PROJECT / CONTRACT : PRODUCTION SEPARATOR / BETARA

COMPLEX DEVELOPMENT (PRESSURE VESSEL INSPECTION)

SQ Job Ref. : SQ-014-15

INSPECTION LOG BOOK

Client : PetroChina Jabung Limited

End User : PetroChina Jabung Limited

ITEMS / SUBJECT TO BE INSPECTED :


VERIFICATION DESIGN, MATERIAL, DIMENSIONAL, SHIPPING AFTER CONSTRUCTION :

SeparatorSkid
See continuation sheet Yes No
Manufacturer : PT. Gerbang Sarana Baja (GSB)
See continuation sheet Yes No

DOCUMENTS OF REFERENCE :
Title :
Visual Inspection as per Petrochina inernational
Jabung Design Spesification
See continuation sheet

Yes No

Detail :
-

Container Skid (Separator System)

INSPECTION
1

INSPECTION PLACE :
PT. Gerbang Sarana Baja (GSB) - Indonesia

2 INSPECTION DATE :
August 27, 2015
3 STAGE OF INSPECTION
A

B
C
D

4 DOCUMENT REVIEW :

INSPECTION
LOG BOOK
Visual Inspection

Verification Design Spec.


Vessel Part
Piping System
Instrument System
Verification Material Spec.
Verification Dimensional Spec
Verification Shipping

5 KIND OF INSPECTION
Visul Verification After Construction and Hydrotest.
6 Type of Activity
- See detail at continuation sheets
7 ATTENDANCE

PT. Sertco Quality :


- Rahmad Desman
PT. Alam Bersemi Sentosa
- Ramdhoni W. Baskoro

1. NEXT VISIT SCHEDULED :


T.B.A
ATTACHMENT
Yes (Total number of pages : 9 )

ATTACHMENT

Posisi Valve harus dapat harus dapat diakses dengan mudah

Penambahan Drain sehingga mudah dalam pengeluaran air

Pressure Vessel Part

Piping connection from Pressure Vessel

Tambahkan Valve agar mudah dalam melakukan service Meteringnya

Pressure Vessel Support and Piping Skid

Container Piping Skid

Surveillance performed by

Rahmad Desman

Inspection Center : PT. Sertco Quality


Diffusion :

1. PT. SQ Office

2. Client

3. Manufacturer