ANALISA PEKERJAAN BONGKARAN

1. Bongkar dinding 1/2 batu


0.2
org/hr

M2

2. Bongkar dinding 1/2 batu


org/hr

3. Bongkar batu kali


1.5
org/hr
(tebal < 50 cm)
0.075 org/hr
4. Bongkar batu kali
org/hr
(tebal < 50 cm)
0.15 org/hr
5. Bongkar beton
org/hr

10.Bongkar karpusan atap genteng


0.03 org/hr

0.01

mandor
org/hr
M3
pekerja

0.1

M3

pekerja

mandor
M3

M2

8. Bongkar plesteran
0.05 org/hr

9. Bongkar atas genteng


org/hr

mandor
org/hr
M3
pekerja

mandor

6. Bongkar beton bertulang


1.6
org/hr

7. Bongkar lantai
org/hr

pekerja

M2

tukang

1.2

kepala tukang
org/hr
pekerja
org/hr
mandor
org/hr
M3
tukang

0.12

kepala tukang
org/hr
pekerja
org/hr
mandor
org/hr
pekerja

0.16

mandor
org/hr
M2
pekerja

0.01

mandor
org/hr
pekerja

0.0025

mandor
org/hr
M2
pekerja

0.01

mandor
org/hr

0.015

6
0.3

8
0.4
0.1

0.02

11.Bongkar atap seng/asbes


0.05 org/hr

M2

pekerja
org/hr
M2
tk. Kayu

12.Bongkar kaso & reng kayu


0.025 org/hr
(kayu tidak dipakai lagi)
org/hr

ke. Tk. Kayu

kepala tukang
org/hr
M2
pekerja

0.2

mandor
org/hr
M'
pekerja

0.02

0.015

M3

mandor
org/hr
tukang

0.1

M2

kepala tukang
org/hr
pekerja

0.001

M2

mandor
org/hr
pekerja

0.003

M2

mandor
org/hr
pekerja
mandor
org/hr
BH
pekerja

0.0025

mandor
org/hr

0.015

15.Bongkar lisplank
0.03 org/hr

18.Bongkar kaca
org/hr

19.Bongkar rabat beton


org/hr

20.Bongkar bak air teraso


0.3
org/hr

0.0025
0.1

14.Bongkar plafond + rangka


0.04 org/hr

17.Bongkar daun pintu


org/hr

0.01

pekerja
org/hr
mandor
org/hr
M3
tukang kayu

13.Bongkar rangka atap kuda-2 kayu


org/hr

16.Bongkar kusen pintu


org/hr

tk. Besi

0.005
1

0.02

0.03

0.05