NO
TENAGA KERJA
A. UPAH
1
Mandor Lapangan
Mekanik
Kepala Tukang
Tukang Batu / Kayu / Gali / Besi / Cor / Semen / Cat / Listrik / Pancang
Operator terlatih
Sopir
NO
MATERIAL
SATUAN
KODE
B. BAHAN PENGISI
1
Batu Kong
M.101
M.020
M.022
M.023
M.024
M.025
M.026
10
Filler
Kg
11
Chipping
12
Chipping
Kg
13
NO
MATERIAL
SATUAN
KODE
14
Aspal
Kg
15
Pasir
M.040
16
Semen PC
Zak
M.080
17
Semen PC
Kg
18
M.050.a
19
M.050
20
Paving Block
Bh
21
Paving Stone
Bh
22
Bh
23
Bataco 15 x 30 x 7 cm
Bh
24
Bh
25
Bh
26
Terawang ( roster ) 18 x 18 cm
Bh
27
Keramik 20 x 20 cm
Kotak
28
Keramik 30 x 30 cm
Kotak
29
Keramik 30 x 30 cm Unpolished
Kotak
30
Keramik 30 x 30 cm Artistik
Kotak
31
Keramik 40 x 40 cm (biasa)
Kotak
32
Kotak
33
Keramik 40 x 40 cm Unpolished
Kotak
34
Granito 40 x 40 cm
Kotak
35
Marmer
36
Wood Flooring
37
Bh
38
39
Keramik dinding 20 x 20 cm
40
Keramik dinding 20 x 25 cm
41
Floor Hardener
Kg
42
43
44
45
46
47
48
Gulung
Btg
Btg
Btg
Btg
NO
MATERIAL
SATUAN
KODE
53
Btg
54
55
NO
MATERIAL
SATUAN
KODE
C.
BAHAN KAYU
M.181.a
M.181.b
10
11
12
13
M.181.e
14
M.181.d
15
M.181.f
16
M.181.g
17
18
19
20
21
M.181.h
22
M.181.i
23
24
25
26
27
28
29
30
31
32
33
34
35
M.181.j
36
M.181.k
37
NO
MATERIAL
SATUAN
KODE
38
39
M.181.l
40
Papan Simpiran
41
Btg
42
Btg
43
Btg
44
Btg
45
Btg
46
Btg
47
48
Btg
D.
BAHAN CAT
Amplas
Lbr
Minyak cat
Kg
Cat kilat
Kg
Plamur
Kg
Cat dasar
Kg
Cat tembok
Kg
Kg
Cat seng
Kg
Dempul
Kg
10
Plitur
Kg
11
Thiner
Ltr
M.090.f
12
Thiner ND
Ltr
13
Melamic
Ltr
14
Vernis
Ltr
15
Meni
Kg
16
Oker
Kg
17
Lem Kayu
Kg
18
Sealent
Tube
19
Soda Api
Kg
20
Kg
21
Teak Oil
Ltr
22
Ter / Residu
Ltr
23
Kuas 4"
Bh
24
Ltr
M.090.e
25
Glass Bit
Kg
M.090.g
26
Kg
M.090.h
NO
MATERIAL
SATUAN
KODE
Kg
M.167
27
Termoplast
E.
Kg
Kg
Kawat baja/bendrat
Kg
M.168
Simpai roll
Kg
Kawat simpai
Kg
Btg
M.163
Besi Penahan
bh
Beugel plat L. 3 cm
bh
Bh
10
Kg
11
Besi Konstruksi ( C )
Kg
12
Kg
NO
MATERIAL
SATUAN
KODE
13
Kawat Las
Btg
14
Kawat Las
Kg
15
Kawat harmonika
16
Kawat kasa
17
Btg
18
Btg
19
Btg
20
Btg
21
Btg
22
Btg
23
Btg
24
Btg
25
Folding gate
26
Meter
27
Meter
28
Unit
29
30
Alumatek
F.
BAHAN PENGANTUNG
1
2
Unit
Bh
Kait angin
Bh
Handle
Bh
Engsel jendela
Bh
Engsel pintu
Bh
Slot pintu
Bh
Slot jendela
Bh
Bh
Bh
10
Bh
11
Bh
12
Kunci silinder
Bh
13
Door Closer
Bh
14
Door Stoper
Bh
15
Paku Seng
Kg
M.166.a
16
Kg
M.166.b
17
Paku beton
Kg
18
Kg
M.166.c
19
Paku triplek
Kg
NO
20
MATERIAL
SATUAN
KODE
Paku GRC
Kg
21
Paku Zincallume
Kg
22
Sekrup Gypsum
Kg
23
Sekrup Fixer
Bh
Bh
24
Engsel Angin
G.
BAHAN ATAP
Sirap belian
Lbr
Asbes
Lbr
Eternit
Lbr
Lbr
Lbr
Lbr
Lbr
M'
10
11
Bh
12
Meter
13
Meter
14
Lbr
15
Lbr
16
Lbr
17
Lbr
18
M'
19
Lbr
20
21
22
23
24
Lbr
25
Aluminium Foil
H.
BAHAN KACA
Kaca Polos, t = 5 mm
Kaca Rayben, t = 5 mm
Kaca Patri
NO
MATERIAL
SATUAN
KODE
Sealent
Kg
Bh
Bh
Kaca Es
I.
BAHAN TRIPLEK
Triplek t = 3 mm
Lbr
Triplek t = 6 mm
Lbr
Triplek t =9 mm
Lbr
Multiplek t = 10 mm
Lbr
Multiplek t = 12 mm
Lbr
Lbr
Lbr
GypsumBoard t = 9mm
Lbr
NO
MATERIAL
SATUAN
KODE
J.
BAHAN SANITASI
Bh
Bh
Bh
Bh
Bh
Bh
Btg
Btg
Btg
10
Btg
11
Btg
12
Btg
K.
Minyak solar
Ltr
M.183
Ltr
Bensin premium
Ltr
M.184
Minyak pelumas
Ltr
M.185
Ltr
Minyak tanah
Ltr
M.064
Ltr
Gas Elpiji
Kg
Alat-alat bantu
Set
M.170
10
Jam
11
Sewa Molen
Set
12
Set
L.
Unit
Unit
Unit
Unit
Unit
Set
Set
Set
Set
Tiang
NO
MATERIAL
SATUAN
KODE
Tiang
Btg
Btg
Tiang
Tiang
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Set
Set
26 Traffo
Buah
27 Traffo
Buah
28 Traffo
Buah
29 Traffo
Buah
30 Traffo
Buah
31 Traffo
Buah
32 Traffo
Buah
33 Traffo
Buah
34 Traffo
SON T 70 Watt
Buah
35 Traffo
Buah
36 Traffo
Buah
37 Traffo
Buah
38 Traffo
SON H 70 Watt
Buah
39 Traffo
HPiT 400
Buah
40 Traffo
Neon 40 Watt
Buah
41 Traffo
Neon 20 Watt
Buah
42 Traffo
Neon 10 Watt
Buah
43 HPL
400 Watt
Buah
44 HPL
250 Watt
Buah
45 HPL
125 Watt
Buah
46 SOX
135 Watt
Buah
47 SOX
180 Watt
Buah
48 MLL
160 Watt
Buah
Buah
NO
MATERIAL
SATUAN
KODE
Buah
Buah
Buah
Buah
Buah
Buah
Buah
57 SON H 70 Watt
Buah
Buah
Buah
Kotak
61 Seri Kuning
Kotak
62 Neon Sen
Meter
63 Pijar 5 Watt
Buah
64 Pijar 20 Watt
Buah
65 Pijar 25 Watt
Buah
NO
MATERIAL
SATUAN
KODE
66 Pijar 40 Watt
Buah
67 Pijar 60 Watt
Buah
68 Pijar 75 Watt
Buah
69 Pijar 80 Watt
Buah
Buah
Buah
72 Neon 40 Watt
Buah
73 Neon 20 Watt
Buah
74 Neon 10 Watt
Buah
Set
Buah
Buah
78 Lampu XL 14 Watt
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
95 Lampu Taman
Buah
96 SL 15 Watt
Buah
97 SL 18 Watt
Buah
98 SL 25 Watt
Buah
99 TL Rina 32 Watt
Buah
Buah
Buah
Buah
Buah
Buah
NO
MATERIAL
SATUAN
KODE
105 NYY
1 x 1.5 mm
Meter
106 NYY
1 x 2.5 mm
Meter
107 NYY
1 x 4 mm
Meter
108 NYY
1 x 6 mm
Meter
109 NYY
2 mm
Meter
110 NYY
2 x 2.5 mm
Meter
111 NYY
2 x 4 mm
Meter
112 NYY
2 x 6 mm
Meter
113 NYY
2 x 10 mm
Meter
114 NYY
3 x 4 mm
Meter
115 NYY
4 x 2.5 mm
Meter
116 NYY
4 x 4 mm
Meter
117 NYY
4 x 6 mm
Meter
118 NYY
4 x 10 mm
Meter
119 NYY
4 x 16 mm
Meter
120 NYY
4 x 25 mm
Meter
121 NYY
4 x 35 mm
Meter
122 NYY
4 x 50 mm
Meter
123 NYY
4 x 70 mm
Meter
124 NYYFYGBY 4 x 6 mm
Meter
125 NYYFYGBY 4 x 10 mm
Meter
126 NYN
2 x 2,5 mm
Meter
127 NYN
3 x 1,5 mm
Meter
128 NYN
3 x 2,5 mm
Meter
129 NYA
1 x 1,5 mm
Meter
130 NYA
1 x 2,5 mm
Meter
131 NYA
1 x 4 mm
Meter
132 NYA
1 x 6 mm
Meter
133 NYA
2 x 2,5 mm
Meter
134 NYA
2 x 4 mm
Meter
135 NYA
2 x 30 mm
Meter
136 NYA
4 x 6 mm
Meter
137 NYA
1,5 mm
Meter
138 NYA
4 mm
Meter
139 NYA
10 mm
Meter
140 NYA
16 mm
Meter
141 NYF6BY 4 x 10 mm
Meter
142 NYF6BY 4 x 16 mm
Meter
143 NYF6BY 4 x 25 mm
Meter
NO
MATERIAL
SATUAN
KODE
144 NYF6BY 4 x 35 mm
Meter
145 NYF6BY 4 x 50 mm
Meter
146 NYF6BY 4 x 70 mm
Meter
147 NYM
4 mm
Meter
148 NYM
3 x 4 mm
Meter
149 NYM
2 x 2 mm
Meter
150 NYM
2 x 4 mm
Meter
151 NYM
2 x 2,5 mm
Meter
152 NYM
2 x 1,5 mm
Meter
153 NYM
3 x 1,5 mm
Meter
154 NYM
3 x 2,5 mm
Meter
155 NYM
3 x 10 mm
Meter
156 NYM
4 x 2,5 mm
Meter
157 NYM
4 x 4 mm
Meter
Meter
NO
SATUAN
KODE
Meter
Buah
Buah
Buah
Buah
Roll
Meter
Meter
Roll
Meter
Roll
170 Kabel H / M
Meter
Meter
Meter
173 Kabel TC 2 x 10 mm
Meter
174 Kabel TC 2 x 16 mm
Meter
Buah
Buah
Buah
Buah
179 Conector
Buah
Buah
181 Esensial
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
193 Icnitor SN 58
Buah
194 Inector
Buah
195 Ignator
Buah
196 Indiktor
Buah
197 Insuluk
Buah
MATERIAL
NO
MATERIAL
SATUAN
KODE
198 Kapasitor
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
208 MCB 25 A
Buah
209 MCB 63 A
Buah
210 MCB 40 A
Buah
211 MCB 45 A
Buah
212 MCB 50 A
Buah
213 MCB 10 A
Buah
214 MCB 16 A
Buah
215 MCB 6 A
Buah
216 MCB 2 A
Buah
217 MCB 4 A
Buah
218 MCB 32 A
Buah
Buah
Buah
221 MC Se-3 N
Buah
Buah
Buah
224 NH Fuse 80 A
Buah
Buah
Buah
Buah
Buah
Buah
230 On - Off
Buah
231 Pat 38
Buah
Buah
Batang
Batang
Batang
Batang
NO
MATERIAL
SATUAN
KODE
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Unit
Buah
Buah
Buah
Buah
Buah
NO
MATERIAL
SATUAN
KODE
Buah
Buah
Buah
254 Sekring 63 A
Buah
Buah
256 Solder
Buah
Buah
Buah
Buah
260 Steker T
Buah
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
Buah
Bungkus
Steker PH
Sadel No. 6
Sadel No. 8
Sadel No. 9
Sadel No. 10
Sadel No. 12
Sadel No. 14
Sadel No. 19
Sadel No. 22
Skun RS-16
Stater
Ston 63 A
Stost 40 A + Ip
Stost 32 A + Ip
Tedus Hitam
Tali Tester
Tang Amper
Tang Buaya
Tang Potong
Tang Kombinasi
Tang Jepit
Tang Skun
Time Swicht Theben
Taping
Taping Conector 1 baut
Taping Conector 2 baut
Tespen
Timah Solder
Terminal 25 ml
Tolkit
Wedge Klem
Wide Klem
WD 40
Bungkus
Bungkus
Bungkus
Bungkus
Bungkus
Bungkus
Bungkus
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
NO
MATERIAL
M.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
SATUAN
KODE
Buah
Buah
Roll
Roll
Buah
Unit
Unit
Buah
Buah
Buah
Pasang
Pasang
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Unit
Buah
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
NO
MATERIAL
SATUAN
KODE
TENTANG
RGA SATUAN BAHAN UPAH
I BANGUNAN GEDUNG DAN PERUMAHAN
AHUN ANGGARAN 2010
HARGA
TANPA
SATUAN
KODE
HARGA TERMASUK
KEUNTUNGAN
KEUNTUNGAN
KEUNTUNGAN
(OVERHEAD)
(OVERHEAD)
(OVERHEAD)
(Rp)
(Rp)
(Rp)
Org/hari
L.061
60,500.00
6,050.00
66,550.00
Org/hari
L.071
60,500.00
6,050.00
66,550.00
Org/hari
L.073
60,500.00
6,050.00
66,550.00
Org/hari
L.079
55,000.00
5,500.00
60,500.00
Org/hari
L.081
49,500.00
4,950.00
54,450.00
Org/hari
L.082
44,000.00
4,400.00
48,400.00
Org/hari
L.091
49,500.00
4,950.00
54,450.00
Org/hari
L.101
44,000.00
4,400.00
48,400.00
Org/hari
L.106
49,500.00
4,950.00
54,450.00
HARGA DI
JARAK
ONGKOS
LOKASI
ANGKUT
ANGKUT
TANPA
RATA-RATA
PER UNIT
KEUNTUNGAN
KEUNTUNGAN
KEUNTUNGAN
(km)
(Rp)
(OVERHEAD)
(OVERHEAD)
(OVERHEAD)
(Rp)
(Rp)
(Rp)
(Rp)
HARGA
HARGA TERMASUK
146,700.00
###
14,670.00
161,370.00
195,500.00
###
19,550.00
215,050.00
209,300.00
###
20,930.00
230,230.00
223,700.00
###
22,370.00
246,070.00
228,300.00
###
22,830.00
251,130.00
257,900.00
###
25,790.00
283,690.00
297,300.00
###
29,730.00
327,030.00
322,500.00
###
32,250.00
354,750.00
339,300.00
###
33,930.00
373,230.00
550.00
###
55.00
600.00
306,000.00
###
30,600.00
336,600.00
170.00
###
17.00
180.00
337,600.00
###
33,760.00
371,360.00
HARGA DI
LOKASI
(Rp)
JARAK
HARGA
ONGKOS
ANGKUT
ANGKUT
TANPA
RATA-RATA
PER UNIT
KEUNTUNGAN
KEUNTUNGAN
KEUNTUNGAN
(km)
(Rp)
(OVERHEAD)
(OVERHEAD)
(OVERHEAD)
(Rp)
(Rp)
(Rp)
HARGA TERMASUK
9,000.00
###
900.00
9,900.00
52,100.00
###
5,210.00
57,310.00
64,000.00
###
6,400.00
70,400.00
1,280.00
###
128.00
1,400.00
104,600.00
###
10,460.00
115,060.00
165,000.00
###
16,500.00
181,500.00
2,000.00
###
200.00
2,200.00
3,300.00
###
330.00
3,630.00
2,300.00
###
230.00
2,530.00
900.00
###
90.00
990.00
2,300.00
###
230.00
2,530.00
2,100.00
###
210.00
2,310.00
2,500.00
###
250.00
2,750.00
45,569.44
###
4,556.94
50,120.00
36,391.67
###
3,639.17
40,030.00
49,500.00
###
4,950.00
54,450.00
58,300.00
###
5,830.00
64,130.00
64,900.00
###
6,490.00
71,390.00
87,500.00
###
8,750.00
96,250.00
89,500.00
###
8,950.00
98,450.00
172,200.00
###
17,220.00
189,420.00
412,500.00
###
41,250.00
453,750.00
250,000.00
###
25,000.00
275,000.00
220,000.00
###
22,000.00
242,000.00
42,500.00
###
4,250.00
46,750.00
45,800.00
###
4,580.00
50,380.00
49,900.00
###
4,990.00
54,890.00
7,500.00
###
750.00
8,250.00
620,000.00
###
62,000.00
682,000.00
655,000.00
###
65,500.00
720,500.00
721,000.00
###
72,100.00
793,100.00
797,000.00
###
79,700.00
876,700.00
862,000.00
###
86,200.00
948,200.00
40,000.00
###
4,000.00
44,000.00
10,400.00
###
1,040.00
11,440.00
1,050,000.00
###
105,000.00
1,155,000.00
1,350,000.00
###
135,000.00
1,485,000.00
900,000.00
###
90,000.00
990,000.00
1,005,000.00
###
100,500.00
1,105,500.00
HARGA DI
LOKASI
(Rp)
JARAK
HARGA
ONGKOS
ANGKUT
ANGKUT
TANPA
RATA-RATA
PER UNIT
KEUNTUNGAN
KEUNTUNGAN
KEUNTUNGAN
(km)
(Rp)
(OVERHEAD)
(OVERHEAD)
(OVERHEAD)
(Rp)
(Rp)
(Rp)
HARGA TERMASUK
125,200.00
###
12,520.00
137,720.00
50,000.00
###
5,000.00
55,000.00
350.00
3,850.00
3,500.00
HARGA DI
LOKASI
(Rp)
JARAK
HARGA
ONGKOS
ANGKUT
ANGKUT
TANPA
RATA-RATA
PER UNIT
KEUNTUNGAN
KEUNTUNGAN
KEUNTUNGAN
(km)
(Rp)
(OVERHEAD)
(OVERHEAD)
(OVERHEAD)
(Rp)
(Rp)
(Rp)
HARGA TERMASUK
8,851,200.00
###
885,120.00
9,736,320.00
10,421,400.00
###
1,042,140.00
11,463,540.00
8,239,300.00
###
823,930.00
9,063,230.00
8,500,500.00
###
850,050.00
9,350,550.00
7,185,400.00
###
718,540.00
7,903,940.00
7,378,500.00
###
737,850.00
8,116,350.00
6,700,700.00
###
670,070.00
7,370,770.00
8,122,500.00
###
812,250.00
8,934,750.00
10,811,100.00
###
1,081,110.00
11,892,210.00
9,792,000.00
###
979,200.00
10,771,200.00
8,750,000.00
###
875,000.00
9,625,000.00
8,593,750.00
###
859,375.00
9,453,120.00
15,416,700.00
###
1,541,670.00
16,958,370.00
13,703,700.00
###
1,370,370.00
15,074,070.00
6,054,700.00
###
605,470.00
6,660,170.00
10,270,200.00
###
1,027,020.00
11,297,220.00
4,209,200.00
###
420,920.00
4,630,120.00
5,484,700.00
###
548,470.00
6,033,170.00
10,500,000.00
###
1,050,000.00
11,550,000.00
75,000.00
###
7,500.00
82,500.00
1,995,200.00
###
199,520.00
2,194,720.00
2,994,200.00
###
299,420.00
3,293,620.00
3,385,600.00
###
338,560.00
3,724,160.00
2,880,500.00
###
288,050.00
3,168,550.00
2,513,600.00
###
251,360.00
2,764,960.00
1,712,500.00
###
171,250.00
1,883,750.00
2,775,700.00
###
277,570.00
3,053,270.00
2,949,100.00
###
294,910.00
3,244,010.00
3,590,900.00
###
359,090.00
3,949,990.00
3,736,200.00
###
373,620.00
4,109,820.00
2,291,700.00
###
229,170.00
2,520,870.00
4,497,600.00
###
449,760.00
4,947,360.00
875,000.00
###
87,500.00
962,500.00
1,860,100.00
###
186,010.00
2,046,110.00
4,128,900.00
###
412,890.00
4,541,790.00
5,755,600.00
###
575,560.00
6,331,160.00
8,229,200.00
###
822,920.00
9,052,120.00
HARGA DI
LOKASI
(Rp)
JARAK
HARGA
ONGKOS
ANGKUT
ANGKUT
TANPA
RATA-RATA
PER UNIT
KEUNTUNGAN
KEUNTUNGAN
KEUNTUNGAN
(km)
(Rp)
(OVERHEAD)
(OVERHEAD)
(OVERHEAD)
(Rp)
(Rp)
(Rp)
HARGA TERMASUK
6,875,000.00
###
687,500.00
7,562,500.00
1,203,200.00
###
120,320.00
1,323,520.00
549,800.00
###
54,980.00
604,780.00
17,600.00
###
1,760.00
19,360.00
18,800.00
###
1,880.00
20,680.00
4,700.00
###
470.00
5,170.00
9,500.00
###
950.00
10,450.00
49,500.00
###
4,950.00
54,450.00
65,000.00
###
6,500.00
71,500.00
165,000.00
###
16,500.00
181,500.00
10,000.00
###
1,000.00
11,000.00
2,100.00
###
210.00
2,310.00
25,400.00
###
2,540.00
27,940.00
38,300.00
###
3,830.00
42,130.00
26,800.00
###
2,680.00
29,480.00
30,000.00
###
3,000.00
33,000.00
33,200.00
###
3,320.00
36,520.00
72,800.00
###
7,280.00
80,080.00
39,000.00
###
3,900.00
42,900.00
25,400.00
###
2,540.00
27,940.00
35,600.00
###
3,560.00
39,160.00
20,900.00
###
2,090.00
22,990.00
29,500.00
###
2,950.00
32,450.00
51,400.00
###
5,140.00
56,540.00
28,100.00
###
2,810.00
30,910.00
40,200.00
###
4,020.00
44,220.00
50,750.00
###
5,075.00
55,820.00
18,550.00
###
1,855.00
20,400.00
125,000.00
###
12,500.00
137,500.00
10,600.00
###
1,060.00
11,660.00
18,500.00
###
1,850.00
20,350.00
40,000.00
###
4,000.00
44,000.00
23,000.00
###
2,300.00
25,300.00
16,100.00
###
1,610.00
17,710.00
45,000.00
###
4,500.00
49,500.00
33,200.00
###
3,320.00
36,520.00
45,000.00
###
4,500.00
49,500.00
HARGA DI
LOKASI
(Rp)
JARAK
HARGA
ONGKOS
ANGKUT
ANGKUT
TANPA
RATA-RATA
PER UNIT
KEUNTUNGAN
KEUNTUNGAN
KEUNTUNGAN
(km)
(Rp)
(OVERHEAD)
(OVERHEAD)
(OVERHEAD)
(Rp)
(Rp)
(Rp)
HARGA TERMASUK
15,800.00
###
1,580.00
17,380.00
14,100.00
###
1,410.00
15,510.00
16,100.00
###
1,610.00
17,710.00
17,000.00
###
1,700.00
18,700.00
19,000.00
###
1,900.00
20,900.00
24,200.00
###
2,420.00
26,620.00
7,500.00
###
750.00
8,250.00
10,500.00
###
1,050.00
11,550.00
35,000.00
###
3,500.00
38,500.00
405,000.00
###
40,500.00
445,500.00
16,300.00
###
1,630.00
17,930.00
16,900.00
###
1,690.00
18,590.00
16,900.00
###
1,690.00
18,590.00
HARGA DI
LOKASI
(Rp)
JARAK
HARGA
ONGKOS
ANGKUT
ANGKUT
TANPA
RATA-RATA
PER UNIT
KEUNTUNGAN
KEUNTUNGAN
KEUNTUNGAN
(km)
(Rp)
(OVERHEAD)
(OVERHEAD)
(OVERHEAD)
(Rp)
(Rp)
(Rp)
HARGA TERMASUK
5,000.00
###
500.00
5,500.00
100,000.00
###
10,000.00
110,000.00
25,000.00
###
2,500.00
27,500.00
12,500.00
###
1,250.00
13,750.00
135,100.00
###
13,510.00
148,610.00
110,800.00
###
11,080.00
121,880.00
174,100.00
###
17,410.00
191,510.00
245,300.00
###
24,530.00
269,830.00
284,300.00
###
28,430.00
312,730.00
349,500.00
###
34,950.00
384,450.00
558,500.00
###
55,850.00
614,350.00
397,800.00
###
39,780.00
437,580.00
500,000.00
###
50,000.00
550,000.00
75,000.00
###
7,500.00
82,500.00
96,000.00
###
9,600.00
105,600.00
2,175,000.00
###
217,500.00
2,392,500.00
230,000.00
###
23,000.00
253,000.00
1,900,000.00
###
190,000.00
2,090,000.00
225,000.00
###
22,500.00
247,500.00
12,300.00
###
1,230.00
13,530.00
23,200.00
###
2,320.00
25,520.00
13,600.00
###
1,360.00
14,960.00
19,500.00
###
1,950.00
21,450.00
17,000.00
###
1,700.00
18,700.00
10,500.00
###
1,050.00
11,550.00
147,500.00
###
14,750.00
162,250.00
107,500.00
###
10,750.00
118,250.00
125,000.00
###
12,500.00
137,500.00
79,000.00
###
7,900.00
86,900.00
87,500.00
###
8,750.00
96,250.00
105,800.00
###
10,580.00
116,380.00
20,000.00
###
2,000.00
22,000.00
22,300.00
###
2,230.00
24,530.00
16,800.00
###
1,680.00
18,480.00
23,400.00
###
2,340.00
25,740.00
23,300.00
###
2,330.00
25,630.00
23,500.00
###
2,350.00
25,850.00
HARGA DI
LOKASI
(Rp)
JARAK
HARGA
ONGKOS
ANGKUT
ANGKUT
TANPA
RATA-RATA
PER UNIT
KEUNTUNGAN
KEUNTUNGAN
KEUNTUNGAN
(km)
(Rp)
(OVERHEAD)
(OVERHEAD)
(OVERHEAD)
(Rp)
(Rp)
(Rp)
HARGA TERMASUK
23,700.00
###
2,370.00
26,070.00
26,000.00
###
2,600.00
28,600.00
33,125.00
###
3,312.50
36,430.00
300.00
###
30.00
330.00
10,000.00
###
1,000.00
11,000.00
5,000.00
###
500.00
5,500.00
50,000.00
###
5,000.00
55,000.00
65,000.00
###
6,500.00
71,500.00
63,300.00
###
6,330.00
69,630.00
63,300.00
###
6,330.00
69,630.00
61,200.00
###
6,120.00
67,320.00
80,800.00
###
8,080.00
88,880.00
80,800.00
###
8,080.00
88,880.00
85,000.00
###
8,500.00
93,500.00
106,300.00
###
10,630.00
116,930.00
57,200.00
###
5,720.00
62,920.00
77,600.00
###
7,760.00
85,360.00
92,000.00
###
9,200.00
101,200.00
64,900.00
###
6,490.00
71,390.00
46,700.00
###
4,670.00
51,370.00
48,000.00
###
4,800.00
52,800.00
64,500.00
###
6,450.00
70,950.00
19,000.00
###
1,900.00
20,900.00
55,000.00
###
5,500.00
60,500.00
103,750.00
###
10,375.00
114,120.00
91,250.00
###
9,125.00
100,370.00
116,250.00
###
11,625.00
127,870.00
103,750.00
###
10,375.00
114,120.00
119,000.00
###
11,900.00
130,900.00
50,000.00
###
5,000.00
55,000.00
99,500.00
###
9,950.00
109,450.00
384,000.00
###
38,400.00
422,400.00
133,000.00
###
13,300.00
146,300.00
142,500.00
###
14,250.00
156,750.00
950,000.00
###
95,000.00
1,045,000.00
HARGA DI
LOKASI
(Rp)
JARAK
HARGA
ONGKOS
ANGKUT
ANGKUT
TANPA
RATA-RATA
PER UNIT
KEUNTUNGAN
KEUNTUNGAN
KEUNTUNGAN
(km)
(Rp)
(OVERHEAD)
(OVERHEAD)
(OVERHEAD)
(Rp)
(Rp)
(Rp)
HARGA TERMASUK
101,500.00
###
10,150.00
111,650.00
195,000.00
###
19,500.00
214,500.00
205,000.00
###
20,500.00
225,500.00
152,000.00
###
15,200.00
167,200.00
46,800.00
###
4,680.00
51,480.00
91,000.00
###
9,100.00
100,100.00
149,500.00
###
14,950.00
164,450.00
162,500.00
###
16,250.00
178,750.00
202,000.00
###
20,200.00
222,200.00
99,400.00
###
9,940.00
109,340.00
55,100.00
###
5,510.00
60,610.00
56,700.00
###
5,670.00
62,370.00
HARGA DI
LOKASI
(Rp)
JARAK
HARGA
ONGKOS
ANGKUT
ANGKUT
TANPA
RATA-RATA
PER UNIT
KEUNTUNGAN
KEUNTUNGAN
KEUNTUNGAN
(km)
(Rp)
(OVERHEAD)
(OVERHEAD)
(OVERHEAD)
(Rp)
(Rp)
(Rp)
HARGA TERMASUK
1,550,000.00
###
155,000.00
1,705,000.00
1,950,000.00
###
195,000.00
2,145,000.00
2,130,000.00
###
213,000.00
2,343,000.00
186,000.00
###
18,600.00
204,600.00
121,300.00
###
12,130.00
133,430.00
30,500.00
###
3,050.00
33,550.00
16,200.00
###
1,620.00
17,820.00
23,000.00
###
2,300.00
25,300.00
31,900.00
###
3,190.00
35,090.00
56,200.00
###
5,620.00
61,820.00
106,500.00
###
10,650.00
117,150.00
140,000.00
###
14,000.00
154,000.00
4,500.00
###
4,500.00
4,300.00
###
4,300.00
4,500.00
###
4,500.00
24,200.00
###
24,200.00
42,400.00
###
42,400.00
5,100.00
###
5,100.00
5,100.00
###
5,100.00
8,300.00
###
8,300.00
57,000.00
###
57,000.00
62,500.00
###
62,500.00
150,000.00
###
150,000.00
63,300.00
###
63,300.00
11,970,000.00
###
1,197,000.00
13,167,000.00
4,962,300.00
###
496,230.00
5,458,530.00
4,112,000.00
###
411,200.00
4,523,200.00
4,641,000.00
###
464,100.00
5,105,100.00
4,275,000.00
###
427,500.00
4,702,500.00
495,000.00
###
49,500.00
544,500.00
6,069,000.00
###
606,900.00
6,675,900.00
5,057,500.00
###
505,750.00
5,563,250.00
3,272,500.00
###
327,250.00
3,599,750.00
7,049,916.67
###
704,991.67
7,754,900.00
HARGA DI
LOKASI
(Rp)
JARAK
HARGA
ONGKOS
ANGKUT
ANGKUT
TANPA
RATA-RATA
PER UNIT
KEUNTUNGAN
KEUNTUNGAN
KEUNTUNGAN
(km)
(Rp)
(OVERHEAD)
(OVERHEAD)
(OVERHEAD)
(Rp)
(Rp)
(Rp)
HARGA TERMASUK
6,187,166.67
###
618,716.67
6,805,880.00
7,260,000.00
###
726,000.00
7,986,000.00
6,910,000.00
###
691,000.00
7,601,000.00
61,106,500.00
###
6,110,650.00
67,217,150.00
73,327,800.00
###
7,332,780.00
80,660,580.00
9,853,200.00
###
985,320.00
10,838,520.00
11,238,300.00
###
1,123,830.00
12,362,130.00
9,853,000.00
###
985,300.00
10,838,300.00
10,353,000.00
###
1,035,300.00
11,388,300.00
983,000.00
###
98,300.00
1,081,300.00
832,000.00
###
83,200.00
915,200.00
682,000.00
###
68,200.00
750,200.00
532,000.00
###
53,200.00
585,200.00
4,240,000.00
###
424,000.00
4,664,000.00
3,480,000.00
###
348,000.00
3,828,000.00
227,000.00
###
22,700.00
249,700.00
183,666.67
###
18,366.67
202,030.00
113,500.00
###
11,350.00
124,850.00
766,250.00
###
76,625.00
842,870.00
766,250.00
###
76,625.00
842,870.00
417,666.67
###
41,766.67
459,430.00
340,333.33
###
34,033.33
374,360.00
225,750.00
###
22,575.00
248,320.00
131,416.67
###
13,141.67
144,550.00
372,083.33
###
37,208.33
409,290.00
255,416.67
###
25,541.67
280,950.00
225,750.00
###
22,575.00
248,320.00
134,750.00
###
13,475.00
148,220.00
245,916.67
###
24,591.67
270,500.00
17,833.33
###
1,783.33
19,610.00
14,875.00
###
1,487.50
16,360.00
13,083.33
###
1,308.33
14,390.00
184,500.00
###
18,450.00
202,950.00
134,833.33
###
13,483.33
148,310.00
63,833.33
###
6,383.33
70,210.00
441,416.67
###
44,141.67
485,550.00
441,416.67
###
44,141.67
485,550.00
63,833.33
###
6,383.33
70,210.00
675,000.00
###
67,500.00
742,500.00
HARGA DI
LOKASI
(Rp)
JARAK
HARGA
ONGKOS
ANGKUT
ANGKUT
TANPA
RATA-RATA
PER UNIT
KEUNTUNGAN
KEUNTUNGAN
KEUNTUNGAN
(km)
(Rp)
(OVERHEAD)
(OVERHEAD)
(OVERHEAD)
(Rp)
(Rp)
(Rp)
HARGA TERMASUK
306,000.00
###
30,600.00
336,600.00
295,000.00
###
29,500.00
324,500.00
225,750.00
###
22,575.00
248,320.00
153,200.00
###
15,320.00
168,520.00
255,416.67
###
25,541.67
280,950.00
255,416.67
###
25,541.67
280,950.00
225,750.00
###
22,575.00
248,320.00
127,666.67
###
12,766.67
140,430.00
306,000.00
###
30,600.00
336,600.00
295,100.00
###
29,510.00
324,610.00
50,416.67
###
5,041.67
55,450.00
50,416.67
###
5,041.67
55,450.00
37,841.67
###
3,784.17
41,620.00
1,916.67
###
191.67
2,100.00
3,166.67
###
316.67
3,480.00
3,166.67
###
316.67
3,480.00
HARGA DI
LOKASI
(Rp)
JARAK
HARGA
ONGKOS
ANGKUT
ANGKUT
TANPA
RATA-RATA
PER UNIT
KEUNTUNGAN
KEUNTUNGAN
KEUNTUNGAN
(km)
(Rp)
(OVERHEAD)
(OVERHEAD)
(OVERHEAD)
(Rp)
(Rp)
(Rp)
HARGA TERMASUK
3,166.67
###
316.67
3,480.00
4,500.00
###
450.00
4,950.00
4,500.00
###
450.00
4,950.00
3,583.33
###
358.33
3,940.00
5,666.67
###
566.67
6,230.00
12,583.33
###
1,258.33
13,840.00
11,916.67
###
1,191.67
13,100.00
8,250.00
###
825.00
9,070.00
4,750.00
###
475.00
5,220.00
489,166.67
###
48,916.67
538,080.00
119,833.33
###
11,983.33
131,810.00
37,833.33
###
3,783.33
41,610.00
31,500.00
###
3,150.00
34,650.00
125,000.00
###
12,500.00
137,500.00
31,500.00
###
3,150.00
34,650.00
5,000.00
###
500.00
5,500.00
5,666.67
###
566.67
6,230.00
31,500.00
###
3,150.00
34,650.00
31,500.00
###
3,150.00
34,650.00
25,250.00
###
2,525.00
27,770.00
63,833.33
###
6,383.33
70,210.00
134,750.00
###
13,475.00
148,220.00
75,666.67
###
7,566.67
83,230.00
18,916.67
###
1,891.67
20,800.00
20,166.67
###
2,016.67
22,180.00
29,000.00
###
2,900.00
31,900.00
34,083.33
###
3,408.33
37,490.00
35,333.33
###
3,533.33
38,860.00
46,666.67
###
4,666.67
51,330.00
31,500.00
###
3,150.00
34,650.00
105,000.00
###
10,500.00
115,500.00
40,900.00
###
4,090.00
44,990.00
52,900.00
###
5,290.00
58,190.00
25,166.67
###
2,516.67
27,680.00
30,333.33
###
3,033.33
33,360.00
47,250.00
###
4,725.00
51,970.00
36,583.33
###
3,658.33
40,240.00
71,916.67
###
7,191.67
79,100.00
81,916.67
###
8,191.67
90,100.00
HARGA DI
LOKASI
(Rp)
JARAK
HARGA
ONGKOS
ANGKUT
ANGKUT
TANPA
RATA-RATA
PER UNIT
KEUNTUNGAN
KEUNTUNGAN
KEUNTUNGAN
(km)
(Rp)
(OVERHEAD)
(OVERHEAD)
(OVERHEAD)
(Rp)
(Rp)
(Rp)
HARGA TERMASUK
2,700.00
###
270.00
2,970.00
4,200.00
###
420.00
4,620.00
6,600.00
###
660.00
7,260.00
10,200.00
###
1,020.00
11,220.00
5,583.33
###
558.33
6,140.00
11,100.00
###
1,110.00
12,210.00
19,200.00
###
1,920.00
21,120.00
15,100.00
###
1,510.00
16,610.00
19,916.67
###
1,991.67
21,900.00
21,583.33
###
2,158.33
23,740.00
21,300.00
###
2,130.00
23,430.00
31,500.00
###
3,150.00
34,650.00
52,800.00
###
5,280.00
58,080.00
69,600.00
###
6,960.00
76,560.00
59,916.67
###
5,991.67
65,900.00
248,500.00
###
24,850.00
273,350.00
277,500.00
###
27,750.00
305,250.00
340,500.00
###
34,050.00
374,550.00
122,333.33
###
12,233.33
134,560.00
78,800.00
###
7,880.00
86,680.00
116,300.00
###
11,630.00
127,930.00
5,916.67
###
591.67
6,500.00
5,416.67
###
541.67
5,950.00
7,166.67
###
716.67
7,880.00
2,700.00
###
270.00
2,970.00
4,200.00
###
420.00
4,620.00
6,600.00
###
660.00
7,260.00
10,200.00
###
1,020.00
11,220.00
11,100.00
###
1,110.00
12,210.00
16,000.00
###
1,600.00
17,600.00
11,166.67
###
1,116.67
12,280.00
20,750.00
###
2,075.00
22,820.00
1,250.00
###
125.00
1,370.00
3,250.00
###
325.00
3,570.00
7,916.67
###
791.67
8,700.00
2,166.67
###
216.67
2,380.00
55,000.00
###
5,500.00
60,500.00
80,250.00
###
8,025.00
88,270.00
111,000.00
###
11,100.00
122,100.00
HARGA DI
LOKASI
(Rp)
JARAK
HARGA
ONGKOS
ANGKUT
ANGKUT
TANPA
RATA-RATA
PER UNIT
KEUNTUNGAN
KEUNTUNGAN
KEUNTUNGAN
(km)
(Rp)
(OVERHEAD)
(OVERHEAD)
(OVERHEAD)
(Rp)
(Rp)
(Rp)
HARGA TERMASUK
141,250.00
###
14,125.00
155,370.00
181,583.33
###
18,158.33
199,740.00
247,250.00
###
24,725.00
271,970.00
3,250.00
###
325.00
3,570.00
17,916.67
###
1,791.67
19,700.00
5,416.67
###
541.67
5,950.00
13,333.33
###
1,333.33
14,660.00
9,250.00
###
925.00
10,170.00
4,000.00
###
400.00
4,400.00
5,000.00
###
500.00
5,500.00
7,166.67
###
716.67
7,880.00
25,166.67
###
2,516.67
27,680.00
9,166.67
###
916.67
10,080.00
23,166.67
###
2,316.67
25,480.00
2,833.33
###
283.33
3,110.00
HARGA DI
LOKASI
(Rp)
JARAK
HARGA
ONGKOS
ANGKUT
ANGKUT
TANPA
RATA-RATA
PER UNIT
KEUNTUNGAN
KEUNTUNGAN
KEUNTUNGAN
(km)
(Rp)
(OVERHEAD)
(OVERHEAD)
(OVERHEAD)
(Rp)
(Rp)
(Rp)
HARGA TERMASUK
4,833.33
###
483.33
5,310.00
845,000.00
###
84,500.00
929,500.00
501,200.00
###
50,120.00
551,320.00
408,400.00
###
40,840.00
449,240.00
157,700.00
###
15,770.00
173,470.00
50,416.67
###
5,041.67
55,450.00
25,166.67
###
2,516.67
27,680.00
50,416.67
###
5,041.67
55,450.00
163,916.67
###
16,391.67
180,300.00
7,166.67
###
716.67
7,880.00
31,500.00
###
3,150.00
34,650.00
1,833.33
###
183.33
2,010.00
2,500.00
###
250.00
2,750.00
1,500.00
###
150.00
1,650.00
7,100.00
###
710.00
7,810.00
9,000.00
###
900.00
9,900.00
7,500.00
###
750.00
8,250.00
3,750.00
###
375.00
4,120.00
50,416.67
###
5,041.67
55,450.00
1,005,500.00
###
100,550.00
1,106,050.00
7,250.00
###
725.00
7,970.00
6,333.33
###
633.33
6,960.00
31,500.00
###
3,150.00
34,650.00
1,333.33
###
133.33
1,460.00
3,166.67
###
316.67
3,480.00
25,250.00
###
2,525.00
27,770.00
15,100.00
###
1,510.00
16,610.00
6,300.00
###
630.00
6,930.00
20,100.00
###
2,010.00
22,110.00
25,250.00
###
2,525.00
27,770.00
12,500.00
###
1,250.00
13,750.00
63,083.33
###
6,308.33
69,390.00
63,083.33
###
6,308.33
69,390.00
4,500.00
###
450.00
4,950.00
90,800.00
###
9,080.00
99,880.00
75,666.67
###
7,566.67
83,230.00
50,455.83
###
5,045.58
55,500.00
118,333.33
###
11,833.33
130,160.00
291.67
###
29.17
320.00
HARGA DI
LOKASI
(Rp)
JARAK
HARGA
ONGKOS
ANGKUT
ANGKUT
TANPA
RATA-RATA
PER UNIT
KEUNTUNGAN
KEUNTUNGAN
KEUNTUNGAN
(km)
(Rp)
(OVERHEAD)
(OVERHEAD)
(OVERHEAD)
(Rp)
(Rp)
(Rp)
HARGA TERMASUK
142,000.00
###
14,200.00
156,200.00
25,000.00
###
2,500.00
27,500.00
40,000.00
###
4,000.00
44,000.00
88,250.00
###
8,825.00
97,070.00
88,250.00
###
8,825.00
97,070.00
3,812.50
###
381.25
4,190.00
10,125.00
###
1,012.50
11,130.00
770.83
###
77.08
840.00
12,625.00
###
1,262.50
13,880.00
12,625.00
###
1,262.50
13,880.00
12,625.00
###
1,262.50
13,880.00
113,500.00
###
11,350.00
124,850.00
47,916.67
###
4,791.67
52,700.00
47,916.67
###
4,791.67
52,700.00
214,200.00
###
21,420.00
235,620.00
102,000.00
###
10,200.00
112,200.00
31,500.00
###
3,150.00
34,650.00
31,500.00
###
3,150.00
34,650.00
12,625.00
###
1,262.50
13,880.00
31,500.00
###
3,150.00
34,650.00
31,500.00
###
3,150.00
34,650.00
3,166.67
###
316.67
3,480.00
56,750.00
###
5,675.00
62,420.00
828,750.00
###
82,875.00
911,620.00
454,083.33
###
45,408.33
499,490.00
1,206,600.00
###
120,660.00
1,327,260.00
22,729.17
###
2,272.92
25,000.00
44,145.83
###
4,414.58
48,560.00
44,145.83
###
4,414.58
48,560.00
17,833.33
###
1,783.33
19,610.00
17,833.33
###
1,783.33
19,610.00
1,904.17
###
190.42
2,090.00
5,708.33
###
570.83
6,270.00
47,291.67
###
4,729.17
52,020.00
94,583.33
###
9,458.33
104,040.00
208,250.00
###
20,825.00
229,070.00
6,958.33
###
695.83
7,650.00
1,904.17
###
190.42
2,090.00
8,208.33
###
820.83
9,020.00
HARGA DI
LOKASI
(Rp)
JARAK
HARGA
ONGKOS
ANGKUT
ANGKUT
TANPA
RATA-RATA
PER UNIT
KEUNTUNGAN
KEUNTUNGAN
KEUNTUNGAN
(km)
(Rp)
(OVERHEAD)
(OVERHEAD)
(OVERHEAD)
(Rp)
(Rp)
(Rp)
HARGA TERMASUK
7,583.33
###
758.33
8,340.00
15,166.67
###
1,516.67
16,680.00
75,666.67
###
7,566.67
83,230.00
88,291.67
###
8,829.17
97,120.00
398,666.67
###
39,866.67
438,530.00
517,666.67
###
51,766.67
569,430.00
1,041,250.00
###
104,125.00
1,145,370.00
1,160,250.00
###
116,025.00
1,276,270.00
1,309,000.00
###
130,900.00
1,439,900.00
2,562.50
###
256.25
2,810.00
12,583.33
###
1,258.33
13,840.00
18,916.67
###
1,891.67
20,800.00
4,458.33
###
445.83
4,900.00
5,711.67
###
571.17
6,280.00
HARGA DI
LOKASI
(Rp)
JARAK
HARGA
ONGKOS
ANGKUT
ANGKUT
TANPA
RATA-RATA
PER UNIT
KEUNTUNGAN
KEUNTUNGAN
KEUNTUNGAN
(km)
(Rp)
(OVERHEAD)
(OVERHEAD)
(OVERHEAD)
(Rp)
(Rp)
(Rp)
HARGA TERMASUK
3,916.67
###
391.67
4,300.00
15,166.67
###
1,516.67
16,680.00
50,416.67
###
5,041.67
55,450.00
8,208.33
###
820.83
9,020.00
277,500.00
###
27,750.00
305,250.00
18,916.67
###
1,891.67
20,800.00
113,500.00
###
11,350.00
124,850.00
3,812.50
###
381.25
4,190.00
7,583.33
###
758.33
8,340.00
8,833.33
###
883.33
9,710.00
2,562.50
895.83
1,187.50
1,312.50
3,500.00
4,500.00
2,562.50
3,812.50
7,612.50
895.83
2,562.50
113,529.17
47,958.33
31,535.00
654.17
18,916.67
819,912.50
25,229.17
25,229.17
25,229.17
25,229.17
252,279.17
538,350.00
416,250.00
12,495.00
21,425.00
6,291.67
18,916.67
31,541.67
56,750.00
3,812.50
6,425.00
31,537.50
###
256.25
2,810.00
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
89.58
118.75
131.25
350.00
450.00
256.25
381.25
761.25
89.58
256.25
11,352.92
4,795.83
3,153.50
65.42
1,891.67
81,991.25
2,522.92
2,522.92
2,522.92
2,522.92
25,227.92
53,835.00
41,625.00
1,249.50
2,142.50
629.17
1,891.67
3,154.17
5,675.00
381.25
642.50
3,153.75
980.00
1,300.00
1,440.00
3,850.00
4,950.00
2,810.00
4,190.00
8,370.00
980.00
2,810.00
124,880.00
52,750.00
34,680.00
710.00
20,800.00
901,900.00
27,750.00
27,750.00
27,750.00
27,750.00
277,500.00
592,180.00
457,870.00
13,740.00
23,560.00
6,920.00
20,800.00
34,690.00
62,420.00
4,190.00
7,060.00
34,690.00
HARGA DI
LOKASI
(Rp)
573,500.00
6,500,000.00
50,000.00
5,500,000.00
500,000.00
333,500.00
8,000,000.00
60,000.00
2,500,000.00
150,000.00
300,000.00
45,000.00
4,500,000.00
5,000,000.00
4,900,000.00
7,500,000.00
8,000,000.00
2,750,000.00
2,950,000.00
9,600,000.00
8,800,000.00
16,250,000.00
82,916,700.00
4,750,000.00
666,666.67
1,000,000.00
10,000,000.00
15,833,333.33
35,182,250.00
5,000,000.00
8,666,666.67
JARAK
HARGA
ONGKOS
ANGKUT
ANGKUT
TANPA
RATA-RATA
PER UNIT
KEUNTUNGAN
KEUNTUNGAN
KEUNTUNGAN
(km)
(Rp)
(OVERHEAD)
(OVERHEAD)
(OVERHEAD)
(Rp)
(Rp)
(Rp)
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
HARGA TERMASUK
57,350.00
650,000.00
5,000.00
550,000.00
50,000.00
33,350.00
800,000.00
6,000.00
250,000.00
15,000.00
30,000.00
4,500.00
450,000.00
500,000.00
490,000.00
750,000.00
800,000.00
630,850.00
7,150,000.00
55,000.00
6,050,000.00
550,000.00
366,850.00
8,800,000.00
66,000.00
2,750,000.00
165,000.00
330,000.00
49,500.00
4,950,000.00
5,500,000.00
5,390,000.00
8,250,000.00
8,800,000.00
275,000.00
3,025,000.00
295,000.00
3,245,000.00
960,000.00
880,000.00
10,560,000.00
9,680,000.00
1,625,000.00
17,875,000.00
8,291,670.00
475,000.00
66,666.67
100,000.00
1,000,000.00
1,583,333.33
3,518,225.00
500,000.00
866,666.67
91,208,370.00
5,225,000.00
733,330.00
1,100,000.00
11,000,000.00
17,416,660.00
38,700,470.00
5,500,000.00
9,533,330.00
WALIKOTA PONTIANAK
HARGA DI
LOKASI
(Rp)
JARAK
HARGA
ONGKOS
ANGKUT
ANGKUT
TANPA
RATA-RATA
PER UNIT
KEUNTUNGAN
KEUNTUNGAN
KEUNTUNGAN
(km)
(Rp)
(OVERHEAD)
(OVERHEAD)
(OVERHEAD)
(Rp)
(Rp)
(Rp)
HARGA TERMASUK
SA-
KOTA
KAB
KOTA
KAB.
KAB.
KAB.
KAB.
KAB.
KAB.
UPAH KERJA
TUAN
PTK
PTK
SKW
SBS
BKY
LDK
SGU
STG
KTP
BAHAN PENGISI
M3
53,800
35,100
33,500
42,000
40,500
50,000
22,100
45,000
40,000
2 Pasir Urug
M3
36,800
41,580
51,750
56,750
50,000
53,500
37,500
45,000
56,000
Pasir Pasang
M3
36,800
48,510
53,500
87,250
57,500
59,550
51,250
55,000
M3
243,100
190,150
108,750
246,500
219,400
291,700
305,000
288,000
M3
110,000
115,000
120,000
125,000
80,500
138,360
87,000
120,000
168,000
M3
137,500
110,610
81,450
167,500
83,000
138,360
145,500
120,000
178,000
M3
152,700
118,800
97,250
177,000
107,500
150,000
176,750
140,000
188,000
M3
219,000
150,000
176,000
227,000
138,000
168,200
290,000
210,000
285,000
M3
261,500
156,200
198,000
248,000
219,000
185,000
298,400
250,000
303,000
10
-1-
M3
55,000
50,000
53,000
60,000
63,500
70,000
0
10. Batu . . . . . . . .
80,500
63,250
85,000
325,000
82,000
150,000
0
10. Batu . . . . . . . .
BIAYA
SATUAN
( Rp )
2,500.00
2,000.00
4,500.00
BAHAN
Jumlah
C
D
.
0.00
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Jumlah
4,500.00
0.00
4,500.00
BAHAN
Kayu Papan 3/20
Kayu 5/7
Paku biasa 2" - 5"
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
M3
M3
Kg
70,400.00
595,200.00
9,000.00
0.007
0.012
0.020
3,500.00
400.00
2,500.00
200.00
6,600.00
492.80
7,142.40
180.00
7,815.20
14,415.20
0.00
14,415.20
BIAYA
SATUAN
( Rp )
BIAYA
SATUAN
( Rp )
10,000.00
1,600.00
11,600.00
BAHAN
Jumlah
C
D
E
0.00
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
11,600.00
0.00
11,600.00
KWANTITAS
BIAYA
SATUAN
( Rp )
1
2
Pekerja
Mandor
Jumlah
BAHAN
Hari/Org
Hari/Org
25,000.00
40,000.00
0.625
0.062
15,625.00
2,480.00
18,105.00
Jumlah
C
D
E
0.00
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
18,105.00
0.00
18,105.00
BIAYA
SATUAN
( Rp )
31,250.00
5,000.00
36,250.00
BAHAN
Jumlah
C
D
E
0.00
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
36,250.00
0.00
36,250.00
BIAYA
SATUAN
( Rp )
20,575.00
3,320.00
23,895.00
BAHAN
Jumlah
C
D
E
0.00
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
23,895.00
0.00
23,895.00
1. URUGAN PASIR / M3
Analisa Biaya Konstrusi ( ABK ) berdasarkan SNI 2002 ( Hal 7 - 9 )
HARGA
NO.
U R A I A N
SATUAN
SATUAN
KWANTITAS
( Rp )
A
TENAGA KERJA
1
Pekerja
Hari/Org
25,000.00
0.300
2
Mandor
Hari/Org
40,000.00
0.010
Jumlah
B
1
BAHAN
Pasir Urug
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
M3
36,800.00
1.200
BIAYA
SATUAN
( Rp )
7,500.00
400.00
7,900.00
44,160.00
44,160.00
52,060.00
0.00
52,060.00
NO.
U R A I A N
SATUAN
HARGA
SATUAN
( Rp )
KWANTITAS
BIAYA
SATUAN
( Rp )
A
1
2
4
5
TENAGA KERJA
Pekerja
Mandor
Tukang Batu
Kepala Tukang Batu
Jumlah
Hari/Org
Hari/Org
Hari/Org
Hari/Org
25,000.00
40,000.00
35,000.00
40,000.00
1.500
0.075
0.600
0.060
37,500.00
3,000.00
21,000.00
2,400.00
63,900.00
B
1
2
3
BAHAN
Batu Belah 10/15 cm
Pasir Pasang
Semen Portland
Jumlah
M3
M3
Kg.
137,500.00
36,800.00
670.00
1.100
0.485
202.000
151,250.00
17,848.00
135,340.00
304,438.00
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
368,338.00
0.00
368,338.00
BAHAN
Batu Belah 10/15 cm
Pasir Pasang
Semen Portland
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
M3
M3
Kg.
137,500.00
36,800.00
670.00
1.100
0.520
163.000
BIAYA
SATUAN
( Rp )
37,500.00
3,000.00
21,000.00
2,400.00
63,900.00
151,250.00
19,136.00
109,210.00
279,596.00
343,496.00
0.00
343,496.00
U R A I A N
A
1
2
3
4
TENAGA KERJA
Pekerja
Mandor
Tukang Batu
Kepala Tukang Batu
Jumlah
B
1
2
3
BAHAN
Bataco uk. 7x15x30 cm
Pasir Pasang
Semen Portland
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
SATUAN
HARGA
SATUAN
( Rp )
KWANTITAS
BIAYA
SATUAN
( Rp )
Hari/Org
Hari/Org
Hari/Org
Hari/Org
25,000.00
40,000.00
35,000.00
40,000.00
0.270
0.016
0.128
0.014
6,750.00
640.00
4,480.00
560.00
12,430.00
buah
M3
Kg
1,430.00
36,800.00
670.00
20.000
0.020
0.184
28,600.00
736.00
123.28
29,459.28
41,889.28
0.00
41,889.28
Hal. 06
3. PASANGAN BATU BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS / M
Analisa Biaya Konstrusi ( ABK ) berdasarkan SNI 2002 ( Hal 6 - 17 )
HARGA
NO.
U R A I A N
SATUAN
SATUAN
KWANTITAS
( Rp )
A
TENAGA KERJA
1
Pekerja
Hari/Org
25,000.00
0.650
2
Mandor
Hari/Org
40,000.00
0.030
3
Tukang Batu
Hari/Org
35,000.00
0.200
4
Kepala Tukang Batu
Hari/Org
40,000.00
0.020
Jumlah
3
B
1
2
3
BAHAN
Bata merah 5 x 11 x 22 Cm
Pasir Pasang
Semen Portland
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
Buah
M3
Kg.
800.00
36,800.00
670.00
140.000
0.093
26.550
BAHAN
Tegel Uk. 30x30 cm
Pasir Pasang
Semen Portland
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
16,250.00
1,200.00
7,000.00
800.00
25,250.00
112,000.00
3,422.40
17,788.50
133,210.90
158,460.90
0.00
158,460.90
BIAYA
SATUAN
( Rp )
Buah
M3
Kg
4,000.00
36,800.00
670.00
11.000
0.036
0.176
BIAYA
SATUAN
( Rp )
12,500.00
1,000.00
8,750.00
1,000.00
23,250.00
44,000.00
1,324.80
117.92
45,442.72
68,692.72
0.00
68,692.72
Hal. 07
5. MEMASANG KERAMIK UK. 20X20 Cm (Upah. G.69 / M2)
BOW, Suplement
NO.
U R A I A N
SATUAN
HARGA
SATUAN
( Rp )
KWANTITAS
BIAYA
SATUAN
( Rp )
A
1
2
3
4
TENAGA KERJA
Pekerja
Mandor
Tukang Batu
Kepala Tukang Batu
Jumlah
Hari/Org
Hari/Org
Hari/Org
Hari/Org
25,000.00
40,000.00
35,000.00
40,000.00
0.500
0.025
0.250
0.025
12,500.00
1,000.00
8,750.00
1,000.00
23,250.00
B
1
2
3
BAHAN
Tegel Uk.20x20 cm
Pasir Pasang
Semen Portland
Jumlah
Buah
M3
Kg
2,300.00
36,800.00
670.00
25.000
0.036
0.176
57,500.00
1,324.80
117.92
58,942.72
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
82,192.72
0.00
82,192.72
E. PEKERJAAN BETON
1. PEK.BETON CAMPURAN 1 : 3 : 5 (G.43a / M3)
BOW, Ir. J.A Mukomoko, Hal - 358
NO.
U R A I A N
A
1
2
3
4
TENAGA KERJA
Pekerja
Mandor
Tukang Batu
Kepala Tukang Batu
Jumlah
B
1
2
3
BAHAN
Semen Portland
Pasir Pasang
Batu Splite 2/3
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
SATUAN
HARGA
SATUAN
( Rp )
KWANTITAS
BIAYA
SATUAN
( Rp )
Hari/Org
Hari/Org
Hari/Org
Hari/Org
25,000.00
40,000.00
35,000.00
40,000.00
6.000
0.300
0.500
0.050
150,000.00
12,000.00
17,500.00
2,000.00
181,500.00
Kg
M3
M3
670.00
36,800.00
219,000.00
227.000
0.540
0.910
152,090.00
19,872.00
199,290.00
371,252.00
552,752.00
0.00
552,752.00
Hal. 08
2. PEK. LANTAI KERJA BETON TUMBUK CAMPURAN 1 PC : 3 PS : 5 Kr / M , TEBAL 5 Cm.
Analisa Biaya Konstrusi ( ABK ) berdasarkan SNI 2002 ( Hal 6 - 28 )
HARGA
BIAYA
NO.
U R A I A N
SATUAN
SATUAN
KWANTITAS
SATUAN
( Rp )
( Rp )
A
TENAGA KERJA
1
Pekerja
Hari/Org
25,000.00
1.150
28,750.00
2
Mandor
Hari/Org
40,000.00
0.006
240.00
3
Tukang Batu
Hari/Org
35,000.00
0.020
700.00
4
Kepala Tukang Batu
Hari/Org
40,000.00
0.002
80.00
Jumlah
29,770.00
2
B
1
2
3
BAHAN
Semen Portland
Pasir Pasang
Batu Splite 2/3
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
Kg.
M3
M3
670.00
36,800.00
219,000.00
10.000
0.026
0.440
133,786.80
0.00
133,786.80
BAHAN
Semen Portland
Pasir Pasang
Batu Splite 2/3
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
6,700.00
956.80
96,360.00
104,016.80
Kg
M3
M3
670.00
36,800.00
219,000.00
340.000
0.540
0.820
BIAYA
SATUAN
( Rp )
150,000.00
12,000.00
35,000.00
4,000.00
201,000.00
227,800.00
19,872.00
179,580.00
427,252.00
628,252.00
0.00
628,252.00
Hal. 09
4. PEK. LANTAI BETON CAMP 1 PC : 3 PS : 5 Kr ( G.44 / M 3 )
BOW, Ir. J.A Mukomoko, Hal - 358
Untuk lantai di atas pasir tebal 6 - 7 Cm ( Upah G.43 )
HARGA
NO.
U R A I A N
SATUAN
SATUAN
KWANTITAS
( Rp )
A
TENAGA KERJA
1
Pekerja
Hari/Org
25,000.00
6.000
2
Mandor
Hari/Org
40,000.00
0.300
3
Tukang Batu
Hari/Org
35,000.00
0.500
4
Kepala Tukang Batu
Hari/Org
40,000.00
0.050
Jumlah
B
1
2
3
C
D
E
BAHAN
Semen Portland
Pasir Pasang
Batu Splite 2/3
Kg
M3
M3
670.00
36,800.00
219,000.00
212.000
0.500
1.000
BIAYA
SATUAN
( Rp )
150,000.00
12,000.00
17,500.00
2,000.00
181,500.00
142,040.00
18,400.00
219,000.00
Jumlah
379,440.00
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
560,940.00
0.00
560,940.00
BAHAN
Semen Portland
Pasir Pasang
Batu Splite 2/3
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
Kg
M3
M3
670.00
36,800.00
219,000.00
250.000
0.500
1.000
BIAYA
SATUAN
( Rp )
150,000.00
12,000.00
17,500.00
2,000.00
181,500.00
167,500.00
18,400.00
219,000.00
404,900.00
586,400.00
0.00
586,400.00
Hal. 10
6. 1 M Membuat beton dengan mutu K 275
Analisa Biaya Konstrusi ( ABK ) berdasarkan SNI 2002 ( Hal - 21 - 28 )
HARGA
U R A I A N
SATUAN
SATUAN
KWANTITAS
( Rp )
Tenaga
Pekerja
Hari/Org
25,000.00
6.000
Tukang batu
Hari/Org
35,000.00
1.000
Kepala Tukang
Hari/Org
40,000.00
0.100
Mandor
Hari/Org
40,000.00
0.300
Jumlah
3
NO.
A
1
2
3
4
B
1
2
3
Bahan
Semen portland
Pasir beton
Batu Splite 1/1
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
NO.
A
1
2
3
4
Kg
M3
M3
670.00
36,800.00
261,500.00
400.000
0.400
0.820
Bahan
Kayu Kls.III
Paku biasa 2" - 5"
Kayu Bulat
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
150,000.00
35,000.00
4,000.00
12,000.00
201,000.00
268,000.00
14,720.00
214,430.00
497,150.00
698,150.00
0.00
698,150.00
B
1
2
3
BIAYA
SATUAN
( Rp )
M3
Kg
M3
595,200.00
9,000.00
4,000.00
0.026
0.600
0.500
BIAYA
SATUAN
( Rp )
3,750.00
1,750.00
200.00
280.00
5,980.00
15,713.28
5,400.00
2,000.00
23,113.28
29,093.28
0.00
29,093.28
Hal. 11
NO.
A
1
2
3
4
5
6
B
1
2
3
4
5
6
7
8
Bahan
Kayu Kls.III
Paku biasa 2" - 5"
Minyak bekisting
Besi beton
Kawat beton
Semen portland
Pasir beton
Batu Splite 1/1
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
M3
Kg
Lt
Kg
Kg
Kg
M3
M3
595,200.00
9,000.00
15,000.00
6,950.00
10,000.00
670.00
36,800.00
261,500.00
0.200
1.500
0.400
150.000
2.250
323.000
0.520
0.780
BIAYA
SATUAN
( Rp )
97,500.00
12,250.00
36,400.00
36,750.00
9,800.00
6,600.00
199,300.00
119,040.00
13,500.00
6,000.00
1,042,500.00
22,500.00
216,410.00
19,136.00
203,970.00
1,643,056.00
1,842,356.00
0.00
1,842,356.00
Hal. 12
NO.
A
1
2
3
4
5
6
B
1
2
3
4
5
6
7
8
Bahan
Kayu Kls.III
Paku biasa 2" - 5"
Minyak bekisting
Besi beton
Kawat beton
Semen portland
Pasir beton
Batu Splite 1/1
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
M3
Kg
Lt
Kg
Kg
Kg
M3
M3
595,200.00
9,000.00
15,000.00
6,950.00
10,000.00
670.00
36,800.00
261,500.00
0.270
2.000
0.600
200.000
3.000
323.000
0.520
0.780
BIAYA
SATUAN
( Rp )
121,250.00
12,250.00
54,600.00
49,000.00
13,240.00
6,800.00
257,140.00
160,704.00
18,000.00
9,000.00
1,390,000.00
30,000.00
216,410.00
19,136.00
203,970.00
2,047,220.00
2,304,360.00
0.00
2,304,360.00
Hal. 13
NO.
A
1
2
3
4
5
6
B
1
2
3
4
5
6
7
8
9
10
11
Bahan
Kayu Kls.III
Paku biasa 2" - 5"
Minyak bekisting
Besi beton
Kawat beton
Semen portland
Pasir beton
Batu Splite 1/1
Kayu Papan Kls.III
Mutiplex 9 mm
Kayu Bulat - 8 cm / 4 m
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
M3
Kg
Lt
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
595,200.00
9,000.00
15,000.00
6,950.00
10,000.00
670.00
36,800.00
261,500.00
595,200.00
56,500.00
4,000.00
0.400
4.000
2.000
300.000
4.500
323.000
0.520
0.780
0.150
0.150
20.000
BIAYA
SATUAN
( Rp )
182,500.00
12,250.00
115,500.00
73,500.00
22,800.00
10,000.00
416,550.00
238,080.00
36,000.00
30,000.00
2,085,000.00
45,000.00
216,410.00
19,136.00
203,970.00
89,280.00
8,475.00
80,000.00
3,051,351.00
3,467,901.00
0.00
3,467,901.00
Hal. 14
NO.
A
1
2
3
4
5
6
B
1
2
3
4
5
6
7
8
9
10
11
Bahan
Kayu Kls.III
Paku biasa 2" - 5"
Minyak bekisting
Besi beton
Kawat beton
Semen portland
Pasir beton
Batu Splite 1/1
Kayu Papan Kls.III
Multiplex 9 mm
Kayu Bulat - 8 cm / 4 m
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
M3
Kg
Lt
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
595,200.00
9,000.00
15,000.00
6,950.00
10,000.00
670.00
36,800.00
261,500.00
595,200.00
56,500.00
4,000.00
0.320
3.200
1.600
200.000
3.000
323.000
0.520
0.780
0.140
2.800
16.000
BIAYA
SATUAN
( Rp )
149,000.00
12,250.00
98,000.00
49,000.00
18,200.00
8,320.00
334,770.00
190,464.00
28,800.00
24,000.00
1,390,000.00
30,000.00
216,410.00
19,136.00
203,970.00
83,328.00
158,200.00
64,000.00
2,408,308.00
2,743,078.00
0.00
2,743,078.00
Hal. 15
NO.
A
1
2
3
4
5
6
B
1
2
3
4
5
6
7
8
9
10
11
Bahan
Kayu Kls.III
Paku biasa 2" - 5"
Minyak bekisting
Besi beton polos
Kawat beton
Semen portland
Pasir beton
Batu Splite 1/1
Kayu Papan Kls.III
Multiplex 9 mm
Kayu Bulat - 8 cm / 4 m
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
M3
Kg
Lt
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
595,200.00
9,000.00
15,000.00
6,950.00
10,000.00
670.00
36,800.00
261,500.00
595,200.00
56,500.00
4,000.00
0.320
3.200
1.600
150.000
2.250
323.000
0.520
0.780
0.120
2.800
32.000
BIAYA
SATUAN
( Rp )
145,000.00
12,250.00
98,000.00
36,750.00
16,800.00
7,400.00
316,200.00
190,464.00
28,800.00
24,000.00
1,042,500.00
22,500.00
216,410.00
19,136.00
203,970.00
71,424.00
158,200.00
128,000.00
2,105,404.00
2,421,604.00
0.00
2,421,604.00
Hal. 16
NO.
A
1
2
3
4
5
6
B
1
2
3
4
5
6
7
8
9
10
11
Bahan
Kayu Kls.III
Paku biasa 2" - 5"
Minyak bekisting
Besi beton polos
Kawat beton
Semen portland
Pasir beton
Batu Splite 1/1
Kayu Papan Kls.III
Multiplex 9 mm
Kayu Bulat - 8 cm / 4 m
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
M3
Kg
Lt
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
595,200.00
9,000.00
15,000.00
6,950.00
10,000.00
670.00
36,800.00
261,500.00
595,200.00
56,500.00
4,000.00
0.240
3.200
1.600
150.000
2.250
323.000
0.520
0.780
0.160
2.800
24.000
BIAYA
SATUAN
( Rp )
140,000.00
12,250.00
92,400.00
36,750.00
16,000.00
7,720.00
305,120.00
142,848.00
28,800.00
24,000.00
1,042,500.00
22,500.00
216,410.00
19,136.00
203,970.00
95,232.00
158,200.00
96,000.00
2,049,596.00
2,354,716.00
0.00
2,354,716.00
Hal. 17
NO.
A
1
2
3
4
5
6
B
1
2
3
4
5
6
7
8
9
10
11
Bahan
Kayu Kls.III
Paku biasa 2" - 5"
Minyak bekisting
Besi beton polos
Kawat beton
Semen portland
Pasir beton
Batu Splite 1/1
Kayu Papan Kls.III
Multiplex 9 mm
Kayu Bulat - 8 cm / 4 m
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
M3
Kg
Lt
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
595,200.00
9,000.00
15,000.00
6,950.00
10,000.00
670.00
36,800.00
261,500.00
595,200.00
56,500.00
4,000.00
0.250
3.000
1.200
200.000
3.000
323.000
0.520
0.780
0.105
2.500
14.000
BIAYA
SATUAN
( Rp )
140,000.00
12,250.00
80,500.00
49,000.00
16,200.00
8,080.00
306,030.00
148,800.00
27,000.00
18,000.00
1,390,000.00
30,000.00
216,410.00
19,136.00
203,970.00
62,496.00
141,250.00
56,000.00
2,313,062.00
2,619,092.00
0.00
2,619,092.00
Hal. 18
15. 1 M Membuat kolom penguat beton bertulang (11 x 11) cm.
Analisa Biaya Konstrusi ( ABK ) berdasarkan SNI 2002 ( Hal 27 - 28 )
HARGA
U R A I A N
SATUAN
SATUAN
KWANTITAS
( Rp )
Tenaga
Pekerja
Hari/Org
25,000.00
0.060
Tukang batu
Hari/Org
35,000.00
0.020
Tukang kayu
Hari/Org
35,000.00
0.020
Tukang besi
Hari/Org
35,000.00
0.020
Kepala Tukang
Hari/Org
40,000.00
0.006
Mandor
Hari/Org
40,000.00
0.003
Jumlah
1
NO.
A
1
2
3
4
5
6
B
1
2
3
4
5
6
7
Bahan
Kayu Kls.III
Paku biasa 2" - 5"
Besi beton
Kawat beton
Semen portland
Pasir beton
Batu Splite 1/1
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
M3
Kg
Kg
Kg
M3
M3
M3
595,200.00
9,000.00
6,950.00
10,000.00
670.00
36,800.00
261,500.00
0.002
0.010
3.000
0.450
0.006
0.009
0.105
BIAYA
SATUAN
( Rp )
1,500.00
700.00
700.00
700.00
240.00
120.00
3,960.00
1,190.40
90.00
20,850.00
4,500.00
4.02
331.20
27,457.50
54,423.12
58,383.12
0.00
58,383.12
Hal. 19
16. 1 M Membuat ring balok beton bertulang (10 x 15) cm.
Analisa Biaya Konstrusi ( ABK ) berdasarkan SNI 2002 ( Hal 28 - 28 )
HARGA
U R A I A N
SATUAN
SATUAN
KWANTITAS
( Rp )
Tenaga
Pekerja
Hari/Org
25,000.00
0.100
Tukang batu
Hari/Org
35,000.00
0.033
Tukang kayu
Hari/Org
35,000.00
0.033
Tukang besi
Hari/Org
35,000.00
0.033
Kepala Tukang
Hari/Org
40,000.00
0.010
Mandor
Hari/Org
40,000.00
0.005
Jumlah
1
NO.
A
1
2
3
4
5
6
B
1
2
3
4
5
6
7
Bahan
Kayu Kls.III
Paku biasa 2" - 5"
Besi beton
Kawat beton
Semen portland
Pasir beton
Batu Splite 1/1
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
M3
Kg
Kg
Kg
Kg
M3
M3
595,200.00
9,000.00
6,950.00
10,000.00
670.00
36,800.00
261,500.00
0.003
0.020
3.600
0.050
5.500
0.009
0.015
BAHAN
Semen Portland
Pasir Pasang
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
2,500.00
1,155.00
1,155.00
1,155.00
400.00
200.00
6,565.00
1,785.60
180.00
25,020.00
500.00
3,685.00
331.20
3,922.50
35,424.30
41,989.30
0.00
41,989.30
BIAYA
SATUAN
( Rp )
Kg.
M3
670.00
36,800.00
8.520
0.017
BIAYA
SATUAN
( Rp )
5,000.00
400.00
5,250.00
600.00
11,250.00
5,708.40
625.60
6,334.00
17,584.00
0.00
17,584.00
Hal. 20
18. PEKERJAAN PLESTERAN TEBAL 15 mm CAMP PERBANDINGAN 1 PC : 3 PS / M
Analisa Biaya Konstrusi ( ABK ) berdasarkan SNI 2002 ( Hal 5 - 18 )
HARGA
NO.
U R A I A N
SATUAN
SATUAN
KWANTITAS
( Rp )
A
TENAGA KERJA
1
Pekerja
Hari/Org
25,000.00
0.200
2
Mandor
Hari/Org
40,000.00
0.010
3
Tukang Batu
Hari/Org
35,000.00
0.150
4
Kepala Tukang Batu
Hari/Org
40,000.00
0.015
Jumlah
2
B
1
2
BAHAN
Semen Portland
Pasir Pasang
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
Kg.
M3
670.00
36,800.00
6.480
0.019
BAHAN
Kayu Klas III
Paku Biasa
Minyak Bekisting
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
5,000.00
400.00
5,250.00
600.00
11,250.00
4,341.60
699.20
5,040.80
16,290.80
0.00
16,290.80
BIAYA
SATUAN
( Rp )
M3
Kg
Ltr
595,200.00
9,000.00
7,500.00
0.040
0.300
0.100
BIAYA
SATUAN
( Rp )
7,500.00
200.00
910.00
10,400.00
19,010.00
23,808.00
2,700.00
750.00
27,258.00
46,268.00
0.00
46,268.00
Hal. 21
20. PEKERJAAN BEKISTING UNTUK SLOF / M
Analisa Biaya Konstrusi ( ABK ) berdasarkan SNI 2002 ( Hal 17 - 28 )
HARGA
NO.
U R A I A N
SATUAN
SATUAN
KWANTITAS
( Rp )
A
TENAGA KERJA
1
Pekerja
Hari/Org
25,000.00
0.300
2
Mandor
Hari/Org
40,000.00
0.005
3
Tukang Kayu
Hari/Org
35,000.00
0.260
4
Kepala Tukang Kayu
Hari/Org
40,000.00
0.026
2
Jumlah
B
1
2
3
BAHAN
Kayu Klas III
Paku Biasa
Minyak Bekisting
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
M3
Kg
Ltr
595,200.00
9,000.00
7,500.00
0.045
0.300
0.100
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
26,784.00
2,700.00
750.00
29,484.00
47,324.00
0.00
47,324.00
Jumlah
BAHAN
Kayu Klas IV
Paku Biasa
Minyak Bekisting
Balok Kayu Kls.II
Multiplex tebal 9 mm
Kayu Bulat - 8 cm / 4 m
Jumlah
7,500.00
200.00
9,100.00
1,040.00
17,840.00
B
1
2
3
4
5
6
BIAYA
SATUAN
( Rp )
BIAYA
SATUAN
( Rp )
7,500.00
240.00
11,550.00
1,320.00
20,610.00
M3
Kg
Ltr
M3
Lbr
Btg
595,200.00
9,000.00
7,500.00
1,131,500.00
56,500.00
4,000.00
0.040
0.400
0.200
0.015
0.350
2.000
23,808.00
3,600.00
1,500.00
16,972.50
19,775.00
8,000.00
73,655.50
94,265.50
0.00
94,265.50
Hal. 22
22. PEKERJAAN BEKISTING UNTUK BALOK / M
Analisa Biaya Konstrusi ( ABK ) berdasarkan SNI 2002 ( Hal 18 - 28 )
HARGA
NO.
U R A I A N
SATUAN
SATUAN
KWANTITAS
( Rp )
A
TENAGA KERJA
1
Pekerja
Hari/Org
25,000.00
0.320
2
Mandor
Hari/Org
40,000.00
0.006
3
Tukang Kayu
Hari/Org
35,000.00
0.330
4
Kepala Tukang Kayu
Hari/Org
40,000.00
0.033
2
Jumlah
B
1
2
3
4
5
6
BAHAN
Kayu Klas III
Paku Biasa
Minyak Bekisting
Balok Kayu Kls.III
Multiplex tebal 9 mm
Kayu Bulat - 8 cm / 4 m
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
M3
Kg
Ltr
M3
Lbr
Btg
595,200.00
9,000.00
7,500.00
595,200.00
56,500.00
4,000.00
0.040
0.400
0.200
0.018
0.350
2.000
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
23,808.00
3,600.00
1,500.00
10,713.60
19,775.00
8,000.00
67,396.60
88,506.60
0.00
88,506.60
Jumlah
BAHAN
Kayu Klas III
Paku Biasa
Minyak Bekisting
Balok Kayu Kls.III
Multiplex tebal 9 mm
Kayu Bulat - 8 cm / 4 m
Jumlah
8,000.00
240.00
11,550.00
1,320.00
21,110.00
B
1
2
3
4
5
6
BIAYA
SATUAN
( Rp )
BIAYA
SATUAN
( Rp )
8,000.00
240.00
11,550.00
1,320.00
21,110.00
M3
Kg
Ltr
M3
Lbr
Btg
595,200.00
9,000.00
7,500.00
595,200.00
56,500.00
4,000.00
0.040
0.400
0.200
0.015
0.350
6.000
23,808.00
3,600.00
1,500.00
8,928.00
19,775.00
24,000.00
81,611.00
102,721.00
0.00
102,721.00
Hal. 23
24. PEKERJAAN BEKISTING UNTUK DINDING / M
Analisa Biaya Konstrusi ( ABK ) berdasarkan SNI 2002 ( 19 - 28 )
HARGA
NO.
U R A I A N
SATUAN
SATUAN
KWANTITAS
( Rp )
A
TENAGA KERJA
1
Pekerja
Hari/Org
25,000.00
0.320
2
Mandor
Hari/Org
40,000.00
0.006
3
Tukang Kayu
Hari/Org
35,000.00
0.330
4
Kepala Tukang Kayu
Hari/Org
40,000.00
0.033
2
Jumlah
BIAYA
SATUAN
( Rp )
8,000.00
240.00
11,550.00
1,320.00
21,110.00
B
1
2
3
4
5
6
7
BAHAN
Kayu Klas III
Paku Biasa
Minyak Bekisting
Balok Kayu Kls.III
Multiplex tebal 9 mm
Kayu Bulat - 8 cm / 4 m
Farnutie / Penyangga bekisting
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
M3
Kg
Ltr
M3
Lbr
Btg
bh
595,200.00
9,000.00
7,500.00
595,200.00
56,500.00
4,000.00
4,000.00
0.030
0.400
0.200
0.020
0.350
3.000
4.000
17,856.00
3,600.00
1,500.00
11,904.00
19,775.00
12,000.00
16,000.00
82,635.00
103,745.00
0.00
103,745.00
B
1
2
C
D
E
U R A I A N
TENAGA KERJA
Pekerja
Tukang Besi
Kepala Tukang Besi
Jumlah
Upah 3/4
BAHAN
Besi Beton
Kawat Besi
Jumlah
SATUAN
HARGA
SATUAN
( Rp )
KWANTITAS
BIAYA
SATUAN
( Rp )
Hari/Org
Hari/Org
Hari/Org
25,000.00
35,000.00
40,000.00
9.000
9.000
3.000
225,000.00
315,000.00
120,000.00
660,000.00
495,000.00
Kg
Kg
6,950.00
10,000.00
110.000
2.000
764,500.00
20,000.00
784,500.00
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
Per M beton 125 kg besi
1.25
Jumlah
1,279,500.00
0.00
1,279,500.00
1,599,375.00
1,599,375.00
*) Berat beton tidak tetap 110 Kg., tergantung pada Konstruksi sampai 160 Kg.
Hal. 24
* SUB PEKERJAAN BETON CAMP. 1 : 2 : 3.
NO.
A.
B.
U R A I A N
SATUAN
HARGA
SATUAN
( Rp )
KWANTITAS
M3
M3
586,400.00
47,324.00
1.000
1.000
586,400.00
47,324.00
Kg.
1,599,375.00
1.000
1,599,375.00
2,233,099.00
F. PEKERJAAN PLESTERAN
1. PEKERJAAN PLESTERAN TEBAL 1,5 Cm CAMP. 1 : 4 (G.47 & G.50p / M 2)
BOW, Ir. J.A Mukomoko, Hal. 201 & 207
HARGA
NO.
U R A I A N
SATUAN
SATUAN
KWANTITAS
( Rp )
A
TENAGA KERJA
1
Pekerja
Hari/Org
25,000.00
0.400
2
Mandor
Hari/Org
40,000.00
0.020
3
Tukang Semen
Hari/Org
35,000.00
0.200
4
Kepala Tukang Semen
Hari/Org
40,000.00
0.020
Jumlah
B
BAHAN
BIAYA
SATUAN
( Rp )
BIAYA
SATUAN
( Rp )
10,000.00
800.00
7,000.00
800.00
18,600.00
1
2
Semen Portland
Pasir Pasang
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
.
Kg
M3
670.00
36,800.00
0.104
0.021
69.68
769.12
838.80
19,438.80
0.00
19,438.80
Hal. 25
G. PEKERJAAN KAYU
1. PEK. LANTAI JEMBATAN ( F.8 / M2)
BOW, Ir. J.A Mukomoko, Hal. 143
NO.
U R A I A N
A
1
2
3
4
TENAGA KERJA
Pekerja
Mandor
Tukang Kayu
Kepala Tukang Kayu
Jumlah
B
1
2
BAHAN
Papan Kayu belian tb. 5 cm
Paku
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
SATUAN
HARGA
SATUAN
( Rp )
KWANTITAS
Hari/Org
Hari/Org
Hari/Org
Hari/Org
25,000.00
40,000.00
35,000.00
40,000.00
0.200
0.010
0.500
0.050
5,000.00
400.00
17,500.00
2,000.00
24,900.00
M3
Kg
0.00
9,000.00
0.050
2.500
0.00
22,500.00
22,500.00
47,400.00
0.00
47,400.00
BIAYA
SATUAN
( Rp )
2,500.00
200.00
8,750.00
1,000.00
12,450.00
BAHAN
Jumlah
C
D
E
BIAYA
SATUAN
( Rp )
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
0.00
12,450.00
0.00
12,450.00
Hal. 26
3. PEK. KAYU KASAR PERANCAH, GELEGAR BALOK LANTAI GANTUNGAN LANGIT-LANGIT
KAYU KLS.II (F.1 / M3)
BOW, Ir. J.A Mukomoko, Hal. 140
HARGA
BIAYA
NO.
U R A I A N
SATUAN
SATUAN
KWANTITAS
SATUAN
( Rp )
( Rp )
A
TENAGA KERJA
1
Pekerja
Hari/Org
25,000.00
5.000
125,000.00
2
Mandor
Hari/Org
40,000.00
0.250
10,000.00
3
Tukang Kayu
Hari/Org
35,000.00
15.000
525,000.00
4
Kepala Tukang Kayu
Hari/Org
40,000.00
1.500
60,000.00
Jumlah
720,000.00
Koefisien upah 0,5
360,000.00
B
1
2
BAHAN
Kayu Kelas II
Paku
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
M3
Kg
595,200.00
9,000.00
1.100
0.200
654,720.00
1,800.00
656,520.00
1,016,520.00
0.00
1,016,520.00
BAHAN
Kayu Belian
Paku
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
* Kayu Disesuaikan Dengan Kondisi
M3
Kg
1,690,750.00
9,000.00
1.100
3.000
BIAYA
SATUAN
( Rp )
200,000.00
16,000.00
840,000.00
96,000.00
1,152,000.00
1,859,825.00
27,000.00
1,886,825.00
3,038,825.00
0.00
3,038,825.00
Hal. 27
5. PEK. KASO DAN RENG (F.16 / M2)
BOW, Ir. J.A Mukomoko, Hal. 146
NO.
U R A I A N
A
1
2
3
4
TENAGA KERJA
Pekerja
Mandor
Tukang Kayu
Kepala Tukang Kayu
Jumlah
B
1
2
BAHAN
Kayu Kelas II
Paku
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
SATUAN
HARGA
SATUAN
( Rp )
KWANTITAS
BIAYA
SATUAN
( Rp )
Hari/Org
Hari/Org
Hari/Org
Hari/Org
25,000.00
40,000.00
35,000.00
40,000.00
0.100
0.005
0.100
0.010
2,500.00
200.00
3,500.00
400.00
6,600.00
M3
Kg
595,200.00
9,000.00
0.017
0.010
10,118.40
90.00
10,208.40
16,808.40
0.00
16,808.40
U R A I A N
A
1
2
3
4
TENAGA KERJA
Pekerja
Mandor
Tukang Kayu
Kepala Tukang Kayu
Jumlah
B
1
2
BAHAN
Kayu Kelas II
Paku
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
SATUAN
HARGA
SATUAN
( Rp )
KWANTITAS
BIAYA
SATUAN
( Rp )
Hari/Org
Hari/Org
Hari/Org
Hari/Org
25,000.00
40,000.00
35,000.00
40,000.00
0.150
0.008
0.100
0.010
3,750.00
300.00
3,500.00
400.00
7,950.00
M3
Kg
595,200.00
9,000.00
0.011
0.010
6,547.20
90.00
6,637.20
14,587.20
0.00
14,587.20
Hal. 28
7. PEK. LISPLANK PAPAN BELIAN (F.21 / M )
BOW, Ir. J.A Mukomoko, Hal. 149
2
NO.
U R A I A N
A
1
2
3
4
TENAGA KERJA
Pekerja
Mandor
Tukang Kayu
Kepala Tukang Kayu
Jumlah
B
1
2
BAHAN
Papan Belian
Paku
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
SATUAN
HARGA
SATUAN
( Rp )
KWANTITAS
BIAYA
SATUAN
( Rp )
Hari/Org
Hari/Org
Hari/Org
Hari/Org
25,000.00
40,000.00
35,000.00
40,000.00
0.280
0.014
0.800
0.080
7,000.00
560.00
28,000.00
3,200.00
38,760.00
M3
Kg
0.00
9,000.00
0.017
0.100
0.00
900.00
900.00
39,660.00
0.00
39,660.00
U R A I A N
A
1
2
3
4
TENAGA KERJA
Pekerja
Mandor
Tukang Kayu
Kepala Tukang Kayu
Jumlah
Upah 3/4
B
1
2
BAHAN
Kayu Klas II Kayu
Paku
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
SATUAN
HARGA
SATUAN
( Rp )
KWANTITAS
BIAYA
SATUAN
( Rp )
Hari/Org
Hari/Org
Hari/Org
Hari/Org
25,000.00
40,000.00
35,000.00
40,000.00
12.000
0.600
36.000
3.600
300,000.00
24,000.00
1,260,000.00
144,000.00
1,728,000.00
1,296,000.00
M3
Kg
595,200.00
9,000.00
1.100
8.500
654,720.00
76,500.00
76,500.00
1,804,500.00
0.00
1,804,500.00
Hal. 29
9. PEK. KAYU RANGKA ATAP DGN BENTANGAN 7 M (F.22 / M )
BOW, Ir. J.A Mukomoko, Hal. 149
HARGA
NO.
U R A I A N
SATUAN
SATUAN
KWANTITAS
( Rp )
A
TENAGA KERJA
1
Pekerja
Hari/Org
25,000.00
8.000
2
Mandor
Hari/Org
40,000.00
0.400
3
Tukang Kayu
Hari/Org
35,000.00
24.000
4
Kepala Tukang Kayu
Hari/Org
40,000.00
2.400
Jumlah
Upah diambil 3/4 x.......
3
B
1
2
BAHAN
Kayu Klas II Kayu
Paku
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
M3
Kg
595,200.00
9,000.00
1.100
6.000
BIAYA
SATUAN
( Rp )
200,000.00
16,000.00
840,000.00
96,000.00
1,152,000.00
864,000.00
654,720.00
54,000.00
54,000.00
918,000.00
0.00
918,000.00
10. PEK. MEMBUAT KOSEN-KOSEN UNTUK INDUK RUMAH (RANGKA BADAN) (F.27 / M3)
BOW, Ir. J.A Mukomoko, Hal. 154
NO.
A
1
2
3
4
B
1
C
D
E
U R A I A N
TENAGA KERJA
Pekerja
Mandor
Tukang Kayu
Kepala Tukang Kayu
Jumlah
Upah 3/4
BAHAN
Kayu Klas I
Jumlah
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
SATUAN
Hari/Org
Hari/Org
Hari/Org
Hari/Org
M3
HARGA
SATUAN
( Rp )
KWANTITAS
BIAYA
SATUAN
( Rp )
25,000.00
40,000.00
35,000.00
40,000.00
12.000
0.600
36.000
3.600
300,000.00
24,000.00
1,260,000.00
144,000.00
1,728,000.00
1,296,000.00
1,690,750.00
1.200
2,028,900.00
2,028,900.00
3,324,900.00
0.00
3,324,900.00
Hal. 30
11. PEK. MEMBUAT KOSEN-KOSEN PINTU DAN JENDELA KAYU KLS.I
BOW, Ir. J.A Mukomoko, Hal. 152
NO.
A
1
2
3
4
B
1
C
D
E
U R A I A N
TENAGA KERJA
Pekerja
Mandor
Tukang Kayu
Kepala Tukang Kayu
Jumlah
Upah 3/4
BAHAN
Kayu Klas I / Belian
Jumlah
SATUAN
Hari/Org
Hari/Org
Hari/Org
Hari/Org
M3
HARGA
SATUAN
( Rp )
KWANTITAS
25,000.00
40,000.00
35,000.00
40,000.00
6.000
0.300
18.000
2.000
150,000.00
12,000.00
630,000.00
80,000.00
872,000.00
654,000.00
1,690,750.00
1.200
2,028,900.00
2,028,900.00
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
2,682,900.00
0.00
2,682,900.00
12. PEK. DAUN JENDELA & PINTU PANEL TEBAL 3,5 Cm (F.33 / M2)
BOW, Ir. J.A Mukomoko, Hal. 157
HARGA
NO.
U R A I A N
SATUAN
SATUAN
KWANTITAS
( Rp )
A
TENAGA KERJA
1
Mandor
Hari/Org
40,000.00
0.300
2
Kepala tukang kayu
Hari/Org
40,000.00
2.000
3
Tukang Kayu
Hari/Org
35,000.00
20.000
4
Pekerja
Hari/Org
25,000.00
6.000
Jumlah
B
1
BAHAN
Papan Kayu Belian (tebal 3,5cm )
Jumlah
C
D
E
Jumlah A + B
Biaya Umum dan Keuntungan = % x D
Harga Satuan = ( D + E )
BIAYA
SATUAN
( Rp )
M3
2,229,500.00
1.100
BIAYA
SATUAN
( Rp )
12,000.00
80,000.00
700,000.00
150,000.00
942,000.00
2,452,450.00
2,452,450.00
3,394,450.00
0.00
3,394,450.00
Hal. 31
12. PEKERJAAN PLAFON TRIPLEX 3mm (F.37 / M2)
BOW, Suplement
NO.
U R A I A N
A
1
2
3
4
TENAGA KERJA
Pekerja
Mandor
Tukang Kayu
Kepala Tukang Kayu
Jumlah
B
1
2
3
BAHAN
Kayu Kelas II
Paku
Triplex 3 mm
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
SATUAN
HARGA
SATUAN
( Rp )
KWANTITAS
BIAYA
SATUAN
( Rp )
Hari/Org
Hari/Org
Hari/Org
Hari/Org
25,000.00
40,000.00
35,000.00
40,000.00
0.280
0.140
0.800
0.080
7,000.00
5,600.00
28,000.00
3,200.00
43,800.00
M3
Kg
M2
595,200.00
9,000.00
32,500.00
0.011
0.100
0.350
6,547.20
900.00
11,375.00
18,822.20
62,622.20
0.00
62,622.20
U R A I A N
A
1
2
3
4
TENAGA KERJA
Pekerja
Mandor
Tukang Kayu
Kepala Tukang Kayu
Jumlah
B
1
2
BAHAN
Papan Belian Tb. 3.5 cm
Paku
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
SATUAN
Hari/Org
Hari/Org
Hari/Org
Hari/Org
M3
Kg
HARGA
SATUAN
( Rp )
KWANTITAS
BIAYA
SATUAN
( Rp )
25,000.00
40,000.00
35,000.00
40,000.00
0.600
0.030
1.800
0.180
15,000.00
1,200.00
63,000.00
7,200.00
86,400.00
2,229,500.00
9,000.00
0.025
0.200
55,737.50
1,800.00
57,537.50
143,937.50
0.00
143,937.50
Hal. 32
14. PEKERJAAN PINTU TRIPLEX 3mm (F.36 / M )
2
BOW, Suplement
NO.
A
1
2
3
4
B
1
2
3
C
D
E
U R A I A N
TENAGA KERJA
Pekerja
Mandor
Tukang Kayu
Kepala Tukang Kayu
Jumlah
Upah 2/3
BAHAN
Kayu Kelas I
Paku
Triplex 3 mm
Jumlah
SATUAN
HARGA
SATUAN
( Rp )
Hari/Org
Hari/Org
Hari/Org
Hari/Org
M3
Kg
Kp
KWANTITAS
BIAYA
SATUAN
( Rp )
25,000.00
40,000.00
35,000.00
40,000.00
2.000
0.100
6.000
0.600
50,000.00
4,000.00
210,000.00
24,000.00
288,000.00
192,000.00
1,650,000.00
9,000.00
32,500.00
0.035
0.100
1.000
57,750.00
900.00
32,500.00
91,150.00
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
283,150.00
0.00
283,150.00
U R A I A N
SATUAN
HARGA
SATUAN
( Rp )
KWANTITAS
BIAYA
SATUAN
( Rp )
A
1
2
3
4
TENAGA KERJA
Pekerja
Mandor
Tukang Kayu
Kepala Tukang Kayu
Jumlah
Hari/Org
Hari/Org
Hari/Org
Hari/Org
25,000.00
40,000.00
35,000.00
40,000.00
0.300
0.015
0.150
0.015
7,500.00
600.00
5,250.00
600.00
13,950.00
B
1
2
BAHAN
Atap Sirap Belian Kls.I
Paku
Jumlah
Lembar
Kg
1,500.00
9,000.00
120.000
0.150
180,000.00
1,350.00
181,350.00
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
195,300.00
0.00
195,300.00
Hal. 33
2. PEKERJAAN RANGKA ATAP SENG (H.8 / M2)
BOW, Ir. J.A Mukomoko, Hal. 227
NO.
U R A I A N
SATUAN
HARGA
SATUAN
( Rp )
KWANTITAS
BIAYA
SATUAN
( Rp )
A
1
2
3
4
TENAGA KERJA
Pekerja
Mandor
Tukang Kayu
Kepala Tukang Kayu
Jumlah
Hari/Org
Hari/Org
Hari/Org
Hari/Org
25,000.00
40,000.00
35,000.00
40,000.00
0.100
0.005
0.200
0.020
2,500.00
200.00
7,000.00
800.00
10,500.00
B
1
2
BAHAN
Atap Seng Gelombang BJLS.20
Paku Seng
Jumlah
Lembar
Kg
32,500.00
8,900.00
0.700
0.020
22,750.00
178.00
22,928.00
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
33,428.00
0.00
33,428.00
U R A I A N
SATUAN
HARGA
SATUAN
( Rp )
KWANTITAS
BIAYA
SATUAN
( Rp )
A
1
2
3
4
TENAGA KERJA
Pekerja
Mandor
Tukang Kayu
Kepala Tukang Kayu
Jumlah
Hari/Org
Hari/Org
Hari/Org
Hari/Org
25,000.00
40,000.00
35,000.00
40,000.00
0.100
0.050
0.200
0.020
2,500.00
2,000.00
7,000.00
800.00
12,300.00
B
1
2
BAHAN
Atap Zink Calum
Paku
Jumlah
Lembar
Kg
80,000.00
7,000.00
1.020
0.200
81,600.00
1,400.00
83,000.00
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
95,300.00
0.00
95,300.00
Hal. 34
4. PEKERJAAN TANGGA BIASA LBR. 1 M, LBR. ANAK TANGGA 0.30 M & TINGGI ANAK
TANGGA 0.15 M (F.45 / M2)
BOW, Ir. J.A Mukomoko, Hal. 165
NO.
U R A I A N
A
1
2
3
4
TENAGA KERJA
Pekerja
Mandor
Tukang Kayu
Kepala Tukang Kayu
Jumlah
B
1
BAHAN
Kayu Belian
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
SATUAN
Hari/Org
Hari/Org
Hari/Org
Hari/Org
M3
HARGA
SATUAN
( Rp )
KWANTITAS
BIAYA
SATUAN
( Rp )
25,000.00
40,000.00
35,000.00
40,000.00
1.000
0.050
3.000
0.300
25,000.00
2,000.00
105,000.00
12,000.00
144,000.00
1,690,750.00
0.050
84,537.50
84,537.50
228,537.50
0.00
228,537.50
U R A I A N
SATUAN
HARGA
SATUAN
( Rp )
KWANTITAS
BIAYA
SATUAN
( Rp )
A
1
2
3
TENAGA KERJA
Pekerja
Tukang Besi
Kepala Tukang Besi
Jumlah
Hari/Org
Hari/Org
Hari/Org
25,000.00
35,000.00
40,000.00
0.250
0.250
0.025
6,250.00
8,750.00
1,000.00
16,000.00
B
1
2
BAHAN
Seng Plat BJLS 30
Paku Seng
Jumlah
Lembar
Kg
38,000.00
7,000.00
6.000
12.000
228,000.00
84,000.00
312,000.00
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
Pekerjaan menutup 1 m' utk atap seng
328,000.00
0.00
328,000.00
32,800.00
Hal. 35
6. PEKERJAAN ATAP GENTENG (H.2 / M )
2
U R A I A N
A
1
2
3
4
TENAGA KERJA
Pekerja
Mandor
Tukang Batu
Kepala Tukang Batu
Jumlah
B
1
BAHAN
Genteng
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
SATUAN
HARGA
SATUAN
( Rp )
KWANTITAS
BIAYA
SATUAN
( Rp )
Hari/Org
Hari/Org
Hari/Org
Hari/Org
25,000.00
40,000.00
35,000.00
40,000.00
0.200
0.010
0.100
0.010
5,000.00
400.00
3,500.00
400.00
9,300.00
Buah
2,000.00
25.000
50,000.00
50,000.00
59,300.00
0.00
59,300.00
U R A I A N
SATUAN
HARGA
SATUAN
( Rp )
KWANTITAS
BIAYA
SATUAN
( Rp )
A
1
2
2
3
TENAGA KERJA
Pekerja
Mandor
Tukang Talang
Kepala Tukang Talang
Jumlah
Hari/Org
Hari/Org
Hari/Org
Hari/Org
25,000.00
40,000.00
35,000.00
40,000.00
3.000
0.150
5.000
0.500
75,000.00
6,000.00
175,000.00
20,000.00
276,000.00
B
1
2
BAHAN
Seng Plat BJLS 30
Besi penahan 10 mm
Jumlah
Lembar
Buah
38,000.00
2,000.00
3.000
11.000
114,000.00
22,000.00
136,000.00
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
412,000.00
0.00
412,000.00
Hal. 36
8. PEKERJAAN 10 M' PIPA PEMBUANGAN UK. 6x8 Cm DGN. SENG BJLS (H.18 /10 M 1 )
BOW, Suplement
NO.
U R A I A N
SATUAN
HARGA
SATUAN
( Rp )
KWANTITAS
BIAYA
SATUAN
( Rp )
A
1
2
2
3
TENAGA KERJA
Pekerja
Mandor
Tukang Talang
Kepala Tukang Talang
Jumlah
Hari/Org
Hari/Org
Hari/Org
Hari/Org
25,000.00
40,000.00
35,000.00
40,000.00
2.250
0.110
3.750
0.375
56,250.00
4,400.00
131,250.00
15,000.00
206,900.00
B
1
2
BAHAN
Seng Plat BJLS 30
Timah Patri
Jumlah
Lembar
Batang
38,000.00
2,000.00
2.000
1.000
76,000.00
2,000.00
78,000.00
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
284,900.00
0.00
284,900.00
Jumlah
B
1
BAHAN
Sabun
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
BIAYA
SATUAN
( Rp )
3,750.00
100.00
3,850.00
Kg
10,000.00
0.050
500.00
500.00
4,350.00
0.00
4,350.00
Hal. 37
2. PEK. MENDEMPUL DAN MENGGOSOK KAYU / M2
Analisa Biaya Konstrusi ( ABK ) berdasarkan SNI 2002 ( Hal 6 - 14 )
HARGA
NO.
U R A I A N
SATUAN
SATUAN
KWANTITAS
( Rp )
A
TENAGA KERJA
1
Pekerja
Hari/Org
25,000.00
0.040
2
Mandor
Hari/Org
40,000.00
0.0025
3
Tukang Cat
Hari/Org
35,000.00
0.040
4
Kepala Tukang Cat
Hari/Org
40,000.00
0.004
Jumlah
B
1
2
3
BAHAN
Dempul
Minyak Cat
Amplas
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
Kg
Kg
Lembar
15,000.00
11,500.00
1,600.00
BIAYA
SATUAN
( Rp )
1,000.00
100.00
1,400.00
160.00
2,660.00
0.080
0.020
1.000
1,200.00
230.00
1,600.00
3,030.00
5,690.00
0.00
5,690.00
3. PEK. PENGECATAN TEMBOK BARU ( 1 lapis plamur, 1 lapis cat dasar, 2 lapis penutup) / M 2
Analisa Biaya Konstrusi ( ABK ) berdasarkan SNI 2002 ( Hal 9 - 14 )
HARGA
NO.
U R A I A N
SATUAN
SATUAN
KWANTITAS
( Rp )
A
TENAGA KERJA
1
Pekerja
Hari/Org
25,000.00
0.020
2
Mandor
Hari/Org
40,000.00
0.0025
3
Tukang Cat
Hari/Org
35,000.00
0.063
4
Kepala Tukang Cat
Hari/Org
40,000.00
0.0063
Jumlah
B
1
2
3
C
D
E
BAHAN
Dempul
Cat Dasar
Cat Penutup
Kg
Kg
Kg
15,000.00
12,000.00
28,500.00
0.100
0.100
0.260
BIAYA
SATUAN
( Rp )
500.00
100.00
2,205.00
252.00
3,057.00
1,500.00
1,200.00
7,410.00
Jumlah
10,110.00
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
13,167.00
0.00
13,167.00
Hal. 38
4. PEK. Pengecatan Bidang Kayu baru ( 1 lapis plamur, 1 lapis cat dasar, 2 lapis penutup) / M2
Analisa Biaya Konstrusi ( ABK ) berdasarkan SNI 2002
NO.
U R A I A N
A
1
2
3
4
TENAGA KERJA
Pekerja
Mandor
Tukang Cat
Kepala Tukang Cat
Jumlah
B
1
2
3
4
BAHAN
Cat Meni
Dempul
Cat Dasar Kayu
Cat Penutup
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
SATUAN
HARGA
SATUAN
( Rp )
KWANTITAS
BIAYA
SATUAN
( Rp )
Hari/Org
Hari/Org
Hari/Org
Hari/Org
25,000.00
40,000.00
35,000.00
40,000.00
0.070
0.0025
0.009
0.006
1,750.00
100.00
315.00
240.00
2,405.00
Kg
Kg
Kg
Kg
15,000.00
15,000.00
28,500.00
28,500.00
0.200
0.150
0.170
0.260
3,000.00
2,250.00
4,845.00
7,410.00
17,505.00
19,910.00
0.00
19,910.00
Mandor
Tukang Cat
Kepala Tukang Cat
Jumlah
B
1
2
3
BAHAN
Pelitur
Pelitur Jati
Amplas
C
D
E
KWANTITAS
BIAYA
SATUAN
( Rp )
Hari/Org
Hari/Org
Hari/Org
40,000.00
35,000.00
40,000.00
0.0025
0.060
0.016
100.00
2,100.00
640.00
2,840.00
Ltr
Ltr
Lbr
15,000.00
15,000.00
1,600.00
0.150
0.372
2.000
2,250.00
5,580.00
3,200.00
Jumlah
11,030.00
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
13,870.00
0.00
13,870.00
Hal. 39
J. PEKERJAAN JALAN & JEMBATAN
1. PEK. MENARUH URUGAN PASIR DIBAWAH ALAS JALAN (W.1 /M3)
BOW, Ir. J.A Mukomoko, Hal. 262
NO.
U R A I A N
A
1
2
TENAGA KERJA
Pekerja
Mandor
Jumlah
B
1
BAHAN
Pasir Urug
Jumlah
C
D
E
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Harga Satuan = ( C + D )
SATUAN
HARGA
SATUAN
( Rp )
KWANTITAS
BIAYA
SATUAN
( Rp )
Hari/Org
Hari/Org
25,000.00
40,000.00
0.375
0.190
9,375.00
7,600.00
16,975.00
M3
36,800.00
1.200
44,160.00
44,160.00
61,135.00
0.00
61,135.00
2. PEK. MENGHAMPAR ALAS SETEBAL 15 Cm (Paglak dari Batu Belah /M2) (W.2 / M 2)
BOW, Ir. J.A Mukomoko, Hal. 262
NO.
A
1
2
B
1
2
U R A I A N
TENAGA KERJA
Pekerja
Mandor
Jumlah
BAHAN
Batu Belah Uk. 10/15
Pasir Urug
Jumlah
C
1
Peralatan
Biaya Gilas 1/75100 dari 1 bln (W.4)
Jumlah
D
E
F
Jumlah A + B + C
Biaya Umum & Keuntungan= % x D
Harga Satuan = ( D + E )
SATUAN
HARGA
SATUAN
( Rp )
KWANTITAS
BIAYA
SATUAN
( Rp )
Hari/Org
Hari/Org
25,000.00
40,000.00
0.375
0.019
9,375.00
760.00
10,135.00
M3
M3
137,500.00
36,800.00
0.200
0.050
27,500.00
1,840.00
29,340.00
10,545,000.00
1,406.00
1,406.00
40,881.00
0.00
40,881.00
Hal. 40
3. PEK. MENGASPAL JALAN DGN ASPAL PANAS (W.5 / 100 M )
2
U R A I A N
SATUAN
HARGA
SATUAN
KWANTITAS
( Rp )
A
1
2
B
1
2
TENAGA KERJA
Pekerja
Mandor
Jumlah
BAHAN
Aspal Panas
Split 1/2 Cm
Jumlah
C
1
Peralatan
Tempat Goreng
Jumlah
D
E
F
Jumlah A + B + C
Biaya Umum & Keuntungan= % x D
Harga Satuan = ( D + E )
BIAYA
SATUAN
( Rp )
Hari/Org
Hari/Org
25,000.00
40,000.00
10.000
0.500
250,000.00
20,000.00
270,000.00
kg
M3
3,600.00
219,000.00
250.000
1.200
900,000.00
262,800.00
1,162,800.00
Buah
45,000.00
0.500
22,500.00
22,500.00
1,455,300.00
0.00
1,455,300.00
4. PEK. MENGHAMPAR SLISTLANG (Lapis Kulit Penahan Tb. 6 Cm) KEMUDIAN DIGILAS
(W.3 /100 M2)
BOW, Ir. J.A Mukomoko, Hal. 263
HARGA
NO.
U R A I A N
SATUAN
SATUAN
BIAYA
KWANTITAS
( Rp )
A
1
2
B
1
2
TENAGA KERJA
Pekerja
Mandor
Jumlah
BAHAN
Batu Pecah Uk. 5/7, 3/4 Cm
Pasir Urug
Jumlah
C
1
Peralatan
Biaya Gilas /100 M2 (2/75 x(W.4))
Jumlah
D
E
F
Jumlah A + B + C
Biaya Umum & Keuntungan= % x D
Harga Satuan = ( D + E )
SATUAN
( Rp )
Hari/Org
Hari/Org
25,000.00
40,000.00
7.500
0.375
187,500.00
15,000.00
202,500.00
M3
M3
152,700.00
36,800.00
8.000
2.000
1,221,600.00
73,600.00
1,295,200.00
281,200.00
281,200.00
1,778,900.00
0.00
1,778,900.00
Hal. 41
5. PEK. 1 BULAN BIAYA MENGGILAS, UNTUK 1 BH MESIN GILAS (W.4 /100 M )
2
U R A I A N
A
1
2
3
4
TENAGA KERJA
Pekerja
Masinis
Penjaga Api
Penjaga Malam
Jumlah
B
1
BAHAN
Bahan Bakar Solar
SATUAN
HARGA
SATUAN
( Rp )
KWANTITAS
BIAYA
SATUAN
( Rp )
Hari/Org
Hari/Org
Hari/Org
Hari/Org
25,000.00
35,000.00
20,000.00
25,000.00
150.000
1.000
1.000
30.000
3,750,000.00
35,000.00
20,000.00
750,000.00
4,555,000.00
Liter
1,650.00
600.000
990,000.00
Jumlah
C
1
Peralatan
Sewa Mesin Gilas
Jumlah
D
E
F
Jumlah A + B + C
Biaya Umum & Keuntungan= % x D
Harga Satuan = ( D + E )
990,000.00
200,000.00
25.000
10,545,000.00
0.00
10,545,000.00
Biaya Menggilas (W.4) untuk 1 Mesin Gilas /100 m2 diperlukan = 2/75 x W.4 =
281,200.00
6. PEK. MENGASPAL DGN (SPLIT) & ASPAL PANAS TB.3 CM (C.10 / 100 M 2)
BOW, Ir. J.A Mukomoko, Hal. 335
HARGA
NO.
U R A I A N
SATUAN
SATUAN
KWANTITAS
( Rp )
A
TENAGA KERJA
1
Pekerja
Hari/Org
25,000.00
25.000
2
Mandor
Hari/Org
40,000.00
1.000
3
Tukang Aspal
Hari/Org
35,000.00
2.000
Jumlah
B
BAHAN
1
Pasir ( Stone Dust )
M3
243,100.00
2.000
2
Kerikil + Splite 1/2 Cm
M3
219,000.00
3.600
3
Aspal Panas
Kg
3,600.00
1,000.000
4
Kayu Bakar
M3
70,000.00
0.250
5
Residu
liter
1,250.00
200.000
Jumlah
C
1
Peralatan
Biaya Gilas 1 bln 1/3 x 1/75 x (W.4)
Jumlah
D
E
F
Jumlah A + B + C
Biaya Umum & Keuntungan= % x D
Harga Satuan = ( D + E )
5,000,000.00
5,000,000.00
10,545,000.00
BIAYA
SATUAN
( Rp )
625,000.00
40,000.00
70,000.00
735,000.00
486,200.00
788,400.00
3,600,000.00
17,500.00
250,000.00
5,142,100.00
2,609,887.50
2,609,887.50
8,486,987.50
0.00
8,486,987.50
Hal. 42
7. PEK. MENGASPAL DGN SPLIT ATAU DGN PASIR (OPERVLAKTE ASPHALT VEBETERING)
(C.13 /100 M1 )
BOW, Ir. J.A Mukomoko, Hal. 337
HARGA
BIAYA
NO.
U R A I A N
SATUAN
SATUAN
KWANTITAS
SATUAN
( Rp )
( Rp )
A
TENAGA KERJA
1
Pekerja
Hari/Org
25,000.00
22.000
550,000.00
2
Mandor
Hari/Org
40,000.00
1.000
40,000.00
3
Tukang Aspal
Hari/Org
35,000.00
2.000
70,000.00
Jumlah
660,000.00
B
1
2
3
4
BAHAN
Pasir
Kerikil + Splite
Aspal Panas
Kayu Bakar
Jumlah
C
1
2
3
4
5
Peralatan
Kawat sikat Baja
Sapu Lidi
Karung Goni
Skop
Minyak Tanah
Jumlah
M3
M3
Kg
M3
243,100.00
219,000.00
3,600.00
70,000.00
1.300
1.500
280.000
0.150
316,030.00
328,500.00
1,008,000.00
10,500.00
1,663,030.00
Buah
Buah
Buah
Buah
liter
3,500.00
1,500.00
750.00
12,500.00
1,800.00
0.200
2.000
2.000
2.000
0.400
700.00
3,000.00
1,500.00
25,000.00
720.00
30,920.00
D
E
F
Jumlah A + B + C
Biaya Umum & Keuntungan= % x D
Harga Satuan = ( D + E )
2,353,950.00
0.00
2,353,950.00
KETERANGAN :
1.
Banyaknya bahan dan biaya serta yang dibutuhkan untuk pembuatan Perekat
a. PC ( Portland Cement)
=
0,760 %
b. Pasir
=
0,675 %
c. Batu Krikil / Splite
=
0,520 %
Berat Jenis PC ( Portland Cemen)
= 1.250 Kg/M3
Untuk Pek.Beton Camp 1 : 3 : 5
1 M3 PC
=
3 M3 Pasir
=
5 M3 Krikil / Splite
=
1 M3 PC
1 M3 Pasir
1 M3 Krikil / Splite
2.
=
=
=
1 x 0,760
3 x 0,675
5 x 0,520
Jumlah
=
=
=
=
0.760
2.025
2.600
5.385
1 x 5,385
3 x 1/5,385
5 x 1/5,385
=
=
=
5,385 Zak
0,5571 M3
0,9285 M3
Biaya satuan sudah termasuk pengeluaran untuk seluruh Pajak yang berkaitan (tetapi
tidak termasuk PPN yang dibayarkan dari Kontrak) dan biaya lainnya. KEPMEN PU
No. 67/KPTS/1995 tanggal 13 Maret 1995.
TENAGA KERJA
SATUAN
KODE
TANPA
KEUNTUNGAN
(OVERHEAD)
(Rp)
A. UPAH
1
Mandor Lapangan
Org/hari
L.061
85,000.00
Mekanik
Org/hari
L.071
85,000.00
Kepala Tukang
Org/hari
L.073
85,000.00
Tukang Batu / Kayu / Gali / Besi / Cor / Semen / Cat / Listrik / Pancang Org/hari
L.079
78,000.00
Operator terlatih
Org/hari
L.081
70,000.00
Org/hari
L.082
62,000.00
Sopir
Org/hari
L.091
70,000.00
Org/hari
L.101
62,000.00
Org/hari
L.106
70,000.00
NO
MATERIAL
SATUAN
B. BAHAN PENGISI
1
Batu Kong
10
11
Stone Dust
12
Aspal
Kg
13
Pasir
14
Semen PC
Zak
15
Semen PC
Kg
16
17
18
Paving Block
Bh
19
Paving Stone
Bh
20
Bh
21
Bataco 15 x 30 x 7 cm
Bh
NO
MATERIAL
SATUAN
22
Bataco 20 x 40 x 9 cm ( press )
Bh
23
Bataco 20 x 40 x 7 cm ( press )
Bh
24
Kerawang ( roster ) 18 x 18 cm
Bh
25
Bh
26
Keramik 20 x 20 cm
Kotak
27
Keramik 30 x 30 cm
Kotak
28
Keramik 30 x 30 cm Unpolished
Kotak
29
Keramik 30 x 30 cm Artistik
Kotak
30
Keramik 40 x 40 cm (biasa)
Kotak
31
Kotak
32
Kotak
33
Kotak
34
Kotak
35
Kotak
36
Kotak
37
Granito 40 x 40 cm
Kotak
38
Marmer
39
Wood Flooring
40
Karpet
41
Wallpaper
42
Bh
43
Bh
44
Keramik dinding 20 x 20 cm
Kotak
NO
MATERIAL
SATUAN
45
Keramik dinding 20 x 25 cm
46
Floor Hardener
Kotak
Kg
47
48
49
50
51
52
53
54
Btg
55
Btg
56
Btg
57
Btg
58
Kpg
59
Kpg
60
Btg
61
62
Liter
Lembar
C.
BAHAN KAYU
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
NO
MATERIAL
SATUAN
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
Papan Simpiran
43
Btg
44
Btg
45
Btg
NO
MATERIAL
SATUAN
46
Btg
47
Btg
48
Btg
49
Btg
50
51
Alas laci
Btg
52
Wood Plank
M'
D.
BAHAN CAT
Amplas
Lbr
Minyak cat
Kg
Cat kilat
Kg
Plamur
Kg
Cat dasar
Kg
Cat tembok
Kg
Kg
Kg
Cat seng
Kg
10
Dempul
Kg
11
Plitur
Kg
12
Thiner
Ltr
13
Thiner ND
Ltr
14
Melamic
Ltr
15
Vernis
Ltr
16
Meni
Kg
17
Oker
Kg
18
Lem Kayu
Kg
19
Sealent
20
Soda Api
Kg
21
Kg
22
Teak Oil
Ltr
23
Ter / Residu
Ltr
24
Kuas 4"
Bh
25
Ltr
26
Glass Bit
Kg
27
Kg
28
Termoplast
Kg
29
Water Proofing
Tube
E.
Kg
Kg
Kawat baja/bendrat
Kg
Simpai roll
Kg
NO
MATERIAL
SATUAN
Kawat simpai
Kg
Btg
Besi Penahan
bh
Beugel plat L. 3 cm
bh
Bh
10
Kg
11
Besi Konstruksi ( C )
Kg
12
Kg
13
Kawat Las
Btg
NO
MATERIAL
SATUAN
14
Kawat Las
Kg
15
Kawat harmonika
16
Kawat kasa
17
Btg
18
Btg
19
Btg
20
Btg
21
Btg
22
Btg
23
Btg
24
Btg
25
Folding gate
26
Meter
27
Meter
28
29
Rangka Baja Ringan Zincalume (truss/color) (Tanpa Jurai Dalam - Bentang s/d 16 m)
30
Rangka Baja Ringan Zincalume (truss/color) (Tanpa Jurai Dalam - Bentang 17 m s/d 30 m)
31
Rangka Baja Ringan Zincalume (truss/color) (Dengan Jurai Dalam - Bentang s/d 16m)
32
Rangka Baja Ringan Zincalume (truss/color) (Dengan Jurai Dalam - Bentang 17 m s/d 30 m
33
Rangka Baja Ringan Zincalume (truss/polos) (Tanpa Jurai Dalam - Bentang s/d 16 m)
34
Rangka Baja Ringan Zincalume (truss/polos) (Tanpa Jurai Dalam - Bentang 17 m s/d 30 m)
35
Rangka Baja Ringan Zincalume (truss/polos) (Dengan Jurai Dalam - Bentang s/d 16m)
36
Rangka Baja Ringan Zincalume (truss/polos) (Dengan Jurai Dalam - Bentang 17 m s/d 30 m
37
38
F.
BAHAN PENGANTUNG
Bh
Kait angin
Bh
Handle Jendela
Bh
Handle Pintu
Bh
Engsel jendela
Bh
Engsel pintu
Bh
Slot pintu
Bh
Slot jendela
Bh
Unit
Bh
10
Bh
11
Bh
12
Bh
13
Kunci silinder
Bh
14
Door Closer
Bh
15
Door Stoper
Bh
16
Paku Seng
Kg
17
Kg
NO
MATERIAL
SATUAN
18
Paku beton
Kg
19
Kg
20
Paku triplek
Kg
21
Paku GRC
Kg
22
Sekrup Gypsum
Kg
23
Sekrup Fixer
Bh
24
Bh
25
Sekrup Zincalume
Bh
26
Unit
27
Unit
28
Unit
29
Unit
30
Kusen Alumunium
M'
NO
MATERIAL
SATUAN
G.
BAHAN ATAP
Sirap belian
Lbr
Asbes
Lbr
Eternit
Lbr
Lbr
Lbr
Lbr
Lbr
M'
10
11
12
13
Bh
14
Nok bubungan genteng metal stone 1/2 lingkaran 0.35 (pj 40cm)
Bh
15
M'
16
M'
17
M'
18
M'
19
M'
20
M'
21
M'
22
M'
23
Lbr
24
Lbr
25
Lbr
26
Lbr
27
M'
28
Lbr
29
30
31
32
33
Lbr
34
Aluminium Foil
35
36
37
Lbr
H.
BAHAN KACA
Kaca Polos, t = 5 mm
Kaca Rayben, t = 5 mm
NO
MATERIAL
SATUAN
Kaca Patri
Sealent
Kg
Bh
Bh
Kaca Es
10
Kaca Polos, t = 8 mm
11
Kaca Raindown, t = 5 mm
12
Kaca Buram, t = 5 mm
NO
MATERIAL
SATUAN
I.
BAHAN TRIPLEK
Triplek t = 3 mm
Lbr
Triplek t = 6 mm
Lbr
Triplek t =9 mm
Lbr
Multiplek t = 10 mm
Lbr
Multiplek t = 12 mm
Lbr
Lbr
Lbr
GypsumBoard t = 9mm
Lbr
Tepung Gypsum
Kg
10
M'
J.
BAHAN SANITASI
Bh
Bh
Bh
Bh
Bh
Urinoir
Bh
Washtafel
Bh
Floor Drain
Bh
Bh
Btg
Btg
Btg
10
Btg
11
Btg
12
Btg
13
Btg
14
Seal Tape
Bh
K.
Ltr
Minyak solar
Ltr
Ltr
Bensin premium
Ltr
Minyak pelumas
Ltr
Ltr
Minyak tanah
Ltr
Gas Elpiji
Kg
Alat-alat bantu
Set
10
Jam
11
Sewa Molen
Set
NO
MATERIAL
12
L.
SATUAN
Set
Unit
Unit
Unit
Unit
Unit
Unit
Set
Set
Set
Set
Tiang
Tiang
Btg
Btg
Tiang
Tiang
Btg
Btg
Btg
Btg
Btg
Btg
Btg
12
Btg
Set
Set
NO
MATERIAL
SATUAN
Buah
29 Traffo
Buah
30 Traffo
Buah
31 Traffo
Buah
32 Traffo
Buah
33 Traffo
Buah
34 Traffo
Buah
35 Traffo
Buah
36 Traffo
Buah
37 Traffo
SON T 70 Watt
Buah
38 Traffo
Buah
39 Traffo
Buah
40 Traffo
Buah
41 Traffo
SON H 70 Watt
Buah
42 Traffo
HPiT 400
Buah
43 Traffo
Neon 40 Watt
Buah
44 Traffo
Neon 20 Watt
Buah
45 Traffo
Neon 10 Watt
Buah
46 Traffo
400 Watt
Buah
47 HPL
250 Watt
Buah
48 HPL
125 Watt
Buah
49 HPL
135 Watt
Buah
50 SOX
180 Watt
Buah
51 SOX
160 Watt
Buah
52 MLL
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
NO
MATERIAL
SATUAN
61 SON H 70 Watt
Buah
Buah
Buah
Kotak
65 Seri Kuning
Kotak
66 Neon Sen
Meter
67 Pijar 5 Watt
Buah
68 Pijar 20 Watt
Buah
69 Pijar 25 Watt
Buah
70 Pijar 40 Watt
Buah
71 Pijar 60 Watt
Buah
72 Pijar 75 Watt
Buah
73 Pijar 80 Watt
Buah
Buah
Buah
76 Neon 40 Watt
Buah
77 Neon 20 Watt
Buah
78 Neon 10 Watt
Buah
Set
Buah
Buah
82 Lampu XL 14 Watt
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
99 Lampu Taman
Buah
100 SL 15 Watt
Buah
101 SL 18 Watt
Buah
102 SL 25 Watt
Buah
Buah
Buah
NO
MATERIAL
SATUAN
Buah
Buah
Buah
Buah
Buah
110 NYY
1 x 2.5 mm
Meter
111 NYY
1 x 4 mm
Meter
112 NYY
1 x 6 mm
Meter
113 NYY
2 mm
Meter
114 NYY
2 x 2.5 mm
Meter
115 NYY
2 x 4 mm
Meter
116 NYY
2 x 6 mm
Meter
117 NYY
2 x 10 mm
Meter
118 NYY
3 x 4 mm
Meter
119 NYY
4 x 2.5 mm
Meter
120 NYY
4 x 4 mm
Meter
121 NYY
4 x 6 mm
Meter
122 NYY
4 x 10 mm
Meter
123 NYY
4 x 16 mm
Meter
124 NYY
4 x 25 mm
Meter
125 NYY
4 x 35 mm
Meter
126 NYY
4 x 50 mm
Meter
127 NYY
4 x 70 mm
Meter
NO
MATERIAL
SATUAN
128 NYN
2 x 2,5 mm
Meter
129 NYN
3 x 1,5 mm
Meter
130 NYN
3 x 2,5 mm
Meter
131 NYA
1 x 1,5 mm
Meter
132 NYA
1 x 2,5 mm
Meter
133 NYA
1 x 4 mm
Meter
134 NYA
1 x 6 mm
Meter
Meter
136 NYF6BY 2 x 4 mm
Meter
137 NYF6BY 2 x 30 mm
Meter
138 NYF6BY 4 x 6 mm
Meter
Meter
140 NYF6BY 4 mm
Meter
141 NYM
10 mm
Meter
142 NYM
16 mm
Meter
143 NYM
Meter
144 NYM
Meter
145 NYM
Meter
146 NYM
Meter
147 NYM
Meter
148 NYM
Meter
149 NYM
4 mm
Meter
150 NYM
3 x 4 mm
Meter
151 NYM
2 x 2 mm
Meter
152 NYMHYM2 x 4 mm
Meter
Meter
Buah
Roll
Meter
Meter
Roll
159 Kabel 3 4 x 4 mm
160 Kabel Antena
Meter
Roll
161 Kabel H / M
Meter
Meter
Meter
164 Kabel TC 2 x 10 mm
Meter
165 Kabel TC 2 x 16 mm
Meter
Buah
Buah
Buah
Buah
170 Conector
Buah
Buah
NO
MATERIAL
SATUAN
172 Esensial
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
184 Icnitor SN 58
Buah
185 Inector
Buah
186 Ignator
Buah
187 Indiktor
Buah
188 Insuluk
Buah
189 Kapasitor
Buah
Buah
Buah
Buah
Buah
Buah
NO
MATERIAL
SATUAN
Buah
Buah
Buah
Buah
199 MCB 25 A
Buah
200 MCB 63 A
Buah
201 MCB 40 A
Buah
202 MCB 45 A
Buah
203 MCB 50 A
Buah
204 MCB 10 A
Buah
205 MCB 16 A
Buah
206 MCB 6 A
Buah
207 MCB 32 A
Buah
Buah
Buah
210 MC Se-3 N
Buah
Buah
Buah
213 NH Fuse 80 A
Buah
Buah
Buah
Buah
Buah
Buah
219 On - Off
Buah
220 Pat 38
Buah
Buah
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Unit
Buah
Buah
NO
MATERIAL
SATUAN
Buah
Buah
Buah
Buah
Buah
Buah
245 Sekring 63 A
Buah
Buah
247 Solder
Buah
NO
MATERIAL
SATUAN
Buah
Buah
Buah
251 Steker T
Buah
252 Steker PH
Buah
Bungkus
Bungkus
Bungkus
Bungkus
Bungkus
Bungkus
Bungkus
Bungkus
Buah
262 Stater
Buah
263 Ston 63 A
Buah
264 Stost 40 A + Ip
Buah
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
Buah
Buah
Buah
Buah
Buah
Stost 32 A + Ip
Tedus Hitam
Tali Tester
Tang Amper
Tang Buaya
Tang Potong
Tang Kombinasi
Tang Jepit
Tang Skun
Time Swicht Theben
Taping
Taping Conector 1 baut
Taping Conector 2 baut
Tespen
Timah Solder
Terminal 25 ml
Tolkit
Wedge Klem
Wide Klem
WD 40
Klem Tiang uk. 5" s/d 8" x 2"
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Set
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)
8,500.00
93,500.00
8,500.00
93,500.00
8,500.00
93,500.00
7,800.00
85,800.00
7,000.00
77,000.00
6,200.00
68,200.00
7,000.00
77,000.00
6,200.00
68,200.00
7,000.00
77,000.00
KODE
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)
M.101
192,500.00
220,000.00
259,880.00
M.020
275,000.00
M.022
385,000.00
M.023
330,000.00
M.024
359,700.00
M.025
418,620.00
467,500.00
M.026
476,670.00
408,540.00
10,890.00
M.040
91,300.00
M.080
72,820.00
1,460.00
M.050.a
120,000.00
M.050
238,340.00
2,640.00
4,360.00
2,790.00
1,040.00
KODE
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)
2,530.00
2,310.00
29,700.00
45,100.00
52,440.00
45,930.00
57,750.00
64,130.00
71,390.00
130,170.00
113,670.00
167,750.00
148,500.00
308,000.00
242,000.00
193,470.00
499,130.00
302,500.00
225,000.00
100,000.00
8,800.00
60,500.00
56,650.00
KODE
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)
56,830.00
9,080.00
1,018,050.00
1,100,000.00
1,175,900.00
1,324,400.00
1,405,250.00
44,000.00
12,710.00
1,270,500.00
1,669,800.00
1,089,000.00
1,216,050.00
968,000.00
1,234,200.00
145,200.00
60,500.00
3,850.00
14,513,890.00
13,857,640.00
11,806,930.00
9,227,860.00
M.181.a
14,655,350.00
M.181.b
11,435,420.00
11,458,340.00
8,107,850.00
13,566,670.00
16,041,670.00
14,057,340.00
13,646,880.00
18,333,340.00
13,893,230.00
M.181.e
16,958,370.00
M.181.d
15,074,070.00
M.181.f
11,733,340.00
M.181.g
11,733,340.00
8,983,340.00
8,983,340.00
11,550,000.00
115,500.00
M.181.h
3,646,680.00
M.181.i
3,915,320.00
KODE
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)
5,219,520.00
5,490,840.00
2,764,960.00
2,716,480.00
4,393,890.00
3,858,150.00
4,094,370.00
5,188,340.00
3,807,230.00
4,947,360.00
2,813,560.00
2,436,300.00
M.181.j
6,518,520.00
M.181.k
6,569,450.00
9,052,120.00
10,388,890.00
M.181.l
1,599,590.00
1,159,550.00
42,680.00
31,900.00
5,630.00
KODE
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)
13,750.00
10,450.00
80,850.00
99,000.00
219,620.00
16,500.00
60,500.00
2,840.00
28,190.00
45,650.00
29,520.00
47,850.00
73,920.00
180,840.00
180,680.00
194,150.00
36,990.00
50,160.00
M.090.f
26,090.00
32,450.00
58,300.00
71,370.00
65,220.00
55,920.00
21,520.00
137,500.00
19,800.00
20,350.00
48,400.00
58,300.00
20,680.00
M.090.e
99,000.00
M.090.g
40,170.00
M.090.h
110,000.00
41,270.00
72,600.00
M.167
15,600.00
20,610.00
M.168
19,800.00
23,420.00
KODE
M.163
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)
54,380.00
8,250.00
33,000.00
42,350.00
490,050.00
19,730.00
20,450.00
20,450.00
22,550.00
KODE
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)
126,500.00
39,880.00
15,130.00
148,610.00
121,880.00
191,510.00
269,830.00
312,730.00
384,450.00
614,350.00
837,380.00
715,000.00
90,750.00
116,160.00
2,631,750.00
205,700.00
290,400.00
217,800.00
326,700.00
193,600.00
242,000.00
205,700.00
278,300.00
1,045,000.00
148,500.00
302,500.00
14,850.00
16,500.00
162,250.00
24,750.00
33,000.00
20,350.00
23,930.00
184,250.00
187,000.00
179,020.00
88,550.00
110,000.00
231,000.00
77,000.00
M.166.a
24,530.00
M.166.b
20,900.00
KODE
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)
27,500.00
M.166.c
27,500.00
28,870.00
28,870.00
96,800.00
1,650.00
530.00
580.00
4,840,000.00
2,420,000.00
1,815,000.00
726,000.00
84,700.00
KODE
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)
6,050.00
56,650.00
78,650.00
69,630.00
69,630.00
67,320.00
88,880.00
88,880.00
93,500.00
128,630.00
114,950.00
129,110.00
71,500.00
88,000.00
93,900.00
111,320.00
125,840.00
141,570.00
50,820.00
58,080.00
47,190.00
50,820.00
72,770.00
51,370.00
52,800.00
72,770.00
22,990.00
62,340.00
138,070.00
121,490.00
154,760.00
138,070.00
143,990.00
60,500.00
128,150.00
128,150.00
17,500.00
133,100.00
605,000.00
160,930.00
KODE
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)
242,000.00
320,000.00
3,025,000.00
122,820.00
280,720.00
309,760.00
183,920.00
313,500.00
159,500.00
159,500.00
KODE
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)
52,190.00
230,220.00
165,830.00
205,700.00
229,270.00
109,340.00
64,970.00
67,100.00
28,000.00
17,500.00
1,870,000.00
2,252,250.00
2,475,000.00
212,030.00
147,130.00
1,585,000.00
1,700,000.00
155,000.00
38,500.00
17,910.00
27,670.00
40,700.00
61,820.00
117,150.00
176,830.00
700,000.00
15,000.00
M.183
9,950.00
M.183
4,525.00
10,550.00
M.184
4,950.00
M.185
26,625.00
51,325.00
M.064
9,650.00
9,150.00
M.170
62,700.00
68,750.00
165,000.00
KODE
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)
69,650.00
16,410,050.00
-
6,802,975.00
4,642,450.00
6,362,500.00
5,327,925.00
6,155,475.00
678,625.00
8,320,175.00
6,933,500.00
4,486,375.00
9,664,950.00
8,482,175.00
9,019,500.00
9,473,150.00
83,772,750.00
100,526,200.00
13,508,050.00
15,406,925.00
13,507,775.00
14,193,250.00
1,225,150.00
1,225,100.00
1,140,625.00
849,975.00
644,350.00
5,812,750.00
4,207,725.00
KODE
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)
993,925.00
311,225.00
251,800.00
155,600.00
1,050,475.00
1,050,475.00
1,158,450.00
572,600.00
466,575.00
371,800.00
180,150.00
510,100.00
350,150.00
309,500.00
184,750.00
337,125.00
24,450.00
20,400.00
17,950.00
252,950.00
184,850.00
87,500.00
605,150.00
605,150.00
87,500.00
925,400.00
419,500.00
404,425.00
309,500.00
210,050.00
350,150.00
350,150.00
309,500.00
KODE
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)
186,925.00
448,025.00
432,050.00
73,800.00
73,800.00
55,400.00
2,800.00
4,650.00
4,650.00
4,650.00
6,600.00
6,600.00
5,250.00
8,300.00
18,425.00
54,300.00
29,425.00
15,325.00
716,200.00
175,450.00
55,400.00
46,125.00
183,025.00
46,125.00
7,325.00
8,300.00
46,125.00
46,125.00
36,975.00
93,450.00
197,300.00
110,775.00
27,700.00
29,525.00
42,450.00
49,900.00
51,750.00
68,325.00
46,125.00
153,750.00
59,900.00
77,450.00
36,850.00
44,400.00
KODE
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)
69,175.00
183,025.00
53,575.00
105,300.00
119,950.00
3,950.00
6,150.00
9,675.00
14,950.00
16,250.00
23,300.00
22,100.00
29,150.00
31,600.00
31,200.00
46,125.00
74,900.00
101,900.00
87,725.00
363,850.00
406,300.00
498,525.00
179,100.00
KODE
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)
20,650.00
16,900.00
24,625.00
23,075.00
35,275.00
40,200.00
60,050.00
169,450.00
186,750.00
221,625.00
272,875.00
363,650.00
471,325.00
4,750.00
26,225.00
7,925.00
19,525.00
13,550.00
5,875.00
7,325.00
10,500.00
36,850.00
13,425.00
33,925.00
4,150.00
7,075.00
1,237,175.00
73,800.00
36,850.00
73,800.00
240,000.00
10,500.00
46,125.00
2,700.00
3,675.00
2,200.00
9,450.00
13,175.00
11,000.00
5,500.00
73,800.00
1,472,175.00
10,625.00
9,275.00
KODE
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)
46,125.00
1,950.00
4,650.00
36,975.00
23,225.00
23,225.00
29,450.00
36,975.00
16,650.00
92,375.00
92,375.00
6,600.00
132,950.00
110,775.00
128,700.00
173,250.00
425.00
207,900.00
36,600.00
58,575.00
129,200.00
129,200.00
5,575.00
KODE
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)
14,825.00
1,125.00
39,950.00
46,600.00
203,325.00
333,150.00
173,050.00
224,800.00
313,625.00
149,100.00
159,725.00
179,225.00
375,350.00
4,650.00
83,100.00
1,213,375.00
664,825.00
1,766,600.00
33,300.00
433,500.00
64,650.00
46,600.00
46,600.00
39,950.00
8,350.00
69,250.00
166,175.00
304,900.00
10,200.00
2,800.00
12,025.00
11,100.00
22,200.00
57,900.00
199,650.00
110,775.00
129,275.00
583,700.00
757,925.00
1,524,500.00
1,698,725.00
1,916,500.00
3,750.00
18,425.00
KODE
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)
27,700.00
6,525.00
8,350.00
5,725.00
22,200.00
73,800.00
12,025.00
406,300.00
27,700.00
KODE
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)
166,175.00
5,575.00
11,100.00
12,925.00
3,750.00
1,300.00
1,750.00
1,925.00
5,125.00
6,600.00
3,750.00
5,575.00
11,150.00
1,300.00
3,750.00
166,225.00
70,225.00
46,175.00
950.00
27,700.00
1,200,425.00
36,950.00
36,950.00
36,950.00
36,950.00
369,350.00
788,200.00
609,450.00
14,250.00
23,225.00
9,225.00
27,700.00
46,175.00
83,100.00
5,575.00
8,550.00
46,175.00
256,225.00
DAFTAR REKAPITULASI
ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
KOTA PONTIANAK
TAHUN ANGGARAN 2012
KODE
ANALISA
1
A.
P.PS.01
P.PS.02
P.PS.03
P.PS.04
B.
PT.01
PT.02
PT.03
PT.04
PT.05
PT.06
PT.07
PT.08
PT.09
PT.10
PT.11
PT.12
C.
P.PND 01
P.PND 02
P.PND. 03
P.PND. 04
P.PND. 05
P.PND. 06
P.PND. 07
D.
PB.01
PB.02
PB.03
PB.04
PB.05
PB.06
PB.07
PB.08
PB.09
PB.10
PB.11
PB.12
KODE
ANALISA
1
PB.13
PB.14
PB.15
PB.16
PB.17
PB.18
PB.19
PB.20
PB.21
PB.22
PB.23
PB.24
PB.25
PB.26
PB.27
PB.28
PB.29
PB.30
PB.31
PB.32
PB.33
PB.34
PB.35
PB.36
KODE
ANALISA
1
E.
P.DND.01
P.DND.02
P.DND.03
P.DND.04
F.
P.PLS.01
P.PLS.02
P.PLS.03
P.PLS.04
P.PLS.05
P.PLS.06
P.PLS.07
P.PLS.08
P.PLS.09
P.PLS.10
P.PLS.11
G.
PK.01
PK.02
PK.03
PK.04
PK.05
PK.06
PK.07
PK.08
PK.09
PK.10
PK.11
PK.12
PK.13
PK.14
PK.15
PK.16
PK.17
PK.18
PK.19
PK.20
PK.21
PK.22
H.
P.PA.
P.PA.
P.PA.
P.PA.
P.PA.
P.PA.
01
02
03
04
05
06
KODE
ANALISA
1
P.PA. 07
I.
P.LL.01
P.LL.02
P.LL.03
P.LL.04
P.LL.05
P.LL.06
J.
P.SNT.
P.SNT.
P.SNT.
P.SNT.
P.SNT.
P.SNT.
P.SNT.
P.SNT.
P.SNT.
P.SNT.
P.SNT.
P.SNT.
P.SNT.
P.SNT.
P.SNT.
P.SNT.
P.SNT.
P.SNT.
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
KODE
ANALISA
1
K.
P.BA.
P.BA.
P.BA.
P.BA.
P.BA.
P.BA.
P.BA.
P.BA.
01
03
04
05
06
07
08
09
L.
P.KK.
P.KK.
P.KK.
P.KK.
P.KK.
P.KK.
P.KK.
P.KK.
P.KK.
P.KK.
P.KK.
P.KK.
P.KK.
P.KK.
P.KK.
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
M.
P.PLD.01
P.PLD.02
P.PLD.03
P.PLD.04
P.PLD.05
P.PLD.06
P.PLD.07
P.PLD.08
P.PLD.09
P.PLD.10
P.PLD.11
P.PLD.12
N.
P.CT.
P.CT.
P.CT.
P.CT.
P.CT.
P.CT.
P.CT.
P.CT.
01
02
03
04
05
06
07
08
KODE
ANALISA
1
P.CT.
P.CT.
P.CT.
P.CT.
09
10
11
12
DAFTAR REKAPITULASI
ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
KOTA PONTIANAK
TAHUN ANGGARAN 2012
URAIAN PEKERJAAN
2
PEKERJAAN PERSIAPAN ( P.PS )
1.
2.
3.
4.
PEKERJAAN TANAH ( PT )
1. MENGGALI 1 M3 TANAH BIASA SEDALAM 1 METER
2. MENGGALI 1 M3 TANAH BIASA SEDALAM 2 METER
3. MENGGALI 1 M3 TANAH BIASA SEDALAM 3 METER
4. MENGGALI 1 M3 TANAH KERAS SEDALAM 1 METER
5. MENGGALI 1 M3 TANAH CADAS SEDALAM 1 METER
6. MENGGALI 1 M3 TANAH LUMPUR SEDALAM 1 METER
7. MENGERJAKAN 1 M2 STRIPING TEBING SETINGGI 1 METER
8. MEMBUANG 1 M3 TANAH SEJAUH 15 METER
9. MENGURUG KEMBALI 1 M3 GALIAN
10. MEMADATKAN 1 M3 TANAH ( PER 20 CM )
11. MENGURUG 1 M3 PASIR URUG
12. MENGURUG 1 M3 SIRTU UNTUK PENINGGIAN LANTAI BANGUNAN
MEMASANG
MEMASANG
MEMASANG
MEMASANG
MEMASANG
MEMASANG
MEMASANG
1
1
1
1
1
1
1
M3
M3
M3
M3
M3
M3
M3
PEKERJAAN BETON ( PB )
1. MEMBUAT 1 M3 BETON MUTU f'c = 7,4 MPa ( K 100 ), SLUMP ( 12 2 ) CM, w/c = 0.87
2. MEMBUAT 1 M3 BETON MUTU f'c = 9,8 MPa ( K 125 ), SLUMP ( 12 2 ) CM, w/c = 0.78
3. MEMBUAT 1 M3 BETON MUTU f'c = 12,2 MPa ( K 150 ), SLUMP ( 12 2 ) CM, w/c = 0.72
4. MEMBUAT 1 M3 LANTAI KERJA BETON MUTU f'c = 7, 4 MPa ( K 100 ), SLUMP ( 3 - 6 ) CM, w/c = 0.87
5. MEMBUAT 1 M3 BETON MUTU f'c = 14, 5 MPa ( K 175 ), SLUMP ( 12 2 ) CM, w/c = 0.66
6. MEMBUAT 1 M3 BETON MUTU f'c = 16, 9 MPa ( K 200 ), SLUMP ( 12 2 ) CM, w/c = 0.61
7. MEMBUAT 1 M3 BETON MUTU f'c = 19, 3 MPa ( K 225 ), SLUMP ( 12 2 ) CM, w/c = 0.58
8. MEMBUAT 1 M3 BETON MUTU f'c = 21, 7 MPa ( K 250 ), SLUMP ( 12 2 ) CM, w/c = 0.56
9. MEMBUAT 1 M3 BETON MUTU f'c = 24,0 MPa ( K 275 ), SLUMP ( 12 2 ) CM, w/c = 0.53
10. MEMBUAT 1 M3 BETON MUTU f'c = 26,4 MPa ( K 300 ), SLUMP ( 12 2 ) CM, w/c = 0.52
11. MEMBUAT 1 M3 BETON MUTU f'c = 28,8 MPa ( K 325 ), SLUMP ( 12 2 ) CM, w/c = 0.49
12. MEMBUAT 1 M3 BETON MUTU f'c = 31,2 MPa ( K 350 ), SLUMP ( 12 2 ) CM, w/c = 0.48
URAIAN PEKERJAAN
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
2
MEMBUAT 1 M3 BETON KEDAP AIR DENGAN STROROX - 100
MEMBUAT 1 M' PVC WATERSTOP LEBAR 150 MM
MEMBUAT 1 M' PVC WATERSTOP LEBAR 200 MM
MEMBUAT 1 M' PVC WATERSTOP LEBAR 230 MM - 320 MM
PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR
MEMASANG 10 KG KABEL PRESSTRESSED POLOS/STRAND
MEMASANG 10 KG JARING KAWAT BAJA/ WIRE MESH
MEMASANG 1 M2 BEKISTING UNTUK PONDASI
MEMASANG 1 M2 BEKISTING UNTUK SLOOF
MEMASANG 1 M2 BEKISTING UNTUK KOLOM
MEMASANG 1 M2 BEKISTING UNTUK BALOK
MEMASANG 1 M2 BEKISTING UNTUK LANTAI
MEMASANG 1 M2 BEKISTING UNTUK DINDING
MEMASANG 1 M2 BEKISTING UNTUK TANGGA
MEMASANG 1 M2 JEMBATAN UNTUK PENGECORAN BETON
MEMBUAT 1 M3 PONDASI BETON BERTULANG 150 Kg BESI + BEKISTING
MEMBUAT 1 M3 SLOOF BETON BERTULANG 200 Kg BESI + BEKISTING ( PB.29 )
MEMBUAT 1 M3 KOLOM BETON BERTULANG 300 Kg BESI + BEKISTING
MEMBUAT 1 M3 BALOK BETON BERTULANG 200 Kg BESI + BEKISTING
MEMBUAT 1 M3 KOLOM BETON BERTULANG 150 Kg BESI + BEKISTING
MEMBUAT 1 M3 DINDING BETON BERTULANG 150 Kg BESI + BEKISTING
MEMBUAT 1 M3 DINDING BETON BERTULANG 200 Kg BESI + BEKISTING
MEMBUAT 1 M' KOLOM PRAKTIS BETON BERTULANG 11 x 11 CM
MEMBUAT 1 M' RING BALOK BETON BERTULANG 11 x 11 CM
URAIAN PEKERJAAN
2
PEKERJAAN DINDING ( P.DND )
1.
2.
3.
4.
MEMASANG
MEMASANG
MEMASANG
MEMASANG
1
1
1
1
M2
M2
M2
M2
DINDING
DINDING
DINDING
DINDING
BATAKO UK. 7 x 15 x 30 CM
BATAKO UK. 9 x 20 x 40 CM
BATAKO UK. 7 x 20 x 40 CM
TERAWANG ( ROOSTER )
1
1
1
1
1
1
M2
M2
M2
M2
M2
M1
PASANG
PASANG
PASANG
PASANG
PASANG
PASANG
URAIAN PEKERJAAN
2
7. 1 M1 PASANG NOK/BUMBUNGAN GENTENG METAL KOTAK 0.35
PEKERJAAN LANGIT - LANGIT ( P.LL )
1.
2.
3.
4.
5.
6.
MEMASANG
MEMASANG
MEMASANG
MEMASANG
MEMASANG
MEMASANG
1
1
1
1
1
1
M2
M2
M2
M2
M1
M1
URAIAN PEKERJAAN
2
PEKERJAAN BESI DAN ALUMINIUM ( P. BA )
1.
2.
4.
5.
6.
7.
8.
9.
URAIAN PEKERJAAN
2
9. 1 M2 PENGECATAN TEMBOK BARU ( 1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP ) DGN MUTU CAT BAIK
10. 1 M2 PENGECATAN TEMBOK LAMA ( 1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP ) DGN MUTU CAT BAIK
11. 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI
12. 1 M2 PENGECATAN PERMUKAAN KAYU DENGAN TEER/RESIDU
ERUMAHAN
JUMLAH (Rp.)
KETERANGA
N
323,217.62
42,167.63
11,495.00
883,170.80
53,487.50
65,587.50
77,874.50
71,192.00
107,910.00
86,047.50
3,877.50
38,775.00
17,829.17
38,775.00
130,955.00
250,387.50
831,731.50
777,987.00
740,758.20
714,570.30
678,710.20
437,031.60
437,031.60
829,972.71
873,102.71
906,123.71
774,154.80
946,197.69
982,799.37
1,012,650.40
1,029,107.56
1,057,242.07
1,065,934.21
1,099,180.18
1,110,525.87
JUMLAH (Rp.)
3
950,584.46
96,477.00
113,805.50
140,886.00
17,857.85
17,422.80
21,749.30
166,808.50
178,990.00
305,901.70
314,051.14
347,701.70
305,571.10
281,312.45
75,729.68
4,489,148.50
5,588,489.00
8,472,842.50
6,811,409.70
6,001,495.70
5,722,991.70
6,409,483.40
89,243.20
110,211.20
KETERANGA
N
4
JUMLAH (Rp.)
KETERANGA
N
82,376.60
91,121.60
88,371.60
793,133.00
52,944.14
45,600.54
42,300.36
60,345.32
55,945.08
53,046.30
27,580.94
42,241.80
34,635.50
45,535.50
25,238.00
15,260,920.00
7,470,263.00
389,283.50
190,489.10
784,640.60
542,449.36
1,033,973.96
535,790.75
673,342.58
893,784.90
6,360,897.00
16,904,575.50
6,062,709.00
161,346.38
80,315.85
80,315.85
480,561.40
91,801.29
92,623.62
140,607.51
142,107.79
375,782.86
155,547.70
146,495.80
136,486.90
190,967.70
403,036.70
212,333.00
JUMLAH (Rp.)
3
127,483.00
71,684.20
37,239.85
222,221.05
37,437.40
32,656.50
17,030.75
2,316,693.50
447,588.00
2,242,873.00
2,143,298.00
1,300,195.00
2,103,000.00
46,256.47
53,161.72
105,786.08
183,704.58
15,272.63
19,054.63
24,103.75
29,645.00
32,287.75
75,508.68
98,634.68
48,077.50
KETERANGA
N
4
JUMLAH (Rp.)
KETERANGA
N
33,879.50
33,051.50
23,148.50
724.05
17,889.60
51,384.50
72,591.00
175,524.05
240,482.50
133,534.50
153,731.88
48,365.63
40,115.63
30,215.63
282,218.75
40,837.50
44,417.50
87,243.75
161,775.63
697,250.38
281,565.63
367,365.63
3,342,865.63
157,859.31
150,631.10
121,466.42
356,710.10
630,185.66
443,359.80
308,913.00
414,852.00
182,446.10
180,673.37
352,165.50
156,041.50
30,263.75
11,481.25
33,587.50
44,211.50
57,095.25
31,681.65
38,741.27
56,654.00
JUMLAH (Rp.)
3
35,505.40
25,187.25
29,443.80
34,595.00
KETERANGA
N
4
NAMA KEGIATAN
LOKASI
: KOTA PONTIANAK
TAHUN ANGGARAN
: 2015
NO.
JENIS PEKERJAAN
JUMLAH
[2]
[3]
[1]
I
PEKERJAAN PENDAHULUAN
II
PEKERJAAN PERBAIKAN
17,673,164.30
III
94,923,485.31
IV
Err:509
Err:509
Err:509
VI
Err:509
Err:509
VII
Err:509
Err:509
VIII Err:509
Err:509
IX
Err:509
Err:509
Err:509
Err:509
XI
Err:509
Err:509
XII
Err:509
Err:509
XIII Err:509
7,752,316.00
TOTAL BIAYA
DIBULATKAN
Err:509
Err:509
TERBILANG : DUA RATUS TIGA PULUH SATU JUTA ENAM RATUS DUA BELAS RIBU RUPIAH
RAHMAT
Cost Estimator
NAMA KEGIATAN
LOKASI
: KOTA PONTIANAK
TAHUN ANGGARAN
: 2015
NO.
URAIAN PEKERJAAN
[1]
[2]
KODE
ANALISA
SATUAN
[3]
VOLUME
[4]
PEKERJAAN PENDAHULUAN
Pekerjaan Pembersihan
ls
1.00
ls
1.00
Sub Jumlah
II.
PEKERJAAN PERBAIKAN
1.
M2
2.
3.
8.00
16.00
Perbaikan Plafond
M2
175.67
Perbaikan Lisplang
M2
24.00
Sub Jumlah
II
III.
1.
M2
484.27
2.
527.20
3.
M2
878.35
Sub Jumlah
III
IV.
1.
M2
60.80
2.
M2
144.00
3.
Sub Jumlah
JUMLAH TOTAL
( I + II + III + IV )
24.00
IV
( Rp.)
[5]
[6]
-
162,648.70
1,301,189.60
162,648.70
2,602,379.20
45,869.40
8,057,877.50
237,988.25
5,711,718.00
17,673,164.30
50,228.85
24,324,325.19
50,228.85
26,480,649.72
50,228.85
44,118,510.40
94,923,485.31
33,882.50
2,060,056.00
33,882.50
4,879,080.00
33,882.50
813,180.00
7,752,316.00
120,348,965.61
DAFTAR
B
1
2
3
4
U R
TENAGA KERJA
Pekerja
Mandor
Tukang Kayu
Kepala Tukang
Jumlah
Org
Org
Org
Org
BAHAN
Kayu Pancang (Dolken) d = 10cm, p = 4
Seng Gelombang BJLS 0.20
Kayu Kelas II uk. 4/6
Paku
HARGA
SATUAN
( Rp )
SATUAN
/
/
/
/
Hari
Hari
Hari
Hari
Btg
Lbr
M3
Kg
INDEKS
68,200.00
93,500.00
85,800.00
93,500.00
0.400
0.020
0.200
0.020
10,450.00
51,370.00
2,764,960.00
20,900.00
1.250
1.200
0.072
0.060
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Jumlah
B
1
2
3
U R
TENAGA KERJA
Pekerja
Mandor
Tukang Kayu
Kepala Tukang
Jumlah
BAHAN
Kayu Pancang (Dolken) d = 6-8 cm, p =
Paku
Papan Kayu Kelas III
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Jumlah
SATUAN
Org
Org
Org
Org
/
/
/
/
Hari
Hari
Hari
Hari
Btg
Kg
M3
HARGA
SATUAN
( Rp )
INDEKS
68,200.00
93,500.00
85,800.00
93,500.00
0.100
0.005
0.100
0.010
13,750.00
20,900.00
1,599,590.00
1.000
0.020
0.007
U R
TENAGA KERJA
Pekerja
Mandor
Jumlah
HARGA
SATUAN
( Rp )
SATUAN
Org / Hari
Org / Hari
68,200.00
93,500.00
INDEKS
0.100
0.050
BAHAN
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Jumlah
B
1
2
3
4
5
U R
TENAGA KERJA
Pekerja
Mandor
Tukang Kayu
Kepala Tukang
Jumlah
BAHAN
Kayu Pancang (Dolken) d = 10cm, p = 4
Kayu Kelas III
Paku
Seng Gelombang BJLS 0.20
Triplek 4mm
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Jumlah
SATUAN
Org
Org
Org
Org
/
/
/
/
Hari
Hari
Hari
Hari
Btg
M3
Kg
Lbr
Lbr
HARGA
SATUAN
( Rp )
INDEKS
68,200.00
93,500.00
85,800.00
93,500.00
1.000
0.050
2.000
0.200
10,450.00
2,436,300.00
20,900.00
51,370.00
52,190.00
1.250
0.186
0.300
1.500
1.350
P.PS.01
BIAYA
SATUAN
( Rp )
27,280.00
1,870.00
17,160.00
1,870.00
48,180.00
13,062.50
61,644.00
199,077.12
1,254.00
275,037.62
323,217.62
0.00
323,217.62
P.PS.02
BIAYA
SATUAN
( Rp )
6,820.00
467.50
8,580.00
935.00
16,802.50
13,750.00
418.00
11,197.13
25,365.13
42,167.63
0.00
42,167.63
P.PS.03
BIAYA
SATUAN
( Rp )
6,820.00
4,675.00
11,495.00
0.00
11,495.00
0.00
11,495.00
P.PS.04
BIAYA
SATUAN
( Rp )
68,200.00
4,675.00
171,600.00
18,700.00
263,175.00
13,062.50
453,151.80
6,270.00
77,055.00
70,456.50
619,995.80
883,170.80
0.00
883,170.80
DAFTAR
INDEKS
0.750
0.025
BAHAN
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Jumlah
INDEKS
0.900
0.045
BAHAN
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Jumlah
BAHAN
INDEKS
1.050
0.067
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Jumlah
INDEKS
1.000
0.032
BAHAN
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Jumlah
INDEKS
1.500
0.060
BAHAN
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Jumlah
BAHAN
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan= % x C
INDEKS
1.200
0.045
Jumlah
INDEKS
0.050
0.005
BAHAN
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Jumlah
INDEKS
0.330
0.010
BAHAN
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Jumlah
BAHAN
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Jumlah
INDEKS
0.750
0.025
0.333
BAHAN
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Jumlah
BAHAN
Pasir Urug
M3
91,300.00
1.200
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Jumlah
BAHAN
Sirtu / Batu Kong
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Kg
192,500.00
1.200
Jumlah
PT.01
BIAYA
SATUAN
( Rp )
51,150.00
2,337.50
53,487.50
0.00
53,487.50
0.00
53,487.50
PT.02
BIAYA
SATUAN
( Rp )
61,380.00
4,207.50
65,587.50
0.00
65,587.50
0.00
65,587.50
PT.03
BIAYA
SATUAN
( Rp )
71,610.00
6,264.50
77,874.50
0.00
77,874.50
0.00
77,874.50
PT.04
BIAYA
SATUAN
( Rp )
68,200.00
2,992.00
71,192.00
0.00
71,192.00
0.00
71,192.00
PT.05
BIAYA
SATUAN
( Rp )
102,300.00
5,610.00
107,910.00
0.00
107,910.00
0.00
107,910.00
PT.06
BIAYA
SATUAN
( Rp )
81,840.00
4,207.50
86,047.50
0.00
86,047.50
0.00
86,047.50
PT.07
BIAYA
SATUAN
( Rp )
3,410.00
467.50
3,877.50
0.00
3,877.50
0.00
3,877.50
PT.08
BIAYA
SATUAN
( Rp )
22,506.00
935.00
23,441.00
0.00
23,441.00
0.00
23,441.00
PT.09
BIAYA
SATUAN
( Rp )
51,150.00
2,337.50
53,487.50
0.00
53,487.50
0.00
53,487.50
17,829.17
PT.10
BIAYA
SATUAN
( Rp )
34,100.00
4,675.00
38,775.00
0.00
38,775.00
0.00
38,775.00
PT.11
BIAYA
SATUAN
( Rp )
20,460.00
935.00
21,395.00
109,560.00
109,560.00
130,955.00
0.00
130,955.00
PT.12
BIAYA
SATUAN
( Rp )
17,050.00
2,337.50
19,387.50
231,000.00
231,000.00
250,387.50
0.00
250,387.50
DAFTAR
BAHAN
Batu Belah
Semen
Pasir Pasang
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Jumlah
M3
Kg
M3
259,880.00
1,460.00
91,300.00
INDEKS
1.500
0.075
0.750
0.075
1.200
202.000
0.485
BAHAN
Batu Belah
Semen
Pasir Pasang
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Jumlah
M3
Kg
M3
259,880.00
1,460.00
91,300.00
INDEKS
1.500
0.075
0.750
0.075
1.200
163.000
0.520
BAHAN
Batu Belah
Semen
Pasir Pasang
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Jumlah
M3
Kg
M3
259,880.00
1,460.00
91,300.00
INDEKS
1.500
0.075
0.750
0.075
1.200
136.000
0.544
BAHAN
Batu Belah
Semen
Pasir Pasang
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Jumlah
M3
Kg
M3
259,880.00
1,460.00
91,300.00
INDEKS
1.500
0.075
0.750
0.075
1.200
117.000
0.561
BAHAN
Batu Belah
Semen
Pasir Pasang
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Jumlah
M3
Kg
M3
259,880.00
1,460.00
91,300.00
INDEKS
1.500
0.075
0.750
0.075
1.200
91.000
0.584
BAHAN
Batu Belah
Pasir Pasang
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Jumlah
M3
M3
259,880.00
91,300.00
INDEKS
0.780
0.039
0.390
0.039
1.200
0.342
Jumlah
B
1
2
BAHAN
Batu Belah
Pasir Pasang
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan= % x C
Jumlah
M3
M3
259,880.00
91,300.00
1.200
0.342
P.PND 01
BIAYA
SATUAN
( Rp )
102,300.00
7,012.50
64,350.00
7,012.50
180,675.00
311,856.00
294,920.00
44,280.50
651,056.50
831,731.50
0.00
831,731.50
P.PND 02
BIAYA
SATUAN
( Rp )
102,300.00
7,012.50
64,350.00
7,012.50
180,675.00
311,856.00
237,980.00
47,476.00
597,312.00
777,987.00
0.00
777,987.00
P.PND. 03
BIAYA
SATUAN
( Rp )
102,300.00
7,012.50
64,350.00
7,012.50
180,675.00
311,856.00
198,560.00
49,667.20
560,083.20
740,758.20
0.00
740,758.20
P.PND. 04
BIAYA
SATUAN
( Rp )
102,300.00
7,012.50
64,350.00
7,012.50
180,675.00
311,856.00
170,820.00
51,219.30
533,895.30
714,570.30
0.00
714,570.30
P.PND. 05
BIAYA
SATUAN
( Rp )
102,300.00
7,012.50
64,350.00
7,012.50
180,675.00
311,856.00
132,860.00
53,319.20
498,035.20
678,710.20
0.00
678,710.20
P.PND. 06
BIAYA
SATUAN
( Rp )
53,196.00
3,646.50
33,462.00
3,646.50
93,951.00
311,856.00
31,224.60
343,080.60
437,031.60
0.00
437,031.60
93,951.00
311,856.00
31,224.60
343,080.60
437,031.60
0.00
437,031.60
DAFTAR
1. MEMBUAT 1 M3 BETON MUTU f'c = 7,4 MPa ( K 100 ), SLUMP ( 12 2 ) CM, w/c = 0.87
Analisa Biaya Konstruksi ( ABK ) berdasarkan SNI 7394 - 2008 - 6.1
HARGA
NO.
U R A I A N
SATUAN
SATUAN
( Rp )
A
TENAGA KERJA
1
Pekerja
Org / Hari
68,200.00
2
Mandor
Org / Hari
93,500.00
3
Tukang Batu
Org / Hari
85,800.00
4
Kepala Tukang
Org / Hari
93,500.00
Jumlah
B
1
2
3
4
BAHAN
Semen
Pasir Pasang
Kerikil Batu 2/ 3 cm
Air
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
Kg
Kg
Liter
1,460.00
65.21
266.44
0.00
INDEKS
1.650
0.083
0.275
0.028
247.000
869.000
999.000
215.000
2. MEMBUAT 1 M3 BETON MUTU f'c = 9,8 MPa ( K 125 ), SLUMP ( 12 2 ) CM, w/c = 0.78
Analisa Biaya Konstruksi ( ABK ) berdasarkan SNI 7394 - 2008 - 6.2
HARGA
NO.
U R A I A N
SATUAN
SATUAN
( Rp )
A
TENAGA KERJA
1
Pekerja
Org / Hari
68,200.00
2
Mandor
Org / Hari
93,500.00
3
Tukang Batu
Org / Hari
85,800.00
4
Kepala Tukang
Org / Hari
93,500.00
Jumlah
B
1
2
3
4
BAHAN
Semen
Pasir Pasang
Kerikil Batu 2/ 3 cm
Air
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
Kg
Kg
Liter
1,460.00
65.21
266.44
0.00
INDEKS
1.650
0.083
0.275
0.028
276.000
828.000
1,012.000
215.000
3. MEMBUAT 1 M3 BETON MUTU f'c = 12,2 MPa ( K 150 ), SLUMP ( 12 2 ) CM, w/c = 0.72
Analisa Biaya Konstruksi ( ABK ) berdasarkan SNI 7394 - 2008 - 6.3
HARGA
NO.
U R A I A N
SATUAN
SATUAN
( Rp )
A
TENAGA KERJA
1
Pekerja
Org / Hari
68,200.00
2
Mandor
Org / Hari
93,500.00
3
Tukang Batu
Org / Hari
85,800.00
4
Kepala Tukang
Org / Hari
93,500.00
Jumlah
B
1
2
3
4
BAHAN
Semen
Pasir Pasang
Kerikil Batu 2/ 3 cm
Air
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
Kg
Kg
Liter
1,460.00
65.21
266.44
0.00
INDEKS
1.650
0.083
0.275
0.028
299.000
799.000
1,017.000
215.000
4. MEMBUAT 1 M3 LANTAI KERJA BETON MUTU f'c = 7, 4 MPa ( K 100 ), SLUMP ( 3 - 6 ) CM, w/c =
Analisa Biaya Konstruksi ( ABK ) berdasarkan SNI 7394 - 2008 - 6.4
HARGA
NO.
U R A I A N
SATUAN
SATUAN
( Rp )
A
TENAGA KERJA
1
Pekerja
Org / Hari
68,200.00
2
Mandor
Org / Hari
93,500.00
3
Tukang Batu
Org / Hari
85,800.00
4
Kepala Tukang
Org / Hari
93,500.00
Jumlah
B
1
2
3
4
BAHAN
Semen
Pasir Pasang
Kerikil Batu 2/ 3 cm
Air
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
Kg
Kg
Liter
1,460.00
65.21
266.44
0.00
INDEKS
1.200
0.060
0.200
0.020
230.000
893.000
1,027.000
200.000
5. MEMBUAT 1 M3 BETON MUTU f'c = 14, 5 MPa ( K 175 ), SLUMP ( 12 2 ) CM, w/c = 0.66
Analisa Biaya Konstruksi ( ABK ) berdasarkan SNI 7394 - 2008 - 6.5
HARGA
NO.
U R A I A N
SATUAN
SATUAN
( Rp )
A
TENAGA KERJA
1
Pekerja
Org / Hari
68,200.00
2
Mandor
Org / Hari
93,500.00
3
Tukang Batu
Org / Hari
85,800.00
4
Kepala Tukang
Org / Hari
93,500.00
Jumlah
B
1
2
3
4
BAHAN
Semen
Pasir Pasang
Kerikil Batu 2/ 3 cm
Air
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
Kg
Kg
Liter
1,460.00
65.21
266.44
0.00
INDEKS
1.650
0.083
0.275
0.028
326.000
760.000
1,029.000
215.000
6. MEMBUAT 1 M3 BETON MUTU f'c = 16, 9 MPa ( K 200 ), SLUMP ( 12 2 ) CM, w/c = 0.61
Analisa Biaya Konstruksi ( ABK ) berdasarkan SNI 7394 - 2008 - 6.6
HARGA
NO.
U R A I A N
SATUAN
SATUAN
( Rp )
A
TENAGA KERJA
1
Pekerja
Org / Hari
68,200.00
2
Mandor
Org / Hari
93,500.00
3
Tukang Batu
Org / Hari
85,800.00
4
Kepala Tukang
Org / Hari
93,500.00
Jumlah
B
1
2
3
4
BAHAN
Semen
Pasir Pasang
Kerikil Batu 2/ 3 cm
Air
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
Kg
Kg
Liter
1,460.00
65.21
266.44
0.00
INDEKS
1.650
0.083
0.275
0.028
352.000
731.000
1,031.000
215.000
7. MEMBUAT 1 M3 BETON MUTU f'c = 19, 3 MPa ( K 225 ), SLUMP ( 12 2 ) CM, w/c = 0.58
Analisa Biaya Konstruksi ( ABK ) berdasarkan SNI 7394 - 2008 - 6.7
HARGA
NO.
U R A I A N
SATUAN
SATUAN
( Rp )
A
TENAGA KERJA
1
Pekerja
Org / Hari
68,200.00
2
Mandor
Org / Hari
93,500.00
3
Tukang Batu
Org / Hari
85,800.00
4
Kepala Tukang
Org / Hari
93,500.00
Jumlah
B
1
2
3
4
BAHAN
Semen
Pasir Pasang
Kerikil Batu 2/ 3 cm
Air
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
Kg
Kg
Liter
1,460.00
65.21
266.44
0.00
INDEKS
1.650
0.083
0.275
0.028
371.000
698.000
1,047.000
215.000
8. MEMBUAT 1 M3 BETON MUTU f'c = 21, 7 MPa ( K 250 ), SLUMP ( 12 2 ) CM, w/c = 0.56
Analisa Biaya Konstruksi ( ABK ) berdasarkan SNI 7394 - 2008 - 6.8
HARGA
NO.
U R A I A N
SATUAN
SATUAN
( Rp )
A
TENAGA KERJA
1
Pekerja
Org / Hari
68,200.00
2
Mandor
Org / Hari
93,500.00
3
Tukang Batu
Org / Hari
85,800.00
4
Kepala Tukang
Org / Hari
93,500.00
Jumlah
B
1
2
3
4
BAHAN
Semen
Pasir Pasang
Kerikil Batu 2/ 3 cm
Air
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
Kg
Kg
Liter
1,460.00
65.21
266.44
0.00
INDEKS
1.650
0.083
0.275
0.028
384.000
692.000
1,039.000
215.000
9. MEMBUAT 1 M3 BETON MUTU f'c = 24,0 MPa ( K 275 ), SLUMP ( 12 2 ) CM, w/c = 0.53
Analisa Biaya Konstruksi ( ABK ) berdasarkan SNI 7394 - 2008 - 6.9
HARGA
NO.
U R A I A N
SATUAN
SATUAN
( Rp )
A
TENAGA KERJA
1
Pekerja
Org / Hari
68,200.00
2
Mandor
Org / Hari
93,500.00
3
Tukang Batu
Org / Hari
85,800.00
4
Kepala Tukang
Org / Hari
93,500.00
Jumlah
B
1
2
3
4
BAHAN
Semen
Pasir Pasang
Kerikil Batu 2/ 3 cm
Air
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
Kg
Kg
Liter
1,460.00
65.21
266.44
0.00
INDEKS
1.650
0.083
0.275
0.028
406.000
684.000
1,026.000
215.000
10. MEMBUAT 1 M3 BETON MUTU f'c = 26,4 MPa ( K 300 ), SLUMP ( 12 2 ) CM, w/c = 0.52
Analisa Biaya Konstruksi ( ABK ) berdasarkan SNI 7394 - 2008 - 6.10
HARGA
NO.
U R A I A N
SATUAN
SATUAN
INDEKS
( Rp )
A
TENAGA KERJA
1
Pekerja
Org / Hari
68,200.00
1.650
2
Mandor
Org / Hari
93,500.00
0.083
3
Tukang Batu
Org / Hari
85,800.00
0.275
4
Kepala Tukang
Org / Hari
93,500.00
0.028
Jumlah
B
1
2
3
4
BAHAN
Semen
Pasir Pasang
Kerikil Batu 2/ 3 cm
Air
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
Kg
Kg
Liter
1,460.00
65.21
266.44
0.00
413.000
681.000
1,021.000
215.000
11. MEMBUAT 1 M3 BETON MUTU f'c = 28,8 MPa ( K 325 ), SLUMP ( 12 2 ) CM, w/c = 0.49
Analisa Biaya Konstruksi ( ABK ) berdasarkan SNI 7394 - 2008 - 6.11
HARGA
NO.
U R A I A N
SATUAN
SATUAN
INDEKS
( Rp )
A
TENAGA KERJA
1
Pekerja
Org / Hari
68,200.00
1.650
2
Mandor
Org / Hari
93,500.00
0.083
3
Tukang Batu
Org / Hari
85,800.00
0.275
4
Kepala Tukang
Org / Hari
93,500.00
0.028
Jumlah
B
1
2
3
4
BAHAN
Semen
Pasir Pasang
Kerikil Batu 2/ 3 cm
Air
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
Kg
Kg
Liter
1,460.00
65.21
266.44
0.00
439.000
670.000
1,006.000
215.000
12. MEMBUAT 1 M3 BETON MUTU f'c = 31,2 MPa ( K 350 ), SLUMP ( 12 2 ) CM, w/c = 0.48
Analisa Biaya Konstruksi ( ABK ) berdasarkan SNI 7394 - 2008 - 6.12
HARGA
NO.
U R A I A N
SATUAN
SATUAN
INDEKS
( Rp )
A
TENAGA KERJA
1
Pekerja
Org / Hari
68,200.00
1.650
2
Mandor
Org / Hari
93,500.00
0.083
3
Tukang Batu
Org / Hari
85,800.00
0.275
4
Kepala Tukang
Org / Hari
93,500.00
0.028
Jumlah
B
1
2
3
4
BAHAN
Semen
Pasir Pasang
Kerikil Batu 2/ 3 cm
Air
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
Kg
Kg
Liter
1,460.00
65.21
266.44
0.00
448.000
667.000
1,000.000
215.000
BAHAN
Semen
Pasir Pasang
Kerikil Batu 2/ 3 cm
Strorox - 100
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
M3
M3
Kg
1,460.00
65.21
266.44
150,000.00
400.000
0.480
0.800
1.200
BAHAN
Waterstop Lebar 150 mm
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M'
85,000.00
1.050
B
1
BAHAN
Waterstop Lebar 200 mm
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M'
100,000.00
1.050
BAHAN
Waterstop Lebar 230 mm - 320 mm
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M'
125,000.00
1.050
BAHAN
Besi Beton ( Polos / Ulir )
Kawat Beton
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah Per 10 Kg
Jumlah Per 1 Kg
Kg
Kg
15,600.00
19,800.00
10.500
0.150
BAHAN
Besi Beton ( Polos / Ulir )
Kawat Beton
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah Per 10 Kg
Jumlah Per 1 Kg
Kg
Kg
15,600.00
19,800.00
10.500
0.100
BAHAN
Jaring Kawat Baja di Las
Kawat Beton
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah Per 10 Kg
Jumlah Per 1 Kg
Kg
Kg
20,610.00
19,800.00
10.200
0.050
BAHAN
Kayu Kls III
Paku 5 cm - 10 cm
Minyak Bekisting
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
Liter
2,436,300.00
20,900.00
4,525.00
0.040
0.300
0.100
BAHAN
Kayu Kls III
Paku 5 cm - 10 cm
Minyak Bekisting
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
Liter
2,436,300.00
20,900.00
4,525.00
0.045
0.300
0.100
BAHAN
Kayu Kls III
Paku 5 cm - 10 cm
Minyak Bekisting
Balok Kayu Kls II
Plywood Tebal 9 mm
Dolken 8 - 10 cm Panjang 4 Meter
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
Liter
M3
Lembar
Batang
2,436,300.00
20,900.00
4,525.00
2,716,480.00
165,830.00
10,450.00
0.040
0.400
0.200
0.015
0.350
2.000
BAHAN
Kayu Kls III
Paku 5 cm - 10 cm
Minyak Bekisting
Balok Kayu Kls II
Plywood Tebal 9 mm
Dolken 8 - 10 cm Panjang 4 Meter
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
Liter
M3
Lembar
Batang
2,436,300.00
20,900.00
4,525.00
2,716,480.00
165,830.00
10,450.00
0.040
0.400
0.200
0.018
0.350
2.000
BAHAN
Kayu Kls III
Paku 5 cm - 10 cm
Minyak Bekisting
Balok Kayu Kls II
Plywood Tebal 9 mm
Dolken 8 - 10 cm Panjang 4 Meter
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
Liter
M3
Lembar
Batang
2,436,300.00
20,900.00
4,525.00
2,716,480.00
165,830.00
10,450.00
0.040
0.400
0.200
0.015
0.350
6.000
BAHAN
Kayu Kls III
Paku 5 cm - 10 cm
Minyak Bekisting
Balok Kayu Kls II
Plywood Tebal 9 mm
Dolken 8 - 10 cm Panjang 4 Meter
Spacer
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
Liter
M3
Lembar
Batang
Buah
2,436,300.00
20,900.00
4,525.00
2,716,480.00
165,830.00
10,450.00
0.00
0.030
0.400
0.200
0.020
0.350
3.000
4.000
BAHAN
Kayu Kls III
Paku 5 cm - 10 cm
Minyak Bekisting
Balok Kayu Kls II
Plywood Tebal 9 mm
Dolken 8 - 10 cm Panjang 4 Meter
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
Liter
M3
Lembar
Batang
2,436,300.00
20,900.00
4,525.00
2,716,480.00
165,830.00
10,450.00
0.030
0.400
0.150
0.015
0.350
2.000
BAHAN
Kayu Kls III ( Papan )
Paku 5 cm - 10 cm
Dolken 8 - 10 cm Panjang 4 Meter
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
Batang
1,599,590.00
20,900.00
10,450.00
0.026
0.600
0.500
BAHAN
Kayu Kls III
Paku 5 cm - 10 cm
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen
Pasir Pasang
Kerikil
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
Liter
Kg
Kg
Kg
M3
M3
2,436,300.00
20,900.00
4,525.00
15,600.00
19,800.00
1,460.00
91,300.00
359,700.00
0.200
1.500
0.400
157.500
2.250
336.000
0.540
0.810
BAHAN
Kayu Kls III
Paku 5 cm - 12 cm
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen
Pasir Pasang
Kerikil
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
Liter
Kg
Kg
Kg
M3
M3
2,436,300.00
20,900.00
4,525.00
15,600.00
19,800.00
1,460.00
91,300.00
359,700.00
0.270
2.000
0.600
210.000
3.000
336.000
0.540
0.810
BAHAN
Kayu Kls III
Paku 5 cm - 12 cm
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen
Pasir Pasang
Kerikil
Balok Kayu Kls II
Plywood Tebal 9 mm
Dolken 8 - 10 cm Panjang 4 Meter
Jumlah
M3
Kg
Liter
Kg
Kg
Kg
M3
M3
M3
Lembar
Batang
2,436,300.00
20,900.00
4,525.00
15,600.00
19,800.00
1,460.00
91,300.00
359,700.00
2,716,480.00
165,830.00
10,450.00
0.400
4.000
2.000
315.000
4.500
336.000
0.540
0.810
0.150
0.350
20.000
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
BAHAN
Kayu Kls III
Paku 5 cm - 12 cm
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen
Pasir Pasang
Kerikil
Balok Kayu Kls II
Plywood Tebal 9 mm
Dolken 8 - 10 cm Panjang 4 Meter
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
Liter
Kg
Kg
Kg
M3
M3
M3
Lembar
Batang
2,436,300.00
20,900.00
4,525.00
15,600.00
19,800.00
1,460.00
91,300.00
359,700.00
2,716,480.00
165,830.00
10,450.00
0.320
3.200
1.600
210.000
3.000
336.000
0.540
0.810
0.140
2.800
16.000
BAHAN
Kayu Kls III
Paku 5 cm - 12 cm
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen
Pasir Pasang
Kerikil
Balok Kayu Kls II
M3
Kg
Liter
Kg
Kg
Kg
M3
M3
M3
2,436,300.00
20,900.00
4,525.00
15,600.00
19,800.00
1,460.00
91,300.00
359,700.00
2,716,480.00
0.320
3.200
1.600
157.500
2.250
336.000
0.540
0.810
0.140
10
11
Plywood Tebal 9 mm
Dolken 8 - 10 cm Panjang 4 Meter
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Lembar
Batang
165,830.00
10,450.00
2.800
32.000
BAHAN
Kayu Kls III
Paku 5 cm - 12 cm
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen
Pasir Pasang
Kerikil
Balok Kayu Kls II
Plywood Tebal 9 mm
Dolken 8 - 10 cm Panjang 4 Meter
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
Liter
Kg
Kg
Kg
M3
M3
M3
Lembar
Batang
2,436,300.00
20,900.00
4,525.00
15,600.00
19,800.00
1,460.00
91,300.00
359,700.00
2,716,480.00
165,830.00
10,450.00
0.240
3.200
1.600
157.500
2.250
336.000
0.540
0.810
0.140
2.800
24.000
BAHAN
Kayu Kls III
Paku 5 cm - 12 cm
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen
Pasir Pasang
Kerikil
Balok Kayu Kls II
M3
Kg
Liter
Kg
Kg
Kg
M3
M3
M3
2,436,300.00
20,900.00
4,525.00
15,600.00
19,800.00
1,460.00
91,300.00
359,700.00
2,716,480.00
0.250
3.000
1.200
210.000
3.000
336.000
0.540
0.810
0.105
10
11
Plywood Tebal 9 mm
Dolken 8 - 10 cm Panjang 4 Meter
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Lembar
Batang
165,830.00
10,450.00
2.500
14.000
BAHAN
Kayu Kls III
Paku 5 cm - 12 cm
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen
Pasir Pasang
Kerikil
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
Liter
Kg
Kg
Kg
M3
M3
2,436,300.00
20,900.00
4,525.00
15,600.00
19,800.00
1,460.00
91,300.00
359,700.00
0.002
0.010
0.000
3.000
0.450
4.000
0.006
0.009
BAHAN
Kayu Kls III
Paku 5 cm - 12 cm
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen
Pasir Pasang
Kerikil
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
M3
Kg
Liter
Kg
Kg
Kg
M3
M3
2,436,300.00
20,900.00
4,525.00
15,600.00
19,800.00
1,460.00
91,300.00
359,700.00
0.003
0.020
0.000
3.600
0.050
5.500
0.009
0.015
Jumlah
PEKERJAAN
360,620.00
56,671.21
266,178.00
0.00
683,469.21
829,972.71
0.00
829,972.71
402,960.00
53,997.43
269,641.78
0.00
726,599.21
873,102.71
0.00
873,102.71
436,540.00
52,106.21
270,974.00
0.00
759,620.21
906,123.71
0.00
906,123.71
335,800.00
58,236.36
273,638.44
0.00
667,674.80
774,154.80
0.00
774,154.80
475,960.00
49,562.86
274,171.33
0.00
799,694.19
946,197.69
0.00
946,197.69
513,920.00
47,671.64
274,704.22
0.00
836,295.87
982,799.37
0.00
982,799.37
541,660.00
45,519.57
278,967.33
0.00
866,146.90
1,012,650.40
0.00
1,012,650.40
560,640.00
45,128.29
276,835.78
0.00
882,604.06
1,029,107.56
0.00
1,029,107.56
592,760.00
44,606.57
273,372.00
0.00
910,738.57
1,057,242.07
0.00
1,057,242.07
602,980.00
44,410.93
272,039.78
0.00
919,430.71
1,065,934.21
0.00
1,065,934.21
640,940.00
43,693.57
268,043.11
0.00
952,676.68
1,099,180.18
0.00
1,099,180.18
654,080.00
43,497.93
266,444.44
0.00
964,022.37
1,110,525.87
0.00
1,110,525.87
PB.13
BIAYA
SATUAN
( Rp )
143,220.00
9,817.50
30,030.00
3,272.50
186,340.00
584,000.00
31.30
213.16
180,000.00
764,244.46
950,584.46
0.00
950,584.46
PB.14
BIAYA
SATUAN
( Rp )
4,092.00
280.50
2,574.00
280.50
7,227.00
89,250.00
89,250.00
96,477.00
0.00
96,477.00
PB.15
BIAYA
SATUAN
( Rp )
4,774.00
654.50
3,003.00
374.00
8,805.50
105,000.00
105,000.00
113,805.50
0.00
113,805.50
PB.16
BIAYA
SATUAN
( Rp )
5,456.00
374.00
3,432.00
374.00
9,636.00
131,250.00
131,250.00
140,886.00
0.00
140,886.00
PB.17
BIAYA
SATUAN
( Rp )
4,774.00
374.00
6,006.00
654.50
11,808.50
163,800.00
2,970.00
166,770.00
178,578.50
0.00
178,578.50
17,857.85
PB.18
BIAYA
SATUAN
( Rp )
3,410.00
280.50
4,290.00
467.50
8,448.00
163,800.00
1,980.00
165,780.00
174,228.00
0.00
174,228.00
17,422.80
PB.19
BIAYA
SATUAN
( Rp )
1,705.00
93.50
2,145.00
2,337.50
6,281.00
210,222.00
990.00
211,212.00
217,493.00
0.00
217,493.00
21,749.30
PB.20
BIAYA
SATUAN
( Rp )
35,464.00
2,431.00
22,308.00
2,431.00
62,634.00
97,452.00
6,270.00
452.50
104,174.50
166,808.50
0.00
166,808.50
PB.21
BIAYA
SATUAN
( Rp )
35,464.00
2,431.00
22,308.00
2,431.00
62,634.00
109,633.50
6,270.00
452.50
116,356.00
178,990.00
0.00
178,990.00
PB.22
BIAYA
SATUAN
( Rp )
45,012.00
3,085.50
28,314.00
3,085.50
79,497.00
97,452.00
8,360.00
905.00
40,747.20
58,040.50
20,900.00
226,404.70
305,901.70
0.00
305,901.70
PB.23
BIAYA
SATUAN
( Rp )
45,012.00
3,085.50
28,314.00
3,085.50
79,497.00
97,452.00
8,360.00
905.00
48,896.64
58,040.50
20,900.00
234,554.14
314,051.14
0.00
314,051.14
PB.24
BIAYA
SATUAN
( Rp )
45,012.00
3,085.50
28,314.00
3,085.50
79,497.00
97,452.00
8,360.00
905.00
40,747.20
58,040.50
62,700.00
268,204.70
347,701.70
0.00
347,701.70
PB.25
BIAYA
SATUAN
( Rp )
45,012.00
3,085.50
28,314.00
3,085.50
79,497.00
73,089.00
8,360.00
905.00
54,329.60
58,040.50
31,350.00
0.00
226,074.10
305,571.10
0.00
305,571.10
PB.26
BIAYA
SATUAN
( Rp )
45,012.00
3,085.50
28,314.00
3,085.50
79,497.00
73,089.00
8,360.00
678.75
40,747.20
58,040.50
20,900.00
201,815.45
281,312.45
0.00
281,312.45
PB.27
BIAYA
SATUAN
( Rp )
10,230.00
748.00
4,290.00
467.50
15,735.50
42,229.18
12,540.00
5,225.00
59,994.18
75,729.68
0.00
75,729.68
BEKISTING
PB.28
BIAYA
SATUAN
( Rp )
361,460.00
24,777.50
23,595.00
111,540.00
90,090.00
24,497.00
635,959.50
487,260.00
31,350.00
1,810.00
2,457,000.00
44,550.00
490,560.00
49,302.00
291,357.00
3,853,189.00
4,489,148.50
0.00
4,489,148.50
KISTING ( PB.29 )
PB.29
BIAYA
SATUAN
( Rp )
385,330.00
26,460.50
23,595.00
133,848.00
120,120.00
30,200.50
719,554.00
657,801.00
41,800.00
2,715.00
3,276,000.00
59,400.00
490,560.00
49,302.00
291,357.00
4,868,935.00
5,588,489.00
0.00
5,588,489.00
PB.30
BIAYA
SATUAN
( Rp )
480,810.00
33,005.50
23,595.00
141,570.00
180,180.00
37,680.50
896,841.00
974,520.00
83,600.00
9,050.00
4,914,000.00
89,100.00
490,560.00
49,302.00
291,357.00
407,472.00
58,040.50
209,000.00
7,576,001.50
8,472,842.50
0.00
8,472,842.50
PB.31
BIAYA
SATUAN
( Rp )
433,070.00
29,733.00
23,595.00
141,570.00
120,120.00
31,135.50
779,223.50
779,616.00
66,880.00
7,240.00
3,276,000.00
59,400.00
490,560.00
49,302.00
291,357.00
380,307.20
464,324.00
167,200.00
6,032,186.20
6,811,409.70
0.00
6,811,409.70
PB.32
BIAYA
SATUAN
( Rp )
361,460.00
24,777.50
23,595.00
111,540.00
90,090.00
24,497.00
635,959.50
779,616.00
66,880.00
7,240.00
2,457,000.00
44,550.00
490,560.00
49,302.00
291,357.00
380,307.20
464,324.00
334,400.00
5,365,536.20
6,001,495.70
0.00
6,001,495.70
PB.33
BIAYA
SATUAN
( Rp )
361,460.00
24,777.50
23,595.00
111,540.00
90,090.00
24,497.00
635,959.50
584,712.00
66,880.00
7,240.00
2,457,000.00
44,550.00
490,560.00
49,302.00
291,357.00
380,307.20
464,324.00
250,800.00
5,087,032.20
5,722,991.70
0.00
5,722,991.70
PB.34
BIAYA
SATUAN
( Rp )
385,330.00
26,460.50
23,595.00
133,848.00
120,120.00
30,200.50
719,554.00
609,075.00
62,700.00
5,430.00
3,276,000.00
59,400.00
490,560.00
49,302.00
291,357.00
285,230.40
414,575.00
146,300.00
5,689,929.40
6,409,483.40
0.00
6,409,483.40
PB.35
BIAYA
SATUAN
( Rp )
12,276.00
841.50
1,716.00
1,716.00
1,716.00
561.00
18,826.50
4,872.60
209.00
0.00
46,800.00
8,910.00
5,840.00
547.80
3,237.30
70,416.70
89,243.20
0.00
89,243.20
PB.36
BIAYA
SATUAN
( Rp )
20,255.40
1,402.50
2,831.40
2,831.40
2,831.40
935.00
31,087.10
7,308.90
418.00
0.00
56,160.00
990.00
8,030.00
821.70
5,395.50
79,124.10
110,211.20
0.00
110,211.20
DAFTAR
BAHAN
Batako Uk. 7 x 15 x 30 cm
Semen
Pasir Pasang
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Buah
Kg
M3
1,040.00
1,460.00
91,300.00
INDEKS
0.300
0.015
0.150
0.015
22.000
14.000
0.032
BAHAN
Batako Uk. 9 x 20 x 40 cm ( Cetak Mesi
Semen
Pasir Pasang
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Buah
Kg
M3
2,530.00
1,460.00
91,300.00
INDEKS
0.300
0.015
0.150
0.015
12.500
14.000
0.032
BAHAN
Batako Uk. 7 x 20 x 40 cm ( Cetak Mesi
Semen
Pasir Pasang
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Buah
Kg
Kg
2,310.00
1,460.00
91,300.00
INDEKS
0.300
0.015
0.150
0.015
12.500
14.000
0.032
BAHAN
Terawang
Semen
Pasir Pasang
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Buah
Kg
M3
29,700.00
1,460.00
91,300.00
INDEKS
0.300
0.010
0.100
0.015
25.000
11.000
0.035
ERJAAN
P.DND.01
BIAYA
SATUAN
( Rp )
20,460.00
1,402.50
12,870.00
1,402.50
36,135.00
22,880.00
20,440.00
2,921.60
46,241.60
82,376.60
0.00
82,376.60
P.DND.02
BIAYA
SATUAN
( Rp )
20,460.00
1,402.50
12,870.00
1,402.50
36,135.00
31,625.00
20,440.00
2,921.60
54,986.60
91,121.60
0.00
91,121.60
P.DND.03
BIAYA
SATUAN
( Rp )
20,460.00
1,402.50
12,870.00
1,402.50
36,135.00
28,875.00
20,440.00
2,921.60
52,236.60
88,371.60
0.00
88,371.60
P.DND.04
BIAYA
SATUAN
( Rp )
20,460.00
935.00
8,580.00
1,402.50
31,377.50
742,500.00
16,060.00
3,195.50
761,755.50
793,133.00
0.00
793,133.00
DAFTAR
BAHAN
Semen
Pasir Pasang
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
M3
1,460.00
91,300.00
INDEKS
0.200
0.010
0.150
0.015
15.504
0.016
BAHAN
Semen
Pasir Pasang
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
M3
1,460.00
91,300.00
INDEKS
0.200
0.010
0.150
0.015
10.224
0.020
BAHAN
Semen
Pasir Pasang
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
M3
1,460.00
91,300.00
INDEKS
0.200
0.010
0.150
0.015
7.776
0.023
BAHAN
Semen
Pasir Pasang
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
M3
1,460.00
91,300.00
INDEKS
0.260
0.013
0.200
0.020
13.632
0.027
BAHAN
Semen
Pasir Pasang
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
M3
1,460.00
91,300.00
INDEKS
0.260
0.013
0.200
0.020
10.368
0.031
BAHAN
Semen
Pasir Pasang
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
M3
1,460.00
91,300.00
INDEKS
0.260
0.013
0.200
0.020
8.320
0.032
BAHAN
Semen
Pasir Pasang
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
M3
1,460.00
91,300.00
INDEKS
0.150
0.008
0.070
0.007
5.184
0.026
BAHAN
Semen
Pasir Pasang
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
M3
1,460.00
91,300.00
INDEKS
0.057
0.003
0.380
0.038
0.500
0.013
BAHAN
Semen
Pasir Pasang
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
M3
INDEKS
0.250
0.013
0.100
0.010
1,460.00
91,300.00
4.320
0.006
BAHAN
Semen
Pasir Pasang
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
M3
1,460.00
91,300.00
INDEKS
0.300
0.015
0.140
0.014
6.340
0.012
BAHAN
Semen
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
1,460.00
INDEKS
0.150
0.008
0.100
0.010
3.250
KERJAAN
P.PLS.01
BIAYA
SATUAN
( Rp )
13,640.00
935.00
12,870.00
1,402.50
28,847.50
22,635.84
1,460.80
24,096.64
52,944.14
0.00
52,944.14
P.PLS.02
BIAYA
SATUAN
( Rp )
13,640.00
935.00
12,870.00
1,402.50
28,847.50
14,927.04
1,826.00
16,753.04
45,600.54
0.00
45,600.54
P.PLS.03
BIAYA
SATUAN
( Rp )
13,640.00
935.00
12,870.00
1,402.50
28,847.50
11,352.96
2,099.90
13,452.86
42,300.36
0.00
42,300.36
P.PLS.04
BIAYA
SATUAN
( Rp )
17,732.00
1,215.50
17,160.00
1,870.00
37,977.50
19,902.72
2,465.10
22,367.82
60,345.32
0.00
60,345.32
P.PLS.05
BIAYA
SATUAN
( Rp )
17,732.00
1,215.50
17,160.00
1,870.00
37,977.50
15,137.28
2,830.30
17,967.58
55,945.08
0.00
55,945.08
P.PLS.06
BIAYA
SATUAN
( Rp )
17,732.00
1,215.50
17,160.00
1,870.00
37,977.50
12,147.20
2,921.60
15,068.80
53,046.30
0.00
53,046.30
P.PLS.07
BIAYA
SATUAN
( Rp )
10,230.00
748.00
6,006.00
654.50
17,638.50
7,568.64
2,373.80
9,942.44
27,580.94
0.00
27,580.94
P.PLS.08
BIAYA
SATUAN
( Rp )
3,887.40
280.50
32,604.00
3,553.00
40,324.90
730.00
1,186.90
1,916.90
42,241.80
0.00
42,241.80
P.PLS.09
BIAYA
SATUAN
( Rp )
17,050.00
1,215.50
8,580.00
935.00
27,780.50
6,307.20
547.80
6,855.00
34,635.50
0.00
34,635.50
P.PLS.10
BIAYA
SATUAN
( Rp )
20,460.00
1,402.50
12,012.00
1,309.00
35,183.50
9,256.40
1,095.60
10,352.00
45,535.50
0.00
45,535.50
P.PLS.11
BIAYA
SATUAN
( Rp )
10,230.00
748.00
8,580.00
935.00
20,493.00
4,745.00
4,745.00
25,238.00
0.00
25,238.00
DAFTAR
1. MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN KUSEN JENDELA, KAYU KELAS I
Analisa Biaya Konstruksi ( ABK ) berdasarkan SNI 3434 - 2008 - 6.1
HARGA
NO.
U R A I A N
SATUAN
SATUAN
( Rp )
A
TENAGA KERJA
1
Pekerja
Org / Hari
68,200.00
2
Mandor
Org / Hari
93,500.00
3
Tukang Kayu
Org / Hari
85,800.00
4
Kepala Tukang
Org / Hari
93,500.00
Jumlah
B
1
2
3
BAHAN
Balok Kayu
Paku 10 cm
Lem Kayu
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
Kg
11,550,000.00
20,900.00
21,520.00
INDEKS
7.000
0.350
21.000
2.100
1.100
1.250
1.000
2. MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN KUSEN JENDELA, KAYU KELAS II ATAU III
Analisa Biaya Konstruksi ( ABK ) berdasarkan SNI 3434 - 2008 - 6.2
HARGA
NO.
U R A I A N
SATUAN
SATUAN
( Rp )
A
TENAGA KERJA
1
Pekerja
Org / Hari
68,200.00
2
Mandor
Org / Hari
93,500.00
3
Tukang Kayu
Org / Hari
85,800.00
4
Kepala Tukang
Org / Hari
93,500.00
Jumlah
B
1
2
3
BAHAN
Balok Kayu
Paku 10 cm
Lem Kayu
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
Kg
4,393,890.00
20,900.00
21,520.00
INDEKS
6.000
0.300
18.000
1.800
1.200
1.250
1.000
BAHAN
Papan Kayu Kls. II
Paku 5 - 7 cm
M3
Kg
6,569,450.00
20,900.00
INDEKS
0.350
0.018
1.050
0.105
0.040
0.050
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
BAHAN
Papan Kayu Kls. III
Paku 5 - 7 cm
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
1,599,590.00
20,900.00
INDEKS
0.350
0.018
1.050
0.105
0.040
0.050
BAHAN
Papan Kayu Kls. I
Lem Kayu
M3
Kg
10,388,890.00
21,520.00
INDEKS
1.000
0.050
3.000
0.300
0.040
0.500
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
6. MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS I ATAU II
Analisa Biaya Konstruksi ( ABK ) berdasarkan SNI 3434 - 2008 - 6.6
HARGA
NO.
U R A I A N
SATUAN
SATUAN
( Rp )
A
TENAGA KERJA
1
Pekerja
Org / Hari
68,200.00
2
Mandor
Org / Hari
93,500.00
3
Tukang Kayu
Org / Hari
85,800.00
4
Kepala Tukang
Org / Hari
93,500.00
Jumlah
B
1
2
BAHAN
Papan Kayu Kls. I
Lem Kayu
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
10,388,890.00
21,520.00
INDEKS
0.800
0.040
2.400
0.240
0.024
0.300
7. MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS I ATAU II
Analisa Biaya Konstruksi ( ABK ) berdasarkan SNI 3434 - 2008 - 6.7
HARGA
NO.
U R A I A N
SATUAN
SATUAN
( Rp )
A
TENAGA KERJA
1
Pekerja
Org / Hari
68,200.00
2
Mandor
Org / Hari
93,500.00
3
Tukang Kayu
Org / Hari
85,800.00
4
Kepala Tukang
Org / Hari
93,500.00
Jumlah
B
1
2
BAHAN
Papan Kayu Kls. I
Lem Kayu
M3
Kg
10,388,890.00
21,520.00
INDEKS
1.000
0.050
3.000
0.300
0.064
0.500
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
8. MEMBUAT 1 M2 PINTU KAYU LAPIS ( PLYWOOD ) RANGKAP, RANGKA TERTUTUP KAYU KELAS II
( LEBAR SAMPAI 90 CM )
Analisa Biaya Konstruksi ( ABK ) berdasarkan SNI 3434 - 2008 - 6.8
HARGA
NO.
U R A I A N
SATUAN
SATUAN
( Rp )
A
TENAGA KERJA
1
Pekerja
Org / Hari
68,200.00
2
Mandor
Org / Hari
93,500.00
3
Tukang Kayu
Org / Hari
85,800.00
4
Kepala Tukang
Org / Hari
93,500.00
Jumlah
B
1
2
3
4
BAHAN
Papan Kayu Kls. II
Paku 1 - 2, 5 cm
Lem Kayu
Plywood Tebal 4 mm ukuran ( 90 x 220
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
Kg
Lembar
6,569,450.00
20,900.00
21,520.00
109,340.00
INDEKS
0.700
0.035
2.100
0.210
0.025
0.030
0.500
1.000
BAHAN
Papan Kayu Kls. I
Paku 1 - 2, 5 cm
Lem Kayu
Plywood Tebal 4 mm ukuran ( 90 x 220
M3
Kg
Kg
Lembar
10,388,890.00
20,900.00
21,520.00
109,340.00
INDEKS
0.800
0.040
2.400
0.240
0.026
0.030
0.500
1.000
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
BAHAN
Papan Kayu Kls. I
Paku 1 - 2, 5 cm
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
10,388,890.00
20,900.00
INDEKS
0.670
0.335
2.000
0.200
0.060
0.150
11. MEMASANG 1 M3 KUDA - KUDA KONVENSIONAL , KAYU KELAS I , II DAN III BENTANG 6 METER
Analisa Biaya Konstruksi ( ABK ) berdasarkan SNI 3434 - 2008 - 6.13
HARGA
NO.
U R A I A N
SATUAN
SATUAN
( Rp )
A
TENAGA KERJA
1
Pekerja
Org / Hari
68,200.00
2
Mandor
Org / Hari
93,500.00
3
Tukang Kayu
Org / Hari
85,800.00
4
Kepala Tukang
Org / Hari
93,500.00
Jumlah
B
1
2
3
BAHAN
Balok Kayu
Paku 12 cm
Besi Strip Tebal 5 mm
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
Kg
4,094,370.00
20,900.00
20,450.00
INDEKS
4.000
0.200
12.000
1.200
1.100
5.600
15.000
BAHAN
Balok Kayu
Paku 12 cm
Besi Strip Tebal 5 mm
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
Kg
11,733,340.00
20,900.00
20,450.00
INDEKS
6.700
0.335
20.100
2.010
1.200
5.600
15.000
BAHAN
Balok Kayu
Paku 12 cm
Besi Strip Tebal 5 mm
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
Kg
4,393,890.00
20,900.00
20,450.00
INDEKS
2.400
0.120
7.200
0.720
1.100
3.000
15.000
BAHAN
Kaso - Kaso 5/7 cm
Reng ( 2 x 3 ) cm
Paku 5 cm dan 10 cm
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
M3
Kg
2,716,480.00
2,813,560.00
20,900.00
INDEKS
0.100
0.005
0.100
0.010
0.014
0.036
0.250
BAHAN
Kaso - Kaso 5/7 cm
Reng ( 3 x 4 ) cm
Paku 5 cm dan 10 cm
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
M3
Kg
2,716,480.00
2,813,560.00
20,900.00
INDEKS
0.100
0.005
0.100
0.010
0.014
0.007
0.250
BAHAN
Kaso - Kaso 5/7 cm
Reng ( 3 x 4 ) cm
Paku 5 cm dan 10 cm
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
M3
Kg
2,716,480.00
2,813,560.00
20,900.00
INDEKS
0.100
0.005
0.100
0.010
0.014
0.007
0.250
BAHAN
Kayu Kelas II
Paku 5 cm dan 10 cm
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
2,764,960.00
20,900.00
INDEKS
0.120
0.006
0.120
0.012
0.165
0.200
18. MEMASANG 1 M2 RANGKA LANGIT - LANGIT ( 50 X 100 ) CM, KAYU KELAS II ATAU III
Analisa Biaya Konstruksi ( ABK ) berdasarkan SNI 3434 - 2008 - 6.19
HARGA
NO.
U R A I A N
SATUAN
SATUAN
( Rp )
A
TENAGA KERJA
1
Pekerja
Org / Hari
68,200.00
2
Mandor
Org / Hari
93,500.00
3
Tukang Kayu
Org / Hari
85,800.00
4
Kepala Tukang
Org / Hari
93,500.00
Jumlah
B
1
2
BAHAN
Kaso - Kaso 5/7 cm
Paku 7 - 10 cm
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
2,716,480.00
20,900.00
INDEKS
0.150
0.075
0.300
0.030
0.015
0.200
19. MEMASANG 1 M2 RANGKA LANGIT - LANGIT ( 60 X 60 ) CM, KAYU KELAS II ATAU III
Analisa Biaya Konstruksi ( ABK ) berdasarkan SNI 3434 - 2008 - 6.20
HARGA
NO.
U R A I A N
SATUAN
SATUAN
( Rp )
A
TENAGA KERJA
1
Pekerja
Org / Hari
68,200.00
2
Mandor
Org / Hari
93,500.00
3
Tukang Kayu
Org / Hari
85,800.00
4
Kepala Tukang
Org / Hari
93,500.00
Jumlah
B
1
2
BAHAN
Kaso - Kaso 5/7 cm
Paku 7 - 10 cm
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
2,716,480.00
20,900.00
INDEKS
0.200
0.010
0.300
0.030
0.016
0.250
BAHAN
Papan Kayu
Paku 7 - 10 cm
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
10,388,890.00
20,900.00
INDEKS
0.100
0.005
0.200
0.020
0.011
0.100
BAHAN
Papan Kayu
Paku 7 - 10 cm
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
10,388,890.00
20,900.00
INDEKS
0.100
0.005
0.200
0.025
0.011
0.050
BAHAN
Ky. klas II
Paku
Multiplek t = 12 mm
Lem Kayu
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
Lbr
Kg
3,915,320.00
20,900.00
229,270.00
21,520.00
INDEKS
0.150
0.008
0.450
0.045
0.0280
0.150
0.860
0.560
RJAAN
U KELAS I
PK.01
BIAYA
SATUAN
( Rp )
477,400.00
32,725.00
1,801,800.00
196,350.00
2,508,275.00
12,705,000.00
26,125.00
21,520.00
12,752,645.00
15,260,920.00
0.00
15,260,920.00
5,272,668.00
26,125.00
21,520.00
5,320,313.00
7,470,263.00
0.00
7,470,263.00
PK.03
BIAYA
SATUAN
( Rp )
23,870.00
1,683.00
90,090.00
9,817.50
125,460.50
262,778.00
1,045.00
263,823.00
389,283.50
0.00
389,283.50
PK.04
BIAYA
SATUAN
( Rp )
23,870.00
1,683.00
90,090.00
9,817.50
125,460.50
63,983.60
1,045.00
65,028.60
190,489.10
0.00
190,489.10
PK.05
BIAYA
SATUAN
( Rp )
68,200.00
4,675.00
257,400.00
28,050.00
358,325.00
415,555.60
10,760.00
426,315.60
784,640.60
0.00
784,640.60
I ATAU II
PK.06
BIAYA
SATUAN
( Rp )
54,560.00
3,740.00
205,920.00
22,440.00
286,660.00
249,333.36
6,456.00
255,789.36
542,449.36
0.00
542,449.36
S I ATAU II
PK.07
BIAYA
SATUAN
( Rp )
68,200.00
4,675.00
257,400.00
28,050.00
358,325.00
664,888.96
10,760.00
675,648.96
1,033,973.96
0.00
1,033,973.96
164,236.25
627.00
10,760.00
109,340.00
284,963.25
535,790.75
0.00
535,790.75
S I ATAU II
PK.09
BIAYA
SATUAN
( Rp )
54,560.00
3,740.00
205,920.00
22,440.00
286,660.00
265,955.58
627.00
10,760.00
109,340.00
386,682.58
673,342.58
0.00
673,342.58
PK.10
BIAYA
SATUAN
( Rp )
45,694.00
31,322.50
171,600.00
18,700.00
267,316.50
623,333.40
3,135.00
626,468.40
893,784.90
0.00
893,784.90
4,503,807.00
117,040.00
306,750.00
4,927,597.00
6,360,897.00
0.00
6,360,897.00
PK.12
BIAYA
SATUAN
( Rp )
456,940.00
31,322.50
1,724,580.00
187,935.00
2,400,777.50
14,080,008.00
117,040.00
306,750.00
14,503,798.00
16,904,575.50
0.00
16,904,575.50
PK.13
BIAYA
SATUAN
( Rp )
163,680.00
11,220.00
617,760.00
67,320.00
859,980.00
4,833,279.00
62,700.00
306,750.00
5,202,729.00
6,062,709.00
0.00
6,062,709.00
PK.14
BIAYA
SATUAN
( Rp )
6,820.00
467.50
8,580.00
935.00
16,802.50
38,030.72
101,288.16
5,225.00
144,543.88
161,346.38
0.00
161,346.38
PK.15
BIAYA
SATUAN
( Rp )
6,820.00
467.50
8,580.00
935.00
16,802.50
38,030.72
20,257.63
5,225.00
63,513.35
80,315.85
0.00
80,315.85
PK.16
BIAYA
SATUAN
( Rp )
6,820.00
467.50
8,580.00
935.00
16,802.50
38,030.72
20,257.63
5,225.00
63,513.35
80,315.85
0.00
80,315.85
PK.17
BIAYA
SATUAN
( Rp )
8,184.00
561.00
10,296.00
1,122.00
20,163.00
456,218.40
4,180.00
460,398.40
480,561.40
0.00
480,561.40
AS II ATAU III
PK.18
BIAYA
SATUAN
( Rp )
10,230.00
7,012.50
25,740.00
2,805.00
45,787.50
41,833.79
4,180.00
46,013.79
91,801.29
0.00
91,801.29
S II ATAU III
PK.19
BIAYA
SATUAN
( Rp )
13,640.00
935.00
25,740.00
2,805.00
43,120.00
44,278.62
5,225.00
49,503.62
92,623.62
0.00
92,623.62
PK.20
BIAYA
SATUAN
( Rp )
6,820.00
467.50
17,160.00
1,870.00
26,317.50
112,200.01
2,090.00
114,290.01
140,607.51
0.00
140,607.51
PK.21
BIAYA
SATUAN
( Rp )
6,820.00
467.50
17,160.00
2,337.50
26,785.00
114,277.79
1,045.00
115,322.79
142,107.79
0.00
142,107.79
PK.22
BIAYA
SATUAN
( Rp )
10,230.00
748.00
38,610.00
4,207.50
53,795.50
109,628.96
3,135.00
197,172.20
12,051.20
321,987.36
375,782.86
0.00
375,782.86
B
1
2
U R
TENAGA KERJA
Pekerja
Mandor
Tukang Kayu
Kepala Tukang
Jumlah
SATUAN
Org
Org
Org
Org
BAHAN
Genteng Metal Type PRIMA 0.35
Paku
/
/
/
/
Hari
Hari
Hari
Hari
Lbr
Kg
HARGA
SATUAN
( Rp )
INDEKS
68,200.00
93,500.00
85,800.00
93,500.00
0.200
0.001
0.100
0.010
69,630.00
20,900.00
1.840
0.200
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
B
1
2
U R
TENAGA KERJA
Pekerja
Mandor
Tukang Kayu
Kepala Tukang
Jumlah
BAHAN
Genteng Metal Type ROYAL 0.35
Paku
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
SATUAN
Org
Org
Org
Org
/
/
/
/
Hari
Hari
Hari
Hari
Lbr
Kg
HARGA
SATUAN
( Rp )
INDEKS
68,200.00
93,500.00
85,800.00
93,500.00
0.200
0.001
0.100
0.010
69,630.00
20,900.00
1.710
0.200
B
1
2
U R
TENAGA KERJA
Pekerja
Mandor
Tukang Kayu
Kepala Tukang
Jumlah
SATUAN
Org
Org
Org
Org
BAHAN
Genteng Metal Type CLASSIC 0.35
Paku
/
/
/
/
Hari
Hari
Hari
Hari
Lbr
Kg
HARGA
SATUAN
( Rp )
INDEKS
68,200.00
93,500.00
85,800.00
93,500.00
0.200
0.001
0.100
0.010
67,320.00
20,900.00
1.620
0.200
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
B
1
2
U R
TENAGA KERJA
Pekerja
Mandor
Tukang Kayu
Kepala Tukang
Jumlah
BAHAN
Genteng Metal Stone Type PRIMA 0.35
Paku
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
SATUAN
Org
Org
Org
Org
/
/
/
/
Hari
Hari
Hari
Hari
Lbr
Kg
HARGA
SATUAN
( Rp )
INDEKS
68,200.00
93,500.00
85,800.00
93,500.00
0.200
0.001
0.100
0.010
88,880.00
20,900.00
1.840
0.200
B
1
2
U R
TENAGA KERJA
Pekerja
Mandor
Tukang Kayu
Kepala Tukang
Jumlah
SATUAN
Org
Org
Org
Org
BAHAN
Genteng Sirap Belian
Paku 1/2" - 1"
/
/
/
/
Hari
Hari
Hari
Hari
Bh
Kg
HARGA
SATUAN
( Rp )
INDEKS
68,200.00
93,500.00
85,800.00
93,500.00
0.166
0.008
0.250
0.025
6,050.00
20,900.00
60.000
0.200
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
B
1
2
U R
TENAGA KERJA
Pekerja
Mandor
Tukang Kayu
Kepala Tukang
Jumlah
BAHAN
Nok / Bubungan Genteng Metal 1/2 lingk
Paku 1/2" - 1"
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
SATUAN
Org
Org
Org
Org
/
/
/
/
Hari
Hari
Hari
Hari
Bh
Kg
HARGA
SATUAN
( Rp )
INDEKS
68,200.00
93,500.00
85,800.00
93,500.00
0.250
0.013
0.150
0.015
71,500.00
20,900.00
2.500
0.050
B
1
2
U R
TENAGA KERJA
Pekerja
Mandor
Tukang Kayu
Kepala Tukang
Jumlah
BAHAN
Nok / Bubungan Genteng Metal Kotak 0.
Paku 1/2" - 1"
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
SATUAN
Org
Org
Org
Org
/
/
/
/
Hari
Hari
Hari
Hari
Meter
Kg
HARGA
SATUAN
( Rp )
INDEKS
68,200.00
93,500.00
85,800.00
93,500.00
0.250
0.013
0.150
0.015
93,900.00
20,900.00
1.000
0.050
RJAAN
P.PA. 01
BIAYA
SATUAN
( Rp )
13,640.00
93.50
8,580.00
935.00
23,248.50
128,119.20
4,180.00
132,299.20
155,547.70
0.00
155,547.70
P.PA. 02
BIAYA
SATUAN
( Rp )
13,640.00
93.50
8,580.00
935.00
23,248.50
119,067.30
4,180.00
123,247.30
146,495.80
0.00
146,495.80
P.PA. 03
BIAYA
SATUAN
( Rp )
13,640.00
93.50
8,580.00
935.00
23,248.50
109,058.40
4,180.00
113,238.40
136,486.90
0.00
136,486.90
P.PA. 04
BIAYA
SATUAN
( Rp )
13,640.00
93.50
8,580.00
935.00
23,248.50
163,539.20
4,180.00
167,719.20
190,967.70
0.00
190,967.70
P.PA. 05
BIAYA
SATUAN
( Rp )
11,321.20
748.00
21,450.00
2,337.50
35,856.70
363,000.00
4,180.00
367,180.00
403,036.70
0.00
403,036.70
P.PA. 06
BIAYA
SATUAN
( Rp )
17,050.00
1,215.50
12,870.00
1,402.50
32,538.00
178,750.00
1,045.00
179,795.00
212,333.00
0.00
212,333.00
P.PA. 07
BIAYA
SATUAN
( Rp )
17,050.00
1,215.50
12,870.00
1,402.50
32,538.00
93,900.00
1,045.00
94,945.00
127,483.00
0.00
127,483.00
BAHAN
Asbes Semen
Paku Tripleks
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M1
Kg
56,650.00
28,870.00
INDEKS
0.030
0.004
0.070
0.007
1.100
0.010
BAHAN
Tripleks T = 3 mm
Paku Tripleks
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Lbr
Kg
52,190.00
28,870.00
INDEKS
0.100
0.005
0.100
0.010
0.375
0.030
BAHAN
Kayu Papan
Paku Tripleks
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M3
Kg
10,388,890.00
28,870.00
INDEKS
0.800
0.040
0.080
0.010
0.015
0.010
BAHAN
Gypsum Board
Paku Skrup
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Lbr
Kg
67,100.00
96,800.00
INDEKS
0.100
0.005
0.050
0.005
0.364
0.010
BAHAN
List Gypsum Profil
Tepung Gypsum
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M1
Kg
17,500.00
28,000.00
INDEKS
0.060
0.003
0.060
0.006
1.050
0.150
BAHAN
List Kayu Profil
Paku
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M1
Kg
7,975.00
20,900.00
INDEKS
0.050
0.003
0.050
0.005
1.050
0.010
AN
P.LL.01
BIAYA
SATUAN
( Rp )
2,046.00
374.00
6,006.00
654.50
9,080.50
62,315.00
288.70
62,603.70
71,684.20
0.00
71,684.20
MM
P.LL.02
BIAYA
SATUAN
( Rp )
6,820.00
467.50
8,580.00
935.00
16,802.50
19,571.25
866.10
20,437.35
37,239.85
0.00
37,239.85
P.LL.03
BIAYA
SATUAN
( Rp )
54,560.00
3,740.00
6,864.00
935.00
66,099.00
155,833.35
288.70
156,122.05
222,221.05
0.00
222,221.05
P.LL.04
BIAYA
SATUAN
( Rp )
6,820.00
467.50
4,290.00
467.50
12,045.00
24,424.40
968.00
25,392.40
37,437.40
0.00
37,437.40
P.LL.05
BIAYA
SATUAN
( Rp )
4,092.00
280.50
5,148.00
561.00
10,081.50
18,375.00
4,200.00
22,575.00
32,656.50
0.00
32,656.50
P.LL.06
BIAYA
SATUAN
( Rp )
3,410.00
280.50
4,290.00
467.50
8,448.00
8,373.75
209.00
8,582.75
17,030.75
0.00
17,030.75
DAFTAR
BAHAN
Kloset Duduk Monoblok
Perlengkapan
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Bh
Ls
1,870,000.00
1.000
1,870,000.00 6% Harga Kloset
BAHAN
Kloset Jongkok Keramik
Semen Portland
Pasir Pasang/Beton
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Bh
Kg
212,030.00
1,460.00
1.000
6.000
M3
91,300.00
0.010
BAHAN
Urinoir
Perlengkapan
Semen Portland
Pasir Pasang/Beton
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Bh
Ls
Kg
M3
1.000
1,585,000.00
30%
x
harga
Urinoi
1,585,000.00
6.000
1,460.00
91,300.00
0.010
BAHAN
Washtafel
Perlengkapan
Semen Portland
Pasir Pasang/Beton
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Bh
Ls
Kg
M3
1.000
1,700,000.00
1,700,000.00 12% x harga Washt
6.000
1,460.00
0.010
91,300.00
BAHAN
Bak Fiberglass
Perlengkapan
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Bh
Ls
1.000
750,000.00
750,000.00 18% x harga Bak
BAHAN
Bak Fiberglass
Perlengkapan
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Bh
Ls
1.000
1,200,000.00
1,200,000.00 12% x harga Bak
BAHAN
Pipa Galvanis 1/2"
Perlengkapan
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M1
Ls
1.200
20,313.33
20,313.33 35% x harga Pipa
BAHAN
Pipa Galvanis 3/4"
Perlengkapan
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M1
Ls
1.200
24,768.33
24,768.33 35% x harga Pipa
BAHAN
Pipa Galvanis 1 "
Perlengkapan
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M1
Ls
1.200
31,918.33
31,918.33 35% x harga Pipa
BAHAN
Pipa Galvanis 1 1/2"
Perlengkapan
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M1
Ls
1.200
52,121.67
52,121.67 35% x harga Pipa
BAHAN
Pipa Galvanis 3"
Perlengkapan
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M1
Ls
1.200
102,391.67
102,391.67 35% x harga Pipa
BAHAN
Pipa Galvanis 4"
Perlengkapan
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M1
Ls
1.200
139,563.33
139,563.33 35% x harga Pipa
BAHAN
Pipa PVC 1/2"
Perlengkapan
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M1
Ls
1.200
4,477.50
4,477.50 35% x harga Pipa
BAHAN
Pipa PVC 3/4"
Perlengkapan
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M1
Ls
1.200
6,917.50
6,917.50 35% x harga Pipa
BAHAN
Pipa PVC 1"
Perlengkapan
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M1
Ls
1.200
10,175.00
10,175.00 35% x harga Pipa
BAHAN
Pipa PVC 1 1/2"
Perlengkapan
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M1
Ls
1.200
13,750.00
13,750.00 35% x harga Pipa
BAHAN
Pipa PVC 2"
Perlengkapan
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M1
Ls
1.200
15,455.00
15,455.00 35% x harga Pipa
BAHAN
Pipa PVC 3"
Perlengkapan
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M1
Ls
1.200
29,287.50
29,287.50 35% x harga Pipa
BAHAN
Pipa PVC 4"
Perlengkapan
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M1
Ls
1.200
44,207.50
44,207.50 35% x harga Pipa
BAHAN
Kran Air 1/2"
Seal Tape
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Bh
Bh
38,500.00
2,500.00
1.000
0.025
BAHAN
Kran Air 3/4"
Seal Tape
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Bh
Bh
38,500.00
15,000.00
1.000
0.025
BAHAN
Floor Drain
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Bh
155,000.00
1.000
JAAN
P.SNT. 01
BIAYA
SATUAN
( Rp )
225,060.00
14,960.00
94,380.00
93.50
334,493.50
1,870,000.00
112,200.00
1,982,200.00
2,316,693.50
0.00
2,316,693.50
P.SNT. 02
BIAYA
SATUAN
( Rp )
68,200.00
14,960.00
128,700.00
14,025.00
225,885.00
212,030.00
8,760.00
913.00
221,703.00
447,588.00
0.00
447,588.00
P.SNT. 03
BIAYA
SATUAN
( Rp )
68,200.00
9,350.00
85,800.00
9,350.00
172,700.00
1,585,000.00
475,500.00
8,760.00
913.00
2,070,173.00
2,242,873.00
0.00
2,242,873.00
P.SNT. 04
BIAYA
SATUAN
( Rp )
81,840.00
9,350.00
124,410.00
14,025.00
229,625.00
1,700,000.00
204,000.00
8,760.00
913.00
1,913,673.00
2,143,298.00
0.00
2,143,298.00
P.SNT. 05
BIAYA
SATUAN
( Rp )
122,760.00
10,285.00
231,660.00
50,490.00
415,195.00
750,000.00
135,000.00
885,000.00
1,300,195.00
0.00
1,300,195.00
P.SNT. 06
BIAYA
SATUAN
( Rp )
204,600.00
84,150.00
386,100.00
84,150.00
759,000.00
1,200,000.00
144,000.00
1,344,000.00
2,103,000.00
0.00
2,103,000.00
P.SNT. 07
BIAYA
SATUAN
( Rp )
3,682.80
2,524.50
7,722.00
841.50
14,770.80
24,376.00
7,109.67
31,485.67
46,256.47
0.00
46,256.47
P.SNT. 08
BIAYA
SATUAN
( Rp )
3,682.80
2,524.50
7,722.00
841.50
14,770.80
29,722.00
8,668.92
38,390.92
53,161.72
0.00
53,161.72
P.SNT. 08
BIAYA
SATUAN
( Rp )
3,682.80
252.45
7,722.00
841.50
12,498.75
38,302.00
11,171.42
49,473.42
61,972.17
0.00
61,972.17
P.SNT. 09
BIAYA
SATUAN
( Rp )
7,365.60
504.90
15,444.00
1,683.00
24,997.50
62,546.00
18,242.58
80,788.58
105,786.08
0.00
105,786.08
P.SNT. 10
BIAYA
SATUAN
( Rp )
7,365.60
504.90
15,444.00
1,683.00
24,997.50
122,870.00
35,837.08
158,707.08
183,704.58
0.00
183,704.58
P.SNT. 10
BIAYA
SATUAN
( Rp )
9,207.00
635.80
19,305.00
2,103.75
31,251.55
167,476.00
48,847.17
216,323.17
247,574.72
0.00
247,574.72
P.SNT. 11
BIAYA
SATUAN
( Rp )
2,455.20
168.30
5,148.00
561.00
8,332.50
5,373.00
1,567.13
6,940.13
15,272.63
0.00
15,272.63
P.SNT. 12
BIAYA
SATUAN
( Rp )
2,455.20
168.30
5,148.00
561.00
8,332.50
8,301.00
2,421.13
10,722.13
19,054.63
0.00
19,054.63
P.SNT. 13
BIAYA
SATUAN
( Rp )
2,455.20
168.30
5,148.00
561.00
8,332.50
12,210.00
3,561.25
15,771.25
24,103.75
0.00
24,103.75
P.SNT. 14
BIAYA
SATUAN
( Rp )
2,455.20
168.30
5,148.00
561.00
8,332.50
16,500.00
4,812.50
21,312.50
29,645.00
0.00
29,645.00
P.SNT. 15
BIAYA
SATUAN
( Rp )
2,455.20
168.30
5,148.00
561.00
8,332.50
18,546.00
5,409.25
23,955.25
32,287.75
0.00
32,287.75
P.SNT. 16
BIAYA
SATUAN
( Rp )
5,524.20
383.35
11,583.00
12,622.50
30,113.05
35,145.00
10,250.63
45,395.63
75,508.68
0.00
75,508.68
P.SNT. 17
BIAYA
SATUAN
( Rp )
5,524.20
383.35
11,583.00
12,622.50
30,113.05
53,049.00
15,472.63
68,521.63
98,634.68
0.00
98,634.68
P.SNT. 18
BIAYA
SATUAN
( Rp )
8,580.00
935.00
9,515.00
38,500.00
62.50
38,562.50
48,077.50
0.00
48,077.50
P.SNT. 19
BIAYA
SATUAN
( Rp )
8,580.00
935.00
9,515.00
38,500.00
375.00
38,875.00
48,390.00
0.00
48,390.00
P.SNT. 20
BIAYA
SATUAN
( Rp )
8,580.00
935.00
9,515.00
155,000.00
155,000.00
164,515.00
0.00
164,515.00
BAHAN
Besi Profil
Kg
20,450.00
1.150
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
BAHAN
Besi Baja IWF
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
19,730.00
1.150
BAHAN
Besi Baja IWF
Kg
19,730.00
1.150
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
BAHAN
Solar
Minyak Pelumas
Jumlah
C
1
ALAT
Sewa Alat
D
E
Jumlah A + B + C
Biaya Umum & Keuntungan = % x D
Jumlah
Liter
Liter
4,525.00
26,625.00
1.000
0.100
Jam
68,750.00
0.080
BAHAN
Kawat Las Listrik
Solar
Minyak Pelumas
Jumlah
C
1
ALAT
Sewa Alat
D
E
Jumlah A + B + C
Biaya Umum & Keuntungan = % x D
Jumlah
Kg
Liter
Liter
126,500.00
4,525.00
26,625.00
0.040
0.030
0.004
Jam
68,750.00
0.017
BAHAN
Profil Aluminium
Sekrup Pixer
Sealant
Jumlah
C
1
ALAT
Sewa Alat
D
E
Jumlah A + B + C
Biaya Umum & Keuntungan = % x D
Jumlah
M1
Buah
Tube
Jam
84,700.00
1,650.00
122,820.00
1.100
2.000
0.060
68,750.00
0.017
BAHAN
Seng Plat
Paku Campur
Besi Strip
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M1
Kg
Kg
22,990.00
20,900.00
19,730.00
1.050
0.100
0.500
BAHAN
Jendela Nako
Paku Skrup
Besi Strip
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M2
Buah
M1
280,720.00
530.00
4,932.50
1.100
10.000
7.000
BAHAN
Seng Plat
Paku Campuran
Papan Kayu Kls. II atau III
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M1
Kg
M3
22,990.00
20,900.00
6,569,450.00
1.050
0.015
0.019
RJAAN
A)
P.BA. 01
BIAYA
SATUAN
( Rp )
4,092.00
561.00
5,148.00
561.00
10,362.00
23,517.50
23,517.50
33,879.50
0.00
33,879.50
P.BA. 02
BIAYA
SATUAN
( Rp )
4,092.00
561.00
5,148.00
561.00
10,362.00
22,689.50
22,689.50
33,051.50
0.00
33,051.50
P.BA. 03
BIAYA
SATUAN
( Rp )
4,092.00
561.00
5,148.00
561.00
10,362.00
22,689.50
22,689.50
33,051.50
0.00
33,051.50
P.BA. 04
BIAYA
SATUAN
( Rp )
6,820.00
467.50
8,580.00
93.50
15,961.00
4,525.00
2,662.50
7,187.50
5,500.00
23,148.50
0.00
23,148.50
P.BA. 05
BIAYA
SATUAN
( Rp )
272.80
18.70
171.60
18.70
481.80
5,060.00
135.75
106.50
242.25
1,168.75
724.05
0.00
724.05
P.BA. 06
BIAYA
SATUAN
( Rp )
2,932.60
196.35
3,689.40
402.05
7,220.40
93,170.00
3,300.00
7,369.20
10,669.20
1,168.75
17,889.60
0.00
17,889.60
EBAR 45 CM
P.BA. 07
BIAYA
SATUAN
( Rp )
10,230.00
654.50
25,740.00
2,805.00
39,429.50
24,139.50
2,090.00
9,865.00
11,955.00
51,384.50
0.00
51,384.50
P.BA. 08
BIAYA
SATUAN
( Rp )
13,640.00
93.50
17,160.00
1,870.00
32,763.50
308,792.00
5,300.00
34,527.50
39,827.50
72,591.00
0.00
72,591.00
P.BA. 09
BIAYA
SATUAN
( Rp )
13,640.00
93.50
34,320.00
2,337.50
50,391.00
24,139.50
313.50
124,819.55
125,133.05
175,524.05
0.00
175,524.05
BAHAN
Kunci Tanam Antik
Bh
179,020.00
INDEKS
0.060
0.003
0.600
0.060
1.000
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
BAHAN
Kunci Tanam Biasa
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Bh
88,550.00
INDEKS
0.010
0.005
0.500
0.010
1.000
BAHAN
Kunci Tanam Silinder
Bh
110,000.00
INDEKS
0.0050
0.0003
0.5000
0.0050
1.000
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
BAHAN
Engsel Pintu
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Bh
33,000.00
INDEKS
0.0150
0.0008
0.1500
0.0150
1.000
BAHAN
Engsel Jendela
Bh
24,750.00
INDEKS
0.0150
0.0008
0.1500
0.0150
1.000
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
BAHAN
Kait Angin
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Bh
14,850.00
INDEKS
0.0150
0.0008
0.1500
0.0150
1.000
BAHAN
Door Closer
Bh
231,000.00
INDEKS
0.0500
0.0025
0.5000
0.0500
1.000
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
BAHAN
Slot Pintu
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Bh
20,350.00
INDEKS
0.0200
0.0010
0.2000
0.0200
1.000
BAHAN
Slot Jendela
Bh
23,930.00
INDEKS
0.0200
0.0010
0.2000
0.0200
1.000
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
BAHAN
Door Stoper
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Bh
77,000.00
INDEKS
0.0100
0.0005
0.1000
0.0100
1.000
BAHAN
Kaca tebal 5 mm
M2
133,100.00
INDEKS
0.0150
0.0008
0.1500
0.0150
1.100
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
BAHAN
Kaca tebal 12 mm
Sealent
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M2
Kg
605,000.00
122,820.00
INDEKS
0.0250
0.0013
0.2500
0.0250
1.100
0.050
BAHAN
Kaca Cermin 3 mm
M2
242,000.00
INDEKS
0.0150
0.0008
0.1500
0.0150
1.100
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
BAHAN
Kaca Cermin 5 mm
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M2
320,000.00
INDEKS
0.0150
0.0008
0.1500
0.0150
1.100
BAHAN
Kaca Patri tebal 5mm
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M2
3,025,000.00
INDEKS
0.0150
0.0008
0.1500
0.0150
1.100
RJAAN
)
P.KK. 01
BIAYA
SATUAN
( Rp )
4,092.00
280.50
51,480.00
5,610.00
61,462.50
179,020.00
179,020.00
240,482.50
0.00
240,482.50
P.KK. 02
BIAYA
SATUAN
( Rp )
682.00
467.50
42,900.00
935.00
44,984.50
88,550.00
88,550.00
133,534.50
0.00
133,534.50
P.KK. 03
BIAYA
SATUAN
( Rp )
341.00
23.38
42,900.00
467.50
43,731.88
110,000.00
110,000.00
153,731.88
0.00
153,731.88
P.KK. 04
BIAYA
SATUAN
( Rp )
1,023.00
70.13
12,870.00
1,402.50
15,365.63
33,000.00
33,000.00
48,365.63
0.00
48,365.63
P.KK. 05
BIAYA
SATUAN
( Rp )
1,023.00
70.13
12,870.00
1,402.50
15,365.63
24,750.00
24,750.00
40,115.63
0.00
40,115.63
P.KK. 06
BIAYA
SATUAN
( Rp )
1,023.00
70.13
12,870.00
1,402.50
15,365.63
14,850.00
14,850.00
30,215.63
0.00
30,215.63
P.KK. 07
BIAYA
SATUAN
( Rp )
3,410.00
233.75
42,900.00
4,675.00
51,218.75
231,000.00
231,000.00
282,218.75
0.00
282,218.75
P.KK. 08
BIAYA
SATUAN
( Rp )
1,364.00
93.50
17,160.00
1,870.00
20,487.50
20,350.00
20,350.00
40,837.50
0.00
40,837.50
P.KK. 09
BIAYA
SATUAN
( Rp )
1,364.00
93.50
17,160.00
1,870.00
20,487.50
23,930.00
23,930.00
44,417.50
0.00
44,417.50
P.KK. 10
BIAYA
SATUAN
( Rp )
682.00
46.75
8,580.00
935.00
10,243.75
77,000.00
77,000.00
87,243.75
0.00
87,243.75
P.KK. 11
BIAYA
SATUAN
( Rp )
1,023.00
70.13
12,870.00
1,402.50
15,365.63
146,410.00
146,410.00
161,775.63
0.00
161,775.63
P.KK. 12
BIAYA
SATUAN
( Rp )
1,705.00
116.88
21,450.00
2,337.50
25,609.38
665,500.00
6,141.00
671,641.00
697,250.38
0.00
697,250.38
P.KK. 13
BIAYA
SATUAN
( Rp )
1,023.00
70.13
12,870.00
1,402.50
15,365.63
266,200.00
266,200.00
281,565.63
0.00
281,565.63
P.KK. 14
BIAYA
SATUAN
( Rp )
1,023.00
70.13
12,870.00
1,402.50
15,365.63
352,000.00
352,000.00
367,365.63
0.00
367,365.63
P.KK. 15
BIAYA
SATUAN
( Rp )
1,023.00
70.13
12,870.00
1,402.50
15,365.63
3,327,500.00
3,327,500.00
3,342,865.63
0.00
3,342,865.63
BAHAN
Keramik Ukuran 20 x 20 cm
Semen
Pasir Pasang
Semen Warna
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Buah
Kg
M3
Kg
1,978.87
1,460.00
91,300.00
1,118.40
INDEKS
0.700
0.035
0.350
0.035
26.500
10.400
0.045
1.620
BAHAN
Keramik Ukuran 30 x 30 cm
Semen
Pasir Pasang
Semen Warna
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Buah
Kg
M3
Kg
3,869.42
1,460.00
91,300.00
1,118.40
INDEKS
0.700
0.035
0.350
0.035
11.870
10.000
0.045
1.500
BAHAN
Keramik Ukuran 40 x 40 cm
Semen
Pasir Pasang
Semen Warna
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Buah
Kg
M3
Kg
10,767.72
1,460.00
91,300.00
1,118.40
INDEKS
0.250
0.013
0.125
0.013
6.630
9.800
0.045
1.300
BAHAN
Keramik Ukuran 60 x 60 cm
Semen
Pasir Pasang
Semen Warna
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Buah
Kg
M3
Kg
99,354.84
1,460.00
91,300.00
1,118.40
3.100
9.600
0.045
1.500
BAHAN
Marmer Ukuran 100 x 100 cm
Semen
Pasir Pasang
Semen Warna
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Buah
Kg
M3
Kg
499,130.00
1,460.00
91,300.00
1,118.40
INDEKS
0.700
0.035
0.350
0.035
1.060
8.190
0.045
0.650
BAHAN
Karpet
Lem
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M2
Kg
225,000.00
21,520.00
INDEKS
0.170
0.009
0.170
0.017
1.060
8.190
BAHAN
Underlayer
Lem
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M2
Kg
200,000.00
225,000.00
INDEKS
0.120
0.006
0.120
0.012
1.050
0.350
BAHAN
Parquet Kayu
Lem
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M2
Kg
302,500.00
21,520.00
INDEKS
0.700
0.035
0.350
0.035
1.050
0.600
BAHAN
Keramik Ukuran 20 x 20 cm
Semen
Pasir Pasang
Semen Warna
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Buah
Kg
M3
Kg
2,137.74
1,460.00
91,300.00
1,118.40
INDEKS
0.900
0.045
0.450
0.045
26.500
9.300
0.018
1.940
BAHAN
Keramik Ukuran 20 x 25 cm
Semen
Pasir Pasang
Semen Warna
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Buah
Kg
M3
Kg
2,841.50
1,460.00
91,300.00
1,118.40
20.000
9.300
0.018
0.194
BAHAN
Batu Tempel Hitam
Semen
Pasir Pasang
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M2
Kg
M3
225,000.00
1,460.00
91,300.00
INDEKS
0.700
0.035
0.350
0.035
1.100
11.750
0.035
BAHAN
Wallpaper
Lem
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
M2
Kg
100,000.00
21,520.00
INDEKS
0.350
0.002
0.175
0.017
1.100
0.250
PEKERJAAN
DING( P.PLD )
P.PLD.01
BIAYA
SATUAN
( Rp )
47,740.00
3,272.50
30,030.00
3,272.50
84,315.00
52,440.00
15,184.00
4,108.50
1,811.81
73,544.31
157,859.31
0.00
157,859.31
P.PLD.02
BIAYA
SATUAN
( Rp )
47,740.00
3,272.50
30,030.00
3,272.50
84,315.00
45,930.00
14,600.00
4,108.50
1,677.60
66,316.10
150,631.10
0.00
150,631.10
P.PLD.03
BIAYA
SATUAN
( Rp )
17,050.00
1,215.50
10,725.00
1,215.50
30,206.00
71,390.00
14,308.00
4,108.50
1,453.92
91,260.42
121,466.42
0.00
121,466.42
P.PLD.04
BIAYA
SATUAN
( Rp )
16,368.00
1,122.00
10,296.00
1,122.00
28,908.00
308,000.00
14,016.00
4,108.50
1,677.60
327,802.10
356,710.10
0.00
356,710.10
P.PLD.05
BIAYA
SATUAN
( Rp )
47,740.00
3,272.50
30,030.00
3,272.50
84,315.00
529,077.80
11,957.40
4,108.50
726.96
545,870.66
630,185.66
0.00
630,185.66
P.PLD.06
BIAYA
SATUAN
( Rp )
11,594.00
841.50
14,586.00
1,589.50
28,611.00
238,500.00
176,248.80
414,748.80
443,359.80
0.00
443,359.80
P.PLD.07
BIAYA
SATUAN
( Rp )
8,184.00
561.00
10,296.00
1,122.00
20,163.00
210,000.00
78,750.00
288,750.00
308,913.00
0.00
308,913.00
P.PLD.08
BIAYA
SATUAN
( Rp )
47,740.00
3,272.50
30,030.00
3,272.50
84,315.00
317,625.00
12,912.00
330,537.00
414,852.00
0.00
414,852.00
P.PLD.09
BIAYA
SATUAN
( Rp )
61,380.00
4,207.50
38,610.00
4,207.50
108,405.00
56,650.00
13,578.00
1,643.40
2,169.70
74,041.10
182,446.10
0.00
182,446.10
P.PLD.10
BIAYA
SATUAN
( Rp )
61,380.00
4,207.50
38,610.00
4,207.50
108,405.00
56,830.00
13,578.00
1,643.40
216.97
72,268.37
180,673.37
0.00
180,673.37
P.PLD.11
BIAYA
SATUAN
( Rp )
47,740.00
3,272.50
30,030.00
3,272.50
84,315.00
247,500.00
17,155.00
3,195.50
267,850.50
352,165.50
0.00
352,165.50
P.PLD.12
BIAYA
SATUAN
( Rp )
23,870.00
187.00
15,015.00
1,589.50
40,661.50
110,000.00
5,380.00
115,380.00
156,041.50
0.00
156,041.50
DAFTAR
BAHAN
Soda Api
Kg
19,800.00
1.000
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
BAHAN
Sabun
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
20,350.00
0.050
BAHAN
Dempul
Cat Dasar
Cat Kilat Penutup
Kg
Kg
Kg
36,990.00
47,850.00
45,650.00
0.150
0.170
0.170
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
4. 1 M2 PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PEN
Analisa Biaya Konstruksi ( ABK ) berdasarkan SNI DT - 91 - 0010 - 2007 - 6.8
HARGA
NO.
U R A I A N
SATUAN
SATUAN
INDEKS
( Rp )
A
TENAGA KERJA
1
Pekerja
Org / Hari
68,200.00
0.070
2
Mandor
Org / Hari
93,500.00
0.009
3
Tukang Cat
Org / Hari
85,800.00
0.006
4
Kepala Tukang
Org / Hari
93,500.00
0.008
Jumlah
B
1
2
3
4
BAHAN
Cat Meni
Dempul
Cat Dasar
Cat Kilat Penutup 2 Kali
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
Kg
Kg
Kg
65,220.00
36,990.00
47,850.00
45,650.00
0.200
0.150
0.170
0.260
5. 1 M2 PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 3 LAPIS CAT PEN
Analisa Biaya Konstruksi ( ABK ) berdasarkan SNI DT - 91 - 0010 - 2007 - 6.9
HARGA
NO.
U R A I A N
SATUAN
SATUAN
INDEKS
( Rp )
A
TENAGA KERJA
1
Pekerja
Org / Hari
68,200.00
0.070
2
Mandor
Org / Hari
93,500.00
0.003
3
Tukang Cat
Org / Hari
85,800.00
0.105
4
Kepala Tukang
Org / Hari
93,500.00
0.004
Jumlah
B
1
2
3
4
BAHAN
Cat Meni
Dempul
Cat Dasar
Cat Kilat Penutup 3 Kali
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
Kg
Kg
Kg
65,220.00
36,990.00
47,850.00
45,650.00
0.200
0.150
0.170
0.350
BAHAN
Teak Oil
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Ltr
48,400.00
0.360
BAHAN
Politur
Politur Jadi
Ampelas
Kg
Kg
Lbr
50,160.00
50,160.00
2,840.00
0.150
0.372
2.000
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
BAHAN
Plamur (dempul tembok)
Cat Dasar tembok
Cat Tembok Penutup 2 x
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
Kg
Kg
29,520.00
47,850.00
73,920.00
0.100
0.120
0.260
9. 1 M2 PENGECATAN TEMBOK BARU ( 1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP ) DGN MU
BAHAN
Plamur (dempul tembok)
Cat Dasar tembok
Cat Tembok Penutup 2 x
Kg
Kg
Kg
29,520.00
47,850.00
73,920.00
0.100
0.120
0.260
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
10. 1 M2 PENGECATAN TEMBOK LAMA ( 1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP ) DGN M
BAHAN
Cat Dasar tembok
Cat Tembok Penutup 2 x
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Kg
Kg
47,850.00
73,920.00
0.120
0.180
BAHAN
Meni Besi
Kuas
Kg
Bh
65,220.00
20,680.00
0.100
0.010
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
BAHAN
Teer /Residu
Jumlah
C
D
Jumlah A + B
Biaya Umum & Keuntungan = % x C
Jumlah
Liter
58,300.00
0.350
KERJAAN
P.CT. 01
BIAYA
SATUAN
( Rp )
10,230.00
233.75
10,463.75
19,800.00
19,800.00
30,263.75
0.00
30,263.75
A MANUAL
P.CT. 02
BIAYA
SATUAN
( Rp )
10,230.00
233.75
10,463.75
1,017.50
1,017.50
11,481.25
0.00
11,481.25
P.CT. 03
BIAYA
SATUAN
( Rp )
4,774.00
233.75
6,435.00
701.25
12,144.00
5,548.50
8,134.50
7,760.50
21,443.50
33,587.50
0.00
33,587.50
13,044.00
5,548.50
8,134.50
11,869.00
38,596.00
44,211.50
0.00
44,211.50
13,044.00
5,548.50
8,134.50
15,977.50
42,704.50
57,095.25
0.00
57,095.25
P.CT. 06
BIAYA
SATUAN
( Rp )
2,728.00
233.75
5,405.40
5,890.50
14,257.65
17,424.00
17,424.00
31,681.65
0.00
31,681.65
P.CT. 07
BIAYA
SATUAN
( Rp )
233.75
5,148.00
1,496.00
6,877.75
7,524.00
18,659.52
5,680.00
31,863.52
38,741.27
0.00
38,741.27
P.CT. 08
BIAYA
SATUAN
( Rp )
10,912.00
14,960.00
1,372.80
1,496.00
28,740.80
2,952.00
5,742.00
19,219.20
27,913.20
56,654.00
0.00
56,654.00
P.CT. 09
BIAYA
SATUAN
( Rp )
1,364.00
233.75
5,405.40
589.05
7,592.20
2,952.00
5,742.00
19,219.20
27,913.20
35,505.40
0.00
35,505.40
P.CT. 10
BIAYA
SATUAN
( Rp )
1,909.60
233.75
3,603.60
392.70
6,139.65
5,742.00
13,305.60
19,047.60
25,187.25
0.00
25,187.25
P.CT. 11
BIAYA
SATUAN
( Rp )
1,364.00
935.00
1,716.00
18,700.00
22,715.00
6,522.00
206.80
6,728.80
29,443.80
0.00
29,443.80
P.CT. 12
BIAYA
SATUAN
( Rp )
8,580.00
5,610.00
14,190.00
20,405.00
20,405.00
34,595.00
0.00
34,595.00
: SAMBAS
KECAMATAN
: PALOH
A.
UPAH KERJA
NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TENAGA KERJA
SATUAN
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
32
33
34
35
Pembantu Supir
Pembantu mekanik
Pengemudi
Penjaga malam
Org
Org
Org
Org
/
/
/
/
Hari
Hari
Hari
Hari
B.
BAHAN / MATERIAL
NO
MATERIAL
I.
BAHAN PENGISI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
SATUAN
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
Kg
Zak
Kg
Set
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Kg
Kg
Kg
Kg
Pcs
Pcs
Pcs
Bh
Bh
Bh
Bh
Bh
II.
BAHAN KAYU
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
M3
Btg
Btg
Btg
Btg
Btg
III.
BAHAN BESI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
M'
M'
M'
M'
M'
Buah
Buah
Buah
Buah
M'
M2
M'
M'
M'
M'
M'
M'
M'
Lbr
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
Besi Tempa
Rangka atap baja ringan
Kawat ikat beton
Kawat Duri 10 Kg
Kawat Duri 30 Kg
Kawat Harmonika
Kawat Nyamuk / Besi
Kawat plastik
Kawat Semen
Kawat anyam
Kawat Benrat
Ram Kawat Ayam
Saringan Pasir Uk.55 ( 30 m )
Baut Baja
Baut o 5/8 -25 cm
Baut o 5/8 -30 cm
Beugel
Baja Tulangan
Baja konstruksi / profil
Saringan air pembuang
Besi Penguras
Paku Besi
Paku Jembatan
Paku seng R R T
Paku ulir aluminium
Paku campuran
Kunci Pintu 2 Slaag/besar
Kunci pintu kecil
Kait angin
Handle jendela
Slot Pintu 4"
Slot Jendela 3"
List Propil Gipsum
Wire Mesh D-5 mm
Wire Mesh D-6 mm
Plastik Beton
m2
m2
Kg
Kg
Kg
M2
Roll
M2
Kg
Roll
Kg
Kg
Roll
Kg
Btg
Btg
Btg
Kg
Kg
Bh
Bh
Kg
Kg
Kg
Kg
Kg
Bh
Bh
Bh
Bh
Bh
Bh
M'
M2
M2
M2
IV.
BAHAN CAT
1
2
3
4
5
6
7
8
9
10
Cat Dasar
Cat Kilat
Cat Tembok
Dempul
Plamur
Amplas Kayu
Amplas Besi
Thinner
Teer
Oker
V.
BAHAN PENGGANTUNG
1
2
3
4
5
6
7
8
9
10
11
Kg
Liter
Kg
Kg
Kg
Lbr
Lbr
Kg
Kg
Kg
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
12
13
14
15
V.
BAHAN PERPIPAAN
Bh
Bh
Bh
Bh
M1
M1
UPAH TERMASUK
PAJAK DAN KEUNTUNGAN
(Rp)
66,000.00
69,300.00
66,000.00
99,000.00
71,500.00
71,500.00
104,500.00
71,500.00
71,500.00
104,500.00
71,500.00
71,500.00
71,500.00
71,500.00
71,500.00
104,500.00
70,000.00
71,500.00
104,500.00
71,500.00
104,500.00
71,500.00
104,500.00
71,500.00
60,000.00
88,000.00
66,000.00
69,300.00
66,000.00
85,000.00
99,000.00
66,000.00
66,000.00
99,000.00
55,000.00
UPAH TERMASUK
PAJAK DAN KEUNTUNGAN
(Rp)
133,440.00
180,000.00
211,440.00
211,440.00
431,500.00
507,300.00
431,500.00
507,300.00
739,500.00
437,400.00
570,000.00
780,000.00
885,000.00
920,600.00
1,058,100.00
970,600.00
970,600.00
845,600.00
14,265.00
118,020.00
2,360.40
120,000.00
10,400.00
6,865.00
11,570.00
11,570.00
6,865.00
23,200.00
34,600.00
40,200.00
42,300.00
54,700.00
214,300.00
165,800.00
191,100.00
3,000.00
1,200.00
6,000.00
57,600.00
604,800.00
14,534,000.00
11,342,000.00
11,458,000.00
11,492,000.00
13,691,000.00
13,691,000.00
12,869,000.00
11,588,000.00
11,612,000.00
14,587,000.00
14,142,000.00
13,452,000.00
14,467,000.00
13,595,000.00
5,561,700.00
5,566,300.00
4,980,000.00
4,300,000.00
4,588,800.00
3,200,000.00
3,600,000.00
2,850,000.00
2,200,000.00
2,500,000.00
3,050,000.00
1,954,600.00
1,850,000.00
1,525,800.00
72,600.00
92,400.00
129,360.00
178,200.00
250,800.00
145,200.00
165,000.00
250,800.00
129,360.00
178,200.00
303,600.00
95,000.00
12,000.00
10,000.00
102,000.00
12,000.00
7,200.00
48,700.00
41,300.00
16,270.00
18,400.00
20,400.00
19,700.00
17,500.00
17,550.00
18,100.00
18,000.00
18,400.00
22,100.00
19,600.00
20,400.00
19,200.00
304,400.00
1,045,200.00
557,900.00
688,500.00
101,891,250.00
115,391,250.00
209,891,250.00
243,641,250.00
9,606,821.92
172,800.00
46,326,470.59
44,472,289.16
41,195,918.37
41,377,876.11
41,009,375.00
53,218,181.82
53,235,443.04
368,906.40
23,692.50
54,700.00
19,800.00
21,384.00
21,780.00
21,120.00
21,120.00
21,120.00
19,800.00
2,244.00
17,160.00
17,160.00
348,840.00
252,000.00
23,500.00
67,790.00
160,250.00
43,560.00
329,210.00
23,790.00
23,000.00
432,220.00
19,800.00
21,120.00
549,670.00
21,400.00
14,900.00
12,500.00
40,700.00
14,950.00
50,550.00
30,590.00
27,830.00
30,360.00
48,840.00
64,580.00
74,940.00
20,800.00
120,000.00
55,000.00
11,000.00
7,700.00
3,200.00
2,700.00
55,000.00
48,400.00
65,400.00
3,650.00
28,300.00
60,900.00
19,900.00
18,400.00
16,300.00
2,700.00
4,800.00
8,300.00
17,400.00
63,700.00
393,250.00
9,800.00
6,900.00
143,000.00
32,175.00
42,900.00
2,600.00
2,000.00
239,525.00
100,000.00
232,726.00
112,970.00
139,425.00
212,706.00
100,100.00
32,000.00
38,000.00