1936
2014
2177
2274
2578
2982
3010
3126
3861
4017
4197
4247
4307
4333
4353
4419
4445
4461
4530
4571
4650
Desde KB
TVDSS (m)
+/- 30
+/- 30
+/- 30
+/- 30
+/- 30
+/- 30
+/- 50
+/- 50
+/- 50
+/- 50
+/- 50
+/- 50
+/- 50
+/- 50
+/- 50
+/- 50
+/- 50
+/- 50
+/- 50
+/- 50
+/- 50
+/- 50
1839
1936
2014
2177
2274
2578
2982
3010
3126
3861
4017
4197
4247
4307
4333
4353
4419
4445
4461
4530
4571
4650
-1402
-1499
-1577
-1740
-1837
-2141
-2545
-2573
-2689
-3424
-3580
-3760
-3810
-3870
-3896
-3916
-3982
-4008
-4024
-4093
-4134
-4213
8) Fallas
No se prev atravesar ninguna falla
PSI
Mximo
Estimado
PSI
Ms probable
PSI
Mnimo
Original
PSI
Comentarios
Sobrepresin
Tipo
Exploratorio
Desarrollo
Desarrollo
Estado
Productor
Productor
Productor
Km
2.2
4.2
4.9
Profundidad final
4395 m MD
4256 m MD
4560 m MD
Perfil
Observaciones
Resistividades, GR, Snico (hasta superficie), Caliper,
Resistividades, GR, Snico (full wave ), Densidad-Neutrn, Imagen de Pozo, Caliper
Registro de presiones en hueco abierto (XPT), Opcional Rt Scanner
Resistividades, GR, Snico (full wave ), Densidad-Neutrn, Imagen de Pozo (opcional), Caliper
Agujero 6"
LWD (Logging While Drilling) con registro de GR (desde el Ingreso al Devnico), hasta fondo pozo.
Estudios especiales
Se realizar el reprocesamiento e interpretacin de los registros de Imagen de pozo y snico full wave
Coronas
No se cortaran testigos
Otros perfiles
Perfil de cementacin, para los tramos necesarios
Deteccin de gas
Con unidad completa de mudlogging desde superficie hasta fondo pozo
Ensayos a pozo abierto
No
Zonas de aislamiento
Tamao de balas/Tipo
Mtodo de despliegue
Mtodo de baleo
Comentarios
Areniscas de la Fm. Iquiri, tramos: ( a definir con datos de mudlogging y registros elctricos) +/- entre 20 m de baleo
Areniscas de la Fm. Los Monos, tramos: (a definir) considerar 2 zonas de 10 m baleo cada una.
N/A
Can 4.5 in, Cargas Alta Penetracin HMX 12 spf; Can 3.375in, Cargas Alta Penetracin HMX 6 spf
1 TCP/DST (+/- 20m) con medida de presin de fondo, Htas. min 10 Kpsi (Fm. Iquiri, Ar. Guanacos)
2 TCP/DST (+/- 10 m c/u) con medida de presin de fondo, Htas. min 10 Kpsi (Fm. Los Monos)
Cabeza de disparo redundante mecnica/hidrulica
18) Presupuesto
Presupuestado para la gestin 2014-2015
Cargo
Gerente del proyecto
Gelogo
Reservorio
Operaciones
Team Leader Perforacin
Ingeniero de Perforacin
Supervisor Fluidos
Telfono oficina
20) Aprobacin
Gerente Exploracin
Gerente Perforacin
Fecha
Mario Raimondeau
Domicilio
Mvil
Gerencia de Exploracin
Noviembre de 2014
Gerencia de Exploracin
Indice
1.
INTRODUCCION .......................................................................................................... 4
2.
ANTECEDENTES .......................................................................................................... 5
3.
4.
4.1.
4.2.
CLASIFICACIN ....................................................................................................... 8
4.3.
LOCALIZACIN ........................................................................................................ 8
4.4.
5.
5.1.
5.2.
SECUENCIA ESTRATIGRFICA..................................................................................13
5.3.
5.3.1.
5.3.2.
ROCAS RESERVORIO............................................................................................23
5.3.3.
ROCA SELLO........................................................................................................25
5.3.4.
5.3.5.
TRAMPA ..............................................................................................................26
5.4.
6.
6.1.
8.
9.
10.
11.
12.
CORONAS ...............................................................................................................41
13.
14.
15.
16.
Gerencia de Exploracin
LISTA DE FIGURAS
Figura 1. Mapa de ubicacin del Bloque El Dorado Oeste. ............................................. 4
Figura 2. Imagen satelital con la ubicacin de los pozos del Campo El Dorado Sur y el Pozo
DRO-X1001 ...................................................................................................................... 9
Figura 3. Lnea ssmica (XL 1235) a travs del pozo DRO-X1001, mostrando la configuracin
estructural del Anticlinal El Dorado. ............................................................................... 11
Figura 4. Corte Estructural (Oeste- Este) perpendicular al Anticlinal El Dorado, a travs del pozo
DRO-X1001. ................................................................................................................... 12
Figura 5. Columna estratigrfica generalizada del rea de Percheles El Dorado. ....... 13
Figura 6. Correlacin Estratigrfica Estructural entre los pozos DRO-X1001 y DRO-X1002.14
Figura 7. Correlacin estratigrfica-estructural de la Arenisca Guanacos y las areniscas de la
Formacin Los Monos entre el Campo El Dorado Oeste y El Dorado Sur. ....................... 16
Figura 8. Resumen del sistema petrolero del rea de El Dorado..................................... 19
Figura 9. Relacin entre COT y pirolisis S1 - S2 del pozo DRD-X1001. ................................ 20
Figura 10. Relacin entre IH e IO de las muestras de la Formacin Los Monos del pozo DRDX1001............................................................................................................................. 21
Figura 11. Mapa de ubicacin del Bloque El Dorado y Campos del rea Centro mostrando los
reservorios productores.................................................................................................. 24
Figura 12. Correlacin estratigrfica-estructural de la Arenisca Guanacos entre el Campo El
Dorado y El Dorado Sur y el pozo DRO-X1002, mostrando las variaciones en el contenido de
areniscas en la seccin correspondiente al Miembro Guanacos. .................................. 25
Figura 13. Desarrollo del sello para la Arenisca Guanacos en el Bloque El Dorado. ........ 26
Figura 14. Vista del modelo estructural 3D del Campo El Dorado, Dorado Sur y el Prospecto El
Dorado Oeste, mostrando el sello oeste de la trampa que corresponde a la Falla El Dorado.
..................................................................................................................................... 27
Figura 15. Perfil interpretado para la Arenisca Guanacos del pozo DRO-X1002.............. 30
Figura 16. Vista 3D del modelo estructural mostrando el volumen de Roca para reservas P1
..................................................................................................................................... 32
Figura 17. Criterios geolgicos para la delimitacin de reservas P1, P2 y P3 ................... 32
Figura 18. Vista 3D del modelo estructural mostrando el volumen de Roca para reservas P2
..................................................................................................................................... 33
Figura 19. Mapa de anomalas ssmicas asociadas a la Arenisca Guanacos en los Campos El
Dorado Sur y El Dorado Oeste ....................................................................................... 34
Figura 20. Resultados de simulacin Monte Carlo para Gas In-Situ................................. 35
Figura 21. Resultados de simulacin Monte Carlo para reservas de gas......................... 35
Figura 22. Gradiente de presiones construido con pesos de lodo para los pozos DRD-X1001 y
DRD-X1002. .................................................................................................................... 36
Figura 23. Seccin ssmica Oeste-Este a nivel de la Arenisca Guanacos y Formacin Los Monos,
a travs del pozo DRO-X1001......................................................................................... 38
Figura 24. Plan direccional del pozo DRO-X1001, vista en planta, mostrando el rea de
tolerancia de la desviacin. .......................................................................................... 39
Figura 25. Diseo del pozo DRO-X1001 ........................................................................... 40
Figura 26. Caudales estimados de gas y condensado. .................................................. 42
LISTA DE TABLAS
Tabla 1. Anlisis geoqumico realizado sobre recortes de perforacin (cuttings) del pozo DRDX1001............................................................................................................................. 20
Gerencia de Exploracin
Tabla 2. Caracterizacin de tipo de Roca Madre segn el valor de S2. Formacin Los Monos
(Pozo DRD-X1001). ......................................................................................................... 20
Tabla 3. Caracterizacin de tipo de materia orgnica e ndice de Alteracin Trmica (TAI).
..................................................................................................................................... 22
Tabla 4. Anlisis de Reflectancia de Vitrinita para el pozo DRD-X1001. ........................... 23
Tabla 5. Evaluacin de riesgo para el pozo DRO-X1001 ................................................. 28
Tabla 6. Propiedades petrofsicas Arenisca Guanacos (seccin inferior). ....................... 29
Tabla 7. Propiedades petrofsicas Arenisca Guanacos (seccin inferior) en el pozo DRO-X1002
..................................................................................................................................... 31
Tabla 8. Propiedades petrofsicas Arenisca Guanacos (seccin inferior) en los pozos del Campo
El Dorado Sur ................................................................................................................. 31
Tabla 9. Resumen de reservas para Campo El Dorado Oeste................................................. 36
Tabla 10. Prognosis estratigrfica ................................................................................... 37
Tabla 11. Programa de Muestreo de recortes de Formacin ......................................... 41
Tabla 12. Pronstico de produccin pozo DRO-X1001.................................................... 42
ADJUNTOS
ADJUNTO 1. IMAGEN SATELITAL ESCALA GRAFICA
ADJUNTO 2. MAPA TOPOGRAFICO (ESCALA 1:25.000)
ADJUNTO 3. MAPA ESTRUCTURAL CON ANOMALIAS DE AMPLITUD SISMICA ESCALA
(1:25.000)
ADJUNTO 4. CORRELACION ESTRATIGRAFICA ESTRUCTURAL (ESCALA VERTICAL 1:1.000)
ADJUNTO 5. IMAGEN SISMICA
ADJUNTO 6. CORTE ESTRUCTURAL (ESCALA 1:25.000)
Gerencia de Exploracin
1. INTRODUCCION
El rea de Exploracin El Dorado Oeste, se encuentra ubicado en la provincia
Cordillera del Departamento de Santa Cruz (Figura 1).
Gerencia de Exploracin
2. ANTECEDENTES
La estructura de El Dorado fue originalmente trabajada a principios de la dcada de
los aos 60, por la Bolivian Gulf Oil Company (BOGOC), utilizando informacin ssmica
2D y gravimetra. Sobre la base de sta interpretacin se perforaron tres pozos:
Dorado-X1 (DRD-X1), Dorado-X2 (DRD-X2) y Florida-X1 (FLA-X1), todos con objetivos
Carbonferos. Estos fueron abandonados como improductivos.
En el ao 1980, YPFB perfor el Pozo Dorado-X3 (DRD-X3), teniendo como objetivos a
los reservorios de las formaciones Cretcicas, Carbonferas y Devnicas. Luego de la
correspondiente etapa de evaluacin, el pozo fue clasificado como seco.
A fines del ao 1997, Bridas SAPIC se adjudic el Bloque El Dorado luego de un proceso
de licitacin ante YPFB. Esta compaa registr un programa de aproximadamente 600
km 2 de ssmica de 3D sobre la estructura del mismo nombre. Con esta informacin, se
procedi a efectuar trabajos de interpretacin ssmica, con el objetivo de reevaluar el
potencial hidrocarburfero en la estructura El Dorado.
Entre los aos 1998 y 2000, Pan American Energy (PAE) (empresa resultante del proceso
de fusin entre Bridas y Amoco) perfor los pozos Dorado-X1001 (DRD-X1001) y DoradoX1002 (DRD-X1002), descubriendo gas en la Arenisca Guanacos, miembro inferior de la
Formacin Iquiri.
En el ao 2003, la empresa CHACO S. A. compr los intereses de PAE sobre este bloque
de exploracin, adquiriendo los derechos y compromisos del contrato de riesgo
compartido existente.
Con el objetivo de certificar UTEs correspondientes a la Fase III del primer perodo
exploratorio, Chaco S. A., en el ao 2004 decidi perforar el pozo Dorado-X1004 (DRDX1004). Por problemas operativos sus resultados no fueron conclusivos, pese a ello logr
el cometido de certificar el nmero suficiente de UTEs. Ese mismo ao el Campo El
Dorado adquiere el estatus de rea de Retencin.
En octubre del ao 2007, Chaco inici el trmite solicitando la Declaratoria de
Comercialidad del Campo El Dorado, solicitud que fue aceptada por YPFB mediante
nota LP-PRS-2280 VPACF-668/2007, teniendo como fecha efectiva de inicio de este
5
Gerencia de Exploracin
Gerencia de Exploracin
Gerencia de Exploracin
3. OBJETIVOS DE LA PERFORACIN
El Pozo Exploratorio Dorado Oeste-X1001 (DRO-X1001), tiene como objetivo evaluar el
potencial hidrocarburfero de los niveles arenosos del Sistema Devnico Superior.
Objetivo Principal:
Objetivos Secundarios:
4. INFORMACION GENERAL
4.1.
4.2.
DATOS GENERALES
Bloque
El Dorado Oeste
Pozo
Estructura
CLASIFICACIN
Pozo Exploratorio de Avanzada (A1)
4.3.
LOCALIZACIN
Bloque
El Dorado Oeste
Departamento
Santa Cruz
Provincia
Cordillera
Ubicacin en superficie
X=
487.145 m E
Y=
7.955.985 m N
Elevacin
Zt=
437 m
Altura Rotaria
Zr=
10.7 m
Gerencia de Exploracin
Figura 2. Imagen satelital con la ubicacin de los pozos del Campo El Dorado Sur y el Pozo DRO-X1001
Gerencia de Exploracin
487.145 m E
Y=
7.955.985 m N
X=
487.145 m E
Y=
7.955.985 m N
(Pozo Vertical)
En coordenadas UTM, PSAD 56
Datum horizontal, Zona 20.
4.4.
Profundidad a alcanzar:
4650 m MD
5. FUNDAMENTOS TCNICOS
5.1.
CONSIDERACIONES ESTRUCTURALES
10
Gerencia de Exploracin
Figura 3. Lnea ssmica (XL 1235) a travs del pozo DRO-X1001, mostrando la configuracin estructural del
Anticlinal El Dorado.
11
Gerencia de Exploracin
Figura 4. Corte Estructural (Oeste- Este) perpendicular al Anticlinal El Dorado, a travs del pozo DRO-X1001.
12
5.2.
Gerencia de Exploracin
SECUENCIA ESTRATIGRFICA
La secuencia estratigrfica que ser atravesada por el pozo DRO-X1001 ser similar a
la del pozo DRO-X1002 hasta la Formacin Iquiri (Figura 6), con la nica excepcin de
que no se atravesar la Falla El Dorado, y adicionalmente se atravesaran los niveles
arenosos de la Formacin Los Monos descritos en los pozos del Campo el Dorado y El
Dorado Sur.
13
Gerencia de Exploracin
14
Gerencia de Exploracin
SISTEMA DEVONICO
La Formacin Los Monos est conformada predominantemente por lutitas con
delgadas intercalaciones de cuerpos arenosos. Esta formacin se constituye en un
importante elemento del sistema petrolero del rea, ya que debido a sus propiedades
geoqumicas es considerada como roca madre generadora de hidrocarburos. En esta
formacin se han identificado varios niveles arenosos de los cuales sobresalen los
miembros denominados Arenisca 2, Arenisca 1 y Arenisca 0, ubicados en la parte
media a superior de esta unidad (Figura 7). El pase hacia la Formacin Iquiri es de tipo
transicional, en este sentido se defini como tope de la Formacin Los Monos el punto
donde existen altas detecciones de gas que marcan el inicio de la zona de alta
presin.
La Formacin Iquiri est constituida por una secuencia en la que predominan las
intercalaciones de lutitas y limonitas, de forma subordinada se desarrollan delgados
bancos de areniscas. Sobresalen dentro de esta formacin el nivel denominado
Arenisca Guanacos, horizonte que est ubicado en la zona basal de esta formacin.
Este miembro est conformado por varias capas de areniscas intercaladas con
delgados bancos pelticos. El mayor contenido de areniscas se presenta hacia la base,
pudiendo tener un espesor promedio de 20 m.
Por las caractersticas litolgicas que presenta la Formacin Iquiri, representada por la
intercalacin de lutitas y limolitas grises con bancos de
15
Gerencia de Exploracin
SISTEMA CARBONIFERO
16
Gerencia de Exploracin
SISTEMA PERMICO
Las facies de la Formacin Cangapi son predominantemente arenosas, de
granulometra fina a media con abundante matriz arcillosa. No se describen niveles
pelticos en la mayora de los pozos.
SISTEMA CRETACICO
La Formacin Ichoa est constituida principalmente por facies arenosas de origen
elico, con granulometra media a gruesa. Esta formacin se caracteriza por tener
excelente permeabilidad, factor que puede incrementar la admisin de lodo en la
etapa de perforacin.
17
Gerencia de Exploracin
Durante la perforacin del pozo DRO-X1002, en la parte media de esta unidad, fue
atravesado un nivel
dentro
la
TERCIARIO
La secuencia Terciaria se inicia con la Formacion Petaca constituida en su base por
arcillitas marrn rojizas (miembro naranjillos), y limolitas y areniscas gris verdosas, hacia
el tope. Suprayaciendo a esta formacin se encuentra la formacin Yecua, con un
desarrollo predominante de facies pelticas de coloracin gris verdosa.
Culminando la Secuencia estratigrfica se tiene al Grupo Chaco, el mismo que puede
ser subdivido en Chaco Inferior (Formacin Tariqua), que consiste en gruesos bancos
de arcilitas marrn rojizas intercaladas areniscas de coloracin marrn claro,
correspondiente a un ambiente sedimentario de tipo continental.
El Chaco Superior (Formacin Guandacay), que a diferencia del primero presenta
predominancia de bancos de areniscas y espordicos niveles conglomerdicos,
corresponden a depsitos de canales fluviales.
18
5.3.
Gerencia de Exploracin
SISTEMA PETROLERO
19
Gerencia de Exploracin
Yantata
Taiguati
Iquiri
Los Monos
4740
Los Monos
1.13 0.18
COT:
S1:
S2:
S3:
Tmax:
IH:
IO:
IP:
2.27
0.88
424
IH
IO
IP
15
5
211
327
628
46
0.34
7.17
0.07
0.01
16
201
78
2.58
0.07
Tabla 1. Anlisis geoqumico realizado sobre recortes de perforacin (cuttings) del pozo DRD-X1001.
Valor de S2
<2
2a5
5 a 10
>10
Tabla 2. Caracterizacin de tipo de Roca Madre segn el valor de S2. Formacin Los Monos (Pozo DRDX1001).
20
Gerencia de Exploracin
Presenta un ndice de hidrgeno (IH) entre 200 a 300 mg y un ndice de oxgeno (IO) de
45 a 80 mg, segn la relacin entre estos dos ndices (IH IO, figura 10), se concluye
que el hidrocarburo expelido es gas y petrleo principalmente en la parte superior y
gas en la parte inferior de la Formacin Los Monos.
Figura 10. Relacin entre IH e IO de las muestras de la Formacin Los Monos del pozo DRD-X1001.
Los valores del ndice de Alteracin Trmica (TAI) de la Formacin Los Monos segn los
anlisis realizados en los pozos DRD-X1001, varan entre 2/2+ y 3- (ver tabla 3), estos
valores sugieren que la Formacin los Monos se encuentra en la ventana de
generacin de petrleo a gas hmedo condensado.
21
Gerencia de Exploracin
Los valores de Reflectancia de Vitrinita (Ro%) obtenidos del pozo DRD-X1001 para la
Formacin Los Monos tienen un rango de 0.50 a 0.70% (tabla 4), sugiriendo que el
hidrocarburo generado se encuentra en la ventana de gas-petrleo.
22
Gerencia de Exploracin
23
Gerencia de Exploracin
Figura 11. Mapa de ubicacin del Bloque El Dorado y Campos del rea Centro mostrando los reservorios
productores.
24
Gerencia de Exploracin
25
Gerencia de Exploracin
Figura 13. Desarrollo del sello para la Arenisca Guanacos en el Bloque El Dorado.
5.3.5. TRAMPA
26
Gerencia de Exploracin
Los hidrocarburos generados en la Formacin Los Monos migraron hacia las rocas
arenosas de la Formacin Iquiri, donde quedaron entrampadas en la estructura
previamente formada. La trampa de El Dorado Oeste es una anticlinal con cierre en
cuatro direcciones, desarrollado en el bloque bajo alto de la falla El Dorado. Los cierres
oeste y sur son de tipo estructural referido al hundimiento de las capas. El cierre este es
contra la Falla El Dorado. El cierre norte no est muy bien definido, pudiendo ser este
de tipo estructural como tambin sedimentario. Es una de los principales factores de
riesgo del proyecto. (Figura 14).
Figura 14. Vista del modelo estructural 3D del Campo El Dorado, Dorado Sur y el Prospecto El Dorado
Oeste, mostrando el sello oeste de la trampa que corresponde a la Falla El Dorado.
5.4.
27
Gerencia de Exploracin
RESERVORIO:AR. GUANACOS
Roca Madre
DRO-X1001
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
0.6
0.6
1.0
0.9
1.0
1.0
0.9
1.0
0.9
0.9
0.9
Probabilidad de xito
54%
Migracin
Tiempo
Vas de Migracin
Preservacin
Trampa - Sello
Consistencia del Modelo Geologico Final (Trampa)
Analisis Capacidad de Sello de las Fallas
Presencia y Distribucin Roca Sello
Definicin de Propiedades Petrofcas del Sello
Capacidad de Columna
Reservorio
Presencia y Distribucin
Espesor y continuidad lateral
Permeabilidad y continuidad
Color
RIESGO ALTO
RIESGO MODERADO/MEDIO
RIESGO BAJO
Significado
< 0.5
> 0.5 - < 0.7
> 0.7
Para los factores Roca Madre, Migracin, Sello y Reservorio no representan elementos
de riesgo debido al resultado positivo encontrado en pozo DRO-X1002. Como se
mencionan en el punto 5.3.5., el principal elemento de riesgo geolgico para el
proyecto es la definicin del cierre norte de la trampa, la misma que por la
informacin ssmica existente no sera de tipo netamente estructural sino que tendra
un componente estratigrfico (cambio de facies), sin embargo este factor ser
determinado con la perforacin del pozo DRO-X1003, que se ubica la norte de la
estructura.
28
Gerencia de Exploracin
6. ESTIMACION DE RESERVAS
Los siguientes clculos de estimacin de reservas fueron extrados de la declaratoria
de comercialidad que se realiz para el Campo el Dorado Oeste considerando la
estructura completa la cual comprende parte de los Bloques El Dorado y El Dorado
Oeste.
6.1.
Propiedad
El Dorado
RREE
El Dorado Sur
Testigos de corona
El Dorado Oeste
Testigos laterales
Porosidad
12 - 16 %
16 - 20 %
20 - 23 %
Permeabilidad
5 - 10 mD
20 - 40 mD
5 - 11 mD
La evaluacin petrofsica del reservorio Guanacos, tuvo como origen los siguientes
registros: Potencial Espontneo, Gamma Ray, Calibre, Induccin, Snico, Densidad y
29
Gerencia de Exploracin
Neutrn. Los volmenes de arcilla fueron calculados a partir de los perfiles Gamma
Ray. Las Porosidades Efectivas (porosidad corregida por efecto de arcilla) fueron
calculadas a partir del crossplot Densidad Neutrn. La correccin de la porosidad por
efecto de arcilla se realiz utilizando la curva del volumen de arcilla, calculada a partir
de la curva GR. La saturacin de agua del sistema se calcul utilizando la ecuacin de
Simandoux, la cual introduce correcciones por efecto de arcilla. Actualmente no se
tiene produccin significativa de agua de los pozos del Campo El Dorado para la
determinacin de la resistividad del agua de formacin (Rw), por tal razn se utilizaron
los datos de la salinidad del Campo Naranjillos que varan entre 18000 a 20000 ppm de
cloruro de sodio, para la Arenisca Guanacos.
Figura 15. Perfil interpretado para la Arenisca Guanacos del pozo DRO-X1002
POZO
ZONA
TOPE
BASE
m (MD)
4147
m (MD)
4164.7
ESPESOR
TOTAL
m
17.7
NET PAY
m
12.20
PAY/ESPESOR
TOTAL
DEC.
0.69
Gerencia de Exploracin
POROSIDAD
(PROMEDIO)
%
0.16
SATURACION DE
AGUA PROMEDIO
%
0.33
POZO
ZONA
DRD-X3 ST
DRS-1001
DRS-1002
DRS-1004
DRS-1005
PROMEDIO
AR. GUANACOS
AR. GUANACOS
AR. GUANACOS
AR. GUANACOS
AR. GUANACOS
AR. GUANACOS
TOPE
BASE
m (MD)
4173.7
4156
4187.5
4195
4181.5
m (MD)
4192.6
4176
4207.5
4215.08
4201
ESPESOR
TOTAL
m
18.9
20
20
20.08
19.5
19.70
NET PAY
m
11.25
17.71
15.24
15.85
13.69
14.75
PAY/ESPESOR
TOTAL
DEC.
0.60
0.89
0.76
0.79
0.70
0.75
POROSIDAD
(PROMEDIO)
%
15.00
16.00
16.00
17.00
15.00
15.80
SATURACION DE
AGUA PROMEDIO
%
42.00
38.00
40.00
45.00
44.00
41.80
Tabla 8. Propiedades petrofsicas Arenisca Guanacos (seccin inferior) en los pozos del Campo El Dorado
Sur
6.2.
En el pozo Dorado Oeste-X1002 se establece que el Lowest Known Gas (LKG) para el
reservorio Guanacos, de la Formacin Iquiri, se encuentra en la cota de -3714 m
correspondiente a la base del Reservorio Guanacos y base de los baleos efectuados
en los ensayos de formacin, Esta cota delimitara la base de las reservas probadas
P1 (Figuras 16 y 17).
31
Gerencia de Exploracin
Figura 16. Vista 3D del modelo estructural mostrando el volumen de Roca para reservas P1
Para delimitar la base de reservas probables (P2), se utiliz como limite la falla Back
DRO, que configura parcialmente un cierre estructural en el oeste, para el Reservorio
Guanacos, esta falla tiene su mejor expresin en la parte sur, en el sector centro no
existe ningn rechazo y en el norte este rechazo es mnimo, debido a este criterio no
32
Gerencia de Exploracin
se considera una cota fija para delimitar las reservas P2, siendo esta cota variable en
funcin a la forma/geometra de dicha falla. (Figuras 18 y 19)
Figura 18. Vista 3D del modelo estructural mostrando el volumen de Roca para reservas P2
33
Gerencia de Exploracin
Figura 19. Mapa de anomalas ssmicas asociadas a la Arenisca Guanacos en los Campos El Dorado Sur y
El Dorado Oeste
34
Gerencia de Exploracin
35
Gerencia de Exploracin
Reservas de Gas
Tipo de Reservas
[BCF]
1P (Probadas)
20.5
2P (Probadas + Probables)
42.6
78.6
7. ANLISIS DE PRESIONES
De acuerdo a las referencias de los pozos perforados en los campos El Dorado y El
Dorado Sur, la secuencia estratigrfica, incluida la Formacin Iquiri, presenta un
gradiente de presin normal. La presin original para la Arenisca Guanacos (Base
Formacin Iquiri) se estima en 5900 psi. A partir de la Formacin Los Monos el gradiente
de presin tiene un comportamiento anormal, ya que esta formacin se encuentra
sobrepresionada, pasando de 5900 psi en la Arenisca Guanacos a 9500 a 10500 psi
en la Formacin Los Monos, la misma que se encuentra a solo 100 m por debajo de la
anterior (Figura 22).
Figura 22. Gradiente de presiones construido con pesos de lodo para los pozos DRD-X1001 y DRD-X1002.
36
Gerencia de Exploracin
8. PROGNOSIS ESTRATIGRFICA
La prognosis estratigrfica propuesta para la perforacin del pozo DRO-X1001 se
detalla en la tabla adjunta.
FORMACION
Buz. ()
Aprox.
Grupo Chaco
YECUA
PETACA
CAJONES
YANTATA
ICHOA
CANGAPI
SAN TELMO
ESCARPMENT
TARIJA
TUPAMBI
IQUIRI
Tope Arenisca Guanacos 7 - 9
Tope Reservorio Guanacos
Base Arenisca Guanacos
LOS MONOS
Tope Arenisca
Base Arenisca
Tope Arenisca
Arenisca
Base Arenisca
Tope Arenisca
Base Arenisca
0
0
1
1
1
2
2
TD FINAL
Profundidad
Profundidad Vertical Verdadera desde KB (447.7 m)
medida
Aprox.
Esperado MD
Variacin (m)
Desde KB
TVDSS (m)
Superficie
+/- 30
1849.7
1849.7
-1402.00
1946.7
+/- 30
1946.7
-1499.00
+/- 30
2024.7
2024.7
-1577.00
2187.7
+/- 30
2187.7
-1740.00
+/- 30
2284.7
2284.7
-1837.00
+/- 30
2588.7
2588.7
-2141.00
2992.7
+/- 50
2992.7
-2545.00
+/- 50
3020.7
3020.7
-2573.00
3136.7
+/- 50
3136.7
-2689.00
+/- 50
3871.7
3871.7
-3424.00
4027.7
+/- 50
4027.7
-3580.00
260 - 280
+/- 50
4207.7
4207.7
-3760.00
+/- 50
4236.0
4260.0
-3788.30
4257.7
+/- 50
4257.7
-3810.00
+/- 50
4317.7
4317.7
-3870.00
4343.7
+/- 50
4343.7
-3896.00
+/- 50
4363.7
4363.7
-3916.00
+/- 50
4429.7
4429.7
-3982.00
4455.7
+/- 50
4455.7
-4008.00
+/- 50
4471.7
4471.7
-4024.00
4540.7
+/- 50
4540.7
-4093.00
+/- 50
4581.7
4581.7
-4134.00
4650.0
+/- 50
4650.0
-4202.30
Acimut ()
9. PLAN DIRECCIONAL
La perforacin del pozo DRO-X1001 considera una trayectoria vertical hasta alcanzar
los objetivos de la Formacin Los Monos. En el pozo DRO-X1002 se tena previsto
atravesar los mismos objetivos, pero debido a que la falla El Dorado fue registrada
antes de lo previsto, repitiendo la secuencia del Iquiri Inferior, no se logr alcanzar los
niveles arenosos de la Formacin Los Monos. El pozo DRO-X1001 se ubica
aproximadamente a 600 m al oeste del DRO-X1002, este desplazamiento hace que la
Falla El Dorado, al ubicarse a mayor profundidad, permite
Gerencia de Exploracin
Figura 23. Seccin ssmica Oeste-Este a nivel de la Arenisca Guanacos y Formacin Los Monos, a travs
del pozo DRO-X1001.
38
Gerencia de Exploracin
Figura 24. Plan direccional del pozo DRO-X1001, vista en planta, mostrando el rea de tolerancia de la
desviacin.
39
Gerencia de Exploracin
40
Gerencia de Exploracin
Tramo 81/2
Resistividad, Gamma Ray, Snico (full wave), DensidadNeutrn, Imagen de pozo, Calibre de pozo, Registro de
presiones en hueco abierto, (Opcional) Rt Scanner
Tramo 6
Resistividad, Gamma Ray, Snico (full wave), DensidadNeutrn, Calibre de pozo (opcional Imagen de pozo).
12. CORONAS
No se cortaran coronas ni testigos de fondo.
FRECUENCIA DE MUESTREO
17
12
41
Gerencia de Exploracin
42
Gerencia de Exploracin
43
Gerencia de Exploracin
44
www.ypfbchaco.com.bo
Noviembre - 2014
www.ypfbchaco.com.bo
Mapa de Ubicacin
www.ypfbchaco.com.bo
INFORMACION SISMICA
5
www.ypfbchaco.com.bo
www.ypfbchaco.com.bo
www.ypfbchaco.com.bo
www.ypfbchaco.com.bo
ESTRATIGRAFIA
www.ypfbchaco.com.bo
www.ypfbchaco.com.bo
CORTE ESTRUCTURAL
www.ypfbchaco.com.bo
CORRELACION
ESTRATIGRAFICA
www.ypfbchaco.com.bo
www.ypfbchaco.com.bo
PROGNOSIS ESTRATIGRAFICA
FORMACION
Buz . ()
Aprox.
Grupo Chaco
YECUA
PETACA
CAJONES
YANTATA
ICHOA
CANGAPI
SAN TELMO
ESCARPMENT
TARIJA
TUPAMBI
IQUIRI
Tope Arenisca Guanacos 7 - 9
Base Arenisca Guanacos
LOS MONOS
Tope Arenisca 0
Base Arenisca 0
Tope Arenisca 1
Arenisca 1
Base Arenisca 1
Tope Arenisca 2
Base Arenisca 2
TD FINAL
www.ypfbchaco.com.bo
Profundidad
medida
Aprox.
Esperado MD
Superficie
1839
1936
2014
2177
2274
2578
2982
3010
3126
3861
4017
260 - 280
4197
4247
4307
4333
4353
4419
4445
4461
4530
4571
4650
Acimut ()
Desde KB
TVDSS (m)
+/- 30
+/- 30
+/- 30
+/- 30
+/- 30
+/- 30
+/- 50
+/- 50
+/- 50
+/- 50
+/- 50
+/- 50
+/- 50
+/- 50
+/- 50
+/- 50
+/- 50
+/- 50
+/- 50
+/- 50
+/- 50
+/- 50
1839
1936
2014
2177
2274
2578
2982
3010
3126
3861
4017
4197
4247
4307
4333
4353
4419
4445
4461
4530
4571
4650
-1402
-1499
-1577
-1740
-1837
-2141
-2545
-2573
-2689
-3424
-3580
-3760
-3810
-3870
-3896
-3916
-3982
-4008
-4024
-4093
-4134
-4213
Cretcico
Terciario
Pernico
Devnico
www.ypfbchaco.com.bo
Agujero 6
Carbonfero
www.ypfbchaco.com.bo
OD
Inches
17.50
9.50
9.50
9.50
9.50
8.00
5.50
5.50
TOTAL BHA =
Mud Weight
Bouyancy Factor
Wt. Below the Jars in mud
String Wt in mud at Total Depth
Maximum Overpull
5 1/2" 21.9 # FH S135 DP Properties
Class I (New) Strength
Capacities (bbl/m) c/TJ
Open End Displacement c/TJ
ID
Inches
3.00
3.00
3.00
3.00
3.00
3.00
3.00
4.78
Length
meters
0.42
7.40
1.21
9.50
1.22
0.93
85.50
3.82
Bottom - Top
Connection
7-5/8" Reg (P)
7-5/8" Reg (B) x (P)
7-5/8" Reg(B) x 7-5/8" Reg (B)
7-5/8" Reg (P) x (B)
7-5/8" Reg (P) x 6-5/8" Reg (B)
6-5/8" Reg (P) x 5 1/2" FH (B)
5 1/2" FH (P) x (B)
5 1/2" FH (P) x (B)
106.2 m
Weight
lbs/ft
400
216.0
216.0
216.0
216.0
147.0
65.2
26.3
32,828 lbs
8.7 ppg WBM
0.867
N/A
28,461 lbs
679,667 lbs
110.0 m
90%
786,809 lbs
0.0709 Bbl/m
0.0303 Bbl/m
Page 1
Air
Wt. Lbs
400
5,243
857
6,731
864
448
18,285
330
Source
YPFB Chaco
YPFB Chaco
Contratista
Contratista
Contratista
Contratista
Contratista
Contratista
17.5" (500 m)
OD
Inches
17.50
9.50
9.50
9.50
9.50
9.50
9.50
9.50
9.50
8.00
8.00
5.00
5.00
TOTAL BHA =
Mud Weight
Bouyancy Factor
Wt. Below the Jars in mud
String Wt in mud at Total Depth
Maximum Overpull
5 1/2" 21.9 # FH S135 DP Properties
Class I (New) Strength
Capacities (bbl/m) c/TJ
Open End Displacement c/TJ
ID
Inches
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
4.78
Length
meters
0.42
7.20
1.21
9.39
1.80
9.39
1.80
9.39
1.22
55.80
0.93
85.50
315.95
Bottom - Top
Connection
7-5/8" Reg (P)
7-5/8" Reg (B) x (P)
7-5/8" Reg(B) x 7-5/8" Reg (B)
7-5/8" Reg (P) x (B)
7-5/8" Reg (P) x (B)
7-5/8" Reg (P) x (B)
7-5/8" Reg (P) x (B)
7-5/8" Reg (P) x (B)
7-5/8" Reg (P) x 6-5/8" Reg (B)
6-5/8" Reg (P) x (B)
6-5/8" Reg (P) x 5 1/2" FH (B)
5 1/2" FH (P) x (B)
5 1/2" FH (P) x (B)
184.1 m
Weight
lbs/ft
400
216.0
216.0
216.0
216.0
216.0
216.0
216.0
216.0
147.0
147.0
65.3
26.3
74,539 lbs
8.8 ppg WBM
0.865
NA
64,510 lbs
643,618 lbs
500.0 m
90%
786,809 lbs
0.0709 Bbl/m
0.0303 Bbl/m
Page 2
Air
Wt. Lbs
400
5,101
6,653
1,275
6,653
1,275
6,653
864
26,905
448
18,313
27,255
Source
YPFB Chaco
YPFB Chaco
Contratista
Contratista
Contratista
Contratista
Contratista
Contratista
Contratista
Contratista
Contratista
Contratista
Contratista
17.5" (1100 m)
OD
Inches
17.50
9.63
9.50
9.50
9.44
9.44
9.50
9.19
8.00
8.00
8.00
8.00
5.50
5.50
ID
Inches
3.00
3.25
3.06
3.00
3.19
3.50
3.50
3.00
3.00
2.94
3.00
2.88
3.00
4.78
Length
meters
0.40
9.16
1.00
1.80
1.04
8.21
4.19
1.18
57.00
9.49
28.50
0.72
85.50
891.81
208.2 m
1100.0 m
90%
Bottom - Top
Connection
7-5/8" Reg (P)
7-5/8" Reg(B) x 7-5/8" Reg (B)
7-5/8" Reg (P) x (B)
7-5/8" Reg (P) x (B)
7-5/8" Reg (P) x (B)
7-5/8" Reg (P) x (B)
7-5/8" Reg (P) x (B)
7-5/8" Reg (P) x 6-5/8" Reg (B)
6-5/8" Reg (P) x (B)
6-5/8" Reg (P) x (B)
6-5/8" Reg (P) x (B)
6-5/8" Reg (P) x 5 1/2" FH (B)
5 1/2" FH (P) x (B)
5 1/2" FH (P) x (B)
83,692 lbs
9.2 ppg WBM
0.859
40,143 lbs
138,028 lbs
570,101 lbs
786,809 lbs
0.0709 Bbl/m
0.0303 Bbl/m
Page 3
Weight
lbs/ft
400
216.0
216.0
216.0
216.0
216.0
216.0
216.0
147.0
147.0
147.0
147.0
65.3
26.3
Air
Wt. Lbs
400
6,490
708
1,275
737
5,817
2,969
836
27,483
4,576
13,742
347
18,313
76,931
Source
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
Contratista
Contratista
YPFB Chaco
Contratista
Contratista
Contratista
Contratista
OD
Inches
17.50
9.50
9.50
9.50
9.50
9.50
9.50
9.19
8.00
8.00
8.00
8.00
5.50
5.50
ID
Inches
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
2.75
2.94
2.75
3.06
3.00
4.78
Length
meters
0.40
1.80
9.39
1.80
9.50
1.80
9.50
1.18
27.90
9.49
27.90
0.72
85.50
913.12
186.9 m
1100.0 m
90%
Bottom - Top
Connection
7-5/8" Reg (P)
7-5/8" Reg(B) x 7-5/8" Reg (B)
7-5/8" Reg (P) x (B)
7-5/8" Reg (P) x (B)
7-5/8" Reg (P) x (B)
7-5/8" Reg (P) x (B)
7-5/8" Reg (P) x (B)
7-5/8" Reg (P) x 6-5/8" Reg (B)
6-5/8" Reg (P) x (B)
6-5/8" Reg (P) x (B)
6-5/8" Reg (P) x (B)
6-5/8" Reg (P) x 5 1/2" FH (B)
5 1/2" FH (P) x (B)
5 1/2" FH (P) x (B)
74,440 lbs
9.2 ppg WBM
0.859
32,442 lbs
131,657 lbs
576,471 lbs
786,809 lbs
0.0709 Bbl/m
0.0303 Bbl/m
Page 4
Weight
lbs/ft
400
216.0
216.0
216.0
216.0
216.0
216.0
216.0
147.0
147.0
147.0
147.0
65.3
26.3
Air
Wt. Lbs
400
400
6,653
1,275
6,731
1,275
6,731
836
13,452
4,576
13,452
347
18,313
78,769
Source
YPFB Chaco
YPFB Chaco
Contratista
YPFB Chaco
Contratista
YPFB Chaco
Contratista
Contratista
Contratista
YPFB Chaco
Contratista
Contratista
Contratista
Contratista
OD
Inches
12.25
9.50
8.00
8.00
8.00
8.00
5.50
5.50
TOTAL BHA =
Mud Weight
Bouyancy Factor
Wt. Below the Jars in mud
String Wt in mud at Total Depth
Maximum Overpull
5 1/2" 21.9 # FH S135 DP Properties
Class I (New) Strength
Capacities (bbl/m) c/TJ
Open End Displacement c/TJ
N 4
ID
Inches
3.00
2.88
2.81
3.00
3.00
3.06
3.00
4.78
Length
meters
0.40
1.00
55.80
9.49
27.90
0.80
85.50
919.11
180.9 m
1100.0 m
90%
Bottom - Top
Connection
6-5/8" Reg (P)
6-5/8" Reg (B) x 6-5/8" Reg (B)
6-5/8" Reg (P) x (B)
6-5/8" Reg (P) x (B)
6-5/8" Reg (P) x (B)
6-5/8" Reg (P) x 5 1/2" FH (B)
5 1/2" FH (P) x (B)
5 1/2" FH (P) x (B)
Weight
lbs/ft
400
216.0
147.0
147.0
147.0
147.0
65.3
26.3
64,739 lbs
9.2 ppg WBM
0.859
24,072 lbs
123,765 lbs
584,363 lbs
786,809 lbs
0.0709 Bbl/m
0.0303 Bbl/m
Air
Wt. Lbs
400
708
26,905
4,576
13,452
386
18,313
79,286
Source
YPFB Chaco
Contratista
Contratista
Contratista
Contratista
Contratista
Contratista
Contratista
OD
Inches
12 1 /4"
9.63
9.50
9.50
9.50
9.50
9.50
9.50
8.00
8.00
8.00
8.00
5.50
5.50
ID
Inches
3.25
2.88
2.81
3.00
3.25
2.94
3.00
3.00
3.00
3.00
3.06
3.00
4.78
Length
meters
0.32
9.34
0.62
2.03
0.97
8.99
2.80
1.00
57.00
9.70
28.50
0.80
85.50
3242.43
207.6 m
3450.0 m
90%
Bottom - Top
Connection
6-5/8" Reg (P)
6-5/8" Reg (B) x 7-5/8 (B)
7-5/8" Reg (P) x (B)
7-5/8" Reg (P) x (B)
7-5/8" Reg (P) x (B)
7-5/8" Reg (P) x (B)
7-5/8" Reg (P) x (B)
7-5/8" Reg (P) x 6-5/8" Reg (B)
6-5/8" Reg (P) x (B)
6-5/8" Reg (P) x (B)
6-5/8" Reg (P) x (B)
6-5/8" Reg (P) x 5 1/2" FH (B)
5 1/2" FH (P) x (B)
5 1/2" FH (P) x (B)
216.0
216.0
216.0
216.0
216.0
216.0
216.0
147.0
147.0
147.0
147.0
65.3
26.3
83,243 lbs
9.4 ppg WBM
0.856
39,497 lbs
310,782 lbs
397,347 lbs
786,809 lbs
0.0709 Bbl/m
0.0303 Bbl/m
Page 6
Weight
lbs/ft
Air
Wt. Lbs
400
6,617
439
1,438
687
6,369
1,984
708
27,483
4,677
13,742
386
18,313
279,705
Source
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
Contratista
Contratista
YPFB Chaco
Contratista
Contratista
Contratista
Contratista
OD
Inches
12.25
8.00
8.00
8.00
8.00
8.00
8.00
8.00
5.50
5.50
TOTAL BHA =
Mud Weight
Bouyancy Factor
Wt. Below the Jar in mud
String Wt in mud at Total Depth
Maximum Overpull
5 1/2" 21.9 # FH S135 DP Properties
Class I (New) Strength
Capacities (bbl/m) c/TJ
Open End Displacement c/TJ
ID
Inches
3.00
3.00
3.00
3.00
3.00
3.00
3.06
3.00
4.78
Length
meters
0.4 m
2.0 m
9.3 m
2.0 m
57.00
9.70
28.50
0.80
85.50
3254.8 m
Bottom - Top
Connection
6-5/8" Reg (P)
6-5/8" (B) x 6-5/8" (B)
6-5/8" Reg (P) x (B)
6-5/8" Reg (P) x (B)
6-5/8" Reg (P) x (B)
6-5/8" Reg (P) x (B)
6-5/8" Reg (P) x (B)
6-5/8" Reg (P) x 5 1/2" FH (B)
5 1/2" FH (P) x (B)
5 1/2" FH (P) x (B)
195.2 m
Weight
lbs/ft
147.0
147.0
147.0
147.0
147.0
147.0
147.0
65.3
26.3
71,413 lbs
9.4 ppg WBM
0.856
29,366 lbs
301,568 lbs
406,560 lbs
3450.0 m
90%
786,809 lbs
0.0709 Bbl/m
0.0303 Bbl/m
Page 7
Air
Wt. Lbs
400
964
4,484
964
27,483
4,677
13,742
386
18,313
280,776
Source
YPFB Chaco
YPFB Chaco
Contratista
YPFB Chaco
Contratista
YPFB Chaco
Contratista
Contratista
Contratista
Contratista
OD
Inches
12.25
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
5.50
5.50
TOTAL BHA =
Mud Weight
Bouyancy Factor
Wt. Below the Jar in mud
String Wt in mud at Total Depth
Maximum Overpull
5 1/2" 21.9 # FH S135 DP Properties
Class I (New) Strength
Capacities (bbl/m) c/TJ
Open End Displacement c/TJ
ID
Inches
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.06
3.00
4.78
Length
meters
0.4 m
2.0 m
9.3 m
1.9 m
9.3 m
1.9 m
46.50
9.70
27.90
0.80
85.50
3254.9 m
Bottom - Top
Connection
6-5/8" Reg (P)
6-5/8" (B) x 6-5/8" (B)
6-5/8" Reg (P) x (B)
6-5/8" Reg (P) x (B)
6-5/8" Reg (P) x (B)
6-5/8" Reg (P) x (B)
6-5/8" Reg (P) x (B)
6-5/8" Reg (P) x (B)
6-5/8" Reg (P) x (B)
6-5/8" Reg (P) x 5 1/2" FH (B)
5 1/2" FH (P) x (B)
5 1/2" FH (P) x (B)
195.1 m
Weight
lbs/ft
147.0
147.0
147.0
147.0
147.0
147.0
147.0
147.0
147.0
65.3
26.3
71,384 lbs
9.4 ppg WBM
0.856
29,589 lbs
301,548 lbs
406,580 lbs
3450.0 m
90%
786,809 lbs
0.0709 Bbl/m
0.0303 Bbl/m
Page 8
Air
Wt. Lbs
400
964
4,484
902
4,484
902
22,420
4,677
13,452
386
18,313
280,781
Source
YPFB Chaco
YPFB Chaco
Contratista
YPFB Chaco
Contratista
YPFB Chaco
Contratista
YPFB Chaco
Contratista
Contratista
Contratista
Contratista
OD
Inches
8.50
6.75
6.50
4.50
6.50
4.50
4.50
5.00
5.00
TOTAL BHA =
Mud Weight
Bouyancy Factor
Wt. Below the Jar in mud
String Wt in mud at Total Depth
Maximum Overpull
5 1/2" 21.9 # FH S135 DP Properties
Class I (New) Strength
Capacities (bbl/m) c/TJ
Open End Displacement c/TJ
ID
Inches
2.75
2.81
2.75
2.25
2.75
3.83
3.00
4.28
Length
meters
0.3 m
2.0 m
55.8 m
142.5 m
9.5 m
114.0 m
521.0 m
0.8 m
2600.0 m
Bottom - Top
Connection
4-1/2" Reg Pin
4-1/2" Reg (B) x NC-46 (B)
NC46 (P) x (B)
NC46 (P) x (B)
NC46 (P) x (B)
NC46 (P) x (B)
NC46 (P) x (B)
NC46 (P) x NC50 (B)
NC50 (P) x (B)
324.0 m
Weight
lbs/ft
99.0
99.0
41.0
99.0
41.0
19.3
22.6
22.6
56,582 lbs
9.4 ppg WBM
0.856
32,689 lbs
213,480 lbs
494,648 lbs
3445.0 m
90%
786,809 lbs
0.0709 Bbl/m
0.0303 Bbl/m
Page 9
Air
Wt. Lbs
250
643
18,119
19,163
3,075
15,331
32,947
59
192,733
Source
YPFB Chaco
Contratista
Contratista
Contratista
YPFB Chaco
Contratista
Contratista
Contratista
Contratista
OD
Inches
8.50
6.75
6.50
6.50
6.50
4.50
5.00
5.00
TOTAL BHA =
Mud Weight
Bouyancy Factor
Wt. Below the Jar in mud
String Wt in mud at Total Depth
Maximum Overpull
5 1/2" 21.9 # FH S135 DP Properties
Class I (New) Strength
Capacities (bbl/m) c/TJ
Open End Displacement c/TJ
ID
Inches
2.75
3.00
2.25
2.75
3.83
3.00
4.28
Length
meters
0.3 m
2.0 m
142.5 m
9.5 m
57.0 m
633.8 m
0.8 m
2600.0 m
BHA N 10 (2)
Bottom - Top
Connection
4-1/2" Reg Pin
4-1/2" Reg (B) x NC-46 (B)
NC46 (P) x (B)
NC46 (P) x (B)
NC46 (P) x (B)
NC46 (P) x (B)
NC46 (P) x NC50 (B)
NC50 (P) x (B)
211.2 m
Weight
lbs/ft
99.0
89.0
89.0
89.0
19.3
22.6
22.6
61,895 lbs
9.4 ppg WBM
0.856
36,384 lbs
218,030 lbs
490,098 lbs
3445.0 m
90%
786,809 lbs
0.0709 Bbl/m
0.0303 Bbl/m
Page 10
Air
Wt. Lbs
250
643
41,599
2,764
16,639
40,080
59
192,733
Source
YPFB Chaco
Contratista
Contratista
YPFB Chaco
Contratista
Contratista
Contratista
Contratista
OD
Inches
8.50
8.25
6.75
6.50
6.50
6.50
4.50
5.00
5.00
TOTAL BHA =
Mud Weight
Bouyancy Factor
Wt. Below the Jar in mud
String Wt in mud at Total Depth
Maximum Overpull
5" 19.5# NC50 S135 DP Properties
Class I (New) Strength
Capacities (bbl/m) c/TJ
Open End Displacement c/TJ
ID
Inches
3.38
2.75
2.81
2.25
2.75
3.83
3.00
4.28
Length
meters
0.3 m
1.1 m
2.0 m
142.5 m
9.5 m
57.0 m
632.7 m
0.8 m
2600.0 m
BHA N 11
Bottom - Top
Connection
4-1/2" Reg Pin
4-1/2" Reg (B) x 4-1/2" Reg (P)
4-1/2" Reg (B) x NC-46 (B)
NC46 (P) x (B)
NC46 (P) x (B)
NC46 (P) x (B)
NC46 (P) x (B)
NC46 (P) x NC50 (B)
NC50 (P) x (B)
212.3 m
Weight
lbs/ft
99.0
89.0
89.0
89.0
89.0
19.3
22.6
22.6
62,194 lbs
9.4 ppg WBM
0.856
36,640 lbs
218,286 lbs
422,514 lbs
3445.0 m
90%
712,000 lbs
0.0573 Bbl/m
0.0257 Bbl/m
Page 11
Air
Wt. Lbs
250
364
578
41,599
2,764
16,639
40,009
59
192,733
Source
YPFB Chaco
YPFB Chaco
Contratista
Contratista
YPFB Chaco
Contratista
Contratista
Contratista
Contratista
OD
Inches
8.50
6.75
6.63
6.50
6.63
6.50
6.44
6.50
6.44
6.44
6.50
6.50
6.50
4.50
5.00
5.00
ID
Inches
2.88
2.25
2.81
2.25
2.81
2.81
2.81
2.81
2.81
2.88
2.88
2.75
3.83
3.00
4.28
Length
meters
0.26
8.36
1.00
0.80
1.51
0.80
1.01
0.80
8.63
4.02
142.50
9.96
57.0 m
1038.4 m
0.8 m
2600.00
BHA N 12
Top
Connection
4-1/2" Reg Pin
4-1/2" Reg (B) x 4-1/2" IF (B)
NC-50 (P) x (B)
NC-50 (P) x NC-46 (B)
NC-46 (P) x (B)
NC-46 (P) x NC-50 (B)
NC-50 (P) x (B)
NC-50 (P) x NC-46 (B)
NC-46 (P) x (B)
NC-46 (P) x (B)
NC-46 (P) x (B)
NC-50 (P) x (B)
NC46 (P) x (B)
NC46 (P) x (B)
NC46 (P) x NC50 (B)
NC-50 (P) x (B)
236.7 m
3875.0 m
90%
91.0
91.0
89.0
89.0
89.0
89.0
89.0
89.0
89.0
89.0
89.0
89.0
19.3
22.6
22.6
69,318 lbs
11.5 ppg WBM
0.824
41,020 lbs
215,972 lbs
424,828 lbs
712,000 lbs
0.0573 Bbl/m
0.0257 Bbl/m
Page 12
Weight
lbs/ft
Air
Wt. Lbs
250
2,495
298
234
441
234
295
234
2,519
1,174
41,599
2,908
16,639
65,664
59
192,733
Source
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
Contratista
YPFB Chaco
Contratista
Contratista
Contratista
Contratista
OD
Inches
8.50
6.75
6.63
6.50
6.63
6.50
6.44
6.50
6.44
6.44
6.50
6.50
6.50
4.50
5.00
5.00
ID
Inches
2.88
2.25
2.81
2.25
2.81
2.81
2.81
2.81
2.81
2.88
2.88
2.75
3.83
3.00
4.28
Length
meters
0.26
8.36
1.00
0.80
1.51
0.80
1.01
0.80
8.63
4.02
142.50
9.96
57.0 m
1463.35
0.80
2600.00
BHA N 13
Top
Connection
4-1/2" Reg Pin
4-1/2" Reg (B) x 4-1/2" IF (B)
NC-50 (P) x (B)
NC-50 (P) x NC-46 (B)
NC-46 (P) x (B)
NC-46 (P) x N-C-50 (B)
NC-50 (P) x (B)
NC-50 (P) x NC-46 (B)
NC46 (P) x (B)
NC46 (P) x (B)
NC-46 (P) x (B)
NC-50 (P) x (B)
NC46 (P) x (B)
NC46 (P) x (B)
NC46 (P) x NC50 (B)
NC-50 (P) x (B)
236.7 m
4300.0 m
90%
91.0
91.0
91.0
91.0
91.0
91.0
91.0
91.0
91.0
89.0
89.0
89.0
19.3
22.6
22.6
162,033 lbs
11.5 ppg WBM
0.824
41,115 lbs
292,383 lbs
348,417 lbs
712,000 lbs
0.0573 Bbl/m
0.0257 Bbl/m
Page 13
Weight
lbs/ft
Air
Wt. Lbs
250
2,495
298
239
451
239
301
239
2,576
1,200
41,599
2,908
16,639
92,540
59
192,733
Source
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
Contratista
YPFB Chaco
Contratista
Contratista
Contratista
Contratista
OD
ID
Inches Inches
8.50
6.50
2.50
6.50
2.81
6.50
2.50
6.50
2.88
6.50
2.88
6.50
2.75
4.50
3.83
5.00
3.00
5.00
4.28
TOTAL BHA =
Mud Weight
Bouyancy Factor
Wt. Below the Jar in mud
String Wt in mud at Total Depth
Maximum Overpull
5" 19.5# NC50 S135 DP Properties
Class I (New) Strength
Capacities (bbl/m) c/TJ
Open End Displacement c/TJ
Length
meters
0.32
1.50
9.30
1.67
142.50
9.96
57.0 m
1477.75
0.80
2600.00
222.3 m
4300.0 m
90%
Top
Connection
4-1/2" Reg Pin
4-1/2" Reg (B) x 4-1/2" XH(B)
NC46 (P) x (B)
NC46 (P) x (B)
NC-46 (P) x (B)
NC-50 (P) x (B)
NC46 (P) x (B)
NC46 (P) x (B)
NC46 (P) x NC50 (B)
NC-50 (P) x (B)
BHA N 14 & 15
Weight
lbs/ft
91.0
91.0
91.0
89.0
89.0
89.0
19.3
22.6
22.6
158,627 lbs
11.5 ppg WBM
0.824
37,557 lbs
289,577 lbs
351,223 lbs
712,000 lbs
0.0573 Bbl/m
0.0257 Bbl/m
Page 14
Air
Wt. Lbs
250
448
2,776
498
41,599
2,908
16,639
93,451
59
192,733
Source
YPFB Chaco
YPFB Chaco
Contratista
YPFB Chaco
Contratista
YPFB Chaco
Contratista
Contratista
Contratista
Contratista
OD
ID
Inches Inches
8.50
6.50
2.50
6.50
2.81
6.50
2.50
6.50
2.81
6.50
2.50
6.50
2.88
6.50
2.88
6.50
2.75
4.50
3.83
5.00
3.00
5.00
4.28
TOTAL BHA =
Mud Weight
Bouyancy Factor
Wt. Below the Jar in mud
String Wt in mud at Total Depth
Maximum Overpull
5" 19.5# NC50 S135 DP Properties
Class I (New) Strength
Capacities (bbl/m) c/TJ
Open End Displacement c/TJ
Length
meters
0.32
1.50
9.30
1.67
9.30
1.67
142.50
9.96
57.0 m
1466.78
0.80
2600.00
233.2 m
4300.0 m
90%
BHA N 16
Top
Connection
4-1/2" Reg Pin
4-1/2" Reg (B) x 4-1/2" XH(B)
NC46 (P) x (B)
NC46 (P) x (B)
NC46 (P) x (B)
NC46 (P) x (B)
NC-46 (P) x (B)
NC-50 (P) x (B)
NC46 (P) x (B)
NC46 (P) x (B)
NC46 (P) x NC50 (B)
NC-50 (P) x (B)
Weight
lbs/ft
89.0
89.0
89.0
89.0
89.0
89.0
89.0
89.0
19.3
22.6
22.6
161,054 lbs
11.5 ppg WBM
0.824
40,129 lbs
291,577 lbs
349,223 lbs
712,000 lbs
0.0573 Bbl/m
0.0257 Bbl/m
Page 15
Air
Wt. Lbs
250
438
2,715
488
2,715
488
41,599
2,908
16,639
92,757
59
192,733
Source
YPFB Chaco
YPFB Chaco
Contratista
YPFB Chaco
Contratista
YPFB Chaco
Contratista
YPFB Chaco
Contratista
Contratista
Contratista
Contratista
OD
Inches
8.50
8.25
6.75
6.50
6.50
6.50
4.50
5.00
5.00
TOTAL BHA =
Mud Weight
Bouyancy Factor
Wt. Below the Jar in mud
String Wt in mud at Total Depth
Maximum Overpull
5" 19.5# NC50 S135 DP Properties
Class I (New) Strength
Capacities (bbl/m) c/TJ
Open End Displacement c/TJ
ID
Inches
3.38
2.75
2.88
2.88
2.75
3.83
3.00
4.28
Length
meters
0.3 m
1.1 m
2.0 m
142.50
9.96
57.0 m
547.2 m
0.8 m
2600.0 m
BHA N 17
Bottom - Top
Connection
4-1/2" Reg Pin
4-1/2" Reg (B) x 4-1/2" Reg (P)
4-1/2" Reg (B) x NC-46 (B)
NC-46 (P) x (B)
NC-50 (P) x (B)
NC46 (P) x (B)
NC46 (P) x (B)
NC46 (P) x NC50 (B)
NC-50 (P) x (B)
212.8 m
Weight
lbs/ft
99.0
99.0
89.0
89.0
89.0
19.3
22.6
22.6
97,064 lbs
11.5 ppg WBM
0.824
35,320 lbs
238,839 lbs
401,961 lbs
3360.0 m
90%
712,000 lbs
0.0573 Bbl/m
0.0257 Bbl/m
Page 16
Air
Wt. Lbs
250
364
643
41,599
2,908
16,639
34,603
59
192,733
Source
YPFB Chaco
YPFB Chaco
Contratista
Contratista
YPFB Chaco
Contratista
Contratista
Contratista
Contratista
OD
ID
Inches Inches
6.00
4.50
2.25
4.75
2.44
3.50
3.00
4.75
2.25
3.50
3.00
3.50
2.25
4.50
3.83
4.50
3.83
5.00
3.00
5.00
4.28
TOTAL BHA =
Mud Weight
Bouyancy Factor
Wt. Below the Jar in mud
String Wt in mud at Total Depth
Maximum Overpull
5" 19.5# NC50 S135 DP Properties
Class I (New) Strength
Capacities (bbl/m) c/TJ
Open End Displacement c/TJ
Length
meters
0.2 m
1.2 m
85.5 m
85.50
9.96
57.00
1200.0 m
0.8 m
254.6 m
0.8 m
2600.0
BHA N 18
Top
Connection
3-1/2" Reg Pin
3-1/2" Reg (B) x 3-1/2" IF (B)
NC38 (P) x (B)
NC-38 (P) x (B)
NC-38 (P) x (B)
NC-38 (P) x (B)
NC38 (P) x (B)
NC38 (P) x NC46 (B)
NC46 (P) x (B)
NC46 (P) x NC50 (B)
NC-50 (P) x (B)
239.4 m
Weight
lbs/ft
50.0
50.0
25.3
47.0
25.3
16.9
19.3
19.3
22.6
22.6
27,829 lbs
11.5 ppg WBM
0.824
17,772 lbs
181,778 lbs
459,022 lbs
4294.0 m
90%
712,000 lbs
0.0573 Bbl/m
0.0257 Bbl/m
Page 17
Air
Wt. Lbs
250
197
14,022
7,095
1,535
4,730
66,440
51
16,103
59
192,733
Source
YPFB Chaco
Contratista
Contratista
Contratista
YPFB Chaco
Contratista
Contratista
Contratista
Contratista
Contratista
Contratista
OD
ID
Inches Inches
6.00
6.00
4.50
2.25
5.00
3.00
4.75
2.44
3.50
3.00
4.75
2.25
3.50
3.00
3.50
2.25
4.50
3.83
4.50
3.83
5.00
3.00
5.00
4.28
TOTAL BHA =
Mud Weight
Bouyancy Factor
Wt. Below the Jar in mud
String Wt in mud at Total Depth
Maximum Overpull
5" 19.5# NC50 S135 DP Properties
Class I (New) Strength
Capacities (bbl/m) c/TJ
Open End Displacement c/TJ
Length
meters
0.2 m
1.5 m
1.2 m
7.0 m
85.5 m
85.50
9.96
57.00
1200.0 m
0.8 m
246.1 m
0.8 m
2600.0
BHA N 19
Top
Connection
3-1/2" Reg Pin
3-1/2" Reg (B) x 3-1/2" Reg (P)
3-1/2" Reg (B) x 3-1/2" IF (B)
NC38 (P) x (B)
NC38 (P) x (B)
NC-38 (P) x (B)
NC-38 (P) x (B)
NC-38 (P) x (B)
NC38 (P) x (B)
NC38 (P) x NC46 (B)
NC46 (P) x (B)
NC46 (P) x NC50 (B)
NC-50 (P) x (B)
247.9 m
Weight
lbs/ft
50.0
50.0
50.0
50.0
25.3
47.0
25.3
16.9
19.3
19.3
22.6
22.6
111,279 lbs
11.5 ppg WBM
0.824
18,921 lbs
250,554 lbs
390,246 lbs
4294.0 m
90%
712,000 lbs
0.0573 Bbl/m
0.0257 Bbl/m
Page 18
Air
Wt. Lbs
250
246
197
1,148
14,022
7,095
1,535
4,730
66,440
51
15,565
59
192,733
Source
YPFB Chaco
YPFB Chaco
Contratista
YPFB Chaco
Contratista
Contratista
YPFB Chaco
Contratista
Contratista
Contratista
Contratista
Contratista
Contratista
OD
ID
Inches Inches
8.50
4.75
2.88
4.75
2.25
4.75
2.25
4.75
2.81
4.75
2.25
4.75
2.81
4.75
2.25
4.75
2.81
4.75
2.25
3.50
3.00
4.75
2.25
3.50
3.00
3.50
2.25
4.50
3.83
4.50
3.83
5.00
3.00
5.00
4.28
Length
meters
0.29
6.38
0.85
1.20
0.89
0.42
9.52
0.43
4.02
85.50
85.50
9.96
57.00
1200.0 m
0.8 m
598.04
0.8 m
2600.0
BHA N 20 & 21
Top
Connection
3-1/2" Reg Pin
3-1/2" Reg (B) x 3-1/2" IF (B)
NC-38 (P) x (B)
NC-38 (P) x (B)
NC-38 (P) x (B)
NC-38 (P) x (P)
NC-38 (B) x (B)
NC-38 (P) x (P)
NC-38 (B) x (B)
NC-38 (P) x (B)
NC-38 (P) x (B)
NC-38 (P) x (B)
NC-38 (P) x (B)
NC38 (P) x (B)
NC38 (P) x NC46 (B)
NC46 (P) x (B)
NC46 (P) x NC50 (B)
NC-50 (P) x (B)
262.0 m
Weight
lbs/ft
47.0
47.0
47.0
47.0
47.0
47.0
47.0
47.0
47.0
25.3
47.0
25.3
16.9
19.3
19.3
22.6
22.6
30,446 lbs
15.3 ppg WBM
0.766
18,524 lbs
170,968 lbs
469,832 lbs
4660.0 m
90%
712,000 lbs
0.0573 Bbl/m
0.0257 Bbl/m
Page 19
Air
Wt. Lbs
250
984
131
185
137
65
1,468
66
620
13,181
7,095
1,535
4,730
66,440
51
37,819
59
192,733
Source
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
Contratista
Contratista
YPFB Chaco
Contratista
Contratista
Contratista
Contratista
Contratista
Contratista
OD
ID
Length
Inches Inches meters
6.00
0.5 m
5.88
2.25
8.4 m
6.50
2.25
9.5 m
5.88
2.25
1.5 m
4.75
2.25
85.5 m
3.50
3.00
85.5 m
4.75
2.25
5.0 m
3.50
2.25
57.0 m
3.50
2.25 1200.0 m
4.50
3.83
0.8 m
4.50
3.83
607.20
5.00
3.00
0.8 m
5.00
4.28
2600.0
TOTAL BHA =
Mud Weight
Bouyancy Factor
Wt. Below the Jar in mud
String Wt in mud at Total Depth
Maximum Overpull
5" 19.5# NC50 S135 DP Properties
Class I (New) Strength
Capacities (bbl/m) c/TJ
Open End Displacement c/TJ
N 22
252.8 m
4660.0 m
90%
Top
Connection
3-1/2" Reg (P)
3-1/2" Reg (B) x 3 1/2" IF (B)
NC 38 (P) x (B)
NC 38 (P) x (B)
NC 38 (P) x (B)
NC-38 (P) x (B)
NC 38 (P) x (B)
NC 38 (P) x (B)
NC38 (P) x (B)
NC38 (P) x NC46 (B)
NC46 (P) x (B)
NC46 (P) x NC50 (B)
NC-50 (P) x (B)
Weight
lbs/ft
47.0
47.0
47.0
47.0
25.3
47.0
25.3
16.9
19.3
19.3
22.6
22.6
134,108 lbs
15.3 ppg WBM
0.766
18,124 lbs
250,378 lbs
390,422 lbs
712,000 lbs
0.0573 Bbl/m
0.0257 Bbl/m
Air
Wt. Lbs
400
1,287
1,465
231
13,181
7,095
771
4,730
66,440
51
38,398
59
192,733
Source
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
Contratista
Contratista
YPFB Chaco
Contratista
Contratista
Contratista
Contratista
Contratista
Contratista
OD
ID
Length
Inches Inches meters
6.00
0.5 m
5.88
2.25
8.4 m
6.50
2.25
9.5 m
5.88
2.25
1.5 m
6.50
2.25
9.5 m
5.88
2.25
1.5 m
4.75
2.25
85.5 m
3.50
3.00
85.5 m
4.75
2.25
5.0 m
3.50
2.25
57.0 m
3.50
2.25 1200.0 m
4.50
3.83
0.8 m
4.50
3.83
596.20
5.00
3.00
0.8 m
5.00
4.28
2600.0
TOTAL BHA =
Mud Weight
Bouyancy Factor
Wt. Below the Jar in mud
String Wt in mud at Total Depth
Maximum Overpull
5" 19.5# NC50 S135 DP Properties
Class I (New) Strength
Capacities (bbl/m) c/TJ
Open End Displacement c/TJ
N 23
263.8 m
4660.0 m
90%
Top
Connection
3-1/2" Reg (P)
3-1/2" Reg (B) x 3 1/2" IF (B)
NC 38 (P) x (B)
NC 38 (P) x (B)
NC 38 (P) x (B)
NC 38 (P) x (B)
NC 38 (P) x (B)
NC-38 (P) x (B)
NC 38 (P) x (B)
NC 38 (P) x (B)
NC38 (P) x (B)
NC38 (P) x NC46 (B)
NC46 (P) x (B)
NC46 (P) x NC50 (B)
NC-50 (P) x (B)
Weight
lbs/ft
47.0
47.0
47.0
47.0
47.0
47.0
25.3
47.0
25.3
16.9
19.3
19.3
22.6
22.6
327,841 lbs
15.3 ppg WBM
0.766
19,423 lbs
398,788 lbs
242,012 lbs
712,000 lbs
0.0573 Bbl/m
0.0257 Bbl/m
Air
Wt. Lbs
400
1,287
1,465
231
1,465
231
13,181
7,095
771
4,730
66,440
51
37,703
59
192,733
Source
YPFB Chaco
YPFB Chaco
Contratista
YPFB Chaco
Contratista
YPFB Chaco
Contratista
Contratista
YPFB Chaco
Contratista
Contratista
Contratista
Contratista
Contratista
Contratista
OD
ID
Length
Inches Inches meters
6.00
0.5 m
3.50
2.50
8.4 m
4.75
2.25
85.5 m
3.50
2.25
85.5 m
4.75
2.25
5.0 m
3.50
2.25
57.0 m
3.50
2.13 3998.2 m
TOTAL BHA =
Mud Weight
Bouyancy Factor
Wt. Below the Jar in mud
String Wt in mud at Total Depth
Maximum Overpull
90%
3 1/2" 15.5# NC38 S135 DP Properties
Premium Strength
Capacities (bbl/m) c/TJ
Open End Displacement c/TJ
N 24
241.8 m
4240.0 m
Top
Weight
Connection
lbs/ft
3-1/2" Reg (P)
3-1/2" Reg (B) x 3 1/2" IF (B)
47.0
NC 38 (P) x (B)
47.0
NC 38 (P) x (B)
25.3
NC 38 (P) x (B)
47.0
NC 38 (P) x (B)
25.3
NC 38 (P) x (B)
16.9
27,464 lbs
15.3 ppg WBM
0.766
16,825 lbs
190,617 lbs
215,386 lbs
451,115 lbs
0.0216 Bbl/m
0.0199 Bbl/m
Air
Wt. Lbs
400
1,287
13,181
7,095
771
4,730
221,366
Source
YPFB Chaco
Contratista
Contratista
Contratista
YPFB Chaco
Contratista
Contratista
N 25
OD
ID
Length
Inches Inches meters
4.125
0.2 m
3.063 0.8125
0.3 m
3.50
1.25
1.2 m
3.125 1.50
114.0 m
3.50
1.50
0.5 m
2.88
2.25
304.0 m
3.50
1.50
1.5 m
3.50
2.25
85.5 m
4.75
2.25
5.0 m
3.50
2.25
57.0 m
3.50
2.13 4084.8 m
569.2 m
4654.0 m
90%
Top
Connection
2-3/8" Reg (B)
2-3/8" Reg (P) x (P)
2-3/8" Reg (B) x (B)
2.3/8" Reg (P) x (B)
2-3/8 Reg (P) x PH-6 (B)
PH-6 (P) x (B)
PH-6 (P) x NC 38 (B)
NC 38 (P) x (B)
NC 38 (P) x (B)
NC 38 (P) x (B)
NC38 (P) x (B)
Weight
lbs/ft
35.0
35.0
35.0
35.0
8.7
20.0
25.3
47.0
25.3
16.9
13,506 lbs
15.3 ppg WBM
0.766
10,346 lbs
186,757 lbs
219,246 lbs
451,115 lbs
0.0216 Bbl/m
0.0199 Bbl/m
Air
Wt. Lbs
250
29
140
13,087
61
8,675
98
226,161
Source
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
Contratista
YPFB Chaco
Contratista
Contratista
N 26
OD
ID
Length
Inches Inches meters
4.125
0.2 m
5.000 1.25
1.5 m
3.50
1.25
1.2 m
3.125 1.50
114.0 m
3.50
1.50
0.5 m
2.88
2.25
304.0 m
3.50
2.25
1.0 m
3.50
2.25
85.5 m
4.75
2.25
5.0 m
3.50
2.25
57.0 m
5.88
2.00
4.0 m
3.50
2.13 4084.1 m
570.0 m
4654.0 m
90%
Top
Connection
2-3/8" Reg Pin
2-3/8" Reg (B) x 2-3/8" Reg (P)
2-3/8" Reg (B x B)
2-3/8" Reg (PxB)
2.3/8 Reg (P) x PH-6 (B)
PH-6 (P) x (B)
PH-6 (P) x NC 38 (B)
NC 38 (P) x (B)
NC 38 (P) x (B)
NC 38 (P) x (B)
NC38 (P) x (B)
NC38 (P) x (B)
Weight
lbs/ft
25.0
28.0
22.0
22.0
8.7
20.0
25.3
47.0
25.3
45.0
16.9
8,486 lbs
14.9 ppg WBM
0.772
6,553 lbs
183,089 lbs
222,915 lbs
451,115 lbs
0.0216 Bbl/m
0.0199 Bbl/m
Air
Wt. Lbs
25
123
112
8,226
38
8,675
66
7,095
771
4,730
590
226,119
Source
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
Contratista
YPFB Chaco
Contratista
YPFB Chaco
Contratista
PROGRAMA
PERFORACION DIRECCIONAL
PRESENTADO A
PROGRAMA
PERFORACION DIRECCIONAL
CAMPO : DORADO
POZO : DRO - X1001
INDICE
1.-
2.-
ANTECEDENTES
3.-
PLAN DIRECCIONAL
4.-
GRAFICOS
5.-
BHAs
6.-
RECOMENDACIONES
PROGRAMA
PERFORACION DIRECCIONAL
CAMPO : DORADO
POZO : DRO - X1001
NOMBRE POZO:
DRO-X1001
CAMPO:
DORADO
X
487145.00
Y
7955985.00
Z
437
ASR: 10.7 m
OBJETIVO
Ar. Guanacos
X
487711.16
Y
7958205.28
12
1100 3450
8
3450-4300
TVD (m)
4163.70
171/2
5 1100
6
4300-4660
PROGRAMA
PERFORACION DIRECCIONAL
CAMPO : DORADO
POZO : DRO - X1001
2.ANTECEDENTES
10
Dogleg Sev.
Azimuth
100 200 300
Build Rate
3
-3
-2
-1
Temp C - F
1
0
100
200
300
400
500
600
700
800
17
1/2"
BHA
#1
CHACO
900
1000
1100
1200
1300
1400
1500
1600
YECUA
PETACA
1700
1800
1900
CAJONES
2000
YANTATA
2100
2200
2300
12
1/4"
BHA
#2,
3,4
ICHOA
CANGAPI
C
2400
2500
2600
SAN
TELMO
2700
2800
2900
ESCARPMENT
3000
TARIJA
3100
3200
3300
TUPAMBI
3400
3500
3600
3700
3800
8.5"
3900
BHA
#5,6
IQUIRI
AR.
GUANACOS
4000
4100
AR.MORA
4200
4300
4400
4500
6"
BHA
#7,8
AR.TACOBO
Desplazamiento
0 20 40 60 80 100 120
WOB
0
10
15
20
RPM
70
120
0.0
ROP
50.0
100.0
150
450
GPM
750 1050
MW
10 12 14 16
DEPTH
IN
OUT
500
1000
2000
3000
3400
4000
4250
4400
1000
2000
3000
3400
4000
4250
4400
4503
DESCRIPTION
17 " PDC Bit + 9 " DHM, 0 Ako,17 "Stb,W/valve + 17 " String Stab + 1x9 " DC + 17 " String Stab + 2 x 9 " DC + XO + 3 x 8" DC + Drilling Jar + 3 x 8" DC + XO + 9 x 5" HWDP
12 " PDC + 9 "DHM, 0.78 Ako,12 "Stb + Float sub c/valv + 12 " String Stab. + 9 " A.Sub + 9 " Monel c/MWD + 9 " Pony Monel + XO + 6 x 8" DC + Drilling Jar + 3 x 8" DC + XO + 9 x 5" HWDP
12 " PDC + 9 "DHM, 0.78 Ako,12 "Stb + Float sub c/valv + 12 " String Stab. + 9 " A.Sub + 9 " Monel c/MWD + 9 " Pony Monel + XO + 6x 8" DC + Drilling Jar + 3 x 8" DC + XO + 9 x 5" HWDP
12 " PDC + 9 "DHM, 0.78 Ako,12 "Stb + Float sub c/valv + 12 " String Stab. + 9 " A.Sub + 9 " Monel c/MWD + 9 " Pony Monel + XO + 6x 8" DC + Drilling Jar + 3 x 8" DC + XO + 9 x 5" HWDP
8 " PDC + 6 "DHM, 0.78 Ako, 8 "Stb + 6 "Float sub c/valv + 6 "XO + 8"String Stb.+ 6 "XO + 6 "A. Sub + 6 "XO NM + 6 "Monel w/MWD + 6 "P. Monel + 6x6 " DC + 6 "XO + 12x5"HWDP + 6 "J
8 " PDC + 6 "DHM, 0.78 Ako, 8 "Stb + 6 "Float sub c/valv + 8"String Stb. + 6 "A. Sub + 6 "XO NM + 6 "Monel w/MWD-GR+ 6 "P. Monel + 6x6 " DC + 6 1/4"XO + 12x5"HWDP + 6 "JAR + 8x5"HW
6"Bit PDC + 4 "DHM 0.78AKO, 5 "Stb + F. sub + 5 "Stb String + 4"NM A.Sub + NM X-O + 4 "Monel MWD-GR + NM X-O + 4 "Pony Monel + 9x4 "DC + 9x3 " HWDP + 4"JAR + 9x3 "HWDP
6"Bit PDC + 4 "DHM 0.78AKO, 5 "Stb + F. sub + 5 "Stb String + 4"NM A.Sub + NM X-O + 4 "Monel MWD-GR + NM X-O + 4 "Pony Monel + 9x4 "DC + 9x3 " HWDP + 4"JAR + 9x3 "HWDP
Dogleg Sev.
Azimuth
Inclination
0
10
100
200
300
Temp C - F
Build Rate
-3
-2
-1
Desplazamiento
20
40
60
80 100
WOB
0
20
20
70
0.0
20.0
MW
GPM
ROP
RPM
40
40.0
150
450
750
1050
100
200
ROP bajaporuso
decaudalbajo
porperdidade
lodo
300
400
500
600
171/2
BHA#1
700
CHACO
TARIQUIA
800
900
1000
1100
1200
1300
1400
1500
YECUA
PETACA
1600
1700
CAJONES
1800
YANTATA
2000
ICHOA
2100
2200
121/4"
2300
BHA#2
BHA#3
2400
2500
CANGAPI
2600
2700
2800
ESCARPMENT
2900
3000
3100
3200
TARIJA
1900
3300
3400
3500
3600
3700
3800
81/2"
3900
BHA#4
BHA#5
BHA#6
TUPAMBI
4000
IQUIRI
4100
4200
4300
4400
4500
6"
BHA#7
BHA#8
IQUIRI
Ar. Guanacos
IQUIRI
Ar. MORA
LOSMONOS
10
12
14
# BHA
BHA #
BHA #
BHA #
BHA #
BHA #
BHA #
BHA #
BHA #
1
2
3
4
5
6
7 GR
8 GR
DEPTH
IN
OUT
210
1030
2420
2044
3420
3980
4230
4510
1025
2420
3420
3414
3980
4230
4510
4560
DESCRIPTION
17 1/2" Trep. PDC + 9 5/8" DHM AKO 1.15,Stb 17 1/4" + Float Sub + STB 17 3/8" + Aligment Sub + Monel C/ MWD + STB 17 3/8" + 2 pza de DC 9.5" + 1 X-over + 1 tiro DC 8" + 1 Drilling Jar 8" + 1 tiro DC 8" + X-Over
12 " Trep. PDC + 9" + DHM AKO 0.78, Stb 12 1/4" + Float Sub c/Vlv. 12 1/8" String STB. + Aligment sub + Monel c/MWD + Pony Monel + 1 X-over + 2 tiros DC 8" + Drilling Jar 8" + 1 tiro DC 8" + XO + 3 tiros HWD
12 " Trep. PDC + 9" + DHM AKO 0.78, Stb 12 1/4" + Float Sub c/Vlv. 12 1/8" String STB. + Aligment sub + Monel c/MWD + Pony Monel + 1 X-over + 2 tiros DC 8" + Drilling Jar 8" + 1 tiro DC 8" + XO + 3 tiros HWD
8 1/2" Trep. PDC + 6 3/4"DHM AKO 0, Stb 8 3/8" Stb + X-Over + 2 Tiros DC 6 1/2" + X-Over + 2 Tiros HWDP 5" + 6 1/2" Drilling Jar + 2 Tiros HWDP 5".
8 1/2" Trep PDC + 6 3/4" + DHM AKO 0.78, Stb 8 3/8" + Float Sub c/Vlv. + XO + 8 3/8" STB + XO +Aligment Sub + Monel c/MWD + Pony Monel + XO + 6 DC6 1/2" + XO +12x5"HWDP + 6 1/2" JAR + 9x5" HWPD
8 1/2" Trep PDC + 6 3/4" + DHM AKO 0.78, Stb 8 3/8" + Float Sub c/Vlv. + XO + 8 3/8" STB + XO +Aligment Sub + Monel c/MWD + Pony Monel + XO + 6 DC6 1/2" + XO +12x5"HWDP + 6 1/2" JAR + 9x5" HWPD
6" Trep PDC + 4 3/4" + DHM AKO 0.78, Stb 5 7/8" + Float Sub c/Vlv. + 5 7/8" STB + Aligment Sub + NMXO + Monel c/LWD + NMXO + Pony Monel + 9x4 3/4" DC + 9x3 1/2"HWDP + 4 3/4" JAR + 6x3 1/2" HWPD
6" Trep PDC + 4 3/4" + DHM AKO 0.78, Stb 5 7/8" + Float Sub c/Vlv. + 5 7/8" STB + Aligment Sub + NMXO + Monel c/LWD + NMXO + Pony Monel + 9x4 3/4" DC + 9x3 1/2"HWDP + 4 3/4" JAR + 6x3 1/2" HWPD
Dogleg Sev.
Azimuth
Inclination
0
10
100
200
300
Temp C - F
Build Rate
3
-3
-2
-1
Desplazamiento
0
100
200
300
400
500
600
700
800
17.5"
BHA
#1
TARIQUIA
900
1000
1100
1200
1300
1400
1500
YECUA
1600
PETACA
1700
CAJONES
1800
YANTATA
1900
2000
ICHOA
2100
2200
12.25"
2300
BHA
#2
IQUIRI
2400
2500
CANGAPI
2600
2700
2800
2900
ESCARPMENT
3000
3100
3200
3300
TARIJA
3400
3500
3600
3700
3800
3900
8.5"
8.5"
TUPAMBI
4000
4100
4200
4300
4400
4500
IQUIRI
IQUIRI
Ar. Guanacos
IQUIRI
Ar. MORA
LOSMONOS
20
40
60
80 100
WOB
0.0
20.0
RPM
40.0
20
70
GPM
ROP
0.0
50.0
100.0
150
450
750
MW
1050
10
15
# BHA
BHA # 1
BHA # 2
BHA # 3
BHA # 4
BHA # 5
BHA # 6 GR
BHA # 7 GR
DEPTH
IN
OUT
500
1098
2323
3326
3425
4100
4245
1093
2323
3324
3425
4100
4245
4435
DESCRIPTION
17 1/2" Trep.PDC+ 9 5/8" DHM 0 AKO 17 1/4" Stb + F.Sub c/Valv + 17 3/8" Stb + 1x9 1/2" DC + 17 3/8" Stb + 2x9 1/2" DC + XO + 3x8"DC + JAR + 3x8"DC + XO + 9x5" HWDP
12 1/4" Trep.PDC+ 9 5/8" DHM 0.78 AKO 12 1/8" Stb + F.Sub c/Valv + 12 1/8" Stb + 9 1/2" A.Sub + 9 1/2"Monel MWD + 9 1/2" Pony Monel + XO + 6x8"DC + JAR + 3x8" DC + XO + 9x5" HWDP
12 1/4" Trep.PDC+ 9 5/8" DHM 0.78 AKO 12 1/8" Stb + F.Sub c/Valv + 12 1/8" Stb + 9 1/2" A.Sub + 9 1/2"Monel MWD + 9 1/2" Pony Monel + XO + 6x8"DC + JAR + 3x8" DC + XO + 9x5" HWDP
12 1/4" Trep.PDC+ 9 5/8" DHM 0.78 AKO 12 1/8" Stb + F.Sub c/Valv + 12 1/8" Stb + 9 1/2" A.Sub + 9 1/2"Monel MWD + 9 1/2" Pony Monel + XO + 6x8"DC + JAR + 3x8" DC + XO + 9x5" HWDP
8 1/2" Trep.PDC+ 6 3/4" DHM 0.78AKO 8 3/8" Stb + F.Sub c/valv + XO + 8 3/8" Stb + XO + 6 1/2" A.Sub +6 1/2" NMXO + 6 1/2" Monel c/ MWD + 6 1/2" Pony Monel + 6x6 1/2" DC + XO+ 12x5" HWDP + 6 1/2" JAR +
8 1/2" Trep.PDC+ 6 3/4" DHM 0.78AKO 8 3/8" Stb + F.Sub + XO + 8 3/8" Stb + XO + 6 1/2" A.Sub + 6 1/2" Monel c/ MWD + GR + 6 1/2" Pony Monel + XO + 6x6 1/2" DC + XO+ 12x5" HWDP + 6 1/2" JAR + 8 x 5" HW
6" Trep.PDC+ 4 3/4" DHM 0.78AKO 5 7/8" Stb + F.Sub + 5 7/8" Stb + 4 3/4" A.Sub + NMXO + 4 3/4" Monel c/ MWD + GR + NMXO + 4 3/4" Pony Monel + 9x4 3/4" DC + 9x3 1/2" HWDP + 4 3/4" JAR + 9x3 1/2 " HWD
PROGRAMA
PERFORACION DIRECCIONAL
CAMPO : DORADO
POZO : DRO - X1001
3.PLAN DIRECCIONAL
1
5D Plan Report
5D Plan Report
DORADO
DORADO
DRO-X1001
Working Plan
05 diciembre 2014
2
5D Plan Report
Map Units : m
Company Name :
Field Name
DORADO
Units : m
Position
Site Name
Easting : 487145.00
DORADO
Comment :
Position (Offsets relative to Site Centre)
Slot Name
+N / -S : 0.00 m
Northing :7955985.00 m
Latitude : -1829'11.38"
+E / -W : 0.00 m
Easting :487145.00 m
Longitude : -637'18.37"
DRO-X1001
Well Name
DRO-X1001
UWI : DRO-X1001
Comment :
Closure Distance : 0 m
Closure Azimuth : 0
+E / -W : 0.00 m
Az :0.00
Dec : -11.07
Dip : -16.22
Magnetic Parameters
Model : IGRF
Date : 05/dic/2014
Plan Archive
Plan Folder
Date
P1
05/dic/2014
Comment
Plans
Plan
P1:V1
Date
05/dic/2014
Comment
Target Set
Name :
Number of Targets :
Comment :
3
5D Plan Report
Position (Relative to Site centre)
Northing : 7955985.00 m
Easting : 487145.00 m
+N / -S : 0.00m
+E / -W : 0.00m
TVD (Drill Floor) : 4207.40 m
Target Name:
Ar.Guanacos
Latitude : -1829'11.38"
Longitude : -637'18.37"
Planes
Shape:
4207.4 m
Arbitrary
TVD
Northing
4207.40m
7955985.00m
Perimeter Co-ordinates (Relative to Plane Centre)
North Offset (m)
50.00
-50.00
-50.00
50.00
Easting
487145.00 m
East Offset (m)
20.00
20.00
-20.00
-20.00
Inc
()
Az
()
Drill Floor )
TVD
(m)
N.Offset
(m)
E.Offset
(m)
DLS
(/30 m)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1100.00
0.00
0.00
1100.00
0.00
0.00
0.00
1849.40
0.00
0.00
1849.40
0.00
0.00
0.00
1946.40
0.00
0.00
1946.40
0.00
0.00
0.00
2024.40
0.00
0.00
2024.40
0.00
0.00
0.00
2187.40
0.00
0.00
2187.40
0.00
0.00
0.00
2284.40
0.00
0.00
2284.40
0.00
0.00
0.00
2588.40
0.00
0.00
2588.40
0.00
0.00
0.00
2992.40
0.00
0.00
2992.40
0.00
0.00
0.00
3020.40
0.00
0.00
3020.40
0.00
0.00
0.00
3136.40
0.00
0.00
3136.40
0.00
0.00
0.00
3450.00
0.00
0.00
3450.00
0.00
0.00
0.00
3871.40
0.00
0.00
3871.40
0.00
0.00
0.00
4027.40
0.00
0.00
4027.40
0.00
0.00
0.00
4207.40
0.00
0.00
4207.40
0.00
0.00
0.00
4317.40
0.00
0.00
4317.40
0.00
0.00
0.00
4343.40
0.00
0.00
4343.40
0.00
0.00
0.00
4429.40
0.00
0.00
4429.40
0.00
0.00
0.00
4
5D Plan Report
Salient Points (Relative to Site centre, TVD relative to
Drill Floor )
MD
(m)
Inc
()
Az
()
TVD
(m)
N.Offset
(m)
E.Offset
(m)
DLS
(/30 m)
4540.40
0.00
0.00
4540.40
0.00
0.00
0.00
4660.00
0.00
0.00
4660.00
0.00
0.00
0.00
Inc
()
Az
()
Drill Floor )
TVD
(m)
N.Offset
(m)
E.Offset
(m)
DLS
(/30 m)
Comment
Superficie; Chaco :
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
0.00
0.00
30.00
0.00
0.00
0.00
60.00
0.00
0.00
60.00
0.00
0.00
0.00
90.00
0.00
0.00
90.00
0.00
0.00
0.00
120.00
0.00
0.00
120.00
0.00
0.00
0.00
150.00
0.00
0.00
150.00
0.00
0.00
0.00
180.00
0.00
0.00
180.00
0.00
0.00
0.00
210.00
0.00
0.00
210.00
0.00
0.00
0.00
240.00
0.00
0.00
240.00
0.00
0.00
0.00
270.00
0.00
0.00
270.00
0.00
0.00
0.00
300.00
0.00
0.00
300.00
0.00
0.00
0.00
330.00
0.00
0.00
330.00
0.00
0.00
0.00
360.00
0.00
0.00
360.00
0.00
0.00
0.00
390.00
0.00
0.00
390.00
0.00
0.00
0.00
420.00
0.00
0.00
420.00
0.00
0.00
0.00
450.00
0.00
0.00
450.00
0.00
0.00
0.00
480.00
0.00
0.00
480.00
0.00
0.00
0.00
510.00
0.00
0.00
510.00
0.00
0.00
0.00
540.00
0.00
0.00
540.00
0.00
0.00
0.00
570.00
0.00
0.00
570.00
0.00
0.00
0.00
600.00
0.00
0.00
600.00
0.00
0.00
0.00
630.00
0.00
0.00
630.00
0.00
0.00
0.00
660.00
0.00
0.00
660.00
0.00
0.00
0.00
690.00
0.00
0.00
690.00
0.00
0.00
0.00
720.00
0.00
0.00
720.00
0.00
0.00
0.00
750.00
0.00
0.00
750.00
0.00
0.00
0.00
780.00
0.00
0.00
780.00
0.00
0.00
0.00
810.00
0.00
0.00
810.00
0.00
0.00
0.00
5
5D Plan Report
Interpolated Points (Relative to Site centre, TVD relative to
Drill Floor )
MD
(m)
Inc
()
Az
()
TVD
(m)
N.Offset
(m)
E.Offset
(m)
DLS
(/30 m)
840.00
0.00
0.00
840.00
0.00
0.00
0.00
870.00
0.00
0.00
870.00
0.00
0.00
0.00
900.00
0.00
0.00
900.00
0.00
0.00
0.00
930.00
0.00
0.00
930.00
0.00
0.00
0.00
960.00
0.00
0.00
960.00
0.00
0.00
0.00
990.00
0.00
0.00
990.00
0.00
0.00
0.00
1020.00
0.00
0.00
1020.00
0.00
0.00
0.00
1050.00
0.00
0.00
1050.00
0.00
0.00
0.00
1080.00
0.00
0.00
1080.00
0.00
0.00
0.00
1100.00
0.00
0.00
1100.00
0.00
0.00
0.00
1110.00
0.00
0.00
1110.00
0.00
0.00
0.00
1140.00
0.00
0.00
1140.00
0.00
0.00
0.00
1170.00
0.00
0.00
1170.00
0.00
0.00
0.00
1200.00
0.00
0.00
1200.00
0.00
0.00
0.00
1230.00
0.00
0.00
1230.00
0.00
0.00
0.00
1260.00
0.00
0.00
1260.00
0.00
0.00
0.00
1290.00
0.00
0.00
1290.00
0.00
0.00
0.00
1320.00
0.00
0.00
1320.00
0.00
0.00
0.00
1350.00
0.00
0.00
1350.00
0.00
0.00
0.00
1380.00
0.00
0.00
1380.00
0.00
0.00
0.00
1410.00
0.00
0.00
1410.00
0.00
0.00
0.00
1440.00
0.00
0.00
1440.00
0.00
0.00
0.00
1470.00
0.00
0.00
1470.00
0.00
0.00
0.00
1500.00
0.00
0.00
1500.00
0.00
0.00
0.00
1530.00
0.00
0.00
1530.00
0.00
0.00
0.00
1560.00
0.00
0.00
1560.00
0.00
0.00
0.00
1590.00
0.00
0.00
1590.00
0.00
0.00
0.00
1620.00
0.00
0.00
1620.00
0.00
0.00
0.00
1650.00
0.00
0.00
1650.00
0.00
0.00
0.00
1680.00
0.00
0.00
1680.00
0.00
0.00
0.00
1710.00
0.00
0.00
1710.00
0.00
0.00
0.00
1740.00
0.00
0.00
1740.00
0.00
0.00
0.00
1770.00
0.00
0.00
1770.00
0.00
0.00
0.00
Comment
Caeria 13 3/8"
6
5D Plan Report
Interpolated Points (Relative to Site centre, TVD relative to
Drill Floor )
MD
(m)
Inc
()
Az
()
TVD
(m)
N.Offset
(m)
E.Offset
(m)
DLS
(/30 m)
1800.00
0.00
0.00
1800.00
0.00
0.00
0.00
1830.00
0.00
0.00
1830.00
0.00
0.00
0.00
1849.40
0.00
0.00
1849.40
0.00
0.00
0.00
1860.00
0.00
0.00
1860.00
0.00
0.00
0.00
1890.00
0.00
0.00
1890.00
0.00
0.00
0.00
1920.00
0.00
0.00
1920.00
0.00
0.00
0.00
1946.40
0.00
0.00
1946.40
0.00
0.00
0.00
1950.00
0.00
0.00
1950.00
0.00
0.00
0.00
1980.00
0.00
0.00
1980.00
0.00
0.00
0.00
2010.00
0.00
0.00
2010.00
0.00
0.00
0.00
2024.40
0.00
0.00
2024.40
0.00
0.00
0.00
2040.00
0.00
0.00
2040.00
0.00
0.00
0.00
2070.00
0.00
0.00
2070.00
0.00
0.00
0.00
2100.00
0.00
0.00
2100.00
0.00
0.00
0.00
2130.00
0.00
0.00
2130.00
0.00
0.00
0.00
2160.00
0.00
0.00
2160.00
0.00
0.00
0.00
2187.40
0.00
0.00
2187.40
0.00
0.00
0.00
2190.00
0.00
0.00
2190.00
0.00
0.00
0.00
2220.00
0.00
0.00
2220.00
0.00
0.00
0.00
2250.00
0.00
0.00
2250.00
0.00
0.00
0.00
2280.00
0.00
0.00
2280.00
0.00
0.00
0.00
2284.40
0.00
0.00
2284.40
0.00
0.00
0.00
2310.00
0.00
0.00
2310.00
0.00
0.00
0.00
2340.00
0.00
0.00
2340.00
0.00
0.00
0.00
2370.00
0.00
0.00
2370.00
0.00
0.00
0.00
2400.00
0.00
0.00
2400.00
0.00
0.00
0.00
2430.00
0.00
0.00
2430.00
0.00
0.00
0.00
2460.00
0.00
0.00
2460.00
0.00
0.00
0.00
2490.00
0.00
0.00
2490.00
0.00
0.00
0.00
2520.00
0.00
0.00
2520.00
0.00
0.00
0.00
2550.00
0.00
0.00
2550.00
0.00
0.00
0.00
2580.00
0.00
0.00
2580.00
0.00
0.00
0.00
2588.40
0.00
0.00
2588.40
0.00
0.00
0.00
Comment
Yecua :
Petaca :
Cajones :
Yantata :
Ichoa :
Cangapi :
7
5D Plan Report
Interpolated Points (Relative to Site centre, TVD relative to
Drill Floor )
MD
(m)
Inc
()
Az
()
TVD
(m)
N.Offset
(m)
E.Offset
(m)
DLS
(/30 m)
2610.00
0.00
0.00
2610.00
0.00
0.00
0.00
2640.00
0.00
0.00
2640.00
0.00
0.00
0.00
2670.00
0.00
0.00
2670.00
0.00
0.00
0.00
2700.00
0.00
0.00
2700.00
0.00
0.00
0.00
2730.00
0.00
0.00
2730.00
0.00
0.00
0.00
2760.00
0.00
0.00
2760.00
0.00
0.00
0.00
2790.00
0.00
0.00
2790.00
0.00
0.00
0.00
2820.00
0.00
0.00
2820.00
0.00
0.00
0.00
2850.00
0.00
0.00
2850.00
0.00
0.00
0.00
2880.00
0.00
0.00
2880.00
0.00
0.00
0.00
2910.00
0.00
0.00
2910.00
0.00
0.00
0.00
2940.00
0.00
0.00
2940.00
0.00
0.00
0.00
2970.00
0.00
0.00
2970.00
0.00
0.00
0.00
2992.40
0.00
0.00
2992.40
0.00
0.00
0.00
3000.00
0.00
0.00
3000.00
0.00
0.00
0.00
3020.40
0.00
0.00
3020.40
0.00
0.00
0.00
3030.00
0.00
0.00
3030.00
0.00
0.00
0.00
3060.00
0.00
0.00
3060.00
0.00
0.00
0.00
3090.00
0.00
0.00
3090.00
0.00
0.00
0.00
3120.00
0.00
0.00
3120.00
0.00
0.00
0.00
3136.40
0.00
0.00
3136.40
0.00
0.00
0.00
3150.00
0.00
0.00
3150.00
0.00
0.00
0.00
3180.00
0.00
0.00
3180.00
0.00
0.00
0.00
3210.00
0.00
0.00
3210.00
0.00
0.00
0.00
3240.00
0.00
0.00
3240.00
0.00
0.00
0.00
3270.00
0.00
0.00
3270.00
0.00
0.00
0.00
3300.00
0.00
0.00
3300.00
0.00
0.00
0.00
3330.00
0.00
0.00
3330.00
0.00
0.00
0.00
3360.00
0.00
0.00
3360.00
0.00
0.00
0.00
3390.00
0.00
0.00
3390.00
0.00
0.00
0.00
3420.00
0.00
0.00
3420.00
0.00
0.00
0.00
3450.00
0.00
0.00
3450.00
0.00
0.00
0.00
3480.00
0.00
0.00
3480.00
0.00
0.00
0.00
Comment
San Telmo :
Escarpment :
Tarija :
Caeria 9 5/8"
8
5D Plan Report
Interpolated Points (Relative to Site centre, TVD relative to
Drill Floor )
MD
(m)
Inc
()
Az
()
TVD
(m)
N.Offset
(m)
E.Offset
(m)
DLS
(/30 m)
3510.00
0.00
0.00
3510.00
0.00
0.00
0.00
3540.00
0.00
0.00
3540.00
0.00
0.00
0.00
3570.00
0.00
0.00
3570.00
0.00
0.00
0.00
3600.00
0.00
0.00
3600.00
0.00
0.00
0.00
3630.00
0.00
0.00
3630.00
0.00
0.00
0.00
3660.00
0.00
0.00
3660.00
0.00
0.00
0.00
3690.00
0.00
0.00
3690.00
0.00
0.00
0.00
3720.00
0.00
0.00
3720.00
0.00
0.00
0.00
3750.00
0.00
0.00
3750.00
0.00
0.00
0.00
3780.00
0.00
0.00
3780.00
0.00
0.00
0.00
3810.00
0.00
0.00
3810.00
0.00
0.00
0.00
3840.00
0.00
0.00
3840.00
0.00
0.00
0.00
3870.00
0.00
0.00
3870.00
0.00
0.00
0.00
3871.40
0.00
0.00
3871.40
0.00
0.00
0.00
3900.00
0.00
0.00
3900.00
0.00
0.00
0.00
3930.00
0.00
0.00
3930.00
0.00
0.00
0.00
3960.00
0.00
0.00
3960.00
0.00
0.00
0.00
3990.00
0.00
0.00
3990.00
0.00
0.00
0.00
4020.00
0.00
0.00
4020.00
0.00
0.00
0.00
4027.40
0.00
0.00
4027.40
0.00
0.00
0.00
4050.00
0.00
0.00
4050.00
0.00
0.00
0.00
4080.00
0.00
0.00
4080.00
0.00
0.00
0.00
4110.00
0.00
0.00
4110.00
0.00
0.00
0.00
4140.00
0.00
0.00
4140.00
0.00
0.00
0.00
4170.00
0.00
0.00
4170.00
0.00
0.00
0.00
4200.00
0.00
0.00
4200.00
0.00
0.00
0.00
4207.40
0.00
0.00
4207.40
0.00
0.00
0.00
4230.00
0.00
0.00
4230.00
0.00
0.00
0.00
4260.00
0.00
0.00
4260.00
0.00
0.00
0.00
4290.00
0.00
0.00
4290.00
0.00
0.00
0.00
4317.40
0.00
0.00
4317.40
0.00
0.00
0.00
4320.00
0.00
0.00
4320.00
0.00
0.00
0.00
Comment
Tupambi :
Iquiri :
Ar. Guanacos;
Ar.Guanacos :
Los monos :
9
5D Plan Report
Interpolated Points (Relative to Site centre, TVD relative to
Drill Floor )
MD
(m)
Inc
()
Az
()
TVD
(m)
N.Offset
(m)
E.Offset
(m)
DLS
(/30 m)
Comment
4343.40
0.00
0.00
4343.40
0.00
0.00
0.00
Ar.#0 :
4350.00
0.00
0.00
4350.00
0.00
0.00
0.00
4380.00
0.00
0.00
4380.00
0.00
0.00
0.00
4410.00
0.00
0.00
4410.00
0.00
0.00
0.00
4429.40
0.00
0.00
4429.40
0.00
0.00
0.00
4440.00
0.00
0.00
4440.00
0.00
0.00
0.00
4470.00
0.00
0.00
4470.00
0.00
0.00
0.00
4500.00
0.00
0.00
4500.00
0.00
0.00
0.00
4530.00
0.00
0.00
4530.00
0.00
0.00
0.00
4540.40
0.00
0.00
4540.40
0.00
0.00
0.00
4560.00
0.00
0.00
4560.00
0.00
0.00
0.00
4590.00
0.00
0.00
4590.00
0.00
0.00
0.00
4620.00
0.00
0.00
4620.00
0.00
0.00
0.00
4650.00
0.00
0.00
4650.00
0.00
0.00
0.00
4660.00
0.00
0.00
4660.00
0.00
0.00
0.00
Formation Points
Name
(Relative to Site
Ar.#1; Ar.#1 :
Ar.#2 :
Profundidad final;
Profundidad final :
Drill Floor )
MD
(m)
Inc
()
Az
()
TVD
(m)
N.Offset
(m)
E.Offset
(m)
F.Dip
()
F.Dir
()
Chaco
0.00
0.00
Yecua
1849.40
0.00
0.00
0.00
0.00
0.00
0.00
1849.40
0.00
0.00
Petaca
1946.40
0.00
0.00
1946.40
0.00
0.00
Cajones
2024.40
0.00
0.00
2024.40
0.00
0.00
Yantata
2187.40
0.00
0.00
2187.40
0.00
0.00
Ichoa
2284.40
0.00
0.00
2284.40
0.00
0.00
Cangapi
2588.40
0.00
0.00
2588.40
0.00
0.00
0
0
San Telmo
2992.40
0.00
0.00
2992.40
0.00
0.00
Escarpment
3020.40
0.00
0.00
3020.40
0.00
0.00
Tarija
3136.40
0.00
0.00
3136.40
0.00
0.00
Tupambi
3871.40
0.00
0.00
3871.40
0.00
0.00
Iquiri
4027.40
0.00
0.00
4027.40
0.00
0.00
Ar.Guanacos
4207.40
0.00
0.00
4207.40
0.00
0.00
Los monos
4317.40
0.00
0.00
4317.40
0.00
0.00
10
5D Plan Report
Formation Points
(Relative to Site
Drill Floor )
Name
MD
(m)
Inc
()
Az
()
TVD
(m)
N.Offset
(m)
E.Offset
(m)
F.Dip
()
F.Dir
()
Ar.#0
4343.40
0.00
0.00
4343.40
0.00
0.00
Ar.#1
4429.40
0.00
0.00
4429.40
0.00
0.00
Ar.#2
4540.40
0.00
0.00
4540.40
0.00
0.00
Profundidad final
4660.00
0.00
0.00
4660.00
0.00
0.00
Well Report
Page: 1
Date : 05/12/2014
MD
m
0.00
Inc
deg
0.00
Azi
deg
0.00
TVD
m
0.00
1100.00
0.00
0.00
1100.00
INT
1849.40
0.00
0.00
1849.40
INT
1946.40
0.00
0.00
1946.40
INT
2024.40
0.00
0.00
2024.40
INT
2187.40
0.00
0.00
2187.40
INT
2284.40
0.00
0.00
2284.40
INT
2588.40
0.00
0.00
2588.40
INT
3020.40
0.00
0.00
3020.40
INT
3136.40
0.00
0.00
3136.40
10
3450.00
0.00
0.00
3450.00
INT
3871.40
0.00
0.00
3871.40
INT
4027.40
0.00
0.00
4027.40
13
14
4207.40
4300.00
0.00
0.00
0.00
0.00
4207.40
4300.00
INT
4317.40
0.00
0.00
4317.40
Closure
m
0.00
Bearing
deg
0.00
Field East
m
487145.00
Field North
m
7955985.00
0.00
0.00
487145.00
7955985.00
0.00
0.00
487145.00
7955985.00
0.00
0.00
487145.00
7955985.00
0.00
0.00
487145.00
7955985.00
0.00
0.00
487145.00
7955985.00
0.00
0.00
487145.00
7955985.00
0.00
0.00
487145.00
7955985.00
0.00
0.00
487145.00
7955985.00
0.00
0.00
487145.00
7955985.00
0.00
0.00
487145.00
7955985.00
0.00
0.00
487145.00
7955985.00
0.00
0.00
487145.00
7955985.00
0.00
0.00
0.00
0.00
487145.00
487145.00
7955985.00
7955985.00
0.00
0.00
487145.00
7955985.00
Well Report
Page: 2
Date : 05/12/2014
INT
MD
m
4429.00
Inc
deg
0.00
Azi
deg
0.00
TVD
m
4429.00
17
4660.00
0.00
0.00
4660.00
Closure
m
0.00
Bearing
deg
0.00
Field East
m
487145.00
Field North
m
7955985.00
0.00
0.00
487145.00
7955985.00
PROGRAMA
PERFORACION DIRECCIONAL
CAMPO : DORADO
POZO : DRO - X1001
4.GRAFICOS
MD.0m Superficie
0
200
400
600
800
1000
1400
200
1600
175
1800
150
2000
125
2200
100
2400
75
2600
50
2800
25
N.Offset (m)
TVD (m)
1200
3000
3200
3400
0
-25
-50
3600
-75
3800
-100
4000
-125
4200
4400
4600
Ar.Guanacos
-150
-175
-200
-200 -175 -150 -125 -100 -75 -50 -25 0
25
50
75
E.Offset (m)(Scale:25m/inch)
4800
5000
-200 0
VS (m)(Bearing:70.00 Scale:200m/inch)
True
Mag
Grid
YPFB CHACO
DRO-X1001
DORADO
Section View
PLAN DRO-X1001
SUPERFICIE
500
1000
CAERIA 13 3/8"
1500
2000
2500
3000
CAERIA 9 5/8"
3500
4000
Ar.
1 GUANACOS
Ar. #1
4500
PROFUNDIDAD FINAL
-2000
-1500
-1000
-500
500
1000
1500
2000
2500
Date :05/12/2014
File #:
YPFB CHACO
DRO-X1001
DORADO
Plan View
PLAN DRO-X1001
100
80
60
40
20
Ar.
1 GUANACOS
-20
-40
-60
-80
-100
-100
-80
-60
-40
-20
20
40
60
80
100
Date :05/12/2014
File #:
PROGRAMA
PERFORACION DIRECCIONAL
CAMPO : DORADO
POZO : DRO - X1001
5.BHAs
BHA
DIAGRAM
IN:
BHA No
OUT:
RUN No
YPFB CHACO SA
Well:
DRO - X1001
Objective:
12
11
10
9.2
1100.0
Progres ( m ):
600.0
No Saler
OD
ID
No
(in)
(in)
INT
9 5/8
CHA
A.SUB
INT
1 MONEL MWD
Pony Monel
XO
8
9
Fishing
Conection
Serial
neck
Bottom
Top
---
---
Total
Weight
Total
Lbs
Wgth w/ff
Length Length
(m)
(m)
Lbs
0.39
0.39
100
100
---
9.23
9.62
5950
6050
9 1/2
2.10
11.72
1488
7538
9 1/2
3 3/16
1.32
13.04
935
8474
INT
9 1/2
3 1/2
8.50
21.54
6024
14498
INT
9 1/2
3 1/2"
4.00
25.54
2835
17332
CHA
9 1/2
0.89
26.43
631
17963
6 x DC 8"
Rig
55.00
81.43
26527
44490
Drilling Jar
2.25/32
9.70
91.13
4678
49168
10 3 x DC 8"
Rig
28.28
119.41
13640
62808
11 XO
Rig
5.1/2 FH (B)
0.88
120.29
424
63233
12 9 x 5 1/2"HWDP
Rig
5 1/2
5.1/2 FH (P)
5.1/2 FH (B)
83.76
204.05
17946
81178
204.05
81178
81178
62808
STABILIZER DESCRIPTION
7
6
Depth Out:
Hours:
F Neck
Description
500.0
Vertical
Item
Depth In:
YPFB 02
Item
Description
Spiral
Blade
Length
Blade
Width
Bit Data
Gauge
Length
Gauge
In
Gauge
Out
Diam
Type
17 1/2
PDC
19mm
DHM Stabilizer
No
17 1/4
Cut
String Stab
Si
17 3/8
Make
Serial
Boq
TFA
0.650
# Blade
Item
Description
Heavy weigth
Drill pipe
Grade
OD
ID
OD Con
Conn
Weight
S-135
51/2"
5 1/2 FH
5 1/2 FH
65.3
S-135
5 1/2"
4.28
5 1/2 FH
5 1/2 FH
26.3
WOB
GPM
SPP
RPM
Diam ( plg )
9 5/8
Rotation ( Hr )
Tot.(Hr)
K lbs
(gpm)
(psi)
LE6750
Steering ( Hr )
Ako/Bur
Total Drillg ( Hr
Gap In
Circulation ( Hr
Gap out
DRILLING PARAMETERS
Sliding
Rotary
Stator s/n
MUD PARAMETERS
Mud Type
Comments:
Run comments
BENTONITICO
Weight(ppg)
PV/YP
1
INTERGAS
8.6 - 9.2
1.15/4
BHA
DIAGRAM
IN:
BHA No
OUT:
RUN No
YPFB CHACO SA
Well:
DRO - X1001
Objective:
11
10
Depth Out:
2500.0
Progres ( m ):
1400.0
Hours:
9.4
F Neck
12
1100.0
Vertical
Item
Description
1 SMITH
No Saler
Serial
12 1/4
IGAS
9 5/8
IGAS
Chaco
No
13
Depth In:
YPFB 02
Fishing
Conection
OD
ID
(in)
(in)
neck
Bottom
Top
Weight
Total
Lbs
Wgth w/ff
(m)
(m)
Lbs
0.30
0.30
150
129
3 1/2
9.22
9.52
5063
4478
9 5/8
1.14
10.66
808
5172
9 1/2
1.80
12.46
1276
6268
9 " A.Sub
IGAS
9 1/2
1.32
13.78
935
7071
IGAS
9 5/8
3 1/2
8.96
22.74
6350
12526
IGAS
9 1/2
3 1/2
3.82
26.56
2707
14851
XO
Rig
9 1/2
0.75
27.31
532
15308
Rig
55.28
82.59
26662
38211
10 Drilling Jar
1 SMITH
7 7/8
2 15/16
10.21
92.80
4924
42441
Rig
27.65
120.45
13336
53896
12 XO
Rig
5.1/2 FH (B)
0.88
121.33
424
54320
13 9 x 5 1/2"HWDP
Rig
5 1/2
5.1/2 FH (P)
5.1/2 FH (B)
83.76
205.09
17946
72266
205.09
81113
81113
42441
72266
STABILIZER DESCRIPTION
Item
Total
Length Length
Description
Spiral
Blade
Length
Blade
Width
Bit Data
Gauge
Length
Gauge
In
Gauge
Out
Diam
Type
12
PDC
Serial
Boq
7 x 11/32"
19mm
TFA
0.650
# Blade
DHM Stabilizer
No
2 3/4
12 1/8
Cut
String Stab
Si
22
2 3/4
13
12 1/8
Make
Description
Heavy weigth
Drill pipe
Grade
OD
ID
OD Con
Conn
Weight
S-135
51/2"
5 1/2 FH
5 1/2 FH
65.3
S-135
5 1/2"
4.28
5 1/2 FH
5 1/2 FH
26.3
WOB
GPM
SPP
RPM
Diam ( plg )
9 5/8
Rotation ( Hr )
Tot.(Hr)
K lbs
(gpm)
(psi)
LE6750
Steering ( Hr )
Ako/Bur
Sliding
2-10
750
2700
0/90
Total Drillg ( Hr
Gap In
Rotary
2-10
750
2800
50/90
Stator s/n
Circulation ( Hr
Gap out
DRILLING PARAMETERS
5
4
3
2
MUD PARAMETERS
Mud Type
Comments:
0.78
Run comments
POLITRAXX
Weight(ppg)
PV/YP
INTERGAS
8.8 - 9.4
BHA
DIAGRAM
IN:
BHA No
OUT:
RUN No
YPFB CHACO SA
Well:
DRO - X1001
Objective:
11
10
Depth Out:
3450.0
Progres ( m ):
950.0
Hours:
9.4
F Neck
12
2500.0
Vertical
Item
Description
1 SMITH
No Saler
Serial
12 1/4
IGAS
9 5/8
IGAS
Chaco
No
13
Depth In:
YPFB 02
Fishing
Conection
OD
ID
(in)
(in)
neck
Bottom
Top
Weight
Total
Lbs
Wgth w/ff
(m)
(m)
Lbs
0.30
0.30
150
129
3 1/2
9.22
9.52
5063
4478
9 5/8
1.14
10.66
808
5172
9 1/2
1.80
12.46
1276
6268
9 " A.Sub
IGAS
9 1/2
1.32
13.78
935
7071
IGAS
9 5/8
3 1/2
8.96
22.74
6350
12526
IGAS
9 1/2
3 1/2
3.82
26.56
2707
14851
XO
Rig
9 1/2
0.75
27.31
532
15308
Rig
55.28
82.59
26662
38211
10 Drilling Jar
1 SMITH
7 7/8
2 15/16
10.21
92.80
4924
42441
Rig
27.65
120.45
13336
53896
12 XO
Rig
5.1/2 FH (B)
0.88
121.33
424
54320
13 9 x 5 1/2"HWDP
Rig
5 1/2
5.1/2 FH (P)
5.1/2 FH (B)
83.76
205.09
17946
72266
205.09
81113
81113
42441
72266
STABILIZER DESCRIPTION
Item
Total
Length Length
Description
Spiral
Blade
Length
Blade
Width
Bit Data
Gauge
Length
Gauge
In
Gauge
Out
Diam
Type
12
PDC
19mm
DHM Stabilizer
No
2 3/4
12 1/8
Cut
String Stab
Si
22
2 3/4
13
12 1/8
Make
Serial
Boq 5X12- 2X13
TFA
0.811
# Blade
Description
Heavy weigth
Drill pipe
Grade
OD
ID
OD Con
Conn
Weight
S-135
51/2"
5 1/2 FH
5 1/2 FH
65.3
S-135
5 1/2"
4.28
5 1/2 FH
5 1/2 FH
26.3
WOB
GPM
SPP
RPM
Diam ( plg )
9 5/8
Rotation ( Hr )
Tot.(Hr)
K lbs
(gpm)
(psi)
LE6750
Steering ( Hr )
Ako/Bur
Sliding
8-15
700
3100
0/84
Total Drillg ( Hr
Gap In
Rotary
8-15
750
3300
40/90
Stator s/n
Circulation ( Hr
Gap out
DRILLING PARAMETERS
5
4
3
2
MUD PARAMETERS
Mud Type
Comments:
0.78
Run comments
POLITRAXX
Weight(ppg)
PV/YP
INTERGAS
8.8 - 9.4
BHA No
OUT:
RUN No
DATE:
BHA
DIAGRAM
YPFB 02
YPFB CHACO SA
Operator:
DRO- X1001
Well:
Objective:
11
10
No Saler
3950.0
Progres ( m ):
500.0
11.5
Conection
Serial
OD
ID
No
(in)
(in)
Total
Weight
Total
neck
Length
Length
Lbs
Wgth w/ff
(m)
(m)
Bottom
Top
Boq. 5x12
---
0.25
0.25
100
Lbs
83
4 1/2 IF (B)
Slick
7.48
7.73
2125
1841
4 1/2 IF (P)
4 1/2 IF (B)
Slick
1.02
8.75
308
2096
4 1/2 IF (P)
4 1/2 IF (B)
0.60
1.71
10.46
516
2523
8 " PDC
1 SMITH
IGAS
IGAS
6 3/4
1 Fassur
6 5/8
2 13/16
6 "Alignment Sub
IGAS
6 3/4
3 1/8
4 1/2 IF (P)
4 1/2 IF (B)
Slick
1.08
11.54
326
2793
IGAS
6 3/8
2 13/16
4 1/2 XH (P)
4 1/2 XH (B)
Slick
8.69
20.23
2623
4963
IGAS
6 3/8
2 13/16
4 1/2 XH (P)
4 1/2 XH (B)
Slick
12
RIG
6 1/2
2 7/8
4 1/2 XH (P)
4 1/2 XH (B)
6 "JAR
Smith
6 1/2
2 13/16
4 1/2 XH (P)
RIG
6 1/2
2 7/8
4 1/2 XH (P)
RIG
4 1/2
3 44/53
4 1/2 XH (P)
4 1/2 XH (B)
RIG
4 1/2 XH (P)
4 1/2 IF (B)
6 3/4
3 1/2
4.15
24.38
1253
6000
110.00
134.38
33204
33476
4 1/2 XH (B)
9.88
144.26
2982
35944
4 1/2 XH (B)
55.00
199.26
16602
49682
1038.40 1237.66
65755
104094
14
15
Depth Out:
Hours:
F Neck
Description
3450.0
VERTICAL
Item
Depth In:
13
125794
1237.66
35944
104094
STABILIZER DESCRIPTION
Item
Description
125794
Bit Data
Spiral
Blade
Length
Blade
Width
Gauge
Length
Gauge
In
Gauge
Out
Diam
Type
8 1/2
PDC
Serial
Boq
5x12
16mm
TFA
0.552
# Blade
DHM Stabilizer
No
6 1/2
1 1/2
4 3/4
8 3/8
Cut
String Stab
Si
25
2 1/2
22
8 3/8
Make
Item
Description
Heavy weigth
Drill pipe
Grade
OD
ID
OD Con
Conn
Weight
S-135
51/2"
5 1/2 FH
5 1/2 FH
65.3
S-135
5 1/2"
4.28
5 1/2 FH
5 1/2 FH
26.3
WOB
GPM
SPP
RPM
Diam ( plg )
6 3/4
Rotation ( Hr )
Tot.(Hr)
K lbs
(gpm)
(psi)
Type
LE6750
Steering ( Hr )
Ako/Bur
Sliding
6-8
450
2900
Total Drillg ( Hr )
Gap In
Rotary
10-12
450
3000
Circulation ( Hr )
Gap out
DRILLING PARAMETERS
5
4
3
2
MUD PARAMETERS
Mud Type
Weight(ppg)
PV/YP
Comments:
Run comments
POLITRAXX
11.3
24 / 38
INTERGAS
0.78/1
BHA
DIAGRAM
IN:
BHA No
OUT:
RUN No
YPFB CHACO SA
Well:
DRO- X1001
Objective:
11
10
Depth Out:
4300.0
Progres ( m ):
350.0
Hours:
11.5
F Neck
Description
3950.0
VERTICAL
Item
Depth In:
YPFB 02
No Saler
Fishing
Conection
Serial
OD
ID
No
(in)
(in)
Total
Weight
Total
neck
Length
Length
Lbs
Wgth w/ff
(m)
(m)
Bottom
Top
Boq. 5x12
---
0.25
0.25
100
Lbs
83
4 1/2 IF (B)
Slick
7.48
7.73
2125
1841
4 1/2 IF (P)
4 1/2 IF (B)
Slick
1.02
8.75
308
2096
4 1/2 IF (P)
4 1/2 IF (B)
0.60
1.71
10.46
516
2523
1 SMITH
IGAS
IGAS
6 3/4
1 Fassur
6 5/8
2 13/16
6 "Alignment Sub
IGAS
6 3/4
3 1/8
4 1/2 IF (P)
4 1/2 IF (B)
Slick
1.08
11.54
326
2793
IGAS
6 3/8
2 13/16
4 1/2 XH (P)
4 1/2 XH (B)
Slick
8.69
20.23
2623
4963
IGAS
6 3/8
2 13/16
4 1/2 XH (P)
4 1/2 XH (B)
Slick
12
RIG
6 1/2
2 7/8
4 1/2 XH (P)
4 1/2 XH (B)
6 "JAR
Smith
6 1/2
2 13/16
4 1/2 XH (P)
RIG
6 1/2
2 7/8
4 1/2 XH (P)
RIG
4 1/2
3 44/53
4 1/2 XH (P)
4 1/2 XH (B)
RIG
4 1/2 XH (P)
4 1/2 IF (B)
6 3/4
3 1/2
4.15
24.38
1253
6000
110.00
134.38
33204
33476
4 1/2 XH (B)
9.88
144.26
2982
35944
4 1/2 XH (B)
55.00
199.26
16602
49682
1038.40 1237.66
65755
104094
14
15
13
125794
104094
STABILIZER DESCRIPTION
Item
Description
125794
1237.66
Bit Data
Spiral
Blade
Length
Blade
Width
Gauge
Length
Gauge
In
Gauge
Out
Diam
Type
8 1/2
PDC
Serial
Boq
5x12
16mm
TFA
0.552
# Blade
DHM Stabilizer
No
6 1/2
1 1/2
4 3/4
8 3/8
Cut
String Stab
Si
25
2 1/2
22
8 3/8
Make
Item
Description
Heavy weigth
Drill pipe
Grade
OD
ID
OD Con
Conn
Weight
S-135
51/2"
5 1/2 FH
5 1/2 FH
65.3
S-135
5 1/2"
4.28
5 1/2 FH
5 1/2 FH
26.3
WOB
GPM
SPP
RPM
Diam ( plg )
6 3/4
Rotation ( Hr )
Tot.(Hr)
K lbs
(gpm)
(psi)
Type
LE6750
Steering ( Hr )
Ako/Bur
Sliding
6-8
430
3200
Total Drillg ( Hr )
Gap In
Rotary
6-8
430
3200
Circulation ( Hr )
Gap out
DRILLING PARAMETERS
5
4
3
2
MUD PARAMETERS
Mud Type
Weight(ppg)
Comments:
Run comments
POLITRAXX
11.5
PV/YP
INTERGAS
0.78/1
BHA
DIAGRAM
IN:
BHA No
OUT:
RUN No
YPFB CHACO SA
Well:
DRO- X1001
Objective:
12
11
Description
No Saler
6"Bit PDC
4500.0
Progres ( m ):
200.0
14.9
Float sub
5
6
Fishing
Conection
Serial
OD
No
(in)
(in)
1 1/2
neck
ID
Bottom
Top
Total
Weight
Total
Length
Length
Lbs
Wgth w/ff
(m)
(m)
0.23
0.23
100
78
7.03
7.26
1084
919
4 13/16 3
IGAS
4 13/16 2 3/8
3 1/2" IF(P)
3 1/2" IF(B)
0.85
8.11
131
1021
Farsur
4 7/8
2 1/4
3 1/2" IF(P)
3 1/2" IF(B)
1.79
9.90
276
1236
IGAS
4 3/4
2 1/2
3 1/2" IF (P)
3 1/2" IF (B)
1.07
10.97
164
1363
NM X-O (PxP)
IGAS
4 3/4
2 5/16
3 1/2" IF(P)
3 1/2" IF(P)
0.42
11.39
65
1413
IGAS
4 11/16 2 13/16
3 1/2" IF (B)
3 1/2" IF(B)
9.08
20.47
1400
2501
NM X-O (PxP)
IGAS
4 3/4
2 5/16
3 1/2" IF(P)
3 1/2" IF(P)
0.43
20.90
66
2552
IGAS
4 3/4
2 13/16
3 1/2" IF (P)
3 1/2" IF(B)
4.25
25.15
655
3061
10 9 x 4 " DC
Rig
4 3/4
2 1/4
3 1/2" IF (P)
3 1/2" IF(B)
83.82
108.97
12926
13098
11 9 x 3 " HWDP
Rig
3 1/2
2 1/4
3 1/2" IF (P)
3 1/2" IF(B)
82.84
191.81
6876
18437
Smith
4 3/4
2 1/4
3 1/2" IF (P)
3 1/2" IF(B)
8.98
200.79
1385
19513
13 6 x 3 " HWDP
Rig
3 1/2
2 1/4
3 1/2" IF (P)
3 1/2" IF(B)
55.00
255.79
4566
23058
Rig
3 1/2"
2 1/4
3 1/2" IF (P)
3 1/2" IF(B)
600.00
855.79
33269
48891
Rig
4 1/2
3 44/53
3 1/2" IF (P)
4 1/2" XH
256.59
51
23097
RIG
4 1/2
3 44/53
4 1/2 XH (P)
4 1/2 XH (B)
1038.40 1294.99
65755
74156
RIG
4 1/2 XH (P)
4 1/2 IF (B)
15 XO
16 4 1/2" DP
17 XO
0.80
128769
18437
23058
STABILIZER DESCRIPTION
8
Lbs
IGAS
10
Depth Out:
Hours:
F Neck
Item
4300.0
VERTICAL
13
Depth In:
YPFB 02
Item
Description
Spiral
Blade
Length
Blade
Width
Bit Data
Gauge
Length
Gauge
In
Gauge
Out
Diam
Type
6
PDC
Serial
Boq
7 x 11
13mm
TFA
0.650
# Blade
DHM Stabilizer
No
4 1/4
1 1/4
5 7/8
Cut
String Stab
SI
24
2 3/4
20
5 7/8
Make
Item
Description
Heavy weigth
Drill pipe
OD
ID
OD Con
Conn
Weight
S-135
3 1/2
2 1/4
4 3/4
3 1/2 IF
25.3
S-135
3 1/2
2 1/8
4 3/4
3 1/2 IF
16.9
WOB
GPM
SPP
RPM
K lbs
(gpm)
(psi)
DRILLING PARAMETERS
Grade
Sliding
Diam ( plg )
Type
Driv. sub s/n
5-10
Rotary
200
MUD PARAMETERS
Mud Type
Weight(ppg)
Comments:
4 3/4
Rotation ( Hr )
Tot.(Hr)
LE-7838
Steering ( Hr )
Ako/Bur
Total Drillg ( Hr )
Gap In
Circulation ( Hr )
Gap out
Run comments
POLITRAXX
14.9
PV/YP
INTERGAS
0.78/7
BHA
DIAGRAM
IN:
BHA No
OUT:
RUN No
YPFB CHACO SA
Well:
DRO- X1001
Objective:
12
11
Description
No Saler
6"Bit PDC
4660.0
Progres ( m ):
160.0
14.9
Float sub
5
6
Fishing
Conection
Serial
OD
No
(in)
(in)
1 1/2
neck
ID
Bottom
Top
Total
Weight
Total
Length
Length
Lbs
Wgth w/ff
(m)
(m)
0.23
0.23
100
78
7.03
7.26
1084
919
4 13/16 3
IGAS
4 13/16 2 3/8
3 1/2" IF(P)
3 1/2" IF(B)
0.85
8.11
131
1021
Farsur
4 7/8
2 1/4
3 1/2" IF(P)
3 1/2" IF(B)
1.79
9.90
276
1236
IGAS
4 3/4
2 1/2
3 1/2" IF (P)
3 1/2" IF (B)
1.07
10.97
164
1363
NM X-O (PxP)
IGAS
4 3/4
2 5/16
3 1/2" IF(P)
3 1/2" IF(P)
0.42
11.39
65
1413
IGAS
4 11/16 2 13/16
3 1/2" IF (B)
3 1/2" IF(B)
9.08
20.47
1400
2501
NM X-O (PxP)
IGAS
4 3/4
2 5/16
3 1/2" IF(P)
3 1/2" IF(P)
0.43
20.90
66
2552
IGAS
4 3/4
2 13/16
3 1/2" IF (P)
3 1/2" IF(B)
4.25
25.15
655
3061
10 9 x 4 " DC
Rig
4 3/4
2 1/4
3 1/2" IF (P)
3 1/2" IF(B)
83.82
108.97
12926
13098
11 9 x 3 " HWDP
Rig
3 1/2
2 1/4
3 1/2" IF (P)
3 1/2" IF(B)
82.84
191.81
6876
18437
Smith
4 3/4
2 1/4
3 1/2" IF (P)
3 1/2" IF(B)
8.98
200.79
1385
19513
13 6 x 3 " HWDP
Rig
3 1/2
2 1/4
3 1/2" IF (P)
3 1/2" IF(B)
55.00
255.79
4566
23058
Rig
3 1/2"
2 1/4
3 1/2" IF (P)
3 1/2" IF(B)
600.00
855.79
33269
48891
Rig
4 1/2
3 44/53
3 1/2" IF (P)
4 1/2" XH
256.59
51
23097
RIG
4 1/2
3 44/53
4 1/2 XH (P)
4 1/2 XH (B)
1038.40 1294.99
65755
74156
RIG
4 1/2 XH (P)
4 1/2 IF (B)
15 XO
16 4 1/2" DP
17 XO
0.80
128769
18437
23058
STABILIZER DESCRIPTION
8
Lbs
IGAS
10
Depth Out:
Hours:
F Neck
Item
4500.0
VERTICAL
13
Depth In:
YPFB 02
Item
Description
Spiral
Blade
Length
Blade
Width
Bit Data
Gauge
Length
Gauge
In
Gauge
Out
Diam
Type
6
PDC
Serial
Boq
7 x 11
13mm
TFA
0.650
# Blade
DHM Stabilizer
No
4 1/4
1 1/4
5 7/8
Cut
String Stab
SI
24
2 3/4
20
5 7/8
Make
Item
Description
Heavy weigth
Drill pipe
OD
ID
OD Con
Conn
Weight
S-135
3 1/2
2 1/4
4 3/4
3 1/2 IF
25.3
S-135
3 1/2
2 1/8
4 3/4
3 1/2 IF
16.9
WOB
GPM
SPP
RPM
K lbs
(gpm)
(psi)
DRILLING PARAMETERS
Grade
Sliding
Diam ( plg )
Type
Driv. sub s/n
5-10
Rotary
200
MUD PARAMETERS
Mud Type
Weight(ppg)
Comments:
4 3/4
Rotation ( Hr )
Tot.(Hr)
LE-7838
Steering ( Hr )
Ako/Bur
Total Drillg ( Hr )
Gap In
Circulation ( Hr )
Gap out
Run comments
POLITRAXX
14.9
PV/YP
INTERGAS
0.78/7
PROGRAMA
PERFORACION DIRECCIONAL
CAMPO : DORADO
POZO : DRO - X1001
6.RECOMENDACIONES
LECCIONES APRENDIDAS
PERFORACIN
Pozo: DRO-X1002
Grficos:
26 28 de Septiembre - 2013
Tipo de Trabajo:
Perforacin vertical
Empresas Involucradas:
INTERGAS SERVICIOS PETROLEROS S.A.
Evento y Fase (Descrito en DIMS):
Perforacin tramo 17 .
Profundidad:
554 - 1033 m
Breve descripcin del Trabajo:
Se perfor el tramo 17 con motor de
fondo 9 5/8, AKO 0 y sin MWD para mantener
la verticalidad del pozo.
Fallas:
Separacion de la vertical.
Causas:
El BHA#1 a pesar de que se utiliz parmetros
mnimos para controlar el incremento de la
inclinacin, se produjo una separacin de la
vertical a los 1033m de 18 m, obligando luego
en el tramo de 12 a utilizar un plan de
contingencia o plan retorno. Esto signific
deslizar ms y con ello crear mayor
tortuosidad en el pozo.
Solucin inmediata:
NPT y NPC atribuidos a esta falla:
No aplica
Lecciones Aprendidas y Acciones Futuras:
Utilizar arreglo direccional en la fase 17 , es
decir desde el inicio del plan. Llevar un
control direccional desde el inicio, implica en
minimizar la tortuosidad del pozo.
BHA #1
10/12/2014
LECCIONES APRENDIDAS
PERFORACIN
Pozo: DRO-X1003
Grficos:
03 10 de Octubre 2013
Tipo de Trabajo:
Perforacin direccional
Empresas Involucradas:
INTERGAS SERVICIOS PETROLEROS S.A.
Evento y Fase (Descrito en DIMS):
Perforacin tramo 12
Profundidad:
1038 2357 m
Breve descripcin del Trabajo:
Perforacin direccional con control de
verticalidad.
Durante la misma se observ falla en el
equipo de control de slidos, incorporndose
una importante cantidad de slidos al sistema,
por lo cual El Motor de fondo no cumplio con
las 150 hrs garantizadas y sufri un desgaste
de 5 mm en el GAP en 147 hrs de trabajo.
Fallas:
El equipo de control de slidos dej de
funcionar por aproximadamente 5 horas.
Causas:
Falta de mantenimiento al equipo de control
de solidos y limpieza de los cajones y lneas
de succion.
Solucin inmediata:
NPT y NPC atribuidos a esta falla:
No aplica
Lecciones Aprendidas y Acciones Futuras:
El desgaste prematuro del motor de fondo es
consecuencia de los slidos incorporados al
sistema cuando fall el equipo de control de
slidos,
No
descuidar
la
parte
del
mantenimiento durante las operaciones.
BHA #2
10/12/2014
LECCIONES APRENDIDAS
PERFORACIN
Pozo: DR0-X1002
Fotos:
BHA #4
BHA #5
10/12/2014
LECCIONES APRENDIDAS
PERFORACIN
Pozo: DR0-X1002
Fotos:
13 19 de Diciembre 2013
Tipo de Trabajo:
Perforacin direccional
Empresas Involucradas:
INTERGAS SERVICIOS PETROLEROS S.A.
Evento y Fase (Descrito en DIMS):
Perforacin tramo 6.
Profundidad:
4215 4390 m
Breve descripcin del Trabajo:
Perforacin vertical del tramo de 8 con
arreglo direccional y trpano PDC.
Fallas:
Ninguna.
Causas:
Ninguna
Solucin inmediata:
NPT y NPC atribuidos a esta falla:
No aplica
Lecciones Aprendidas y Acciones Futuras:
El tramo tramo de 6 (BHA#6) con control
direccional
y
normas
de
perforacin
adecuadas se termin exitosamente, dentro
del rea de tolerancia segn el programa
direccional.
BHA# 6
10/12/2014
Rendimientos Seccin 17
Date:
ER#:
6-jul-2014
PLUSPETROL
SAN ANTONIO INTERNACIONAL
SAI 314
BOLIVIA
SANTA CRUZ
BOLIVIA
SAN ISIDRO
SIN-X1
RUN INFORMATION
Bit #
Bit Size
Bit Mfg
Bit Type
IADC
Code
Serial
#
(in)
2
12 1/4
SMITH
TCTi+CR
117T
PZ4906
Depth
In
NOZZLES (32nd's)
N1 N2 N3
N4 N5 N6 N7 N8 N9 (Metros)
13
14
13
13
268
TFA = 0.669
Depth
Out
Footage
Drilled
(Metros)
(Metros)
1448
1180
HOURS
87.97
ROP
WOB
(m/hr)
(klbs)
Motor
RPM
Total
RPM
28
13.41
73
Rot
Type
Conv.
DEV
Pump
Press
Volume
Mud
()
(psi)
(gpm)
Weight
0.25
923
529
9.1
VP/PC
14
23
DULL COMMENTS
El trepano biconico entra al pozo y rota cemento desde 260 hasta 268, donde
comienza a perforar formacion, en total el trepano perfora 1180 m en un total
de 87.97 horas de perforacion, obteniendo una ROP promedio de 13.4 m/hr.
El trepano salio con desgaste de cresta plana (FC) presente en todas las areas
de la estructura de corte, ademas con calibre redondeado (RG), tanto las filas
internas como externas recibieron una evaluacion de desgaste de 6, el trepano
perdio 3/16 al calibre, los sellos de los conos salieron efectivos y la razon para
sacar el trepano del pozo fue baja taza de penetracion (PR).
BEARINGS
REMARKS
INSIDE
OUTSIDE
DULL
LOCATION
GAGE
OTHER
REASON
FC
RG
PR
DULL
BIT PHOTOS
H.S.I.
1.345
Rendimientos Seccin 12
Rendimientos Seccin 8
Average
Median
Max
Min
169
85
800
5
3
2.6
5.8
0.7
1
0.9
1.7
0.3
0
0
1
0
1
1
1
0
INDICE DE CONTENIDO
I.
II.
2.1.
2.2.
2.3.
IV.
V.
5.0
5.1
5.2
5.3
5.4
5.5
DENSIDAD ............................................................................................................ 24
5.6
5.7
5.8
5.9
5.10
5.11
6.0
6.1
6.2
6.3
6.4
DENSIDAD ............................................................................................................ 30
6.5
PERDIDA DE CIRCULACION................................................................................ 31
6.6
6.7
6.8
6.9
6.10
6.11
6.12
6.13
6.14
6.15
6.16
7.0
7.1
7.2
7.3
7.4
7.5
7.6
DENSIDAD ............................................................................................................ 41
7.7
7.8
LIMPIEZA DE POZO.............................................................................................. 42
7.9
7.10
PERDIDAS DE LODO............................................................................................ 43
7.11
7.12
7.13
7.14
7.15
7.16
7.17
7.18
8.0
8.1
8.2
8.3
8.4
LIMPIEZA DE POZO.............................................................................................. 49
8.5
8.6
8.7
IX.
9.1
9.2
9.3
9.4
X.
ANEXOS ................................................................................................................ 54
5
10.1
ANEXO I ................................................................................................................ 54
10.2
ANEXO II ............................................................................................................... 58
10.3
10.4
10.5
RESUMEN EJECUTIVO
por
Tramos
con
(volmenes,
tabla
Anexos:
I. Recomendaciones para pega de la hta.
II. Prdidas de circulacin.
PERFORMANCE
INDICADOR
TECNICO
tem
Medicin
Bencmark
Metas ,%
Volmenes usado
Bbl
Programa
+- 20
bbl/m
Informe
final
+- 20
de
$us/bbl
Programa
-+ 20
Visitas al pozo
# de visitas
2- mes
INDICADOR
QHES
tem
Medicin
Benchmar
k
Metas
Derrame productos
Barril
Accidente
Reporte de
Accidentes
Seccin
Casing
17.5
13 3/8
Prof. (mts)
MD/TVD
Angulo
0 -1100 mts.
0 grados
Riesgos
Consecuencias
Mitigacin
Flujo de lodo en
planchada
Taponamiento mallas
de zaranda
Empaquetamiento,
arcilla plstica sobre
carga E.A. prdidas
inducidas.
Pobre Limpieza
Arcillas plsticas
muy hidratables
Perdida por
permeabilidad,
conglomerados Altas
ROP.
Prdida de circulacin
Empaquetamiento,
arcilla plstica, sobre
carga E.A. prdida
inducidas.
Colapso del pozo por
falta de hidrosttica,
problemas
de
12.25
(9 5/8)
1100-3450
mts. vertical
Hidratacin de Arcillas
Desgaste
BHA
Densidad
lodo
Prcticas
no
adecuadas.
Aprisionamiento por
diferencial
en
la
perforacin.
Seccin
Casing
Prof. (mts)
MD/TVD
Vertical
Aprisionamiento
en
bajada de caera.
Agujero lavados
Atascamiento
CSC
2333-3895 mts
0 grados
del
Riesgos
Consecuencias
Limpieza inadecuada.
Empaquetamiento,
sobrecarga E.A.
Mitigacin
Control ROP, cada 100m , B.V,
pesado, caudal.
Descenso de PH,
degradacin
del
sistema. Corrosin
Aprisionamiento
durante los viajes.
Ingreso fluidos
Excesivo
drag
8.5
(7)
aprisionamientos,
Perdida total de lodo.
Alto torque durante
la
Perforacin,
embotamiento del
BHA,
inestabilidad
del pozo (derrumbe),
Stuck durante la
maniobras,
mala
limpieza del pozo.
Mayor costo de time,
Pescas, Sidetracks.
Torque
&
Densidad de Lodo no
adecuada.
Aprisionamiento
durante
los
agregados
Derrumbes en Iquiri,
empaquetamiento,
golpes de presin,
cavernas, ojos de
llaves, mala limpieza.
Inestabilidad
hueco.
Mala inhibicin
10
del
Intervalo 6
Arena de LMS
influjo
3450 -4300 m
Polytraxx HT
Inestabilidad Agujero
Alta
torque
aprisionamiento
Ingreso de agua
Alteracin
propiedades
Medidas Preventivas:
Minimizar ECDs. Monitorear ROP para minimizar la carga de
recortes en el anular.
El movimiento de la tubera no deber exceder las
velocidades crticas durante los viajes. Realizar el clculo de
las presiones de suaveo y surgencia (swab/surge) usando el
software HydPro antes de cada viaje.
Mantener el peso del lodo en el mnimo requerido para
controlar las presiones de formacin y dar estabilidad al
agujero.
Rotar la columna de perforacin cuando se empieza a circular
para ayudar a romper el esfuerzo de gel y minimizar la
presiones de surgencia.
Comenzar la circulacin lentamente luego de conexiones y
largos periodos de no circulacin.
Planificar romper circulacin en 3 o 4 diferentes profundidades
mientras se viaja en el pozo dependiendo de la reologa del
lodo, la profundidad y las condiciones del pozo.
13
CAUSAS Y MEDIDAS
Causas Mecnicas:
Hidrulica inapropiada,
excesivo caudal de bomba,
excesivas velocidades causando altas ECDs
Prcticas de Perforacin no Adecuadas :
Incremento muy rpido del caudal de bomba luego de las
conexiones y los viajes.
Levantar y Bajar la tubera muy rpido (Surge and Swab).
Excesiva ROP la cual resulta en alta concentracin de
recortes en el fluido del anular causando alta ECDs
Condicin del Agujero como un Factor:
Hinchamiento de las arcillas o incremento de la cada de
recortes en el anular con alta ECD (empaquetamiento).
14
17
19
20
5 1100 m.
FORMACION:
CHACO
TIPO DE FLUIDO:
BENTONITICO EXTENDIDO
+SELLANTES
MATERIALES BASICOS:
5.1.- OBJETIVOS:
Perforar hasta 1100 m con mnimos problemas, bajar y cementar
caera de 13 3/8.
5.2.- PROBLEMAS ESPERADOS:
Posibles prdidas de lodo por permeabilidad,
Tramos masivos de arcillas plsticas y pegajosas que
taponan el flow line.
Vibracin de la hta. por presencia de conglomerados
Alta generacin de slidos,
Inestabilidad del agujero,
5.3.- PROPIEDADES RECOMENDADAS
Unidad
Densidad
lb/gal
21
Valores
8,7 9,2
Viscosidad Marsh
Seg/qt
60-80
Viscosidad Plstica
Cps
15 - 20
Punto Cedente
lb/100ft2
Geles
lb/100ft2
Filtrado API
30 - 45
10-16/14-25
cc
< 20
MBT
lb/bbl
< 30
Ion Calcio
mg/lt
< 200
pH
9 - 10
% v/v
Arena
< 0.5
22
Modo de preparacin:
El lodo Bentontico Extendido se recomienda prepararlo de la
siguiente manera
Pre-hidratar por lo menos 6 horas, 16 lb/bbl Bentonita +
Soda custica a pH 10. Esto para preparar unos 600 bbl de
inicio, luego se bajar concentracin conforme sube el MBT y
sobre todo la reologa.
Seguidamente agregar
Bentonita (Benex).
IMPORTANTE
NOTA1.-Antes de preparar el lodo bentnico, al agua que se
utilizar para preparar el lodo, hacerle un anlisis iones Calcio y
Magnesio y sulfatos, para esto se tendr el HACH DR 2010 en el
23
25
DEL
POZO
PARA
BAJAR
26
PROPIEDADES
20 inch
5m
bbls
1100 m
15 dias
17 1/2 inch
0,976 bbl/m
15%
18,77 inch
1,123 bbl/m
80,00%
22,46 bbL/100m
4,5 %
499 bbL/100m
5464 bbls
500 bbls
5464
DENSIDAD
VISCOSIDAD
VISC. PLASTICA
P. de FLUENCIA
GELES
LECTURA 3 / 6 RPM
FILTRADO API
FILT. HPHT
Ph
CALCIO
SOLIDOS PERFORADOS
M.B.T.
Arena
(lb/gal)
(seg)
(cps)
(lbs/100p2)
(lbs/100p2)
(cc/30 min)
(cc/30 min)
(mg/l)
(%v)
(lb/bbl)
%v
CALCULO DENSIFICANTE
PESO ESPEC.
8,7
4,2
DENSIF. (lb/bbl)
8.6 - 9.2
50 - 70
12 - 15
30- 40
12-18/15-30
12-20/20-28
< 18
S/C
9 - 10,5
< 200
<5
25 - 28
< 0.3
9,0
16,96
5,0
BBL/m
PESO
CONC. #/BBL
(#/unidad)
100
14,0
2
0,02
55
0,25
25
0,75
88
15,00
46
0,75
2200
17,00
25
2,00
50
1,00
BENTONITA
EXTENDEDOR BENTONITA
SODA CAUSTICA
NOV XAN-D
CARB. DE CALCIO SELL
NOV MYACIDE G253
BARITINA BIG BAG
SERFLUFIBRA M
NOV PAC LV
CONTIGENCIA
DEFOAM PLUS
40
NOV MMO
25
BETONITA GEL SUPREME
55
OM-500/800/1200
40
NOV ROP-EPX02
463
NOV DRILL -L(PHPA)
46
NOV TEX
50
CASCARA DE NUEZ F/M
40
MICA F,M,C
55
DESCO CF
25
COSTO TOTAL DE PRODUCTOS
COSTO POR BARRIL ELABORADO ($us/bbl)
COSTO INGENIERIA (2 Ing.Senior)
UNIDADES
765
55
25
164
931
89
42
437
109
UNITARIO
($us)
17,87
22,54
42,23
115,67
7,31
138,69
197,67
38,00
120,93
16
40
150
120
16
32
40
40
80
40
$1.390,00
27
TOTAL
($us)
13.670,55
$1.239,70
$1.055,75
$18.969,88
$6.805,61
$12.343,41
$8.302,14
$16.606,00
$13.181,37
$92.174,41
$16,87
$20.850,00
$113.024,41
TIPO DE FLUIDO:
POLYTRAXX SELLANTE
MATERIALES BASICOS:
PROBLEMAS
Arcillas duras y pegajosas.
Embotamiento , sube MBT
(Chaco ,Yecua ,Tarija ,Tupambi)
Intercalaciones de arenas, con
alta permeabilidad. En pozo
DRO X-1002 prdida total. P.
Diferencial Cajones , Yantata
Ichoa
Alta generacin de solidos por
RECOMENDACIONES
Iniciar la perforacin con el
lodo armado con todos los
aditivos , bajo HPHT
Mantener la densidad los ms
bajo posible, usar sellantes
carbonatos ,grafitos , asfaltos.
Realizar Flow Check
Trabajar con tres centrifugas ,
28
alta ROP
29
Unidad
Valores
Densidad
lb/gal
8.8 9.4
Viscosidad Marsh
seg/qt
50 - 70
cp
15 25
Punto Cedente
lb/100ft2
30 - 40
Gel
lb/100ft2
12 -18/15-30
rpm
10-15/ 12-20
Filtrado API
cc/30 min
4-6
cc/30 min
10 9.0
MBT
lb/bbl
8 - 20
Calcio en filtrado
mg/Lt
< 200
Viscosidad Plstica
Lecturas de 6 / 3
pH
9.5 - 10
Arena
% v/v
< 0.25
Slidos perforados
% v/v
3-4
Pm
ml Ac. Sulf.N/50
1-2
Pf / Mf
ml Ac. Sulf.N/50
0.1
-0.5 / 3 - 5
6.4.- DENSIDAD
Segn los pozos de referencia, las densidades alcanzadas
estuvieron entre 8.8 a 9,4 ppg.
Empezar con 8.8, mantener 9 ppg hasta pasar el Cangapy ,
densificar lentamente para tener 9, 4 lb /gal en Tarija.
30
32
33
36
PROPIEDADES
12,615 inch
1100 m
1000 bbls
3450 m
38 dias
12 1/4 inch
0,478 bbl/m
15,00%
13,14 inch
0,550 bbl/m
85%
8,24 bb/100m
3,0 %
275 bb/100m
6458 bbls
600 bbls
6458
DENSIDAD
VISCOSIDAD
VISC. PLASTICA
P. de FLUENCIA
GELES
LECTURA 6/3 RPM
FILTRADO API
FILTR. HPHT( 200F,500 psi)
Ph
Calcio
SOLIDOS PERFORADOS
M.B.T.
(lb/gal)
(seg)
(cps)
(lbs/100p2)
(lbs/100p2)
8,8 - 9,4
50 - 70
15 - 20
30 - 35
12-18/15-25
10-15/12-20
4- 6
9 -13
9,5-10
< 200
3- 4
5 - 20
(cc/30 min)
(cc/30 min)
ppm
(%)
(lb/bbl)
CALCULO DENSIFICANTE
DEN INIC (Lb/gal)
8,7
9,4
PESO ESPEC.
4,2
DENSIF. (lb/bbl)
40,18
2,75
bbl/m
SISTEMA: POLYTRAXX-SELLANTE
MATERIALES
BENTONITA
SODA CAUSTICA
XAN VIS
NOV PAC LV
SLIP SEAL F
NOV ROP-EPX02
NOV TRAXX BLOCK(POLIAMINA)
LUBE EXP-01
CARB. DE CALCIO SELL
BARITINA BIG BAG
NOV MYACIDE G253
NOV R LIG
PAVE PLEX(ASF.SULFONADO)
CARBONATO DE POTASIO
NOV XAN-D
NOV TEX
CONTINGENCIA
OM-500/800/1200
NOV DRILL -L(PHPA)
NOV TEX
DEFOAM PLUS
CARBONATO DE POTASIO
MICA F,M,C
CASCARA DE NUEZ F/M
NOV THIN-L
CAL HIDRATADA
STEARATO DE AL
PESO
(#/unidad)
100
55
25
50
50
463
450
431
88
2200
46
50
50
55
25
50
CONCENT
LB/BBL
8,00
1,00
0,50
2,00
4,00
6,00
5,00
4,00
20,00
45,00
0,50
3,00
5,00
2,00
0,75
3,00
40
46
50
40
55
55
40
54
55
66
3 - 10
0.5 - 1
3- 5
0,5 - 1
1- 2
3- 5
2- 5
0,25 - 0,5
0,5 - 1
0.25-1
UNIDADES
517
117
129
258
517
84
72
60
1468
132
70
387
646
235
194
387
COSTO UNIT.
($us)
$17,87
$42,23
$281,60
$120,93
$75,29
$788,23
$887,63
$1.200,00
$7,31
$197,67
$138,69
$68,00
$80,64
$120,00
$115,67
$80,00
TOTAL
($us)
$9.238,79
$4.940,91
$36.326,40
$31.199,94
$38.924,93
$66.211,32
$63.909,36
$72.000,00
$10.731,08
$26.092,44
$9.708,30
$26.316,00
$52.093,44
$28.200,00
$22.439,98
$30.960,00
120
32
120
32
40
80
80
32
40
40
$1.390,00
37
$529.292,89
$81,96
$52.820,00
$582.112,89
TIPO DE FLUIDO:
POLYTRAXX- HPHT
38
Unidad
Valores
Densidad
Lb/gal
11.3 -11.5
Viscosidad Marsh
Seg/qt
60 - 80
Cps
20- 25
Punto Cedente
Lb/100 pie2
30 - 45
Gel 10s/10min
Lb/100 pie2
10-14/15-30
Viscosidad Plstica
Lect. 6 / 3 rpm
17-19/16-15
Filtrado API
Cc/30 min
3-4
Cc/30 min.
9 - 10
Slidos totales
% v/v
MBT
lb/bbl
pH
10 -20
9.5 10.5
Cloruros
mg/l
1000 12000
Calcio
mg/l
< 200
cc/30 min
< 10
cc/1r min
<5
% v/v
> 0.5
Arena
39
7.6.- DENSIDAD
Como ya indicamos anteriormente se iniciar perforacin del tramo
con 11.3 ppg, valor que se acord con Ingenieros de YPFB Chaco.
Una de las propiedades crticas para mantener la estabilidad de la
formacin a perforar, es la densidad;
Iniciar con 11.3 ppg, para tratar de reducir los problemas
anteriores y evitar tramos con hueco muy lavado
Luego subir a 11.5 ppg llegando a 3600 m,
41
7.15.-ACONDICIONAMIENTO
DEL
REGISTROS Y BAJAR CAERA
HUECO
PARA
PROPIEDADES
8,755 plg
3450 m
1000 bbls
4300 m
34 dias
8 1/2 inch
0,230 bbl/m
15,00%
9,12 inch
0,265 bbl/m
85,00%
3,973 bbl/100m
2,5 %
158,93 bbl/100m
1351 bbls
600 bbls
DENSIDAD
(lb/gal)
VISCOSIDAD
(seg)
VISC. PLASTICA
(cps)
P. de FLUENCIA
(lbs/100p2)
GELES 10 ' /10 s
(lbs/100p2)
LECTURA 3 RPM
FILTRADO API
cc/30 min
FILT. HPHT(220F, 500 PSI cc/30 min
pH
CALCIO EN FILTRADO
mg/l
LGS(SP)
% v/v
MBT
ppb
cc/1 min
PPT, SPURT LOSS
CALCULO DENSIFICANTE
1951
2,3
BBLS/m
PESO ESPEC.
PESO
(#/unidad)
BENTONITA
100
XAN VIS
25
55
SODA CAUSTICA
NOV PAC LV
50
NOV TRAXX BLOCK(POLIAMINA)
450
PAVE PLEX(ASF.SULFONADO)
50
NOV R LIG
50
NOV ROP-EPX02
463
GLYCOL GP/MC
463
CARB. DE CALCIO SELL
88
BARITINA BIG BAG
2200
NOV MYACIDE G253
46
CARBONATO DE POTASIO
55
SLIP SEAL F
50
NOV TEX
50
AQUA FILM HT
50
MATERIALES
CONTINGENCIA
LUBE EXP-01
DEFOAM PLUS
MAGMA FIBER R
NOV TEX
NOV SPA
NOV BEADS
OM-500/800/1200
NOV BLACKNITE
STEARATO DE AL
CAL HIDRATADA
431
40
30
50
50
40
40
495
66
55
11,3-11,5
50 - 70
20 - 25
30 - 45
10-15/16-30
10 - 15
3- 4
9 - 10
10 - 11
< 200
<3
15 - 20
<5
CONCENT.
#/BBL
8,00
1,50
1,50
2,00
5,00
5,00
3,00
4,00
7,00
15,00
156
0,75
1,00
4,00
3,00
2,00
UNIDADES
156
117
53
78
22
195
117
17
29
333
138
32
35
156
117
78
4- 6
0,5 - 1
5 -8
3- 5
2- 4
6- 7
5 - 10
4 -6
0.5 -1
0,5 - 1
11,5
156
UNITARIO
($us)
$17,87
$281,60
$42,23
$120,93
$887,63
$80,64
$68,00
$788,23
$911,51
$7,31
$197,67
$138,69
$120,00
$75,29
$80,00
$106,65
20
32
70
80
80
40
120
20
40
40
$1.390,00
47
TOTAL
($us)
$2.787,72
$32.947,20
$2.238,19
$9.432,54
$19.527,86
$15.724,80
$7.956,00
$13.399,91
$26.433,79
$2.434,23
$27.278,46
$4.438,08
$4.200,00
$11.745,24
$9.360,00
$8.318,70
$198.222,72
$101,61
$47.260,00
$245.482,72
I. INTERVALO 6
4300 4660 M
FORMACION:
LMS
TIPO DE FLUIDO:
POLYTRAXX HT
RECOMENDACIONES
Circula hasta eliminar gas
, si negativo densificar
INESTABILIDAD
DE Aumentar
la
AGUJERO
concentracin
de
Blacknite ,mantener la
densidad programada ,
subir la concentracin
grafito
POSIBLES
PERDIDAS Bombear B.V con grafito y
LODO
Nov TEX (-). Sacar arreglo
y Bbear B.V con 100 lb /
bbl de LCM
48
APRISIONAMIENTO
HTA
DE Repasar
varias
veces
tramos con resistencia ,
alto Torque
DIFICULTA PARA BAJAR Utilizar en fondo pozo
LINER
lubricante lquido y solido
49
PROPIEDADES
8,755 plg
6,184 m
1500 bbls
4660 m
25 dias
8 1/2 inch
0,230 bbl/m
15,00%
9,12 inch
0,265 bbl/m
85,00%
3,973 bbl/100m
2,0 %
198,66 bbl/100m
681 bbls
977 bbls
1658
4,8
TIPO DE LODO: POLYTRAXX HPHT
PESO
(#/unidad)
25
XAN VIS
SODA CAUSTICA
55
DRISPAC SL
50
NOV TRAXX BLOCK(POLIAMINA)
450
NOV BLACKNITE
495
BARITINA BIG BAG
2200
CARB. DE CALCIO SELL
88
50
NOV R LIG
SLIP SEAL M
50
SLIP SEAL F
50
NOV MYACIDE G253
46
GLYCOL GP/MC
463
PAVE PLEX(ASF.SULFONADO)
50
CARBONATO DE POTASIO
55
NOV TEX
50
CONTINGENCIA
COASTA LUBE
367
DEFOAM PLUS
40
NOV SPA
50
NOV TEX
50
NOV BEADS
40
OM-500/800/1200
40
SODA ASH
55
STEARATO DE AL
66
CAL HIDRATADA
55
MATERIALES
DENSIDAD
(lb/gal)
VISCOSIDAD
(seg)
VISC. PLASTICA
(cps)
P. de FLUENCIA
(lbs/100p2)
GELES 10 ' /10 s
(lbs/100p2)
LECTURA 3 RPM
FILTRADO API
cc/30 min
FILT. HPHT(300F, 500 PSI cc/30 min
pH
CALCIO EN FILTRADO
mg/l
LGS(SP)
% v/v
ppb
MBT
PPT, SPURT LOSS
cc/1 min
CALCULO DENSIFICANTE
PESO ESPEC.
CONCENT.
#/BBL
1,00
1,50
2,00
5,00
12,00
350
10
4,00
4,00
5,00
1,00
7,00
5,00
2,00
3,00
4- 5
0,5 - 1
2- 4
4- 6
6- 7
5 - 10
1- 2
0.5 -1
0,5 - 1
UNIDADES
66
45
66
18
40
264
188
133
133
166
36
25
166
60
99
UNITARIO
($us)
$281,60
$42,23
$310,00
$887,63
$1.085,41
$197,67
$7,31
$68,00
$67,35
$75,29
$138,69
$911,51
$80,64
$120,00
$80,00
20
16
80
120
100
120
40
40
40
$1.390,00
50
14.9 - 15.3
50 - 70
20 - 30
25 - 35
12-15/16-30
14 - 16
3- 4
8 - 10
10 - 10.5
< 200
<3
< 10
<5
15,3
320
TOTAL
($us)
$18.585,60
$1.900,35
$20.460,00
$15.977,34
$43.416,40
$52.184,88
$1.374,28
$9.044,00
$8.957,55
$12.498,14
$4.992,84
$22.787,75
$13.386,24
$7.200,00
$7.920,00
$240.685,37
$145,17
$34.750,00
$275.435,37
Producto
Unit
Size
Unit
Cost
BENTONITA
EXTENDEDOR BENTONITA
SODA CAUSTICA
CARB. DE CALCIO SELL
NOV XAN-D
NOV MYACIDE G253
BARITINA BIG BAG
NOV PAC LV
SERFLUFIBRA M
NOV ROP-EPX02
NOV TRAXX BLOCK(POLIAMINA)
NOV R LIG
SLIP SEAL M
SLIP SEAL F
XAN VIS
DRISPAC SL
GLYCOL GP/MC
LUBE EXP-01
NOV BLACKNITE
CARBONATO DE POTASIO
PAVE PLEX(ASF.SULFONADO)
AQUA FILM HT
NOV TEX
100 LB/SX
2 LB/SX
25 KG/SX
40 KG/SX
25 LB/SX
5 GL/BD
25 KG/SX
50 LB/SX
25 LB/SX
55 LB/SX
55 GL/TB
50 LB/SX
50 LB/SX
50 LB/SX
25 LB/SX
50 LB/SX
55 GL/TB
55 GL/TB
55 GL/TB
25 KG/SX
50 LB/SX
50 LB/SX
50 LB/SX
$17,87
$22,54
$42,23
$7,31
$115,67
$138,69
$197,67
$120,93
$38,00
$788,23
$887,63
$68,00
$67,35
$75,29
$281,60
$310,00
$911,51
$1.200,00
$1.085,41
$120,00
$80,64
$106,65
$80,00
COSTO PRODUCTOS
COSTO INGENIERA
COSTO TOTAL FLUIDOS
Interval
1
765
55
25
931
164
89
42
109
437
Intervalo
3
Intervalo
4
517
156
117
1468
194
70
132
258
53
333
45
188
32
138
78
36
264
84
72
387
17
22
117
517
129
156
117
COSTO TOTAL
$US
$25.697,06
$1.239,70
$10.135,20
$21.345,20
$41.409,86
$31.482,63
$113.857,92
$53.813,85
$16.606,00
$79.611,23
$99.414,56
$43.316,00
$8.957,55
$63.168,31
$87.859,20
$20.460,00
$49.221,54
$72.000,00
$43.416,40
$39.600,00
$81.204,48
$8.318,70
$48.240,00
$1.060.375,39
29
235
646
387
20.850
$113.024,41
TOTAL
MATERIALES
1438
55
240
2920
358
227
576
445
437
101
112
637
133
839
312
66
54
60
40
330
1007
78
603
18
133
133
166
66
66
25
60
$92.174,41
$1.390,00
Interval
2
52.820
35
195
78
117
99
155.680
$155.680,00
$1.216.055,39
51
47.260
40
60
166
34.750
MATERIALES DE CONTINGENCIA
Unit
Size
Producto
OM-500/800/1200
SERFLUFIBRA F
SODA ASH
DESCO CF
CASCARA DE NUEZ F/M
CITRIC ACID
NOV THIN-L
NOV TRAXX TC(MEJOR. DE ROP)
CARB. DE CALCIO S/G
LUBRA GLYDE F/C
CAL HIDRATADA
DEFOAM PLUS
LUBE EXP-01
MAGMA FIBER
NOV HEC-L
COASTA LUBE
NOV FREE PIPE
CARB.CALCIO MARM. UF(2 )
40 LB/SX
25 LB/SX
25 KG/SX
25 LB/SX
40 LB/SX
25 KG/SX
5 GL/BD
55 GAL/DR
40 KG/SX
50 LB/SX
25 KG/SX
5 GL/CN
55 GL/TB
30 LB/SX
5 GL/BD
55 GL/TM
55 GL/TB
25 KG/SX
52
TOTAL
MATERIALES
500
300
40
200
200
50
32
12
200
300
50
32
12
120
32
12
12
200
IX FORMULACIONES
TRAMOS
PROBADAS
PARA
DIFERENTES
X ANEXOS
53
55GAL/TB
43.0
Diesel
cc
203
Agua
cc
102.2
Salmuera
cc
cc
203
102.2
36.6
36.6
Prueba # 2
Unidades Prueba # 1
cc
300
cc
cc
50
cc
Prueba # 2
348
2
57
se va dispersando pero no se
esperados.
Recomendaciones:
PERDIDAS DINAMICAS
Prdidas
estticas son
aquellas que
requieren el
llenado del
pozo a travs
del anular.
61
con
aditivos
lquidos)
Si las prdidas son por filtracin o parciales pero < 150 bbl/hr:
tratar de estimar la ECD usando la Hidrulica antes de bombear
pldoras LCM o pldoras alta viscosidad HiVis y reducir la
densidad tanto como sea posible. Recomendable que el LCM a
usar debe ser soluble en cidos.
Pldoras de baja viscosidad debern ser bombeadas siempre antes
de las pldoras de alta viscosidad para tratar de remover lechos de
recortes acumulados antes de levantarlos con las pldoras de alta
viscosidad.
Rotar la tubera y re perforar si se tiene un top drive cuando se
est bombeando la pldora para asegurar la limpieza del agujero.
El material para prdida puede ser agregado al lodo que este
perforando, el sistema debe tener suficiente viscosidad para
mantener en suspensin cualquier concentracin de material
para prdida y Carbonatos de Calcio.
El material grueso utilizado para prdidas de circulacin LCM
(Carbonato de Calcio sellante) deber ser agregado para proveer
un puente en la zona de fractura y deber ser combinado con
material fino.
Repita el bombeo de las pldoras de LCM solo una vez, a no ser
que hay una disminucin en la prdida en este caso continuar
bombeando pldoras hasta que la prdida se estabilice o se
observe que no tiene ningn efecto adicional.
62
Squeezes
Tierras diatomeas.
Gunksqueeze
63
Ver la posibilidad de
agregar
al
sistema
obturantes mientras se
perfora.
-parar perforacin
< 50 bbl
>50 bbl
Prdida
de lodo
prdida
total
-levantar vstago
-reducir caudal
-balancear en fondo 60
bbl lodo sellante mas:
Magma Fiber 10 ppb
-levantar por encima
del bache.
-circular con mximo
caudal. Si positivo, bajar circulando hasta
fondo. Perforar 1 m,
observar, seguir asi
hasta normalizar.
Si prdida se reduce
parcialmente, bombear otros 50 bbl.
Repetir secuencia an terior
-levantar vstago
-parar circulacin,
-rotar hta, observar nivel pozo.
-bombear a mnimo caudal 100
bbl lodo sellante mas:
Carb. Ca G-S 20 ppb
Magma Fiber 20 ppb
Selflufibra
5 ppb
-Una vez el bache llega al trp.
-bajar hasta cerca a la zona de
prdida, seguir bbeando bache.
-Si positivo, bajar circulando al
fondo. -Perforar 1m, observar,
-seguir asi hasta normalizar.
-Si prdida se reduce parcialmente, bombear otros 50 bbl.
-repetir secuencia anterior.
65
66
67
INFORME DE LABORATORIO
REPORTADO POR:
REVISADO POR:
APROBADO POR:
LODO:
OPERADORA:
POZO:
No. REPORTE:
FECHA DE ANALISIS:
IRMA ROMERO
ARTURO LOPEZ
POLYTRAXX
YPFB -Chaco
DRD
RPL-011-2015
07-02-2015
PRUEBAS REALIZADAS:
Se realizaron pruebas para diferentes tramos para pozo DRD.
1.
2.
3.
4.
68
PRUEBA 1
PRUEBA 2
PRUEBA 3
BENTONITA (S)
SODA CAUSTICA
0.75
0.75
0.75
MYACIDE
0.5
0.5
0.5
PAC LV
XANVIS
0.85
0.85
ROP EXP 02
TRAXX BLOCK
LUBE EXP 01
LUBE EXP 08
SLIP SEAL F
R LIG
NOV TEX
PAVE PLEX
20
20
20
69
BARITA
10
10
10
DATOS REOLOGICOS:
PROPIEDADES
PRUEBA 1
PRUEBA 2
PRUEBA 3
pH
11.5
11.4
11.4
REOLOGIA @ 120F
120F
120F
120F
600/300
62/42
32/23
76/54
6/3
7/5
6/5
10/8
200/100
34/24
VP, cp
PC, lbs/100ft2
GELES 10s / 10min, lbs/100ft2
20
23
6/12
10.6
19/15
9
14
7/10
MEDICION DE LA DENSIDAD:
DENSIDAD TEORICA = 9 PPG
70
43/31
22
32
9/16
10.6
TIEMPO
PRUEBA 1 PRUEBA 2
9+
PRUEBA 3
9+
9+
9.1
9.1
9+
9.1
9+
9+
FORMULACIN:
PRUEBA 4
BENTONITA (S)
SODA CAUSTICA
0.75
MYACIDE
0.5
PAC LV
XANVIS
0.85
ROP EXP 02
TRAXX BLOCK
LUBE EXP 01
71
9+
9+
PRODUCTO
9.1
LUBE EXP 08
SLIP SEAL F
R LIG
NOV TEX
PAVE PLEX
5
20
BARITA
21.4
DATOS REOLOGICOS:
PROPIEDADES
PRUEBA 4
PH
11.4+
REOLOGIA @ 120F
120F
600/300
62/41
200/100
32/23
6/3
6/5
VP, cp
19
PC, lbs/100ft
21
2
6/15
72
10.4
INTERVALOS DE TIEMPO
DENSIDAD TEORICA (PPG)
PRUEBA 4
(PPG)
9.2
9.2
9.2
9.2+
9.2+
73
PRUEBA 4
9.0
120F
91/66
54/40
14/12
25
41
13/30
13.0
PRUEBA 1
PRUEBA 2
PRUEBA 3
271,5
272
270
Soda Custica
Bentonita
Myacide G
0,5
0,5
0,5
Xan vis
1,2
1,2
ROP EXP 02
Polytraxx
Glycol
SlipSeal F
R-Lig
---
---
Pave Plex
Nov Tex
---
Pac LV
1,5
1,5
---
NOV SPA
---
---
Carbonato de K
20
20
20
146,5
146,5
146,5
Agua
Baritina
lb/bbl
74
lb/bbl
lb/bbl
PROPIEDADES INICIALES
PROPIEDADES
PRUEBA 1
PRUEBA 2
PRUEBA 3
11.5+
11
120F
94/65
52/37
11/9
29
11.4+
10,9
120F
82/60
48/33
9/7
22
11,5
10,5
120F
94/67
57/44
19/16
28
36
38
39
9/35
10/29
15/30
API (cc)
HPHT @220F/500 psi(cc)
Pm (ml)
Pf (ml)
Mf (ml)
3.2
9.0
3.0
0.55
2.65
3.2
9.0
3.0
0.75
4.65
3.6
9.0
2.9
O.7
4.6
CO 3 - (ppm)
660
1800
1680
HCO 3 = (ppm)
1891
3843
3904
CLORUROS (mg/l)
CALCIO ( mg/l)
MBT (lpb)
% SOLIDOS
% AGUA
% ACEITE
600
360
8
20
78
2
900
500
8
20
78
2
850
500
8
20
78
2
DENSIDAD (ppg)
PH @ 70F
REOLOGIA @ 120F
600/300
200/100
6/3
VP, cp
PC, lbs/100ft2
75
PROPIEDADES
DENSIDAD (ppg)
PH
REOLOGIA @ 120F
600/300
200/100
6/3
VP, cp
PRUEBA 1
PRUEBA 2
PRUEBA 3
11.6
9.1
120F
131/97
80/60
24/20
34
11.6+
9.1
120F
121/89
74/55
23/21
32
11,8
9.1
120F
100/70
57/41
14/11
30
63
57
40
21/47
19/47
12/19
8,6
9,6
PC, lbs/100ft2
GELES 10sec / 10min,
lbs/100ft2
HPHT @220F/500 psi (cc)
C/30% H2O
C/30% H2O
15
15
10.5
10.5
120F
120F
122/81
108/71
200/100
64/44
50/38
6/3
11/9
10/8
41
37
40
34
9/35
8/20
10
10
0.5
0.6
4.5
CO 3 - (ppm)
1200
1440
HCO 3 = (ppm)
4270
4636
CLORUROS (mg/l)
1000
1000
CALCIO ( mg/l)
460
460
20
20
77
77
PROPIEDADES
DENSIDAD (ppg)
PH @ 70F
REOLOGIA @ 120F
600/300
VP, cp
PC, lbs/100ft2
GELES 10sec / 10min,
lbs/100ft2
API (cc)
HPHT @220F/500 psi (cc)
Pf (ml)
Mf (ml)
% SOLIDOS
% AGUA
% ACEITE
77
PROPIEDADES
C/30% H2O
C/30% H2O
15+
15,1
120F
120F
125/83
136/91
65/44
72/51
1297
16/14
42
45
41
46
9/22
14/36
9,4 cc
10,2 cc
DENSIDAD (ppg)
PH @ 70F
REOLOGIA @ 120F
600/300
200/100
6/3
VP, cp
PC, lbs/100ft2
= 1000 psi
Temperatura = 220 F
PPT
PRUEBA 1
PRUEBA 2
PRUEBA 3
Spurt Loss
3.5
3.6
2.4
Filtrado total
12.3
12.4
12
5.- CONCLUSIONES:
78
79
INDICE
PREFACIO
NUESTRO COMPROMISO
OBJETIVOS DE LA EMPRESA
METAS
INDICADORES DE RENDIMIENTO
INDICADORES DE SEGURIDAD Y MEDIO AMBIENTE
PARAMETROS AMBIENTALES
PLANIFICACIN
MONTAJE DE EQUIPO
Costos ($us)
Desechos Generados y consumo de agua
Coordinacin del trabajo
INTERVALO 17 1/2" (0- 1100 M)
Costos ($us)
Desechos Generados y consumo de agua
Discusin del Intervalo
INTERVALO - 12 1/4" (1100 - 3450 M)
Costos ($us)
Desechos Generados y consumo de agua
Discusin del Intervalo
INTERVALO - 8 1/2" (3450 - 4300 M)
Costos ($us)
Desechos Generados y consumo de agua
Discusin del Intervalo
INTERVALO - 6" (4300 - 4660 M)
Costos ($us)
Desechos Generados y consumo de agua
Discusin del Intervalo
COMPLETACIN
Costos ($us)
Desechos Generados y consumo de agua
Discusin del Intervalo
Desmontaje del Equipo
Costos ($us)
Desechos Generados y consumo de agua
MANEJO DE DESECHOS Y TRABAJOS PFM
Abastecimiento de agua
Inyeccin de desechos lquidos
Entierro de Recortes
Problemas potenciales y recomendaciones del equipo PFM
RESUMEN DRO - X1001
SISTEMA DE GESTION AMBIENTAL
ANEXOS
1
2
3
5
5
5
6
7
9
9
9
9
12
12
12
12
13
13
13
13
14
14
14
14
14
14
14
15
16
16
16
16
17
18
19
20
21
22
23
23
24
25
26
Prefacio
Como marco de referencia para este nuevo proyecto se han tomado como referencia las lecciones
aprendidas del pozo DRD-1001, DRD-1003, DRD-1004, DRD-1005, DRD-X3ST, DRS-1002, DRS1005, DRS-1004.
Aunque todos los pozos sean diferentes, se ha visto que es posible mejorar de forma continua desde el
punto de vista tanto tcnico como econmico e identificar tambin Oportunidades de ahorro; es decir,
minimizar los gastos para hacer del proyecto ms rentable, pero sin poner en riesgo la calidad tcnica.
El sistema de trabajo
DRO - X1001
Nuestro Compromiso
Verificar que el agua y desechos lquidos que sale de la locacin al campo, debe cumplir con el
100% de la legislacin de Medioambiente.
Hacer cumplir la ley de Medio Ambiente 1333 y que todos lo desechos generados enviados a
disposicin estn bajo los parmetros establecidos en el misma.
DRO - X1001
Objetivos Especficos
Verificar y controlar que todos los parmetros de los desechos lquidos y slidos llevados a
disposicin final estn bajo los rangos y lmites permisibles que nos dicta la ley 1333 de medio
ambiente.
Balances de Volmenes
Controlar los volmenes de fluido perdido en formacin y superficie, recuperados y fluido nuevo
preparado.
Lquidos Irrigados
Cumplir con las regulaciones medio ambientales respecto a la calidad del agua irrigada, de acuerdo
a lo que nos dice la ley 1333, Anexo 4, Sulfatos < 1200 mg/lt, Cloruros < 2500 mg/lt, Slidos totales
disuelto < 2500 mg/lt, Ph= 7.
DRO - X1001
Controlar diariamente los medidores de flujo (Flujo metros) en las lneas de agua (pozo y
minicampamento).
Verificar que todos los equipos de control de slidos estn en condiciones ptimas de operacin
para minimizar desechos lquidos.
Manejo de Desechos
Realizar anlisis de contenido de humedad y cloruros a los desechos slidos antes de ser enviados
a sus dispocisin final.
Realizar compactacin en el rea de entierro de recortes para poder reutilizar el rea en los
siguientes pozos a perforar.
Verificar que los lquidos y slidos salados o contaminados con Cloruros altos sean lavados o
diluidos con agua dulce, hasta obtener parmetros segn ley del medioambiente, Cl < 2500 mg/lt.
Controlar y supervisar para que el agua contaminada sea irrigada o inyectada, previo anlisis fsico
qumico y tratamiento si es necesario.
Verificar que al finalizar el entierro de los desechos slidos, esta rea tiene que ser compactada y
nivelada para realizar la entrega de la planchada a produccin.
Colocar geomembranas y bermas en todos los tanques de almacenamiento de lquidos para evitar
derrames y por ende posible contaminacin ambiental.
Colocar skimmers en todos los lugares que la planchada lo requiere para evitar contaminacin con
aceite.
DRO - X1001
Meta
Alcanzar en un 100 % todo lo propuesto en los objetivos, con un trabajo de
calidad, ahorrando tiempo y dinero.
Indicadores de Rendimiento
El xito del trabajo de P.F.M. en relacin al Fluido de Perforacin ser medido por el cumplimiento de
los Objetivos mostrados en la siguiente tabla:
Descripcin
Indicador
Tiempo no Productivo
< 5%
> 75%
100%
Propuesta
1/Mes
diario
Capacitacin
2 Por ao
Descripcin
Propuesta
Generacin de Desechos
(Etapa Perforacin)
Generacin de Desechos
(Etapa completacin)
Spills
DRO - X1001
1 /Mes
200 1200 bbls
Parmetro
TPH
Sulfato (ug/l = 50000)
Cloruros (ug/l = 400000)
SAR (Relacin Adsorcin
Sodio)
Unidad
Mtodos de Ensayos
Lmites
Permisibles
mg / Kg
mg / Kg
mg / Kg
EPA 418,1
Fotomtrico
Clculo API
5000
N/a
N/a
Adimensional
Clculo
12
Limites Mximos para suelos en funcin al uso actual potencial Suelo Industrial/ Comercial (de 0,0 a
1,5 m de metros de profundidad) segn Anexo 7, Ley 1333 Medio Ambiente.
Mtodos de Ensayos
Lmites
Permisibles
Sulfato
mg / L
Clculo API
< 1200
Cloruros
mg / L
Clculo API
< 2500
mg / L
Clculo API
< 2500
Adimensional
Clculo API
Parmetro
pH
DRO - X1001
Planificacin
Inspeccin de la Locacin
El grupo de PFM en conjunto con personal de YPFB CHACO S.A., debe realizar una inspeccin a la
locacin antes de iniciar las operaciones de Rig up, con la finalidad de determinar lo siguiente:
Seguridad
Planes de Contingencia
Primeros auxilios
Programa STOP
Extinguidores de Incendio
DRO - X1001
Montaje de Equipo
Duracin: 15 das.
Costos ($us)
Excavadora
Volqueta
Cisterna
P.F.M.
Ayudantes
Qumicos
TOTAL
6.600
3.000
4.500
5.400
5.400
24.900
Desechos Lquidos
5475
COORDINACIN DE TRABAJO:
Ing. PFM:
Debe ir 3 das antes o continuar en el traslado, para recepcionar los tanques, armar
planta de lodos e inyeccin, coordinar ubicacin de equipos relacionados con el
Manejo de desechos, verificar la zona de entierro de recortes y la produccin del pozo
agua.
1 tanque de oro
Volumen Total
Se debe considerar que el segundo tanque de oro que se tiene es de Intervencin de cap. 180 bbl, por
lo que se lo tiene que acondicionar para montar paralelo con el fin de recibir los desechos slidos del
magcliner y de las centrifugas, el primer tanque de oro se lo montara segn procedimiento enterrado
para recibir los recortes de las zarandas + la zarnada secadora.
Instalacin de la planta de Lodos
Inicialmente compactar el rea donde ser ubicada la planta de lodos, colocar arena sobre la superficie
3
(Vol. Aprox. 12 m ), para nivelar el rea posteriormente colocar las geomembranas y bermas.
Para el montaje de dicha planta contamos con una geomembrana de 18 x 26 mt.El rea disponible
contra derrames tiene que ser 23 x 16 x 0.35 m teniendo un volumen de 810 Bbl de capacidad contra
derrames, es decir cumpliendo a cabalidad la ley 1333 (110% de volumen, del recipiente de mayor
capacidad).
DRO - X1001
Una vez montada la planta de fluidos con los 4 tanques grises y 2 epoxicos, se debe colocar la
pasarela y aterrar los tanques. Considerar espacios para montaje de equipos de control de slidos,
montaje de bombas y unidad de filtrado.
Instalacin de Canaletas metlicas y skimmers
Es necesario que el Ingeniero de PFM se asegure de la correcta instalacin de las canaletas de
recoleccin de fluidos en el rea de piletas, bombas y torre. Es decir, deber coordinar y supervisar que
tengan una buena pendiente y que sean colocadas en los lugares adecuados.
As mismo los separadores de aceite (Skimmer), deben ser colocados en el lugar correcto y deben
tener el nivel adecuado para asegurar una buena separacin y evitar la acumulacin de agua.
Verificacin o Check list a los equipos relacionados con PFM
Antes de comenzar con las operaciones de traslado, debe constituirse en la locacin el Ing. PFM, para
realizar un check list, de: Equipos de Control de Slidos (tanto de Tuboscope, SAI y empresa de
apoyo), Piletas de Lodo, Lneas y Bombas.
Geomembranas
Se debe prever la cantidad y tamao suficiente de geomembranas y bermas que se usarn durante la
operacin para cuidar el medioambiente. Los mismos, deben ser colocados en las siguientes reas:
Tanques de combustible
Bombas
Booms (5 sacos)
DRO - X1001
15 das
Costos ($us)
Excavadora
Volqueta
Cisterna
P.F.M.
Ayudantes
Qumicos
TOTAL
6.000
3.000
4.500
5.400
5.400
24.900
Desechos Lquidos
3222
1807
7275
DRO - X1001
10
40 das
Costos ($us)
Excavadora
Volqueta
Cisterna
P.F.M.
Ayudantes
Qumicos
TOTAL
17.600
8.000
12.000
14.400
14.400
66.400
Desechos Lquidos
2628
1746
8841
DRO - X1001
11
35 das
Costos ($us)
Excavadora
Volqueta
Cisterna
P.F.M.
Ayudantes
Qumicos
TOTAL
15.400
7.000
10.500
12.600
12.600
58.100
Desechos Lquidos
1502
1559
8820
DRO - X1001
12
25 das
Costos ($us)
Excavadora
Volqueta
Cisterna
P.F.M.
Ayudantes
Qumicos
TOTAL
11.000
5.000
7.500
9.000
9.000
41.500
Desechos Lquidos
644
1840
7132
DRO - X1001
13
Completacin (4503m)
Duracin:
60 das
Costos ($us)
Excavadora
Volqueta
Cisterna
P.F.M.
Ayudantes
Qumicos
TOTAL
26.400
12.000
18.000
21.600
21.600
99.600
Desechos Lquidos
231
2245
9000
Discusin Intervalo
Realizar el cambio de fluido por fluido de Empaque, coordinar el fluido filtrado para su reutilizacin y
almacenamiento para otro proyecto, analizar sus propiedades con el Qumico.
Ensayo a conclusin del pozo.
DRO - X1001
14
Excavadora
Volqueta
Cisterna
P.F.M.
Ayudantes
Qumicos
TOTAL
4000.00
3500.00
3000.00
10,500.00
Slidos a fosas
Desechos Lquidos
1880
Mini Cam
m /da
Campam
22
m /da
Equipo =
12
m /da
Total
42
263.76
m /da
bbl/da
3
3
3
DRO - X1001
15
el consumo de agua en el lavado de los equipos deber ser controlado con rigurosidad, en el anteriores
proyectos se ha venido utilizando en un promedio de 20 bbl/da, el objetivo en este proyecto es de bajar
esta cifra, adems no se debe sobrepasar el valor que se tiene en el programa ya que el mismo es el
promedio del campo el cual se debe cumplir y reportar cualquier variacin.
Al final tendremos diferenciado los desechos generados por agua de lavado, desechos de lodo y
recortes de perforacin, se debe tambin realizar el seguimiento del funcionamiento de la bomba de
inyeccin; en este caso es muy importante, el control del tiempo de trabajo, esto debe ser diario y
llenado en la planillas correspondientes.
Para la inyeccin de los desechos lquidos se tiene el pozo DRD 1004 a 9 km de distancia, en
este pozo se han inyectado los volmenes de la perforacin de los DORADOS.
Para tal efecto no se va a montar planta de inyeccin (con el propsito de optimizar el uso de tanques),
se va a colocar una lnea desde el pozo DRS-1003 hasta el pozo la seccin A DRD-1004, y con una
bomba (puede ser la del equipo) se va a proceder a inyectar desde los tanques de la planta de fluidos
todos los desechos lquidos.
DRO - X1001
16
Para el entierro de recortes se recomienda tener un rea efectiva aproximada de 1200 m , pero en
2
planchada se tiene un rea de 1970 m , donde se harn fosas de 3 x 4 x 2.5 m para la disposicin final
de los desechos slidos. Se debe llevar un control estricto (registrar para la curva del indicador de
medio ambiente) de los slidos generados y saber diferencia entre slidos generados por la
perforacin del agujero (recorte), slidos generados del procesamiento del lodo (centrifugado) y
slidos generados por cargas muertas (limpieza de tanques de la planta).
Antes y despus de realizar el entierro de recortes es importante realizar un anlisis fsico qumico para
verificar el estado de los slidos, para tal efecto antes de llevar a las fosas los recortes se saca una
muestra y se realiza un anlisis en el campo para determinar Ph y cloruros, despus de realizar el
entierro con una relacin de 2:1 o 3:1 se saca otra muestra del rea y se la enva a un laboratorio a
Santa Cruz para que se verifiquen que los parmetros estn dentro de los lmites permisibles exigidos
por la ley de medio ambiente 1333, como se puede ver en la siguiente tabla:
Parmetro
TPH
Sulfato (ug/l = 50000)
Cloruros (ug/l = 400000)
SAR (Relacin Adsorcin
Sodio)
Unidad
Mtodos de Ensayos
Lmites
Permisibles
mg / Kg
mg / Kg
mg / Kg
EPA 418,1
Fotomtrico
Clculo API
5000
N/a
N/a
Adimensional
Clculo
12
DRO - X1001
17
Durante las operaciones de limpieza de lneas y piletas, desplazar con agua las lneas, manifold y
bombas.
Taponamiento de pozo inyector, controlar el contenido de slidos en los desechos lquidos, bajar
peso por centrifuga, realizar dilucin parcial antes de inyectar los fluidos para evitar este tipo de
inconvenientes
Pobre caudal de admisin en el pozo inyector, controlar viscosidad de los desechos lquidos < 45
seg., para no tener problemas en el bombeo y caudales. Realizar Prueba de inyectividad al pozo
previo a inicio de operaciones para evitar contratiempos.
Acumulacin de desechos lquidos en planta de lodos, falta de espacio para recibir volmenes,
anticiparse a este problema con una buena coordinacin en el envo e inyeccin de los desechos
lquidos, requerir la cantidad adecuada de cisternas para realizar los viajes al pozo inyector.
CODIGO
DESCRIPCION
SGA IO09 -- 01
SGA IO09 02
SGA IO09 03
Desplazamiento de Lodo
SGA IO09 04
SGA IO09 05
SGA IO09 06
SGA IO09 07
Neutralizacin Acida
SGA PO 12
SGA PO 14
Landfarming - Landspreading
SGA PO 15
Gestin de residuos
DRO - X1001
18
DRO - X1001
19
Document number
Revision
Page
TS2014-CDS-001
01
1 of 13
CAMPO DORADO
PROGRAMA DE CDS
YPFB-02
DRO-X1001 ENERO 2015
Este documento contiene informacin propietaria y confidencial que pertenece a National Oilwell Varco,
sino que se presta para fines limitados, es propiedad de National Oilwell Varco. La reproduccin, en
todo o en parte, o el uso de este diseo o la distribucin de esta informacin a terceros no est
permitida sin el expreso consentimiento de National Oilwell Varco escrita. Este documento debe ser
devuelto a la National Oilwell Varco a peticin y en cualquier caso al finalizar el uso para el que fue
cedido.
Copyright National Oilwell Varco - 2011
Tuboscope Servicios de
Bolivia SRL
Doble Via a La Guardia Km.6
Casilla 3813
Santa Cruz de la Sierra, BO
Tel: +591-3-355-3500
Numero de Documento:
REV
TS2014-CDS-001
01
www.nov.com
Document number
Revision
Page
TS2014-CDS-001
01
2 of 13
HISTORIAL DE REVISIONES
01
22/02/14
Rev
Fecha
Translation to Spanish
Razon de Revision
(dd.mm.yyyy)
DESCRIPCION DE REVISION
Revision
1
www.nov.com
Change description
Translation from English to Spanish
F. Barrero
Preparado
M. Scofield R. Estupin
Revisado
Aprobado
Document number
Revision
Page
TS2014-CDS-001
01
3 of 13
CONTENTS
1.0
INTRODUCcIN..................................................................................................... 4
2.0
2.1
2.2
2.3
3.0
3.1
3.2
3.3
3.4
4.0
5.0
5.1
5.2
5.3
5.4
6.0
6.1
6.2
6.3
7
OPERACIONES EN 17 ...........................................................................
OPERACIONES EN 12 ...........................................................................
OPERACIONES EN 8 .............................................................................
OPERACIONES EN 6 .................................................................................
9
9
9
9
AFE...................................................................................................................... 11
PERSONAL ............................................................................................... 11
CONSUMIBLES ......................................................................................... 11
PRODUCTOS QUMICOS........................................................................... 11
NOV CONTACTOS ..................................................................................... 13
www.nov.com
Document number
Revision
Page
TS2014-CDS-001
01
4 of 13
1.0 INTRODUCCIN
A medida que los fluidos de perforacin se tornan ms complejos, se requiere un enfoque de
ingeniera para la formulacin del fluido y el tratamiento adecuado para mantener propiedades
especficas de los fluidos. El tratamiento de lodo se clasifica en dos categoras: la adicin de
materiales comerciales y la extraccin de contaminantes no deseados. Se har referencia a cada
una de estas categoras en el presente manual. A pesar que no es el objetivo de este manual
proporcionar un historial detallado de las innovaciones en los fluidos de perforacin y el control de
slidos, debemos mencionar las fuerzas impulsoras de los logros tecnolgicos de la actualidad.
Estas fuerzas son las siguientes:
Elemento/Clasificacin
Recortes
Mayor a 500
Arena
74 500
Limo
2 74
Arcilla (Clay)
Menor a 2
www.nov.com
Document number
Revision
Page
YPFB Chaco
Perforador
YPFB-02
Contratado por
YPFB Chaco
Locacin
DORADO
DRO-X1001
Tipo de Fluido
WBM POLYTRAXX
Compaa de Lodo
NOV FluidControl
ENERO 2015
4660 m
17 , 12 , 8 y 6
Personal de Perforacion
Ingeniero Proyecto YPFB CHACO
APOLINAR HIDALGO
ARTURO LOPEZ
Personal de NOV
Ingeniero Proyecto
MATTHEW SCOFIELD
Soporte Tcnico
FERDIN BARRERO
Gerente General
ROBERTO ESTUPIN
www.nov.com
TS2014-CDS-001
01
5 of 13
Document number
Revision
Page
2.1
TS2014-CDS-001
01
6 of 13
Durante la perforacin de estas secciones se contar con equipos de control de slidos como:
Tres zarandas primarias: DERRICK de movimiento lineal y una zarandas secadora tipo KING
COBRA, un acondicionador de lodos tipo KING COBRA 16-2, dos centrfugas: 1 HS-3400 y 2 HS2000 de mayor caudal, se usaran ambas centrifugas con velocidad variable de acuerdo a las
densidades que tenga el lodo, ya sea en serie (recuperar barita) o en paralelo controlando los LGS
que se incorporan al sistema
2.2
MANEJO DE RECORTES
Los slidos generados por la zaranda secadora se recibirn en un tk de Oro enterrado cerca de la
descarga de la misma, los slidos generados por el acondicionador de lodo y las dos centrifugas
decantadoras sern recibidos en otro tanque ms pequeo colocado de tal manera que las
descargas solidas de los equipos ya mencionados se depositen en su interior.
Una vez cuantificado el volumen y el porcentaje de humedad se proceder a su disposicin final
mediante una volqueta y una retroexcavadora que ser la encargada de realizar la remediacin en
el rea que la operadora designe para dicho trabajo, esto ser en coordinacin con el supervisor de
la empresa PFM.
2.3
ZARANDAS PRIMARIAS.
La configuracin de mallas en cada una de las zarandas lineales estar en funcin de las
propiedades del lodo, caudal de procesamiento, la ROP, el dimetro del hueco, la formacin que se
atraviesa y el tamao de los cortes que se observan por zaranda; tomando en cuenta estos
parmetros se optimizar la combinacin de mallas para una mejor remocin de slidos gruesos y
minimizar la incorporacin de slidos finos al lodo del sistema.
3.1 SECCION DE 17
Zaranda Primaria Derrick 1
Zaranda Primaria Derrick 2
Zaranda Primaria Derrick 3
Zaranda Secadora K Cobra
www.nov.com
API de mallas
API de mallas
API de mallas
API de mallas
50/50/50/50
50/50/50/50
60/60/60/60
80/80/80/80
PC:
PC:
PC:
PC:
275
275
231
165
micrones
micrones
micrones
micrones
Document number
Revision
Page
3.2
100/100/100/100
100/100/100/100
80/80/80/80
100/100/100/100
120/120/120/120
100/100/100/100
100/100/100/100
80/80/80/80
100/100/100/100
120/120/120/120
100/100/100/100
100/100/100/100
80/80/80/80
100/100/100/100
120/120/120/120
SECCION DE 8
3.4
SECCION DE 12
3.3
TS2014-CDS-001
01
7 of 13
SECCION DE 6
Metros
Das
Recuperado
Devuelto al Sistema
17 1/2
12 1/4
8 1/2
1033
2307
865
10
24
28
705
596
23
705
70
190
38
TOTAL
4395
100
1324
775
www.nov.com
Document number
Revision
Page
TS2014-CDS-001
01
8 of 13
Seccines
Est. Profundidad
Fecha
Caeria
17 Seccin
1100 m
N/A
13
12 Seccin
3450 m
N/A
8 Seccin
4300 m
N/A
6 Seccin
4660 m
N/A
www.nov.com
Equipos de Laboratorio
Cantidad
2
1
1
1
1
1
1
1
3
4
1
Descripcin
Balanza para lodo-recortes
Retorta Offite 50 ml
Balanza electrnica
Ph metro
Conductivmetro
Colormetro
Cantidad
1
1
1
1
1
1
Document number
Revision
Page
5.1
TS2014-CDS-001
01
9 of 13
OPERACIONES EN 17
Monitoreo de volmenes peridicamente ante cualquier anormalidad informar al Co man, en todas las zarandas, chequeo
de accesorios y tensionado de mallas de ser necesario reajustar para optimizar la vida til de las mismas, y que el fluido
de perforacin se recargue de solidos indeseados. Recomendacin para todos los tramos a perforar.
El volumen considerado es el total incluyendo de limpieza de equipo.
SECCION
TIPO DE LODO
DENSIDAD
(ppg)
PROFUNDIDAD
(m)
METROS
PERFORADOS
BBL.CORTE
POR (m)
ESTIMADO
RECORTES BBL
17
Bent Ext
8.6 9.2
0 1033
1033
3.12
3227
5.2
OPERACIONES EN 12
SECCION
TIPO DE LODO
DENSIDAD
(ppg)
PROFUNDIDAD
(m)
METROS
PERFORADOS
BBL.CORTE
POR (m)
ESTIMADO
RECORTES BBL
12
POLYTRAXX
8.8 9.4
1033 3340
2307
1.19
2757
5.3
OPERACIONES EN 8
SECCION
TIPO DE LODO
DENSIDAD
(ppg)
PROFUNDIDAD
(m)
METROS
PERFORADOS
BBL.CORTE
POR (m)
ESTIMADO
RECORTES BBL
POLYTRAXX
9.4 11.5
3340 4205
865
1.16
1006
5.4
OPERACIONES EN 6
SECCION
TIPO DE LODO
DENSIDAD
(ppg)
PROFUNDIDAD
(m)
METROS
PERFORADOS
BBL.CORTE
POR (m)
ESTIMADO
RECORTES BBL
POLYTRAXX
9.4 11.5
4205 4395
190
2.84
540
www.nov.com
Document number
Revision
Page
TS2014-CDS-001
01
10 of 13
VOLUMEN DE CORTES; TEORICO, LAVADO DEL HUECO, TOTAL LGS EN ECS (bbl)
Y DIAMETROS (Pulg)
Seccin
(Pulg)
Metros
17 1/2
12 1/4
8 1/2
6
TOTAL
Das
Terico
Lavado de
hueco
Total LGS
Dimetro
Prom.
% lavado
1033
2307
865
190
10
24
28
38
1007.5
460.2
1468
21.12
45.68
1102.5
132.0
1235
12.96
11.98
199.0
41.4
240
9.34
20.82
21.8
2.7
24
6.36
12.45
4395
100
Perf.
Tramos
(mts)
Metros
Das
Dewatering
Tratamiento
Irrigada
16 "
1033
1033
10
4900
6000
6000
12 "
1033
3340
2307
24
5500
6600
6600
8 "
3340
4205
865
28
2100
2300
2300
4205
4395
190
38
1800
2100
2100
4395
100
14300
17000
17000
TOTAL WBM
www.nov.com
Document number
Revision
Page
TS2014-CDS-001
01
11 of 13
6.0 AFE
6.1
PERSONAL
Supervisor
(1)
$ 375
171
Costo Total
Pozo
64125
Operador
(2)
$ 165
342
56430
Ayudante
(2)
$ 115
300
34500
PERSONAL
Costo Diario
Das Total
Total
6.2
$ 155.055.00
CONSUMIBLES
LCM-2D
145
DERRICK
180
70
89
115
180
215
255
425
Tot
3
24
20
34
27
54
6
TOTAL
6.3
PRODUCTOS QUMICOS
CONSUMIBLE
POLIMERO 1143
POLIMERO 1148
SULFATO DE ALUMINIO
Cal Hidratada
cido Ctrico
Costo
Unitario
10.62
10.62
2.1
2.5
5.5
TOTAL
www.nov.com
Costo Total
Pozo
22302
3186
24990
30500
3960
$uS 84.938
Document number
Revision
Page
TS2014-CDS-001
01
12 of 13
6.3 COSTOS
PERSONAL
EQUIPOS
MALLAS
17 1/2
12 1/4
8 1/2
6
-----
36438
25575
24189
25380
6655.32
12622
TOTAL
155.055
111.582
19,277.32
www.nov.com
QUIMICOS
TOTAL
43093.06
38197
50369
60680
84.938
370,852.32
Document number
Revision
Page
TS2014-CDS-001
01
13 of 13
7 NOV CONTACTOS
MATTHEW SCOFIELD
SENIOR ENGINEER
Bolivia
Tel Directo:
E-mail:
713-13628
matthew.scofield@nov.com
JUBERT RUA
SENIOR ENGINEER
Bolivia
Tel Directo:
E-mail:
713-20952
jubert.rua@nov.com
BISMAR ROJAS
FIELD SUPERVISOR
Bolivia
Tel Directo:
E-mail:
766-59197
bismar.rojasyllanes@nov.com
Tel Directo:
E-mail:
713-47272
ferdin.barrerofarah@nov.com
Dirrecion:
NOV FluidControl
Tuboscope Servicios de Bolivia
SRL
Doble Via a La Guardia Km 6
Santa Cruz de la Sierra
Bolivia
www.nov.com
www.nov.com
PROGRAMA DE TRABAJO
MUD LOGGING (UNIDAD ILS-09)
POZO DRO-X1001
SERVICIO MUD LOGGING AVANZADO
REPRESENTANTE: Manuel Domnguez
SUPERVISOR PARA YPFB-CHACO: HUGO SOLIZ
DICIEMBRE-2014
COMPAIA: INTERGAS SERVICIOS PETROLEROS S. A.
FI-ILS-08-#
F.E.: 31/07/2008
Pgina 1
La unidad, ser montada con todos sus sensores y sistema de red, para comunicacin tiempo real a oficinas Santa Cruz y
Pgina WEB, si el cliente lo requiere. Tres das antes de inicio de operaciones el personal de laboratorio realizar el montaje de
la Unidad; previamente en base, se realizara un mantenimiento preventivo a la Unidad para que todo est en orden para el
control de operaciones. Se enviar una persona de QHSE, para que certifique que el montaje est cumpliendo los
requerimiento de seguridad de YPFB CHACO, es decir que tenga sus letreros de aviso, donde estn enterrado los cables de
los sensores,etc.
Durante esta fase, se recolectar muestras, y guardada correspondiente, segn el programa de YPFB-CHACO. Perforar las
formaciones Tariquia. La descripcin litolgica debe ser apoyada por Geologo de Chaco, para determinar un nivel arcilloso
donde se bajar la Caera de 13.3/8.
La deteccin de gas, ser continua con sus anlisis cromatogrficos correspondientes y adems se llenar una planilla por el
Logger, para que en cada cambio de turno de 12 hrs, est registrado el tiempo de succin de la zaranda a la unidad.
Se controlar todos los parmetros de perforacin y se emitir un reporte diario al Company Man, planillas de parmetros de
perforacin, planilla de gases, para que distribuya, tanto a Geologa como a Perforacin de YPFB-CHACO.
Se controlar durante los viajes de cambio de trpano, el control de llenado y desplazamiento de sarta, los puntos de arrastre o
resistencia que hubiese durante la bajada o sacada de herramienta. Adems del control de la bajada de caera 13 3/8,
mediante grficas.
FI-ILS-08-#
F.E.: 31/07/2008
Pgina 2
El perfil de Muglog ser actualizado en las maniobras, debido a que en esta fase la penetracin es de 200 a 250 metros das y
el personal logger trabaja solo en el control de toda la unidad. Adems debe actualizar los reportes de perforacin, parmetros,
ROP-Gas. Planilla control volumen.
Fase 12.1/4
Control Mud Logging, tramo: 1000 m - 3400 m.
2 ADT
2 Cutineros
2 cutineros
En esta fase de perforacin, se continuara el monitoreado de los parmetros de superficie y recolectar muestras, para su
descripcin litolgica y guardado correspondiente, segn el programa de YPFB-CHACO. Perforar las formaciones Tariquia,
Yecua, Petaca, Cajones, Yantata, Ichoa, Cangapi, San Telmo, Escarpment, Tarija, donde bajar Caera de 9.5/8.
La deteccin de gas, ser continua con sus anlisis cromatogrficos correspondientes y adems se llenar una planilla por el
Logger, para que en cada cambio de turno de 12 hrs, est registrado el tiempo de succin de la zaranda a la unidad.
Se controlar todos los parmetros de perforacin y se emitir un reporte diario al Company Man, planillas de parmetros de
perforacin, planilla de gases, para que distribuya, tanto a Geologa como a Perforacin de YPFB-CHACO.
Se controlar durante los viajes de cambio de trpano, el control de llenado y desplazamiento de sarta, los puntos de arrastre o
resistencia que hubiese durante la bajada o sacada de herramienta. Adems del control de la bajada de caera 13 3/8,
mediante grficas.
Tambin el ADT elaborar la tabla de presiones y el perfil de Muglog correspondiente, tanto de gases como de parmetros y
presiones, adems de las grficas de maniobras, con los correspondientes anlisis geomecnico de las muestras recuperadas.
Fase 8.1/2
Control Mud Logging, tramo: 3400 m - 4250 m.
FI-ILS-08-#
F.E.: 31/07/2008
Pgina 3
2 ADT
2 Cutineros
2 cutineros
En esta fase de perforacin, se continuara el monitoreando los parmetros de superficie y recolectar muestras, para su
descripcin litolgica y guardado correspondiente, segn el programa de YPFB-CHACO. Perforar las formaciones Tarija, Falla
1, Tarija, Tupambi, Iquiri, Falla 2, Iquiri, Ars. Guanacos donde bajar Liner de 7.
La deteccin de gas, ser continua con sus anlisis cromatogrficos , se emitir un reporte diario al Company Man, planillas de
parmetros de perforacin, planilla de gases, para que distribuya, tanto a Geologa como a Perforacin de YPFB-CHACO.
Se controlar durante los viajes de cambio de trpano, el control de llenado y desplazamiento de sarta, los puntos de arrastre o
resistencia que hubiese durante la bajada o sacada de herramienta. Adems del control de la bajada de caera 13 3/8,
mediante grficas.
Tambin el ADT continuara la evaluacin de las presiones de formacin y el perfil de Muglog correspondiente, llevando control
de los anlisis geomecnico de las muestras recuperadas y la presencia de derrumbes.
Fase 6
Control Mud Logging, tramo: 4250 m 4500 m.
2 ADT
Costo Diario, Unidad: 2575 $us/dia
2 Cutineros
(Incluye 3 monitores, Consumibles y ADT adisional)
2 Cutineros
En esta fase de perforacin, el control estar ms centralizado en la formacin: Iquiri con especial cuidado al atravesar las
Arenisca Tacobo y Arenisca 1 que son de alta presin, donde se bajar el Liner 5.
FI-ILS-08-#
F.E.: 31/07/2008
Pgina 4
El servicio es con la misma unidad, tiempo real a oficina CHACO y todo el control que involucra esta fase. La diferencia, es que
el servicio se hace solo con los 2 Mud Loggers.
Al final del servicio, el grupo de trabajo, presentar el informe final, tanto de la etapa de perforacin como la etapa
De terminacin, conjuntamente las lecciones aprendidas de todo el pozo.
FI-ILS-08-#
F.E.: 31/07/2008
Pgina 5
PROGRAMACIN DE ACTIVIDADES
tem
1
rea de Trabajo
LABORATORIO
Resultado Deseado
Unidad 100 %
Tcnica Operativa
Responsable
Diego Aldunate
Fecha de Realizacin
01 al 20 Dic. -2014
Temas a Tratar
- - Mantenimiento preventivo de la unidad en locacin. La
unidad se qued en locacin.
- Realizar el check list de la unidad ILS-09, para que en
UNIDAD
Personal Asignado
01 al 20 Dic. -2014
CAPACITACION
personal asignado.
SUPERVISION
Manuel Domnguez
01 al 20 Dic. -2014
LOGSTICA
CALIDAD
Asistente Gerencia
(S.Mosciaro/V.Revollo) y Enc. de
Almacn Javier Salinas
Trabajo.
01 al 20 Dic. -2014
pozo.
- Documentos integrados (Calidad y Medio Ambiente) y
procedimientos de la ISO
- Tarjetas STOP
SEGURIDAD
01 al 20 Dic. -2014
FI-ILS-08-#
F.E.: 31/07/2008
MEDIO AMBIENTE
01 al 20 Dic. -2014
- Control Derrames
- Plan de Contingencias
Pgina 6
CAPACITACIN PERSONAL
Nuestro personal, continuar recibiendo la capacitacin a travs del CIE (Centro de Entrenamiento Intergas) y capacitaciones
de nuestro sistema de gestin integrado (Calidad-Seguridad-Medio ambiente). Adems del curso de
Welll Control para todos los Ing.ADT y Logger, este curso se renueva cada 2 aos.
Adems el personal de Campo, recibir capacitacin en el pozo por el Ing. Hugo Soliz, sobre hidrulica, surge and swab y
manejo de software que tiene la unidad Mud Logging y presiones de formacin.
SUPERVISION DEL TRABAJO EN EL CAMPO Y EN LA CIUDAD
El Ing.Hugo Soliz ser el Supervisor para los tres pozos de YPFB-CHACO. El ser el responsable de la supervisin de nuestro
trabajo en el campo y tambin asistir a las reuniones diarias en oficinas Santa Cruz.
FI-ILS-08-#
F.E.: 31/07/2008
Pgina 7
Ingenieros Loggers
Cutineros
FI-ILS-08-#
F.E.: 31/07/2008
NOMBRE
TTULO
Ricardo Gironda
Ing. Gelogo
Antonio Rodriguez
Ing. Gelogo
Carlos Alberto Perez
Ing. Petrolero
Freddy Romero
Ing. Petrolero
Raul Pozo
Ing. Petrolero
Mayra Rojas
Ing. Geologo
Juan Carlos Ramos
Ing. Petrolero
Daniel Soliz
Ing. Petrolero
Antonio Alvares
Bachiller
Oliver Balderrama
Bachiller
Jorge Vaca
Bachiller
Supervisin IGAS
Manuel Domnguez
Ing. Petrolero
Hugo Soliz
Ing. Petrolero
Diego Aldunate
Grace Kelly Rosales
Ing. Electrnico
Ing. Comercial
EXPERIENCIA
TELEFONO
23 aos
5 aos
8 aos
10 aos
3 aos
5 aos
2 aos
3 aos
7aos
3 aos
2 aos
79050499
76293506
70167423
79050499
67840498
76339909
67840498
67647999
76843278
76653703
70931111
22 aos
18 aos
773-90565
78565056
5 aos
8 aos
77041998
76349407
Pgina 8
Servicio Ofertado.
Unidad ILS 06, DrillPro-Alpha, Scada Pro, con capacidad de transmisin satelital y capacidad de WEB PAGE
Capacidad de acuerdo al servicio requerido por YPFB-CHACO.
Todos los sensores ofertados.
Pgina Web a solicitud de YPFB-CHACO, quin tiene que dar la comunicacin satelital.
Cmaras de vigilancia robtica en Zaranda y Torre de Perforacin (Martin Decker), a solicitud de YPFB-CHACO.
NOTA.- a) Para el carguo y descarguo de la Unidad en el pozo, se necesita una gra de 15 Ton, para colocarla en el camin, por
tener instrumentos electrnicos de cuidado.
b) Para el montaje de la unidad, se requiere tres das como mximo, para ponerla en funcionamiento 100 %.
c) Para el desmontaje de la unidad, se requiere un da, por el lavado de cables y sensores.
FI-ILS-08-#
F.E.: 31/07/2008
Pgina 9
NUEVOS SERVICIOS REALIZADOS POR MUD LOGGING: Equipos de CFM o Cuantificadores de Volumen de Recortes.
FI-ILS-08-#
F.E.: 31/07/2008
Pgina 10
NUEVOS SERVICIOS REALIZADOS POR MUD LOGGING: Sensor Caudalmetro ultrasnico que mide con precisin
el flujo.
FI-ILS-08-#
F.E.: 31/07/2008
Pgina 11
FI-ILS-08-#
F.E.: 31/07/2008
Pgina 12
FI-ILS-08-#
F.E.: 31/07/2008
Pgina 13
FI-ILS-08-#
F.E.: 31/07/2008
Pgina 14
FI-ILS-08-#
F.E.: 31/07/2008
Pgina 15
FI-ILS-08-#
F.E.: 31/07/2008
Pgina 16
Excellence in
Execution
Secion OH 12 1/4
- AIT-SLS-PPC-GR
Seccion CH 9 5/8
- USIT-CBL-VDL-GR-CCL
Seccion OH 8 1/2
- FMI-GPIT-SS-PPC-GR
- (Z-AIT)-PEX-GR
- XPT-PPC-GR
Seccion CH 7
- USIT-CBL-VDL-GR-CCL
Seccion OH 6
- FMI-GPIT-SS-PPC-GR
- AIT-PEX-GR
Seccion CH 5
- USIT-CBL-VDL-GR-CCL
Dec-2014
Schlumberger Confidential
DRO-X1001
Programa Registros
WIRELINE
Schlumberger Confidential
Excellence in Execution
Carrera
1.1
AIT-SLS-PPCGR
3450
Excellence in Execution
8.80
3248
Punto
Debil
Maxima
Sobretensio
n Segura
MSOP (lbs)
ECRD
< 5263.8
Schlumberger Confidential
Bajada
Tension
Densidad
Fondo de
esperada
del Lodo
pozo (m)
@ Fondo
(lb/gal)
(lbs)
Schlumberger Confidential
Excellence in Execution
Preparacin Equipo
0.5
Reunin Seguridad
0.5
TOTAL
1.5
4.0
2.0
8.5
* Todos los tiempos son considerados en condiciones ideales. Los tiempos puede variar en
funcin a condiciones de pozo.
Excellence in Execution
Schlumberger Confidential
DETALLE
Carrera
Fondo de
pozo (m)
Densidad del
Lodo (lb/gal)
1.2
USIT-CBL-VDL-GR-CCL
3450
8.80
3070
Excellence in Execution
Punto Debil
Maxima
Sobretension
Segura MSOP
(lbs)
Azul
4224.2
Schlumberger Confidential
Bajada
Tension
esperado @
Fondo (lbs)
Schlumberger Confidential
Longitud: 16.49 m
Max. Dimetro: 6.69 in
Max. Temp: 257 degF
Max. Presin: 15000 psi
Excelencia
ExcellenceeninEjecucin
Execution
Preparacin Equipo
0.5
Reunin Seguridad
Armado de Equipo(RIG UP)
Calibracin en Superficie Bajada # 1
Bajada hasta fondo de pozo, Tramo
Repetido y Registro de Tramo Principal
de Bajada # 1.
POOH a Superficie, Desmontaje de
herramienta de la Bajada # 1.
0.5
TOTAL
7.5
1.5
4.0
1.0
* Todos los tiempos son considerados en condiciones ideales. Los tiempos puede variar en
funcin a condiciones de pozo.
Excellence in Execution
Schlumberger Confidential
DETALLE
2.1
2.2
2.3
Carrera
AIT-PEX
FMI-GPIT-SS-PPCGR
XPT-PPC-GR
Tension
esperado @
Fondo (lbs)
Punto Debil
Maxima
Sobretension
Segura MSOP
(lbs)
4300
11.30
4277
ECRD
< 5334
4300
11.30
4966
ECRD
< 4645
4300
11.30
3789
ECRD
< 5517
Excellence in Execution
Schlumberger Confidential
Bajada
Fondo
de
Densidad del
pozo Lodo (lb/gal)
(m)
Schlumberger Confidential
Excellence in Execution
Schlumberger Confidential
Max. Dimetro: 5 in
Max. Temperatura: 350 degF
Max. Presin: 20000 psi
Longitud: 26.4 m
Excellence in Execution
Schlumberger Confidential
Excellence in Execution
RESUMEN OPERACIONES
TIEMPO (hrs)
Excellence in Execution
Schlumberger Confidential
Preparacin Equipo
0.5
Reunin Seguridad
0.5
Armado de Equipo(RIG UP)Calibracin en
1.5
Superficie Bajada # 1
Bajada hasta fondo de pozo, Tramo Repetido y
4.0
Registro de Tramo Principal de Bajada # 1.
POOH de zapato de Caera a Superficie,
2.0
Desmontaje de herramienta de la Bajada # 1.
Armado de Equipo(RIG UP)Calibracin en
2.0
Superficie Bajada # 2
Bajada hasta fondo de pozo, Tramo Repetido y
6.0
Registro de Tramo Principal de Bajada # 2.
POOH de zapato de Caera a Superficie,
2.0
Desmontaje de herramienta de la Bajada # 2.
Armado de Equipo(RIG UP)Calibracin en
1.5
Superficie Bajada # 3
Bajada a fondo de pozo, Toma de presiones,
6.0
(se consideran 10 puntos) Bajada # 3.
POOH de zapato de Caera a Superficie,
2.0
Desmontaje
deson
herramienta
deenlacondiciones
Bajada # 3ideales. Los tiempos puede variar en
* Todos
los tiempos
considerados
funcin a condiciones deTOTAL
pozo.
28
2.4
Carrera
USIT-CBL-VDL-GR-CCL
Fondo de
pozo (m)
Densidad del
Lodo (lb/gal)
4300
11.30
4930
Excellence in Execution
Punto Debil
Maxima
Sobretension
Segura MSOP
(lbs)
Tan
4076
Schlumberger Confidential
Bajada
Tension
esperado @
Fondo (lbs)
Schlumberger Confidential
Excellence in Execution
Preparacin Equipo
0.5
Reunion Seguridad
Armado de Equipo(RIG UP)
Calibracin en Superficie Bajada # 1
Bajada hasta fondo de pozo, Tramo
Repetido y Registro de Tramo Principal
de Bajada # 1.
POOH a Superficie, Desmontaje de
herramienta de la Bajada # 1.
0.5
TOTAL
7.0
1.5
3.5
1.0
* Todos los tiempos son considerados en condiciones ideales. Los tiempos puede variar en
funcin a condiciones de pozo.
Excellence in Execution
Schlumberger Confidential
DETALLE
Carrera
Tension
esperado @
Fondo (lbs)
Punto Debil
Maxima
Sobretension
Segura MSOP
(lbs)
3.1
AIT-PEX-GR
4660
14.90
3620
ECRD
< 5489
3.2
FMI-GPIT-SS-PPCGR
4660
14.90
3698
ECRD
< 541O
Excellence in Execution
Schlumberger Confidential
Bajada
Fondo
de
Densidad del
pozo Lodo (lb/gal)
(m)
Schlumberger Confidential
Excellence in Execution
Schlumberger Confidential
Excellence in Execution
Preparacin Equipo
0.5
Reunin Seguridad
0.5
DETALLE
Armado de Equipo(RIG UP)Calibracin en Superficie
Bajada # 2
Bajada hasta fondo de pozo, Tramo Repetido y Registro de
Tramo Principal de Bajada # 2.
POOH de zapato de Caera a Superficie, Desmontaje de
herramienta de la Bajada # 2.
TOTAL
1.5
4.0
2.0
* Todos los tiempos son considerados en condiciones ideales. Los tiempos puede variar en
funcin a condiciones de pozo.
Excellence in Execution
Schlumberger Confidential
Carrera
Fondo de
pozo (m)
Densidad del
Lodo (lb/gal)
3.3
USIT-CBL-VDL-GR-CCL
4660
14.90
3790
Excellence in Execution
Punto Debil
Maxima
Sobretension
Segura MSOP
(lbs)
ECRD
5318
Schlumberger Confidential
Bajada
Tension
esperado @
Fondo (lbs)
Schlumberger Confidential
Excellence in Execution
Preparacin Equipo
0.5
Reunin Seguridad
Armado de Equipo(RIG UP)
Calibracin en Superficie Bajada # 1
Bajada hasta fondo de pozo, Tramo
Repetido y Registro de Tramo Principal
de Bajada # 1.
POOH a Superficie, Desmontaje de
herramienta de la Bajada # 1.
0.5
TOTAL
8.5
1.5
5.0
1.0
* Todos los tiempos son considerados en condiciones ideales. Los tiempos puede variar en
funcin a condiciones de pozo.
Excellence in Execution
Schlumberger Confidential
DETALLE
TITULO:
Propuesta para Cementacin
Dueo:
CMT
Aprobado por:
Gerente de Lnea
Fecha Rev.:
10.ENERO.2014
Atentamente
HALLIBURTON
Elabor:
Revis:
Recibi:
I.
M (MD)
0-5
0 - 1100
0 3450
Etapa
OD
ID
Caera
Caera
Caera
Plg.
20.000
13.375
9.625
Plg.
19.124
12.615
8.681
Profundidad Vertical:
3450 m
Desviacin mxima:
0 Inc.
Zapato Anterior:
1100 m
13.0 ppg @ 1600 m
15.6 ppg @ 2200 m
Tope de cemento:
Shoe Track Virtual:
Dimetro Trpano:
Grado
Libraje
Conexin
K-55
K-55
P-110
Lb/ft
94.0
54.5
47.0
BTC
BTC
UPJ
Ultima Caera
cementada:
Gradiente de Fractura:
Presin de Poro:
9 ppg @ 3450 m
Gradiente de Temperatura:
Temperatura Esttica:
Temperatura Circulante:
Fluido del pozo:
II.
1. 1F/100 ft
204 F @ 3450 m
159 F @ 3450 m
WBM
9.4 ppg. YP/PV = 10/20
Cantidad
50
8.4
NA
NA
Unidad
bbl
Lbs/gal
Cpoise
Lb/100ft2
Los
Cantidad
100
12
45
29
Acta
como
dispersante
para
las
partculas de arcilla y como un
surfactante para remover qumicamente
el fluido de perforacin y dejar toda la
superficie del pozo humectada con agua.
Unidad
bbl
Lbs/gal
Cpoise
Lb/100ft2
III.
Lechada Principal
Lechada Relleno
Tpico
Cantidad
Unidad
Tpico
Cantidad
Unidad
Densidad
Longitud
Cemento G
Volumen
Rendimiento
Req. Agua
15.6
1250
1310
343
1.47
6.31
Lb/gal
m
sacos
bbl
Cf/sk
Gps
Densidad
Longitud
Cemento G
Volumen
Rendimiento
Req. Agua
13.0
600
747
165
1.24
4.99
Lb/gal
m
sacos
bbl
Cf/sk
Gps
Aditivos
Cantidad
0.012 gps
D-Air 3000L
16 gal
0.25 gps
HALAD-300L
328 gal
0.5 % bwoc
GasStop (PB)
721 lbs
0.15 % bwoc
HR-800
216 lbs
5 % bwoc
Microbond M
7205 lbs
6.31 gps
Agua
197 bbls
Aditivos
Cantidad
0.012 gps
D-Air 3000L
0.4 % bwoc
HR-800
329 lbs
0.7 % bwoc
GasStop HT
575 lbs
0.6 % bwoc
HALAD-322
493 lbs
4.99 gps
Agua
89 bbls
gps = galones/saco
bwoc= peso del cemento
9 gal
IV.
REPORTE DE LABORATORIO
2159024/3
Rig Name
Date
03/AUG/2014
Submitted By
Francisco Delgado
Job Type
Intermediate Casing
Bulk Plant
Customer
Chaco S.A.
Location
Bulo Bulo
Well
Well Information
Casing/Liner Size
9.625 in
Depth MD
3450 m
BHST
204 F
Hole Size
12.25 in
Depth TVD
3450 m
BHCT
159 F
Pressure
NOV
9.4 lbm/gal
Density
UOM
Cement/Additive
Sample Type
Sample Date
Lot No.
23.3
lb/bbl
Chemicals
23.05.14
12.0
lbm/gal
29.02
gal/bbl
Fresh Water
Bulk Blend
11.08.14
Slurry Yield
1.3547
ft3/sack
0.12
gal/bbl
D-Air 3000L
Chemicals
06.06.14
Water Requirement
7.0028
gal/sack
Barite
Chemicals
23.05.14
Water Source
Fresh Water
Water Chloride
330
414.445 lb/bbl
Spacer Properties
ppm
06/AUG/2014
Temp (F)
600
300
200
100
60
30
PV/YP
80
116
84
69
54
46
38
26
23
58.3 / 30.99
API Rheology
06/AUG/2014
Temp (F)
600
300
200
100
60
30
PV/YP
159
90
70
59
47
41
35
25
23
45.09 / 29.61
Rheology Compatibility
06/AUG/2014
Fluid 2
Fluid
Ratio
600
300
200
100
60
30
159
spacer
100
51
41
37
33
30
29
27
25
75/25
55
37
30
22
18
15
10
50/50
54
35
28
29
15
12
25/75
63
42
34
24
19
15
100
90
70
59
47
41
35
25
23
27
Rheology Compatibility
06/AUG/2014
Fluid 2
Fluid
Ratio
600
300
200
100
60
30
159
slurry
100
90
27
70
59
47
41
35
25
23
75/25
130
106
80
67
55
45
40
50/50
175
138
94
73
54
35
30
25/75
250
195
125
93
64
30
25
100
300
255
178
130
90
40
28
06/AUG/2014
Temp (F)
Final gel
159
37
01:00
30
2158656/5
Rig Name
Date
02/AUG/2014
Submitted By
Francisco Delgado
Job Type
Intermediate Casing
Bulk Plant
Customer
Chaco S.A.
Location
Bulo Bulo
Well
Well Information
Casing/Liner Size
9.625 in
Depth MD
3450 m
BHST
204 F
Hole Size
12.25 in
Depth TVD
3450 m
BHCT
159 F
Pressure
9.4 lbm/gal
Density
UOM
Cement/Additive
% BWOC PCR Class G (3.18 SG)
Sample Type
Bulk Blend
Sample Date
04.08.14
Lot No.
15-14
gal/sack
Fresh Water
Bulk Blend
11.08.14
1.2442
ft3/sack
0.012
gps
D-Air 3000L
Chemicals
06.06.14
2014052ALWater Requirement
4.9955
gal/sack
0.4
% BWOC HR-800
Chemicals
06.06.14
5.01
gal/sack
0.7
Chemicals
22.07.14
ZM3J0285A0
0.6
% BWOC HALAD-322
Chemicals
05.08.14
4101405
Slurry Density
Cement Properties
13.0
lbm/gal
Slurry Yield
Water Source
Fresh Water
Water Chloride
330
ppm
06/AUG/2014
Mixability rating (0 - 5)
12000
10
Thickening Time
06/AUG/2014
Temp (F)
Start BC
50 Bc
(hh:mm)
70 Bc
(hh:mm)
100 Bc
(hh:mm)
Termination
Time
Termination
BC
159
10566
160
6:03
7:02
7:06
7:06
100
API Rheology
05/AUG/2014
Temp (F)
300
200
100
60
30
PV/YP
159
300
255
178
130
90
40
28
270.9 / 58.84
API Rheology
05/AUG/2014
Temp (F)
300
200
100
60
30
PV/YP
80
300
251
138
89
48
11
307.36 / 18.41
05/AUG/2014
Incl. (deg)
% Fluid
159
27
160
30
120
08/AUG/2014
Pressure (psi)
50 psi (hh:mm)
24 hr CS (psi)
End CS (psi)
204
3000
14:47
16:13
3277
3532
30.5
05/AUG/2014
204
1000
30
48
2136017/1
Rig Name
SAI-379
Date
21/MAY/2014
Submitted By
Francisco Delgado
Job Type
Production Casing
Bulk Plant
Customer
Chaco S.A.
Location
Santa Rosa
Well
Well Information
Casing/Liner Size
9.625 in
Depth MD
3450 m
BHST
204 F
Hole Size
12.25 in
Depth TVD
3450 m
BHCT
159 F
Pressure
9.4 lbm/gal
Density
UOM
Cement/Additive
% BWOC PCR Class G (3.18 SG)
Sample Type
Bulk Blend
Sample Date
18.05.14
6.32
gal/sack
Outgoing
05.05.14
1.4667
ft3/sack
0.5
Chemicals
19.11.13
ZM1L0192AO
Water Requirement
6.3156
gal/sack
0.012
gps
D-Air 3000L
Chemicals
11.04.14
6.33
gal/sack
0.25
gps
HALAD-300L
Chemicals
24.12.13
USHA039349
0.15
% BWOC HR-800
Chemicals
28.12.13
10051306
% BWOC Microbond M
Chemicals
29.04.14
Fresh Water
Lot No.
5.14
Slurry Density
Cement Properties
15.6
lbm/gal
Slurry Yield
Fresh Water
460
ppm
21/MAY/201
4
Mixability rating (0 - 5)
4000
Thickening Time
21/MAY/201
4
Temp (F)
Start BC
50 Bc
(hh:mm)
70 Bc
(hh:mm)
100 Bc
(hh:mm)
Termination
Time
Termination
BC
159
3620
3:12
3:13
3:20
3:20
100
40
21/MAY/201
4
Incl. (deg)
% Fluid
159
27
40
120
API Rheology
21/MAY/201
4
Temp (F)
300
200
100
60
30
PV/YP
80
185
134
75
48
26
183.65 / 7.1
API Rheology
21/MAY/201
4
Temp (F)
300
200
100
60
30
PV/YP
159
213
160
99
71
46
19
14
198.29 / 23.88
22/MAY/201
4
Pressure (psi)
50 psi (hh:mm)
8 hr CS (psi)
12 hr CS (psi)
204
3000
3:23
4:10
2029
2646
21/MAY/201
4
204
1000
30
36
V.
SECUENCIA DE BOMBEO
Description
Stage
No.
Density
Rate
Yield
Water Req.
Volume
Duration
(ppg)
(bbl/min)
(ft/sk)
(gal/sk94)
(bbl)
(min)
Bottom Plug #1
MUD FLUSH III - CSG 9 5/8" DRO-X1001
8.40
5.00
50.00
10.00
12.00
5.00
100.00
20.00
13.00
4.00
1.24
4.99
164.71
41.18
15.60
4.00
1.47
6.31
293.14
85.79
15.60
4.00
1.47
6.31
50.00
85.79
5-1
8.33
7.00
500.00
71.43
5-2
8.33
5.00
300.00
60.00
5-3
8.33
2.00
28.62
14.31
1,486.47
302.70
Bottom Plug #2
LECHADA PRINCIPAL - CSG 9 5/8" DROX1001
Top Plug/Start Displacement
Total:
*Pump schedule may include additional rows for displacement if Automatic Rate Adjustment was enabled and ECDs approached the fracture gradient.
Rgimen de Flujo
Velocity
"Ft/seg"
0.299
0.598
0.896
1.195
1.494
1.793
2.092
2.390
2.689
2.988
Fric. Grad.
"psi/ft"
0.024
0.030
0.035
0.039
0.042
0.045
0.048
0.050
0.052
0.054
Re
11.671
36.310
70.528
112.964
162.789
219.421
282.421
351.443
426.200
506.451
Lechada de Relleno
1.371
0.441
0.227
0.142
0.098
0.073
0.057
0.046
0.038
0.032
Fric. Grad.
"psi/ft"
0.066
0.091
0.111
0.127
0.141
0.154
0.166
0.177
0.187
0.196
Re
4.747
13.661
25.350
39.309
55.241
72.946
92.275
113.113
135.366
158.958
Lechada Principal
3.370
1.171
0.631
0.407
0.290
0.219
0.173
0.141
0.118
0.101
Fric. Grad.
"psi/ft"
0.020
0.032
0.043
0.052
0.061
0.069
0.077
0.085
0.092
0.099
Re
17.318
42.718
72.440
105.371
140.913
178.686
218.420
259.915
303.013
347.587
0.924
0.375
0.221
0.152
0.114
0.090
0.073
0.062
0.053
0.046
VI.
1.31
Reservoir Zone MD
3450.00 m
* Based on analysis of the above outlined well conditions, this well is considered to have a [NO] flow potential after cement slurry placement. Wells in this category fall
into [1].
VII.
Time
Liquid Volume In
Pump Output
Surface Pressure In
(mins)
(bbl)
(hp)
(psi)
(psi)
(ppg)
(m)
0.00
0.0
0.00
297.17
0.00
9.84
0.000
6.08
30.4
44.54
315.69
0.00
9.84
0.000
14.16
70.8
47.44
292.45
0.00
9.84
0.000
30.00
150.0
30.60
154.98
0.00
9.84
0.000
45.57
212.3
5.64
2.28
0.00
9.83
0.000
66.05
294.2
5.42
0.00
0.00
9.85
114.989
81.45
355.8
12.83
0.00
0.00
9.86
255.103
101.58
436.3
12.83
0.00
0.00
9.86
480.448
121.72
516.9
12.83
0.00
0.00
9.86
705.607
141.86
597.4
12.83
0.00
0.00
9.86
929.846
157.16
659.2
12.76
0.00
0.00
9.84
1,070.338
169.03
742.3
12.76
0.00
0.00
9.83
927.648
180.91
825.4
12.76
0.00
0.00
9.83
765.972
192.78
908.5
12.76
0.00
0.00
9.82
595.093
204.65
991.6
12.76
0.00
0.00
9.82
424.257
216.52
1,074.7
12.76
0.00
0.00
9.83
253.504
228.39
1,157.8
12.76
0.00
0.01
9.82
54.923
240.55
1,218.6
54.25
395.16
0.00
9.84
0.000
256.50
1,298.4
143.78
1,126.31
0.00
9.84
0.000
272.44
1,378.1
233.22
1,856.76
0.00
9.84
0.000
288.39
1,457.8
322.38
2,584.86
0.00
9.84
0.000
297.06
1,475.2
131.29
2,659.19
0.00
9.80
0.000
300.00
1,481.0
133.79
3,210.17
0.00
9.77
0.000
VIII. CENTRALIZACIN
Measured Depth
Deviation
Azimuth
Restoring Force
Standoff at Centralizer
(m)
()
()
(lbf)
(%)
(%)
1,402.00
0.0
0.0
100.0
100.0
1,448.00
0.0
0.0
100.0
100.0
1,494.00
0.0
0.0
100.0
100.0
1,540.00
0.0
0.0
100.0
100.0
1,586.00
0.0
0.0
100.0
100.0
1,632.00
0.0
0.0
100.0
100.0
1,678.00
0.0
0.0
100.0
100.0
1,724.00
0.0
0.0
100.0
100.0
1,770.00
0.0
0.0
100.0
100.0
1,816.00
0.0
0.0
100.0
100.0
1,862.00
0.0
0.0
100.0
100.0
1,908.00
0.0
0.0
100.0
100.0
1,954.00
0.0
0.0
100.0
100.0
2,000.00
0.0
0.0
100.0
100.0
2,001.00
0.0
0.0
70.1
70.1
2,024.00
0.0
0.0
70.1
70.1
2,070.00
0.0
0.0
70.1
70.1
2,116.00
0.0
0.0
70.1
70.1
2,162.00
0.0
0.0
70.1
70.1
2,208.00
0.0
0.0
70.1
70.1
2,254.00
0.0
0.0
70.1
70.1
2,300.00
0.0
0.0
70.1
70.1
2,346.00
0.0
0.0
70.1
70.1
2,392.00
0.0
0.0
70.1
70.1
2,438.00
0.0
0.0
70.1
70.1
2,484.00
0.0
0.0
70.1
70.1
2,530.00
0.0
0.0
70.1
70.1
2,576.00
0.0
0.0
70.1
70.1
2,622.00
0.0
0.0
70.1
70.1
2,668.00
0.0
0.0
70.1
70.1
2,714.00
0.0
0.0
70.1
70.1
2,760.00
0.0
0.0
70.1
70.1
2,806.00
0.0
0.0
70.1
70.1
2,852.00
0.0
0.0
70.1
70.1
2,898.00
0.0
0.0
70.1
70.1
2,944.00
0.0
0.0
70.1
70.1
2,990.00
0.0
0.0
70.1
70.1
Measured Depth
Deviation
Azimuth
Restoring Force
Standoff at Centralizer
(m)
()
()
(lbf)
(%)
(%)
3,036.00
0.0
0.0
70.1
70.1
3,082.00
0.0
0.0
70.1
70.1
3,128.00
0.0
0.0
70.1
70.1
3,174.00
0.0
0.0
70.1
70.1
3,220.00
0.0
0.0
70.1
70.1
3,266.00
0.0
0.0
70.1
70.1
3,312.00
0.0
0.0
70.1
70.1
3,358.00
0.0
0.0
70.1
70.1
3,404.00
0.0
0.0
70.1
70.1
3,450.00
0.0
0.0
70.1
70.1
SE RECOMIENDA USAR LA
DISPOSICION DE CENTRALIZADORES
PROPUESTA PARA OBTENER EL MAYOR STAND OFF POSIBLE SIN
AFECTAR EL ECD.
TOTAL:
14 CENTRALIZADORES TIPO BOW
SPRING SERIE 700
33 CENTRALIZADORES TIPO CENTEK
Type*
COD
Hole Dia.
(in)
(in)
Nom.
Dia.
Min. Dia.
Rest. Force
(in)
(lbf)
Bows
(in)
100004485
BS
9.625
12.250
13.500
11.250
3,302.0
14
216647
BS
9.625
12.250
12.250
10.510
3,250.0
33
CENTRALIZACIN
CARGA AL GANCHO
IX.
La presin en el Espacio Anular es mayor con 972 psi comparado con la presin en el interior de la Caera.
JERARQUA REOLGICA
PERFIL DE LIMPIEZA
PRESIONES DE BOMBEO
X.
EFICIENCIA DE DESPLAZAMIENTO-3D
SIMULACION 3D
SIMULACION 2D
Eff = 79%
EFICIENCIA DE DESPLAZAMIENTO EN 3D
Measured Depth
Total Displacement
Efficiency
Approximate Deviation
Approximate Standoff
(m)
(%)
()
(%)
0.000
0.00
0.00
100.00
141.997
0.00
0.00
100.00
283.994
0.00
0.00
100.00
425.991
0.00
0.00
100.00
567.988
0.00
0.00
100.00
709.985
0.00
0.00
100.00
851.982
0.00
0.00
100.00
993.979
0.00
0.00
100.00
1,135.976
0.00
0.00
100.00
1,277.973
0.00
0.00
100.00
1,419.970
0.00
0.00
100.00
1,561.966
0.00
0.00
100.00
1,703.963
0.00
0.00
100.00
1,845.960
0.00
0.00
100.00
1,987.957
0.00
0.00
100.00
2,129.954
0.00
0.00
70.08
2,271.951
0.00
0.00
70.08
2,413.948
0.00
0.00
70.08
2,555.945
0.00
0.00
70.08
2,697.942
0.00
0.00
70.08
2,839.939
0.00
0.00
70.08
2,981.936
0.00
0.00
70.08
3,123.933
0.00
0.00
70.08
3,265.930
0.00
0.00
70.08
3,407.927
0.00
0.00
70.08
3,450.000
0.00
0.00
70.08
Esta tabla resume bsicamente que la lechada tiene la capacidad de desplazar el lodo del
pozo en una eficiencia mnima de 79 %.
XI.
PROCEDIMIENTO OPERATIVO
Iniciar el bombeo:
7. Liberar Tapn Inferior #1.
8. Bombear 2 bbls de Mud Flush III de 8.4 ppg @ 5 bpm.
9. Parar y cargar en la Cabeza de Cementacin 9.625 tapn inferior #2 y tapn
superior.
10.Bombear 48 bbls de Mud Flush III de 8.4 ppg @ 5 bpm
11.Bombear 100 bbls de Tuned Spacer III de 12.0 ppg @ 5 bpm.
12.Mezclar en RCM y bombear, 165 bbls de Lechada de Relleno con densidad de
13 ppg @ 3-4 bpm.
13.Mezclar en RCM y bombear, 293 bbls de Lechada Principal con densidad de 15.6
ppg @ 3-4 bpm.
14.Parar bombeo y liberar Tapn Inferior #2.
15.Mezclar en RCM y bombear, 50 bbls de Lechada Principal con densidad de 15.6
ppg @ 3-4 bpm.
16.Parar Bombeo y Liberar Tapn Superior. Iniciar Desplazamiento de acuerdo al
siguiente esquema:
Description
Stage No.
Density
Rate
Volume
Duration
(ppg)
(bbl/min)
(bbl)
(min)
5-1
8.33
7.00
500.00
71.43
5-2
8.33
5.00
300.00
60.00
5-3
8.33
2.00
28.62
14.31
828.62
145.74
TOTAL
17.Observar la presin final de circulacin (2720 psi), y presurizar hasta 3220 psi
por 10 min para realizar prueba de hermeticidad de la caera. Desfogar lnea,
contabilizar volumen en cajones de desplazamiento de la unidad de bombeo y
verificar la efectividad del equipo de flotacin.
Nota: Se recomienda completar el desarrollo de mnimo 500 psi de esfuerzo compresivo
(verificar grafica UCA) del cemento antes de bajar a reconocer el tope de cemento.
XII.
PLAN DE CONTINGENCIAS
XIII.
ANALISIS DE RIESGO
I.
Hay que tomar en cuenta que retornos limpios no significa que todo el sistema se
encuentre en movimiento.
Recomendacin: Una vez obtenido el caliper y un volumen ms exacto del pozo,
determinar el volumen de lodo movible y acondicionar. Se recomienda utilizar fluidos
trazadores para controlar el volumen movible. Acondicionar tomando en cuenta estos
volmenes.
Una vez se baje la caera hasta la profundidad programada, iniciar la circulacin a
bajo caudal para ayudar a romper la estructura de los geles del lodo, aumentar el caudal
gradualmente hasta tener presiones estabilizadas y alcanzar el caudal programado.
Acondicionar el lodo a las siguiente propiedades: YP <=20, Mantener un perfil de
Geles 10 ; 10 & 30 no progresivo (Plano EJ: 1,3 y 7). Una vez acondicionado el
lodo tomar en cuenta dos volmenes del pozo para circular al caudal programado de la
cementacin, esto con el fin de mejorar la movilidad del lodo en el sistema.
Evitar tener el pozo esttico por periodos largos previo y durante la cementacin.
las
los
de
de
XV.
DETALLES DEL CAMBIO INCLUYENDO EQUIPO AFECTADO (SI EXISTE ALGUNO) (USAR HOJAS ADICIONALES SI
ES NECESARIO)
El Anlisis de riesgo debe ser revisado para considerar los efectos del cambio e identificar y aplicar controles adicionales
requeridos.
Como parte del anlisis del cambio, identificar si existen costos asociados con el cambio direccionarlos adecuadamente.
Si
No
Firma
XVIII.
LAYOUT
Equipos:
Unidad de Bombeo
Batch Mixer 100 bbls
Batch Mixer 180 bbls
1 Tanque de 110 bbls
1 Tanque de 30 bbls
Bulk de 660 cuft
Bulk de 660 cuft
Silo de 1500 cuft
Steady Flow de 80 cuft
Cortador para materiales slidos
Compresor
RTO( Caseta de adquisicin de datos)
Personal:
Ingeniero
Supervisor
Operador de unidad de cementacin
4 Asistentes.
Supervisor de Seguridad
XIX. ANEXOS
TITULO:
Propuesta para Cementacin
Dueo:
CMT
Aprobado por:
Gerente de Lnea
Fecha Rev.:
10.ENERO.2014
Atentamente
HALLIBURTON
Elabor:
Revis:
Recibi:
I.
M (MD)
0-5
0 - 1100
0 1099.5
Etapa
OD
ID
Caera
Caera
Drill Pipe
Plg.
20.000
13.375
5.500
Plg.
19.124
12.615
4.548
Profundidad Vertical:
1100 m
Desviacin mxima:
0 Inc.
Zapata Anterior:
5m
13.0 ppg @ Superficie
15.6 ppg @ 800 m
Tope de cemento:
Shoe Track Virtual:
Dimetro Trpano:
Grado
Libraje
Conexin
K-55
K-55
P-110
Lb/ft
94.0
54.5
26.0
BTC
BTC
-
Ultima Caera
cementada:
Gradiente de Fractura:
Presin de Poro:
Gradiente de Temperatura:
Temperatura Esttica:
Temperatura Circulante:
Fluido del pozo:
II.
CSG 20 @ 5 m
1. 1F/100 ft
120 F @ 1100 m
95 F @ 1100 m
WBM/ Bentontico
9.2 ppg. YP/PV = 15/20
Cantidad
50
8.4
NA
NA
Unidad
bbl
Lbs/gal
Cpoise
Lb/100ft2
Los
Cantidad
70
12
33
21
Acta
como
dispersante
para
las
partculas de arcilla y como un
surfactante para remover qumicamente
el fluido de perforacin y dejar toda la
superficie del pozo humectada con agua.
Unidad
bbl
Lbs/gal
Cpoise
Lb/100ft2
III.
Lechada Principal
Lechada Relleno
Tpico
Cantidad
Unidad
Tpico
Cantidad
Unidad
Densidad
Longitud
Cemento A
Volumen
Rendimiento
Req. Agua
15.6
300
745
183
1.38
5.95
Lb/gal
m
sacos
bbl
Cf/sk
Gps
Densidad
Longitud
Cemento A
Volumen
Rendimiento
Req. Agua
13.0
800
1254
487
2.18
12.04
Lb/gal
m
sacos
bbl
Cf/sk
Gps
Aditivos
Cantidad
0.012 gps
D-Air 3000L
9 gal
0.17 gps
HALAD-300L
127 gal
0.25 % bwoc
HALAD-23
205 lbs
0.25 % bwoc
VERSASET (PB)
205 lbs
5.95 gps
Agua
106 bbls
Aditivos
Cantidad
0.012 gps
D-Air 3000L
15 gal
2 % bwow
Bentonite
2515 lbs
0.17 % bwoc
HR-800
235 lbs
12.04 gps
Agua
360 bbls
gps = galones/saco
bwoc= peso del cemento
IV.
REPORTE DE LABORATORIO
2146249/1
Rig Name
SAI-379
Date
23/JUN/2014
Submitted By
Tassia Navia
Job Type
Surface Casing
Bulk Plant
Customer
Chaco S.A.
Location
DRO-X1001
Well
PATUJUSAL - 11DA
Well Information
Casing/Liner Size
13.375 in
Depth MD
1100 m
BHST
120 F
Hole Size
17.5 in
Depth TVD
1100 m
BHCT
95 F
Pressure
NOV
Drillplex
9.2 lbm/gal
Density
UOM
lb/bbl
Cement/Additive
Tuned Spacer III
Sample Type
Chemicals
Sample Date
04.07.14
35.26
gal/bbl
Lot No.
Spacer Properties
2101405 Slurry Density
12
lbm/gal
Fresh Water
Outgoing
25.06.14
Slurry Yield
3.2198
ft3/sack
174.375 lb/bbl
Barite
Chemicals
23.05.14
Water Requirement
20.2223
gal/sack
0.12
D-Air 3000L
Chemicals
30.05.14
Water Source
Fresh Water
Water Chloride
280
gal/bbl
ppm
04/JUL/2014
Temp (F)
600
300
200
100
60
30
PV/YP
80
67
52
44
35
30
22
19
16
35.02 / 20.71
API Rheology
04/JUL/2014
Temp (F)
600
300
200
100
60
30
PV/YP
95
66
50
42
33
30
25
18
15
32.54 / 20.83
Rheology Compatibility
Test Temp Pressure
(F)
(psi)
Fluid 2
95
SPACER 100
27
Fluid
Ratio
04/JUL/2014
600
300
200
100
60
30
50
35
28
22
18
15
12
10
75/25
70
53
44
34
30
25
21
19
50/50
93
74
63
52
46
40
30
27
25/75
90
69
57
45
40
34
24
22
100
66
50
42
33
30
25
18
15
Rheology Compatibility
Test Temp Pressure
(F)
(psi)
Fluid 2
95
SLURRY 100
27
Fluid
Ratio
04/JUL/2014
600
300
200
100
60
30
66
50
42
33
30
25
18
15
75/25
75
60
44
35
30
23
20
50/50
75
61
47
40
34
30
27
25/75
80
68
54
47
44
40
36
100
75
71
63
60
55
30
25
04/JUL/2014
Temp (F)
Final gel
95
57
01:00
30
2145642/5
Rig Name
SAI-379
Date
20/JUN/2014
Submitted By
Tassia Navia
Job Type
Surface Casing
Bulk Plant
Customer
Chaco S.A.
Location
Well
PATUJUSAL - 11DA
Well Information
Casing/Liner Size
13.375 in
Depth MD
1100 m
BHST
120 F
Hole Size
17.5 in
Depth TVD
1100 m
BHCT
95 F
Pressure
Drillplex
9.2 lbm/gal
Density
UOM
Cement/Additive
% BWOC Standard Class A
Sample Type
Bulk Blend
Sample Date
22.05.14
Lot No.
Cement Properties
15/05/2014Slurry Density
13
lbm/gal
12.04
gal/sack
Fresh Water
Outgoing
25.06.14
2.1854
ft3/sack
0.012
gps
D-Air 3000L
Chemicals
30.05.14
2013353ALWater Requirement
12.0358
gal/sack
% BWOW Bentonite
Chemicals
09.06.14
MI SWACO
Total Mix Fluid
12.05
gal/sack
0.17
% BWOC HR-800
Chemicals
06.06.14
1311402
Slurry Yield
Water Source
Fresh Water
Water Chloride
280
ppm
28/JUN/2014
Mixability rating (0 - 5)
4000
30
Thickening Time
28/JUN/2014
Temp (F)
Start BC
50 Bc
(hh:mm)
70 Bc
(hh:mm)
100 Bc
(hh:mm)
Termination
Time
Termination
BC
95
1920
25
22
5:46
5:58
6:43
6:43
100
API Rheology
30/JUN/2014
Temp (F)
300
200
100
60
30
PV/YP
80
74
69
66
61
59
38
26
36.78 / 46.48
API Rheology
30/JUN/2014
Temp (F)
300
200
100
60
30
Cond Time
(min)
PV/YP
95
75
70
63
59
56
31
25
30
42.27 / 42.33
30/JUN/2014
Incl. (deg)
% Fluid
95
27
25
30
45
0.3
120
Water analysis
25/JUN/2014
Sample ID
Acidity (pH)
1131588
280
30/JUN/2014
End Temp
(F)
500 psi
(hh:mm)
120
3000
24:14
174.25
5:27
283.59
497.22
625
38
2145646/4
Rig Name
SAI-379
Date
20/JUN/2014
Submitted By
Tassia Navia
Job Type
Surface Casing
Bulk Plant
Customer
Chaco S.A.
Location
Well
PATUJUSAL - 11DA
Well Information
Casing/Liner Size
13.375 in
Depth MD
1100 m
BHST
120 F
Hole Size
17.5 in
Depth TVD
1100 m
BHCT
95 F
Pressure
Drillplex
9.2 lbm/gal
Density
UOM
Cement/Additive
% BWOC Standard Class A
Sample Type
Bulk Blend
Sample Date
30.05.14
Lot No.
Cement Properties
15/05/2014Slurry Density
15.6
lbm/gal
5.95
gal/sack
Fresh Water
Outgoing
25.06.14
1.3859
ft3/sack
0.012
gps
D-Air 3000L
Chemicals
06.06.14
2014052ALWater Requirement
5.9505
gal/sack
0.17
gps
HALAD-300L
Chemicals
06.06.14
U01C004093
Total Mix Fluid
5.96
gal/sack
0.25
% BWOC HALAD-23
Chemicals
13.03.14
10011302
0.25
Chemicals
07.04.14
11-10-3
Slurry Yield
Water Source
Fresh Water
Water Chloride
280
ppm
26/JUN/2014
Mixability rating (0 - 5)
4000
20
Thickening Time
26/JUN/2014
Temp (F)
Pressure
(psi)
Reached in
(min)
Start BC
40 Bc
(hh:mm)
50 Bc
(hh:mm)
70 Bc
(hh:mm)
100 Bc
(hh:mm)
Termination Termination
Time
BC
95
1920
25
27.9
4:52
5:16
5:42
6:08
6:08
API Rheology
100
26/JUN/2014
Temp (F)
300
200
100
60
30
PV/YP
80
280
251
225
73
72
43
43
260.32 / 57.35
API Rheology
26/JUN/2014
Temp (F)
300
200
100
60
30
Cond Time
(min)
PV/YP
95
230
193
148
64
63
36
33
30
207.65 /
42.46
26/JUN/2014
Incl. (deg)
% Fluid
95
27
25
30
45
120
Water analysis
26/JUN/2014
Sample ID
Acidity (pH)
1131588
280
30/JUN/2014
End Temp
(F)
500 psi
(hh:mm)
120
3000
5:48
988
3:58
1577
2317
2317
24
26/JUN/2014
Meas. Vol.
95
1000
35
171
V.
SECUENCIA DE BOMBEO
Description
Stage
No.
Density
Rate
Yield
(ppg)
(bbl/min)
(ft/sack)
Water
Req.
(gal/sack)
Volume
Duration
(bbl)
(min)
8,40
5,00
50,00
10,00
12,00
5,00
70,00
14,00
13,00
4,00
2,5511
14,078
487,02
121,76
15,60
4,00
1,6149
6,963
182,86
45,71
8,33
4,00
5,00
1,25
6-1
9,20
4,00
50,00
12,50
6-2
9,20
2,00
16,00
8,00
860,88
213,22
Start Displacement
Total:
*Pump schedule may include additional rows for displacement if Automatic Rate Adjustment was enabled and ECDs approached the fracture gradient.
Rgimen de Flujo
Velocity
"Ft/seg"
0.135
0.269
0.404
0.539
0.674
0.808
0.943
1.078
1.212
1.347
Fric. Grad.
"psi/ft"
0.002
0.003
0.004
0.005
0.005
0.006
0.006
0.006
0.007
0.007
Re
16.183
45.313
82.755
126.875
176.738
231.711
291.333
355.249
423.170
494.862
Lechada de Relleno
0.989
0.353
0.193
0.126
0.091
0.069
0.055
0.045
0.038
0.032
Fric. Grad.
"psi/ft"
0.029
0.032
0.034
0.036
0.037
0.038
0.039
0.040
0.041
0.042
Re
1.394
4.995
10.539
17.900
26.996
37.765
50.161
64.142
79.676
96.735
Lechada Principal
11.477
3.203
1.518
0.894
0.593
0.424
0.319
0.249
0.201
0.165
Fric. Grad.
"psi/ft"
0.026
0.034
0.040
0.045
0.049
0.053
0.056
0.059
0.062
0.065
Re
1.724
5.220
9.982
15.810
22.588
30.231
38.680
47.884
57.806
68.410
9.283
3.065
1.603
1.012
0.708
0.529
0.414
0.334
0.277
0.234
VI.
1.06
Reservoir Zone MD
1100.00 m
* Based on analysis of the above outlined well conditions, this well is considered to have a [NO] flow potential after cement slurry placement. Wells in this category fall
into [1].
VII.
Time
(mins)
Liquid
Volume In
(bbl)
Surface Pressure
In
(psi)
Surface Pressure
Out
(psi)
ECD @ Frac
Zone
(ppg)
Free Fall
Height
(m)
0,00
0,0
0,00
95,13
0,00
9,41
0,000
6,08
30,4
23,14
140,95
0,00
9,41
0,000
12,50
62,5
21,05
88,95
0,00
9,41
0,000
21,70
108,5
10,16
0,00
0,03
9,44
200,059
30,28
145,1
7,14
0,00
0,00
9,36
214,127
42,43
193,7
7,14
0,00
0,00
9,40
216,824
54,59
242,4
7,14
0,00
0,07
9,49
191,029
66,74
291,0
7,14
0,00
0,14
9,57
165,201
78,90
339,6
7,14
0,00
0,20
9,64
139,357
91,06
388,2
7,14
0,00
0,27
9,72
113,481
103,21
436,8
7,14
0,00
0,02
9,42
87,730
115,37
485,5
7,14
0,00
0,09
9,51
61,803
127,52
534,1
7,14
0,00
0,16
9,59
35,849
139,68
582,7
7,14
0,00
0,23
9,67
9,870
148,99
620,0
10,76
0,00
0,18
9,62
15,626
161,13
668,5
10,76
0,00
0,00
9,39
108,544
173,26
717,1
10,76
0,00
0,00
9,39
92,722
185,40
765,6
10,76
0,00
0,00
8,38
54,053
191,88
791,5
3,64
0,00
0,00
12,24
30,395
192,72
794,9
3,64
0,00
0,03
12,27
17,682
200,30
825,2
47,85
436,41
0,00
12,24
0,000
206,98
848,4
38,13
751,94
0,00
12,22
0,000
213,22
860,9
47,88
950,93
0,00
12,77
0,000
214,04
862,5
49,17
977,29
0,00
13,45
0,000
VIII. CENTRALIZACIN
Measured Depth
Deviation
Azimuth
Restoring Force
Standoff at Centralizer
(m)
()
()
(lbf)
(%)
(%)
7.50
0.0
0.0
93.9
93.9
42.00
0.0
0.0
93.9
93.9
88.00
0.0
0.0
93.9
93.9
134.00
0.0
0.0
93.9
93.9
180.00
0.0
0.0
93.9
93.9
226.00
0.0
0.0
93.9
93.9
272.00
0.0
0.0
93.9
93.9
318.00
0.0
0.0
93.9
93.9
364.00
0.0
0.0
93.9
93.9
410.00
0.0
0.0
93.9
93.9
456.00
0.0
0.0
93.9
93.9
502.00
0.0
0.0
93.9
93.9
548.00
0.0
0.0
93.9
93.9
594.00
0.0
0.0
93.9
93.9
640.00
0.0
0.0
93.9
93.9
686.00
0.0
0.0
93.9
93.9
732.00
0.0
0.0
93.9
93.9
778.00
0.0
0.0
93.9
93.9
824.00
0.0
0.0
93.9
93.9
870.00
0.0
0.0
93.9
93.9
916.00
0.0
0.0
93.9
93.9
962.00
0.0
0.0
93.9
93.9
1,008.00
0.0
0.0
93.9
93.9
1,054.00
0.0
0.0
93.9
93.9
1,100.00
0.0
0.0
93.9
93.9
SE RECOMIENDA USAR LA
DISPOSICION DE CENTRALIZADORES
PROPUESTA PARA OBTENER EL MAYOR STAND OFF POSIBLE SIN
AFECTAR EL ECD.
TOTAL: 25 CENTRALIZADORES TIPO BOW SPRING
SERIE 700
Type*
COD
Hole Dia.
(in)
(in)
Nom.
Dia.
Min. Dia.
Rest. Force
(in)
(lbf)
16.750
3,714.0
Bows
(in)
100004487
BS
13.375
17.500
18.875
CENTRALIZACIN
25
CARGA AL GANCHO
IX.
La presin en el Espacio Anular es mayor con 853 psi comparado con la presin en el interior de la Caera.
JERARQUA REOLGICA
PERFIL DE LIMPIEZA
PRESIONES DE BOMBEO
X.
EFICIENCIA DE DESPLAZAMIENTO-3D
SIMULACION 3D
SIMULACION 2D
Eff = 94%
EFICIENCIA DE DESPLAZAMIENTO EN 3D
Measured Depth
Total Displacement
Efficiency
Approximate Deviation
Approximate Standoff
(m)
(%)
()
(%)
0.000
94.20
0.00
93.88
45.000
96.53
0.00
93.88
90.000
98.03
0.00
93.88
135.000
98.95
0.00
93.88
180.000
99.52
0.00
93.88
225.000
99.85
0.00
93.88
270.000
99.97
0.00
93.88
315.000
99.99
0.00
93.88
360.000
99.99
0.00
93.88
405.000
99.99
0.00
93.88
450.000
99.99
0.00
93.88
495.000
99.99
0.00
93.88
540.000
99.98
0.00
93.88
585.000
99.98
0.00
93.88
630.000
99.97
0.00
93.88
675.000
99.97
0.00
93.88
720.000
99.97
0.00
93.88
765.000
99.97
0.00
93.88
810.000
99.97
0.00
93.88
855.000
99.98
0.00
93.88
900.000
99.98
0.00
93.88
945.000
96.14
0.00
93.88
990.000
93.86
0.00
93.88
1,035.000
88.06
0.00
93.88
1,080.000
39.21
0.00
93.88
1,100.000
31.04
0.00
93.88
Esta tabla resume bsicamente que la lechada tiene la capacidad de desplazar el lodo del
pozo en una eficiencia mnima de 94 %.
XI.
PROCEDIMIENTO OPERATIVO
XII.
PLAN DE CONTINGENCIAS
Hook Load
Peso de la Caeria en el Aire
Peso del Fluido en Espacio Anular
Peso del Fluido de Desplazamiento
Peso del Cemento en el Shoe Track
Peso del Drill Pipe sobre el Sealing Sleeve
Peso del Cemento en Anular Caeria-Agujero sobre el OD del Zapato
196696
174387,7
27803,48
996,185
93793,95
361135,8
Resultante 132541,5
lbs
lbs
lbs
lbs
lbs
lbs
lbs
Maxima presin permisible durante la Circulacion o Cementacion con Inner String para no desenchufar el
Stinger del Sealing Sleeve
Area interna del Sealing Adapter 8,295 plg2
Peso efectivo del Inner String al Drill Pipe 80619,84 lbs
9719,088 psi
Presion de Colapso de la Caeria
0,8 80% Presion de Colapso de la Caeria por Diseo
904
psi
Presion del Cemento en el Fondo 2570,355 psi
Presion del Lodo en el Fondo 1724,149 psi
Diferencial de Presion 846,2059 psi
Por lo tanto no aplicaria usar QUICK PACK OFF, ya que la presion ejercida por el cemento en
el fondo no pasara la presion de Colapso por diseo de la Caeria
Tension en la Sarta de Trabajo para Liberar el Stinger del Sealing Sleeve del Zapato Flotador
Esfuerzo Compresivo del Cemento 50,00 psi @ xxxx hrs
Area del Stinger 54,54 plg2
Tension para Liberar Sarta de Trabajo 2727,00 lbs
Uso de las Foam Wiper Ball: La utilizacin de esta tecnologa nos permite
asegurar la separacin del lodo con el cemento al momento de desplazarlo,
como tambin limpiar las paredes de la tubera para evitar rastros de cemento
en la misma.
XV.
DETALLES DEL CAMBIO INCLUYENDO EQUIPO AFECTADO (SI EXISTE ALGUNO) (USAR HOJAS ADICIONALES SI
ES NECESARIO)
El Anlisis de riesgo debe ser revisado para considerar los efectos del cambio e identificar y aplicar controles adicionales
requeridos.
Como parte del anlisis del cambio, identificar si existen costos asociados con el cambio direccionarlos adecuadamente.
Si
No
Firma
XVIII.
LAYOUT
Equipos:
Unidad de Bombeo
2 Batch Mixer 100 Bbls
1 Batch Mixer 180 Bbls
2 Tanques de 110 Bbls
2 Bulk de 660 Cuft
1 Silo de 1500 Cuft
Steady Flow de 80 Cuft
Compresor
Cortador para materiales slidos
RTO ( Caseta de adquisicin de datos)
Personal:
Ingeniero
Supervisor
Operador de unidad de cementacin
4 Asistentes.
Supervisor de Seguridad
XIX. ANEXOS
TITULO:
Propuesta para Cementacin
Dueo:
CMT
Aprobado por:
Gerente de Lnea
Fecha Rev.:
10.ENERO.2014
Atentamente
HALLIBURTON
Elabor:
Revis:
Recibi:
I.
Liner de 5 @ 4660 m:
Profundidad
M (MD)
0-5
0 - 1100
0 3450
3360-4300
0-4240
4240-4660
Etapa
OD
ID
Caera
Caera
Caera
Liner
DP
Liner
Plg.
20.000
13.375
9.625
7
3.5
5
Plg.
19.124
12.615
8.681
6.184
2.764
4.276
Profundidad Vertical:
4660 m
Desviacin mxima:
0 Inc.
Zapata Anterior:
4300 m
17.0 ppg @ 4221 m
18.0 ppg @ 4320 m
Tope de cemento:
Shoe Track Virtual:
Dimetro Trpano:
6 + 35% exceso
Grado
Libraje
Conexin
K-55
K-55
P-110
P-110
P-110
Lb/ft
94.0
54.5
47.0
29.0
13.3
18.0
BTC
BTC
UPJ
WSP-3T
VS II
Ultima Caera
cementada:
Gradiente de Fractura:
Presin de Poro:
15 ppg @ 4660 m
Gradiente de Temperatura:
Temperatura Esttica:
Temperatura Circulante:
Fluido del pozo:
II.
LINER 7 @ 4300 m
1. 1F/100 ft
250 F @ 4660 m
201 F @ 4660 m
WBM
15.3 ppg. YP/PV = 10/20
Cantidad
NA
NA
NA
NA
Unidad
bbl
Lbs/gal
Cpoise
Lb/100ft2
Los
Cantidad
50
16.0
30
28
Acta
como
dispersante
para
las
partculas de arcilla y como un
surfactante para remover qumicamente
el fluido de perforacin y dejar toda la
superficie del pozo humectada con agua.
Unidad
bbl
Lbs/gal
Cpoise
Lb/100ft2
III.
Lechada Principal
Lechada Relleno
Tpico
Cantidad
Unidad
Tpico
Cantidad
Unidad
Densidad
Longitud
Cemento G
Volumen
Rendimiento
Req. Agua
18.0
340
44
19
2.44
7.72
Lb/gal
m
sacos
bbl
Cf/sk
Gps
Densidad
Longitud
Cemento G
Volumen
Rendimiento
Req. Agua
17.0
99
14
5
2.1
8.45
Lb/gal
m
sacos
bbl
Cf/sk
Gps
Aditivos
Cantidad
7.72 gps
Agua
8.1 BBL
0.012 gps
D-AIR 3000L
0.5 GAL
6% bwoc
290 LBS
0.35% bwoc
CFR-3
17 LBS
0.35% bwoc
SCR-100
17 LBS
1.5 gps
Latex 3000
66 Gal
35 % bwoc
Silica
1694 lbs
85 % bwoc
Hematite
4114 lbs
0.3 % bwoc
14.5 lbs
0.45% bwoc
Gas Stop HT
22 lbs
0.55% bwoc
HR-25
27 lbs
Aditivos
Cantidad
8.45 gps
Agua
2.8 BBL
35% bwoc
Silica
539 LBS
0.012 gps
D-AIR 3000L
0.2 GAL
40% bwoc
Hematite
616 LBS
1.2% bwoc
Halad - 23
18.5 LBS
0.8% bwoc
CFR-3
12.3 LBS
0.9% bwoc
SCR-100
14 LBS
0.5% bwoc
HR-25
7.7 lbs
0.35% bwoc
Suspend HT
5.4 lbs
IV.
REPORTE DE LABORATORIO
V.
Description
SECUENCIA DE BOMBEO
Stage No.
Density
Rate
Yield
(ppg)
(bbl/min)
(ft/sack)
Water
Req.
(gal/sack)
Volume
Duration
(bbl)
(min)
50,00
12,50
Tuned Spacer
16,00
4,00
Lechada de colgador
17,00
4,00
2.1
8.45
5,00
1,25
Lechada Principal
18,00
4,00
2.43
7,76
18,89
4,72
16,00
3,00
5,00
1,67
WBM
5-1
15,30
3,00
100,00
33,33
WBM
5-2
15,30
1,50
19,92
13,28
198,80
66,75
Total:
*Pump schedule may include additional rows for displacement if Automatic Rate Adjustment was enabled and ECDs approached the fracture gradient.
Rgimen de Flujo
VI.
3.5
Reservoir Zone MD
4660,00 m
* Based on analysis of the above outlined well conditions, this well is considered to have a [NO] flow potential after cement slurry placement. Wells in this category fall
into [1].
VII.
Time
(mins)
Liquid Volume
In
(bbl)
Surface Pressure In
(psi)
Surface Pressure
Out
(psi)
ECD @ Frac
Zone
(ppg)
(hp)
0,00
0,0
0,00
1.641,78
0,00
15,68
0,000
2,25
9,0
163,65
1.600,32
0,00
15,68
0,000
4,98
19,9
158,42
1.546,95
0,00
15,68
0,000
7,72
30,9
153,08
1.492,42
0,00
15,68
0,000
10,45
41,8
147,61
1.436,63
0,00
15,68
0,000
12,70
50,8
151,15
1.398,72
0,00
15,68
0,000
13,54
54,2
156,01
1.448,30
0,00
15,68
0,000
15,24
61,0
158,38
1.475,57
0,00
15,68
0,000
17,83
71,3
159,70
1.489,07
0,00
15,68
0,000
19,26
76,2
71,09
917,90
0,00
15,64
0,000
20,34
79,5
69,93
902,10
0,55
15,64
0,000
24,02
90,5
68,39
879,13
0,00
15,64
0,000
27,70
101,6
66,90
858,77
0,00
15,64
0,000
31,38
112,6
67,46
866,39
0,00
15,64
0,000
35,06
123,7
68,47
880,17
0,00
15,64
0,000
38,75
134,7
73,78
952,49
0,00
15,70
0,000
42,43
145,8
82,01
1.064,51
0,00
15,81
0,000
46,11
156,8
86,42
1.124,52
0,00
15,86
0,000
49,79
167,8
88,21
1.148,91
0,00
15,90
0,000
53,47
178,9
91,95
1.199,69
0,00
15,96
0,000
58,58
186,5
28,82
758,15
0,00
16,01
0,000
65,11
196,4
38,70
1.027,30
0,00
16,26
0,000
67,00
199,2
41,30
1.597,87
0,00
16,32
0,000
VIII. CENTRALIZACIN
Measured Depth
Deviation
Azimuth
Restoring Force
(m)
()
()
(lbf)
Standoff at
Centralizer
(%)
Standoff Between
Centralizers
(%)
4.309,00
0,0
0.0
76,2
76,2
4.322,00
0,0
0.0
76,2
76,2
4.335,00
0,0
0.0
76,2
76,2
4.348,00
0,0
0.0
76,2
76,2
4.361,00
0,0
0.0
76,2
76,2
4.374,00
0,0
0.0
76,2
76,2
4.387,00
0,0
0.0
76,2
76,2
4.400,00
0,0
0.0
76,2
76,2
4.413,00
0,0
0.0
76,2
76,2
4.426,00
0,0
0.0
76,2
76,2
4.439,00
0,0
0.0
76,2
76,2
4.452,00
0,0
0.0
76,2
76,2
4.465,00
0,0
0.0
76,2
76,2
4.478,00
0,0
0.0
76,2
76,2
4.491,00
0,0
0.0
76,2
76,2
4.504,00
0,0
0.0
76,2
76,2
4.517,00
0,0
0.0
76,2
76,2
4.530,00
0,0
0.0
76,2
76,2
4.543,00
0,0
0.0
76,2
76,2
4.556,00
0,0
0.0
76,2
76,2
4.569,00
0,0
0.0
76,2
76,2
4.582,00
0,0
0.0
76,2
76,2
4.595,00
0,0
0.0
76,2
76,2
4.608,00
0,0
0.0
76,2
76,2
4.621,00
0,0
0.0
76,2
76,2
4.634,00
0,0
0.0
76,2
76,2
4.647,00
0,0
0.0
76,2
76,2
4.660,00
0,0
0.0
76,2
76,2
SE
RECOMIENDA
USAR
LA
DISPOSICION
CENTRALIZADORES PROPUESTA PARA OBTENER
MAYOR STAND OFF POSIBLE SIN AFECTAR EL ECD.
TOTAL:
28 CENTRALIZADORES TIPO CENTEK
DE
EL
216651
Type*
BS
COD
Hole Dia.
(in)
(in)
5,000
6,000
Nom.
Dia.
(in)
Min. Dia.
6,000
CENTRALIZACIN
CARGA AL GANCHO
(in)
5,680
Rest.
Force
(lbf)
1.030,0
Bows
Total No.
Required
28
IX.
La presin en el Espacio Anular es mayor con 225 psi comparado con la presin en el interior de la Caera.
JERARQUA REOLGICA
PERFIL DE LIMPIEZA
PRESIONES DE BOMBEO
X.
EFICIENCIA DE DESPLAZAMIENTO-3D
SIMULACION 3D
SIMULACION 2D
Eff = 75%
EFICIENCIA DE DESPLAZAMIENTO EN 3D
Measured Depth
(m)
Total Displacement
Efficiency
(%)
Approximate
Deviation
()
Approximate
Standoff
(%)
0,000
0,00
0,00
76,18
191,770
0,00
0,00
98,94
383,539
0,00
0,00
97,88
575,309
0,00
0,00
96,81
767,078
0,00
0,00
95,75
958,848
0,00
0,00
94,69
1.150,617
0,00
0,00
93,63
1.342,387
0,00
0,00
92,57
1.534,156
0,00
0,00
91,51
1.725,926
0,00
0,00
90,44
1.917,695
0,00
0,00
89,38
2.109,465
0,00
0,00
88,32
2.301,235
0,00
0,00
87,26
2.493,004
0,00
0,00
86,20
2.684,774
0,00
0,00
85,14
2.876,543
0,00
0,00
84,07
3.068,313
0,00
0,00
83,01
3.260,082
0,00
0,00
81,95
3.451,852
0,00
0,00
80,89
3.643,621
0,00
0,00
79,83
3.835,391
0,13
0,00
78,77
4.027,160
18,07
0,00
77,70
4.218,930
78,06
0,00
76,64
4.410,700
98,30
0,00
76,18
4.602,469
100,00
0,00
76,18
4.660,000
100,00
0,00
76,18
Esta tabla resume bsicamente que la lechada tiene la capacidad de desplazar el lodo del
pozo en una eficiencia mnima de 75 %.
XI.
PROCEDIMIENTO OPERATIVO
Zapato Flotador 5
4 piezas de caera 5
Collar Flotador 5
1 pieza de caera de 5
Landing Collar 5.
XX piezas de caeras 5 hasta TOL
28 centralizadores Centek 7, distribuidos Segn Grafico Standoff.
56 Stop Rings a cada extremo del centralizador (35lbs-ft torque).
Tuned Spacer
Stage No.
Density
Rate
Yield
(ppg)
(bbl/min)
(ft/sack)
Water
Req.
(gal/sack)
Volume
Duration
(bbl)
(min)
16,00
3,00
5,00
1,67
WBM
6-1
15,30
3,00
100,00
33,33
WBM
6-2
15,30
1,50
19,92
13,28
124.94
48.28
Total:
XII.
PLAN DE CONTINGENCIAS
XV.
DETALLES DEL CAMBIO INCLUYENDO EQUIPO AFECTADO (SI EXISTE ALGUNO) (USAR HOJAS ADICIONALES SI
ES NECESARIO)
El Anlisis de riesgo debe ser revisado para considerar los efectos del cambio e identificar y aplicar controles adicionales
requeridos.
Como parte del anlisis del cambio, identificar si existen costos asociados con el cambio direccionarlos adecuadamente.
Si
No
Firma
XVIII.
LAYOUT
Equipos:
Unidad de Bombeo
Batch Mixer 100 bbl
Batch Mixer 180 bbl
Bulk de 660 cuft
Cortador para materiales solidos
Steady Flow de 80 cuft
Compresor
RTO( Caseta de adquisicin de datos)
Personal:
Ingeniero
Supervisor
Operador de unidad de cementacin
4 Asistentes.
Supervisor de Seguridad
TITULO:
Propuesta para Cementacin
Dueo:
CMT
Aprobado por:
Gerente de Lnea
Fecha Rev.:
10.ENERO.2014
Atentamente
HALLIBURTON
Elabor:
Revis:
Recibi:
I.
Liner de 7 @ 4300 m:
Profundidad
Etapa
OD
ID
Grado
Libraje
Conexin
M (MD)
0-5
0 - 1100
0 3450
0-3360
3360-4300
Caera
Caera
Caera
DP
Liner
Plg.
20.000
13.375
9.625
5
7
Plg.
19.124
12.615
8.681
4.276
6.184
K-55
K-55
P-110
P-110
P-110
Lb/ft
94.0
54.5
47.0
19.5
29.0
BTC
BTC
UPJ
WSP-3T
Profundidad Vertical:
4300 m
Desviacin mxima:
0 Inc.
Zapata Anterior:
3450 m
14.0 ppg @ 3360 m
15.8 ppg @ 3600 m
Tope de cemento:
Shoe Track Virtual:
Dimetro Trpano:
Ultima Caera
cementada:
Gradiente de Fractura:
Presin de Poro:
10 ppg @ 4300 m
Gradiente de Temperatura:
Temperatura Esttica:
Temperatura Circulante:
Fluido del pozo:
II.
1. 1F/100 ft
231 F @ 4300 m
184 F @ 4300 m
WBM
11.5 ppg. YP/PV = 10/20
Cantidad
NA
NA
NA
NA
Unidad
bbl
Lbs/gal
Cpoise
Lb/100ft2
Los
Cantidad
100
12.5
30
28
Acta
como
dispersante
para
las
partculas de arcilla y como un
surfactante para remover qumicamente
el fluido de perforacin y dejar toda la
superficie del pozo humectada con agua.
Unidad
bbl
Lbs/gal
Cpoise
Lb/100ft2
III.
Lechada Principal
Lechada Relleno
Tpico
Cantidad
Unidad
Tpico
Cantidad
Unidad
Densidad
Longitud
Cemento G
Volumen
Rendimiento
Req. Agua
15.8
700
209
73
1.96
6.45
Lb/gal
m
sacos
bbl
Cf/sk
Gps
Densidad
Longitud
Cemento G
Volumen
Rendimiento
Req. Agua
14.0
240
63
22
1.99
10.64
Lb/gal
m
sacos
bbl
Cf/sk
Gps
Aditivos
Cantidad
35 % bwoc
8046 lbs
1 gps
Latex 3000
209 gal
10 % bwoc
MICROMAX FF
2299 lbs
0.7 % bwoc
SCR-100
6 % bwoc
LifeCem 100
1379 lbs
0.5 % bwoc
WellLife 734
115 lbs
0.6 % bwoc
CFR-3
138 lbs
0.2 % bwoc
Suspend HT
46 lbs
0.012 gps
D-Air 3000L
2.5 gal
0.7 % bwoc
HALAD-322
161 lbs
0.35 % bwoc
HR-25
6.45 gps
Agua
161 lbs
81 lbs
32 bbls
Aditivos
Cantidad
0.012 gps
D-Air 3000L
0.8 gal
1 % bwoc
SCR-100
69 lbs
1 % bwow
Bentonite
56 lbs
10.64 gps
Agua
gps = galones/saco
bwoc= peso del cemento
16 bbls
IV.
REPORTE DE LABORATORIO
2159024/3
Rig Name
Date
03/AUG/2014
Submitted By
Francisco Delgado
Job Type
Intermediate Casing
Bulk Plant
Customer
Chaco S.A.
Location
Bulo Bulo
Well
Well Information
Casing/Liner Size
9.625 in
Depth MD
3450 m
BHST
204 F
Hole Size
12.25 in
Depth TVD
3450 m
BHCT
159 F
Pressure
NOV
9.4 lbm/gal
Density
UOM
Cement/Additive
Sample Type
Sample Date
Lot No.
23.3
lb/bbl
Chemicals
23.05.14
12.5
lbm/gal
29.02
gal/bbl
Fresh Water
Bulk Blend
11.08.14
Slurry Yield
1.3547
ft3/sack
0.12
gal/bbl
D-Air 3000L
Chemicals
06.06.14
Water Requirement
7.0028
gal/sack
Barite
Chemicals
23.05.14
Water Source
Fresh Water
Water Chloride
330
414.445 lb/bbl
Spacer Properties
ppm
06/AUG/2014
Temp (F)
600
300
200
100
60
30
PV/YP
80
116
84
69
54
46
38
26
23
58.3 / 30.99
API Rheology
06/AUG/2014
Temp (F)
600
300
200
100
60
30
PV/YP
159
90
70
59
47
41
35
25
23
45.09 / 29.61
Rheology Compatibility
06/AUG/2014
Fluid 2
Fluid
Ratio
600
300
200
100
60
30
159
spacer
100
51
41
37
33
30
29
27
25
75/25
55
37
30
22
18
15
10
50/50
54
35
28
29
15
12
25/75
63
42
34
24
19
15
100
90
70
59
47
41
35
25
23
27
Rheology Compatibility
06/AUG/2014
Fluid 2
Fluid
Ratio
600
300
200
100
60
30
159
slurry
100
90
27
70
59
47
41
35
25
23
75/25
130
106
80
67
55
45
40
50/50
175
138
94
73
54
35
30
25/75
250
195
125
93
64
30
25
100
300
255
178
130
90
40
28
06/AUG/2014
Temp (F)
Final gel
159
37
01:00
30
2117795/6
Rig Name
SAI-379
Date
20/MAR/2014
Submitted By
Francisco Delgado
Job Type
Production Casing
Bulk Plant
Customer
Chaco S.A.
Location
JUNIN
Well
JUNIN-X1000
Well Information
Casing/Liner Size
7 in / 177.8 mm
Depth MD
3450 m
BHST
204F
Hole Size
8.5 in / 215.9 mm
Depth TVD
3450 m
BHCT
159F
Pressure
11 lbm/gal
Density
UOM
Cement/Additive
% BWOC PCR Class G (3.18 SG)
Sample Type
Bulk Blend
Sample Date
05.03.14
10.64
gal/sack
Outgoing
17.03.14
Slurry Yield
1.99
ft3/sack
% BWOW Bentonite
Chemicals
11.12.13
Water Requirement
10.64
gal/sack
% BWOC SCR-100
Chemicals
07.03.14
10.65
gal/sack
0.012
gps
Chemicals
07.03.14
Fresh Water
D-Air 3000L
Lot No.
5.14
Slurry Density
Cement Properties
14.00
lbm/gal
2013353AL
Total Mix Fluid
Water Source
Fresh Water
Water Chloride
400
ppm
24/Mar/2014
Thickening Time
Temp (F)
106
Pressure
(psi)
2047
25/Mar/2014
Reached in
(min)
40
Start BC
23
30 Bc
(hh:mm)
3:35
50 Bc
(hh:mm)
4:15
70 Bc
(hh:mm)
4:33
100 Bc
(hh:mm)
5:02
Terminatio
n Time
5:02
25/Mar/2014
Incl. (deg)
0
API Rheology
Temp (F)
80
Terminatio
n BC
100
% Fluid
0.5
24/Mar/2014
300
88
200
86
100
84
60
83
30
78
6
31
3
21
API Rheology
PV/YP
50.56 / 53.37
24/Mar/2014
Temp (F)
300
200
100
60
30
106
90
88
80
68
54
26
22
Cond Time
(min)
30
PV/YP
63.46 /
42.24
2175968/2
Submitted By
Francisco Delgado
Customer
Chaco S.A.
Well Information
Casing/Liner Size
7 in / 177.8 mm
Depth MD
4956 m / 16260 ft
BHST
108C / 227F
Hole Size
8.5 in / 215.9 mm
Depth TVD
4956 m / 16260 ft
BHCT
82C / 179F
Pressure
9.3 lbm/gal
Density
UOM
Sample Type
Sample Date
Lot No.
100
Cement/Additive
Bulk Blend
26.09.14
18.14
6.45
gal/sack
Fresh Water
Bulk Blend
35
Bulk Blend
gps
Chemicals
25.08.14
140786
10
% BWOC MICROMAX FF
Bulk Blend
26.09.14
201350
0.7
Chemicals
15.08.14
14C002C
Bulk Blend
26.09.14
0713529
0.5
Chemicals
04.12.13
572254
0.6
Chemicals
15.08.14
0.2
Chemicals
24.04.14
808201302Water Source
K13351B Water Chloride
0.012
gps
D-Air 3000L
Chemicals
25.08.14
2014106AL
0.7
% BWOC HALAD-322
Chemicals
15.08.14
1291402
0.35
Chemicals
22.07.14
87694
Latex 3000
Cement Properties
Slurry Density
15.8
lbm/gal
11.08.14
Slurry Yield
1.962
ft3/sack
26.09.14
Water Requirement
6.454
gal/sack
6.47
gal/sack
Fresh Water
330
03/Oct/2014
Pressure (psi)
3000
04/Oct/2014
50 psi (hh:mm)
11:24
24 hr CS (psi)
1368.61
End CS (psi)
1373.1
Incl. (deg)
0
% Fluid
0.3
03/Oct/2014
Test Pressure (psi)
1000
03/Oct/2014
ppm
03/Oct/2014
200
100
20
13
3D - 3 rpm
Decay
2
6D - 6 rpm
Decay
3
Foam Quality
0
03/Oct/2014
200
100
3D - 3 rpm
Decay
4
27
19
14
10
Reached in
(min)
50
Start BC
Thickening Time
Temp (F)
179
14
179
4500
Foam Quality
0
03/Oct/2014
Temp (F)
6D - 6 rpm
Decay
5
Time CSGS
(hh:mm)
2:45
Termination
Time
13:07
Termination
BC
100
04/Oct/2014
Time 100 lb/100ft2 Time 300 lb/100ft2 Time 500 lb/100ft2 CSGS or 100-500 Test speed
(h:m)
(hh:mm)
(hh:mm)
lb/100ft2 (hh:mm) [deg/min]
2:05
2:25
2:42
00:37
0.25
V.
SECUENCIA DE BOMBEO
Description
Stage
No.
Density
Rate
Yield
(ppg)
(bbl/min)
(ft/110sack)
Water
Req.
(gal/sack)
Volume
Duration
(bbl)
(min)
100,00
20,00
Tuned Spacer
12,50
5,00
Lechada Delantera
14,00
5,00
1.99
10.64
22,01
4,40
Well Life
15,80
5,00
1.96
6,45
72,79
14,56
12,50
5,00
5,00
1,00
WBM
5-1
11,50
6,00
175,00
29,17
WBM
5-2
11,50
2,00
20,00
10,00
WBM
5-3
11,50
3,00
80,00
26,67
WBM
5-4
11,50
2,00
25,00
12,50
499,81
118,30
Total:
*Pump schedule may include additional rows for displacement if Automatic Rate Adjustment was enabled and ECDs approached the fracture gradient.
Rgimen de Flujo
Velocity
"Ft/seg"
0.299
0.598
0.896
1.195
1.494
1.793
2.092
2.390
2.689
2.988
Fric. Grad.
"psi/ft"
0.024
0.030
0.035
0.039
0.042
0.045
0.048
0.050
0.052
0.054
Re
11.671
36.310
70.528
112.964
162.789
219.421
282.421
351.443
426.200
506.451
Lechada de Relleno
1.371
0.441
0.227
0.142
0.098
0.073
0.057
0.046
0.038
0.032
Fric. Grad.
"psi/ft"
0.066
0.091
0.111
0.127
0.141
0.154
0.166
0.177
0.187
0.196
Re
4.747
13.661
25.350
39.309
55.241
72.946
92.275
113.113
135.366
158.958
Lechada Principal
3.370
1.171
0.631
0.407
0.290
0.219
0.173
0.141
0.118
0.101
Fric. Grad.
"psi/ft"
0.020
0.032
0.043
0.052
0.061
0.069
0.077
0.085
0.092
0.099
Re
17.318
42.718
72.440
105.371
140.913
178.686
218.420
259.915
303.013
347.587
0.924
0.375
0.221
0.152
0.114
0.090
0.073
0.062
0.053
0.046
VI.
1.2
Reservoir Zone MD
4300,00 m
* Based on analysis of the above outlined well conditions, this well is considered to have a [NO] flow potential after cement slurry placement. Wells in this category fall
into [1].
VII.
Time
(mins)
Liquid Volume
In
(bbl)
Surface Pressure In
ECD @ Frac
Zone
(ppg)
(psi)
Surface Pressure
Out
(psi)
(hp)
(m)
0,00
0,0
0,00
476,49
0,00
11,88
0,000
4,16
20,8
63,41
436,42
0,00
11,88
0,000
9,44
47,2
57,11
384,97
0,00
11,88
0,000
14,72
73,6
50,85
333,82
0,00
11,88
0,000
20,00
100,0
44,61
282,91
0,00
11,88
0,000
22,72
113,6
41,97
199,12
0,00
11,88
0,000
25,91
129,5
30,01
63,60
0,00
11,88
0,000
31,13
155,6
22,23
0,00
0,25
11,92
75,852
36,35
181,8
22,23
0,00
0,52
11,93
219,565
39,36
196,8
9,97
0,00
0,11
11,92
299,434
40,16
201,0
11,96
0,00
0,71
11,91
310,930
44,80
228,8
16,68
0,00
0,00
11,90
300,759
49,43
256,6
16,68
0,00
0,02
11,90
285,561
54,06
284,4
16,68
0,00
0,08
11,90
268,187
58,70
312,2
16,68
0,00
0,00
11,95
216,441
63,33
340,0
16,68
0,00
0,01
12,04
117,562
67,97
367,9
16,68
0,00
0,00
12,14
9,477
73,25
383,0
1,47
0,00
0,00
12,11
7,127
79,33
395,4
14,08
146,77
0,00
12,22
0,000
88,15
421,9
24,24
285,05
0,00
12,33
0,000
96,97
448,3
47,16
596,94
0,00
12,58
0,000
105,79
474,8
75,73
985,77
0,00
12,90
0,000
113,38
490,0
55,46
1.102,44
0,00
12,95
0,000
118,49
500,2
62,58
1.747,62
0,00
13,07
0,000
VIII. CENTRALIZACIN
Measured Depth
Deviation
Azimuth
Restoring Force
Standoff at
Centralizer
(m)
()
()
(lbf)
(%)
Standoff
Between
Centralizers
(%)
3.455,00
0,0
0.0
78,9
78,9
3.468,00
0,0
0.0
78,9
78,9
3.520,00
0,0
0.0
78,9
78,9
3.572,00
0,0
0.0
78,9
78,9
3.624,00
0,0
0.0
78,9
78,9
3.676,00
0,0
0.0
78,9
78,9
3.728,00
0,0
0.0
78,9
78,9
3.780,00
0,0
0.0
78,9
78,9
3.832,00
0,0
0.0
78,9
78,9
3.884,00
0,0
0.0
78,9
78,9
3.936,00
0,0
0.0
78,9
78,9
3.988,00
0,0
0.0
78,9
78,9
4.040,00
0,0
0.0
78,9
78,9
4.092,00
0,0
0.0
78,9
78,9
4.144,00
0,0
0.0
78,9
78,9
4.196,00
0,0
0.0
78,9
78,9
4.248,00
0,0
0.0
78,9
78,9
4.300,00
0,0
0.0
78,9
78,9
SE RECOMIENDA USAR LA
DISPOSICION DE CENTRALIZADORES
PROPUESTA PARA OBTENER EL MAYOR STAND OFF POSIBLE SIN
AFECTAR EL ECD.
TOTAL:
18 CENTRALIZADORES TIPO CENTEK
Type*
COD
(in)
216648
BS
7,000
Hole
Dia.
(in)
Nom.
Dia.
(in)
Min. Dia.
Bows
(in)
Rest.
Force
(lbf)
8,500
8,500
7,700
2.650,0
Total No.
Required
18
CENTRALIZACIN
CARGA AL GANCHO
IX.
La presin en el Espacio Anular es mayor con 683 psi comparado con la presin en el interior de la Caera.
JERARQUA REOLGICA
PERFIL DE LIMPIEZA
PRESIONES DE BOMBEO
X.
EFICIENCIA DE DESPLAZAMIENTO-3D
SIMULACION 3D
SIMULACION 2D
Eff = 78%
EFICIENCIA DE DESPLAZAMIENTO EN 3D
Measured Depth
(m)
Total Displacement
Efficiency
(%)
Approximate
Deviation
()
Approximate
Standoff
(%)
0,000
0,00
0,00
78,91
175,882
0,00
0,00
98,92
351,763
0,00
0,00
97,85
527,645
0,00
0,00
96,77
703,526
0,00
0,00
95,70
879,408
0,00
0,00
94,62
1.055,289
0,00
0,00
93,55
1.231,171
0,00
0,00
92,47
1.407,052
0,00
0,00
91,40
1.582,934
0,00
0,00
90,32
1.758,815
0,00
0,00
89,24
1.934,697
0,00
0,00
88,17
2.110,578
0,00
0,00
87,09
2.286,460
0,00
0,00
86,02
2.462,341
0,00
0,00
84,94
2.638,223
0,00
0,00
83,87
2.814,104
1,24
0,00
82,79
2.989,986
13,68
0,00
81,72
3.165,867
41,23
0,00
80,64
3.341,749
77,61
0,00
79,57
3.517,630
92,73
0,00
78,91
3.693,512
98,54
0,00
78,91
3.869,394
99,94
0,00
78,91
4.045,275
100,00
0,00
78,91
4.221,157
100,00
0,00
78,91
4.300,000
100,00
0,00
78,91
Esta tabla resume bsicamente que la lechada tiene la capacidad de desplazar el lodo del
pozo en una eficiencia mnima de 78 %.
XI.
PROCEDIMIENTO OPERATIVO
Zapato Flotador 7
2 piezas de caera 7
Collar Flotador 7
1 pieza de caera de 7
Landing Collar 7.
XX piezas de caeras 7 hasta TOL
18 centralizadores Centek 7, distribuidos Segn Grafico Standoff.
36 Stop Rings a cada extremo del centralizador (35lbs-ft torque).
Density
Rate
Yield
(ppg)
(bbl/min)
(ft/sack)
12,50
5,00
5,00
1,00
WBM
6-1
11,50
6,00
175,00
29,17
WBM
6-2
11,50
2,00
20,00
10,00
WBM
6-3
11,50
3,00
80,00
26,67
WBM
6-4
11,50
2,00
25,00
12,50
305,00
79.34
Tuned Spacer
Stage
No.
Water
Req.
(gal/sack)
Total:
Volume
(bbl)
Bulk
Cement
(sacks)
Duration
(min)
XII.
PLAN DE CONTINGENCIAS
Hay que tomar en cuenta que retornos limpios no significa que todo el sistema se
encuentre en movimiento.
Recomendacin: Una vez obtenido el caliper y un volumen ms exacto del pozo,
determinar el volumen de lodo movible y acondicionar. Se recomienda utilizar fluidos
trazadores para controlar el volumen movible. Acondicionar tomando en cuenta estos
volmenes.
Una vez se baje la caera hasta la profundidad programada, iniciar la circulacin a
bajo caudal para ayudar a romper la estructura de los geles del lodo, aumentar el caudal
gradualmente hasta tener presiones estabilizadas y alcanzar el caudal programado.
Acondicionar el lodo a las siguiente propiedades: YP <=20, Mantener un perfil de
Geles 10 ; 10 & 30 no progresivo (Plano EJ: 1,3 y 7). Una vez acondicionado el
lodo tomar en cuenta dos volmenes del pozo para circular al caudal programado de la
cementacin, esto con el fin de mejorar la movilidad del lodo en el sistema.
Evitar tener el pozo esttico por periodos largos previo y durante la cementacin.
XV.
DETALLES DEL CAMBIO INCLUYENDO EQUIPO AFECTADO (SI EXISTE ALGUNO) (USAR HOJAS ADICIONALES SI
ES NECESARIO)
El Anlisis de riesgo debe ser revisado para considerar los efectos del cambio e identificar y aplicar controles adicionales
requeridos.
Como parte del anlisis del cambio, identificar si existen costos asociados con el cambio direccionarlos adecuadamente.
Si
No
Firma
XVIII.
LAYOUT
Equipos:
Unidad de Bombeo
Batch Mixer 100 bbls
Batch Mixer 180 bbls
Bulk de 660 cuft
Cortador para materiales slidos
Steady Flow de 80 cuft
Compresor
RTO( Caseta de adquisicin de datos)
Personal:
Ingeniero
Supervisor
Operador de unidad de cementacin
4 Asistentes.
Supervisor de Seguridad
XIX. ANEXOS
PRESENTACION
POZO DRO-X1001
16 de Diciembre del 2014
Lnea de Servicio
TRS - TUBULAR RUNNING SERVICES:
- Enrosque de Caera (Tubular Make Up)
- Anlisis de Conexiones (Conection Test JAMPro)
- Manejo de Tubulares (Handling Services)
- Nuevas Tecnologas
Diesel
Elctrico
Llaves Hidrulicas
Permite un torque seguro para el cao y la rosca.
Sin Backup
Con Backup
JAM-Pro System
Mesas de Trabajo
CUA MANUAL
KLEPO AIR OPERATED THREAD
PROTECTOR
ESLINGAS
SWIVEL GIRATORIO
STABBING GUIDE
ELEVADOR YT
API BOWL
PETOL SURGRIP
CUA NEUMATICA
Camin Bandeja
Opera con un sistema de poleas y cables.
Puede trabajar con la canoa o slo con los
ganchos.
Tipo de Conexin
Grado de
Acero
Peso Nominal
Prof. en
Metros
Torque
Minimo
Optimo
Mximo
1 Supervisor
2 Op. de Llave
13 3/8"
Buttres
K-55
54.4 ppf
sin informacion
Base de
Triangulo
sin informacion
1100
N/A
2 Enganchador
2 Op. de JAMpro
2 Op. PULDM
2 Op. Auxiliar
1 Supervisor
2 Op. de Llave
9 5/8"
UPJ
P-110
47 ppf
3450
N/A
2 Enganchador
2 Tec. en JAMPro
2 Op. de PLDM
2 Op. Auxiliar
1 Supervisor
2 Op. de Llave
7" Liner
WPS 3T
P-110
29 ppf
+/- 990
N/A
2 Enganchador
2 Tec. En JamPro
2 Op. Auxiliares
1 Supervisor
1 Op. de Llave
5 Liner
VAM SLIJ II
P-110
18ppf
+/- 420
N/A
1 Enganchador
1 Tec en JamPro
1 Op. Auxiliar
Bandeja Hidrulica
Se prescinde del uso de cables y poleas.
Se incrementa el control sobre los tubulares evitando cargas suspendidas.
Se optimiza la comunicacin Operador/Maquinista/Boca de Pozo al ser operada desde el piso de perforacin.
Se elimina el tiempo de instalacin previa a la corrida.
Se eliminan puntos de aprisionamiento
Large Unit
Peso: 27 Ton
Longitud: 70 ft (21,3 m)
Carga mxima: 8000 lb. (3630 Kg.)
Casing: 20
Drill Collar: 9
Rango de altura: 7,3 a 12,4 m
Internal clamping
9-5/8 to 20
External Clamping
4-1/2 to 10-3/4
Simples procedimientos
para la cuadrilla del equipo.
Procedimientos de control
de pozos en perforaciones
convencionales
Casing/Liner en el fondo
No requiere de viajes
adicionales
Reduccion de
Costos
Capacidad de manejo
de densidad del lodo
ms bajas que en la
perforacin
convencional
Resolucin de
Problemas y Mitigacin
de Riesgos
Capacidad de perforacin
en zonas de perdida total
de circulacin o de perdida
somera.
Capacidad de perforacin
en zonas de arcillas
reactivas
Se eliminan problemas
causados por tiempo de
exposicin del agujero
SISTEMA STABMASTER
Brazo hidrulico que permite guiar y centrar la caera.
Reemplaza al enganchador. Rangos de trabajo de 2 3/8 a 36.
YPFB CHACO
Av. San Martin. Edificio Empresarial Piso 6.
Expandable Liner Hanger 5 x 7
DRO-X1001
Dorado Oeste
Rig: YPFB - 02
1
11/02/15
YPFB CHACO
DRO-X1001
SANTA CRUZ
Nombre
Preparado por:
Desarrollo de Negocios, Revisado por:
Ingeniera, Revisado por:
Firma
Fecha
11/02/2015
11/02/2015
11/02/2015
Pablo Moreno
Apolinar HIdalgo
Registro de Revisin
Revisin
1
Fecha de Revisin
11/02/2015
Comentarios
Revisado por
Juan Manuel Vazquez
Lista de Distribucin
Name
Luis Prest Mendoza
Pablo Moreno
Apolinar Hidalgo
Marcelo Salazar
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Company
Halliburton
Halliburton
YPFB Chaco
YPFB Chaco
Role
Associate Technical Professional
Bussines Segment Manager
Team Leader
Drilling Engineer Jr
Confidential
Email
Luis.prest@halliburton.com
Pablo.moreno@halliburton.com
Apolinar.Hidalgo@ypfbchaco.com.bo
Marcelo.Salazar@ypfbchaco.com.bo
YPFB CHACO
DRO-X1001
SANTA CRUZ
Cargo en el
Proyecto
Nombre
Compaa
Juan Manuel
Vazquez
Halliburton
Technical Professional
71647052
Halliburton
Associate Technical
Professional
75377077
Pablo Moreno
Halliburton
Bussines Segment
Manager
713-48643
Apolinar Hidalgo
YPFB Chaco
Drilling Engineer
Marcelo Salazar
YPFB Chaco
Drilling Engineer Jr
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
721-33517
784-52545
Confidential
Email
JuanManuel.Vazquez@halliburton.com
Luis.prest@halliburton.com
Pablo.moreno@halliburton.com
Apolinar.Hidalgo@ypfbchaco.com.bo
Marcelo.Salazar@ypfbchaco.com.bo
YPFB CHACO
DRO-X1001
SANTA CRUZ
Titulo
Technical Professional
Associate Tech.
Professional
Telfono
716-47052
Email
Juanmanuel.vazquez@halliburton.com
753-77077
Luis.prest@halliburton.com
Titulo
Bussines Segment
Manager
Telfono
713-48643
Email
Pablo.moreno@halliburton.com
Anthony Galvez
Service Specialist
721-38309
Anthony.galvez@halliburton.com
Jhonny Salinas
Service Leader
677-02477
Jhonny Salinas@halliburton.com
709-05998
Nataly.pacheco@halliburton.com
713-20113
Nicole.lafuente@halliburton.com
722-42254
Fanor.torrez@halliburton.com
Nataly Pacheco
Nicole La Fuente
Fanor Torrez
Associate Technical
Professional
Associate Technical
Professional
Service Specialist
b. Seguridad
b.1.
Stop Work authority es una herramienta que intrega a todo el personal que forme parte de
Halliburton o trabaje en conjunto con la compaa, la autoridad para detener su propio trabajo o el trabajo del personal que le rodea si usted piensa que su seguridad o la seguridad de sus
compaeros de trabajo y del medio ambiente estn en peligro. Esto tambin le da la responsabilidad de usar su autoridad para prevenir incidentes.
El SWA aplica tanto para seguridad personal y de los procesos. La seguridad personal se enfoca principalmente en el uso de equipo de proteccin personal, uso de equipos certificados y
seguimiento de los procesos. Procesos de seguridad se refiere a la prevencin de incidentes
siguiendo un correcto diseo de ingeniera y trabajo.
Los principales pasos a seguir para detener una accin son los siguientes:
- Comunicar la situacin o cuestionar el comportamiento directamente con la persona
involucrada.
- Corregir la situacin si es posible
- Si no es posible corregir la situacin, dirjase con su supervisor o el representante del
cliente y comente lo observado.
- Detenga la actividad si existe un peligro claro y representativo.
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
YPFB CHACO
DRO-X1001
SANTA CRUZ
b.2.
Seguridad
Halliburton inici el plan ZERO en el ao 2011. ZERO hace alusin a: cero incidentes de seguridad,
cero incidentes ambientales y cero tiempos no productivos. El nombre ZERO, expresa nuestras
prioridades en el conocimiento del plan, aceptar el desafo y mantener el compromiso de ejecutarlo.
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
YPFB CHACO
DRO-X1001
SANTA CRUZ
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
YPFB CHACO
DRO-X1001
SANTA CRUZ
Introduccin
El siguiente programa detalla la secuencia de pasos a seguir para las operaciones involucradas en la co
rrida y asentamiento del colgador de liner expansible Versaflex de 5 x 7 del pozo DRO-X1001, incluyendo:
El montaje y bajada del colgador de liner compuesto por los equipos de flotacin de 5 y la caera de 5.
El dimensionamiento de la herramienta a la profundidad requerida para proseguir con su expansin y prueba de anclaje.
Alcance
Este documento se aplica a las actividades de la lnea de servicios HCT (Halliburton Completion Tools) de
Halliburton Latn Amrica S.A. en Bolivia.
Este procedimiento est especialmente preparado y es particular al Pozo DRO-X1001, propiedad de la
Empresa Petrolera YFB Chaco.
Objetivos
El principal objetivo que se persigue con la presente operacin de Corrida de Liner Expandible es el siguiente:
Realizar una exitosa corrida de liner para poder llegar hasta el fondo del pozo trabajando la herramienta, si es necesario aplicando sus lmites operativos.
Lograr una exitosa operacin de expansin del colgador de liner de 5 que permita una aislacin
efectiva del tramo de inters de estudio.
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
YPFB CHACO
DRO-X1001
SANTA CRUZ
e. Well Information
e.1.
Well Schematic(s)
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
YPFB CHACO
DRO-X1001
SANTA CRUZ
e.2.
Esquemtico de Completacin
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
YPFB CHACO
DRO-X1001
SANTA CRUZ
e.3.
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
10
YPFB CHACO
DRO-X1001
SANTA CRUZ
f. Clculos
Confidential Halliburton Technical Information
Calculations for a Setting Ball, Pumping a ball Down, or Time to Fall in a Static Fluid, Vertical Hole
Sections
Calculations for Reversing out the Setting Ball
Return Fluid Rate (BPM)
Ball Diameter (in)
Absolute Viscosity of the Completion Fluid (cP)
Density of the Completion Fluid (lb/gal)
1,875
18
15,3
0,2832
Workstring ID (in)
2,764
15.093
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
11
YPFB CHACO
DRO-X1001
SANTA CRUZ
g. Procedimiento de Instalacin
g.1.
Actividades Pre-Operacionales
A continuacin se listan las recomendaciones previas al trabajo de Corrida y Expansin del
Colgador de Liner Expansible de 5 x 7.
Actividades Pre-Operacionales Colgador de Liner
1. Las paredes de la caera donde ser asentado el colgador de liner debern ser calibradas
antes de la operacin.
2. Asegurarse que toda la tubera de trabajo sea calibrada asegurando el pasaje de la bola de
asentamiento de 1.875 (calibrador de 2.00).
3. Cargue el dardo de limpieza en la cabeza de cementacin (GSI) antes de ser enviada a locacin.
4. Se llevar a cabo una reunin de seguridad pre-operacional antes de comenzar el trabajo.
5. Toda comunicacin ser dirigida a travs del representante del cliente en locacin.
6. Asegurarse de que se encuentren en locacin artefactos que agilicen la comunicacin en locacin (Radios).
7. El supervisor de Halliburton deber:
Medir OD e ID de todos los ensambles Halliburton en locacin.
Comprobar fsicamente y calibrar todos los crossover para asegurar compatibilidad.
Proveer un esquema detallado del BHA.
8. Circular y acondicionar el lodo de perforacin antes de sacar sarta de trabajo para correr el
liner segn procedimientos del cliente.
9. Registrar pesos subiendo y bajando a la profundidad deseada del tope del liner.
Esto para estimar el arrastre al momento de recuperar el setting tool.
10. Asegurarse que se encuentra en locacin, un segundo dardo y bola como contingencia.
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
12
YPFB CHACO
DRO-X1001
SANTA CRUZ
g.2.
Procedimiento Operacional
La siguiente secuencia operativa constituye un conjunto de pasos ordenados (Plan General) que deben ser seguidos por el Operador de Campo de Halliburton encargado de la
realizacin del Servicio de Corrida y Expansin del Colgador de Liner Expansible en el pozo
MGR-8.
Procedimiento de Instalacin
1. Preprese Tally de Corrida (Running Tally) con medidas de campo corregidas y presntese y
ID
(in)
OD
(in)
4.17
4.276
4.276
4.276
4.17
4.276
4.17
5.24
5
5
5
5.21
5
5.21
Longitud
(m)
0.65 mts
12.00 mts
12.00 mts
12.00 mts
0.56 mts
12.00 mts
0.52 mts
Mnimo
Torque [lbft]
Optimo
Mximo
3.800
4.100
4.400
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
13
YPFB CHACO
DRO-X1001
SANTA CRUZ
Enroscar el colgador con el liner, teniendo mucho cuidado con las gomas del wiper plug.
Utilice los siguientes valores de torque:
10. Contine con la corrida del colgador. Asegrese de que se tomen todos los cuidados
necesarios para proteger los elastmeros exteriores del cuerpo del colgador al momento
que se atraviesan las BOPs.
11. Ajustar un tiro de Heavy Weight por encima del colgador y levante el ensamble para tomar
Torque [lbft]
Optimo
Conexin
13,800
3 NC-38,
funcionamiento y parmetros.
13. Mientras se corre el liner y si hubiera la necesidad de rotar rotar la herramienta, tener cuidado
de no liberar el torque abruptamente ya que la tubera podra ejercer una fuerza contrara
destorqueando las conexiones y activando los mecanismos de asentamiento/liberacin del
running tool. El running tool lleva dos pines anti-rotacionales de 1250 ft-lb en total (625 lb-ft
cada uno).
14. Registre el nmero de tiros de tubera de trabajo mientras se baja el colgador con el liner.
Nota: Asegrese de llenar la tubera de trabajo cada 10 tiros.
15. Antes de ingresar a la seccin de agujero abierto, rompa circulacin, anote parmetros y
vuelva a desfogar. Aplique rotacin a la sarta y anote parmetros. Posterior a eso, tome
pesos subiendo y bajando.
16. Contine bajando el liner en agujero abierto a una velocidad de 2 minutos entre cua y cu-
cin de la cabeza de cementacin y as poder llevar a cabo la cementacin y la posterior expansin del colgador de liner.
Nota: Verifique que los pup joints necesarios se encuentran en locacin y espacie la
sarta para poder dejar el zapato en el fondo.
Confidential
14
YPFB CHACO
DRO-X1001
SANTA CRUZ
establecer circulacin y acondicionar el agujero para cementar. No parar la rotacin durante la cementacin del liner.
ra.
24. Una vez que el wiper plug sea liberado, cuantifique el volumen controlando el
desplazamiento en el liner.
encima de la presin final de bombeo, hasta un mximo de 3,600 psi de presin en superficie.
Libere la presin y observar retornos. Medir y reportar el total de flujo de retorno.
Nota: Si no se viera un acoplamiento de tapones en el landing collar, contine bombeando un 50% del volumen del shoe track, si despus de esta operacin, aun no se
observa acoplamiento, realice reunin para proceder con los puntos de contingencia.
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
15
YPFB CHACO
DRO-X1001
SANTA CRUZ
bpm y observe el incremento de presin constante. El colgador deber iniciar su sistema de expansin a partir de los 1,170 psi, presin con la cual se alinea la herramienta hacia el anular. Mantenga el caudal constante durante la expansin (hasta que el colgador se asiente). No exceda los
7,500 psi.
Nota: No mover la tubera o libere presin hasta que la expansin est completada (No
debe tomar ms de 5 minutos).
Asegurar que la bomba permanezca a un caudal constante durante la expansin del
colgador.
Para esta presurizacin (segunda presurizacin) y para comunicar la directa con el anular, se necesita recorre la camisa inferior de la flapper, la misma que necesita una presin efectiva de 1,170 psi.
La camisa inferior de la flapper tiene un rea de pistn de 4.20 in2 y lleva 4 pines de
corte de 1,856 lbs c/u.
(P=F/A= 4 pines x 1,856 lbs / 4.2 in2= 7,426 lbs / 4.2 in2 = 1,170 psi.)
Si el volumen bombeado y la presin alcanzada en esta segunda presurizacin es similar al observado en el paso 2, este es un indicativo de que la flapper no ha sido activada, de manera que es necesario aumentar el valor de presurizacin hasta su lmite
(7,500 psi, presin de Reventamiento de PBR) asegurando de que las diferenciales del
pozo no afecten a la presin aplicada.
Cualquier presin diferencial a la altura de TOL afecta directamente la presin requerida
para activar la flapper y expandir el colgador. Es decir que si a nivel de la herramienta
existe una carga adicional en el anular de 1,000 psi que se reflejen a nivel de la herramienta es necesario adicionar 1,000 psi tanto a la presin de activacin de la flapper
como a la presin de expansin del colgador.
5. Bombear el volumen requerido para realizar la expansin y para que los puertos se abran en el
setting tool y la presin caiga indicando que la expansin se complet. Una vez la presin en el
camin cementador caiga, parar el bombeo, monitorear la cada de presin y registrar volmenes
(debe ser menor que el volumen despus del desplazamiento de cemento).
Nota: Cuando el cono pase a travs de los puertos del bypass del setting tool, la presin caer indicando que la expansin ha sido completada.
6. Tensionar 100,000 lbs de overpull para verificar el asentamiento del liner hanger. No tratar de rotar la tubera.
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
16
YPFB CHACO
DRO-X1001
SANTA CRUZ
Proceda a expandir el colgador repitiendo los pasos del 4 y 5.Para expandir el colgador, presurice
y mantenga el caudal de bombeo constante a 1 bpm y observe el incremento de presin constante. El colgador deber iniciar su sistema de expansin a partir de 1,770 psi, presin con la cual se
alinea la herramienta hacia el anular. Mantenga el caudal constante durante la expansin (hasta
que el colgador se asiente). No exceda los 8,000 psi.
Contingencia Activacin de la flapper mecnicamente.
Despus de intentar trabajar con la bola y ante la fallida operacin con esta, se proceder a activar la flapper mecnicamente como se detalla a continuacin.
Colocar la herramienta de asentamiento en compresin, aplicando 10 Klbs a nivel de la herramienta.
Aplicar torque a la derecha a manera de sobrepasar los 1,250 ft-lb a nivel de la herramienta
(11,500 ft-lbs en superficie) mantenindola en compresin (se tiene 2 pines anti-rotacionales de
625 ft-lbs c/u =1,250 ft-lb), de esta manera tomaremos parmetros de liberacin.
Manteniendo el torque izquierdo levantar la sarta 60 cm efectivo para activar mecnicamente la
flapper (tensionando 40,000 lbs por encima del peso neutro). Esta ltima maniobra de tensin recorrer una camisa en fondo y desplegar la flapper.
Para expandir el colgador, presurice y mantenga el caudal de bombeo constante a 1 bpm y observe el incremento de presin constante. El colgador deber iniciar su sistema de expansin a partir
de los 1,770 psi, presin con el cual se alinea la herramienta hacia el anular. Mantenga el caudal
constante durante la expansin (hasta que el colgador se asiente). No exceda los 8,000 psi.
Nota: No mover la tubera o libere la presin hasta que la expansin est completa (No debe tomar ms de 5 minutos).
Asegurar que la bomba permanezca a un caudal constante durante la expansin del colgador.
Para esta presurizacin (segunda presurizacin) y para comunicar la directa con el anular,
se necesita recorrer la camisa inferior de la flapper, la misma que necesita una presin
efectiva de 1,770 psi.
2
La camisa inferior de la flapper tiene un rea de pistn de 4.20 in y lleva 4 pines de corte
de 1,856.5 lbs c/u.
2
(P=F/A= 4 pines x 1,856.5 lbs / 4.2 in = 1,770 psi.)
Verificar el volumen requerido para realizar la expansin y para que los puertos se abran en el
setting tool y la presin caiga indicando que la expansin se complet. Una vez la presin en el
camin cementador caiga, parar bombeo, monitorear la cada de presin y registrar volmenes
(debe de ser menor que el volumen despus del desplazamiento de cemento)
Nota: Cuando el cono pase a travs de los puertos del bypass del setting tool, la presin
caer indicando que la expansin ha sido completada.
Tenisionar 100,000 lbs de overpull para chequear el asentamiento del liner hanger. No tratar de
rotar la tubera.
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
17
YPFB CHACO
DRO-X1001
SANTA CRUZ
h. Procedimientos de Recuperacin
h.1.
h.2.
Procedimiento de Recuperacin
h.3.
Antes de realizar el retiro de la herramienta de servicio se debe de verificar que el colgador est anclado.
Una vez verificado el anclaje del colgador se procede a liberar la herramienta aplicando peso
hasta 50,000 lbs. Y se procede a retirar la herramienta de servicio, elevar la sarta 11 metros y
proceder a realizar la circulacin para limpiar el exceso de cemento.
i. Validacin y Prueba
i.1.
i.2.
Procedimiento de Prueba
Para poder probar el anclaje del colgador se debe de realizar la correcta expansin de los elastmeros, observar el incremento de presin en la bomba al momento de asentar el Wiper Plug
en el Landing Collar y su posterior cada de presin indicando el desplazamiento del cono de
expansin, seguidamente se debe de observar retornos por zarandas.
Una vez observados todos estos indicativos se procede a realizar la prueba de anclaje del colgador. Se realiza tensionando la sarta hasta 100,000 lbs de overpull. Esto nos indica que el colgador ha sido anclado.
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
18
YPFB CHACO
DRO-X1001
SANTA CRUZ
j. Contingencia
Comunicacin
Si existieran cambios en las condiciones del pozo, procedimientos o requerimientos de
materiales, los siguientes pasos deben ser tomados en cuenta.
Los cambios acordados mutuamente entre el representante de la compaa y Halliburton deben ser comunicados a todas las partes involucradas.
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
19
YPFB CHACO
BBL-17
SANTA CRUZ BOLIVIA
k. Anlisis de Riesgo
k.1. Formulario de Anlisis de Riesgo
Anlisis de Riesgo
Proyecto/
Pozo:
Completado
por:
Descripcin del Riesgo
Equipamiento inadecuado,
incorrecto, prdida o dao de
equipamiento en locacin
Fecha:
09/12/2014
Efecto
Lesiones personales
Dao de equipamiento
Incremento de costos para
el cliente
Prdida de revenue
Dao medioambiental
Objetivo
P
Existente
Post - Control
Sev
Prob
RPC
IV
IV
E
DT
DC
ENV
P
Lesiones personales
Dao de equipamiento
Incremento de costos para
el cliente
Prdida de revenue
Dao medioambiental
E
DT
DC
ENV
Mala comunicacin
Uso de incorrecto o informacin
desactualizada.
Cambios en el objetivo
Equipo daado, fallado, inadecuado,
incorrecto
Falla de equipo
Personal incorrecto
Condiciones de pozo inesperadas
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Lesiones personales
Dao de equipamiento
Incremento de costos para
el cliente
Prdida de revenue
Dao medioambiental
E
DT
DC
ENV
I
Confidential
20
Sev
Prob
RPC
YPFB CHACO
BBL-17
SANTA CRUZ BOLIVIA
Descriptive
Word
Personal
Illness/
Injury
Fatal or permanent disabling injury or
illness
Catastrophic
Critical
Severe Injury
or illness
Marginal
Minor Injury
or Illness
Negligible
No Injury or
Illness
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Equipment
Loss(s)
>$1,000,000
$200,000
to
$1,000,000
>$10,000
to
$200,000
<$10,000
Probability Rating
A
Frequent
B
Reasonably
Probable
C
Occasional
D
Remote
E
Extremely
Improbable
F
Impossible
Environmental
(Any incident that)
Potentially harms or adversely affects the general public and has
the potential for widespread public concern of Halliburton operations.
Can have serious economic liability on the operation.
Potentially harms or adversely affects trained employees and the
environment. Requires specialised expertise or resources for
correction.
Confidential
21
YPFB CHACO
BBL-17
SANTA CRUZ BOLIVIA
l. Apendices
l.1.
Design Specifications
101600968
59VF50702951-A
NOMINAL OD (ELASTOMERS)
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
Value
HIGH TORQUE
7
29-32#
41XX LOW ALLOY STEEL
80
41XX LOW ALLOY STEEL
125
FLUOROCARBON RUBBER
40:275
STD
5.366 HST-LX
PIN
5.885 inch
5.880 inch
5.250 inch
191.00 inch
5.885 inch
4.687 inch
342.41 inch
8191 PSI
5014 PSI
178054 pound
9377 PSI
10263;10441 PSI
339666 pound
40301 pound/foot
T1 LOCATION: 2367 (MINIMUM),
2641 (OPTIMUM), 2905 (MAXIMUM) FOR 5.607 HST-DS T2
LOCATION: 3142 (MINIMUM),
3491 (OPTIMUM), 3840 (MAXIMUM) FOR 5.366 HST-LX CONTINUED BELOW.
5.870 inch
22
YPFB CHACO
BBL-17
SANTA CRUZ BOLIVIA
Design Specifications
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
101992046
92BPC54262
Name
Value
MAXIMUM OD
MINIMUM ID
LENGTH
MATERIAL
MATERIAL YIELD STRENGTHMIN
TOP THREAD
BOTTOM THREAD
CONNECTION TYPE
SERVICE
BURST PRESSURE (CALC)
COLLAPSE PRESSURE (CALC)
TENSILE STRENGTH, CALC/1000
5.820 inch
2.97 inch
37.0 inch
41XX LOW ALLOY STEEL
125000 pounds/sq. inch
Confidential
5.366 HST-LX
BLANK
BOX-PIN
H2S
13540 pounds/sq. inch
12898 pounds/sq. inch
462.0 pound
23
YPFB CHACO
BBL-17
SANTA CRUZ BOLIVIA
Design Specifications
Name
Value
CASING SIZE
CASING THREADER
CASING THREAD
CASING WEIGHT
CASING GRADE
BLANK
Plug Assembly Latch ID
OD
ID
LENGTH
NET WEIGHT
5
UNIVERSAL
T AND C OR FLUSHLINE
18-23.2
P-110
BLANK
2.380
5.906
3.950
27.75
117.9
Name
Value
CASING SIZE
CASING THREADER
CASING THREAD
CASING WEIGHT
CASING GRADE
BLANK
Plug Assembly Latch ID
OD
ID
LENGTH
NET WEIGHT
BURST PRESSURE
COLLAPSE PRESSURE
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
101665971
101665971
Confidential
7
JFE
BEAR
32
13 CHROME-110
THREADED
3.800
7.701
6.088
26.32
135
15149 PSI
13315 PSI
24
YPFB CHACO
BBL-17
SANTA CRUZ BOLIVIA
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
100008288
836.03516
Name
Value
CASING SIZE
CASING THREAD
CASING WEIGHT
CASING GRADE
VALVE SIZE
BLANK
DOUBLE
NR PLUG SEAT
DOWN JET-UP JET
SOLID VANE-REAMER SHOE
TAPERED NOSE
SEALING SLEEVE OR LATCH
DOWN
OD
ID
LENGTH
NET WEIGHT
FLOAT EQUIPMENT TYPE
5
T AND C OR FLUSHLINE
18-23.2
P-110
2-3/4
BLANK
SINGLE
STANDARD
STANDARD
STANDARD
STANDARD
STANDARD
Confidential
5.906
3.912
28.06
121
COLLAR
25
YPFB CHACO
BBL-17
SANTA CRUZ BOLIVIA
Design Specifications
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
100008293
837.03582
Name
Value
CASING SIZE
CASING THREADER
CASING THREAD
CASING WEIGHT
CASING GRADE
VALVE SIZE
BLANK
DOUBLE
NR PLUG SEAT
DOWN JET-UP JET
SOLID VANE-REAMER SHOE
TAPERED NOSE
SEALING SLEEVE OR LATCH
DOWN
OD
ID
LENGTH
NET WEIGHT
FLOAT EQUIPMENT TYPE
5
UNIVERSAL
T AND C OR FLUSHLINE
18-23.2
P-110
2-3/4
BLANK
SINGLE
STANDARD
HIGH-PORT UP-JET
STANDARD
STANDARD
STANDARD
Confidential
5.906
3.745
24.74
80.4
SHOE
26
YPFB CHACO
BBL-17
SANTA CRUZ BOLIVIA
Design Specifications
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
101712362
101712362
Name
Value
Drillpipe Size
Plug Assembly Latch ID
OD
Length
Weight
3-1/2
1.375
3.13
14.94
1.5
Confidential
27
YPFB CHACO
BBL-17
SANTA CRUZ BOLIVIA
ASSEMBLY, PLUG, 5 HWE, VF LINER HANGER, SHEAR PIN RELEASE, WITH PRESSURE BREAK
SYSTEM, 1350 PSI PRIMARY/3150
SECONDARY PLUG RELEASE
PRESSURE
Design Specifications
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
101664718
101664718
Name
Value
Casing Size
Type
Max Wiping ID
Min Wiping ID
Primary Release Pressure
Contingency Release Pressure
Releasing Dart Latch ID
Landing Collar Latch ID
OD
ID
Length
Weight
Bump Pressure Rating
5
Standard
4.69
3.83
1350
3150
1.375
2.380
4.940
1.375
43.29
23.6
8000
Confidential
28
YPFB CHACO
BBL-17
SANTA CRUZ BOLIVIA
Design Specifications
101593349
59VRT5070300
Name
Value
HIGH TORQUE
5.515 inch
584.00 inch
7.000
23;26;29;32;35 pound/foot
476685 pound
101593930 (12O13761)
34264;25594 foot pound
6000;5053;6023;5048;5445
pounds/sq. inch
122280;111772;137144;114943;
125780 pound
1.795 inch
4 API-FH TOOL JOINT (NC40)
2 7/8-8.70 API-EU
PIN
41XX LOW ALLOY STEEL
STD
275 Deg. F
1.875 inch
STAINLESS STEEL
353805;364913;339541;361742;
350905 pound
SETTING FORCE
MINIMUM ID
TOP THREAD
BOTTOM THREAD
CONNECTION TYPE
MATERIAL
SERVICE
TEMPERATURE RATING
BALL DIAMETER (PRIMARY)
BALL MATERIAL (PRIMARY)
MAXIMUM RUN-IN WEIGHT
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
29
YPFB CHACO
BBL-17
SANTA CRUZ BOLIVIA
a.1.
Especificaciones de la Tubera/Caera
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
30
YPFB CHACO
BBL-17
SANTA CRUZ BOLIVIA
Una llave Allen para abrir la vlvula de liberacin del dardo de la cabeza de cementacin.
Juego de llaves combinadas para retirar las grampas de proteccin de la cabeza de cementacin
en caso que sea necesario.
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
31
YPFB CHACO
BBL-17
SANTA CRUZ BOLIVIA
ANEXOS
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
32
YPFB CHACO
BBL-17
SANTA CRUZ BOLIVIA
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
33
YPFB CHACO
BBL-17
SANTA CRUZ BOLIVIA
Corrida de Liner hasta TD 4,600 mts, No se observa ningn tipo de buckling o esfuerzos laterales
excesivos durante la corrida con los factores de friccin utilizados. A profundidad de TD la simulacin indica 290 klbs disponibles para tratar de llegar con el liner al fondo del pozo.
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
34
YPFB CHACO
BBL-17
SANTA CRUZ BOLIVIA
Grfica de Torque
La grfica siguiente nos ensea el torque en la sarta a la profundidad de TD, el cual es de
1,865 ft- lbs, observados en superficie. Claramente se puede observar que podemos aplicar
hasta 5,000 ft lbs de torque a la sarta, lo que genera 7,000 ft-lbs en superficie. Lo cual a
profundidad del liner se encuentra dentro del rango de la caera.
Grfica de Peso
Nos ensea los pesos predecibles de las operaciones de corrida y sacada del arreglo en
todo momento y de todos los componentes del arreglo (liner, hanger, drill pipe)
Corrida de Liner hasta TD 4,279 mts, No se observa ningn tipo de buckling problemas
con la tensin en todos los componentes de la sarta.
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
35
YPFB CHACO
BBL-17
SANTA CRUZ BOLIVIA
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
36
YPFB CHACO
BBL-17
SANTA CRUZ BOLIVIA
Flujograma de Operaciones
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
37
YPFB CHACO
BBL-17
SANTA CRUZ BOLIVIA
CORRIDA DE LINER
Preparacin de
programa y armado de
heramientas
Envo de herramientas
y documentacin al
pozo
Si
Llenar formatos
Halliburton-Cliente,
permisos de trabajo y
realizar reunin de
seguridad y preoperacional
Si
Corrida de Liner
llenando cada 5
paradas
Liner Libre?
No
Si
Presenta
restriccin?
No
Liner en Fondo
Si
Liner Libre?
No
Si
Puede sentar a la
profundidad?
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
No
38
YPFB CHACO
BBL-17
SANTA CRUZ BOLIVIA
CEMENTACION DE LINER
Llega a fondo,
Espaciar Tubera y
conectar Cabezal de
Cementacin
Establecer
circulacin
No
Reciprocar y Rotar
Sarta si es posible
Existe?
Si
Bombear pildora
viscosa, circular hasta
retorno limpio.
Acondicionar lodo de
perforacion
Si
Existe?
No
Bombear
espaciadores y
lechada de cemento
segun diseno
No
Se registra acople
de dardo y tapn
Si
Se registra acople
de dardo y tapn
Si
Completar
desplazamiento
No
No
Sacar sarta con Liner
No
Se registra BUM
de tapones
Permite circulacin?
Si
Si no logra liberar,
realizar back-off
mecnico y planificar
operacion de pesca
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Si
Completar
desplazamiento
Verificar contraflujo en la
unidad de cementacin
Expandir de acuerdo a la
contingencia, gravitar bola.
(ver flujograma de
expansin)
Confidential
39
YPFB CHACO
BBL-17
SANTA CRUZ BOLIVIA
Se registra BUM
de tapones
No
Si
Presurizar hasta
6300 psi, activar
flapper, igualizar
presin e iniciar
expansin
No
Se registra
incremento de
presin?
Gravitar bola de
asentamiento de
1.875"
Si
Continuar presurizando
a 1 bpm y mantener
constante hasta
expandir colgador
No
Colgador
Expande?
Si
Si
Se registra
incremento de
presin
Si
No
Activar mecanismo de
expansin mecnica,
aplique 10k de peso y
torque izquierdo de 2000 ftlb. Posteriormente levante
la herramienta 30 cm.
Confirmar asentamiento
tensionando con hasta
100Klbs de overpull
Activar mecanismo de
liberacion de emergencia
y sacar herramienta de
asentamiento y circular
hasta retorno limpio.
Posteriormente correr otro
colgador con unidad de
sellos y realizar Tie-Back.
No
Herramienta libre?
Si
Si
No
Herramienta libre?
Activar mecanismo de
liberacin de
emergencia
Si
Herramienta libre?
No
Realizar Back-off
mecnico y planificar
operacin de pesca
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
40
YPFB CHACO
BBL-17
SANTA CRUZ BOLIVIA
YPFB CHACO
Expandable Liner Hanger 5 X 7
DRO-X1001
Confidential
41
YPFB CHACO
Av. San Martin Edif. Empresarial Equipetrol Piso 6to.
Expandable Liner Hanger 7 x 9 5/8
DRO-X1001
Dorado
Rig: YPFB-02
Design of Service
Proceso de Instalacin
Revision:
Date:
1
11/02/15
Prepared by:
Phone:
Address:
YPFB CHACO
DRO-X1001
SANTA CRUZ
NOmbre
Preparado por:
Business Development Revisado por:
Ingeniera Revisado por:
Aprobacin Halliburton:
Firma
Fecha
11/02/15
11/02/15
11/02/15
Pablo Moreno
11/02/15
Apolinar Hidalgo
Registro de Revisiones
Revisin
Fecha de Revisin
11/02/15
Revisado por:
Juan Manuel
Vazquez
Comentarios
Programa Preliminar
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Compaa
Halliburton
Halliburton
YPFB Chaco
YPFB Chaco
Cargo
Associate Technical
Professional
Business Segment Manager
Team Leader
Ingeniero de Proyecto
Confidential
Email
Luis.prest@halliburton.com
Pablo.Moreno@halliburton.com
Apolinar.Hidalgo@ypfbchaco.com.bo
Marcelo.Salazar@ypfbchaco.com.bo
YPFB CHACO
DRO-X1001
SANTA CRUZ
Name
Company
Juan Manuel
Vazquez
Halliburton
Technical
Professional
71647052
Luis Prest
Mendoza
Halliburton
Associate Technical
Professional
75377077
Pablo Moreno
Halliburton
Business Segment
Manager
Apolinar Hidalgo
YPFB
Chaco
Marcelo Salazar
YPFB
Chaco
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Project Role
Email Address
Luis.prest@halliburton.com
Luis.prest@halliburton.com
Pablo.moreno@halliburton.com
Team Leader
Apolinar.hidalgo@ypfbchaco.com.bo
Ingeniero de
Proyectos
Marcelo.salazar@ypfbchaco.com.bo
Confidential
YPFB CHACO
DRO-X1001
SANTA CRUZ
Table of Contents
Design Verification ...................................................................................................................... Error! Bookmark not defined.
Revision Log ................................................................................................................................ Error! Bookmark not defined.
Document Distribution List .......................................................................................................... Error! Bookmark not defined.
Customer / Halliburton / 3rd Party Interfaces ................................................................................................................................. 3
1.
2.
Safety ..................................................................................................................................................................................... 5
2.1.
2.2.
3.
4.
5.
5.2.
5.3.
6.
Calculations ......................................................................................................................................................................... 12
7.
8.
9.
7.1.
7.2.
8.2.
9.2.
10. Contingency......................................................................................................................................................................... 21
11. Risk Assessment ................................................................................................................... Error! Bookmark not defined.
11.1.
11.2.
12.2.
12.3.
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
YPFB CHACO
DRO-X1001
SANTA CRUZ
Titulo
Supervisor
Ingeniero
Telfono
716-47052
753-77077
Email
Juanmanuel.vazquez@halliburton.com
Luis.prest@halliburton.com
Titulo
Business Segment
Manager
Telfono
713-48643
Email
Pablo.Moreno@halliburton.com
Jhonny Salinas
Service Leader
677-02477
Jhonny.salinas@halliburton.com
Anthony Galvez
Service Specialist
760-60277
Anthony.galvez@halliburton.com
Fanor Torrez
Service Specialist
Associate Technical
Professional
Associate Technical
Professional
722-42254
Nataly Pacheco
Nicole La Fuente
678-81440
Fanor.torrez@halliburton.com
Nataly.pacheco@halliburton.com
713-20113
Nicole.lafuente@halliburton.com
b. Seguridad
b.1.
Stop Work authority es una herramienta que intrega a todo el personal que forme parte de
Halliburton o trabaje en conjunto con la compaa, la autoridad para detener su propio
trabajo o el trabajo del personal que le rodea si usted piensa que su seguridad o la seguridad
de sus compaeros de trabajo y del medio ambiente estn en peligro. Esto tambin le da la
responsabilidad de usar su autoridad para prevenir incidentes.
El SWA aplica tanto para seguridad personal y de los procesos. La seguridad personal se
enfoca principalmente en el uso de equipo de proteccin personal, uso de equipos
certificados y seguimiento de los procesos. Procesos de seguridad se refiere a la prevencin
de incidentes siguiendo un correcto diseo de ingeniera y trabajo.
Los principales pasos a seguir para detener una accin son los siguientes:
- Comunicar la situacin o cuestionar el comportamiento directamente con la persona
involucrada.
- Corregir la situacin si es posible
- Si no es posible corregir la situacin, dirjase con su supervisor o el representante del
cliente y comente lo observado.
- Detenga la actividad si existe un peligro claro y representativo.
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
YPFB CHACO
DRO-X1001
SANTA CRUZ
b.2.
Seguridad General
Halliburton inici el plan ZERO en el ao 2011. ZERO hace alusin a: cero incidentes de seguridad,
cero incidentes ambientales y cero tiempos no productivos. El nombre ZERO, expresa nuestras
prioridades en el conocimiento del plan, aceptar el desafo y mantener el compromiso de
ejecutarlo.
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
YPFB CHACO
DRO-X1001
SANTA CRUZ
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
YPFB CHACO
DRO-X1001
SANTA CRUZ
Introduccin
El siguiente programa detalla la secuencia de pasos a seguir para las operaciones involucradas en la
corrida y asentamiento del colgador de liner expansible Versaflex de 7 x 9 5/8 del pozo DRO-X1001,
incluyendo:
El montaje y bajada del colgador de liner compuesto por los equipos de flotacin de 7 y la
caera de 7.
Alcance
Este documento se aplica a las actividades de la lnea de servicios HCT (Halliburton Completion Tools) de
Halliburton Latn Amrica S.A. en Bolivia.
Este procedimiento est especialmente preparado y es particular al Pozo DRO-X1001, propiedad de la
Empresa Petrolera YPFB Chaco.
Objetivos
El principal objetivo que se persigue con la presente operacin de Corrida de Liner Expandible es el
siguiente:
Realizar una exitosa corrida de liner para poder llegar hasta el fondo del pozo trabajando la
herramienta, si es necesario aplicando sus lmites operativos.
Lograr una exitosa operacin de expansin del colgador de liner de 7 que permita una aislacin
efectiva del tramo de inters de estudio.
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
YPFB CHACO
DRO-X1001
SANTA CRUZ
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
YPFB CHACO
DRO-X1001
SANTA CRUZ
e.2.
Diagrama de Completacin
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
10
YPFB CHACO
DRO-X1001
SANTA CRUZ
e.3.
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
11
YPFB CHACO
DRO-X1001
SANTA CRUZ
f. Clculos
Confidential Halliburton Technical Information
Calculations for a Setting Ball, Pumping a ball Down, or Time to Fall in a Static Fluid, Vertical Hole
Sections
Calculations for Reversing out the Setting Ball
Return Fluid Rate (BPM)
2,5
24
11,5
0,2832
Workstring ID (in)
4,276
14.040
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
12
YPFB CHACO
DRO-X1001
SANTA CRUZ
g. Procedimiento de Instalacin
g.1.
1. Las paredes de la caera donde ser asentado el colgador de liner debern ser calibradas
antes de la operacin.
2. Asegurarse que toda la tubera de trabajo sea calibrada asegurando el pasaje de la bola de
asentamiento de 2 1/2 (calibrador de 2.65).
3. Cargue el dardo de limpieza en la cabeza de cementacin (GSI) antes de ser enviada a
locacin.
4. Se llevar a cabo una reunin de seguridad pre-operacional antes de comenzar el trabajo.
5. Toda comunicacin ser dirigida a travs del representante del cliente en locacin.
6. Asegurarse de que se encuentren
comunicacin en locacin (Radios).
en
locacin
artefactos
que
agilicen
para
la
asegurar
8. Circular y acondicionar el lodo de perforacin antes de sacar sarta de trabajo para correr el
liner segn procedimientos del cliente.
9. Registrar pesos subiendo y bajando a la profundidad deseada del tope del liner.
Esto para estimar el arrastre al momento de recuperar el setting tool.
10. Asegurarse que se encuentra en locacin, un segundo dardo y bola como contingencia.
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
13
YPFB CHACO
DRO-X1001
SANTA CRUZ
g.2.
Procedimiento de Instalacin
La siguiente secuencia operativa constituye un conjunto de pasos ordenados (Plan
General) que deben ser seguidos por el Operador de Campo de Halliburton encargado
de la realizacin del Servicio de Corrida y Expansin del Colgador de Liner Expansible en el
pozo DRO-X1001.
1. Preprese Tally de Corrida (Running Tally) con medidas de campo corregidas y presntese y
ID
(in)
OD
(in)
6.00
6.00
6.00
6.00
6.00
7.20
7.00
7.20
7.00
7.20
Longitud
(m)
0.62 mts
13.26 mts
0.50 mts
13.26 mts
0.40 mts
Mnimo
Torque [lbft]
Optimo
Mximo
7,800
8,400
9,000
7. Ajuste el liner con el spider, coloque collarn de seguridad y proceda a elevar el Colgador de
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
14
YPFB CHACO
DRO-X1001
SANTA CRUZ
Mnimo
7 29# WSP-3T
7,800
Torque [lbft]
Optimo
8,400
Mximo
9,000
necesarios para proteger los elastmeros exteriores del cuerpo del colgador al momento
que se atraviesan las BOPs.
11. Ajustar un tiro de drillpipe por encima del colgador y levante el ensamble para tomar
Torque [lbft]
Optimo
Conexin
26,800
funcionamiento y parmetros.
vuelva a desfogar. Aplique rotacin a la sarta y anote parmetros. Posterior a eso, tome
pesos subiendo y bajando.
16. Contine bajando el liner en agujero abierto a una velocidad de 2 minutos entre cua y
Nota: No trate de hacer pasar el colgador por lugares estrechos, puede ocurrir una
liberacin prematura del colgador si la carga sobrepasa el valor de corte de los
pines (48 klbs efectiva).
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
15
YPFB CHACO
DRO-X1001
SANTA CRUZ
17. Con el ltimo tiro, rompa circulacin a bajo caudal y contine profundizando la
Nota: Una vez la herramienta llegue al fondo del pozo, reciproque la sarta y controle
las presiones de circulacin, esto para evitar posibles pegamientos del colgador.
18. Una vez en fondo, realice el espaciamiento de la sarta de trabajo para permitir la
bbl/min, esto para observar el acoplamiento con el wiper plug. El wiper plug se liberar con
1,350 psi como liberacin primaria. Si el wiper plug no se libera con esta presin inicial,
contine presurizando hasta llegar a 3,150 psi para liberar el tapn por su mtodo
secundario de liberacin.
Nota: Coloque corte de bomba automtico en la unidad de cementacin @ 3,500 psi.
La liberacin primaria del Wiper Plug se logra al cortar 5 pines de bronce (P=F/A= 5
pines x 2,250 lbs/8.33 in2= 1,350 psi).
La liberacin secundaria del Wiper Plug se logra al cortar 8 pines de bronce (P=F/A=
8 pines x 4,700 lbs/11.94 in2= 3,150 psi).
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
16
YPFB CHACO
DRO-X1001
SANTA CRUZ
24. Una vez que el wiper plug sea liberado, cuantifique el volumen controlando el
desplazamiento en el liner.
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
17
YPFB CHACO
DRO-X1001
SANTA CRUZ
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
18
YPFB CHACO
DRO-X1001
SANTA CRUZ
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
19
YPFB CHACO
DRO-X1001
SANTA CRUZ
h. Procedimiento de Recuperacin
h.1.
h.2.
Precedimiento de Recuperacin
i. Validacin y Prueba
i.1.
i.2.
Procedimiento de Prueba
Para poder probar el anclaje del colgador se debe de realizar la correcta expansin de los
elastmeros, observar el incremento de presin en la bomba al momento de asentar el Wiper
Plug en el Landing Collar y su posterior cada de presin indicando el desplazamiento del cono
de expansin, seguidamente se debe de observar retornos por zarandas.
Una vez observados todos estos indicativos se procede a realizar la prueba de anclaje del
colgador. Se realiza tensionando la sarta hasta 100,000 lbs de overpull. Esto nos indica que el
colgador ha sido anclado.
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
20
YPFB CHACO
DRO-X1001
SANTA CRUZ
j. Contingencias
Comunicacin
Si existieran cambios en las condiciones del pozo, procedimientos o requerimientos de
materiales, los siguientes pasos deben ser tomados en cuenta.
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
21
YPFB CHACO
DRO-X1001
SANTA CRUZ
k. Anlisis de Riesgo
k.1. Tabla de Anlisis de Riesgo
Risk Assessment
Project/Well:
Date:
10-10-14
Completed By:
Luis Prest
Risk Description
Cause
Effects
Equipamiento inadecuado,
incorrecto, prdida o dao de
equipamiento en locacin
Lesiones personales
Dao de equipamiento
Incremento de costos para el
cliente
Prdida de revenue
Dao medioambiental
Target
Existing
After Controls
Sev
Prob
RPC
IV
IV
P
E
DT
DC
ENV
P
Mala comunicacin
Uso de incorrecto o informacin
desactualizada.
Cambios en el objetivo
Equipo daado, fallado,
inadecuado, incorrecto
Falla de equipo
Personal incorrecto
Condiciones de pozo inesperadas
E
Lesiones personales
Dao de equipamiento
Incremento de costos para el
cliente
Prdida de revenue
Dao medioambiental
DT
DC
ENV
P
Lesiones personales
Dao de equipamiento
Incremento de costos para el
cliente
Prdida de revenue
Dao medioambiental
E
DT
DC
ENV
I
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
22
Sev
Prob
RPC
YPFB CHACO
DRO-X1001
SANTA CRUZ
Descriptive
Word
Personal
Illness/
Injury
Fatal or
permanent
disabling
injury or
illness
Catastrophic
Critical
Severe Injury
or illness
Marginal
Minor Injury
or Illness
Negligible
No Injury or
Illness
Probability Rating
Equipment
Loss(s)
Environmental
(Any incident that)
A
Frequent
B
Reasonably
Probable
C
Occasional
D
Remote
E
Extremely
Improbable
F
Impossible
>$1,000,000
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
$200,000
to
$1,000,000
>$10,000
to
$200,000
<$10,000
Confidential
23
YPFB CHACO
DRO-X1001
SANTA CRUZ
l. Apendices
l.1.
Especificaciones de Equipos
Value
STANDARD
9 3/8; 9 5/8; 9 7/8
39.0;47.0, 53.5;62.8, 65.1
41XX LOW ALLOY STEEL
FLUOROCARBON RUBBER
40:325
STD
7 5/8-33.70 VAMTOP-HT
PIN
8.375 inch
8.315 inch
7.754 inch
116.50 inch
8.325 inch
6.704 inch
350.57 inch
6526 PSI
4079 PSI
307865 pound
8761 PSI
8340 PSI
703138 pound
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
24
YPFB CHACO
DRO-X1001
SANTA CRUZ
ADPTR,7 5/8-33.70
VAMTOP-HT,BOX X BLNK
Design Specifications
MAXIMUM OD
MINIMUM ID
LENGTH
MATERIAL
MATERIAL YIELD STRENGTH-MIN
TOP CONNECTION
BOTTOM CONNECTION
CONNECTION TYPE
SERVICE
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
Value
8.360 inch
5.485 inch
37.0 inch
41XX LOW ALLOY STEEL
110000 pounds/sq. inch
7 5/8-33.70 VAMTOP-HT
BLANK
BOX-BLANK
STD
25
YPFB CHACO
DRO-X1001
SANTA CRUZ
Design Specifications
CASING SIZE
CASING THREADER
CASING THREAD
CASING WEIGHT
CASING GRADE
BLANK
Plug Assembly Latch ID
OD
ID
LENGTH
NET WEIGHT
BURST PRESSURE
COLLAPSE PRESSURE
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
Value
7
ATLAS BRADFORD
ADVANCED NJO
32
P-110/Q-125
THREADED
3.80
7.192
6.051
19.75
73.2
16495 PSI
14572 PSI
26
YPFB CHACO
DRO-X1001
SANTA CRUZ
COLLAR,FLOAT,7
WSP-3T 29 LBS/FT,P-110/Q125,4-1/4 SUPER SEAL II VALVE
Design Specifications
CASING SIZE
CASING THREADER
CASING THREAD
CASING WEIGHT
CASING GRADE
VALVE SIZE
BLANK
DOUBLE
NR PLUG SEAT
DOWN JET-UP JET
SOLID VANE-REAMER SHOE
TAPERED NOSE
SEALING SLEEVE OR LATCH DOWN
OD
ID
LENGTH
NET WEIGHT
FLOAT EQUIPMENT TYPE
BURST PRESSURE
COLLAPSE PRESSURE
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
Value
7
ATLAS BRADFORD
ADVANCED NJO
32
P-110/Q-125
4-1/4
THREADED
SINGLE
STANDARD
STANDARD
STANDARD
STANDARD
STANDARD
7.192
6.051
23.70
101.4
COLLAR
16495 PSI
14571 PSI
27
YPFB CHACO
DRO-X1001
SANTA CRUZ
SHOE, FLOAT, 7
WSP-3T 29 LBS/FT,P-110/Q-125,4-1/4
SUPER SEAL II VALVE,DOWN-JET
Design Specifications
CASING SIZE
CASING THREADER
CASING THREAD
CASING WEIGHT
CASING GRADE
VALVE SIZE
BLANK
DOUBLE
DOWN JET-UP JET
OD
ID
LENGTH
NET WEIGHT
BURST PRESSURE
COLLAPSE PRESSURE
FLOAT EQUIPMENT TYPE
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
Value
7
ATLAS BRADFORD
ADVANCED NJO
32
P-110/Q-125
4-1/4
THREADED
SINGLE
DOWN-JET
7.192
6.051
24.01
85.1
16495 PSI
14572 PSI
SHOE
28
YPFB CHACO
DRO-X1001
SANTA CRUZ
Design Specifications
Drillpipe Size
Plug Assembly Latch ID
OD
Length
Weight
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
Value
5
1.875
4.50
16.98
2.3
29
YPFB CHACO
DRO-X1001
SANTA CRUZ
Design Specifications
Casing Size
Type
Max Wiping ID
Min Wiping ID
Primary Release Pressure
Contingency Release Pressure
Releasing Dart Latch ID
Landing Collar Latch ID
OD
ID
Length
Weight
Bump Pressure Rating
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
Value
7
Standard
6.54
5.66
1350
3150
1.875
3.800
6.788
1.874
48.53
48.7
6000
30
YPFB CHACO
DRO-X1001
SANTA CRUZ
RUN TL,STD
9 3/8,9 5/8,9 7/8,39.0-62.8
Design Specifications
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
101520346
12OO3474
Value
STANDARD
8.375 inch
432.70 inch
9 3/8;9.625; 9 7/8
39.0;40.0;43.5;47.0;53.5;62.8;65.1
pound/foot
586900 pound
101624139 (59V000005)
192000 pound
15500 foot pound
2.425 inch
API-NC50
4 1/2 8RD
PIN
41XX LOW ALLOY STEEL
STD
275 Deg. F
2.500 inch
STAINLESS STEEL
31
YPFB CHACO
DRO-X1001
SANTA CRUZ
l.2.
Especificaciones de la Caera
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
32
YPFB CHACO
DRO-X1001
SANTA CRUZ
Una llave Allen para abrir la vlvula de liberacin del dardo de la cabeza de cementacin.
Juego de llaves combinadas para retirar las grampas de proteccin de la cabeza de cementacin
en caso que sea necesario.
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
33
YPFB CHACO
DRO-X1001
SANTA CRUZ
ANEXOS
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
34
YPFB CHACO
DRO-X1001
SANTA CRUZ
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
35
YPFB CHACO
DRO-X1001
SANTA CRUZ
Corrida de Liner hasta TD 4,279 mts, No se observa ningn tipo de buckling o esfuerzos laterales
excesivos durante la corrida con los factores de friccin utilizados. A profundidad de TD la
simulacin indica 290 klbs disponibles para tratar de llegar con el liner al fondo del pozo. Tener
en cuenta el valor de corte de los pines (48 klbs)
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
36
YPFB CHACO
DRO-X1001
SANTA CRUZ
Grfica de Torque
La grfica siguiente nos ensea el torque en la sarta a la profundidad de TD, el cual es de
6,000 ft- lbs, observados en superficie. Claramente se puede observar que podemos aplicar
hasta 6,000 ft lbs de torque a la sarta, lo que genera 12,000 ft-lbs en superficie. Lo cual a
profundidad del liner se encuentra dentro del rango de la caera.
Grfica de Peso
Nos ensea los pesos predecibles de las operaciones de corrida y sacada del arreglo en
todo momento y de todos los componentes del arreglo (liner, hanger, drill pipe)
Corrida de Liner hasta TD 4,279 mts, No se observa ningn tipo de buckling problemas con la
tensin en todos los componentes de la sarta.
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
37
YPFB CHACO
DRO-X1001
SANTA CRUZ
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
38
YPFB CHACO
DRO-X1001
SANTA CRUZ
Flujograma de Operaciones
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
39
YPFB CHACO
DRO-X1001
SANTA CRUZ
CORRIDA DE LINER
Preparacin de
programa y armado de
heramientas
Envo de herramientas
y documentacin al
pozo
Si
Llenar formatos
Halliburton-Cliente,
permisos de trabajo y
realizar reunin de
seguridad y preoperacional
Si
Corrida de Liner
llenando cada 5
paradas
Liner Libre?
No
Si
Presenta
restriccin?
No
Liner en Fondo
Si
Liner Libre?
No
Si
Puede sentar a la
profundidad?
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
No
40
YPFB CHACO
DRO-X1001
SANTA CRUZ
CEMENTACION DE LINER
Llega a fondo,
Espaciar Tubera y
conectar Cabezal de
Cementacin
Establecer
circulacin
No
Reciprocar y Rotar
Sarta si es posible
Existe?
Si
Bombear pildora
viscosa, circular hasta
retorno limpio.
Acondicionar lodo de
perforacion
Si
Existe?
No
Bombear
espaciadores y
lechada de cemento
segun diseno
No
Se registra acople
de dardo y tapn
Si
Se registra acople
de dardo y tapn
Si
Completar
desplazamiento
No
No
Sacar sarta con Liner
No
Se registra BUM
de tapones
Permite circulacin?
Si
Si no logra liberar,
realizar back-off
mecnico y planificar
operacion de pesca
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Si
Completar
desplazamiento
Verificar contraflujo en la
unidad de cementacin
Expandir de acuerdo a la
contingencia, gravitar bola.
(ver flujograma de
expansin)
Confidential
41
YPFB CHACO
DRO-X1001
SANTA CRUZ
Se registra BUM
de tapones
No
Si
Presurizar hasta
5500 psi, activar
flapper, igualizar
presin e iniciar
expansin
No
Se registra
incremento de
presin?
Gravitar bola de
asentamiento
Si
Si
Continuar presurizando
a 0.5 bpm y mantener
constante hasta
expandir colgador
Se registra
incremento de
presin
No
No
Activar mecanismo de
liberacion de emergencia
y sacar herramienta de
asentamiento y circular
hasta retorno limpio.
Posteriormente correr otro
colgador con unidad de
sellos y realizar Tie-Back.
Colgador
Expande?
Si
Confirmar asentamiento
tensionando con hasta
100Klbs de overpull
Aplicar peso y liberar
herramienta
No
Herramienta libre?
Si
Si
No
Herramienta libre?
Activar mecanismo de
liberacin de
emergencia
Si
Herramienta libre?
No
Realizar Back-off
mecnico y planificar
operacin de pesca
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
42
YPFB CHACO
DRO-X1001
SANTA CRUZ
YPFB CHACO
Expandable Liner Hanger 7x9 5/8
DRO-X1001
Confidential
43
1.5 m.
BASE VIGAS
SALIDA LODO
ASR = 10.4 m.
CASING 20
1.60 m.
VALVULA 4
2.5 m
LANDING
CASING
13 3/8 BTC
ASR = 10.4 m.
NIPLE
CASING
13 3/8BTC
1.60 m.
BRIDA COMPAERA
13 5/8 5000 PSI
SECCION A
0.47 m
SECCION A
0.36 m
CAO GUIA 20
2.5 m
HYDRILL
13 5/8 10M
10.4 m.
13.5/8-5000
13 5/8 10K
13 5/8 U
10K
CAMERON
11 -5M
DS
5/810K
1313
5/8
5000.
13 5/8
CAMERON
U10K
11 -5M
13 5/8-10K
13 5/8-10K
Spacer Spool
13 5/8-10K
13 5/8-10K
0.77 m.
1.60 m.
Adapter Spool
13 5/8 5K
13 5/8 5K
0.47 m.
SECCION A
0.36 m.
CASING 20
Perforacin 8
NIVEL MR
1.5 m
BASE VIGA
HYDRILL
11 10K
13.5/8-5000
ASR = 10.4 m.
BOP Doble 11 10K
BOP
Doble 11
10K
CAMERON
U 11
-5M
13 5/8 5000.
DSA 11 10K
BOP
Simple 11
10K
CAMERON
U 11
-5M
11 10K
ESPACIADOR
11 10K
11 10K.
0.98 m.
SECCION C
0.74m.
1.60 m.
13 5/8- 5K.
13 5/8 5K
0.47 m.
SECCION A
0.36 m.
CASING 20
ESTADO SUPERFICIAL
1.905 m
0.25 m.
1.66 m.
VAVULA 3 1/16-10 K
BRIDA ADAPT.
0.44 m.
11 10 K
11 10K
SECCION C
0.74 m.
1.60 m.
13 5/8 5K
13 5/8 5K
SECCION A
0.47 m.
0.36 m.
CASING 20
1.5 m.
BASE VIGAS
SALIDA LODO
ASR = 10.4 m.
CASING 20
1.60 m.
VALVULA 4
2.5 m
LANDING
CASING
13 3/8 BTC
ASR = 10.4 m.
NIPLE
CASING
13 3/8BTC
1.60 m.
BRIDA COMPAERA
13 5/8 5000 PSI
SECCION A
0.47 m
SECCION A
0.36 m
CAO GUIA 20
2.5 m
HYDRILL
13 5/8 10M
10.4 m.
13.5/8-5000
13 5/8 10K
13 5/8 U
10K
CAMERON
11 -5M
DS
5/810K
1313
5/8
5000.
13 5/8
CAMERON
U10K
11 -5M
13 5/8-10K
13 5/8-10K
Spacer Spool
13 5/8-10K
13 5/8-10K
0.77 m.
1.60 m.
Adapter Spool
13 5/8 5K
13 5/8 5K
0.47 m.
SECCION A
0.36 m.
CASING 20
Perforacin 8
NIVEL MR
1.5 m
BASE VIGA
HYDRILL
11 10K
13.5/8-5000
ASR = 10.4 m.
BOP Doble 11 10K
BOP
Doble 11
10K
CAMERON
U 11
-5M
13 5/8 5000.
DSA 11 10K
BOP
Simple 11
10K
CAMERON
U 11
-5M
11 10K
ESPACIADOR
11 10K
11 10K.
0.98 m.
SECCION B
0.74m.
1.60 m.
13 5/8- 5K.
13 5/8 5K
0.47 m.
SECCION A
0.36 m.
CASING 20
ESTADO SUPERFICIAL
1.905 m
0.25 m.
1.66 m.
VAVULA 3 1/16-10 K
BRIDA ADAPT.
0.44 m.
11 10 K
11 10K
SECCION C
0.74 m.
1.60 m.
13 5/8 5K
13 5/8 5K
SECCION A
0.47 m.
0.36 m.
CASING 20
Propsito
En el pozo DRO-X1001 de realizarse prueba de la integridad de la formacin (FIT) en
pozo abierto luego de perforar 5 m de formacin nueva por debajo de la caera 13 3/8
, 9 5/8 y Liner 7. El propsito de este ensayo es determinar la presin lmite de trabajo
de la formacin por debajo de la zapata, o la presin ejercida durante los trabajos de
cementacin alrededor de la zapata, y establecer una base para la densidad mxima
equivalente de lodo permisible en la zapata al perforar el siguiente tramo del pozo.
Procedimiento del FIT
El siguiente procedimiento es recomendado para el ensayo de la integridad de la
formacin:
1.
2.
3.
4.
2)
3)
En cada equipo y dos veces por semana se deber calibrar el nivel de las piletas
de lodo (cajones). Y los mismos debern ser registrados en el parte Diario de
Perforacin y en el informe IADC.
Simulacros de cierre de BOPs (procedimientos de cierre) se realizarn
semanalmente en cada equipo de perforacin, este deber incluir la operacin de
manejo de los BOPs y que precauciones se deben de tomar en el caso de que
ingrese algn fluido/gas en el pozo durante la perforacin. Se deber registrar en
el parte Diario de Perforacin y el informe IADC.
Simulacro con cierre de BOPs y circulacin a travs del Choke manifold en el
zapato de la caera de 9.5/8", a realizar en un momento conveniente sin afectar la
integridad del pozo. Se podr repetir si es necesario y se den las condiciones. El
objetivo del ejercicio es proveer capacitacin al personal del equipo en una
situacin real de circulacin de control de pozo con BOPs cerradas. Los ejercicios
se registrarn en el parte Diario de Perforacin y el informe IADC.
2.
3.
4.
5.
3.
4.
5.
6.
7.
Las centrfugas debern estar instaladas de tal manera que se pueda tener un control en
la descarga, de tal manera que el volumen de descarga sea monitoreado para poder
controlar ante un influjo de pozo, an cuando estn operando en el modo de
recuperacin de barita. Esto significa que se tendr que recuperar la descarga para tener
los indicadores sobre los niveles del pozo y puedan ser monitoreados ya sea desde la
plataforma de perforacin o desde la caseta de mud logging.
8. Esperar que las presiones se estabilicen. Leer y registrar la presin esttica por
directas de la sarta y la presin del espacio anular de la caera.
9. Registrar el incremento de fluido en las piletas.
10. El Supervisor de Perforacin de Chaco y el Tool Pusher debern decidir los siguientes
pasos de control a seguir.
Recuerde!
Si se coloca una vlvula de contra presin en la sarta de perforacin, la presin de cierre
dentro el DP. ser cero. En este caso, se debe arrancar la bomba lentamente hasta que la
vlvula de contra presin se abra. La presin esttica del DP. es la presin con la cual se
llego abrir est vlvula (flotador) (Una pequea cada de presin cuando el flotador es
bombeado fuera de su asiento)
Se debe tener conocimiento de la presin mxima permisible de la caera de
revestimiento, la cual deber ser colocada a la vista en la plataforma de operaciones
cuando se est ahogando el pozo para no sobrepasarla.
Procedimiento de Control de Pozo:
Existen dos recomendaciones principales, mientras se ejecuta los procedimientos
de control del pozo:
1. Mantener la presin hidrosttica en fondo mayor a la presin de formacin. En caso de
ser as, se permite el ingreso de mayor cantidad de fluido de formacin hacia el pozo.
2. No se debe permitir el incremento de presin en superficie mientras trata de equilibrar
la presin de la formacin, ya que una presin excesiva en superficie sobrepasara la
presin de fractura de la formacin, se tiene tambin la presin de reventamiento de la
caera de revestimiento y el manifold de control.
De los varios mtodos de control de pozo para lograr una presin de fondo constante, se
recomienda el empleo del Mtodo de circular Esperar y Pesar, tanto desde el punto
de vista para minimizar la presin en superficie como para reducir el tiempo circulacin
que se requiere para controlar el pozo.
Procedimiento:
1. Cerrar el pozo inmediatamente despus de reconocer el amago de reventn, usando
los procedimientos de cierre delineados en las secciones anteriores.
2. Leer y registrar las presiones estticas deL DP. de perforacin (SIDPP) y de la
caera de revestimiento (SICP).
3. Registrar el incremento de fluido en las piletas.
4. Verificar si dentro la sarta de perforacin no quedo presin atrapada, esto realizarlo
mediante la purga de hasta 1 Bbl de fluido por el manifold, para posteriormente
observar las presiones estticas por directa en el DP. y al espacio anular de la
caera de revestimiento.
5. Calcular el PESO DEL LODO DE CONTROL que se requiere para controlar el pozo.
6. Densificar el lodo en el sistema activo en las piletas. Hasta la densidad calculada.
7. Preparar la hoja clculo para el control pozo mientras se densifica el lodo.
8. Abrir el manifold de control mediante el choke regulable en cuanto se arranque la
bomba y est hasta alcanzar la velocidad requerida.
9. Considerar el tiempo de 1 segundo de demora por cada 1000 pies de sarta de
perforacin y el espacio anular de la caera de revestimiento.
10. La presin inicial de bombeo deber ser la presin original del casing SICP
11. Desplazar el lodo de ahogado o control segn al programa de desplazamiento
calculado y la presin de desplazamiento el DP, manteniendo la presin en la caera
por debajo del mximo disponible o el 80% de la presin de reventamiento se
considerar el menor de estos valores.
12. Circular la burbuja de gas o hidrocarburo fuera del pozo manteniendo el rgimen de
bombeo baja.
NOTA: Las presiones de la caera de revestimiento se tornarn errticas cuando el gas
llega a la superficie. Tener mucho cuidado con el manejo en la apertura o cierre del
estrangulador, cuidando en la reaccin.
13. Cuando llegue el lodo de control a superficie, parar el bombeo y realizar un flow
check, las presiones del DP. y del espacio anular de la caera debern ser cero. En
ambas casos.
14. Abrir los BOPs y realizar una circulacin completa. Realice el clculo del margen de
seguridad en la densidad del lodo si la prxima maniobra es sacar la herramienta.
Datos Registrados Disponibles
Es de suma importancia que se mantenga continuamente y al da toda la informacin del
pozo la que debe estar debidamente registrada, esto deber ser consultado previo al
control del pozo por el amago de reventn. Esto ayudar al control del pozo en una forma
mucho mas rpida y segura en el momento en que ocurre el amago de descontrol.
Datos Necesarios que deben ser Registrados: Se recomienda tener los siguientes:
Caudal Reducido
Se debe registrar las presiones del caudal reducido cada vez que se realice una
maniobra, cada vez que existan cambios en las propiedades del lodo, los componentes de
la sarta de perforacin, o se cambia la hidrulica del lodo por cambio de boquillas del
trpano, se debe registrar el caudal reducido para poder adaptarse a las nuevas
condiciones. Tomar los caudales reducidos al menos a dos velocidades diferentes de
bombeo. Se debe registrar la fuerza de friccin existente en la lnea de bombeo al caudal
reducido especialmente cuando se cambia la densidad del lodo.
Caudal de la Bomba
Rutinariamente y en cada maniobra se debe verificar el rendimiento de las bombas,
Bbls/stk.
Altura Sub Rotaria
Se debe tener registrado todo las medidas de los elementos del los BOPs como altura, y
lo mas importante su posicin relativa en funcin de la sarta de perforacin, con la que se
podr saber hasta donde se deber levantar para que dar por encima con una conexin
de la herramienta.
Volumen de la Sarta de Perforacin
Se debe conocer siempre el volumen de la sarta de perforacin para poder calcular la
cantidad de strokes de la bomba desde el trpano hasta la superficie.
Provisiones de Barita
Se debe saber siempre la cantidad de barita que hay en el sitio. La torre de perforacin
debe tener una provisin suficiente de barita en el sitio cuando perforan las secciones del
pozo con presin alta. El ingeniero de lodos debera proveer los clculos en que se
detallan la cantidad de barita requerida.
Lnea de Produccin
del pozo DRO-X1001
www.ypfbchaco.com.bo
Lnea de Produccin
del pozo DRO-X1001
13.375 in
0.380 in
12.459 in
Nominal Weight
12.615 in
n.a.
15.513 in
Wall Thickness
PERFORMANCE
Steel Grade
K55
Minimum Yield
55,000 psi
Minimum Ultimate
95,000 psi
Tension Yield
853,000 in
2,730 psi
Collapse Pressure
1,130 psi
Available Seamless
Yes
Available Welded
Yes
CONNECTION DATA
TYPE: BTC
Coupling Reg OD
GEOMETRY
14.375 in
Threads per in
95,000 psi
2,730 psi
PERFORMANCE
Steel Grade
K55
Joint Strength
1,038,000 lbs
55,000 psi
Technical Specifications
Page 1 of 1
Technical Specifications
Created for Alberto Castelli with Tenaris
Connection Type:
ADVANCED NJO Casing
Size(O.D.):
7 in
Weight (Wall):
29.00 lb/ft (0.408 in)
Grade:
P-110
standard
P-110
110,000
125,000
7.000
6.184
0.408
29.00
28.75
8.449
929,000
8,530
11,220
10,300
7.177
6.099
6.059
3.45
5.887
69.7
Material
Grade
Minimum Yield Strength (psi)
Minimum Ultimate Strength (psi)
Pipe Dimensions
Nominal Pipe Body O.D. (in)
Nominal Pipe Body I.D.(in)
Nominal Wall Thickness (in)
Nominal Weight (lbs/ft)
Plain End Weight (lbs/ft)
Nominal Pipe Body Area (sq in)
7/28/2009 7:43:29 AM
http://www.grantprideco.com/engineering/specsdirect/connQrySpecs.asp?ConnType=ADVANCED+... 28/07/2009
Connection
UPJ
Size
9 5/8"
Wall
0.472"
Weight
47 lb/ft
Grade
P110
87.5%
Nominal OD
9.625
Dimensions, masses
Outside
diameter,
Nominal weight
mm
244.5
47.00 lb/ft
Mechanical Properties
70,0 kg/m
Nominal
Drift
ID
diameter
8.681"
8.525"
Performance properties
Yield
strength (min), ksi
Tensile
strength
(min), ksi
110000
125000
Hydrostatic
Collapse
pressure,
Resistance,
psi
psi
8600
5.300
Pipe
Body
Yield
1,000 lb
Internal
Yield
Pressure,
psi
1.493
9.440
Flank
angle
Sealing element
Angle of
Taper
sealing
Dimensions, masses
Thread
The loss of
length after
Threads
Taper
make up
per in.
5.04"
Performance properties
Joint Strength, 1,000 lb
1500
6.25%
1,79
degrees
10%
2,86
degrees
optimum
15932
maximum
17554
maximum
12750
Simulaciones de
Hydra Jar
YPFB Chaco S.A.
Pozo DRO-X1001
DTR BOLIVIA
Alto Impacto:
Tijera alta en el
BHA
Golpe de Corta
Duracin
Optima en
atrapes
Mecnicos
Fase de 12 1/4
Alto Impacto:
Tijera alta en el
BHA
Golpe de Corta
Duracin
Optima en
atrapes
Mecnicos
Fase de 8 1/2
Alto Impacto:
Tijera alta en el
BHA
Golpe de Corta
Duracin
Optima en
atrapes
Mecnicos
Fase de 6
Fase de 6 - BHA 20 y 21
Alto Impacto:
Golpe de Corta
Duracin
Optima en atrapes
Mecnicos
Gracias..
Verificacin
Fecha
Verificacin
Fecha
CANT.
500 m
2 piezas
5 piezas
1 pieza
1 pieza
1 pieza
30 piezas
60 piezas
1 juego
PROVEEDOR
RESPONSABLE
Weatherford
YPFB 02
YPFB 02
Smith
Weatherford/
San Antonio
MI Swaco
Smith
Smith
M. Salazar
Apolinar Hidalgo
Apolinar Hidalgo
M.Salazar
Carlos Godoy
Smith
M.Salazar
Farsur
Carlos Godoy
Farsur
Carlos Godoy
Intergas
M Salazar
Intergas
Intergas
Intergas
Intergas
Intergas
Intergas
Intergas
YPFB 02
YPFB 02
YPFB 02
YPFB 02
Weatherford
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
Weatherfor o
San Antonio
M Salazar
M Salazar
M Salazar
M Salazar
M Salazar
M Salazar
C. Godoy
Apolinar Hidalgo
Apolinar Hidalgo
Apolinar Hidalgo
Apolinar Hidalgo
M Salazar
C Godoy
C Godoy
C Godoy
C Godoy
C. Godoy
PROVEEDOR
RESPONSABLE
YPFB Chaco
YPFB Chaco
YPFB Chaco
C. Godoy
C. Godoy
C. Godoy
Halliburton
Halliburton
Halliburton
Halliburton
Halliburton
Halliburton
M Salazar
M Salazar
M Salazar
M Salazar
M Salazar
M Salazar
M. Salazar
M.Salazar
M.Salazar
1 juego
2 piezas
Halliburton
Halliburton
M Salazar/
M Salazar
Verificacin
Fecha
CANT.
CABEZALES
DESCRIPCION DE MATERIAL
PROVEEDOR
RESPONSABLE
Verificacin
Fecha
CANT.
PROVEEDOR
RESPONSABLE
NOV Tuboscope
Jhonny Aguirre.
NOV Tuboscope
Jhonny Aguirre.
NOV Tuboscope
Jhonny Aguirre.
lote
5000
Sacos
200
bolsas
Verificacin
Fecha
Verificacin
Fecha
CANT.
1000 m
2 piezas
5 piezas
1 pieza
1 pieza
1 pieza
30 piezas
60 piezas
1 juego
1 juego
2 piezas
1 pieza
2 piezas
Calibrador de Trpano 8 .
Plato de ajuste para trpano 8 Tricono & PDC
Trpano Tricono Dientes 8 IADC 117 c/juego
Boquillas
Trpano 8 PDC MDSi519 + MDSi516 + Back Up,
c/juego de boquillas.
Estabilizador 8 3/8 String, cuerpo 6 conexin
NC 46 (P) x (B)
Estabilizador 12 1/8 Near Bit, cuerpo 6 conexin
4 Reg (B) x 4 XH (B), p/BHA calibracin.
6 DHM 0.78 AKO c/8 3/8 STB, 4 Reg (B) x 4
IF (B)
XO Sub NC 50 (P) x NC 46 (B)
6 Aligment Sub, conexin NC 50 (P) x (B)
XO Sub No Magnetig NC 50 (P) x NC 46 (B)
Monel c/MWD 6 , conexin NC 46 (P) x (B)
Pony Monel 6 , conexin NC 46 (P) x (B)
Float Sub 6 , conexin NC 50 (P) x (B)
Tijera Hidrulica 6 , Conex. NC 50 (P) x (B).
PROVEEDOR
RESPONSABLE
Smith
Smith
Smith
M.Salazar
M.Salazar
M.Salazar
Smith
M.Salazar
Farsur
Carlos Godoy
Farsur
Carlos Godoy
Intergas
M Salazar
YPFB 02
Intergas
Intergas
Intergas
Intergas
Intergas
Intergas
Apolinar Hidalgo
M Salazar
M Salazar
M Salazar
M Salazar
M Salazar
C. Godoy
PROVEEDOR
RESPONSABLE
YPFB Chaco
YPFB Chaco
YPFB Chaco
C. Godoy
C. Godoy
C. Godoy
Halliburton
Halliburton
Halliburton
Halliburton
Halliburton
Halliburton
M Salazar
M Salazar
M Salazar
M Salazar
M Salazar
M Salazar
Halliburton
Halliburton
YPFB Chaco
M Salazar/
M Salazar
C. Godoy
YPFB 02
Apolinar Hidalgo
Verificacin
Fecha
CANT.
CABEZALES
DESCRIPCION DE MATERIAL
PROVEEDOR
RESPONSABLE
Verificacin
Fecha
CANT.
PROVEEDOR
RESPONSABLE
NOV Tuboscope
Jhonny Aguirre.
NOV Tuboscope
Jhonny Aguirre.
lote
5000
Sacos
200
bolsas
NOV Tuboscope
Jhonny Aguirre.
Verificacin
Fecha
Verificacin
Fecha
CANT.
3600 m
2 piezas
5 piezas
1 pieza
1 pieza
50 piezas
100
piezas
3 piezas
2 piezas
Verificacin
Fecha
CANT.
1 pieza
conjunto
1 pieza
PROVEEDOR
RESPONSABLE
Smith
Smith
Smith
M.Salazar
M.Salazar
M.Salazar
Smith
M.Salazar
YPFB 02
Farsur
Apolinar Hidalgo
Carlos Godoy
Farsur
Carlos Godoy
Farsur
Carlos Godoy
Intergas
M Salazar
Intergas
Intergas
Intergas
Intergas
Intergas
YPFB 02
YPFB 02
YPFB 02
YPFB 02
YPFB 02
M Salazar
M Salazar
M Salazar
M Salazar
C. Godoy
Apolinar Hidalgo
Apolinar Hidalgo
Apolinar Hidalgo
Apolinar Hidalgo
Apolinar Hidalgo
PROVEEDOR
RESPONSABLE
YPFB Chaco
YPFB Chaco
YPFB Chaco
C. Godoy
C. Godoy
C. Godoy
Halliburton
Halliburton
Halliburton
Halliburton
M Salazar
M Salazar
M Salazar
M Salazar
Halliburton
Halliburton
YPFB Chaco
M Salazar
M Salazar
C. Godoy
PROVEEDOR
RESPONSABLE
MMA
Apolinar Hidalgo
YPFB 02
Apolinar Hidalgo
YPFB 02
Apolinar Hidalgo
Calibrador de Trpano 12 .
Plato de ajuste para trpano 12 Tricono & PDC
Trpano Tricono Dientes 12 IADC 117 c/juego
Boquillas
Trpano 12 PDC MDSi519 + Back Up, c/juego de
boquillas.
Bit Sub 6 5/8 Reg (B) x 6 5/8 Reg (B)
Estabilizador 12 1/8 String, cuerpo 9 conexin 7
5/8 (P) x (B), p/instalar sobre MF 9 .
Estabilizador 12 1/8 Near Bit, cuerpo 8 conexin 6
5/8 Reg (B) x 6 5/8 (B), p/BHA calibracin.
Estabilizador 12 1/8 String, cuerpo 8 conexin 6
5/8 (P) x (B), p/BHA calibracin.
9 DHM 0.78 AKO c/12 1/8 STB, 6 5/8 Reg (B) x
7 5/8 (P)
9 Aligment Sub
Monel c/MWD 9
Pony Monel 9
Float Sub 9
Tijera Hidrulica 8, Conex. 6 5/8 (P x B).
Bit Sub 4 Reg (B) x NC 46 (B)
HWDP 4 conexin NC46
XO Sub NC 46 (P) x NC 50 (B)
DP 4 16.6 #/ft S-135
DP 5 19.5 #/ft S-135
CABEZALES
DESCRIPCION DE MATERIAL
Seccin C MMA con brida Superior 11- 10M &
Conex. Inferior 13 5/8 5K
BOP 13 5/8 10M: simple + carretel perforacin +
doble + anular
Espaciador 11 10M (para conectar Seccin C con
1 pieza
1 pieza
1 pieza
1 pieza
Verificacin
Fecha
CANT.
lote
5000
Sacos
200
bolsas
BOP 11 10M
Wear Bushing 11 (MMA)
Tapn de Prueba 11 con o rings de Back Up
Pescador/Bajante de Wear Bushing/Tapn
Pipa con conexin inferior brida hechiza para conectar
11 10M, con longitud necesaria para alcanzar a la
viga.
MMA
MMA
MMA
YPFB 02
C. Godoy
C. Godoy
C. Godoy
Apolinar Hidalgo
PROVEEDOR
RESPONSABLE
NOV Tuboscope
Jhonny Aguirre.
NOV Tuboscope
Jhonny Aguirre.
NOV Tuboscope
Jhonny Aguirre.
Verificacin
Fecha
1 pieza
1 pieza
1 pieza
1 pieza
1 pieza
1 pieza
2 piezas
3500 m
12 piezas
4 piezas
12 piezas
1 pieza
CANT.
1 pieza
1 pieza
2 piezas
1 pieza
2 piezas
1 pieza
2 piezas
2 piezas
2 piezas
2 piezas
2 piezas
1 pieza
1 pieza
Verificacin
Fecha
conjunto
1 pieza
1 pieza
1200 m
2 piezas
1 pieza
15 piezas
2 piezas
1 pieza
1 pieza
1 pieza
1 pieza
1 pieza
1 pieza
PROVEEDOR
RESPONSABLE
YPFB Chaco
Smith
Smith
Smith
C. Godoy
M.Salazar
M.Salazar
M.Salazar
Smith
M.Salazar
Smith
M.Salazar
YPFB 02
YPFB 02
YPFB 02
YPFB 02
Farsur
Farsur
Intergas
Apolinar Hidalgo
Apolinar Hidalgo
Apolinar Hidalgo
Apolinar Hidalgo
Carlos Godoy
Carlos Godoy
M Salazar
Intergas
Intergas
Intergas
Intergas
Intergas
YPFB 02
YPFB 02
YPFB 02
YPFB 02
YPFB 02
YPFB 02
YPFB Chaco
M Salazar
M Salazar
M Salazar
M Salazar
C. Godoy
Apolinar Hidalgo
Apolinar Hidalgo
Apolinar Hidalgo
Apolinar Hidalgo
Apolinar Hidalgo
Apolinar Hidalgo
Carlos Godoy
PROVEEDOR
RESPONSABLE
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
YPFB Chaco
Halliburton
Halliburton
Halliburton
YPFB Chaco
Halliburton
YPFB 02 o
YPFB Chaco
Halliburton
C. Godoy
C. Godoy
C. Godoy
C. Godoy
C. Godoy
C. Godoy
M Salazar
M Salazar
C. Godoy
M Salazar/
C. Godoy
YPFB - 02
YPFB 02
Apolinar Hidalgo
Apolinar Hidalgo
M Salazar
2 piezas
Verificacin
Fecha
CANT.
1 pieza
1 pieza
1 pieza
1 pieza
1 pieza
1 pieza
Verificacin
Fecha
CANT.
Sellador de rosca
CABEZALES
DESCRIPCION DE MATERIAL
Seccin A MMA con brida Superior 13 5/8-5M
& Conex. Inferior Torqueada en una pieza corta +/3m de CSG-13 3/8. Con sus vlvulas laterales
roscadas
Colgador para caera 9 5/8 (MMA).
Espaciador/Adaptador de 13 5/8 5M X 13-5/8 10M
(para conectar Seccin A con BOP 13-5/8 10M
Wear Bushing 13 5/8 (MMA)
Tapn de Prueba 13 5/8 con o rings de Back Up
Pescador/Bajante de Wear Bushing/Tapn
Pipa con conexin inferior brida hechiza para
conectar 13-5/8 10M, con longitud necesaria para
alcanzar a la viga.
1 pieza
Tanque de Oro
1 pieza
2 unidad.
1 unidad
1 unidad
1 unidad
1 unidad.
2 unidades
4 unidades
1 unidad
3 unidades
70 m
12 m
1 unidad
1 unidad
lote
3000 Sacos
2 unidades
2 unidades
set
set
Halliburton
M Salazar
PROVEEDOR
RESPONSABLE
MMA
Apolinar Hidalgo
MMA
YPFB 02
Apolinar Hidalgo
Apolinar Hidalgo
MMA
MMA
MMA
YPFB 02
C. Godoy
C. Godoy
C. Godoy
Apolinar Hidalgo
PROVEEDOR
RESPONSABLE
YPFB Chaco
S.A.
Tuboscope
Tuboscope
Tuboscope
Tuboscope
Tuboscope
Jhonny Aguirre
Tuboscope
Jhonny Aguirre
Tuboscope
YPFB Chaco
YPFB Chaco.
Jhonny Aguirre
Jhonny Aguirre
Jhonny Aguirre
YPFB 02
Carlos Godoy
YPFB 02
Carlos Godoy
YPFB Chaco
YPFB 02
Carlos Godoy
Carlos Godoy
NOV Tuboscope
Jhonny Aguirre.
NOV Tuboscope
Jhonny Aguirre.
NOV Tuboscope
YPFB 02
PFM
Jhonny Aguirre.
Jhonny Aguirre.
Jhonny Aguirre.
YPFB 02
Tuboscope
Apolinar Hidalgo
Jhonny Aguirre.
Jhonny Aguirre
Jhonny Aguirre
Jhonny Aguirre
Jhonny Aguirre
Jhonny Aguirre
E-3
E-4
E-5
E-6
E-7
E-8
CATEGORY
HOISTING EQUIPMENT
DRAW WORKS
MAST
SUBSTRUCTURE
TRAVELING ASSY
DRILLING LINE
TOP DRIVE
KELLY
KELLY GUARD VALVES
SWIVEL
ROTARY TABLE
PUMPING AND HIGH PRESSURE DISCHARGE SYSTEM
MUD PUMPS
HIGH PRESSURE MUD LINES
CEMENT MANIFOLD
PRIME MOVERS / TRANSMISSION / ELECTRIC
Diesel Engines
Generators (SCR system)
Generators
Emergency Generator
Air Compressors
BLOW OUT PREVENTOR
Diverter 30"
Diverter lines
BOP 21 1/4"
Annular
Ram type Preventers
BOP 13 5/8"
Annular
Ram Type Preventers
BOP 11"
Annular
Ram Type Preventers
Rams Sizes
Drilling Spools
CHOKE MANIFOLD
KILL LINE
PAGINA
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
3
3
E-9
E-10
E-11
E-12
E-13
E-14
E-15
E-16
F
F-1
F-2
F-3
F-4
F-5
F-6
F-7
F-8
F-9
F-10
G
G-1G-2
G-3
G-4
G-5
CHOKE LINE
PRESSURE UNIT AND CONTROL
PORTABLE TEST UNIT
TEST STUMP
MUD/GAS SEPARATOR
INSIDE BOP
CIRCULATING SIDE ENTRY SUB
DSA AND SPACER SPOOL
BOP HANDLING DIVICE
DRILL STRING
5" DP
3 1/2" DP
DP Pup Joints 5" and 3 1/2"
Heavy Weight
5"
3 1/2"
DRILL COLLAR
11" DC
9 1/2" DC
8" DC
6 1/2" DC
4 3/4" DC
3 1/8" DC
TRICONE BIT BREAKER
SUBS
HANDLING TOOLS
IRON ROUGHNECK
EZ-TORQUE
FISHING TOOLS
Overshot
Spears
Baskets TO OH 17 1/2", 12 1/4", 8 1/2"
Reverse circulating basket
17 1/2"
12 1/4"
8 1/2"
6"
Magnet
12 1/4"
8 1/2"
6"
CASING TOOLS
3
3
3
3
3
3
3
3
3
3
3
3
3
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
5
5
5
5
5
5
5
5
5
5
5
5
G
G-1
G-2
G-3
G-4
G-5
G-6
G-7
G-8
G-9
G-10
G-11
G-12
H
I
J
K
L
M
N
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
Archivo
A-2
MAST
A-3
SUBSTRUCTURE
A-4
TRAVELING ASSY
A-5
DRILLING LINE
B
B-1
ROTARY
TOP DRIVE
YPFB CORPORATION
YPFB 01
SCZ
NINGUNO
NUEVO
NUEVO
MODELO ZJ70D/VDF-MCC
7000 metros con Sondeo 4.1/2".
2000 HP.
DESCRIPTION
Electrical
2000 HP.
Diesel Electric
Dynamic and Electromagnetic.
2000 HP
1,300,00 lbs.
Auto Driller Siemens.
YM-16 2 Unidades
K telescopic
45,7 metros.
1,300,000 lbs.
1,300,000 lbs.
590 Ton.
5 Roldanas.
7000 metros con Sondeo 4.1/2".
yes
Autoelevable.
34 pies.
590 Ton.
1,300,000 lbs.
YC 675
675 Ton.
RG
1.1/2" pulg.
Cuatro Bobinas c/u de 1,600 mts.
Manufacturer
Model
Load rating Ton.
CANRIG
1275 AC-750
750 Ton.
Bi-directional
Pipe Handler
HP
Stem Speed RPM
Torque Ft-Lbs
B-2
KELLY
B-3
hydraulic actuationncan be
start/stopped anywhere along 90 plane, Link-tilt
clamps for 500 and 750 ton elevator links
1150 HP
256 RPM
51,400 lbs/ft
Hexagon.
5 1/4" y 3.1/2".
NC-50
Two / 5,000 psi.
B-4
SWIVEL
Manufacturer
Load Rating Ton.
Kelly cock
Kelly spinner
Rotary Hose Length/Rating
RG
450 Ton.
si
No tiene
2 unidades de 5M PSI de 27mt.
B-5
ROTARY TABLE
ZP-375
37 1/2"
Electrical.
1,600 HP.
Archivo
C
C-1
C-2
C-3
CEMENT MANIFOLD
D
D-1
D-2
D-3
D-4
D-5
E
E-1
E-2
E-3
BOP 13 5/8"
Annular
E-4
BOP 11"
Annular
E-5
Rams Sizes
Location
Cement Stand pipe
Solid piping
Hose type
1,300,000 lbs.
300RPM
F-1600
3 ea.
Electrical.
1600 hp
specify
1000 PSI-1500 PSI
1 VAL. POR BOMBA
specify
3"
4 1/16" 5M PSI
4 1/16" 5M PSI
NO
NO
NO
NO
CAT - 4 unidades.
CAT - 3512 B
1,310 Kw.
CATERPILLAR
4 unidades.
1,714 Kva - 1,200 Kw.
4
CAT 3512 B
1,714 Kva - 1,200 Kw.
455 Kva 339 Kw
21.1/4" SHENKAI
No
2000 psi.
No
No
No
No
No
No
Size
Type Single
Pressure Rating
SHENKAI
13 5/8"
Simple
10,000 psi
13.5/8" - 10,000 psi.
13 5/8" (SHENKAI)
Doble / Blind + pipe rams.
10,000 psi
13 3/8", 9 5/8", 7", 5 1/2", 5" 4 1/2", 3 1/2" ,2
7/8", 2 3/8"
Ram Pipe
10000 psi
SHENKAI
11"
Simple
10,000 psi
11"- 10,000 psi.
11"
Doble / Blind + pipe rams.
10,000 psi
13 3/8", 9 5/8", 7", 5 1/2", 5" 4 1/2", 3 1/2" ,2
7/8", 2 3/8"
Simple/ Blind + pipe rams.
10,000 psi
No
Size
Type
Pressure Rating
Bottom conn.
Size
Type Double
Pressure Rating
Size
Type
Pressure Rating
Size
Type
Pressure Rating
Bottom conn.
Size
Type Double
Pressure Rating
Archivo
Drilling Spools
E-7
CHOKE MANIFOLD
E-8
KILL LINE
E-9
CHOKE LINE
E-10
E-11
E-12
E-13
TEST STUMP
MUD/GAS SEPARATOR
E-14
INSIDE BOP
E-15
E-16
E-17
F
F-1
DRILL STRING
5.1/2" DP
F-2
3 1/2" DP
F-3
10,000 PSI
4 1/16" 10M PSI
(1) Manual.
(1) Check.
4 1/16" 10M PSI
(1) Mechanic valve & (1) Hydraulic valve
FKQ128-7
338 Galones
18 Bottles.
si
si
3 Unidades.
2 Staciones.
si
2 unidades.
2 unidades.
Si Modelo F35-70F54-14
15,000 psi
Yes
Atmosferico
30" pulg
4" y 2" pulg
10" pulg
SHUANGJIA
NC-50
NC-38
1
1
Si
5 1/2" FH y 3 1/2" IF
2
si
5 1/2" FH x 1502 Weco
10,000psi
1
SI
NO
NO
NO
Type
Weight
Grade
Conn.
Tool joint OD
Pin ID
Hardbanding
length (m)
HILLONG
5.1/2" HILLONG.
24,7 lbs/pie.
S-135
5.1/2" FH.
7.1/2"
4,670
7.5/8"
5,500 m
Type
Weight
Grade
Conn.
Tool joint OD
Pin ID
Hardbanding
length (m)
Type
Conn.
3.1/2" HILLONG.
15.5 lbs/pie.
S-135
3.1/2" IF.
4.3/4"
2,602
4.7/8"
2.000 m
5.1/2" & 3.1/2"
5.1/2" FH & 3.1/2" IF.
Archivo
F-4
Heavy Weight
5.1/2"
3 1/2"
F-5
DRILL COLLAR
11" DC
9 1/2" DC
8" DC
6 1/2" DC
4 3/4" DC
3 1/8" DC
F-6
F-7
F-8
F-9
F-10
SUBS
HANDLING TOOLS
IRON ROUGHNECK
EZ-TORQUE
Tool joint OD
Pin ID
length (Ft)
Hardbanding (NO)
7 1/2"
4 .778"
5 Ft, 10 Ft, 15 Ft cada uno.
NO
Type
Weight
Grade
Conn.
Tool joint OD
Pin ID
Hardbanding
Quantity
Type
Weight
Grade
Conn.
Tool joint OD
Pin ID
Hardbanding
Quantity
OD
ID
Conn.
Quantity
Spiral Grooved
Lift Shoulder
Slip Recess
OD
ID
Conn.
Quantity
Spiral Grooved
Lift Shoulder
Slip Recess
OD
ID
Conn.
Quantity
Spiral Grooved
Lift Shoulder
Slip Recess
OD
ID
Conn.
Quantity
Spiral Grooved
Lift Shoulder
Slip Recess
OD
ID
Conn.
Quantity
Spiral Grooved
Lift Shoulder
Slip Recess
OD
ID
Conn.
Quantity
Spiral Grooved
Lift Shoulder
Slip Recess
BIT SIZE 24", 17 1/2", 12.1/4"
8 1/2", 6.1/8"
Bit Sub, XO Sub,
11" HILLONG
3"
8.5/8" Regular.
6
SI
SI
SI
9.1/2" HILLONG
3"
7.5/8" Regular.
9
Si
SI
SI
8" HILLONG
2.13/16"
6.5/8" Regular
18
si
SI
SI
6.1/2" HILLONG
2.13/16"
4.1/2" IF
30
Si
SI
SI
4.3/4" HILLONG
2,25"
3.1/2"IF
30
Si
SI
SI
3.1/8" HILLONG
1.3/4"
NC-23
15
Si
NO
NO
SI
SI
SI
SI
NO
YM-16 (2 unidades)
FISHING TOOLS
Archivo
G-1-
Overshot
To fish all CONTRACTOR furnished drilling
tools
SI
G-2
Spears
G-3
NO
G-4
NO
NO
NO
NO
G-5
MAGNET
OH 12 1/4"
OH 8 1/2"
OH 6"
SI
SI
NO
CASING TOOLS
Provide complete list of casing running tools
20", 13 38", 9 5/8", 7", 5"
Provide complete list of tubing running tools
3 1/2", 2 7/8", 2 3/8"
G
G-1
G-2
G-3
G-4
Trip tank
G-5
Water tank
G-6
Fuel tanks
G-7
G-8
SI
SI
Hopers
Low pressures pumps
Turbo shear Equipment
Quantity
Total capacity
Pill tank
Level Indicator
Con agitadores.
Dos en cada cajon de lodo
si
si
4 unidades de 484 Bbls cada uno.
2004 Bbl
SI
SI
Quantity
Total Capacity
Capacity
Level Indicator
Quantity
Total Capacity
Quantity
Total Capacity
Quantity
Make and Type
Max Flow Rate
Screen Size
2 cajones lodo
1000 Bbl
100 Bbl
Si
2 unidades
1300 Bbl
4 tanques
1300 Bbl
3 unidades
Derrick Mongoose Dual Motion
1200 gpm
SI MENOR A 100 MESH
Maker Quantity
Type
Max. Flow Rate
Screen size
NO
NO
NO
NO
G-9
Desander
G-10
Desilter
G-11
Mud Cleaner
Type
No. Of cones - sizes
Max. Flow Rate
Quantity
Type
No. Of cones - sizes
Max. Flow Rate
Quantity
Type
No. Of cones - sizes
Max. Flow Rate
Derrick
4 conos de 8"
1200 gpm
1
Derrick
20 conos ( 2x10" y 12 x 4")
1200 gpm
1
BRANDT ( 3 EN 1)
DESANDER 2 ( 12"), DESILTER 16 ( 4")
960 GPM
G-12
Degasser
Vacum Type
Capacity
See Floo
1460 gpm
Archivo
PARAMETERS RECORDING
CAMP FACILITIES
Operator bed space in the camp
Operator Office in the rig
FORK LIFT
M
N
RADIO COMMUNICATION
POWER MOUSE HOLE
BULK STORAGE TANKS
DOWNTIME (Maintenance service)
Top Drive
Rig
SI
AMERICAN INNOVATIONS
SI
SI
NO
SI
Total
Segn Contrato
Company man
YPFB Eng.
Geologist
Additional Ware house, Co Man
Assitance
SI
SI
SI
SI
SI
SI
SI
SI
SI
SI
Grua autotransportable
35 Ton
Pala Cargadora
5 Ton
NO
No
NO
10 unidades (Motorola)
No
Dos Silos
Nuevo
Nuevo
Nuevo
Make Type
capacity
MakeType
capacity
Pumps
Power Supply
1500 m to Water Supply
BLU, VHF, & Phone, 10 Handys
2 Beds, WC
2 Beds, WC
Archivo
10
Archivo
11
Archivo
12
Archivo
13
Archivo
14
Archivo
15
YPFB
Chaco S.A.
Sistema de Manejo
de Incidentes
Procedimiento
Revis y Autoriz
Mario Catari
Contenido
1.
2.
3.
4.
5.
Prepar:
Rudy Ustarez
Henry Riveros
Objetivo
Alcance
Responsabilidades
Desarrollo
Documentos
Distribucin
- Va Intranet de YPFB Chaco S.A.
Este documento es custodia del departamento de SSA de YPFB Chaco S.A., su modificacin est prohibida y su vigencia es vlida al momento de su impresin.
Fecha de impresin: 17/12/2014
YPFB
Chaco S.A.
Sistema de Manejo
de Incidentes
Procedimiento
Prepar:
Rudy Ustarez
Henry Riveros
Revis y Autoriz
Mario Catari
1. Objetivo
Dar respuesta a cualquier tipo de incidente de manera eficaz y eficiente reduciendo al
mnimo los efectos negativos sobre el personal propio y comunidad, medio ambiente e
instalaciones propias y ajenas.
2. Alcance
Cubre la respuesta a emergencia del Pozo: DRO-X1001 para los siguientes eventos:
1) Evacuacin por emergencia mdica,
2) Derrame de fluidos que contienen hidrocarburos.
3) Incendio y/o explosin en el equipo de perforacin.
3. Responsabilidades
3.1. Gerente Operativo
Verificar el cumplimiento de este procedimiento y asegurara que se realicen simulacros
en sus reas operativas para verificar una respuesta adecuada de toda la logstica en
caso de necesidad.
3.2. Comandante del Sitio del Incidente (Company Man o Delegado)
Responsable por organizar, administrar en forma segura y efectiva las operaciones de
respuesta en el sitio del incidente, mantener informado al Equipo de Manejo de
Incidentes de la situacin del incidente y las operaciones de respuesta.
Funciones
Asume el puesto de comando tctico.
Activa los miembros del equipo de respuesta tctica.
Alerta al personal en el rea sobre el origen y lugar del incidente.
Asegura el conteo de personal en el punto de encuentro.
Establece una red de comunicaciones.
Evala la situacin e identificar los problemas que el personal de respuesta tctica
necesita manejar,
Desarrolla una estrategia de accin.
Este documento es custodia del departamento de SSA de YPFB Chaco S.A., su modificacin est prohibida y su vigencia es vlida al momento de su impresin.
Fecha de impresin: 17/12/2014
YPFB
Chaco S.A.
Sistema de Manejo
de Incidentes
Procedimiento
Prepar:
Rudy Ustarez
Henry Riveros
Revis y Autoriz
Mario Catari
YPFB
Chaco S.A.
Sistema de Manejo
de Incidentes
Procedimiento
Prepar:
Rudy Ustarez
Henry Riveros
Revis y Autoriz
Mario Catari
YPFB
Chaco S.A.
Sistema de Manejo
de Incidentes
Procedimiento
Prepar:
Rudy Ustarez
Henry Riveros
Revis y Autoriz
Mario Catari
incidente.
Evala los daos a las instalaciones afectadas.
Suministra informacin sobre los recursos requeridos al Encargado del Depsito
Transitorio.
Proporciona al Comandante del Sitio del Incidente reportes peridicos
actualizados.
Acopie y mantenga la necesaria documentacin.
3.7. Lder de Tarea
Responsable de llevar a cabo en forma segura las delegaciones y asignaciones
recibidas del Comandante del Sitio del Incidente
Funciones
Colabora al Comandante en el sitio del Incidente en dimensionar la situacin y en
desarrollar soluciones para afrontar los problemas.
Recibe delegacin y asignacin del Comandante del Sitio del Incidente.
o
o
o
o
o
o
o
o
Tipo de asignacin.
Objetivos a ser alcanzados.
Lugar de la asignacin.
Riesgos.
Requisitos de Equipo de Proteccin Personal.
Requisitos de descontaminacin.
Cantidad y tipo de recursos asignados.
Procedimientos de comunicacin.
YPFB
Chaco S.A.
Sistema de Manejo
de Incidentes
Procedimiento
Prepar:
Rudy Ustarez
Henry Riveros
Revis y Autoriz
Mario Catari
Epidemia.
Accidente areo o terrestre.
Problemas climticos / desastres naturales.
Fuego en las oficinas o instalaciones.
Descontrol de pozo.
Derrame de combustible.
Radiaciones peligrosas.
Escape de gas H2S.
Amenaza de bomba.
Explosin.
Rotura de Tubera.
Escape de gas.
Emergencia poltica.
Ataque terrorista / rehenes.
Actividades revolucionarias.
Disturbio o guerra civil.
Actos criminales.
4.1. Procesos y Procedimientos
4.1.1. ROL DE EVACUACION MDICA MEDEVAC
4.1.1.1. ACCIONES INICIALES:
ACTIVACIN DEL EQUIPO DE RESPUESTA TCTICA
El testigo del incidente notifica la emergencia al Comandante del Sitio del Incidente
directamente o a travs de algn representante de YPFB Chaco (Company Man,
operador, u personal de YPFB Chaco).
El Comandante del Sitio del Incidente activa el rol de Medevac coordinando con
el mdico del sitio.
Las acciones inmediatas del mdico son prestar asistencia mdica primaria y
evaluar si se requiere su evacuacin a Santa Cruz, de requerir colaboracin se
deber poner en contacto con el mdico de Oficina de YPFB Chaco a fin de
determinar si es necesaria una evacuacin urgente o no, asimismo debe mantener
Este documento es custodia del departamento de SSA de YPFB Chaco S.A., su modificacin est prohibida y su vigencia es vlida al momento de su impresin.
Fecha de impresin: 17/12/2014
YPFB
Chaco S.A.
Sistema de Manejo
de Incidentes
Procedimiento
Prepar:
Rudy Ustarez
Henry Riveros
Revis y Autoriz
Mario Catari
Este documento es custodia del departamento de SSA de YPFB Chaco S.A., su modificacin est prohibida y su vigencia es vlida al momento de su impresin.
Fecha de impresin: 17/12/2014
YPFB
Chaco S.A.
Procedimiento
Sistema de Manejo
de Incidentes
Prepar:
Rudy Ustarez
Henry Riveros
Revis y Autoriz
Mario Catari
YPFB
Chaco S.A.
Procedimiento
Sistema de Manejo
de Incidentes
Prepar:
Rudy Ustarez
Henry Riveros
Revis y Autoriz
Mario Catari
Se activa la brigada de Seguridad Fsica del Sitio compuesta por los vigilantes que
se encargan de controlar el acceso al sitio del incidente.
Se activa el Rol del Punto de Reunin que alerta al personal del rea mediante
una alarma audible (bocinazos cortos intermitentes) que debe dirigirse al punto de
reunin siguiendo el procedimiento.
Se debe enviar el reporte de 24 horas a la Gerencia de SSA-RC, segn el
procedimiento.
El jefe de Tarea de Derrame establece:
El tipo y cantidad de producto(s) derramado(s) o emitido(s) mediante las hojas de
seguridad de cada producto MSDS (Material Safety Data Sheet)
La respuesta tctica sea por Contencin mecnica o Qumica mediante
dispersantes,
El jefe y brigada de la Tarea de Seguridad del Sitio establece:
Evaluacin y determinacin de las zonas de control de riesgo ZCR
Evaluacin fuera del sitio que es el anlisis del rea usando planos,
inventario de productos.
Evaluacin en el sitio que es la verificacin de atmsferas explosivas,
ambientes carentes de oxigeno o con exceso del oxigeno, concentraciones
txicas.
Defina las zonas de control de riesgos ZCR como:
Zona Caliente o Exclusin
Zona Tibia o Corredor de Reduccin de Contaminacin
Zona Fra o de Apoyo
Caracterice el Equipo de Proteccin Personal adecuado en grados como:
A: Mximo grado de proteccin para la piel, los ojos y aparato respiratorio
B: El mismo grado de proteccin para el aparato respiratorio, menor grado de
proteccin para la piel.
C: El mismo grado de proteccin para la piel, menor grado de proteccin para el
aparato respiratorio.
D: Sin proteccin respiratoria, proteccin de la piel limitada.
Establecer el o los mtodos y procedimiento(s) de descontaminacin que pueden
ser:
Este documento es custodia del departamento de SSA de YPFB Chaco S.A., su modificacin est prohibida y su vigencia es vlida al momento de su impresin.
Fecha de impresin: 17/12/2014
YPFB
Chaco S.A.
Procedimiento
Sistema de Manejo
de Incidentes
Prepar:
Rudy Ustarez
Henry Riveros
Revis y Autoriz
Mario Catari
YPFB
Chaco S.A.
Sistema de Manejo
de Incidentes
Procedimiento
Prepar:
Rudy Ustarez
Henry Riveros
Revis y Autoriz
Mario Catari
Este documento es custodia del departamento de SSA de YPFB Chaco S.A., su modificacin est prohibida y su vigencia es vlida al momento de su impresin.
Fecha de impresin: 17/12/2014
YPFB
Chaco S.A.
Sistema de Manejo
de Incidentes
Procedimiento
ANEXO A.
Prepar:
Rudy Ustarez
Henry Riveros
Revis y Autoriz
Mario Catari
Comunicaciones en la Emergencia
EMERGENCIA
COMANDANTE
DEL SITIO DEL
INCIDENTE
MEDEVAC
INCENDIOS
PROBLEMAS SOCIALES
DERRAMES
RADIO
RADIO CHACO
CHACO
TEL.
TEL. 3510700
3510700
Frecuencia
Frecuencia 6930
6930 U.S.B.
U.S.B.
Flujo de comunicacin en caso de emergencias para el Comandante del Sitio del Incidente
Este documento es custodia del departamento de SSA de YPFB Chaco S.A., su modificacin est prohibida y su vigencia es vlida al momento de su impresin.
Fecha de impresin: 17/12/2014
YPFB
Chaco S.A.
Procedimiento
Sistema de Manejo
de Incidentes
ANEXO B.
Prepar:
Rudy Ustarez
Henry Riveros
Revis y Autoriz
Mario Catari
Flujograma de comunicacin
|
Este documento es custodia del departamento de SSA de YPFB Chaco S.A., su modificacin est prohibida y su vigencia es vlida al momento de su impresin.
Fecha de impresin: 17/12/2014
YPFB
Chaco S.A.
Prepar:
Rudy Ustarez
Henry Riveros
Procedimiento
Sistema de Manejo
de Incidentes
B O L IV IA
Revis y Autoriz
Mario Catari
ANEXO C.
ROL DE INCENDIOS EQUIPO
COORDINADOR
JEFE DE EQUIPO
COMPANY
MAN
BRIGADA AUXILIAR
Jefe de Equipo
Mecanico
Perforador
Electricista
Enganchador
Chofer
A. B. P.
Administrador
Medico
FUNCIONES
Ataque directo a la base
SANTA CRUZ
Pare de Bombas
Pare de Motores
Extinguidores porttiles
Equipo de espuma AFFF
Extinguidores de carro
FUNCIONES
RADIO - OPERADOR
Corte de Energia
GERENTE GENERAL
SUPERINTENDENTE
DEPARTAMENTO DE HSE
Cierre de valvulas en
tanques de combustible
Control de la entrada de
vehiculos y visitantes
ATENCION
UBIQUE EL FOCO DEL INCENDIO E INICIE EL TRABAJO DE EXTINCION
COMUNIQUE A LA BASE INDICANDO LA GRAVEDAD
SIGA LAS INDICACIONES DEL JEFE DE EQUIPO
ALEJE DEL AREA DE INCENDIO COMBUSTIBLE O EQUIPO VALIOSO
SIEMPRE COMBATA EL FUEGO CON UNA VIA DE ESCAPE A SU ESPALDA
LOS EXTINGUIDORES PORTATILES SOLO SON UTILES PARA COMBATIR INCENDIOS
EN SU ETAPA INICIAL
Este documento es custodia del departamento de SSA de YPFB Chaco S.A., su modificacin est prohibida y su vigencia es vlida al momento de su impresin.
Fecha de impresin: 17/12/2014
YPFB
Chaco S.A.
Procedimiento
Sistema de Manejo
de Incidentes
Prepar:
Rudy Ustarez
Henry Riveros
Revis y Autoriz
Mario Catari
ANEXO D.
ROL DE INCENDIOS PARA
CAMPAMENTOS
COORDINADOR
Administrador de Campamento
BRIGADA DE ATAQUE
Administrador de cocina
Cocinero
BRIGADA AUXILIAR
JEFE DE
EQUIPO
Ayudantes de cocina
MEDICO
DEL
EQUIPO
Mucamo
FUNCIONES
Mantenimiento
Ayudante de lavanderia
Chofer del turno
Operarios del Catering
RADIO-OPERADOR
FUNCIONES
tablero principal
Extinguidores portatiles
Pico y Pala
Defensa con arena
Control de ingreso de
GERENTE GENERAL
SUPERINTENDENTE
DEPARTMENTO DE HSE
vehiculos y visitantes
al campamento
ATENCION
Ubique el foco del incendio y proceda a extinguirlo
Caomunique a la base indicando la gravedad
Siga las indicaciones del Administrador del campamento
Retire del area del incendio combustibles y equipo valioso
Siempre ataque el fuego con una salida de escape a su espalda
Los extinguidores portatiles solo sirven para combatir incendios en su etapa inicial
Este documento es custodia del departamento de SSA de YPFB Chaco S.A., su modificacin est prohibida y su vigencia es vlida al momento de su impresin.
Fecha de impresin: 17/12/2014
YPFB
Chaco S.A.
Sistema de Manejo
de Incidentes
Procedimiento
ANEXO E.
Prepar:
Rudy Ustarez
Henry Riveros
Revis y Autoriz
Mario Catari
WGS-84
UTM
20 K
487720 m
7954953 m
Este documento es custodia del departamento de SSA de YPFB Chaco S.A., su modificacin est prohibida y su vigencia es vlida al momento de su impresin.
Fecha de impresin: 17/12/2014
YPFB
Chaco S.A.
Sistema de Manejo
de Incidentes
Procedimiento
Prepar:
Rudy Ustarez
Henry Riveros
Revis y Autoriz
Mario Catari
Este documento es custodia del departamento de SSA de YPFB Chaco S.A., su modificacin est prohibida y su vigencia es vlida al momento de su impresin.
Fecha de impresin: 17/12/2014
0'
Area
Protegida
Ambor
Are
Prot a
eg
Amb ida
o r
15'
18 0" S
PEJI
La Guardia
0" S
17 45'
RO GRANDE
O GUAPAY
Pailn
LOS
SAUCES
40+0 00
QUEBRADA
ESTANCIA
VILLA FLORIDA
A.URB.(SIN
CAT.)
BASILIO
FLORIDA
50+0 00
55+0 00
PERCHELES
Samaipata
60+0 00
45+0 00
TARUMA
SAN LUIS
Santa
Cruz de la
Sierra
35+0 00
A.URB.(SIN
CAT.) DON
LORENZO
A.URB.(SIN
CAT.)
PAURITO
PALMAR
EL ESPINO
560000
ALMENDRO
COMUNIDAD
VILLA
PARAISO
COMUNIDAD
VILLA FLOR
20+0 00
COMUNIDAD
TIQUIPAYA
COMUNIDAD BERMEJO
A.URB.(SIN
CAT.) LA
ANGOSTURA
Samaipata
NARANJILLOS
Cotoca
30'
62 0" W
ZANJA
HONDA
RIO
GRANDE
Santa
Cruz
E
65+0 00
Cabezas
Charagua
70+0 00
RIO SECO
0" S
18 0" S
8000000
Mairana
PUERTO
RICO
LIMONCITO
El Torno
Area a
egid
Prot o r
Amb
00
+0
15
El Torno
PALMAR
VIRUEZ
A.URB.(SIN CAT.) KM 12
KM 12
ZONA
VALPARAISO
COMUNIDAD
QUEBRADA
SECA COMUNIDAD
PEDRO
LORENZO
SANTA MARTHA
SAMARIA
PUEBLO NUEVO
TAROPE
0 00
30+
Area
Protegida
Ambor
La Guardia
10
+0
00
DE PROBOSTE
rea Naval N
Cotoca
LA CRUCEA
EL BISITO
2 "Santa Cruz"
El Trompillo ARROYITO
Km 0+000
0
00
5+
AMBORO
ESPEJOS
NORTE
COMUNIDAD
POZO
COLORADO
PORONGO
CIUDAD COTOCA
45'
62 0" W
8000000
LA GUARDIA
Porongo
(Ayacucho)
ZONA
CALLEJAS
520000
0" S
SANTA CRUZ
Area a
egi d
Prot o r
Amb
Buena
Vista
0'
63 0" W
480000
18 0'
15'
63 0" W
25
+0
00
45'
17 0" S
30'
63 0" W
440000
18 15'
45'
63 0" W
75+0 00
Postrer
Valle
POSTRER
VALLE
85+0 00
EL DORADO
OESTE
7960000
AMBORO
ESPEJOS
SUR
EL
DORADO
87+0 36
DRO-X1001
E
0
63 45'
440000
0" W
MAPA DIRECCIONAL
SANTA CRUZ - PCH-DRD
POZO DRO-X1001
63 30'
0" W
63 15'
Simbologia
"
Escala 1:600,000
?
!
Capitales Municipales
S
"
Capitales Departamentales
Aeropuerto
F
G
Punto de Referencia
20
520000
0" W
30
40
62 45'
0" W
Peaje
Parque Nacional
Rio Intermitente
Municipio
Puente
Rio Permanente
Via Red Secundaria
Brasil
Beni
La Paz
Departamento
Coch abamba
Sant a
Cruz
Oruro
Ch ile
Poto si
560000
Mapa de Ubicacion
Km
0" W
Peru
!
$
"
50
62 30'
Pand o
Pista
Puerto Fluvial
10
63 0'
0" W
Centros Poblados
I
4
m
J
c
J
480000
0" S
Postrer
Valle
80+0 00
18 30'
30'
18 0" S
7960000
Quirusillas
Poto si
Chuquisaca
Para guay
http://s igserver/sigwebfacilidades/?extend=326700,8016500,493000,8116500
3050
3400
3012
3435
3414
3421
3417
3428
3410
721-43410
Aravena Claudia
Burga Sergio
Calzadilla Liseidy
Bejarano Kim Victor
Lazaro Evanz
Quispe Wilfredo
Rosales Adolfo
Fax E&D
SMG - X 1
Company Man
Gelogo
Fiscal - Geolgo-Asist.Ing.Jr. Almacenero
Asistente
DRO- 1002
Company Man
Fiscal
Gelogo
Asist. Ing. Jr.
Almacenero
Telfono satelital de JNE . X 1000
Telfono satelital de INGRE
3426
3416
722-00670
730-87742
721-55705
724-48444
729-07458
710-19703
763-60089
3171
3419
3411
3474
3475
3450
366-3820
366-3821
366-3822
366-3823
3820
3821
3822
3823
366-3830
3830
366-3832
3832
366-3833
3833
366-3831
3831
366-3831
3831
8816-3145-5706
8816-2247-8168
3850 o 3851
121
3880
3881
3882
366-3810
366-3880
366-3881
366-3882
366-3811
366-3881
7500-01251
716-39861
PERFORACION (PISO 5)
721-22280
721-23428
766-72262
728-82642
766-19922
721-23433
716-21708
773-47828
716-30154
721-10084
721-23432
773-50222
3500
721-33676
3700
721-03727
Aguirre Jhonny
Aponte Cristian
Castro Romy
Dvalos Ricardo
3520
3536
3508
3522
3510
716-81574
726-88617
721-57002
716-20551
721-43954
3701
3750
721-00004
366-3750
3505
3506
3512
3517
731-25925
716-56033
3533
3530
709-51550
721-46552
716-30524
721-33517
736-42283
763-26446
753-99171
600-98324
716-96552
721-33667
3736
3727
3429
3725
3733
3702
3703
3750
716-43955
750-18650
Escalante Cecilia
Godoy Carlos (Materiales)
Gonzles Oscar
Hidalgo Apolinar
Meja Augusto
Montao Mayra Dolly
Nota Guzmn Freddy
Pattzy Alvaro
Pedrazas Omar
Pozo Roxana
Rojas Danny
Salazar Omar
Salazar Marcelo
Surez Adolfo
Torrez Adiel
3527
3540
3541
3534
3523
770-37311
778-33542
784-52545
763-82482
763-23212
3730
3705
3739
3722
3714
3735
716-51538
763-49707
707-71298
798-92013
773-49071
731-20082
3521
3514
688-04017
770-41929
710-81602
3724
3710
3717
3711
3716
3721
3712
3664
3732
3713
3660
3661
3675
3674
3677
721-90465
773-03009
773-95394
708-31224
755-48001
776-18167
770-21084
766-20485
716-20000
780-21988
721-33702
716-95078
736-62200
721-34231
775-82002
3679
3065
3673
3672
3680
3668
3681
3676
700-40241
721-33519
721-13204
721-43672
687-06051
721-43005
785-63550
710-33103
Escalera Rubn
Torrico Robert
Torrico Ruddy
Vallejos Adolfo
CONTRATISTAS
Justiniano Miguel (Tuboscope)
Tarqui Ysaas (CoMan)
3501
3535
721-13600
713-46462
710-28307
Rivero Guido
Fax Perforacin
Bulo Bulo
Carrasco
Sala de Control Cel. Carrasco
INGRE
CAIGUA
Los Cusis
CAMPOS
3424
3407
3433
3431
3476
3422
3418
3432
3444
3450
3414
3423
366-3050
785-00916
715-35658
763-55298
730-40286
Raimondeau Mario
Patujusal
Santa Rosa
Montecristo
Percheles
Percheles Sala de Control
Percheles Sala de Reunin
San Roque
Vuelta Grande
3550
773-73603
366-3550
716-22015
366-3850
716-33570
3850
722-44656
8816-2247-8168
8816-3145-5706
750-01251
PRODUCCION (PISO 6)
Fax Gerente
Sagrnaga Edgar (Piso 5) 710-19704
Lopez Videla Juan Federico
Vera Melean Marcelo
Blanco Misael
Cespedes Ariel
Michel Marcelo
Hinojosa Milka
Schutt Eid Julo
Sivila Franco
Villarroel Julio Cesar
Espinoza Freddy
Ferrufino Fernando
Cirbian Alonso
Cruz Luis
Jorgin Jhonny
Robles Mario
Solz Jaime
Fax E&D
Blanco Adbel (Practicante)
Salazar Armando (Practicante)
760-07561
608-90222
366-3866
3866 - 106
366-3865
366-3860
773-16960
366-3880
366-3881
366-3882
(04)693-7600
366-3870
3865 - 108
3860 Int. 101
710-77013
3880
3881
3882
3870 Int. 115
3870
366-3870
366-3870
4693-7696
3678
3670
366-3670
366-3678
3005
3006
3016
CONS.
GENERAL
MEDICO
GERENCIA DE
PLANTA KANATA
POZOS
EXPLORACION
GERENCIA DE DESARROLLO
GERENCIA
Ustarez Rudy
366-3750
3671 721-19496
Dom. 322-6643
Vega Katia
3345
721-02020
3069
721-10034
770-77632
3069
3069
3066
3069
3069
763-24560
763-03252
710-35004
721-53770
710-33101
721-08999
3204
3063
3050
3770
3776
3771
3779
3930
3790
3773
3778
Fax Legal
Rondales Vidal Roberth
Crespo Ral Ernesto
3780
3107
3142
366-3780
713-44804
721-16208
Fax C & ET
Vasquez Salazar Alvaro Sergio
Arce Valeria
Bustillos Shirley
Camacho Nelson
Chvez Norminha
Flores Ximena
Hinojosa Luis Antonio
Rioja Alejandro
Rossell Silvana
Seleme Ana Carola
Surez Roberto
Toledo Oscar
Fax Comercial
Retamoso Carlos (Piso 6)
Aguilera Ninon
Bullan Freddy
Castro Rafael
HELP DESK
Alvarez Oscar
Alfaro Claudia
Cabrera Felipe
Farah William
Garcia Maria de los Angeles (Angie)
Limn Camacho Yasmany
Mndez Cristian
Montao Limbert
Peinado Carlos
Sagrnaga Pamela
Villarroel Marcelo
3050
3600
3612
3610
3177
3720
3175
3723
3617
3604
3601
3630
3616
3650
3300
3319
3303
3305
3333
366-3050
721-33688
721-23612
721-63610
721-32100
710-19706
705-90575
776-99360
3333
3316
3311
3333
3304
3333
721-13604
709-37212
755-40487
721-23616
366-3650
721-23300
796-94272
721-13303
716-47815
721-04000
710-91000
721-43131
708-33635
FINANZAS (PISO 7)
710-33100
780-03675
721-43790
763-25624
706-14820
3900
3904
3910
721-29499
766-03555
677-03920
Terceros Carlos
Zabala Andres Roberto
Oscar Mariscal (Seguro Mdico)
3122
3220
3209
713-31602
760-62505
700-59400
Cespedes Katia
Cuellar Jaime
Flores Marbelia
3917
3913
3914
721-14700
721-33913
Gambarte Kenia
Guzman Nelcy
Laura Llorenty Yaneth
Lpez Anglica
Menacho Ena
Nogales Ana Isabel
3907
3923
3918
3922
3905
3906
721-33922
721-24953
721-34606
3901
3912
3918
Fax RR.HH.
3250
Andrade Rosmery
Miranda Guardia C. Judia
0
3103
Rodriguez Manfred
TROPICAL TOURS ( Yohana Ramirez)
Fax SS.GG.
3104
3114
3151
3109
3222
3223
Alba Sonia
Argandoa Miguel
Espinoza Hernn
Gil Danny
Huarani Jhonny
Limachi Maria Del Carmen
Lpez Pilar
Mollinedo Vladimir Ernesto
Oliver John
Ramirez Juan
Sndico
Soraire Claudia Patricia
Soria Galvarro Lily
Surez Jorge
Vargas David
Taborga Tatiana
Sala de Reuniones
LPZ
3333
3333
3333
3307
3301
721-13061
677-10494
762-04046
650-17301
366-3050
721-20013
721-53065
710-45440
721-22536
Fax Finanzas
Edgar Alarcn(LPZ) Interno 6006
Rodolfo Jimenez
Fax Oficina La Paz
Sindico YPFB CHACO
343-7427
366-3233
3100
3121
3140
3117
3119
3116
3124
3115
3135
3132
3126
3137
3101
3131
3112
3133
3118
3150
(02)244-0886
(02)244-0886
(02)244-0856
3015
721-13304
Actualizada al 1 de Diciembre 2014
Planta Baja 3155
773-44589
713-40055
691-91063
366-3151
710-91911
763-25644
366-3222
716-22061
700-95226
710-44919
760-01112
731-59920
726-86167
721-55548
770-41442
721-23131
608-22914
776-80090
3102
721-64180
750-04429
366-3250
3062
3200
3201
3205
366-3150
720-22099
705-85917
343-4536
TRANSPORTES (ALMACENES)
Unidad de Comunicacin
Ayala Alvaro
7)
716-53577
SIND.
3775
STPCH
OPERACIONES COMERCIALES
INFORMATICA Y TECNOLOGIA
GERENCIA DE PLANIFICACION Y
AUDITORIA
LEGAL
Unidad de Transparencia
Quiroga Ana Mara
RECURSOS HUMANOS
677-03748
721-96603
3921
3916
4700
4712
4709
4705
4716
780-28766
708-16911
4707
4715
4718
4714
4713
4711
4703
4702
4704
4720
4717
4701
4721
750-09895
763-49649
721-05005
721-24954
708-18645
760-01029
721-14605
726-97889
344-2224
4444
345-9700
345-9700
760-43274
780-07072
766-01046
4740
780-84000
780-04357
780-03326
760-01716
760-02294
708-27727
766-23335
780-04358
785-00636
763-06611
770-39567
760-14150
763-65069
763-47705
721-59007
763-47705