Anda di halaman 1dari 1

LEGENDA, SIMBOL LEMBAR LAINNYA

JALAN NEGARA
COUNTRY ROAD

BENDUNG/BANGUNAN IRIGASI

LOBANG MASUK ,SALURAN ,TELEPON

SONDIR

KELAPA/KELAPA SAWIT

KUBURAN CINA

WEIR/IRRIGATION STRUCTURES

IN HOLE,CANAL,TELEPHONE

SOUNDING

COCONUT

CHAINESS GRAVE YARD

JALAN PROPINSI,KABUPATEN DLL

PIPA AIR

LOBANG MASUK TENAGA AIR

LOKASI PENGAMBILAN MATERIAL

BAMBU

KUBURAN HINDU

PROVINCE ROAD,FOOTING ROAD

WATER PIPE

IN HOLLE,WATER POWER

MATERIAL LOCATION

BAMBOO

HINDU GRAVE YARD

JALAN KERETA API ( SKALA BESAR )

BANGUNAN IRIGASI/PINTU MASUK

POTONGAN TANAH ASLI

SUMBER MATERIAL YANG ADA

RAIL WAY ROAD

IRRIGATION STRUCTURES /INLET GATE

GROUND ORIGINAL SECTION

EXISTING MATERIAL RESOURCES

ALANG - ALANG

SELOKAN SAMPING DI PERKERAS ( KIRI )

COARSE GRASS

SIDE DITCH TO PAVED ( LEFT )

JALAN KERETA API ( SKALA KECIL )

GORONG -GORONG BULAT

TIANG/ PATOK

SUMBER MATERIAL PASIR DAN KERIKIL

RAIL WAY ROAD

EXISTING PIPE CULVERT

PILE /PATHOK

GRAVEL ANDS SAND MATERIAL RESOURCES

RUMPUT

SELOKAN SAMPING DI PERKERAS ( KANAN )

GRASS

SIDE DITCH TO PAVED ( RIGHT )

HUTAN KARET

SELOKAN SAMPING DI PERKERAS (KIRI & KANAN )

FOREST/ RUBBER

SIDE DITCH TO PAVED (LEFT & RIGHT )

SEMAK BELUKAR

PAGAR PENGAMAN ( KIRI )

UNDER BRUSH

SAFETY FENCE ( LEFT )

KOPI / COKELAT

PAGAR PENGAMAN ( KANAN )

COFFE/CACAO

SAFETY FENCE ( RIGHT )

TEBU

PAGAR PENGAMAN ( KIRI & KANAN )

SUGAR CANE

SAFETY FENCE ( LEFT & RIGHT )

JATI

TEMPAT PEMBERHENTIAN BIS

TEAK

BUS BAYS

( MAJOR SCALE )

( MINOR SCALE )

PAKAI TEMBOK PENAHAN YANG ADA


GARIS DASAR PENGUKURAN DENGAN STA.

USE WITH RETAINING WALL

BOTTOM LINE MESUAREMENT WITH STA.

TIANG LISTRIK
PLN PILE

TITK KONTROL HORISONTAL


HORIZONTAL CONTROLL POINT

GORONG -GORONG BULAT


AS JALAN YANG DI RENCANAKAN DENGAN STA

EXISTING PIPE CULVERT

TIANG TELEPON/TELEGRAPH

TITIK KONTROL VERTIKAL

CENTRE LINE NEW DESIGN WITH STA

PAKAI TEMBOK PENAHAN YANG DI RENCANAKAN

TELEPHONE/TELEGRAPH PILE

VERTICAL CONTROL POINT

GARIS PERMUKAAN YANG DI RENCANAKAN

MENARA /TIANG TRANSMISI

TITIK KONTROL HORISONTAL DAN VERTIKAL

SURFACE LINE TO DESIGN

TRANSMITION PILE

HORIZONTAL & VERTICAL CONTROL POINT

DINDING BATU

PATOK PENGUKURAN NOMOR

STONE WALL

MEASUREMENT PATHOK NUMBER

TANDA DAERAH PENGUASAAN JALAN YANG ADA

TITK ANALITIS

EXISTING ROAD SIGN PROPERTY

ANALYTIS POINT

DAERAH PENGUASAAN JALAN YANG DI RENCANAKAN

PATOK TETAP PENGUKURAN ( BENCH MARK )

DESIGN OF ROAD SIGN PROPERTY

FIXED PATHOK MEASUREMENT ( BENCH MARK )

RAMBU LALU LINTAS

PUSAT GAMBAR

TRAFIC SIGN

DRAWING CENTRE

USE WITH RETAINING WALL

SALURAN GALIAN
PERMUKAAN TANAH ASLI

EXAVATION CANAL

ORIGINAL GROUND LEVEL


GORONG - GORONG PERSEGI (YANG ADA)
BATAS NEGARA
COUNTRY LIMIT
BATAS PROPINSI

EXISTING BOX CULVERT


GORONG - GORONG PERSEGI YANG DI RENCANAKAN
BOX CULVERT DESIGN

PROVINCE LIMIT
KOLAM BASAH
BATAS KABUPATEN

WEB POOL

KABUPATEN LIMIT
KOLAM KERING
BATAS KECAMATAN

DRY POOL

CEMARA

KAPOK

TIPE YANG DI RENCANAKAN


TYPE OF DESIGN

KECAMATAN LIMIT

BAHAN PERKERASAN/BAHU JALAN

HIGH WATER LEVEL/NORMAL WATER LEVEL

ZONE LIMIT

TEH ATAU LAIN - LAINNYA


JALAN PERKERASAN YANG ADA

BETON CYCLOPE (BETON RINGAN )

EXISTING PAVEMENT ROAD

CYCLOPE CONCRETE

SALURAN
BETON BERTULANG
GARIS TINGGI

ZONE NUMBER

HIGH LINE
PASANGAN BATU LEPAS
MASONRY

COUNTRY TOWN

BETON MASIF
PATOK KM YANG ADA

MASIF CONCRETE

EXISTING KM PATHOK

PROVINCE TOWN
IBUKOTA KABUPATEN, KOTA MADYA
KOTA MADYA/KABUPATEN TOWN
KOTA KECIL LAIN/AKHIR RUAS
SMALL CITY/AND OF LINK
SUNGAI KECIL
SMALL RIVER
SUNGAI BESAR
BIG RIVER
PARIT
SIDE DITCH
DRAINASE
DRAINAGE

JEMBATAN YANG ADA


EXISTING BRIDGE
JEMBATAN YANG DI RENCANAKAN
BRIDGE NEW DESIGN
JEMBATAN ORANG JALAN
FOOT BRIDGE
PAGAR
FENCE
REL PENGAMAN YANG ADA
EXISTING SAFETY RAIL
REL PENGAMAN YANG DI RENCANAKAN
DESIGN OF SAFETY RAIL
PATOK PENGAMAN YANG ADA
EXISTING SAFETY PATHOK
PATOK PENGAMAN YANG DI RTENCANAKAN
DESIGN OF SAFETY PATHOK

PATOK KM YANG DI RENCANAKAN

SWAMP

REINFORCES CONCRETE

BETON DI COR SETEMPAT


IBUKOTA PROPINSI

TEA OR ETC
RAWA

CANAL
NOMOR ZONE

IBUKOTA NEGARA

KAPOK TREE

PAVEMENT MATERIAL/SOULDER
PERMUKAAN AIR NORMAL/PERTMUKAAN AIR TINGGI

BATAS ZONE

CASUARINA TREE

PLACE IN CAST CONCRETE

TEMPAT PENGAMBILAN TANAH


BORROW AREA
BANGUNAN GEDUNG
BUILDING ROOM

DESIGN OF KM PATHOK
PATOK KM DENGAN UKURAN JARAK KE KOTA

BETON TAK BERTULANG

BATAS KAMPUNG

CONCRETE NOT REINFORCEMENT

VILLAGE LIMIT

TIMBUNAN

MESJID

EMBANKMENT

MOSQUE

GALIAN

GEREJA

EXAVATION

CHURCH

KM PATHOK WITH MEASUREMENT SPAN TO CITY


TC,SC,CS,ST ATAU TC,CT
FROM HORISONTAL CURVE
PI DARI LENGKUNG HORISONTAL
HORISONTAL CURVE FROM PVI
PVI DARI LENGKUNG VERTIKAL

BATU MUKA

KUBURAN ISLAM

FACE STONE

ISLAMIC GRAVE YARD

VERTICAL CURVE FROM PVI


PERSAWAHAN
TITK TRIANGGULASI

SAWAH

TRIANGGULASI POINT
PERKEBUNAN
PENGEBORAN DENGAN TANGAN
HAND BORING

GARDENING

KUBURAN KRISTEN
PROTESTAN GRAVE YARD
CANDI / PURA
ACIENT HINDU

PENGEBORAN DENGAN MESIN

KELENTENG

MECHANIC WITH BORING

PAGODA

TEMPAT PEMBERHENTIAN TRUK


TRUCK PARKING AREA

Anda mungkin juga menyukai