Anda di halaman 1dari 39

INSPECTION LOG BOOK

PT. Sertco Quality


Page : 1 / 10

PROJECT / CONTRACT : PRODUCTION SEPARATOR / BETARA


COMPLEX DEVELOPMENT (PRESSURE VESSEL INSPECTION)
Client : PetroChina Jabung Limited

SQ Job Ref. : SQ-014-15

End User : PetroChina Jabung Limited

ITEMS / SUBJECT TO BE INSPECTED :


RADIOGRAPHY TEST RESULT VERIVICATION DURING CONSTRUCTION :
- V210
- V220
- V230
- V240
- V250
- V910
- V920
- V930

Welding Joint
See continuation sheet Yes No
Manufacturer : PT. Prakarsa Langgeng Maju Bersama (PLMB)
See continuation sheet Yes No

DOCUMENTS OF REFERENCE :
Title :

Detail :

INSPECTION LOG BOOK


PT. Sertco Quality
Page : 2 / 10

RT Film

See continuation sheet

Yes No

INSPECTION
1.

INSPECTION PLACE :
PT. PLMB, Banten - Indonesia

2.

INSPECTION DATE :
August 18, 2015

3.

STAGE OF INSPECTION
A.
B.
C.
D.
E.

V210
Welding Joimt (L1, L2, C1, C2 & C3 )
V220
Welding Joint (L1, L2, C1, C2 &C3 )
V230
Welding Joint (L1, L2, C1, C2 & C3 )
V240
Welding Joint (L1, L2, C1 & C3 )
V250
Welding Joint (L1, L2, C1 & C3 )
V910
Welding Joint (L1, L2, C1, C2 & C3 )
V920
Welding Joint (L1, L2, C1, C2 & C3 )
V930
Welding Joint (L1, L2, C1, C2 & C3 )

Verification RT Film
Verification Material Plate
Verification Wall Thickness
Verification Plate Rolling
Witness Cutting

4. DOCUMENT REVIEW :
RT Film
5. KIND OF INSPECTION
RT Film Verification & Inspection During Construction
6. Type of Activity
- See detail at continuation sheets
7. ATTENDANCE

PT. Sertco Quality :


- Rahmad Desman
PT. PLMB
- Djudjuk Djunaidi
- Ari Prima

8. NEXT VISIT SCHEDULED :


T.B.A
ATTACHMENT
Yes (Total number of pages : 6 )

ATTACHMENT

Verification RT filmV210

Verification RT filmV220

Verification RT filmV230

rification RT filmV240

Verification RT filmV250

Verification RT filmV910

Verification RT filmV920

Verification RT filmV930

Surveillance performed by

Rahmad Desman

Inspection Center : PT. Sertco Quality


Diffusion :

1. PT. SQ Office

2. Client

3. Manufacturer

Anda mungkin juga menyukai