Nama Paket
Nilai HPS
: PENINGKATAN JALAN DARI DESA GAWU-GAWU BO'USO - MAZINGO MENUJU DESA LASARA SOWU KEC. GUNUNGSITO
: Rp
1,999,858,000.00
Tahun Anggaran
Nama Perusahan
Harga Penawaran
: 2015
: CV. GAPURA
: Rp
1,994,500,000.00
NO.
KOREKSI ARITMATIKA
I.
URAIAN
Analisa
PEKERJAAN PERSIAPAN
1 Biaya sewa direksikeet
2 Biaya pengukuran dan pematokan
Ditaksir
Ditaksir
Ditaksir
K-210
VOL.
SAT.
1.00
1.00
HARGA
JUMLAH
SATUAN
HARGA
(Rp)
Ls
Ls
1,900,000.00
970,000.00
1.00
Bh
700,000.00
700,000.00
13,760.00
M2
3,340.00
45,958,400.00
JUMLAH SUB I
II.
(Rp)
1,900,000.00
970,000.00
49,528,400.00
K-110
K-311
936.00
600.00
M3
M3
56,103.00
24,134.00
52,512,408.00
14,480,400.00
K-321
23,010.61
M3
19,091.00
439,295,555.51
JUMLAH SUB II
506,288,363.51
K-516
K-516
K-523
296.54
1,045.68
334.80
M3
M3
M3
418,666.00
418,666.00
565,009.00
124,149,959.64
437,790,662.88
189,165,013.20
K-618
K-880
3,294.00
3,294.00
M2
M2
109,427.00
17,437.00
360,452,538.00
57,437,478.00
K-614
4,202.40
m2
13,981.00
6 Pekerjaan Japat
JUMLAH SUB III
58,753,754.40
1,227,749,406.12
K-224
4.80
M3
63,500.00
304,800.00
1.2
1.3
1.4
Pasangan Batu
Plesteran Permukaan tampak
Cor Plat lantai beton K-225
K-705
G-50i
K-725
11.09
19.90
1.20
M3
M2
M3
1,041,759.00
84,000.00
1,245,170.00
11,548,940.27
1,671,600.00
1,494,204.00
1.5
1.6
1.7
Pembesian
Bekisting
Timbunan tanah
K-715
K-710
K-225
239.61
4.48
2.40
Kg
M2
M3
19,248.00
146,638.00
162,816.00
4,612,093.74
656,938.24
390,758.40
1.8
Stelingan Kerja
1.00
Ls
87,000.00
87,000.00
JUMLAH SUB IV
V.
20,766,334.65
PEKERJAAN LAIN-LAIN
1.00
Ls
950,000.00
950,000.00
1.00
Ls
7,900,000.00
7,900,000.00
JUMLAH SUB V
8,850,000.00
1,813,182,504.28
Page 1
: PENINGKATAN JALAN DARI DESA GAWU-GAWU BO'USO - MAZINGO MENUJU DESA LASARA SOWU KEC. GUNUNGSITOLI UTARA
: Rp
1,999,858,000.00
Tahun Anggaran
Nama Perusahan
Harga Penawaran
: 2015
: CV. GAPURA
: Rp
1,994,500,000.00
NO.
KOREKSI ARITMATIKA
URAIAN
Analisa
VOL.
SAT.
HARGA
SATUAN
(Rp)
I.
JUMLAH
HARGA
(Rp)
PEKERJAAN PERSIAPAN
1 Biaya sewa direksikeet
2 Biaya pengukuran dan pematokan
3 Papan pengenal proyek
4 Biaya pembersihan pada damija
Ditaksir
Ditaksir
Ditaksir
1.00
1.00
1.00
Ls
Ls
Bh
1,900,000.00
970,000.00
700,000.00
1,900,000.00
970,000.00
700,000.00
K-210
19,748.00
M2
3,340.00
65,958,320.00
JUMLAH SUB I
II.
69,528,320.00
K-110
M3
56,103.00
EI-820
K-310
K-311
178.00
193.33
6,450.00
Btg
M3
M3
161,350.00
350,965.00
24,134.00
28,720,300.00
67,850,308.63
155,664,300.00
K-321
16,500.00
M3
19,091.00
315,001,500.00
JUMLAH SUB II
567,236,408.63
470,665,800.00
K-516
K-516
31.53
M3
M3
418,666.00
418,666.00
13,200,538.98
-
K-523
K-618
K-880
208.94
2,055.70
2,055.70
M3
M2
M2
565,009.00
109,427.00
17,437.00
118,052,980.46
224,949,083.90
35,845,240.90
m2
13,981.00
6 Pekerjaan Japat
K-614
JUMLAH SUB III
392,047,844.24
1.00
Ls
1,500,000.00
1,500,000.00
1.2
1.3
1.4
1.5
1.6
Galian tanah
Pasangan Batu
Plesteran Permukaan tampak
Cor Plat lantai beton K-225
Pembesian
K-224
K-705
G-50i
K-725
K-715
13.00
8.55
16.08
1.44
286.85
M3
M3
M2
M3
Kg
63,500.00
1,041,759.00
84,000.00
1,245,170.00
19,248.00
825,500.00
8,907,039.45
1,350,720.00
1,793,044.80
5,521,288.80
1.7
1.8
1.9
Bekisting
Timbunan tanah
Stelingan Kerja
K-710
K-225
-
5.28
3.30
1.00
M2
M3
Ls
146,638.00
162,816.00
87,000.00
774,248.64
537,292.80
87,000.00
K-224
K-705
G-50i
K-225
-
14.79
38.53
88.92
7.68
M3
M3
M2
M3
LS
63,500.00
1,041,759.00
84,000.00
162,816.00
75,000.00
939,165.00
40,138,974.27
7,469,280.00
1,250,426.88
75,000.00
32
K-224
K-705
G-50i
223.376
420.620
M3
M3
M2
87,000.00
1,041,759.00
84,000.00
19,433,712.16
438,184,670.58
95,054,400.00
552
1.00
M3
LS
162,816.00
75,000.00
21,569,863.68
75,000.00
K-224
K-723
K-725
K-710
1.00
10.50
2.46
32.78
130.58
Ls
M3
M3
M3
M2
2,500,000.00
63,500.00
1,052,822.00
1,245,170.00
146,638.00
2,500,000.00
666,750.00
2,589,942.12
40,816,672.60
19,147,990.04
K-715
-
4,168.95
1.00
Kg
M3
19,248.00
100,000.00
80,243,949.60
100,000.00
M'
Galian tanah
Pasangan batu pecah SP 1 : 4
Plesteran yang tampak
Pekerjaan Timbunan
Stelingen kerja
K-225
-
4.6 Pembesian
4.7 Pipa Paralon 2"
1.00
1,131.600
132.480
JUMLAH SUB IV
V.
3.84
10.08
27.20
7.68
0.12
0.315
0.85
0.24
2.0500
229.08
420.62
1,131.60
0.2400
132.48
0.4150
0.7620
791,551,931.42
PEKERJAAN LAIN-LAIN
1.00
Ls
950,000.00
950,000.00
1.00
Ls
7,900,000.00
7,900,000.00
JUMLAH SUB V
8,850,000.00
rencana
aktual
1,813,182,504.28
1,829,214,504.28
sisa fisik
(16,032,000.00)
PEMBANGUNAN BOX CULVERT MENUJU LOKASI TPA HELA , KEC. GUNUNGSITOLI UTARA
DIREKTORAT JENDERAL BINA MARGA
ANAL I SA
SUMATERA UTARA
U RAIAN :
SAT UA
HAR GA
KODE
GUNUNGSITOLI
ANGGAPAN / ASUMSI
PEKERJA
JLH.
HARI
ORANG
KODE
E
Mandor
1.00
6.00
L-061
25.00
6.00
L-101
3.00
6.00
L-106
K
Buruh tak terlatih
E
Buruh terlatih
R
J
A
MAT E R IAL
M
A
Alat bantu
Pasir pasangan
Semen
VOL.
SATUAN
KODE
6.00
set
M-170
36.00
m3
432.00
Zak
M-080
48.00
m3
M-012
JLH.
I
A
L
P
E
P E RALATAN
HARI
JLH.
KERJA
KODE
R
A
2.00
3.00
E-089
1.00
6.00
E-252
L
A
T
1.00
3.00
E-341
VOLUME :
69.00
SATUAN : m3
HARGA SATUAN
DIBULATKAN
PEMBUKAAN BADAN JALAN DARI DESA ONOZITOLI OLORA-SMP NEGERI I GUNUNGSITOLI UTARA MENUJU DESA HILIGODU
DIREKTORAT JENDERAL BINA MARGA
ANAL I SA
KOTA :
KODE
SUMATERA UTARA
GUNUNGSITOLI
U RAIAN :
SAT UA
(MENGGUNAKAN BURUH)
PROVINSI :
HAR GA
ANGGAPAN / ASUMSI
PEKERJA
JLH.
HARI
ORANG
KODE
E
K
E
R
Mandor
2.00
1.00
L-061
Operator terlatih
1.00
1.00
L-081
Pembantu operator
1.00
1.00
L-089
Supir terlatih
1.00
1.00
L-091
Pembantu supir
1.00
1.00
L-099
60.00
1.00
L-101
J
A
MAT E R IAL
M
A
Alat bantu
Timbunan Sirtu
E
R
I
VOL.
SATUAN
KODE
2.40
set
M-170
72.00
m3
M-050a
JLH.
A
L
P
E
PERALATAN
HARI
JLH.
KERJA
KODE
R
A
1.00
1.00
E-087
1.00
1.00
E-088
L
A
T
A
N
VOLUME :
60.00
SATUAN : m3
HARGA SATUAN
DIBULATKAN
HAR GA
SAT UAN
KODE
K - 723
TANGGAL
48 adukan /6jam/hari
utuhkan: 1,5 zak (21,7 liter lepas) semen portland; 125 liter pasir;
BIAYA
SUB TOTAL
HARI-ORG
(Rp./Org/hari)
(Rp.)
(Rp.)
6.00
92,000.00
552,000.00
150.00
80,500.00
12,075,000.00
18.00
92,000.00
1,656,000.00
JUMLAH
PEKERJA :
14,283,000.00
HARGA
BIAYA
SUB TOTAL
SATUAN (Rp)
(Rp.)
(Rp.)
27,500.00
165,000.00
368,117.80
13,252,240.80
76,451.08
33,026,866.56
248,284.05
11,917,634.40
MATERIAL :
58,361,741.76
JAM
HARGA
BIAYA
SUB TOTAL
KERJA
(Rp./jam)
(Rp.)
(Rp.)
36.00
0.00
0.00
36.00
0.00
0.00
6.00
0.00
0.00
PERALATAN :
0.00
TOTAL (Rp.)
72,644,741.76
HARGA SATUAN
Rp.
1,052,822.34
per
m3
DIBULATKAN
Rp.
1,052,822.00
per
m3
HAR GA
SAT UAN
KODE
K - 310
MENGGUNAKAN BURUH)
DISIAPKAN OLEH :
TANGGAL
UPAH
BIAYA
SUB TOTAL
HARI-ORG
(Rp./Org/hari)
(Rp.)
(Rp.)
2.00
92,000.00
184,000.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
60.00
80,500.00
4,830,000.00
JUMLAH
PEKERJA :
5,014,000.00
HARGA
BIAYA
SUB TOTAL
SATUAN (Rp)
(Rp.)
(Rp.)
27,500.00
66,000.00
207,784.05
14,960,451.60
MATERIAL :
15,026,451.60
JAM
HARGA
BIAYA
SUB TOTAL
KERJA
(Rp./jam)
(Rp.)
(Rp.)
5.00
203,493.70
1017468.50
10.00
0.00
0.00
PERALATAN :
1,017,468.50
TOTAL (Rp.)
21,057,920.10
HARGA SATUAN
Rp.
350,965.34
per
m3
DIBULATKAN
Rp.
350,965.00
per
m3
3.4.2
Pemotongan pohon pilihan 15 - 30 cm
: Buah
No.
U RAIAN
I.
1
2
3
4
5
6
II.
1
2
2
3
4
III.
ASUMSI
Menggunakan tenaga pekerja/peralatan
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan : sedang / baik
Jam kerja efektif per-hari
1 Pohon diameter 15-30 cm setara dengan volume
Berat Jenis Kayu
URUTAN KERJA
Pemotongon Pohon dilakukan menggunakan peralatan alat
bantu Chainsaw, Kampak dan Parang
Pohon ditebang dimulai dari atas
Penggalian akar pohon dilakukan menggunakan pekerja
Pohon yang sudah ditebang dipotong-potong dan
dimuat kedalam Dump Truck menggunakan pekerja
Dump Truck membuang material hasil tebangan keluar
lokasi jalan sejauh
Tk
Vp
BjK
1.
BAHAN
Tidak ada bahan yang diperlukan
2.
2.a.
ALAT
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat
- Waktu tempuh isi
= (L : v1) x 60
- Waktu tempuh kosong
= (L : v2) x 60
- Lain-lain
Koefisien A= 1 : Q1
'2.b.
KODE
(E09)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts
Q1
(E09)
Poduksi Menentukan
Dalam 1 hari dapat memotong
= H : Tk
Koefisien = 1 : Q2
2.d.
(E08)
3.4.2
Pemotongan pohon pilihan 15 - 30 cm
: Buah
No.
U RAIAN
KODE
TENAGA
Produksi Galian akar pohon / hari =
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / buah :
- Pekerja
= (Tk x P) : Qt
- Mandor
= (Tk x M) : Qt
4.
5.
6.
Q2
3.
161,350.00 / Buah
Qt
P
M
(L01)
(L03)
7.
Analisa El-820
FORMULIR STANDAR UN
PEREKAMAN ANALISA MASING-MASIN
KOEF.
7.00
1.00
0.90
SATUAN
Jam
M3
ton/M3
KETERANGAN
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
2.00
5.0
0.83
20.00
30.00
35.00
6.00
4.00
10.00
55.00
5.03
0.1988
Km
KOMPONEN
A.
TENAGA
1.
2.
Pekerja Biasa
Mandor
B.
BAHAN
C.
PERALATAN
1.
2.
3.
Dump Truck
Chainsaw
Alat Bantu
SATUAN
(L01)
(L03)
Jam
Jam
E09
Jam
Jam
Ls
TON
Km/Jam
Km/Jam
menit
menit
menit
menit
menit
Buah / Jam
jam
buah
1.00
Buah / Jam
1.00
jam
D.
E.
F.
Note: 1
2
Lump Sum
3
4
Analisa El-820
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN
20.00
buah
10.00
1.00
orang
orang
3.50
0.35
jam
jam
KETERANGAN
Analisa EI-820
an pohon pilihan 15 - 30 cm
PERKIRAAN
KUANTITAS
3.5000
0.3500
:
:
HARGA
SATUAN
JUMLAH
HARGA
(Rp.)
(Rp.)
11,500.00
13,142.86
40,250.00
4,600.00
44,850.00
0.00
0.1988
1.0000
1.0000
89,000.00
27,500.00
0.00
89,000.00
27,500.00
116,500.00