Laporan Progress mingguan Pembuatan Tangki CST di area PKS PT. Sungai Rangit yang dikerjak
sebagai berikut :
Ringkasan Kontrak
Contractor
Contract Number
SPK1507/0009
Contract Amount/Unit
1 unit
Commencement Date
17 AGUSTUS 2015
Completion Date
Extension of Time I
Project
Total Unit
30 NOVEMBER 2015
Pembuatan Tangki & Mesin Produksi
24-Aug-15
% Progress
1.2
- Previouse
7.09
Schedule
- This week
10.14
Variance
- To Date
17.22
1.3
1.4
1.5
Signature,
Sudibyo
INEERING DEPT.
Schedule
Variance
17.22 %
PEKERJAAN
LOKASI
KONTRAKTOR
NILAI KONTRAK/UNIT
TOTAL UNIT
:
:
:
:
:
WEEKLY REPORTS
REKONDISI TANGKI CST NO.02
PKS PT. SUNGAI RANGIT
PT. VENTURINDO ENGINEERING
WORK ITEM
PERIODE
: 24 Agu s/d 03 se
WEIGHT
WEIGHT
DISTRIBUTI
ON
PROGRESS OF WORK
THIS WEEK
PREVIOUSE
Volume
Progress
Bobot (%)
Progress
Bobot (%)
PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi
3.529
1.765
75%
2.647
20%
0.706
8.876
4.438
50%
4.438
35%
3.107
TOTAL I
II
: II ( Dua )
1 UNIT
NO
I
MINGGU KE
12.406
7.085
3.813
Tangki oil clarifier 4.2 x 6mtr, Plat SUS 304 6mm thickness, tutup tangki
plat chequer plat 4.5mm
56.724
7.090
4.329
0%
5%
2.165
0%
0%
9.718
2.429
0%
25%
5.765
1.441
0%
0%
7.529
1.882
0%
0%
6 Distribution pipe
3.529
1.765
0%
30%
TOTAL II
TOTAL
87.594
100.000
7.085
2.836
2.429
1.059
6.324
10.137
Y REPORTS
: 24 Agu s/d 03 sept 2015
PROGRESS OF WORK
TO DATE
Progress
Bobot (%)
95%
3.353
85%
7.545
10.898
5%
0%
25%
2.836
2.429
0%
0%
30%
1.059
6.324
17.222
PT.VENTURINDO ENGINEERING
PEKERJAAN
WORK ITEM
NO
PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi
2 Pembongkaran Tangki existing
II
Tangki oil clarifier 4.2 x 6mtr, Plat SUS 304 6mm thickness,
tutup tangki plat chequer plat 4.5mm
C
D
DEVIASI
PT SUNGAI RANGIT
PEKERJAAN REKONDISI TANGKI CST NO.02
WEEKLY PROGRESS REPORT S-CURVE
Aug-15
WEIGHT
W1
1-7
W2
8 - 14
Sep-15
W3
15 - 21
W4
22 -30
3.529
1.765
1.765
8.876
4.438
4.438
56.724
W5
1-7
W6
8 - 14
W7
15 - 21
W8
22 -30
7.090
7.090
7.090
7.090
7.090
7.090
7.090
7.090
4.329
9.718
5.765
7.529
3.529
100.000
0.000
0.000
6.203
6.203
7.085
10.137
0.000
0.000
6.203
12.406
19.496
26.587
33.677
40.768
0.000
0.000
7.085
17.222
17.222
17.222
17.222
17.222
DISUSUN OLEH
DIKETAHUI OLEH
ERIK SUSANTO
DIDIK HARYADI
PT VENTURINDO ENGINEERING
Oct-15
Nov-15
W9
1-7
W10
8 - 14
W11
15 - 21
W12
22 -30
7.090
7.090
7.090
7.090
2.429
W13
1-7
W14
8 - 14
W15
15 - 21
2.1647
2.1647
2.429
2.429
2.429
1.441
1.441
1.441
1.441
1.882
1.882
1.882
1.882
W16
22 -30
1.765
1.765
7.090
7.090
9.520
15.008
7.918
5.753
5.088
1.765
47.858
54.949
64.468
79.476
87.394
93.147
98.235
100.000
17.222
17.222
17.222
17.222
17.222
17.222
17.222
17.222
DIKETAHUI OLEH
DISETUJUI OLEH
SUDIBYO
OKE DILIARDI
PT SUNGAI RANGIT
NO
1
JOB DESCRIPTION
PEKERJAAN PERSIAPAN
Mobilisasi dan Demobilisasi
Distribution pipe
Cikampek,
24 Agustus 2015
Erik Susanto
Project Manager
DO ENGINEERING
gineering and Contractor
Jomin No.46, Cikampek - Karawang
nesia
8385523
8385523
eering@venturyndo.com
@venturyndo.com
REMARK
WEEKLY REPORT