PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
01
01.01
01.01.01
ESTRUCTURAS
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40 x 4.80 m
01.01.02
01.01.03
DESCRIPCION
LONGITUD 1
LONGITUD 2
TOTAL m
N
VECES
1
1
LARGO
(m)
22.72
19.74
01.01.04
01.02
01.02.01
TRABAJOS PRELIMINARES
DESMONTAJE DE TECHO
DESCRIPCION
AREA 1
AREA 2
TOTAL m2
01.02.02
DESMONTAJE DE PUERTAS
01.02.03
DESMONTAJE DE VENTANAS
01.02.04
DESCRIPCION
AREA 1
AREA 2
TOTAL m2
01.02.05
ALTO
(m)
AREA
(m2)
N
VECES
1
1
LARGO
(m)
9.23
18.23
ANCHO
(m)
6.08
5.28
ALTO
(m)
AREA
(m2)
56.12
96.25
152.37
N
VECES
1
1
LARGO
(m)
9.23
18.23
ANCHO
(m)
6.08
5.28
ALTO
(m)
AREA
(m2)
56.12
96.25
152.37
N
VECES
2
2
2
2
LARGO
(m)
9.23
6.08
18.23
5.28
ANCHO
(m)
0.60
0.60
0.60
0.60
ALTO
(m)
1.75
1.75
1.75
1.75
FACTOR DE
ESPONJAMI
1.25
1.25
1.25
1.25
LARGO
ANCHO
ALTO
AREA
DESCRIPCION
MURO 1
MURO 2
MURO 3
MURO 4
TOTAL m3
01.02.06
ANCHO
(m)
22.88
17.24
82.58
DESCRIPCION
320012699.xlsx 1 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
DESCRIPCION
VECES
1
(m)
9.23
(m)
6.08
(m)
(m2)
412.25
412.25
N
VECES
LARGO
(m)
ANCHO
(m)
ALTO
(m)
AREA
(m2)
412.25
412.25
TRAZO Y REPLANTEO
DESCRIPCION
AREA TOTAL DEL TERRENO
TOTAL m2
320012699.xlsx 2 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
01.03
01.03.01
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL PARA CIMIENTOS-ZAPATAS EN TERRENO NORMAL
DESCRIPCION
ZAPATA 1
ZAPATA 2
ZAPATA 3
ZAPATA 4
ZAPATA 5
ZAPATA 5A
ZAPATA 6
ZAPATA 7
ZAPATA 8
ZAPATA 9
ZAPATA 10
ZAPATA 11
ZAPATA 12
ZAPATA 13
ZAPATA 14
ZAPATA 15
ZAPATA 16
ZAPATA 17
ZAPATA 18
CC 1
CC 2
CC 3
CC 4
CC 5
VIGAS ARRIOSTRAS
01.03.02
N
VECES
2
1
1
2
1
1
3
2
1
1
1
1
1
1
1
4
3
2
2
1
1
1
1
1
1
LARGO
(m)
1.50
1.60
1.65
2.20
1.90
2.50
1.80
1.65
3.60
2.00
2.00
2.00
1.60
1.50
2.00
1.90
0.80
1.00
1.20
13.35
47.56
25.21
6.78
4.51
8.05
ANCHO
(m)
1.50
1.50
1.65
2.00
1.80
1.90
1.70
1.50
1.65
1.85
1.70
1.30
1.50
1.40
1.20
1.00
0.80
0.80
1.00
0.50
0.50
0.50
0.60
0.60
0.25
AREA
(m2)
DESCRIPCION
N
VECES
LARGO
(m)
ANCHO
(m)
ALTO
(m)
1.00
AREA
(m2)
181.67
ANCHO
(m)
ALTO
(m)
0.15
0.15
0.15
0.15
0.15
0.15
AREA
(m2)
4.58
4.64
3.89
5.26
10.59
10.07
RELLENO EN AMBIENTE
TOTAL m3
01.03.03
ALTO
PROMEDIO
(m)
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.45
1.30
1.20
1.35
1.20
1.15
DESCRIPCION
SS.HH. HOMBRES
SS.HH. MUJERES
PASADIZO 1
DEPOSITO
DELITOS - FALTAS
VIOLENCIA FAMILIAR
N
VECES
1
1
1
1
1
1
LARGO
(m)
320012699.xlsx 3 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
DEPOSITO 1
SALA DE MEDITACION
SALA DE MEDITACION 1
ATENCION CIUDADANA
MODULO DE ATENCION
INPOL
ADMINISTRACION
VEREDA
DEPOSITO 2
PASADIZO 2
VEREDA+ESTACIONAMIENTO
TOTAL m3
1
1
1
1
1
1
1
1
1
1
1
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
7.33
5.90
5.66
22.31
19.57
24.31
17.12
12.25
10.82
17.39
199.73
320012699.xlsx 4 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
01.03.04
DESCRIPCION
N
VECES
VOLUMEN DE
RELLENO
FACTOR DE
VOLUMEN
(m3)
189.64
(m3)
181.67
ESPONJAMIENTO
1.25
(m3)
7.97
LARGO
(m)
ANCHO
(m)
ALTO
(m)
AREA
(m2)
4.58
4.64
3.89
5.26
10.59
10.07
7.33
5.90
5.66
22.31
19.57
24.31
17.12
12.25
10.82
17.39
DESCRIPCION
SS.HH. HOMBRES
SS.HH. MUJERES
PASADIZO 1
DEPOSITO
DELITOS - FALTAS
VIOLENCIA FAMILIAR
DEPOSITO 1
SALA DE MEDITACION
SALA DE MEDITACION 1
ATENCION CIUDADANA
MODULO DE ATENCION
INPOL
ADMINISTRACION
VEREDA
DEPOSITO 2
PASADIZO 2
TOTAL m2
01.03.06
VOLUMEN DE
CORTE
N
VECES
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
181.67
DESCRIPCION
ZAPATA 1
ZAPATA 2
ZAPATA 3
ZAPATA 4
ZAPATA 5
ZAPATA 5A
ZAPATA 6
ZAPATA 7
ZAPATA 8
ZAPATA 9
ZAPATA 10
ZAPATA 11
ZAPATA 12
ZAPATA 13
ZAPATA 14
N
VECES
2
1
1
2
1
1
3
2
1
1
1
1
1
1
1
LARGO
(m)
1.50
1.60
1.65
2.20
1.90
2.50
1.80
1.65
3.60
2.00
2.00
2.00
1.60
1.50
2.00
ANCHO
(m)
1.50
1.50
1.65
2.00
1.80
1.90
1.70
1.50
1.65
1.85
1.70
1.30
1.50
1.40
1.20
ALTO
(m)
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
AREA
(m2)
320012699.xlsx 5 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
ZAPATA 15
ZAPATA 16
ZAPATA 17
ZAPATA 18
CC 1
CC 2
CC 3
CC 4
CC 5
VIGAS ARRIOSTRAS
TOTAL m3
4
3
2
2
3
2
1
1
1
1
1.90
0.80
1.00
1.20
13.95
49.06
25.21
6.78
5.31
8.05
1.00
0.80
0.80
1.00
0.50
0.50
0.50
0.60
0.60
0.25
0.10
0.10
0.10
0.10
0.15
0.15
0.15
0.15
0.15
1.15
320012699.xlsx 6 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
01.03.07
DESCRIPCION
ZAPATA 1
ZAPATA 2
ZAPATA 3
ZAPATA 4
ZAPATA 5
ZAPATA 5A
ZAPATA 6
ZAPATA 7
ZAPATA 8
ZAPATA 9
ZAPATA 10
ZAPATA 11
ZAPATA 12
ZAPATA 13
ZAPATA 14
ZAPATA 15
ZAPATA 16
ZAPATA 17
ZAPATA 18
TOTAL m3
01.04
01.04.01
01.04.01.01
LARGO
(m)
1.50
1.60
1.65
2.20
1.90
2.50
1.80
1.65
3.60
2.00
2.00
2.00
1.60
1.50
2.00
1.90
0.80
1.00
1.20
ANCHO
(m)
1.50
1.50
1.65
2.00
1.80
1.90
1.70
1.50
1.65
1.85
1.70
1.30
1.50
1.40
1.20
1.00
0.80
0.80
1.00
ALTO
(m)
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
AREA
(m2)
ANCHO
(m)
0.50
0.50
0.50
0.60
0.60
ALTO
(m)
0.50
0.50
0.50
0.50
0.78
AREA
(m2)
ANCHO
(m)
ALTO
(m)
AREA
(m2)
0.39
0.26
0.39
0.39
0.26
0.39
CONCRETO SIMPLE
CIMIENTOS CORRIDOS
CIMIENTOS CORRIDOS MEZCLA C:H 1:10 + 30% PG MAX 8"
DESCRIPCION
CC 1
CC 2
CC 3
CC 4
CC 5
TOTAL m3
01.04.02
01.04.02.01
N
VECES
2
1
1
2
1
1
3
2
1
1
1
1
1
1
1
4
3
2
2
N
VECES
1
1
1
1
1
LARGO
(m)
13.95
49.06
25.21
6.78
5.31
SOBRECIMIENTOS
SOBRECIMIENTO DE CONCRETO C:H 1:8 + 25% PM MAX 3"
DESCRIPCION
EJE A - A TRAMO 9 - 8
EJE A - A TRAMO 18 - 11
EJE A" - A" TRAMO 9 - 8
EJE C - C TRAMO 9 - 8
EJE C - C TRAMO 7 - 2
EJE D - D TRAMO 7 - 4
N
VECES
1
1
1
1
1
1
LARGO
(m)
3.10
12.10
2.20
1.92
8.68
4.22
320012699.xlsx 7 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
EJE D - D TRAMO 4 - 3
EJE D - D TRAMO 3 - 2
EJE D' - D' TRAMO 9 - 8 , 4 EJE E - E TRAMO 7 - 4
EJE F - F TRAMO 9 - 2
EJE H - H TRAMO 9 - 7
EJE I - I TRAMO 9 - 7
EJE 2 - 2 TRAMO C - E
EJE 2' - 2' TRAMO C - D
EJE 3 - 3 TRAMO C - D
EJE 3'' - 3'' TRAMO C - D
EJE 4 - 4 TRAMO C - F
1
1
1
1
1
1
1
1
1
1
1
1
0.45
2.90
2.35
4.99
11.09
2.40
2.40
2.00
2.90
2.60
1.85
5.60
0.22
0.26
0.39
0.26
0.26
0.26
0.26
0.26
0.39
0.27
0.39
0.27
320012699.xlsx 8 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
EJE 5 - 5 TRAMO C - D
EJE 7 - 7 TRAMO C - F
EJE 8 - 8 TRAMO C - E
EJE 8 - 8 TRAMO E - I
EJE 8' - 8' TRAMO A - E
EJE 9 - 9 TRAMO A - C
EJE 9 - 9 TRAMO C - I
EJE 9 - 9 TRAMO I - N
EJE 11 - 11 TRAMO A - K , L
EJE 11 - 11 TRAMO K - L
TOTAL m3
01.04.02.02
1
1
1
1
1
1
1
1
1
1
2.65
5.65
4.40
5.47
7.20
3.89
12.37
2.43
1.29
3.00
0.27
0.27
0.21
0.27
0.39
0.39
0.27
0.11
0.26
0.20
DESCRIPCION
EJE A - A TRAMO 9 - 8
EJE A - A TRAMO 18 - 11
EJE A" - A" TRAMO 9 - 8
EJE C - C TRAMO 9 - 8
EJE C - C TRAMO 7 - 2
EJE D - D TRAMO 7 - 4
EJE D - D TRAMO 4 - 3
EJE D - D TRAMO 3 - 2
EJE D' - D' TRAMO 9 - 8 , 4 EJE E - E TRAMO 7 - 4
EJE F - F TRAMO 9 - 2
EJE H - H TRAMO 9 - 7
EJE I - I TRAMO 9 - 7
EJE 2 - 2 TRAMO C - E
EJE 2' - 2' TRAMO C - D
EJE 3 - 3 TRAMO C - D
EJE 3'' - 3'' TRAMO C - D
EJE 4 - 4 TRAMO C - F
EJE 5 - 5 TRAMO C - D
EJE 7 - 7 TRAMO C - F
EJE 8 - 8 TRAMO C - E
EJE 8 - 8 TRAMO E - I
EJE 8' - 8' TRAMO A - E
EJE 9 - 9 TRAMO A - C
EJE 9 - 9 TRAMO C - I
EJE 9 - 9 TRAMO I - N
EJE 11 - 11 TRAMO A - K , L
EJE 11 - 11 TRAMO K - L
TOTAL m2
N
VECES
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
LARGO
(m)
3.10
12.10
2.20
1.92
8.68
4.22
0.45
2.90
2.35
4.99
11.09
2.40
2.40
2.00
2.90
2.60
1.85
5.60
2.65
5.65
4.40
5.47
7.20
3.89
12.37
2.43
1.29
3.00
ANCHO
(m)
PERIMETRO
(m)
3.50
2.30
3.50
3.50
2.50
3.50
1.90
2.50
3.50
2.50
2.50
2.50
2.50
2.50
3.50
2.50
3.50
2.50
2.50
2.50
1.80
2.50
3.50
3.50
2.50
1.10
2.30
1.60
AREA
(m2)
10.85
27.83
7.70
6.72
21.70
14.77
0.86
7.25
8.23
12.48
27.73
6.00
6.00
5.00
10.15
6.50
6.48
14.00
6.63
14.13
7.92
13.68
25.20
13.62
30.93
2.67
2.97
4.80
322.75
320012699.xlsx 9 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
01.04.03
01.04.03.01
SOLADOS
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON
DESCRIPCION
ZAPATA 1
ZAPATA 2
ZAPATA 3
ZAPATA 4
ZAPATA 5
ZAPATA 5A
ZAPATA 6
ZAPATA 7
ZAPATA 8
ZAPATA 9
ZAPATA 10
ZAPATA 11
ZAPATA 12
ZAPATA 13
ZAPATA 14
ZAPATA 15
ZAPATA 16
ZAPATA 17
ZAPATA 18
TOTAL m2
01.05
01.05.01
01.05.01.01
N
VECES
2
1
1
2
1
1
3
2
1
1
1
1
1
1
1
4
3
2
2
LARGO
(m)
1.50
1.60
1.65
2.20
1.90
2.50
1.80
1.65
3.60
2.00
2.00
2.00
1.60
1.50
2.00
1.90
0.80
1.00
1.20
ANCHO
(m)
1.50
1.50
1.65
2.00
1.80
1.90
1.70
1.50
1.65
1.85
1.70
1.30
1.50
1.40
1.20
1.00
0.80
0.80
1.00
ALTO
(m)
AREA
(m2)
4.50
2.40
2.72
8.80
3.42
4.75
9.19
4.95
5.94
3.70
3.40
2.60
2.40
2.10
2.40
7.60
1.92
1.60
2.40
76.79
LARGO
(m)
1.50
1.60
1.65
2.20
1.90
2.50
1.80
1.65
3.60
2.00
2.00
2.00
1.60
1.50
2.00
1.90
0.80
1.00
ANCHO
(m)
1.50
1.50
1.65
2.00
1.80
1.90
1.70
1.50
1.65
1.85
1.70
1.30
1.50
1.40
1.20
1.00
0.80
0.80
ALTO
(m)
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
AREA
(m2)
CONCRETO ARMADO
ZAPATAS
CONCRETO PARA ZAPATAS F'C=210 KG/CM2
DESCRIPCION
ZAPATA 1
ZAPATA 2
ZAPATA 3
ZAPATA 4
ZAPATA 5
ZAPATA 5A
ZAPATA 6
ZAPATA 7
ZAPATA 8
ZAPATA 9
ZAPATA 10
ZAPATA 11
ZAPATA 12
ZAPATA 13
ZAPATA 14
ZAPATA 15
ZAPATA 16
ZAPATA 17
N
VECES
2
1
1
2
1
1
3
2
1
1
1
1
1
1
1
4
3
2
320012699.xlsx 10 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
ZAPATA 18
TOTAL m3
01.05.01.02
1.20
1.00
0.50
320012699.xlsx 11 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
01.05.02
01.05.02.01
VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2
DESCRIPCION
EJE A - A T
EJE A - A T
EJE A - A T
EJE C - C T
EJE C - C T
EJE C - C T
EJE C - C T
EJE C - C T
EJE D - D T
EJE D - D T
EJE E - E T
EJE E - E T
EJE E - E T
EJE F - F T
EJE F - F T
EJE F - F T
EJE F - F T
EJE F - F T
EJE H - H T
EJE I - I TR
EJE 2 - 2 T
EJE 2 - 2 T
EJE 3 - 3 T
EJE 3 - 3 T
EJE 4 - 4 T
EJE 4 - 4 T
EJE 4 - 4 T
EJE 5 - 5 T
EJE 5 - 5 T
EJE 7 - 7 T
EJE 7 - 7 T
EJE 8 - 8 T
EJE 8 - 8 T
EJE 8 - 8 T
EJE 8 - 8 T
EJE 8 - 8 T
EJE 9 - 9 T
EJE 9 - 9 T
EJE 9 - 9 T
EJE 9 - 9 T
EJE 9 - 9 T
EJE 9 - 9 T
EJE 11 - 11
EJE 11 - 11
VR1
VR2
VR2
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR2
VR2
VR2
N
VECES
1
4
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
LARGO
(m)
3.25
2.45
2.29
3.55
3.07
3.30
3.80
2.90
3.80
3.05
3.55
3.22
3.30
3.55
3.07
3.30
3.80
2.93
3.55
3.55
2.60
4.75
2.60
4.80
2.60
1.40
3.00
4.40
3.00
4.40
3.00
4.66
4.40
3.00
3.05
2.47
4.66
4.40
3.00
3.05
2.47
2.43
0.64
3.00
ANCHO
(m)
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
ALTO
(m)
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
AREA
(m2)
320012699.xlsx 12 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
EJE 11 - 11
TOTAL m3
VR2
0.66
0.25
0.50
320012699.xlsx 13 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
01.05.02.02
DESCRIPCION
EJE A - A T
EJE A - A T
EJE A - A T
EJE C - C T
EJE C - C T
EJE C - C T
EJE C - C T
EJE C - C T
EJE D - D T
EJE D - D T
EJE E - E T
EJE E - E T
EJE E - E T
EJE F - F T
EJE F - F T
EJE F - F T
EJE F - F T
EJE F - F T
EJE H - H T
EJE I - I TR
EJE 2 - 2 T
EJE 2 - 2 T
EJE 3 - 3 T
EJE 3 - 3 T
EJE 4 - 4 T
EJE 4 - 4 T
EJE 4 - 4 T
EJE 5 - 5 T
EJE 5 - 5 T
EJE 7 - 7 T
EJE 7 - 7 T
EJE 8 - 8 T
EJE 8 - 8 T
EJE 8 - 8 T
EJE 8 - 8 T
EJE 8 - 8 T
EJE 9 - 9 T
EJE 9 - 9 T
EJE 9 - 9 T
EJE 9 - 9 T
EJE 9 - 9 T
EJE 9 - 9 T
EJE 11 - 11
EJE 11 - 11
EJE 11 - 11
TOTAL m2
VR1
VR2
VR2
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR2
VR2
VR2
VR2
N
VECES
2
8
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
1
1
1
LARGO
(m)
3.25
2.45
2.29
3.55
3.07
3.30
3.80
2.90
3.80
3.05
3.55
3.22
3.30
3.55
3.07
3.30
3.80
2.93
3.55
3.55
2.60
4.75
2.60
4.80
2.60
1.40
3.00
4.40
3.00
4.40
3.00
4.66
4.40
3.00
3.05
2.47
4.66
4.40
3.00
3.05
2.47
2.43
0.64
3.00
0.66
ANCHO
(m)
ALTO
(m)
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
AREA
(m2)
3.25
9.80
2.29
3.55
3.07
3.30
3.80
2.90
3.80
3.05
3.55
3.22
3.30
3.55
3.07
3.30
3.80
2.93
3.55
3.55
2.60
4.75
2.60
4.80
2.60
1.40
3.00
4.40
3.00
4.40
3.00
4.66
4.40
3.00
3.05
2.47
4.66
4.40
3.00
3.05
2.47
2.43
0.32
1.50
0.33
148.92
320012699.xlsx 14 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
01.05.02.03
320012699.xlsx 15 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
01.05.03
01.05.03.01
COLUMNAS
CONCRETO EN COLUMNAS F'C=210 KG/CM2
DESCRIPCION
EJE A - A C
EJE A - A CO
EJE A - A C
EJE A - A C
EJE A - A C
EJE A - A C
EJE A - A C
EJE A - A C
EJE A - A C
EJE A - A C
EJE A - A C
EJE C - C C
EJE C - C C
EJE C - C CO
EJE C - C C
EJE C - C CO
EJE C - C CO
EJE C - C CO
EJE C - C C
EJE C - C C
EJE C - C CO
EJE C - C C
EJE C - C CO
EJE C - C CO
EJE C - C C
EJE C - C CO
EJE C - C C
EJE C - C CO
EJE C - C CO
EJE C - C C
EJE C - C C
EJE C - C C
EJE C - C C
EJE C - C C
EJE D - D C
EJE D - D CO
EJE D - D CO
EJE D - D C
EJE D - D CO
EJE D - D C
EJE D - D CO
EJE D - D CO
EJE D - D C
EJE D - D CO
EJE D - D CO
C-1
C-9
C-1
C-8
C-7
C-7
C-7
C-7
C-7
C-7
C-7
C-1
C-10
C-9
C-2
C-2
C-10
C-10
C-2
C-10
C-9
C-9
C-9
C-9
C-2
C-9
C-9
C-9
C-9
C-1
C-10
C-2
C-9
C-2
C-2
C-9
C-9
C-4
C-9
C-2
C-9
C-9
C-9
C-9
C-9
N
VECES
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
1
1
LARGO
(m)
ANCHO
(m)
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.40
0.40
0.15
0.15
0.40
0.15
0.25
0.25
0.25
0.25
0.40
0.25
0.25
0.25
0.25
0.15
0.25
0.40
0.40
0.15
0.15
0.40
0.15
0.25
0.25
0.25
0.25
0.40
0.25
0.25
0.25
0.25
0.15
0.40
0.25
0.40
0.40
0.25
0.25
0.40
0.25
0.40
0.25
0.25
0.25
0.25
0.25
0.15
0.40
0.25
0.40
0.40
0.25
0.25
0.40
0.25
0.40
0.25
0.25
0.25
0.25
0.25
ALTO
(m)
10.60
4.20
10.60
5.10
4.90
4.90
4.90
4.90
4.90
4.90
5.40
8.40
1.00
3.70
8.86
3.70
0.96
0.80
8.86
1.00
3.70
3.70
2.40
2.40
8.40
3.70
3.70
2.40
2.40
8.90
1.00
8.90
4.20
8.90
8.40
3.70
2.40
9.80
3.70
9.80
4.40
2.60
7.40
4.40
2.60
AREA
(m2)
1.60
1.60
1.60
1.60
320012699.xlsx 16 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
EJE D - D C
EJE D' - D'
EJE E - E C
EJE E - E C
EJE E - E CO
EJE E - E CO
EJE E - E CO
EJE E - E CO
EJE E - E C
EJE E - E CO
EJE E - E C
EJE E - E C
EJE E - E C
C-9
C-9
C-9
C-2
C-9
C-9
C-9
C-9
C-4
C-9
C-4
C-2
C-2
1
1
1
1
1
1
1
1
1
1
1
1
1
0.25
0.25
0.25
0.40
0.25
0.25
0.25
0.25
0.40
0.25
0.40
0.40
0.40
0.25
0.25
0.25
0.40
0.25
0.25
0.25
0.25
0.40
0.25
0.40
0.40
0.40
7.40
7.40
7.40
7.40
3.70
2.40
3.70
2.40
6.90
2.40
7.40
7.40
8.40
320012699.xlsx 17 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
EJE F - F C
EJE F - F C
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F C
EJE F - F CO
EJE F - F CO
EJE F - F CON
EJE F - F CON
EJE F - F C
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F C
EJE F - F C
EJE F - F C
EJE F - F CO
EJE F - F CO
EJE F - F C
EJE F - F C
EJE H - H C
EJE H - H CO
EJE H - H CO
EJE H - H C
EJE I - I CO
EJE I - I CON
EJE I - I CO
EJE I - I CO
EJE 2 - 2 CO
EJE 2 - 2 CO
EJE 2 - 2 CO
EJE 8 - 8 CO
EJE 8 - 8 CO
EJE 8 - 8 CO
EJE 8 - 8 CO
EJE 8' - 8'
EJE 8' - 8'
EJE 8' - 8'
EJE 8' - 8'
EJE 8' - 8'
EJE 8' - 8'
EJE 9 - 9 CO
C-3
C-2
C-9
C-9
C-10
C-9
C-9
C-10
C-10
C-2
C-9
C-9
C-9
C-9
C-2
C-9
C-9
C-9
C-9
C-10
C-10
C-10
C-1
C-2
C-10
C-9
C-9
C-2
C-2
C-9
C-9
C-2
C-2
C-9
C-10
C-2
C-9
C-9
C-5
C-10
C-9
C-10
C-10
C-10
C-9
C-10
C-9
C-9
C-9
C-9
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0.40
0.25
0.25
0.15
0.25
0.25
0.15
0.15
0.40
0.25
0.25
0.25
0.25
0.40
0.25
0.25
0.25
0.25
0.15
0.15
0.15
0.40
0.25
0.25
0.15
0.25
0.25
0.15
0.15
0.40
0.25
0.25
0.25
0.25
0.40
0.25
0.25
0.25
0.25
0.15
0.15
0.15
0.40
0.15
0.25
0.25
0.40
0.40
0.25
0.25
0.40
0.40
0.25
0.15
0.40
0.25
0.25
0.30
0.15
0.25
0.15
0.15
0.15
0.25
0.15
0.25
0.25
0.25
0.25
0.40
0.15
0.25
0.25
0.40
0.40
0.25
0.25
0.40
0.40
0.25
0.15
0.40
0.25
0.25
0.30
0.15
0.25
0.15
0.15
0.15
0.25
0.15
0.25
0.25
0.25
0.25
8.05
8.05
3.70
2.40
1.00
3.70
2.40
1.90
0.90
8.40
3.70
2.40
3.70
2.40
8.40
3.70
2.40
3.70
2.40
1.90
0.75
1.00
8.40
8.40
1.90
3.70
3.70
8.40
9.05
3.70
2.40
9.05
8.14
3.70
1.75
8.14
3.70
2.40
1.78
2.70
2.40
1.00
0.90
4.20
4.20
4.20
4.20
3.70
2.40
4.20
0.20
1.60
320012699.xlsx 18 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
EJE 9 - 9
EJE 9 - 9
EJE 9 - 9
EJE 9 - 9
EJE 9 - 9
EJE 9 - 9
EJE 9 - 9
EJE 9 - 9
EJE 9 - 9
EJE 9 - 9
EJE 9 - 9
EJE 9 - 9
EJE 9 - 9
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
C
CO
C
C-9
C-6
C-9
C-10
C-9
C-9
C-9
C-9
C-9
C-9
C-10
C-7
C-7
1
1
1
1
1
1
1
2
1
1
1
1
1
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.25
2.40
2.70
4.20
1.00
4.20
2.40
3.70
2.40
3.70
2.40
1.00
4.17
4.17
320012699.xlsx 19 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
EJE 11 - 11
EJE 11 - 11
EJE 11 - 11
TOTAL m3
01.05.03.02
C-8
C-8
C-8
1
1
1
0.25
0.25
0.25
0.25
0.25
0.25
5.10
5.10
5.10
LARGO
(m)
ANCHO
(m)
ALTO
(m)
10.60
4.20
10.60
5.10
4.90
4.90
4.90
4.90
4.90
4.90
5.40
8.40
1.00
3.70
8.86
3.70
0.96
0.80
8.86
1.00
3.70
3.70
2.40
2.40
8.40
3.70
3.70
2.40
2.40
8.90
1.00
8.90
4.20
8.90
8.40
3.70
2.40
9.80
3.70
9.80
4.40
DESCRIPCION
EJE A - A C
EJE A - A CO
EJE A - A C
EJE A - A C
EJE A - A C
EJE A - A C
EJE A - A C
EJE A - A C
EJE A - A C
EJE A - A C
EJE A - A C
EJE C - C C
EJE C - C C
EJE C - C CO
EJE C - C C
EJE C - C CO
EJE C - C CO
EJE C - C CO
EJE C - C C
EJE C - C C
EJE C - C CO
EJE C - C C
EJE C - C CO
EJE C - C CO
EJE C - C C
EJE C - C CO
EJE C - C C
EJE C - C CO
EJE C - C CO
EJE C - C C
EJE C - C C
EJE C - C C
EJE C - C C
EJE C - C C
EJE D - D C
EJE D - D CO
EJE D - D CO
EJE D - D C
EJE D - D CO
EJE D - D C
EJE D - D CO
C-1
C-9
C-1
C-8
C-7
C-7
C-7
C-7
C-7
C-7
C-7
C-1
C-10
C-9
C-2
C-2
C-10
C-10
C-2
C-10
C-9
C-9
C-9
C-9
C-2
C-9
C-9
C-9
C-9
C-1
C-10
C-2
C-9
C-2
C-2
C-9
C-9
C-4
C-9
C-2
C-9
N
VECES
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.40
0.40
0.15
0.15
0.40
0.15
0.25
0.25
0.25
0.25
0.40
0.25
0.25
0.25
0.25
0.15
0.40
0.25
0.40
0.40
0.25
0.25
0.40
0.25
0.40
0.25
PERIMETRO
(m)
1.45
1.45
1.45
1.45
320012699.xlsx 20 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
EJE D - D CO
EJE D - D C
EJE D - D CO
EJE D - D CO
EJE D - D C
EJE D' - D'
EJE E - E C
EJE E - E C
EJE E - E CO
EJE E - E CO
EJE E - E CO
EJE E - E CO
EJE E - E C
EJE E - E CO
C-9
C-9
C-9
C-9
C-9
C-9
C-9
C-2
C-9
C-9
C-9
C-9
C-4
C-9
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.40
0.25
0.25
0.25
0.25
0.40
0.25
2.60
7.40
4.40
2.60
7.40
7.40
7.40
7.40
3.70
2.40
3.70
2.40
6.90
2.40
320012699.xlsx 21 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
EJE E - E C
EJE E - E C
EJE E - E C
EJE F - F C
EJE F - F C
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F C
EJE F - F CO
EJE F - F CO
EJE F - F CON
EJE F - F CON
EJE F - F C
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F C
EJE F - F C
EJE F - F C
EJE F - F CO
EJE F - F CO
EJE F - F C
EJE F - F C
EJE H - H C
EJE H - H CO
EJE H - H CO
EJE H - H C
EJE I - I CO
EJE I - I CON
EJE I - I CO
EJE I - I CO
EJE 2 - 2 CO
EJE 2 - 2 CO
EJE 2 - 2 CO
EJE 8 - 8 CO
EJE 8 - 8 CO
EJE 8 - 8 CO
EJE 8 - 8 CO
EJE 8' - 8'
EJE 8' - 8'
EJE 8' - 8'
EJE 8' - 8'
C-4
C-2
C-2
C-3
C-2
C-9
C-9
C-10
C-9
C-9
C-10
C-10
C-2
C-9
C-9
C-9
C-9
C-2
C-9
C-9
C-9
C-9
C-10
C-10
C-10
C-1
C-2
C-10
C-9
C-9
C-2
C-2
C-9
C-9
C-2
C-2
C-9
C-10
C-2
C-9
C-9
C-5
C-10
C-9
C-10
C-10
C-10
C-9
C-10
C-9
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
0.40
0.40
0.40
0.40
0.25
0.25
0.15
0.25
0.25
0.15
0.15
0.40
0.25
0.25
0.25
0.25
0.40
0.25
0.25
0.25
0.25
0.15
0.15
0.15
0.40
0.15
0.25
0.25
0.40
0.40
0.25
0.25
0.40
0.40
0.25
0.15
0.40
0.25
0.25
0.30
0.15
0.25
0.15
0.15
0.15
0.25
0.15
0.25
7.40
7.40
8.40
8.05
8.05
3.70
2.40
1.00
3.70
2.40
1.90
0.90
8.40
3.70
2.40
3.70
2.40
8.40
3.70
2.40
3.70
2.40
1.90
0.75
1.00
8.40
8.40
1.90
3.70
3.70
8.40
9.05
3.70
2.40
9.05
8.14
3.70
1.75
8.14
3.70
2.40
1.78
2.70
2.40
1.00
0.90
4.20
4.20
4.20
4.20
1.57
1.45
320012699.xlsx 22 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
C-9
C-9
C-9
C-9
C-6
C-9
C-10
C-9
C-9
C-9
C-9
C-9
C-9
1
1
1
1
1
1
1
1
1
1
2
1
1
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.25
0.25
3.70
2.40
4.20
2.40
2.70
4.20
1.00
4.20
2.40
3.70
2.40
3.70
2.40
320012699.xlsx 23 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
EJE 9 - 9 C
EJE 9 - 9 CO
EJE 9 - 9 C
EJE 11 - 11
EJE 11 - 11
EJE 11 - 11
TOTAL m2
C-10
C-7
C-7
C-8
C-8
C-8
1
1
1
1
1
1
01.05.03.03
01.05.04
01.05.04.01
VIGAS
CONCRETO EN VIGAS F'C=210 KG/CM2
DESCRIPCION
VA-101, VAVA2
VA-304
VOLADO
VA-11
VE
VA-102; VAVA-106; VAVE2
VA-303
VOLADO
VA1
VA-107; VAVA21
VA-303
VOLADO
VA-103, VAVA-108, VAVA1
VA21
VA-11
VA-104; VAVA-109; VAVA-301
VOLADO
VA-105, VA-2
VOLADO
VA-11
VA-105
VA-306
VOLADO
V-101, V-201
V-301
VA-11
V-102; V-202
EJE A-A
EJE A-A
EJE A-A
EJE A-A
EJE C-C
EJE C-C
EJE C-C
EJE C-C
EJE C-C
EJE C-C
EJE C-C
EJE D-D
EJE D-D
EJE D-D
EJE D-D
EJE D-D
EJE E-E
EJE E-E
EJE E-E
EJE E-E
EJE F-F
EJE F-F
EJE F-F
EJE F-F
EJE H-H
EJE H-H
EJE H-H
EJE I-I
EJE I-I
EJE I-I
EJE I-I
EJE 2-2
EJE 2-2
EJE 2-2
EJE 3-3
N
VECES
2
1
1
1
1
1
2
2
1
1
1
1
2
1
1
1
2
2
1
1
1
2
2
1
1
1
1
1
1
1
1
2
1
1
2
0.15
0.25
0.25
0.25
0.25
0.25
1.00
4.17
4.17
5.10
5.10
5.10
LARGO
(m)
3.25
12.09
3.25
1.00
14.56
2.45
3.55
13.07
3.80
5.50
1.50
6.72
6.85
6.72
5.50
1.00
3.55
6.52
7.70
8.20
18.96
3.55
13.10
3.78
0.75
3.55
2.50
1.22
3.55
3.55
1.00
8.95
4.75
2.60
9.05
ANCHO
(m)
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.40
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.25
0.15
0.25
ALTO
(m)
0.40
0.25
0.30
0.20
0.15
0.33
0.40
0.40
0.30
0.30
0.20
0.20
0.25
0.20
0.30
0.20
0.40
0.40
0.20
0.20
0.15
0.40
0.40
0.30
0.20
0.40
0.20
0.15
0.40
0.40
0.20
0.40
0.30
0.15
0.40
AREA
(m2)
320012699.xlsx 24 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
VA-302
V-103; V-203
VA-302
V-104; V-204
V-105; V-205
V-106; V-206
VA-11
V-306
VA
V-107; V-207
VA
VA-11
EJE 3-3
EJE 4-4
EJE 4-4
EJE 5-5
EJE 7-7
EJE 8-8
EJE 8-8
EJE 8-8
EJE 8-8
EJE 9-9
EJE 9-9
EJE 9-9
1
1
1
1
1
2
1
1
1
2
1
1
10.05
16.65
4.80
16.80
15.80
18.43
7.79
5.20
1.68
18.43
4.11
12.97
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.15
0.17
0.40
0.17
0.40
0.40
0.40
0.15
0.40
0.20
0.40
0.20
0.15
320012699.xlsx 25 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
V-307
EJE 9-9
VA3
EJE 11-11
V01 (Volado 1era Planta)
VA-10 (Volado 1era Planta)
VA (1era Planta)
V02 (2da Planta)
VA-10 (2da Planta)
VA (2da Planta)
V-302 ( Azotea)
V-304 ( Azote
EJE A'-A'
TOTAL m3
01.05.04.02
1
1
1
1
1
1
1
1
1
1
5.20
4.32
15.65
19.00
2.90
2.25
19.67
2.90
13.06
3.55
0.25
0.25
0.25
0.15
0.25
0.25
0.15
0.25
0.25
0.25
0.40
0.40
0.20
0.20
0.20
0.20
0.20
0.20
0.30
0.30
LARGO
(m)
3.25
12.09
3.25
1.00
14.56
2.45
3.55
13.07
3.80
5.50
1.50
6.72
6.85
6.72
5.50
1.00
3.55
6.52
7.70
8.20
18.96
3.55
13.10
3.78
0.75
3.55
2.50
1.22
3.55
3.55
1.00
8.95
4.75
2.60
ANCHO
(m)
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.40
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.25
0.15
ALTO
(m)
0.40
0.25
0.30
0.20
0.15
0.33
0.40
0.40
0.30
0.30
0.20
0.20
0.25
0.20
0.30
0.20
0.40
0.40
0.20
0.20
0.15
0.40
0.40
0.30
0.20
0.40
0.20
0.15
0.40
0.40
0.20
0.40
0.30
0.15
DESCRIPCION
VA-101, VAVA2
VA-304
VOLADO
VA-11
VE
VA-102; VAVA-106; VAVE2
VA-303
VOLADO
VA1
VA-107; VAVA21
VA-303
VOLADO
VA-103, VAVA-108, VAVA1
VA21
VA-11
VA-104; VAVA-109; VAVA-301
VOLADO
VA-105, VA-2
VOLADO
VA-11
VA-105
VA-306
VOLADO
V-101, V-201
V-301
VA-11
EJE A-A
EJE A-A
EJE A-A
EJE A-A
EJE C-C
EJE C-C
EJE C-C
EJE C-C
EJE C-C
EJE C-C
EJE C-C
EJE D-D
EJE D-D
EJE D-D
EJE D-D
EJE D-D
EJE E-E
EJE E-E
EJE E-E
EJE E-E
EJE F-F
EJE F-F
EJE F-F
EJE F-F
EJE H-H
EJE H-H
EJE H-H
EJE I-I
EJE I-I
EJE I-I
EJE I-I
EJE 2-2
EJE 2-2
EJE 2-2
N
VECES
2
1
1
1
1
1
2
2
1
1
1
1
2
1
1
1
2
2
1
1
1
2
2
1
1
1
1
1
1
1
1
2
1
1
AREA
(m2)
4.23
4.23
1.46
0.25
2.18
1.25
4.62
16.99
1.71
2.48
0.38
1.68
6.85
1.68
2.48
0.25
4.62
8.48
1.93
2.05
2.84
4.62
17.03
1.70
0.19
2.31
0.63
0.18
2.31
2.31
0.25
11.64
2.14
0.39
320012699.xlsx 26 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
V-102; V-202
VA-302
V-103; V-203
VA-302
V-104; V-204
V-105; V-205
V-106; V-206
VA-11
V-306
VA
V-107; V-207
VA
VA-11
EJE 3-3
EJE 3-3
EJE 4-4
EJE 4-4
EJE 5-5
EJE 7-7
EJE 8-8
EJE 8-8
EJE 8-8
EJE 8-8
EJE 9-9
EJE 9-9
EJE 9-9
2
1
1
1
1
1
2
1
1
1
2
1
1
9.05
10.05
16.65
4.80
16.80
15.80
18.43
7.79
5.20
1.68
18.43
4.11
12.97
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.15
0.40
0.17
0.40
0.17
0.40
0.40
0.40
0.15
0.40
0.20
0.40
0.20
0.15
11.77
2.51
10.82
1.20
10.92
10.27
23.96
1.17
3.38
0.42
23.96
1.03
1.95
320012699.xlsx 27 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
V-307
EJE 9-9
VA3
EJE 11-11
V01 (Volado 1era Planta)
VA-10 (Volado 1era Planta)
VA (1era Planta)
V02 (2da Planta)
VA-10 (2da Planta)
VA (2da Planta)
V-302 ( Azotea)
V-304 ( Azote
EJE A'-A'
TOTAL m2
1
1
1
1
1
1
1
1
1
1
5.20
4.32
15.65
19.00
2.90
2.25
19.67
2.90
13.06
3.55
01.05.04.03
01.05.05
01.05.05.01
LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2
DESCRIPCION
0.25
0.25
0.25
0.15
0.25
0.25
0.15
0.25
0.25
0.25
0.40
0.40
0.20
0.20
0.20
0.20
0.20
0.20
0.30
0.30
3.38
2.81
3.91
2.85
0.73
0.56
2.95
0.73
5.88
1.60
247.03
ALTO
(m)
VOL DE LAD.
(m3/m2)
N
VECES
SS.HH.
ATENCION CIUDADANA
MODULO DE ATENCION
INPOL
DELITOS - FALTAS
VIOLENCIA FAMILIAR
SALA DE MEDITACION
DEPOSITO
DEPOSITO 2
ADMINISTRACION
VEREDA
PASADIZO
VOLADO
1
1
1
1
1
1
1
1
1
1
1
1
1
DORMITORIO DE JEFATURA
BAO
COMEDOR
COCINA
RADIO
OFICINA
DORMITORIO FEMENINO
BAO DE MUJERES
ARMERIA
DORMITORIO SUBOFICIALES
PASADIZO
VOLADO, BALCON
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
LARGO
AREA
(m)
(m2)
LOSA DE PRIMERA PLANTA
8.85
10.05
12.54
21.52
9.57
9.34
16.97
16.42
9.57
11.45
11.09
17.35
15.40
LOSA DE SEGUNDA PLANTA
13.12
2.90
23.43
10.38
9.57
9.34
16.42
16.97
11.45
11.09
14.45
27.06
LOSA DE AZOTEA
5.84
25.49
25.85
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.20
0.17
0.17
0.11
0.09
0.09
320012699.xlsx 28 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
LOSA INCLINADA 2
TOTAL m3
33.97
0.17
0.09
320012699.xlsx 29 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
01.05.05.02
DESCRIPCION
N
VECES
SS.HH.
ATENCION CIUDADANA
MODULO DE ATENCION
INPOL
DELITOS - FALTAS
VIOLENCIA FAMILIAR
SALA DE MEDITACION
DEPOSITO
DEPOSITO 2
ADMINISTRACION
VEREDA
PASADIZO
VOLADO
1
1
1
1
1
1
1
1
1
1
1
1
1
DORMITORIO DE JEFATURA
BAO
COMEDOR
COCINA
RADIO
OFICINA
DORMITORIO FEMENINO
BAO DE MUJERES
ARMERIA
DORMITORIO SUBOFICIALES
PASADIZO
VOLADO, BALCON
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
LARGO
ANCHO
(m)
(m)
LOSA DE PRIMERA PLANTA
ALTO
(m)
AREA
(m2)
8.85
10.05
12.54
21.52
9.57
9.34
16.97
16.42
9.57
11.45
11.09
17.35
15.40
01.05.05.03
01.05.05.04
DESCRIPCION
N
VECES
SS.HH.
ATENCION CIUDADANA
MODULO DE ATENCION
INPOL
DELITOS - FALTAS
1
1
1
1
1
LARGO
ANCHO
(m)
(m)
LOSA DE PRIMERA PLANTA
LAD/m2
(und)
AREA
(m2)
8.33
8.33
8.33
8.33
8.33
8.85
10.05
12.54
21.52
9.57
320012699.xlsx 30 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
VIOLENCIA FAMILIAR
SALA DE MEDITACION
DEPOSITO
DEPOSITO 2
ADMINISTRACION
VEREDA
PASADIZO
VOLADO
1
1
1
1
1
1
1
1
8.33
8.33
8.33
8.33
8.33
8.33
8.33
8.33
9.34
16.97
16.42
9.57
11.45
11.09
17.35
15.40
320012699.xlsx 31 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
8.33
8.33
8.33
8.33
8.33
8.33
8.33
8.33
8.33
8.33
8.33
8.33
13.12
2.90
23.43
10.38
9.57
8.33
5.84
LAD/m2
(und)
AREA
(m2)
8.33
8.33
8.33
25.49
25.85
33.97
ANCHO
(m)
1.28
1.28
1.28
1.28
ALTO
(m)
AREA
(m2)
1.40
0.66
0.71
0.64
ANCHO
(m)
1.28
1.28
0.73
1.12
1.28
1.28
1.28
ALTO
(m)
0.18
AREA
(m2)
7.36
2.98
1.86
2.87
2.78
3.38
2.74
0.83
1
1
1
1
1
1
1
1
1
1
1
1
9.34
16.42
16.97
11.45
11.09
14.45
27.06
LOSA DE AZOTEA
LOSA PARA TANQUE
TOTAL (und)
01.05.05.05
DESCRIPCION
LOSA DE ESCALERA
LOSA INCLINADA 1
LOSA INCLINADA 2
TOTAL (und)
01.05.06
01.05.06.01
N
VECES
LARGO
ANCHO
(m)
(m)
LOSA DE AZOTEA
1
1
1
ESCALERAS
CONCRETO EN ESCALERAS F'C=210 KG/CM2
DESCRIPCION
PRIMER TRAMO (1er Piso)
SEGUNDO TRAMO (1er Piso)
PRIMER TRAMO (1er Piso)
SEGUNDO TRAMO (1er Piso)
TOTAL m3
01.05.06.02
N
VECES
1
1
1
1
LARGO
(m)
DESCRIPCION
CONTRAPASO
FONDO LOSA PRIMER TRAMO (
DESCANSO
FONDO LOSA SEGUNDO TRAMO
FONDO LOSA PRIMER TRAMO (
FONDO LOSA SEGUNDO TRAMO
CARA LATERAL PRIMER TRAMO
N
VECES
33
1
2
2
1
1
1
2
LARGO
(m)
2.34
1.28
1.28
2.18
2.65
2.15
320012699.xlsx 32 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
2
2
2
0.67
0.82
0.58
26.87
(Ver hoja adjunta)
320012699.xlsx 33 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
02
02.01
02.01.01
ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MURO DE SOGA LADRILLO DE ARCILLA 9X13X24 CM, MEZ 1:5
DESCRIPCION
EJE A-A (1era Planta)
EJE A-A (2da Planta)
EJE A-A (3era Planta)
EJE A''-A'' (1era Planta)
EJE A''-A'' (2da Planta)
EJE C-C (1era Planta)
EJE C-C (2da Planta)
EJE C-C (3era Planta)
EJE D-D (1era Planta)
EJE D-D (2da Planta)
EJE D'-D' (1era Planta)
EJE D'-D' (2da Planta)
EJE E-E (1era Planta)
EJE E-E (2da Planta)
EJE F-F (1era Planta)
EJE F-F (2da Planta)
EJE F-F (3era Planta)
EJE H-H (1era Planta)
EJE H-H (2da Planta)
EJE H-H (3era Planta)
EJE I-I (1era Planta)
EJE J-J (2da Planta)
EJE 2-2 (1era Planta)
EJE 2-2 (2da Planta)
EJE 2-2 (3era Planta)
EJE 3-3 (1era Planta)
EJE 3-3 (2da Planta)
EJE 3'-3' (1era Planta)
EJE 3'-3' (2da Planta)
EJE 3'-3' (3era Planta)
EJE 4-4 (1era Planta)
EJE 4-4 (2da Planta)
EJE 4-4 (3era Planta)
EJE 5-5 (1era Planta)
EJE 5-5 (2da Planta)
EJE 7-7 (1era Planta)
EJE 7-7 (2da Planta)
EJE 8-8 (1era Planta)
EJE 8-8 (2da Planta)
EJE 8-8 (3era Planta)
EJE 8'-8' (1era Planta)
EJE 8'-8' (2da Planta)
EJE 9-9 (1era Planta)
EJE 9-9 (2da Planta)
N
VECES
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
LARGO
(m)
ANCHO
(m)
ALTO
(m)
AREA
(m2)
44.57
7.80
7.80
6.38
6.84
18.09
34.27
11.66
18.25
18.25
3.50
6.60
12.48
21.52
16.25
12.92
8.95
6.36
5.16
4.44
4.96
11.14
9.05
7.85
3.87
6.50
5.76
12.25
24.36
4.65
14.00
6.24
4.65
6.63
6.36
14.13
13.56
14.05
30.06
10.93
19.00
6.24
48.78
41.54
320012699.xlsx 34 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
1
1
1
17.22
3.90
12.78
632.50
DESCRIPCION
JUNTA SISMICA
TOTAL m2
N
VECES
1
LARGO
(m)
9.40
ANCHO
(m)
0.50
ALTO
(m)
AREA
(m2)
4.70
4.70
320012699.xlsx 35 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
02.01.03
MESADA DE CONCRETO
DESCRIPCION
COCINA
SERVICIOS HIGIENICOS 2do
LAVANDERIA
TOTAL m2
02.02
02.02.01
LOSA 7
LOSA 9
LOSA 10
TOTAL m2
VOLADOS
TOTAL m2
ALTO
(m)
AREA
(m2)
3.52
2.05
2.17
7.74
LARGO
(m)
ANCHO
(m)
ALTO
(m)
AREA
(m2)
25.75
25.40
33.84
84.99
VECES
1
1
1
N
VECES
1
LARGO
(m)
ANCHO
(m)
ALTO
(m)
AREA
(m2)
38.00
38.00
LARGO
(m)
8.40
8.40
ANCHO
(m)
ALTO
(m)
AREA
(m2)
LARGO
(m)
ANCHO
(m)
ALTO
(m)
AREA
(m2)
44.57
7.80
7.80
6.38
6.84
18.09
34.27
11.66
18.25
18.25
3.50
DESCRIPCION
CUMBRERA TEJA ANDINA
TOTAL m
02.03
02.03.01
ANCHO
(m)
DESCRIPCION
02.02.03
VECES
1
1
1
LARGO
(m)
COBERTURA
COBERTURA CON TEJA ANDINA
DESCRIPCION
02.02.02
N
VECES
1
DESCRIPCION
EJE A-A (1era Planta)
EJE A-A (2da Planta)
EJE A-A (3era Planta)
EJE A''-A'' (1era Planta)
EJE A''-A'' (2da Planta)
EJE C-C (1era Planta)
EJE C-C (2da Planta)
EJE C-C (3era Planta)
EJE D-D (1era Planta)
EJE D-D (2da Planta)
EJE D'-D' (1era Planta)
N
VECES
1
1
1
1
1
1
1
1
1
1
1
320012699.xlsx 36 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
1
1
1
1
1
1
1
1
1
1
1
1
1
6.60
12.48
21.52
16.25
12.92
8.95
6.36
5.16
4.44
4.96
11.14
9.05
7.85
320012699.xlsx 37 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
3.87
6.50
5.76
12.25
24.36
4.65
14.00
6.24
4.65
6.63
6.36
14.13
13.56
14.05
30.06
10.93
19.00
6.24
48.78
41.54
17.22
3.90
12.78
632.50
DESCRIPCION
EJE A-A (1era Planta)
EJE A-A (2da Planta)
EJE A-A (3era Planta)
EJE A''-A'' (1era Planta)
EJE A''-A'' (2da Planta)
EJE C-C (1era Planta)
EJE C-C (2da Planta)
EJE C-C (3era Planta)
EJE D-D (1era Planta)
EJE D-D (2da Planta)
EJE D'-D' (1era Planta)
EJE D'-D' (2da Planta)
EJE E-E (1era Planta)
EJE E-E (2da Planta)
EJE F-F (1era Planta)
EJE F-F (2da Planta)
EJE F-F (3era Planta)
EJE H-H (1era Planta)
EJE H-H (2da Planta)
EJE H-H (3era Planta)
EJE I-I (1era Planta)
N
VECES
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
LARGO
(m)
ANCHO
(m)
ALTO
(m)
AREA
(m2)
44.57
7.80
7.80
6.38
6.84
18.09
34.27
11.66
18.25
18.25
3.50
6.60
12.48
21.52
16.25
12.92
8.95
6.36
5.16
4.44
4.96
320012699.xlsx 38 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
1
1
1
1
1
1
1
1
1
1
1
1
11.14
9.05
7.85
3.87
6.50
5.76
12.25
24.36
4.65
14.00
6.24
4.65
320012699.xlsx 39 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
1
1
1
1
1
1
1
1
1
1
1
1
1
6.63
6.36
14.13
13.56
14.05
30.06
10.93
19.00
6.24
48.78
41.54
17.22
3.90
619.72
DESCRIPCION
C-1
C-9
C-8
C-7
C-7
C-1
C-10
C-9
C-2
C-2
C-10
C-10
C-9
C-2
C-1
C-2
C-4
C-2
C-9
C-9
C-9
C-2
C-4
C-4
C-3
C-2
C-10
C-10
C-10
C-2
C-2
N
VECES
2
7
4
6
1
2
9
24
2
1
2
2
25
7
1
2
1
1
2
2
4
2
1
1
1
1
3
2
1
2
2
LARGO
(m)
0.25
0.25
0.25
0.25
0.15
0.25
0.40
0.40
0.15
0.15
0.25
0.40
0.40
0.40
0.40
0.25
0.25
0.25
0.40
0.40
0.40
0.40
0.15
0.15
0.15
0.40
0.40
ANCHO
(m)
ALTO
(m)
10.60
4.20
5.10
4.90
5.40
8.40
1.00
3.70
8.86
3.70
0.96
0.80
2.40
8.40
8.90
8.90
9.80
9.80
4.40
2.60
7.40
7.40
6.90
7.40
8.05
8.05
1.90
0.90
0.75
9.05
8.14
PERIMETRO
(m)
1.45
1.45
1.45
1.57
320012699.xlsx 40 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
C-10
C-5
C-10
C-10
C-6
C-7
TOTAL m2
1
1
1
2
1
2
0.15
0.30
0.15
0.15
0.25
0.25
1.75
1.78
2.70
4.20
2.70
4.17
320012699.xlsx 41 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
02.03.04
DESCRIPCION
VA-101, VAVA2
VA-304
VOLADO
VA-11
VE
VA-102; VAVA-106; VAVE2
VA-303
VOLADO
VA1
VA-107; VAVA21
VA-303
VOLADO
VA-103, VAVA-108, VAVA1
VA21
VA-11
VA-104; VAVA-109; VAVA-301
VOLADO
VA-105, VA-2
VOLADO
VA-11
VA-105
VA-306
VOLADO
V-101, V-201
V-301
VA-11
V-102; V-202
VA-302
V-103; V-203
VA-302
V-104; V-204
V-105; V-205
V-106; V-206
VA-11
V-306
VA
V-107; V-207
EJE A-A
EJE A-A
EJE A-A
EJE A-A
EJE C-C
EJE C-C
EJE C-C
EJE C-C
EJE C-C
EJE C-C
EJE C-C
EJE D-D
EJE D-D
EJE D-D
EJE D-D
EJE D-D
EJE E-E
EJE E-E
EJE E-E
EJE E-E
EJE F-F
EJE F-F
EJE F-F
EJE F-F
EJE H-H
EJE H-H
EJE H-H
EJE I-I
EJE I-I
EJE I-I
EJE I-I
EJE 2-2
EJE 2-2
EJE 2-2
EJE 3-3
EJE 3-3
EJE 4-4
EJE 4-4
EJE 5-5
EJE 7-7
EJE 8-8
EJE 8-8
EJE 8-8
EJE 8-8
EJE 9-9
N
VECES
2
1
1
1
1
1
2
2
1
1
1
1
2
1
1
1
2
2
1
1
1
2
2
1
1
1
1
1
1
1
1
2
1
1
2
1
1
1
1
1
2
1
1
1
2
LARGO
(m)
3.25
12.09
3.25
1.00
14.56
2.45
3.55
13.07
3.80
5.50
1.50
6.72
6.85
6.72
5.50
1.00
3.55
6.52
7.70
8.20
18.96
3.55
13.10
3.78
0.75
3.55
2.50
1.22
3.55
3.55
1.00
8.95
4.75
2.60
9.05
10.05
16.65
4.80
16.80
15.80
18.43
7.79
5.20
1.68
18.43
ANCHO
(m)
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.40
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
ALTO
(m)
0.40
0.25
0.30
0.20
0.15
0.33
0.40
0.40
0.30
0.30
0.20
0.20
0.25
0.20
0.30
0.20
0.40
0.40
0.20
0.20
0.15
0.40
0.40
0.30
0.20
0.40
0.20
0.15
0.40
0.40
0.20
0.40
0.30
0.15
0.40
0.17
0.40
0.17
0.40
0.40
0.40
0.15
0.40
0.20
0.40
AREA
(m2)
3.25
2.42
0.98
0.25
2.18
0.88
3.55
13.07
1.14
1.65
0.38
1.68
4.80
1.68
1.65
0.25
3.55
6.52
1.93
2.05
2.84
3.55
13.10
1.13
0.19
1.78
0.63
0.18
1.78
1.78
0.25
8.95
1.43
0.39
9.05
2.51
8.33
1.20
8.40
7.90
18.43
1.17
2.60
0.42
18.43
320012699.xlsx 42 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
VA
EJE 9-9
VA-11
EJE 9-9
V-307
EJE 9-9
VA3
EJE 11-11
V01 (Volado 1era Planta)
VA-10 (Volado 1era Planta)
VA (1era Planta)
V02 (2da Planta)
VA-10 (2da Planta)
VA (2da Planta)
V-302 ( Azotea)
TOTAL m2
1
1
1
1
1
1
1
1
1
1
1
4.11
12.97
5.20
4.32
15.65
19.00
2.90
2.25
19.67
2.90
13.06
0.25
0.15
0.25
0.25
0.25
0.15
0.25
0.25
0.15
0.25
0.25
0.20
0.15
0.40
0.40
0.20
0.20
0.20
0.20
0.20
0.20
0.30
1.03
1.95
2.60
2.16
3.91
2.85
0.73
0.56
2.95
0.73
3.92
193.62
320012699.xlsx 43 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
02.03.05
DESCRIPCION
V-01
V-02
V-03
V-04
V-05
V-06
V-07
V-08
V-09
V-10
V-11
P-01
P-02
P-03
P-04
P-05
P-06
P-07
P-08
P-09
P-10
M-01
M-02
M-03
M-04
TOTAL m2
02.03.06
N
VECES
2
1
1
3
1
1
1
2
4
1
1
10
7
2
2
1
2
1
6
1
2
1
1
3
3
ANCHO
(m)
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
ALTO
(m)
1.80
1.80
1.90
1.50
1.50
1.50
0.50
0.50
1.50
1.00
1.95
2.10
2.10
2.10
3.00
2.40
2.10
1.00
1.80
2.10
2.40
3.00
2.80
2.80
3.00
AREA
(m2)
1.98
0.77
1.02
2.70
1.13
1.07
0.77
1.02
3.38
0.82
1.04
7.80
5.36
1.59
2.25
1.02
1.53
0.40
3.78
0.74
1.67
1.47
1.47
4.40
4.42
53.56
ANCHO
(m)
0.73
1.12
1.28
1.28
1.28
ALTO
(m)
AREA
(m2)
1.86
2.87
2.78
3.38
2.74
13.63
ALTO
(m)
AREA
(m2)
DESCRIPCION
VECES
DESCANSO
2
2
FONDO LOSA SEGUNDO TRAMO
1
FONDO LOSA PRIMER TRAMO (
1
FONDO LOSA SEGUNDO TRAMO
1
TOTAL m2
02.04
02.04.01
LONGITUD
(m)
1.50
0.75
1.50
1.50
2.25
2.07
2.07
1.20
1.32
1.72
1.50
1.00
0.90
1.10
1.50
2.00
0.90
0.65
0.60
0.70
0.75
3.82
4.17
4.17
3.82
LARGO
(m)
1.28
1.28
2.18
2.65
2.15
CIELORRASOS
CIELORRASOS CON MEZCLA DE CEMENTO-ARENA
DESCRIPCION
SS.HH.
N
VECES
1
LARGO
ANCHO
(m)
(m)
LOSA DE PRIMERA PLANTA
8.85
320012699.xlsx 44 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
ATENCION CIUDADANA
MODULO DE ATENCION
INPOL
DELITOS - FALTAS
VIOLENCIA FAMILIAR
SALA DE MEDITACION
DEPOSITO
DEPOSITO 2
ADMINISTRACION
VEREDA
PASADIZO
VOLADO
1
1
1
1
1
1
1
1
1
1
1
1
10.05
12.54
21.52
9.57
9.34
16.97
16.42
9.57
11.45
11.09
17.35
15.40
320012699.xlsx 45 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
13.12
2.90
23.43
10.38
9.57
1
1
1
1
1
1
1
1
1
1
1
1
9.34
16.42
16.97
11.45
11.09
14.45
27.06
LOSA DE AZOTEA
5.84
25.49
25.85
33.97
427.43
PISOS Y PAVIMENTOS
FALSO PISO DE 4" DE CONCRETO C:H 1:8
DESCRIPCION
SS.HH. HOMBRES
SS.HH. MUJERES
PASADIZO 1
DEPOSITO
DELITOS - FALTAS
VIOLENCIA FAMILIAR
DEPOSITO 1
SALA DE MEDITACION
SALA DE MEDITACION 1
ATENCION CIUDADANA
MODULO DE ATENCION
INPOL
ADMINISTRACION
DEPOSITO 2
PASADIZO 2
TOTAL m2
02.05.02
1
1
1
1
N
VECES
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
LARGO
(m)
ANCHO
(m)
ALTO
(m)
AREA
(m2)
4.58
4.64
3.89
5.26
10.59
10.07
7.33
5.90
5.66
22.31
19.57
24.31
17.12
10.82
17.39
169.42
CONTRAPISO DE 48mm
DESCRIPCION
SS.HH. HOMBRES
SS.HH. MUJERES
PASADIZO 1
DEPOSITO
N
VECES
1
1
1
1
LARGO
(m)
ANCHO
(m)
ALTO
(m)
AREA
(m2)
4.58
4.64
3.89
5.26
320012699.xlsx 46 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
DELITOS - FALTAS
VIOLENCIA FAMILIAR
DEPOSITO 1
SALA DE MEDITACION
SALA DE MEDITACION 1
ATENCION CIUDADANA
MODULO DE ATENCION
INPOL
ADMINISTRACION
DEPOSITO 2
PASADIZO 2
TOTAL m2
1
1
1
1
1
1
1
1
1
1
1
10.59
10.07
7.33
5.90
5.66
22.31
19.57
24.31
17.12
10.82
17.39
169.42
320012699.xlsx 47 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
02.05.03
DESCRIPCION
SS.HH. HOMBRES
SS.HH. MUJERES
PASADIZO 1
DELITOS - FALTAS
VIOLENCIA FAMILIAR
ATENCION CIUDADANA
MODULO DE ATENCION
INPOL
ADMINISTRACION
PASADIZO 2
ESCALERA
N
VECES
LARGO
ANCHO
(m)
(m)
PRIMER PISO
ALTO
(m)
AREA
(m2)
4.58
4.64
3.89
10.59
10.07
22.31
19.57
24.31
17.12
17.39
13.48
1
1
1
1
1
1
1
1
1
1
1
SEGUNDO PISO
DORMITORIO JEFATURA
DESPACHO JEFATURA
COCINA-COMEDOR
RADIO
OFICINA
DORMITORIO SUBOFICIALES
BAO VARONES
DORMITORIO FEMENINO
BAO DE MUJERES
PASADIZO
ESCALERA
1
1
1
1
1
1
1
1
1
1
1
LAVANDERIA
TOTAL m2
11.03
28.43
30.31
10.59
10.07
26.94
13.34
17.37
6.98
16.48
13.48
AZOTEA
02.05.04
340.29
DESCRIPCION
DEPOSITO
DEPOSITO 1
DEPOSITO 2
ARMERIA
AZOTEA
TOTAL m2
02.05.05
7.35
N
VECES
1
1
1
1
1
LARGO
(m)
ANCHO
(m)
ALTO
(m)
AREA
(m2)
5.26
7.33
10.82
7.95
151.47
182.82
DESCRIPCION
VEREDAS
TOTAL m2
N
VECES
1
LARGO
(m)
ANCHO
(m)
ALTO
(m)
AREA
(m2)
83.71
83.71
320012699.xlsx 48 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
02.05.06
DESCRIPCION
SARDINEL
TOTAL m3
02.05.07
N
VECES
1
LARGO
(m)
17.30
ANCHO
(m)
0.10
ALTO
(m)
0.25
AREA
(m2)
ANCHO
(m)
ALTO
(m)
0.18
0.10
AREA
(m2)
77.00
39.01
DESCRIPCION
ESTACIONAMIENTO
PATIO
TOTAL m3
N
VECES
1
1
LARGO
(m)
320012699.xlsx 49 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
02.05.08
DESCRIPCION
SARDINEL
VEREDA+PATIO
ESTACIONAMIENTO
TOTAL m2
02.05.09
SARDINEL
VEREDA
PATIO
ESTACIONAMIENTO
TOTAL m
COTRAPASOS
TOTAL m
AREA
(m2)
8.65
4.20
4.65
17.50
N
VECES
1
1
1
1
LONGITUD
(m)
3.60
38.20
20.65
12.50
ANCHO
(m)
ALTO
(m)
TOTAL
(m)
3.60
38.20
20.65
12.50
74.95
N
VECES
33
LONGITUD
(m)
1.28
ANCHO
(m)
ALTO
(m)
TOTAL
(m)
42.24
42.24
N
VECES
1
1
1
1
1
1
LARGO
(m)
8.40
8.40
11.60
2.92
8.60
1.98
ANCHO
(m)
ALTO
(m)
1.30
1.30
1.30
1.80
1.30
1.80
AREA
(m2)
10.92
10.92
15.08
5.26
11.18
3.56
56.92
LARGO
(m)
125.50
36.00
142.75
304.25
ANCHO
(m)
ALTO
(m)
AREA
(m2)
CONTRAZOCALO DE CERAMICO 10 cm x 30 cm
DESCRIPCION
PRIMERA PLANTA
ESCALERA
SEGUNDA PLANTA
TOTAL m
02.06.03
ALTO
(m)
0.25
0.10
0.18
ZOCALOS Y CONTRAZOCALOS
ZOCALO DE MAYOLICA BLANCA DE 20 X 30
DESCRIPCION
02.06.02
ANCHO
(m)
DESCRIPCION
02.06
02.06.01
LARGO
(m)
17.30
42.00
25.85
DESCRIPCION
02.05.10
N
VECES
2
1
1
N
VECES
1
1
1
320012699.xlsx 50 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
DESCRIPCION
N
VECES
PRIMERA PLANTA
TOTAL m2
02.07
02.07.01
LARGO
(m)
70.20
ANCHO
(m)
ALTO
(m)
0.60
AREA
(m2)
42.12
LARGO
(m)
1.00
0.90
1.10
1.50
2.00
ANCHO
(m)
ALTO
(m)
2.10
2.10
2.10
3.00
2.40
AREA
(m2)
21.00
13.23
4.62
9.00
4.80
52.65
CARPINTERIA DE MADERA
PUERTA APANELADA, MADERA CEDRO E=1 1/4"
DESCRIPCION
P-01
P-02
P-03
P-04
P-05
TOTAL m2
N
VECES
10
7
2
2
1
320012699.xlsx 51 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
02.07.02
DESCRIPCION
V-01
V-02
V-03
V-04
V-05
V-06
V-07
V-08
V-09
V-10
V-11
TOTAL m2
02.07.03
N
VECES
2
1
1
3
1
1
1
2
4
1
1
LARGO
(m)
1.50
0.75
1.50
1.50
2.25
2.07
2.07
1.20
1.32
1.72
1.50
ANCHO
(m)
ALTO
(m)
1.80
1.80
1.90
1.50
1.50
1.50
0.50
0.50
1.50
1.00
1.95
AREA
(m2)
5.40
1.35
2.85
6.75
3.38
3.11
1.04
1.20
7.92
1.72
2.93
37.63
LARGO
(m)
0.60
0.70
0.75
ANCHO
(m)
ALTO
(m)
1.80
2.10
2.40
AREA
(m2)
6.48
1.47
3.60
11.55
LARGO
(m)
ANCHO
(m)
ALTO
(m)
DESCRIPCION
P-08
P-09
P-10
TOTAL m2
N
VECES
6
1
2
02.07.04
02.08
02.08.01
CARPINTERIA METALICA
PUERTA DE METALICA 5/8"
02.08.02
02.08.03
02.08.04
02.08.05
02.09
02.09.01
CERRAJERIA
BISAGRA CAPUCHINA DE 4" X 4"
DESCRIPCION
P-01
P-02
P-03
P-04
P-05
P-08
N
VECES
10
7
2
2
1
6
BISAGRAS/PTA
4
4
4
4
4
4
320012699.xlsx 52 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
P-09
P-10
TOTAL (und)
02.09.02
1
2
4
4
DESCRIPCION
P-08
TOTAL (pza)
N
VECES
2
LARGO
(m)
ANCHO
(m)
ALTO
(m)
CERRADU./PTA
1
320012699.xlsx 53 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
02.09.03
DESCRIPCION
P-01
P-02
P-03
P-04
P-05
P-09
P-10
TOTAL (pza)
02.09.04
P-06
P-07
TOTAL (pza)
V-01
V-02
V-03
V-04
V-05
V-06
V-07
V-08
V-09
V-10
V-11
TOTAL p2
ALTO
(m)
CERRADU./PTA
1
1
1
1
1
1
1
N
VECES
2
1
LARGO
(m)
ANCHO
(m)
ALTO
(m)
LARGO
(m)
1.50
0.75
1.50
1.50
2.25
2.07
2.07
1.20
1.32
1.72
1.50
ANCHO
(m)
ALTO
(m)
1.80
1.80
1.90
1.50
1.50
1.50
0.50
0.50
1.50
1.00
1.95
AREA
(p2)
25.07
11.83
26.60
20.48
31.95
29.19
8.63
4.70
17.89
15.45
27.36
219.14
LARGO
(m)
ANCHO
(m)
ALTO
(m)
AREA
(m2)
427.43
774.98
13.63
1216.04
CERRADU./PTA
1
1
VECES
1
1
1
3
1
1
1
2
4
1
1
PINTURA
PINTURA LATEX EN INTERIORES Y CIELORRASOS
DESCRIPCION
TARRAJEO DE CIELO RAZO
TARRAJEO DE INTERIOR
VESTIDURA DE DERRAMES
TOTAL m2
02.11.02
ANCHO
(m)
VIDRIOS
VIDRIO SEMIDOBLE
DESCRIPCION
02.11
02.11.01
LARGO
(m)
DESCRIPCION
02.10
02.10.01
N
VECES
10
7
2
2
1
1
2
N
VECES
1
1
1
320012699.xlsx 54 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
DESCRIPCION
TARRAJEO DE EXTERIORES
TOTAL m2
N
VECES
1
LARGO
(m)
ANCHO
(m)
ALTO
(m)
AREA
(m2)
774.98
774.98
320012699.xlsx 55 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
02.11.03
DESCRIPCION
P-01
P-02
P-03
P-04
P-05
P-08
P-09
P-10
TOTAL m2
02.11.04
N
VECES
10
7
2
2
1
6
1
2
LARGO
(m)
1.00
0.90
1.10
1.50
2.00
0.60
0.70
0.75
ANCHO
(m)
ALTO
(m)
2.10
2.10
2.10
3.00
2.40
1.80
2.10
2.40
AREA
(m2)
21.00
13.23
4.62
9.00
4.80
6.48
1.47
3.60
64.20
LARGO
(m)
1.50
0.75
1.50
1.50
2.25
2.07
2.07
1.20
1.32
1.72
1.50
ANCHO
(m)
ALTO
(m)
1.80
1.80
1.90
1.50
1.50
1.50
0.50
0.50
1.50
1.00
1.95
AREA
(m2)
2.70
1.35
2.85
6.75
3.38
3.11
1.04
1.20
7.92
1.72
2.93
34.93
DESCRIPCION
V-01
V-02
V-03
V-04
V-05
V-06
V-07
V-08
V-09
V-10
V-11
TOTAL m2
03
03.01
03.01.01
INSTALACIONES ELECTRICAS
CABLES Y CONDUCTORES
CABLE ELECTRICO THW - 2.5 mm2
03.01.02
03.01.03
03.01.04
03.02
03.02.01
TUBERIAS
TUBERIA 20 mm PVC SAP
03.02.02
03.02.03
03.02.04
N
VECES
1
1
1
3
1
1
1
2
4
1
1
320012699.xlsx 56 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
03.02.05
03.02.06
03.03
03.03.01
ARTEFACTOS DE ILUMINACION
FLUORECENTE RECTO 2 x 36 W C/EQ + PANTALLA MAS REJILLA
03.03.02
03.03.03
FOCO AHORRADOR DE 36 W
03.03.04
03.03.05
LAMPARAS DE EMERGENCIA
320012699.xlsx 57 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
03.04
03.04.01
INTERRUPTORES
INTERRUPTOR CON DADO SIMPLE
03.04.02
03.04.03
INTERRUPTOR CONMUTACION
03.05
03.05.01
TOMACORRIENTES
TOMACORRIENTE DOBLE UNIVERSAL MAS TOMA A TIERRA
03.06
03.06.01
CALENTADOR
THERMA ELECTRICA
03.07
03.07.01
ACOMETIDA
ACOMETIDA AEREA
03.08
03.08.01
03.08.02
03.09
03.09.01
TABLEROS ELECTRICOS
TABLERO TG-1
03.09.02
03.10
03.10.01
ELECTROBOMBA
ELECTROBOMBA
03.11
03.11.01
POZO A TIERRA
POZO A TIERRA
03.12
03.12.01
PRUEBAS
PRUEBAS ELECTRICAS
04
04.01
04.01.01
INSTALACIONES SANITARIAS
SISTEMA DE AGUA
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.01.07
320012699.xlsx 58 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
04.01.08
04.01.09
04.01.10
320012699.xlsx 59 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
04.02
04.02.01
SISTEMA DE DESAGUE
SALIDA DE DESAGUE EN PVC SAL 2"
04.02.02
04.02.03
04.02.04
04.02.05
04.02.06
04.02.07
SUMIDEROS DE 2"
04.02.08
04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06
04.03.07
04.03.08
TAZA TURCA
04.03.09
04.04
04.04.01
04.04.02
04.04.03
04.04.04
05
05.01
EQUIPAMIENTO Y OTROS
EQUIPAMIENTO
05.02
ASTA DE BANDERA
05.03
FLETE TERRESTRE
320012699.xlsx 60 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
05.04
320012699.xlsx 61 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
1.00 und
1.00 GLB
82.58 m
VOLUMEN
(m3)
1.00 GLB
152.37 m2
VOLUMEN
(m3)
6.00 und
7.00 und
152.37 m2
VOLUMEN
(m3)
101.90 m3
VOLUMEN
(m3)
24.23
15.96
47.85
13.86
101.90
412.25 m2
VOLUMEN
320012699.xlsx 62 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
(m3)
412.25 m2
VOLUMEN
(m3)
320012699.xlsx 63 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
189.64 m3
VOLUMEN
(m3)
7.20
3.84
4.36
14.08
5.47
7.60
14.70
7.92
9.50
5.92
5.44
4.16
3.84
3.36
3.84
12.16
3.07
2.56
3.84
9.68
30.91
15.13
5.49
3.25
2.31
189.64
181.67 m3
VOLUMEN
(m3)
181.67
181.67
57.21 m3
VOLUMEN
(m3)
0.69
0.70
0.58
0.79
1.59
1.51
320012699.xlsx 64 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
1.10
0.88
0.85
3.35
2.94
3.65
2.57
1.84
1.62
2.61
29.96
57.21
320012699.xlsx 65 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
9.97 m3
VOLUMEN
A ELIMINAR
(m3)
9.97
9.97
181.67 m2
VOLUMEN
(m3)
23.47 m3
VOLUMEN
(m3)
0.45
0.24
0.27
0.88
0.34
0.48
0.92
0.50
0.59
0.37
0.34
0.26
0.24
0.21
0.24
320012699.xlsx 66 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
0.76
0.19
0.16
0.24
3.14
7.36
1.89
0.61
0.48
2.31
23.47
320012699.xlsx 67 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
11.52 m3
VOLUMEN
(m3)
0.68
0.36
0.41
1.32
0.51
0.71
1.38
0.74
0.89
0.56
0.51
0.39
0.36
0.32
0.36
1.14
0.29
0.24
0.36
11.52
26.57 m3
VOLUMEN
(m3)
3.49
12.27
6.30
2.03
2.49
26.57
34.99 m3
VOLUMEN
(m3)
1.21
3.09
0.86
0.75
2.26
1.65
320012699.xlsx 68 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
0.10
0.75
0.92
1.30
2.88
0.62
0.62
0.52
1.13
0.69
0.72
1.51
320012699.xlsx 69 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
0.72
1.50
0.93
1.48
2.81
1.52
3.28
0.26
0.34
0.60
34.99
322.75 m2
VOLUMEN
(m3)
320012699.xlsx 70 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
76.79 m2
VOLUMEN
(m3)
38.40 m3
VOLUMEN
(m3)
2.25
1.20
1.36
4.40
1.71
2.38
4.60
2.48
2.97
1.85
1.70
1.30
1.20
1.05
1.20
3.80
0.96
0.80
320012699.xlsx 71 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
1.20
38.40
1228.13 kg
320012699.xlsx 72 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
18.88 m3
VOLUMEN
(m3)
0.41
1.23
0.29
0.44
0.38
0.41
0.48
0.36
0.48
0.38
0.44
0.40
0.41
0.44
0.38
0.41
0.48
0.37
0.44
0.44
0.33
0.59
0.33
0.60
0.33
0.18
0.38
0.55
0.38
0.55
0.38
0.58
0.55
0.38
0.38
0.31
0.58
0.55
0.38
0.38
0.31
0.30
0.08
0.38
320012699.xlsx 73 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
0.08
18.88
320012699.xlsx 74 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
148.92 m2
VOLUMEN
(m3)
320012699.xlsx 75 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
2117.71 kg
320012699.xlsx 76 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
125.80 m3
VOLUMEN
(m3)
16.96
0.26
16.96
0.32
0.31
0.31
0.31
0.31
0.31
0.31
0.34
13.44
0.05
0.23
1.42
0.59
0.04
0.04
1.42
0.02
0.23
0.23
0.15
0.15
1.34
0.23
0.23
0.15
0.15
14.24
0.02
1.42
0.26
1.42
1.34
0.23
0.30
1.57
0.23
1.57
0.28
0.16
0.46
0.28
0.16
320012699.xlsx 77 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
0.46
0.46
0.46
1.18
0.23
0.15
0.23
0.15
1.10
0.15
1.18
1.18
1.34
320012699.xlsx 78 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
1.58
1.29
0.23
0.15
0.02
0.23
0.15
0.04
0.02
1.34
0.23
0.15
0.23
0.15
1.34
0.23
0.15
0.23
0.15
0.04
0.02
0.02
13.44
1.34
0.04
0.23
0.23
1.34
1.45
0.23
0.30
1.45
1.30
0.46
0.04
1.30
0.23
0.15
0.16
0.06
0.15
0.02
0.02
0.09
0.26
0.09
0.26
0.23
0.15
0.26
320012699.xlsx 79 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
0.15
0.17
0.26
0.02
0.26
0.15
0.23
0.30
0.23
0.15
0.02
0.26
0.26
320012699.xlsx 80 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
0.32
0.32
0.32
125.80
310.52 m2
AREA
(m2)
15.37
1.58
15.37
1.91
1.84
1.84
1.84
1.84
1.84
1.84
2.03
12.18
0.45
1.39
5.32
2.22
0.43
0.36
5.32
0.23
1.39
1.39
0.90
0.90
5.04
1.39
1.39
0.90
0.90
12.91
0.23
5.34
1.58
5.34
5.04
1.39
1.80
5.88
1.39
5.88
1.65
320012699.xlsx 81 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
0.98
2.78
1.65
0.98
2.78
2.78
2.78
4.44
1.39
0.90
1.39
0.90
4.14
0.90
320012699.xlsx 82 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
4.44
4.44
5.04
12.64
4.83
1.39
0.90
0.23
1.39
0.90
0.43
0.20
5.04
1.39
0.90
1.39
0.90
5.04
1.39
0.90
1.39
0.90
0.43
0.17
0.23
12.18
5.04
0.43
1.39
1.39
5.04
5.43
1.39
1.80
5.43
4.88
2.78
0.39
4.88
1.39
0.90
0.80
0.61
0.90
0.23
0.20
0.95
1.58
0.95
1.58
320012699.xlsx 83 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
1.39
0.90
1.58
0.90
1.01
1.58
0.23
1.58
0.90
1.39
1.80
1.39
0.90
320012699.xlsx 84 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
0.23
1.56
1.56
1.91
1.91
1.91
310.52
5623.42 kg
163.51 m3
VOLUMEN
(m3)
2.60
3.02
0.98
0.20
2.18
0.81
2.84
10.46
1.14
1.65
0.30
1.34
3.43
1.34
1.65
0.20
2.84
5.22
1.54
1.64
2.84
2.84
10.48
1.13
0.15
1.42
0.50
0.18
1.42
1.42
0.20
7.16
1.43
0.39
7.24
320012699.xlsx 85 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
1.71
6.66
0.82
6.72
6.32
14.74
1.17
2.08
0.34
14.74
0.82
1.95
320012699.xlsx 86 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
2.08
1.73
3.13
3.80
0.58
0.45
3.93
0.58
3.92
1.07
163.51
247.03 m2
VOLUMEN
(m3)
320012699.xlsx 87 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
320012699.xlsx 88 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
5826.97 kg
36.78 m3
VOLUMEN
(m3)
LOSA DE PRIMERA PLANTA
0.77
0.88
1.10
1.88
0.84
0.82
1.49
1.44
0.84
1.00
0.97
1.52
1.35
LOSA DE SEGUNDA PLANTA
1.15
0.25
2.05
0.91
0.84
0.82
1.44
1.49
1.00
0.97
1.27
2.37
LOSA DE AZOTEA
0.51
2.04
2.07
320012699.xlsx 89 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
2.72
36.78
320012699.xlsx 90 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
427.43 m2
VOLUMEN
(m3)
LOSA DE PRIMERA PLANTA
LOSA DE AZOTEA
2570.03 kg
2850.00 und
UNIDADES
(und)
LOSA DE PRIMERA PLANTA
73.68
83.73
104.46
179.23
79.72
320012699.xlsx 91 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
77.79
141.34
136.77
79.69
95.37
92.41
144.53
128.29
320012699.xlsx 92 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
4.37 m3
VOLUMEN
(m3)
1.79
0.84
0.91
0.82
4.37
26.87 m2
VOLUMEN
(m3)
320012699.xlsx 93 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
294.60 kg
320012699.xlsx 94 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
632.50 m2
VOLUMEN
(m3)
320012699.xlsx 95 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
4.70 m2
VOLUMEN
(m3)
320012699.xlsx 96 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
7.74 m2
VOLUMEN
(m3)
84.99 m2
VOLUMEN
(m3)
38.00 m2
VOLUMEN
(m3)
8.40 m
VOLUMEN
(m3)
632.50 m2
VOLUMEN
(m3)
320012699.xlsx 97 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
320012699.xlsx 98 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
619.72 m2
VOLUMEN
(m3)
320012699.xlsx 99 DE 360
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
310.52 m2
AREA
(m2)
30.74
11.03
7.65
11.03
2.03
24.36
2.03
33.30
10.63
2.22
0.43
0.36
22.50
35.28
12.91
10.68
5.88
5.88
3.30
1.95
11.10
8.88
4.14
4.44
12.64
4.83
1.28
0.41
0.17
10.86
9.77
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
0.39
0.80
0.61
1.89
1.01
3.13
310.52
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
193.62 m2
VOLUMEN
(m3)
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
53.56 m2
VOLUMEN
(m3)
13.63 m2
VOLUMEN
(m3)
427.43 m2
VOLUMEN
(m3)
LOSA DE PRIMERA PLANTA
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
LOSA DE AZOTEA
169.42 m2
VOLUMEN
(m3)
169.42 m2
VOLUMEN
(m3)
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
340.29 m2
VOLUMEN
(m3)
PRIMER PISO
SEGUNDO PISO
AZOTEA
182.82 m2
VOLUMEN
(m3)
83.71 m2
VOLUMEN
(m3)
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
0.43 m3
VOLUMEN
(m3)
0.43
0.43
17.76 m3
VOLUMEN
(m3)
13.86
3.90
17.76
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
17.50 m2
VOLUMEN
(m3)
74.95 m
42.24 m
56.92 m2
VOLUMEN
(m3)
304.25 m
VOLUMEN
(m3)
42.12 m2
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
VOLUMEN
(m3)
52.65 m2
VOLUMEN
(m3)
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
37.63 m2
VOLUMEN
(m3)
11.55 m2
VOLUMEN
(m3)
2.00 und
2.00 und
1.00 und
13.42 m2
2.00 und
2.00 und
124.00 und
UNIDAD
(und)
40.00
28.00
8.00
8.00
4.00
24.00
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
4.00
8.00
124.00
2.00 pza
UNIDAD
(pza)
2.00
2.00
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
25.00 pza
UNIDAD
(pza)
10.00
7.00
2.00
2.00
1.00
1.00
2.00
25.00
3.00 pza
UNIDAD
(pza)
2.00
1.00
3.00
219.14 p2
VOLUMEN
(m3)
1216.04 m2
VOLUMEN
(m3)
774.98 m2
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
VOLUMEN
(m3)
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
64.20 m2
VOLUMEN
(m3)
34.93 m2
VOLUMEN
(m3)
1311.10 m
1042.20 m
108.15 m
19.00 m
1030.25 m
165.00 m
348.00 und
12.00 und
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
397.00 und
6.00 und
29.00 und
27.00 und
4.00 und
5.00 und
8.00 und
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
32.00 und
4.00 und
5.00 und
85.00 und
1.00 und
1.00 und
67.00 und
130.00 und
1.00 und
1.00 und
1.00 und
1.00 und
1.00 und
25.00 pto
4.00 pto
27.96 m
11.00 pza
10.00 pza
55.37 m
59.73 m
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
24.21 m
1.00 und
1.00 und
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
28.00 pto
9.00 pto
15.83 m
57.32 m
12.00 pto
9.00 pza
6.00 pza
4.00 und
6.00 pza
7.00 pza
3.00 pza
4.00 pza
4.00 pza
6.00 pza
4.00 pza
2.00 pza
3.00 pza
52.88 m
3.00 und
24.61 m
1.00 und
1.00 Gbl
1.00 Und
1.00 Gbl
PLANILLA DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
1.00 Gbl
PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012
01.05.01.02
CROQUIS
1228.13 kg
DESCRIPCION
N VECES
N PIEZAS DE
ACERO
LONG. PIEZA
DE ACERO
DIAM.
(pulg)
1.40
Z-01
1/4
3/8
1/2
5/8
1.40
5/8
22.40
1.40
5/8
22.40
3/4
HORIZONTAL
1.40
Z-01
VERTICAL
0.00
0.00
0.00
44.80
0.00
0.00
0.00
0.00
0.00
4.98
0.00
0.00
0.00
0.00
0.00
71.68
0.00
0.00
71.68
DIAM.
CROQUIS
DESCRIPCION
N VECES
N PIEZAS DE
ACERO
LONG. PIEZA
DE ACERO
(pulg)
1.50
Z-02
3/8
1/2
5/8
1.50
5/8
12.00
1.40
5/8
12.60
3/4
HORIZONTAL
1.40
Z-02
VERTICAL
0.00
0.00
0.00
24.60
0.00
0.00
0.00
0.00
0.00
2.73
0.00
0.00
0.00
0.00
0.00
39.36
0.00
0.00
39.36
PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012
CROQUIS
DESCRIPCION
N VECES
N PIEZAS DE
ACERO
LONG. PIEZA
DE ACERO
DIAM.
(pulg)
1.55
Z-03
1/4
3/8
1/2
5/8
1.55
5/8
13.95
1.55
5/8
13.95
3/4
HORIZONTAL
1.55
Z-03
VERTICAL
0.00
0.00
0.00
27.90
0.00
0.00
0.00
0.00
0.00
3.10
0.00
0.00
0.00
0.00
0.00
44.64
0.00
0.00
CROQUIS
44.64
DESCRIPCION
N VECES
N PIEZAS DE
ACERO
LONG. PIEZA
DE ACERO
DIAM.
(pulg)
2.10
Z-04
1/4
3/8
1/2
5/8
11
2.10
5/8
46.20
12
1.90
5/8
45.60
3/4
HORIZONTAL
1.90
Z-04
VERTICAL
0.00
0.00
0.00
91.80
0.00
0.00
0.00
0.00
0.00
10.20
0.00
0.00
0.00
0.00
0.00
146.88
0.00
0.00
146.88
PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012
CROQUIS
DESCRIPCION
N VECES
N PIEZAS DE
ACERO
LONG. PIEZA
DE ACERO
DIAM.
(pulg)
1.80
Z-05
1/4
3/8
1/2
5/8
10
1.80
5/8
18.00
10
1.70
5/8
17.00
3/4
HORIZONTAL
1.70
Z-05
VERTICAL
0.00
0.00
0.00
35.00
0.00
0.00
0.00
0.00
0.00
3.89
0.00
0.00
0.00
0.00
0.00
56.00
0.00
0.00
CROQUIS
56.00
DESCRIPCION
N VECES
N PIEZAS DE
ACERO
LONG. PIEZA
DE ACERO
DIAM.
(pulg)
2.40
Z-05A
1/4
3/8
1/2
5/8
10
2.40
5/8
24.00
13
1.80
5/8
23.40
3/4
HORIZONTAL
1.80
Z-05A
VERTICAL
0.00
0.00
0.00
47.40
0.00
0.00
0.00
0.00
0.00
5.27
0.00
0.00
0.00
0.00
0.00
75.84
0.00
0.00
75.84
PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012
CROQUIS
DESCRIPCION
N VECES
N PIEZAS DE
ACERO
LONG. PIEZA
DE ACERO
DIAM.
(pulg)
1.70
Z-06
1/4
3/8
1/2
5/8
1.70
5/8
45.95
10
1.60
5/8
48.00
3/4
HORIZONTAL
1.60
Z-06
VERTICAL
0.00
0.00
0.00
93.95
0.00
0.00
0.00
0.00
0.00
10.44
0.00
0.00
0.00
0.00
0.00
150.33
0.00
0.00
CROQUIS
150.33
DESCRIPCION
N VECES
N PIEZAS DE
ACERO
LONG. PIEZA
DE ACERO
DIAM.
(pulg)
1.55
Z-07
1/4
3/8
1/2
5/8
1.55
5/8
24.80
1.40
5/8
25.20
3/4
HORIZONTAL
1.40
Z-07
VERTICAL
0.00
0.00
0.00
50.00
0.00
0.00
0.00
0.00
0.00
5.56
0.00
0.00
0.00
0.00
0.00
80.00
0.00
0.00
80.00
PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012
CROQUIS
DESCRIPCION
N VECES
N PIEZAS DE
ACERO
LONG. PIEZA
DE ACERO
DIAM.
(pulg)
3.50
Z-08
1/4
3/8
1/2
5/8
3.50
5/8
31.50
19
1.55
5/8
29.45
3/4
HORIZONTAL
1.55
Z-08
VERTICAL
0.00
0.00
0.00
60.95
0.00
0.00
0.00
0.00
0.00
6.77
0.00
0.00
0.00
0.00
0.00
97.52
0.00
0.00
CROQUIS
97.52
DESCRIPCION
N VECES
N PIEZAS DE
ACERO
LONG. PIEZA
DE ACERO
DIAM.
(pulg)
1.90
Z-09
1/4
3/8
1/2
5/8
10
1.90
5/8
19.00
11
1.75
5/8
19.25
3/4
HORIZONTAL
1.75
Z-09
VERTICAL
0.00
0.00
0.00
38.25
0.00
0.00
0.00
0.00
0.00
4.25
0.00
0.00
0.00
0.00
0.00
61.20
0.00
0.00
61.20
PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012
CROQUIS
DESCRIPCION
N VECES
N PIEZAS DE
ACERO
LONG. PIEZA
DE ACERO
DIAM.
(pulg)
1.90
Z-10
1/4
3/8
1/2
5/8
1.90
5/8
17.10
11
1.60
5/8
17.60
3/4
HORIZONTAL
1.60
Z-10
VERTICAL
0.00
0.00
0.00
34.70
0.00
0.00
0.00
0.00
0.00
3.86
0.00
0.00
0.00
0.00
0.00
55.52
0.00
0.00
CROQUIS
55.52
DESCRIPCION
N VECES
N PIEZAS DE
ACERO
LONG. PIEZA
DE ACERO
DIAM.
(pulg)
1.90
Z-11
1/4
3/8
1/2
5/8
1.90
5/8
13.30
11
1.20
5/8
13.20
3/4
HORIZONTAL
1.20
Z-11
VERTICAL
0.00
0.00
0.00
26.50
0.00
0.00
0.00
0.00
0.00
2.94
0.00
0.00
0.00
0.00
0.00
42.40
0.00
0.00
42.40
PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012
CROQUIS
DESCRIPCION
N VECES
N PIEZAS DE
ACERO
LONG. PIEZA
DE ACERO
DIAM.
(pulg)
1.50
Z-12
1/4
3/8
1/2
5/8
1.50
5/8
12.00
1.40
5/8
12.60
3/4
HORIZONTAL
1.40
Z-12
VERTICAL
0.00
0.00
0.00
24.60
0.00
0.00
0.00
0.00
0.00
2.73
0.00
0.00
0.00
0.00
0.00
39.36
0.00
0.00
CROQUIS
39.36
DESCRIPCION
N VECES
N PIEZAS DE
ACERO
LONG. PIEZA
DE ACERO
DIAM.
(pulg)
1.40
Z-13
1/4
3/8
1/2
5/8
1.40
5/8
11.20
1.30
5/8
10.40
3/4
HORIZONTAL
1.30
Z-13
VERTICAL
0.00
0.00
0.00
21.60
0.00
0.00
0.00
0.00
0.00
2.40
0.00
0.00
0.00
0.00
0.00
34.56
0.00
0.00
34.56
PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012
CROQUIS
DESCRIPCION
N VECES
N PIEZAS DE
ACERO
LONG. PIEZA
DE ACERO
DIAM.
(pulg)
1.90
Z-14
1/4
3/8
1/2
5/8
1.90
5/8
13.30
11
1.10
5/8
12.10
3/4
HORIZONTAL
1.10
Z-14
VERTICAL
0.00
0.00
0.00
25.40
0.00
0.00
0.00
0.00
0.00
2.82
0.00
0.00
0.00
0.00
0.00
40.64
0.00
0.00
CROQUIS
40.64
DESCRIPCION
N VECES
N PIEZAS DE
ACERO
LONG. PIEZA
DE ACERO
DIAM.
(pulg)
1.80
Z-15
1/4
3/8
1/2
5/8
1.80
5/8
43.20
10
0.90
5/8
36.00
3/4
HORIZONTAL
0.90
Z-15
VERTICAL
0.00
0.00
0.00
79.20
0.00
0.00
0.00
0.00
0.00
8.80
0.00
0.00
0.00
0.00
0.00
126.72
0.00
0.00
126.72
PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012
CROQUIS
DESCRIPCION
N VECES
N PIEZAS DE
ACERO
LONG. PIEZA
DE ACERO
DIAM.
(pulg)
0.70
Z-16
1/4
3/8
1/2
0.70
1/2
10.50
0.70
1/2
10.50
5/8
3/4
HORIZONTAL
0.70
Z-16
VERTICAL
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
2.33
0.00
0.00
0.00
0.00
0.00
21.42
0.00
0.00
0.00
CROQUIS
21.42
DESCRIPCION
N VECES
N PIEZAS DE
ACERO
LONG. PIEZA
DE ACERO
DIAM.
(pulg)
0.90
Z-17
1/4
3/8
1/2
0.90
1/2
9.00
0.70
1/2
8.40
5/8
3/4
HORIZONTAL
0.70
Z-17
VERTICAL
0.00
0.00
17.40
0.00
0.00
0.00
0.00
0.00
1.93
0.00
0.00
0.00
0.00
0.00
17.75
0.00
0.00
0.00
17.75
PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012
CROQUIS
DESCRIPCION
N VECES
N PIEZAS DE
ACERO
LONG. PIEZA
DE ACERO
DIAM.
(pulg)
1.10
Z-18
1/4
3/8
1/2
1.10
1/2
13.20
0.90
1/2
12.60
5/8
3/4
HORIZONTAL
0.90
Z-18
VERTICAL
0.00
0.00
25.80
0.00
0.00
0.00
0.00
0.00
2.87
0.00
0.00
0.00
0.00
0.00
26.32
0.00
0.00
0.00
26.32
PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012
1228.13 kg
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
71.68
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
39.36
PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012
0.00
0.00
0.00
44.64
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
146.88
PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012
0.00
0.00
0.00
56.00
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
75.84
PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012
0.00
0.00
0.00
150.33
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
80.00
PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012
0.00
0.00
0.00
97.52
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
61.20
PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012
0.00
0.00
0.00
55.52
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
42.40
PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012
0.00
0.00
0.00
39.36
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
34.56
PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012
0.00
0.00
0.00
40.64
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
126.72
PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012
0.00
0.00
0.00
21.42
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
17.75
PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012
0.00
0.00
0.00
26.32
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
01.05.02.03
CODIGO
ESTRUCTURA
CROQUIS
N VECES
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE A-A
4.00
0.45
2117.71 kg
0.45
TRAMO 9-8
4.90
5/8
4.45
1/2
20
1.45
3/8
19.60
VR1
EJE A-A
0.23
0.23
TRAMO 9-8
4.00
VR1
0.20
EJE A-A
0.45
0.45
TRAMO 9-8
8.90
29.00
VR1
0.20
SUB TOTAL (m)
0.00
29.00
8.90
19.60
0.00
0.00
0.00
0.00
3.22
0.00
16.82
0.99
2.18
0.00
0.00
0.00
9.08
31.36
0.00
0.00
0.00
57.26
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE A-A
5.60
0.45
N VECES
0.45
TRAMO 18-16
6.50
1/2
6.05
3/8
26.00
VR2
EJE A-A
0.23
0.23
TRAMO 18-16
12.10
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
5.60
VR2
0.20
EJE A-A
0.45
0.45
0.20
TRAMO 18-16
35
1.45
1/4
50.75
VR2
50.75
12.10
5.64
12.69
26.00
0.00
0.00
0.00
0.00
1.34
2.89
0.00
0.00
0.00
0.00
7.02
26.52
0.00
0.00
0.00
0.00
46.23
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
26.00
0.00
0.00
0.00
0.00
EJE A-A
5.60
0.45
N VECES
0.45
TRAMO 15-13
6.50
1/2
6.05
3/8
35
1.45
1/4
26.00
VR2
EJE A-A
0.23
0.23
TRAMO 15-13
5.60
VR2
0.20
EJE A-A
0.45
0.45
TRAMO 15-13
12.10
50.75
VR2
0.20
SUB TOTAL (m)
50.75
12.10
5.64
1.34
2.89
0.00
0.00
0.00
0.00
12.69
7.02
26.52
0.00
0.00
0.00
0.00
46.23
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE A-A
2.74
0.45
0.45
TRAMO 12-11
3.64
1/2
3.19
3/8
14.56
VR2
EJE A-A
0.23
0.23
2.74
TRAMO 12-11
6.38
VR2
ACERO VIGA CIMENTACION 145 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
EJE A-A
0.20
0.45
0.45
0.20
TRAMO 12-11
16
1.45
1/4
23.20
VR2
23.20
6.38
2.58
5.80
14.56
0.00
0.00
0.00
0.00
0.71
1.62
0.00
0.00
0.00
0.00
3.70
14.85
0.00
0.00
0.00
0.00
24.35
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE C-C
4.00
0.45
0.45
TRAMO 9-8
4.90
5/8
4.45
1/2
21
1.45
3/8
19.60
VR1
EJE C-C
0.23
0.23
TRAMO 9-8
4.00
VR1
0.20
EJE C-C
0.45
0.45
TRAMO 9-8
8.90
30.45
VR1
0.20
SUB TOTAL (m)
0.00
30.45
8.90
19.60
0.00
0.00
0.00
0.00
3.38
0.99
2.18
0.00
0.00
0.00
0.00
17.66
9.08
31.36
0.00
0.00
0.00
58.10
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE C-C
14.57
0.45
0.45
TRAMO 7-2
16.22
5/8
15.62
1/2
64.88
VR1
EJE C-C
0.23
0.23
14.57
TRAMO 7-2
31.24
VR1
ACERO VIGA CIMENTACION 147 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
EJE C-C
0.20
0.45
0.45
0.20
TRAMO 7-2
83
1.45
3/8
120.35
VR1
0.00
120.35
0.00
13.37
0.00
69.80
31.24
64.88
0.00
0.00
0.00
3.47
7.21
0.00
0.00
0.00
31.86
103.81
0.00
0.00
0.00
205.48
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE D-D
7.55
0.45
0.45
TRAMO 4-2
8.45
5/8
8.00
1/2
42
1.45
3/8
33.80
VR1
EJE D-D
0.23
0.23
TRAMO 4-2
7.55
VR1
0.20
EJE D-D
0.45
0.45
TRAMO 4-2
16.00
60.90
VR1
0.20
SUB TOTAL (m)
0.00
60.90
16.00
33.80
0.00
0.00
0.00
0.00
6.77
1.78
3.76
0.00
0.00
0.00
0.00
35.32
16.32
54.08
0.00
0.00
0.00
105.72
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
3/8
1/2
5/8
3/4
1 3/8
EJE E-E
4.00
0.45
0.45
TRAMO 9-8
4.90
5/8
4.45
1/2
19.60
VR1
EJE E-E
0.23
0.23
4.00
TRAMO 9-8
8.90
VR1
ACERO VIGA CIMENTACION 149 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
EJE E-E
0.20
0.45
0.45
0.20
TRAMO 9-8
21
1.45
3/8
30.45
VR1
0.00
30.45
8.90
19.60
0.00
0.00
0.00
0.00
3.38
0.00
17.66
0.99
2.18
0.00
0.00
0.00
9.08
31.36
0.00
0.00
0.00
58.10
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE E-E
3.17
0.45
N VECES
0.45
TRAMO 7-4
4.07
5/8
3.62
1/2
41
1.45
3/8
16.28
VR1
EJE E-E
0.23
0.23
TRAMO 7-4
3.17
VR1
0.20
EJE E-E
0.45
0.45
TRAMO 7-4
7.24
59.45
VR1
0.20
SUB TOTAL (m)
0.00
59.45
7.24
16.28
0.00
0.00
0.00
0.00
6.61
0.00
34.48
0.80
1.81
0.00
0.00
0.00
7.38
26.05
0.00
0.00
0.00
67.91
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE F-F
4.00
0.45
0.45
TRAMO 9-8
4.90
5/8
4.45
1/2
19.60
VR1
EJE F-F
0.23
0.23
4.00
TRAMO 9-8
8.90
VR1
ACERO VIGA CIMENTACION 151 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
EJE F-F
0.20
0.45
0.45
0.20
TRAMO 9-8
21
1.45
3/8
30.45
VR1
0.00
30.45
8.90
19.60
0.00
0.00
0.00
0.00
3.38
0.00
17.66
0.99
2.18
0.00
0.00
0.00
9.08
31.36
0.00
0.00
0.00
58.10
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE F-F
14.70
0.45
0.45
TRAMO 7-2
16.35
5/8
15.75
1/2
83
1.45
3/8
65.40
VR1
EJE F-F
0.23
0.23
TRAMO 7-2
14.70
VR1
0.20
EJE F-F
0.45
0.45
TRAMO 7-2
31.50
120.35
VR1
0.20
SUB TOTAL (m)
0.00
120.35
31.50
65.40
0.00
0.00
0.00
0.00
13.37
3.50
7.27
0.00
0.00
0.00
0.00
69.80
32.13
104.64
0.00
0.00
0.00
206.57
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
3/8
1/2
5/8
3/4
1 3/8
EJE H-H
4.00
0.45
0.45
TRAMO 9-7
4.90
5/8
4.45
1/2
19.60
VR1
EJE H-H
0.23
0.23
4.00
TRAMO 9-7
8.90
VR1
ACERO VIGA CIMENTACION 153 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
EJE H-H
0.20
0.45
0.45
0.20
TRAMO 9-7
21
1.45
3/8
30.45
VR1
0.00
30.45
8.90
19.60
0.00
0.00
0.00
0.00
3.38
0.00
17.66
0.99
2.18
0.00
0.00
0.00
9.08
31.36
0.00
0.00
0.00
58.10
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE I-I
4.00
0.45
0.45
TRAMO 9-7
4.90
5/8
4.45
1/2
21
1.45
3/8
19.60
VR1
EJE I-I
0.23
0.23
TRAMO 9-7
4.00
VR1
0.20
EJE I-I
0.45
0.45
TRAMO 9-7
8.90
30.45
VR1
0.20
SUB TOTAL (m)
0.00
30.45
8.90
19.60
0.00
0.00
0.00
0.00
3.38
0.99
2.18
0.00
0.00
0.00
0.00
17.66
9.08
31.36
0.00
0.00
0.00
58.10
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE 2-2
8.60
0.45
0.45
TRAMO C-F
10.25
5/8
9.65
1/2
41.00
VR1
EJE 2-2
0.23
0.23
8.60
TRAMO C-F
19.30
VR1
ACERO VIGA CIMENTACION 155 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
EJE 2-2
0.20
0.45
0.45
0.20
TRAMO C-F
45
1.45
3/8
65.25
VR1
0.00
0.00
7.25
0.00
37.85
65.25
19.30
41.00
0.00
0.00
0.00
2.14
4.56
0.00
0.00
0.00
19.69
65.60
0.00
0.00
0.00
123.13
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE 3-3
8.55
0.45
0.45
TRAMO C-F
10.20
5/8
9.60
1/2
45
1.45
3/8
40.80
VR1
EJE 3-3
0.23
0.23
TRAMO C-F
8.55
VR1
0.20
EJE 3-3
0.45
0.45
TRAMO C-F
19.20
65.25
VR1
0.20
SUB TOTAL (m)
0.00
65.25
19.20
40.80
0.00
0.00
0.00
0.00
7.25
2.13
4.53
0.00
0.00
0.00
0.00
37.85
19.58
65.28
0.00
0.00
0.00
122.71
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
3/8
1/2
5/8
3/4
1 3/8
EJE 4-4
8.55
0.45
0.45
TRAMO C-F
10.20
5/8
9.00
1/2
40.80
VR1
EJE 4-4
0.23
0.23
8.55
TRAMO C-F
18.00
VR1
ACERO VIGA CIMENTACION 157 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
EJE 4-4
0.20
0.45
0.45
0.20
TRAMO C-F
50
1.45
3/8
72.50
VR1
0.00
0.00
8.06
0.00
42.05
72.50
18.00
40.80
0.00
0.00
0.00
2.00
4.53
0.00
0.00
0.00
18.36
65.28
0.00
0.00
0.00
125.69
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE 5-5
8.55
0.45
N VECES
0.45
TRAMO C-F
10.20
5/8
9.00
1/2
45
1.45
3/8
40.80
VR1
EJE 5-5
0.23
0.23
TRAMO C-F
8.55
VR1
0.20
EJE 5-5
0.45
0.45
TRAMO C-F
18.00
65.25
VR1
0.20
SUB TOTAL (m)
0.00
65.25
0.00
7.25
0.00
37.85
18.00
40.80
0.00
0.00
0.00
2.00
4.53
0.00
0.00
0.00
18.36
65.28
0.00
0.00
0.00
121.49
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE 7-7
7.55
0.45
0.45
TRAMO C-F
8.45
5/8
8.00
1/2
33.80
VR1
EJE 7-7
0.23
0.23
7.55
TRAMO C-F
16.00
VR1
ACERO VIGA CIMENTACION 159 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
EJE 7-7
0.20
0.45
0.45
0.20
TRAMO C-F
45
1.45
3/8
65.25
VR1
0.00
0.00
7.25
0.00
37.85
65.25
16.00
33.80
0.00
0.00
0.00
1.78
3.76
0.00
0.00
0.00
16.32
54.08
0.00
0.00
0.00
108.25
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE 8-8
5.41
0.45
0.45
TRAMO A-C
6.31
5/8
5.86
1/2
26
1.45
3/8
25.24
VR1
EJE 8-8
0.23
0.23
TRAMO A-C
5.41
VR1
0.20
EJE 8-8
0.45
0.45
TRAMO A-C
11.72
37.70
VR1
0.20
SUB TOTAL (m)
0.00
37.70
11.72
25.24
0.00
0.00
0.00
0.00
4.19
1.30
2.80
0.00
0.00
0.00
0.00
21.87
11.95
40.38
0.00
0.00
0.00
74.20
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE 8-8
14.87
0.45
0.45
TRAMO C-I
16.52
5/8
15.92
1/2
66.08
VR1
EJE 8-8
0.23
0.23
14.87
TRAMO C-I
31.84
VR1
ACERO VIGA CIMENTACION 161 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
EJE 8-8
0.20
0.45
0.45
0.20
TRAMO C-I
83
1.45
3/8
120.35
VR1
0.00
120.35
0.00
13.37
0.00
69.80
31.84
66.08
0.00
0.00
0.00
3.54
7.34
0.00
0.00
0.00
32.48
105.73
0.00
0.00
0.00
208.01
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE 9-9
5.41
0.45
0.45
TRAMO A-C
6.31
5/8
5.86
1/2
26
1.45
3/8
25.24
VR1
EJE 9-9
0.23
0.23
TRAMO A-C
5.41
VR1
0.20
EJE 9-9
0.45
0.45
TRAMO A-C
11.72
37.70
VR1
0.20
SUB TOTAL (m)
0.00
37.70
11.72
25.24
0.00
0.00
0.00
0.00
4.19
1.30
2.80
0.00
0.00
0.00
0.00
21.87
11.95
40.38
0.00
0.00
0.00
74.20
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
3/8
1/2
5/8
3/4
1 3/8
EJE 9-9
2.42
0.45
0.45
TRAMO H-I
3.32
5/8
2.87
1/2
13.28
VR1
EJE 9-9
0.23
0.23
2.42
TRAMO H-I
5.74
VR1
ACERO VIGA CIMENTACION 163 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
EJE 9-9
0.20
0.45
0.45
0.20
TRAMO H-I
17
1.45
3/8
24.65
VR1
0.00
24.65
5.74
13.28
0.00
0.00
0.00
0.00
2.74
0.00
14.30
0.64
1.48
0.00
0.00
0.00
5.85
21.25
0.00
0.00
0.00
41.40
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
15.12
0.00
0.00
0.00
0.00
EJE 9-9
2.88
0.45
N VECES
0.45
TRAMO I-N
3.78
1/2
3.33
3/8
17
1.45
1/4
15.12
VR2
EJE 9-9
0.23
0.23
TRAMO I-N
2.88
VR2
0.20
EJE 9-9
0.45
0.45
TRAMO I-N
6.66
24.65
VR2
0.20
SUB TOTAL (m)
24.65
6.66
2.74
0.74
1.68
0.00
0.00
0.00
0.00
6.16
3.86
15.42
0.00
0.00
0.00
0.00
25.45
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE 11 - 11
5.25
0.45
0.45
TRAMO A - M
6.15
1/2
5.70
3/8
24.60
VR2
EJE 11 - 11
0.23
0.23
5.25
TRAMO A - M
11.40
VR2
ACERO VIGA CIMENTACION 165 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
EJE 11 - 11
0.20
0.45
0.45
0.20
TRAMO A - M
31
1.45
1/4
44.95
VR2
44.95
11.40
4.99
11.24
24.60
0.00
0.00
0.00
0.00
1.27
2.73
0.00
0.00
0.00
0.00
6.61
25.09
0.00
0.00
0.00
0.00
42.94
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
01.05.03.03
CODIGO
ESTRUCTURA
CROQUIS
0.35
0.35
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE A-A
12.75
5/8
12.50
1/2
140
1.13
3/8
127.50
EJE A-A
75.00
C-01
0.32
0.17
C-01
11.05
0.50
N VECES
C-01
11.05
0.60
5623.42 kg
0.17
EJE A-A
316.40
0.32
SUB TOTAL (m)
0.00
316.40
75.00
127.50
0.00
0.00
0.00
0.00
35.16
8.33
14.17
0.00
0.00
0.00
0.00
183.51
76.50
204.00
0.00
0.00
0.00
464.01
CODIGO
ESTRUCTURA
CROQUIS
0.15
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE A-A
5.50
3/8
38
0.75
1/4
22.00
C-9
0.10
0.20
C-9
4.90
0.45
N VECES
0.20
EJE A-A
28.50
0.10
ACERO COLUMNAS 167 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
28.50
22.00
0.00
0.00
0.00
0.00
0.00
3.17
2.44
0.00
0.00
0.00
0.00
0.00
7.13
12.76
0.00
0.00
0.00
0.00
0.00
19.89
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
0.20
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE A-A
6.50
1/2
46
0.83
1/4
26.00
C-7
0.17
0.17
C-7
5.80
0.50
N VECES
0.17
EJE A-A
38.18
0.17
SUB TOTAL (m)
38.18
0.00
26.00
0.00
0.00
0.00
0.00
4.24
0.00
2.89
0.00
0.00
0.00
0.00
9.55
0.00
26.52
0.00
0.00
0.00
0.00
36.07
CODIGO
ESTRUCTURA
CROQUIS
0.20
(pulg)
3/8
1/2
5/8
3/4
1 3/8
EJE A-A
6.00
1/2
40
0.83
1/4
144.00
C-7
0.17
0.17
DIAM.
C-7
5.30
0.50
0.17
EJE A-A
199.20
0.17
SUB TOTAL (m)
199.20
0.00
144.00
0.00
0.00
0.00
0.00
22.13
0.00
16.00
0.00
0.00
0.00
0.00
49.80
0.00
146.88
0.00
0.00
0.00
0.00
196.68
ACERO COLUMNAS 169 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
0.20
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE A-A
6.00
1/2
41
0.83
1/4
24.00
C-8
0.17
0.17
DIAM.
C-8
5.30
0.50
0.17
EJE A-A
34.03
0.17
SUB TOTAL (m)
34.03
0.00
24.00
0.00
0.00
0.00
0.00
3.78
0.00
2.67
0.00
0.00
0.00
0.00
8.51
0.00
24.48
0.00
0.00
0.00
0.00
32.99
CODIGO
ESTRUCTURA
CROQUIS
0.15
0.15
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE C-C
10.80
5/8
10.55
1/2
60
1.13
3/8
86.40
EJE C-C
42.20
C-2
0.32
0.17
C-2
9.30
0.50
DIAM.
C-2
9.30
0.60
0.17
EJE C-C
135.60
0.32
ACERO COLUMNAS 170 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
135.60
0.00
15.07
0.00
78.65
42.20
86.40
0.00
0.00
0.00
4.69
9.60
0.00
0.00
0.00
43.04
138.24
0.00
0.00
0.00
259.93
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
0.15
0.15
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE C-C
9.80
5/8
9.55
1/2
55
1.13
3/8
39.20
EJE C-C
19.10
C-2
0.32
0.17
DIAM.
C-2
8.30
0.50
C-2
8.30
0.60
N VECES
0.17
EJE C-C
62.15
0.32
SUB TOTAL (m)
0.00
62.15
19.10
39.20
0.00
0.00
0.00
0.00
6.91
2.12
4.36
0.00
0.00
0.00
0.00
36.05
19.48
62.72
0.00
0.00
0.00
118.25
CODIGO
ESTRUCTURA
CROQUIS
0.15
(pulg)
3/8
1/2
5/8
3/4
1 3/8
EJE C-C
10.78
5/8
10.53
1/2
86.24
C-2
9.28
0.50
DIAM.
C-2
9.28
0.60
0.15
EJE C-C
42.12
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
C-2
0.32
0.17
0.17
EJE C-C
60
1.13
3/8
135.60
0.32
SUB TOTAL (m)
0.00
135.60
0.00
15.07
0.00
78.65
42.12
86.24
0.00
0.00
0.00
4.68
9.58
0.00
0.00
0.00
42.96
137.98
0.00
0.00
0.00
259.59
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
0.30
0.30
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE C-C
10.97
5/8
10.72
1/2
118
1.13
3/8
54.85
EJE C-C
32.16
C-1
0.32
0.17
DIAM.
C-1
9.32
0.50
C-1
9.32
0.60
N VECES
0.17
EJE C-C
133.34
0.32
SUB TOTAL (m)
0.00
133.34
32.16
54.85
0.00
0.00
0.00
0.00
14.82
3.57
6.09
0.00
0.00
0.00
0.00
77.34
32.80
87.76
0.00
0.00
0.00
197.90
CODIGO
ESTRUCTURA
CROQUIS
0.30
(pulg)
3/8
1/2
5/8
3/4
1 3/8
EJE C-C
10.50
5/8
10.25
1/2
52.50
C-1
8.85
0.50
DIAM.
C-1
8.85
0.60
0.30
EJE C-C
30.75
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
C-1
0.32
0.17
0.17
EJE C-C
110
1.13
3/8
124.30
0.32
SUB TOTAL (m)
0.00
124.30
0.00
13.81
0.00
72.09
30.75
52.50
0.00
0.00
0.00
3.42
5.83
0.00
0.00
0.00
31.37
84.00
0.00
0.00
0.00
187.46
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
0.17
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE C-C
5.64
3/8
37
0.75
1/4
45.12
C-9
0.20
0.10
C-9
5.02
0.45
N VECES
0.10
EJE C-C
55.50
0.20
SUB TOTAL (m)
55.50
45.12
0.00
0.00
0.00
0.00
0.00
6.17
5.01
0.00
0.00
0.00
0.00
0.00
13.88
26.17
0.00
0.00
0.00
0.00
0.00
40.04
CODIGO
ESTRUCTURA
CROQUIS
0.30
(pulg)
3/8
1/2
5/8
3/4
1 3/8
EJE C-C
8.07
3/8
51
0.75
1/4
129.12
C-9
0.20
0.10
DIAM.
C-9
7.32
0.45
0.10
EJE C-C
153.00
0.20
SUB TOTAL (m)
153.00
129.12
0.00
0.00
0.00
0.00
0.00
17.00
14.35
0.00
0.00
0.00
0.00
0.00
38.25
74.89
0.00
0.00
0.00
0.00
0.00
113.14
ACERO COLUMNAS 176 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
0.30
0.30
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE C-C
5.92
5/8
5.82
1/2
32
1.13
1/4
23.68
EJE C-C
11.64
C-2
0.32
0.17
DIAM.
C-2
5.02
0.50
C-2
5.02
0.60
N VECES
0.17
EJE C-C
36.16
0.32
SUB TOTAL (m)
36.16
0.00
11.64
23.68
0.00
0.00
0.00
4.02
0.00
1.29
2.63
0.00
0.00
0.00
9.04
0.00
11.87
37.89
0.00
0.00
0.00
58.80
CODIGO
ESTRUCTURA
CROQUIS
0.30
(pulg)
3/8
1/2
5/8
3/4
1 3/8
EJE C-C
5.27
3/8
32
0.75
1/4
21.08
C-9
0.20
0.10
DIAM.
C-9
4.52
0.45
0.10
EJE C-C
24.00
0.20
ACERO COLUMNAS 177 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
24.00
21.08
0.00
0.00
0.00
0.00
0.00
2.67
2.34
0.00
0.00
0.00
0.00
0.00
6.00
12.23
0.00
0.00
0.00
0.00
0.00
18.23
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
C-10
1.62
0.45
N VECES
0.15
EJE C-C
2.22
3/8
0.55
1/4
17.76
1 PLANTA
C-10
0.10
0.10
0.10
EJE C-C
9.90
1 PLANTA
0.10
SUB TOTAL (m)
9.90
17.76
0.00
0.00
0.00
0.00
0.00
1.10
1.97
0.00
0.00
0.00
0.00
0.00
2.48
10.30
0.00
0.00
0.00
0.00
0.00
12.78
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
3/8
1/2
5/8
3/4
1 3/8
C-10
1.42
0.45
0.15
EJE C-C
2.02
3/8
0.55
1/4
16.16
2 PLANTA
C-10
0.10
0.10
0.10
0.10
EJE C-C
9.90
2 PLANTA
9.90
16.16
0.00
0.00
0.00
0.00
0.00
1.10
1.80
0.00
0.00
0.00
0.00
0.00
2.48
9.37
0.00
0.00
0.00
0.00
0.00
11.85
ACERO COLUMNAS 179 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
C-10
1.32
0.45
N VECES
0.15
EJE C-C
1.92
3/8
0.55
1/4
30.72
AZOTEA
C-10
0.10
0.10
0.10
EJE C-C
19.80
AZOTEA
0.10
SUB TOTAL (m)
19.80
30.72
0.00
0.00
0.00
0.00
0.00
2.20
3.41
0.00
0.00
0.00
0.00
0.00
4.95
17.82
0.00
0.00
0.00
0.00
0.00
22.77
CODIGO
ESTRUCTURA
CROQUIS
0.15
(pulg)
3/8
1/2
5/8
3/4
1 3/8
EJE D-D
7.92
3/8
52
0.75
1/4
95.04
C-9
0.20
0.10
DIAM.
C-9
7.32
0.45
0.10
EJE D-D
117.00
0.20
SUB TOTAL (m)
117.00
95.04
0.00
0.00
0.00
0.00
0.00
13.00
10.56
0.00
0.00
0.00
0.00
0.00
29.25
55.12
0.00
0.00
0.00
0.00
0.00
84.37
ACERO COLUMNAS 180 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
0.30
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE D-D
8.57
3/8
57
0.75
1/4
68.56
C-9
0.20
0.10
C-9
7.82
0.45
N VECES
0.10
EJE D-D
85.50
0.20
SUB TOTAL (m)
85.50
68.56
0.00
0.00
0.00
0.00
0.00
9.50
7.62
0.00
0.00
0.00
0.00
0.00
21.38
39.76
0.00
0.00
0.00
0.00
0.00
61.14
CODIGO
ESTRUCTURA
CROQUIS
0.30
(pulg)
3/8
1/2
5/8
3/4
1 3/8
EJE D-D
5.27
3/8
32
0.75
1/4
21.08
C-9
0.20
0.10
DIAM.
C-9
4.52
0.45
0.10
EJE D-D
24.00
0.20
SUB TOTAL (m)
24.00
21.08
0.00
0.00
0.00
0.00
0.00
2.67
2.34
0.00
0.00
0.00
0.00
0.00
6.00
12.23
0.00
0.00
0.00
0.00
0.00
18.23
ACERO COLUMNAS 181 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
0.30
0.30
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE D-D
11.87
5/8
11.62
1/2
64
1.13
1/4
47.48
EJE D-D
23.24
C-2
0.32
0.17
DIAM.
C-2
10.22
0.50
C-2
10.22
0.60
N VECES
0.17
EJE D-D
72.32
0.32
SUB TOTAL (m)
72.32
0.00
23.24
47.48
0.00
0.00
0.00
8.04
0.00
2.58
5.28
0.00
0.00
0.00
18.08
0.00
23.70
75.97
0.00
0.00
0.00
117.75
CODIGO
ESTRUCTURA
CROQUIS
0.30
(pulg)
3/8
1/2
5/8
3/4
1 3/8
EJE D-D
11.87
5/8
64
1.13
1/4
71.22
C-4
0.32
0.17
DIAM.
C-4
10.22
0.60
0.17
EJE D-D
72.32
0.32
ACERO COLUMNAS 182 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
72.32
0.00
0.00
8.04
0.00
18.08
0.00
71.22
0.00
0.00
0.00
0.00
7.91
0.00
0.00
0.00
0.00
113.95
0.00
0.00
0.00
132.03
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
0.30
0.30
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE D-D
10.47
5/8
10.22
1/2
57
1.13
1/4
41.88
EJE D-D
20.44
C-2
0.32
0.17
DIAM.
C-2
8.82
0.50
C-2
8.82
0.60
N VECES
0.17
EJE D-D
64.41
0.32
SUB TOTAL (m)
64.41
0.00
20.44
41.88
0.00
0.00
0.00
7.16
0.00
2.27
4.65
0.00
0.00
0.00
16.10
0.00
20.85
67.01
0.00
0.00
0.00
103.96
CODIGO
ESTRUCTURA
CROQUIS
0.25
(pulg)
3/8
1/2
5/8
3/4
1 3/8
EJE E-E
10.42
5/8
10.17
1/2
41.68
C-2
8.82
0.50
DIAM.
C-2
8.82
0.60
0.25
EJE E-E
20.34
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
C-2
0.32
0.17
0.17
EJE E-E
57
1.13
1/4
64.41
0.32
SUB TOTAL (m)
64.41
0.00
7.16
0.00
16.10
0.00
20.34
41.68
0.00
0.00
0.00
2.26
4.63
0.00
0.00
0.00
20.75
66.69
0.00
0.00
0.00
103.54
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
0.30
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE E-E
8.07
3/8
52
0.75
1/4
129.12
C-9
0.20
0.10
C-9
7.32
0.45
N VECES
0.10
EJE E-E
156.00
0.20
SUB TOTAL (m)
156.00
129.12
0.00
0.00
0.00
0.00
0.00
17.33
14.35
0.00
0.00
0.00
0.00
0.00
39.00
74.89
0.00
0.00
0.00
0.00
0.00
113.89
CODIGO
ESTRUCTURA
CROQUIS
0.25
0.25
(pulg)
3/8
1/2
5/8
3/4
1 3/8
EJE E-E
8.67
5/8
8.57
1/2
50
1.13
1/4
69.36
EJE E-E
34.28
C-2
0.32
0.17
C-2
7.82
0.50
DIAM.
C-2
7.82
0.60
0.17
EJE E-E
113.00
0.32
ACERO COLUMNAS 186 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
113.00
0.00
12.56
0.00
28.25
0.00
34.28
69.36
0.00
0.00
0.00
3.81
7.71
0.00
0.00
0.00
34.97
110.98
0.00
0.00
0.00
174.19
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
0.25
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE E-E
8.67
5/8
52
1.13
1/4
52.02
C-4
0.32
0.17
C-4
7.82
0.60
N VECES
0.17
EJE E-E
58.76
0.32
SUB TOTAL (m)
58.76
0.00
0.00
52.02
0.00
0.00
0.00
6.53
0.00
0.00
5.78
0.00
0.00
0.00
14.69
0.00
0.00
83.23
0.00
0.00
0.00
97.92
CODIGO
ESTRUCTURA
CROQUIS
0.20
0.20
(pulg)
3/8
1/2
5/8
3/4
1 3/8
EJE F-F
10.37
5/8
10.12
1/2
55
1.13
1/4
165.92
EJE F-F
80.96
C-2
0.32
0.17
C-2
8.82
0.50
DIAM.
C-2
8.82
0.60
0.17
EJE F-F
248.60
0.32
ACERO COLUMNAS 188 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
248.60
0.00
27.62
0.00
62.15
0.00
80.96
165.92
0.00
0.00
0.00
9.00
18.44
0.00
0.00
0.00
82.58
265.47
0.00
0.00
0.00
410.20
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
0.30
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE F-F
5.27
3/8
32
0.75
1/4
42.16
C-9
0.20
0.10
C-9
4.52
0.45
N VECES
0.10
EJE F-F
48.00
0.20
SUB TOTAL (m)
48.00
42.16
0.00
0.00
0.00
0.00
0.00
5.33
4.68
0.00
0.00
0.00
0.00
0.00
12.00
24.45
0.00
0.00
0.00
0.00
0.00
36.45
CODIGO
ESTRUCTURA
CROQUIS
0.30
0.30
(pulg)
3/8
1/2
5/8
3/4
1 3/8
EJE F-F
10.47
5/8
10.22
1/2
144
1.13
3/8
52.35
EJE F-F
30.66
C-1
0.32
0.17
C-1
8.82
0.50
DIAM.
C-1
8.82
0.60
0.17
EJE F-F
162.72
0.32
ACERO COLUMNAS 190 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
162.72
0.00
18.08
0.00
94.38
30.66
52.35
0.00
0.00
0.00
3.41
5.82
0.00
0.00
0.00
31.27
83.76
0.00
0.00
0.00
209.41
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
C-3
8.47
0.70
N VECES
0.40
EJE F-F
10.32
3/4
55
1.47
3/8
61.92
C-3
EJE F-F
1.32
80.85
0.00
80.85
0.00
0.00
61.92
0.00
0.00
0.00
8.98
0.00
0.00
6.88
0.00
0.00
0.00
46.89
0.00
0.00
139.94
0.00
0.00
186.83
CODIGO
ESTRUCTURA
CROQUIS
0.20
(pulg)
3/8
1/2
5/8
3/4
1 3/8
EJE F-F
7.97
3/8
50
0.75
1/4
191.28
C-9
0.20
0.10
DIAM.
C-9
7.32
0.45
0.10
EJE F-F
225.00
0.20
SUB TOTAL (m)
225.00
191.28
0.00
0.00
0.00
0.00
0.00
25.00
21.25
0.00
0.00
0.00
0.00
0.00
56.25
110.94
0.00
0.00
0.00
0.00
0.00
167.19
ACERO COLUMNAS 192 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
0.20
0.20
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE F-F
10.02
5/8
9.77
1/2
55
1.13
1/4
160.32
EJE F-F
78.16
C-2
0.32
0.17
DIAM.
C-2
8.47
0.50
C-2
8.47
0.60
N VECES
0.17
EJE F-F
248.60
0.32
SUB TOTAL (m)
248.60
0.00
78.16
160.32
0.00
0.00
0.00
27.62
0.00
8.68
17.81
0.00
0.00
0.00
62.15
0.00
79.72
256.51
0.00
0.00
0.00
398.39
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
3/8
1/2
5/8
3/4
1 3/8
C-10
2.32
0.45
0.15
EJE F-F
2.92
3/8
20
0.55
1/4
35.04
(1 PLANTA)
C-10
0.10
0.10
0.10
0.10
EJE F-F
33.00
(1 PLANTA)
ACERO COLUMNAS 193 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
33.00
35.04
0.00
0.00
0.00
0.00
0.00
3.67
3.89
0.00
0.00
0.00
0.00
0.00
8.25
20.32
0.00
0.00
0.00
0.00
0.00
28.57
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
C-10
1.22
0.45
N VECES
0.15
EJE F-F
1.82
3/8
10
0.55
1/4
14.56
(2 PLANTA)
C-10
0.10
0.10
0.10
EJE F-F
11.00
(2 PLANTA)
0.10
SUB TOTAL (m)
11.00
14.56
0.00
0.00
0.00
0.00
0.00
1.22
1.62
0.00
0.00
0.00
0.00
0.00
2.75
8.44
0.00
0.00
0.00
0.00
0.00
11.19
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
3/8
1/2
5/8
3/4
1 3/8
C-10
1.32
0.45
0.15
EJE F-F
1.92
3/8
10
0.55
1/4
15.36
(AZOTEA)
C-10
0.10
0.10
0.10
0.10
EJE F-F
11.00
(AZOTEA)
11.00
15.36
0.00
0.00
0.00
0.00
0.00
1.22
1.71
0.00
0.00
0.00
0.00
0.00
2.75
8.91
0.00
0.00
0.00
0.00
0.00
11.66
ACERO COLUMNAS 195 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
0.20
0.20
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE F-F
10.02
5/8
9.77
1/2
55
1.13
1/4
40.08
EJE F-F
19.54
C-2
0.32
0.17
DIAM.
C-2
8.47
0.50
C-2
8.47
0.60
N VECES
0.17
EJE F-F
62.15
0.32
SUB TOTAL (m)
62.15
0.00
19.54
40.08
0.00
0.00
0.00
6.91
0.00
2.17
4.45
0.00
0.00
0.00
15.54
0.00
19.93
64.13
0.00
0.00
0.00
99.60
CODIGO
ESTRUCTURA
CROQUIS
0.20
(pulg)
3/8
1/2
5/8
3/4
1 3/8
EJE H-H
11.02
5/8
10.77
1/2
88.16
C-2
9.47
0.50
DIAM.
C-2
9.47
0.60
0.20
EJE H-H
43.08
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
C-2
0.32
0.17
0.17
EJE H-H
60
1.13
1/4
135.60
0.32
SUB TOTAL (m)
135.60
0.00
15.07
0.00
33.90
0.00
43.08
88.16
0.00
0.00
0.00
4.79
9.80
0.00
0.00
0.00
43.94
141.06
0.00
0.00
0.00
218.90
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
C-9
4.52
0.45
N VECES
0.20
EJE H-H
5.17
3/8
32
0.75
1/4
20.68
(1 PLANTA)
C-9
0.20
0.10
0.10
EJE H-H
24.00
(1 PLANTA)
0.20
SUB TOTAL (m)
24.00
20.68
0.00
0.00
0.00
0.00
0.00
2.67
2.30
0.00
0.00
0.00
0.00
0.00
6.00
11.99
0.00
0.00
0.00
0.00
0.00
17.99
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
3/8
1/2
5/8
3/4
1 3/8
C-9
3.12
0.45
0.20
EJE H-H
3.77
3/8
20
0.75
1/4
30.16
(2 PLANTA)
C-9
0.20
0.10
0.10
0.20
EJE H-H
30.00
(2 PLANTA)
30.00
30.16
0.00
0.00
0.00
0.00
0.00
3.33
3.35
0.00
0.00
0.00
0.00
0.00
7.50
17.49
0.00
0.00
0.00
0.00
0.00
24.99
ACERO COLUMNAS 198 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
0.15
0.15
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE I-I
10.06
5/8
9.81
1/2
53
1.13
1/4
80.48
EJE I-I
39.24
C-2
0.32
0.17
DIAM.
C-2
8.56
0.50
C-2
8.56
0.60
N VECES
0.17
EJE I-I
119.78
0.32
SUB TOTAL (m)
119.78
0.00
39.24
80.48
0.00
0.00
0.00
13.31
0.00
4.36
8.94
0.00
0.00
0.00
29.95
0.00
40.02
128.77
0.00
0.00
0.00
198.74
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
3/8
1/2
5/8
3/4
1 3/8
C-9
4.52
0.45
0.20
EJE I-I
5.17
3/8
32
0.75
1/4
41.36
(1 PLANTA)
C-9
0.20
0.10
0.10
0.20
EJE I-I
48.00
(1 PLANTA)
ACERO COLUMNAS 199 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
48.00
41.36
0.00
0.00
0.00
0.00
0.00
5.33
4.60
0.00
0.00
0.00
0.00
0.00
12.00
23.99
0.00
0.00
0.00
0.00
0.00
35.99
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
C-10
2.17
0.45
N VECES
0.15
EJE I-I
2.77
3/8
20
0.55
1/4
11.08
(1 PLANTA)
C-10
0.10
0.10
0.10
EJE I-I
11.00
(1 PLANTA)
0.10
SUB TOTAL (m)
11.00
11.08
0.00
0.00
0.00
0.00
0.00
1.22
1.23
0.00
0.00
0.00
0.00
0.00
2.75
6.43
0.00
0.00
0.00
0.00
0.00
9.18
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
3/8
1/2
5/8
3/4
1 3/8
C-7
4.00
0.50
0.15
EJE 2-2
4.65
1/2
33
0.83
1/4
37.20
(1 PLANTA)
C-7
0.17
0.17
0.17
0.17
EJE 2-2
54.78
(1 PLANTA)
54.78
0.00
37.20
0.00
0.00
0.00
0.00
6.09
0.00
4.13
0.00
0.00
0.00
0.00
13.70
0.00
37.94
0.00
0.00
0.00
0.00
51.64
ACERO COLUMNAS 201 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
0.20
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE 9-9
7.97
3/8
51
0.75
1/4
63.76
C-9
0.20
0.10
C-9
7.32
0.45
N VECES
0.10
EJE 9-9
76.50
0.20
SUB TOTAL (m)
76.50
63.76
0.00
0.00
0.00
0.00
0.00
8.50
7.08
0.00
0.00
0.00
0.00
0.00
19.13
36.98
0.00
0.00
0.00
0.00
0.00
56.11
CODIGO
ESTRUCTURA
CROQUIS
0.20
(pulg)
3/8
1/2
5/8
3/4
1 3/8
EJE 9-9
8.97
3/8
56
0.75
1/4
71.76
C-9
0.20
0.10
DIAM.
C-9
8.32
0.45
0.10
EJE 9-9
84.00
0.20
SUB TOTAL (m)
84.00
71.76
0.00
0.00
0.00
0.00
0.00
9.33
7.97
0.00
0.00
0.00
0.00
0.00
21.00
41.62
0.00
0.00
0.00
0.00
0.00
62.62
ACERO COLUMNAS 202 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
C-6
3.02
0.45
N VECES
0.20
3.67
1/2
3.67
3/8
21
0.83
1/4
29.36
(AZOTEA)
C-6
3.02
0.45
0.20
14.68
(AZOTEA)
C-6
0.17
0.17
0.17
34.86
(AZOTEA)
0.17
SUB TOTAL (m)
34.86
14.68
29.36
0.00
0.00
0.00
0.00
3.87
1.63
3.26
0.00
0.00
0.00
0.00
8.72
8.51
29.95
0.00
0.00
0.00
0.00
47.18
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
3/8
1/2
5/8
3/4
1 3/8
C-10
1.32
0.45
0.15
1.92
3/8
10
0.55
1/4
15.36
(AZOTEA)
C-10
0.10
0.10
0.10
0.10
11.00
(AZOTEA)
ACERO COLUMNAS 203 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
11.00
15.36
0.00
0.00
0.00
0.00
0.00
1.22
1.71
0.00
0.00
0.00
0.00
0.00
2.75
8.91
0.00
0.00
0.00
0.00
0.00
11.66
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
C-10
1.22
0.45
N VECES
0.15
EJE 8-8
1.82
3/8
0.55
1/4
7.28
(AZOTEA)
C-10
0.10
0.10
0.10
EJE 8-8
4.95
(AZOTEA)
0.10
SUB TOTAL (m)
4.95
7.28
0.00
0.00
0.00
0.00
0.00
0.55
0.81
0.00
0.00
0.00
0.00
0.00
1.24
4.22
0.00
0.00
0.00
0.00
0.00
5.46
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
3/8
1/2
5/8
3/4
1 3/8
C-9
3.12
0.45
0.20
EJE 8-8
3.77
3/8
20
0.75
1/4
15.08
(2 Planta)
C-9
0.20
0.10
0.10
0.20
EJE 8-8
15.00
(2 Planta)
15.00
15.08
0.00
0.00
0.00
0.00
0.00
1.67
1.68
0.00
0.00
0.00
0.00
0.00
3.75
8.75
0.00
0.00
0.00
0.00
0.00
12.50
ACERO COLUMNAS 205 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
C-9
5.02
0.45
N VECES
0.20
EJE 9-9
5.67
3/8
37
0.75
1/4
22.68
(1 PLANTA)
C-9
0.20
0.10
0.10
EJE 9-9
27.75
(1 PLANTA)
0.20
SUB TOTAL (m)
27.75
22.68
0.00
0.00
0.00
0.00
0.00
3.08
2.52
0.00
0.00
0.00
0.00
0.00
6.94
13.15
0.00
0.00
0.00
0.00
0.00
20.09
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
3/8
1/2
5/8
3/4
1 3/8
C-9
7.32
0.45
0.20
EJE 2-2
7.97
3/8
52
0.75
1/4
31.88
(1 PLANTA)
C-9
0.20
0.10
0.10
0.20
EJE 2-2
39.00
(1 PLANTA)
39.00
31.88
0.00
0.00
0.00
0.00
0.00
4.33
3.54
0.00
0.00
0.00
0.00
0.00
9.75
18.49
0.00
0.00
0.00
0.00
0.00
28.24
ACERO COLUMNAS 206 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
C-8
5.52
0.45
N VECES
0.20
EJE 2-2
6.17
1/2
41
0.83
1/4
74.04
(1 PLANTA)
C-8
0.17
0.17
0.17
EJE 2-2
102.09
(1 PLANTA)
0.17
SUB TOTAL (m)
102.09
0.00
74.04
0.00
0.00
0.00
0.00
11.34
0.00
8.23
0.00
0.00
0.00
0.00
25.52
0.00
75.52
0.00
0.00
0.00
0.00
101.04
CODIGO
ESTRUCTURA
CROQUIS
0.20
(pulg)
3/8
1/2
5/8
3/4
1 3/8
EJE D-D
7.97
3/8
52
0.75
1/4
31.88
C-9
0.20
0.10
DIAM.
C-9
7.32
0.45
0.10
EJE D-D
39.00
0.20
SUB TOTAL (m)
39.00
31.88
0.00
0.00
0.00
0.00
0.00
4.33
3.54
0.00
0.00
0.00
0.00
0.00
9.75
18.49
0.00
0.00
0.00
0.00
0.00
28.24
ACERO COLUMNAS 207 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
0.15
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE 8'-8'
5.50
3/8
38
0.55
1/4
44.00
C-10
0.10
0.10
C-10
4.90
0.45
N VECES
0.10
EJE 8'-8'
41.80
0.10
SUB TOTAL (m)
41.80
44.00
0.00
0.00
0.00
0.00
0.00
4.64
4.89
0.00
0.00
0.00
0.00
0.00
10.45
25.52
0.00
0.00
0.00
0.00
0.00
35.97
CODIGO
ESTRUCTURA
CROQUIS
0.15
(pulg)
3/8
1/2
5/8
3/4
1 3/8
EJE 8'-8'
5.50
3/8
38
0.75
1/4
22.00
C-9
0.10
0.20
DIAM.
C-9
4.90
0.45
0.20
EJE 8'-8'
28.50
0.10
SUB TOTAL (m)
28.50
22.00
0.00
0.00
0.00
0.00
0.00
3.17
2.44
0.00
0.00
0.00
0.00
0.00
7.13
12.76
0.00
0.00
0.00
0.00
0.00
19.89
ACERO COLUMNAS 208 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CODIGO
ESTRUCTURA
CROQUIS
0.15
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
EJE 3-3
2.67
5/8
13
0.93
1/4
10.68
C-5
0.22
0.17
C-5
2.07
0.45
N VECES
0.17
EJE 3-3
12.09
0.22
SUB TOTAL (m)
12.09
0.00
0.00
10.68
0.00
0.00
0.00
1.34
0.00
0.00
1.19
0.00
0.00
0.00
3.02
0.00
0.00
17.09
0.00
0.00
0.00
20.11
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
01.05.04.03
CROQUIS
3.98
0.33
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE A-A
0.33
0.18
0.33
5826.97 kg
VA-101
4.64
5/8
25
1.17
1/4
18.56
EJE A-A
0.33
VS-101
29.25
0.18
SUB TOTAL (m)
29.25
0.00
0.00
18.56
0.00
0.00
3.25
0.00
0.00
2.06
0.00
0.00
7.31
0.00
0.00
29.70
0.00
0.00
37.01
CROQUIS
3.98
0.33
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE A-A
0.33
4.98
0.33
DIAM.
VA-201
4.64
5/8
9.28
5.41
5/8
10.82
2.30
1/2
25
1.17
1/4
EJE A-A
0.10
VA-201
EJE A-A
2.20
0.10
0.18
0.33
VA-201
4.60
EJE A-A
0.33
VA-201
29.25
0.18
0.18
EJE A-A
ACERO VIGAS 210 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.13
0.13
VA-201
10
0.77
1/4
7.70
0.18
SUB TOTAL (m)
36.95
0.00
4.60
4.11
0.00
9.24
0.00
20.10
0.00
0.00
0.51
2.23
0.00
0.00
4.69
32.16
0.00
0.00
46.09
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
3.98
0.33
(pulg)
1/4
3/8
1/2
5/8
3/4
18.40
0.00
0.00
0.00
EJE A-A
0.33
4.08
0.33
DIAM.
VA-301
4.64
1/2
9.28
4.56
1/2
9.12
3.61
3/8
23
1.17
1/4
EJE A-A
0.15
VA-301
EJE A-A
3.61
VA-301
0.18
EJE A-A
0.33
0.33
VA-301
7.22
26.91
0.18
SUB TOTAL (m)
26.91
7.22
2.99
0.80
2.04
0.00
0.00
0.00
6.73
4.19
18.77
0.00
0.00
0.00
29.68
CROQUIS
5.58
0.13
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE A-A
0.13
0.18
0.13
DIAM.
VA2
5.84
1/2
40
0.77
1/4
46.72
EJE A-A
0.13
VA2
61.60
0.18
SUB TOTAL (m)
61.60
0.00
46.72
0.00
0.00
0.00
6.84
0.00
5.19
0.00
0.00
0.00
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
15.40
0.00
47.65
0.00
0.00
0.00
63.05
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
2.72
0.13
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE A-A
0.13
0.18
0.13
DIAM.
VA2
2.98
1/2
20
0.77
1/4
11.92
EJE A-A
0.13
VA2
15.40
0.18
SUB TOTAL (m)
15.40
0.00
11.92
0.00
0.00
0.00
1.71
0.00
1.32
0.00
0.00
0.00
3.85
0.00
12.16
0.00
0.00
0.00
16.01
CROQUIS
3.98
0.33
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE C-C
0.33
VA-102
4.64
5/8
26
1.17
1/4
37.12
VA-202
0.18
0.33
EJE C-C
0.33
0.18
VA-102
60.84
VA-202
60.84
0.00
0.00
37.12
0.00
0.00
6.76
0.00
0.00
4.12
0.00
0.00
15.21
0.00
0.00
59.39
0.00
0.00
74.60
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
1.93
0.10
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE C-C
0.10
VA-11
2.13
3/8
13
0.55
1/4
34.08
EJE C-C
0.10
0.10
VA-11
28.60
28.60
34.08
0.00
0.00
0.00
0.00
3.18
3.79
0.00
0.00
0.00
0.00
7.15
19.77
0.00
0.00
0.00
0.00
26.92
CROQUIS
6.49
0.10
DIAM.
(pulg)
3/8
1/2
5/8
3/4
EJE C-C
0.10
VA-11
6.69
3/8
38
0.55
1/4
107.04
(Azotea)
0.10
0.10
EJE C-C
0.10
0.10
VA-11
83.60
(Azotea)
83.60
107.04
0.00
0.00
0.00
0.00
9.29
11.89
0.00
0.00
0.00
0.00
20.90
62.08
0.00
0.00
0.00
0.00
82.98
ACERO VIGAS 215 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
2.77
0.10
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE C-C
0.10
VA-11
2.97
3/8
15
0.55
1/4
47.52
(Azotea)
0.10
0.10
EJE C-C
0.10
0.10
VA-11
33.00
(Azotea)
33.00
47.52
0.00
0.00
0.00
0.00
3.67
5.28
0.00
0.00
0.00
0.00
8.25
27.56
0.00
0.00
0.00
0.00
35.81
CROQUIS
2.88
0.26
DIAM.
(pulg)
3/8
1/2
5/8
3/4
EJE C-C
0.26
VE
3.40
5/8
2.88
3/8
18
1.03
1/4
13.60
EJE C-C
2.88
VE
0.18
EJE C-C
0.26
0.26
VE
5.76
18.54
0.18
SUB TOTAL (m)
18.54
5.76
0.00
13.60
0.00
0.00
2.06
0.64
0.00
1.51
0.00
0.00
4.64
3.34
0.00
21.76
0.00
0.00
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
29.74
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
4.23
0.23
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE C-C
0.23
VE2
4.69
5/8
4.23
3/8
26
0.97
1/4
18.76
EJE C-C
4.23
VE2
0.18
EJE C-C
0.23
0.23
VE2
8.46
25.22
0.18
SUB TOTAL (m)
25.22
8.46
0.00
18.76
0.00
0.00
2.80
0.94
0.00
2.08
0.00
0.00
6.31
4.91
0.00
30.02
0.00
0.00
41.23
CROQUIS
14.55
0.33
(pulg)
3/8
1/2
5/8
3/4
EJE C-C
0.33
15.55
0.33
DIAM.
VA-206
15.81
5/8
31.62
16.63
5/8
33.26
2.35
5/8
4.70
104
1.17
1/4
EJE C-C
0.15
VA-206
EJE C-C
2.20
0.15
0.18
0.33
VA-206
EJE C-C
0.33
VA-206
121.68
ACERO VIGAS 218 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.18
0.18
0.15
EJE C-C
0.15
VA-206
0.81
1/4
6.48
0.18
SUB TOTAL (m)
128.16
0.00
0.00
69.58
0.00
0.00
14.24
0.00
0.00
7.73
0.00
0.00
32.04
0.00
0.00
111.33
0.00
0.00
143.37
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
14.55
0.33
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE C-C
0.33
15.05
0.33
VA-106
15.81
5/8
31.62
16.13
5/8
32.26
1.85
5/8
3.70
104
1.17
1/4
121.68
0.81
1/4
4.05
EJE C-C
0.15
VA-106
EJE C-C
1.70
0.15
0.18
0.33
VA-106
EJE C-C
0.33
VA-106
0.18
0.18
0.15
EJE C-C
0.15
VA-106
0.18
SUB TOTAL (m)
125.73
0.00
0.00
67.58
0.00
0.00
13.97
0.00
0.00
7.51
0.00
0.00
31.43
0.00
0.00
108.13
0.00
0.00
139.56
CROQUIS
5.43
0.23
DIAM.
(pulg)
3/8
1/2
5/8
3/4
EJE C-C
0.23
VA-303
5.89
1/2
29.45
EJE C-C
ACERO VIGAS 220 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
5.43
VA-303
0.18
EJE C-C
0.23
0.23
VA-303
5.43
3/8
39
0.97
1/4
10.86
37.83
0.18
SUB TOTAL (m)
37.83
10.86
29.45
0.00
0.00
0.00
4.20
1.21
3.27
0.00
0.00
0.00
9.46
6.30
30.04
0.00
0.00
0.00
45.80
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
14.55
0.15
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE D-D
0.33
7.53
0.33
VA-107
15.63
5/8
31.26
8.19
5/8
16.38
8.20
5/8
16.40
52
1.17
1/4
60.84
43
0.77
1/4
33.11
EJE D-D
0.33
VA-107
EJE D-D
8.05
0.15
0.18
0.33
VA-107
EJE D-D
0.33
VA-107
0.18
0.18
0.13
EJE D-D
0.13
VA-107
0.18
SUB TOTAL (m)
93.95
0.00
0.00
64.04
0.00
0.00
10.44
0.00
0.00
7.12
0.00
0.00
23.49
0.00
0.00
102.46
0.00
0.00
125.95
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
9.04
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE D-D
0.15
VA-207
9.79
5/8
19.57
7.89
1/2
15.77
8.16
1/2
16.31
8.19
5/8
2.33
1/2
52
1.17
1/4
60.84
52
0.77
1/4
40.04
EJE D-D
0.15
7.74
VA-207
EJE D-D
0.15
8.01
VA-207
7.53
EJE D-D
0.33
0.33
VA-207
16.38
EJE D-D
2.18
0.15
0.18
0.33
VA-207
4.66
EJE D-D
0.33
VA-207
0.18
0.18
0.13
EJE D-D
0.13
VA-207
0.18
SUB TOTAL (m)
100.88
0.00
36.74
35.95
0.00
0.00
11.21
0.00
4.08
3.99
0.00
0.00
25.22
0.00
37.47
57.52
0.00
0.00
120.21
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
5.43
0.23
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE D-D
0.23
VA-303
5.89
1/2
5.43
3/8
39
0.97
1/4
29.45
EJE D-D
5.43
VA-303
0.18
EJE D-D
0.23
0.23
VA-303
10.86
37.83
0.18
SUB TOTAL (m)
37.83
10.86
29.45
0.00
0.00
0.00
4.20
1.21
3.27
0.00
0.00
0.00
9.46
6.30
30.04
0.00
0.00
0.00
45.80
CROQUIS
3.98
0.33
(pulg)
3/8
1/2
5/8
3/4
EJE E-E
0.33
0.18
0.33
DIAM.
VA-103
4.64
5/8
26
1.17
1/4
37.12
EJE E-E
0.33
VA-103
60.84
0.18
SUB TOTAL (m)
60.84
0.00
0.00
37.12
0.00
0.00
6.76
0.00
0.00
4.12
0.00
0.00
15.21
0.00
0.00
59.39
0.00
0.00
74.60
ACERO VIGAS 224 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
7.20
0.33
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE E-E
0.33
15.00
0.33
VA-108
7.86
5/8
15.72
16.08
5/8
32.16
9.62
5/8
19.24
49
1.17
1/4
57.33
55
0.77
1/4
42.35
EJE E-E
0.15
VA-108
EJE E-E
8.87
0.15
0.18
0.33
VA-108
EJE E-E
0.33
VA-108
0.18
0.18
0.13
EJE E-E
0.13
VA-108
0.18
SUB TOTAL (m)
99.68
0.00
0.00
67.12
0.00
0.00
11.08
0.00
0.00
7.46
0.00
0.00
24.92
0.00
0.00
107.39
0.00
0.00
132.31
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
7.20
0.33
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE E-E
0.33
8.65
VA-208
7.86
5/8
15.72
8.98
5/8
17.96
10.02
1/2
20.04
9.50
1/2
19.00
49
1.17
1/4
57.33
56
0.77
1/4
43.12
EJE E-E
0.33
VA-208
EJE E-E
9.37
0.15
VA-208
EJE E-E
8.85
0.15
0.18
0.33
VA-208
EJE E-E
0.33
VA-208
0.18
0.18
0.13
EJE E-E
0.13
VA-208
0.18
SUB TOTAL (m)
100.45
0.00
39.04
33.68
0.00
0.00
11.16
0.00
4.34
3.74
0.00
0.00
25.11
0.00
39.82
53.89
0.00
0.00
CROQUIS
2.05
118.82
DIAM.
(pulg)
3/8
1/2
5/8
3/4
EJE F-F
ACERO VIGAS 226 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.30
0.10
0.10
0.10
VA-11
2.45
3/8
11
0.55
1/4
9.80
EJE F-F
0.10
VA-11
6.05
0.10
SUB TOTAL (m)
6.05
9.80
0.00
0.00
0.00
0.00
0.67
1.09
0.00
0.00
0.00
0.00
1.51
5.68
0.00
0.00
0.00
0.00
7.20
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
1.65
0.30
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE F-F
0.10
0.10
0.10
VA-11
2.05
3/8
10
0.55
1/4
32.80
EJE F-F
0.10
VA-11
22.00
0.10
SUB TOTAL (m)
22.00
32.80
0.00
0.00
0.00
0.00
2.44
3.64
0.00
0.00
0.00
0.00
5.50
19.02
0.00
0.00
0.00
0.00
24.52
CROQUIS
1.93
0.30
(pulg)
3/8
1/2
5/8
3/4
EJE F-F
0.30
0.10
0.10
DIAM.
VA-11
2.53
3/8
12
0.55
1/4
20.24
EJE F-F
0.10
VA-11
13.20
0.10
SUB TOTAL (m)
13.20
20.24
0.00
0.00
0.00
0.00
1.47
2.25
0.00
0.00
0.00
0.00
3.30
11.74
0.00
0.00
0.00
0.00
15.04
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
3.98
0.33
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE F-F
0.33
VA-104
4.64
5/8
26
1.17
1/4
37.12
VA-204
0.18
0.33
EJE F-F
0.33
0.18
VA-104
60.84
VA-204
60.84
0.00
0.00
37.12
0.00
0.00
6.76
0.00
0.00
4.12
0.00
0.00
15.21
0.00
0.00
59.39
0.00
0.00
74.60
CROQUIS
9.69
0.33
(pulg)
3/8
1/2
5/8
3/4
EJE F-F
0.33
0.10
0.10
DIAM.
VA-11
10.80
3/8
56
0.55
1/4
43.20
EJE F-F
0.10
VA-11
30.80
0.10
SUB TOTAL (m)
30.80
43.20
0.00
0.00
0.00
0.00
3.42
4.80
0.00
0.00
0.00
0.00
7.70
25.06
0.00
0.00
0.00
0.00
32.76
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
4.46
0.23
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE F-F
0.23
0.18
0.23
VA-11
4.92
1/2
28
0.97
1/4
19.68
EJE F-F
0.23
VA-11
27.16
0.18
SUB TOTAL (m)
27.16
0.00
19.68
0.00
0.00
0.00
3.02
0.00
2.19
0.00
0.00
0.00
6.79
0.00
20.07
0.00
0.00
0.00
26.86
CROQUIS
14.68
0.33
DIAM.
(pulg)
3/8
1/2
5/8
3/4
EJE F-F
0.33
VA-109
15.94
5/8
63.76
16.13
5/8
64.52
2.38
1/2
VA-209
15.05
0.33
EJE F-F
0.15
VA-109
VA-209
EJE F-F
1.63
0.15
VA-109
9.52
VA-209
0.18
EJE F-F
ACERO VIGAS 230 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.33
0.33
VA-109
0.18
VA-209
0.18
EJE F-F
0.13
0.13
0.18
VA-109
101
1.17
1/4
236.34
0.77
1/4
6.16
VA-209
242.50
0.00
9.52
128.28
0.00
0.00
26.94
0.00
1.06
14.25
0.00
0.00
60.63
0.00
9.71
205.25
0.00
0.00
275.58
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
3.98
0.33
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE F-F
0.33
4.48
0.33
VA-105
4.64
5/8
9.28
4.96
5/8
9.92
2.30
1/2
26
1.17
1/4
30.42
0.77
1/4
3.85
EJE F-F
0.15
VA-105
EJE F-F
1.55
0.15
0.18
0.33
VA-105
4.60
EJE F-F
0.33
VA-105
0.18
0.18
0.13
EJE F-F
0.13
VA-105
0.18
SUB TOTAL (m)
34.27
0.00
4.60
19.20
0.00
0.00
3.81
0.00
0.51
2.13
0.00
0.00
8.57
0.00
4.69
30.72
0.00
0.00
43.98
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
3.98
0.33
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE F-F
0.33
4.98
0.33
VA-205
4.64
5/8
9.28
5.46
5/8
10.92
2.78
1/2
26
1.17
1/4
30.42
0.77
1/4
6.16
EJE F-F
0.15
VA-205
EJE F-F
2.03
0.15
0.18
0.33
VA-205
5.56
EJE F-F
0.33
VA-205
0.18
0.18
0.13
EJE F-F
0.13
VA-205
0.18
SUB TOTAL (m)
36.58
0.00
5.56
20.20
0.00
0.00
4.06
0.00
0.62
2.24
0.00
0.00
9.15
0.00
5.67
32.32
0.00
0.00
47.14
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
3.98
0.33
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE F-F
0.33
4.98
0.33
VA-305
4.64
5/8
9.28
5.46
5/8
10.92
2.78
5/8
5.56
26
1.17
1/4
30.42
0.77
1/4
6.16
EJE F-F
0.15
VA-305
EJE F-F
2.03
0.15
0.18
0.33
VA-305
EJE F-F
0.33
VA-305
0.18
0.18
0.13
EJE F-F
0.13
VA-305
0.18
SUB TOTAL (m)
36.58
0.00
0.00
25.76
0.00
0.00
4.06
0.00
0.00
2.86
0.00
0.00
9.15
0.00
0.00
41.22
0.00
0.00
50.36
CROQUIS
3.98
0.33
(pulg)
3/8
1/2
5/8
3/4
EJE I-I
0.33
0.18
DIAM.
VA-105
4.64
5/8
18.56
EJE I-I
ACERO VIGAS 234 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.33
0.33
VA-105
26
1.17
1/4
30.42
0.18
SUB TOTAL (m)
30.42
0.00
0.00
3.38
0.00
7.61
0.00
18.56
0.00
0.00
0.00
2.06
0.00
0.00
0.00
29.70
0.00
0.00
37.30
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
3.98
0.33
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE I-I
0.33
4.98
0.33
VA-306
4.64
5/8
9.28
5.46
5/8
10.92
2.78
5/8
5.56
26
1.17
1/4
30.42
0.77
1/4
6.16
EJE I-I
0.15
VA-306
EJE I-I
2.03
0.15
0.18
0.33
VA-306
EJE I-I
0.33
VA-306
0.18
0.18
0.13
EJE I-I
0.13
VA-306
0.18
SUB TOTAL (m)
36.58
0.00
0.00
25.76
0.00
0.00
4.06
0.00
0.00
2.86
0.00
0.00
9.15
0.00
0.00
41.22
0.00
0.00
50.36
CROQUIS
1.55
0.10
(pulg)
3/8
1/2
5/8
3/4
EJE I-I
0.10
0.10
DIAM.
VA-11
1.75
3/8
7.00
EJE I-I
ACERO VIGAS 236 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.10
0.10
VA-11
0.55
1/4
4.95
0.10
SUB TOTAL (m)
4.95
7.00
0.00
0.00
0.00
0.00
0.55
0.78
0.00
0.00
0.00
0.00
1.24
4.06
0.00
0.00
0.00
0.00
5.30
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
7.20
0.33
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE 2-2
0.33
VA-101
7.86
5/8
62.88
8.95
1/2
2.60
5/8
5.19
2.95
5/8
5.90
5.38
5/8
10.76
69
1.17
3/8
VA-201
8.65
0.15
EJE 2-2
0.15
VA-101
35.80
VA-201
EJE 2-2
2.27
0.33
VA-101
VA-201
EJE 2-2
2.95
VA-101
VA-201
EJE 2-2
5.38
VA-101
VA-201
0.18
0.33
EJE 2-2
0.33
0.18
VA-101
161.46
VA-201
0.00
161.46
35.80
84.73
0.00
0.00
0.00
17.94
3.98
9.41
0.00
0.00
0.00
93.65
36.52
135.57
0.00
0.00
265.73
ACERO VIGAS 238 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
3.33
0.10
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE 2-2
0.10
0.10
0.10
VA-11
3.53
3/8
17
0.55
1/4
14.12
EJE 2-2
0.10
VA-11
9.35
0.10
SUB TOTAL (m)
9.35
14.12
0.00
0.00
0.00
0.00
1.04
1.57
0.00
0.00
0.00
0.00
2.34
8.19
0.00
0.00
0.00
0.00
10.53
CROQUIS
5.58
0.23
(pulg)
3/8
1/2
5/8
3/4
EJE 2-2
0.23
0.18
0.23
DIAM.
VA-301
6.04
1/2
30
0.97
3/8
24.16
EJE 2-2
0.23
VA-301
29.10
0.18
SUB TOTAL (m)
0.00
29.10
24.16
0.00
0.00
0.00
0.00
3.23
2.68
0.00
0.00
0.00
0.00
16.88
24.64
0.00
0.00
0.00
41.52
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
7.20
0.33
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE 3-3
0.33
VA-102
7.86
5/8
62.88
8.95
1/2
2.75
3/4
5.49
3.30
3/4
6.60
5.25
3/4
10.50
69
1.17
3/8
VA-202
8.65
0.15
EJE 3-3
0.15
VA-102
35.80
VA-202
EJE 3-3
2.42
0.33
VA-102
VA-202
EJE 3-3
3.30
VA-102
VA-202
EJE 3-3
5.25
VA-102
VA-202
0.18
0.33
EJE 3-3
0.33
0.18
VA-102
161.46
VA-202
0.00
161.46
35.80
62.88
22.59
0.00
0.00
17.94
3.98
6.99
2.51
0.00
0.00
93.65
36.52
100.61
51.05
0.00
281.82
ACERO VIGAS 240 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
4.73
0.10
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE 3-3
0.10
0.18
0.10
VA-302
4.93
1/2
32
0.71
1/4
19.72
EJE 3-3
0.10
VA-302
22.72
0.18
SUB TOTAL (m)
22.72
0.00
19.72
0.00
0.00
0.00
2.52
0.00
2.19
0.00
0.00
0.00
5.68
0.00
20.11
0.00
0.00
0.00
25.79
CROQUIS
5.18
0.10
(pulg)
3/8
1/2
5/8
3/4
EJE 3-3
0.10
0.18
0.10
DIAM.
VA-302
5.38
1/2
34
0.71
1/4
21.52
EJE 3-3
0.10
VA-302
24.14
0.18
SUB TOTAL (m)
24.14
0.00
21.52
0.00
0.00
0.00
2.68
0.00
2.39
0.00
0.00
0.00
6.04
0.00
21.95
0.00
0.00
0.00
27.99
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
9.18
0.33
9.18
(pulg)
1/4
3/8
1/2
5/8
3/4
VA-103
10.44
5/8
9.98
1/2
63
1.17
3/8
41.76
EJE 4-4
0.15
0.18
0.33
DIAM.
EJE 4-4
0.33
0.15
VA-103
19.96
EJE 4-4
0.33
VA-103
73.71
0.18
SUB TOTAL (m)
0.00
73.71
19.96
41.76
0.00
0.00
0.00
8.19
2.22
4.64
0.00
0.00
0.00
42.75
20.36
66.82
0.00
0.00
129.93
CROQUIS
10.53
0.33
10.53
(pulg)
3/8
1/2
5/8
3/4
VA-203
11.79
5/8
11.33
1/2
73
1.17
3/8
47.16
EJE 4-4
0.15
0.18
0.33
EJE 4-4
0.33
0.15
DIAM.
VA-203
22.66
EJE 4-4
0.33
VA-203
85.41
0.18
SUB TOTAL (m)
0.00
85.41
22.66
47.16
0.00
0.00
0.00
9.49
2.52
5.24
0.00
0.00
ACERO VIGAS 242 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
49.54
23.11
75.46
0.00
0.00
148.11
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
4.73
0.10
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE 4-4
0.10
0.18
0.10
VA-302
4.93
1/2
32
0.71
1/4
19.72
EJE 4-4
0.10
VA-302
22.72
0.18
SUB TOTAL (m)
22.72
0.00
19.72
0.00
0.00
0.00
2.52
0.00
2.19
0.00
0.00
0.00
5.68
0.00
20.11
0.00
0.00
0.00
25.79
CROQUIS
8.53
0.33
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE 5-5
0.33
8.53
0.15
VA-104
9.79
5/8
8.83
1/2
2.00
5/8
3.15
3/4
39.16
EJE 5-5
0.15
VA-104
17.66
EJE 5-5
1.67
0.33
VA-104
2.00
EJE 5-5
3.15
VA-104
3.15
EJE 5-5
ACERO VIGAS 244 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
4.95
VA-104
0.18
EJE 5-5
0.33
0.33
VA-104
4.95
3/4
55
1.17
3/8
4.95
64.35
0.18
SUB TOTAL (m)
0.00
64.35
17.66
41.16
8.10
0.00
0.00
7.15
1.96
4.57
0.90
0.00
0.00
37.32
18.01
65.85
18.31
0.00
139.49
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
10.53
0.33
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE 5-5
0.33
10.53
0.15
VA-204
11.79
5/8
47.16
11.33
1/2
3.15
5/8
3.15
4.80
5/8
4.80
72
1.17
3/8
EJE 5-5
0.15
VA-204
22.66
EJE 5-5
3.15
VA-204
EJE 5-5
4.80
VA-204
0.18
EJE 5-5
0.33
0.33
VA-204
84.24
0.18
SUB TOTAL (m)
0.00
84.24
22.66
55.11
0.00
0.00
0.00
9.36
2.52
6.12
0.00
0.00
0.00
48.86
23.11
88.18
0.00
0.00
160.15
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
8.53
0.33
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE 7-7
0.33
8.53
0.15
VA-105
9.79
5/8
39.16
8.83
1/2
3.15
3/4
3.15
4.95
3/4
4.95
55
1.17
3/8
EJE 7-7
0.15
VA-105
17.66
EJE 7-7
3.15
VA-105
EJE 7-7
4.95
VA-105
0.18
EJE 7-7
0.33
0.33
VA-105
64.35
0.18
SUB TOTAL (m)
0.00
64.35
17.66
39.16
8.10
0.00
0.00
7.15
1.96
4.35
0.90
0.00
0.00
37.32
18.01
62.66
18.31
0.00
136.30
CROQUIS
9.53
0.33
(pulg)
3/8
1/2
5/8
3/4
EJE 7-7
0.33
9.53
0.15
DIAM.
VA-205
10.79
5/8
10.33
1/2
43.16
EJE 7-7
0.15
VA-205
20.66
ACERO VIGAS 247 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.18
0.33
EJE 7-7
0.33
VA-205
66
1.17
3/8
77.22
0.18
SUB TOTAL (m)
0.00
0.00
8.58
0.00
44.79
77.22
20.66
43.16
0.00
0.00
2.30
4.80
0.00
0.00
21.07
69.06
0.00
0.00
134.92
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
20.76
0.33
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE 8-8
0.33
20.76
0.15
VA-106
22.62
5/8
90.48
22.06
1/2
44.12
2.01
1/2
2.01
5.10
5/8
5.10
3.50
5/8
3.50
137
1.17
3/8
EJE 8-8
0.15
VA-106
EJE 8-8
0.33
1.68
VA-106
EJE 8-8
5.10
VA-106
EJE 8-8
3.50
VA-106
0.18
EJE 8-8
0.33
0.33
VA-106
160.29
0.18
SUB TOTAL (m)
0.00
160.29
46.13
99.08
0.00
0.00
0.00
17.81
5.13
11.01
0.00
0.00
0.00
92.97
47.05
158.53
0.00
0.00
298.55
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
20.76
0.33
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE 8-8
0.33
20.76
0.15
VA-206
22.62
5/8
90.48
22.06
1/2
2.01
5/8
2.01
21.96
5/8
43.92
3.50
5/8
7.00
137
1.17
3/8
EJE 8-8
0.15
VA-206
44.12
EJE 8-8
0.33
1.68
VA-206
EJE 8-8
20.76
VA-206
EJE 8-8
3.50
VA-206
0.18
EJE 8-8
0.33
0.33
VA-206
160.29
0.18
SUB TOTAL (m)
0.00
160.29
44.12
143.41
0.00
0.00
0.00
17.81
4.90
15.93
0.00
0.00
0.00
92.97
45.00
229.46
0.00
0.00
CROQUIS
3.35
367.43
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE 8-8
ACERO VIGAS 250 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.10
0.10
0.10
0.10
VA-11
3.55
3/8
18
0.55
1/4
14.20
EJE 8-8
0.10
VA-11
9.90
0.10
SUB TOTAL (m)
9.90
14.20
0.00
0.00
0.00
0.00
1.10
1.58
0.00
0.00
0.00
0.00
2.48
8.24
0.00
0.00
0.00
0.00
10.71
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
3.18
0.10
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE 8-8
0.10
0.10
0.10
VA-11
3.38
3/8
17
0.55
1/4
13.52
EJE 8-8
0.10
VA-11
9.35
0.10
SUB TOTAL (m)
9.35
13.52
0.00
0.00
0.00
0.00
1.04
1.50
0.00
0.00
0.00
0.00
2.34
7.84
0.00
0.00
0.00
0.00
10.18
CROQUIS
2.40
0.10
(pulg)
3/8
1/2
5/8
3/4
EJE 8-8
0.10
0.10
0.10
DIAM.
VA-11
2.60
3/8
14
0.55
1/4
10.40
EJE 8-8
0.10
VA-11
7.70
0.10
SUB TOTAL (m)
7.70
10.40
0.00
0.00
0.00
0.00
0.86
1.16
0.00
0.00
0.00
0.00
1.93
6.03
0.00
0.00
0.00
0.00
7.96
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
2.11
0.13
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE 8-8
0.13
0.18
0.13
VA
2.37
1/2
16
0.77
1/4
9.48
EJE 8-8
0.13
VA
12.32
0.18
SUB TOTAL (m)
12.32
0.00
9.48
0.00
0.00
0.00
1.37
0.00
1.05
0.00
0.00
0.00
3.08
0.00
9.67
0.00
0.00
0.00
12.75
CROQUIS
5.13
0.33
(pulg)
3/8
1/2
5/8
3/4
EJE 8-8
0.33
0.18
0.33
DIAM.
V-306
5.79
5/8
36
1.17
3/8
23.16
EJE 8-8
0.33
V-306
42.12
0.18
SUB TOTAL (m)
0.00
42.12
0.00
23.16
0.00
0.00
0.00
4.68
0.00
2.57
0.00
0.00
0.00
24.43
0.00
37.06
0.00
0.00
61.49
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
20.76
0.33
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE 9-9
0.33
20.76
0.15
VA-107
22.62
5/8
90.48
22.06
1/2
44.12
2.01
1/2
2.01
5.10
5/8
5.10
3.50
5/8
3.50
137
1.17
3/8
EJE 9-9
0.15
VA-107
EJE 9-9
0.33
1.68
VA-107
EJE 9-9
5.10
VA-107
EJE 9-9
3.50
VA-107
0.18
EJE 9-9
0.33
0.33
VA-107
160.29
0.18
SUB TOTAL (m)
0.00
160.29
46.13
99.08
0.00
0.00
0.00
17.81
5.13
11.01
0.00
0.00
0.00
92.97
47.05
158.53
0.00
0.00
298.55
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
20.76
0.33
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE 9-9
0.33
20.76
0.15
VA-207
22.62
5/8
90.48
22.06
1/2
2.01
5/8
3.50
3/4
7.00
22.26
3/4
44.52
137
1.17
3/8
EJE 9-9
0.15
VA-207
44.12
EJE 9-9
0.33
1.68
VA-207
2.01
EJE 9-9
3.50
VA-207
EJE 9-9
20.76
VA-207
0.18
EJE 9-9
0.33
0.33
VA-207
160.29
0.18
SUB TOTAL (m)
0.00
160.29
44.12
92.49
51.52
0.00
0.00
17.81
4.90
10.28
5.72
0.00
0.00
92.97
45.00
147.98
116.44
0.00
402.39
CROQUIS
14.40
0.10
DIAM.
(pulg)
3/8
1/2
5/8
3/4
EJE 9-9
0.10
VA-11
15.05
3/8
60.20
ACERO VIGAS 255 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.10
0.10
EJE 9-9
0.10
VA-11
84
0.55
1/4
46.20
0.10
SUB TOTAL (m)
46.20
60.20
0.00
0.00
0.00
0.00
5.13
6.69
0.00
0.00
0.00
0.00
11.55
34.92
0.00
0.00
0.00
0.00
46.47
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
2.11
0.13
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE 9-9
0.13
0.18
0.13
VA
2.37
1/2
16
0.77
1/4
9.48
EJE 9-9
0.13
VA
12.32
0.18
SUB TOTAL (m)
12.32
0.00
9.48
0.00
0.00
0.00
1.37
0.00
1.05
0.00
0.00
0.00
3.08
0.00
9.67
0.00
0.00
0.00
12.75
CROQUIS
5.13
0.33
(pulg)
3/8
1/2
5/8
3/4
EJE 9-9
0.33
0.18
0.33
DIAM.
VA-307
5.79
5/8
36
1.17
3/8
23.16
EJE 9-9
0.33
VA-307
42.12
0.18
SUB TOTAL (m)
0.00
42.12
0.00
23.16
0.00
0.00
0.00
4.68
0.00
2.57
0.00
0.00
0.00
24.43
0.00
37.06
0.00
0.00
61.49
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
2.86
0.13
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
EJE 9-9
0.13
0.18
0.13
VA
3.12
1/2
20
0.77
1/4
12.48
EJE 9-9
0.13
VA
15.40
0.18
SUB TOTAL (m)
15.40
0.00
12.48
0.00
0.00
0.00
1.71
0.00
1.39
0.00
0.00
0.00
3.85
0.00
12.73
0.00
0.00
0.00
16.58
CROQUIS
5.23
0.33
(pulg)
3/8
1/2
5/8
3/4
EJE 11-11
0.33
0.18
0.33
DIAM.
VA3
5.89
1/2
34
1.17
1/4
23.56
EJE 11-11
0.33
VA3
39.78
0.18
SUB TOTAL (m)
39.78
0.00
23.56
0.00
0.00
0.00
4.42
0.00
2.62
0.00
0.00
0.00
9.95
0.00
24.03
0.00
0.00
0.00
33.98
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
1.38
0.13
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1era PLANTA
0.13
0.18
0.13
V01
1.64
1/2
14
0.77
1/4
59.04
1era PLANTA
0.13
V01
97.02
0.18
SUB TOTAL (m)
97.02
0.00
59.04
0.00
0.00
0.00
10.78
0.00
6.56
0.00
0.00
0.00
24.26
0.00
60.22
0.00
0.00
0.00
84.48
CROQUIS
0.83
0.13
(pulg)
3/8
1/2
5/8
3/4
1era PLANTA
0.13
0.18
0.13
DIAM.
V01
1.09
1/2
10
0.77
1/4
8.72
1era PLANTA
0.13
V01
15.40
0.18
SUB TOTAL (m)
15.40
0.00
8.72
0.00
0.00
0.00
1.71
0.00
0.97
0.00
0.00
0.00
3.85
0.00
8.89
0.00
0.00
0.00
12.74
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
0.73
0.13
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1era PLANTA
0.13
0.18
0.13
V01
0.99
1/2
0.77
1/4
3.96
1era PLANTA
0.13
V01
6.93
0.18
SUB TOTAL (m)
6.93
0.00
3.96
0.00
0.00
0.00
0.77
0.00
0.44
0.00
0.00
0.00
1.73
0.00
4.04
0.00
0.00
0.00
5.77
CROQUIS
1.93
0.13
(pulg)
3/8
1/2
5/8
3/4
1era PLANTA
0.13
0.10
0.13
DIAM.
VA-10
2.19
1/2
11
0.61
1/4
43.80
1era PLANTA
0.13
VA-10
33.55
0.10
SUB TOTAL (m)
33.55
0.00
43.80
0.00
0.00
0.00
3.73
0.00
4.87
0.00
0.00
0.00
8.39
0.00
44.68
0.00
0.00
0.00
53.06
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
4.73
0.13
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1era PLANTA
0.13
0.10
0.13
VA-10
4.99
1/2
29
0.61
1/4
19.96
1era PLANTA
0.13
VA-10
17.69
0.10
SUB TOTAL (m)
17.69
0.00
19.96
0.00
0.00
0.00
1.97
0.00
2.22
0.00
0.00
0.00
4.42
0.00
20.36
0.00
0.00
0.00
24.78
CROQUIS
1.58
0.13
(pulg)
3/8
1/2
5/8
3/4
1era PLANTA
0.13
0.10
0.13
DIAM.
VA-10
1.84
1/2
12
0.61
1/4
7.36
1era PLANTA
0.13
VA-10
7.32
0.10
SUB TOTAL (m)
7.32
0.00
7.36
0.00
0.00
0.00
0.81
0.00
0.82
0.00
0.00
0.00
1.83
0.00
7.51
0.00
0.00
0.00
9.34
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
1.18
0.13
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1era PLANTA
0.13
0.10
0.13
VA-10
1.44
1/2
11
0.61
1/4
11.52
1era PLANTA
0.13
VA-10
13.42
0.10
SUB TOTAL (m)
13.42
0.00
11.52
0.00
0.00
0.00
1.49
0.00
1.28
0.00
0.00
0.00
3.36
0.00
11.75
0.00
0.00
0.00
15.11
CROQUIS
3.98
0.13
(pulg)
3/8
1/2
5/8
3/4
1era PLANTA
0.13
0.10
0.13
DIAM.
VA-10
4.24
1/2
25
0.61
1/4
16.96
1era PLANTA
0.13
VA-10
15.25
0.10
SUB TOTAL (m)
15.25
0.00
16.96
0.00
0.00
0.00
1.69
0.00
1.88
0.00
0.00
0.00
3.81
0.00
17.30
0.00
0.00
0.00
21.11
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
3.33
0.13
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1era PLANTA
0.13
0.10
0.13
VA
3.59
1/2
22
0.61
1/4
14.36
1era PLANTA
0.13
VA
13.42
0.10
SUB TOTAL (m)
13.42
0.00
14.36
0.00
0.00
0.00
1.49
0.00
1.60
0.00
0.00
0.00
3.36
0.00
14.65
0.00
0.00
0.00
18.00
CROQUIS
2.18
0.13
(pulg)
3/8
1/2
5/8
3/4
2da PLANTA
0.13
0.10
0.13
DIAM.
V02
2.44
1/2
16
0.61
1/4
9.76
2da PLANTA
0.13
V02
9.76
0.10
SUB TOTAL (m)
9.76
0.00
9.76
0.00
0.00
0.00
1.08
0.00
1.08
0.00
0.00
0.00
2.44
0.00
9.96
0.00
0.00
0.00
12.40
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
15.55
0.13
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
2da PLANTA
0.13
0.10
0.13
VA-10
16.31
1/2
94
0.61
1/4
65.24
2da PLANTA
0.13
VA-10
57.34
0.10
SUB TOTAL (m)
57.34
0.00
65.24
0.00
0.00
0.00
6.37
0.00
7.25
0.00
0.00
0.00
14.34
0.00
66.54
0.00
0.00
0.00
80.88
CROQUIS
3.98
0.13
(pulg)
3/8
1/2
5/8
3/4
2da PLANTA
0.13
0.10
0.13
DIAM.
VA-10
4.24
1/2
34
0.61
1/4
16.96
2da PLANTA
0.13
VA-10
20.74
0.10
SUB TOTAL (m)
20.74
0.00
16.96
0.00
0.00
0.00
2.30
0.00
1.88
0.00
0.00
0.00
5.19
0.00
17.30
0.00
0.00
0.00
22.48
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
1.18
0.13
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
2da PLANTA
0.13
0.10
0.13
VA-10
1.44
1/2
12
0.61
1/4
5.76
2da PLANTA
0.13
VA-10
7.32
0.10
SUB TOTAL (m)
7.32
0.00
5.76
0.00
0.00
0.00
0.81
0.00
0.64
0.00
0.00
0.00
1.83
0.00
5.88
0.00
0.00
0.00
7.71
CROQUIS
3.33
0.13
(pulg)
3/8
1/2
5/8
3/4
2da PLANTA
0.13
0.10
0.13
DIAM.
VA
3.59
1/2
22
0.61
1/4
14.36
2da PLANTA
0.13
VA
13.42
0.10
SUB TOTAL (m)
13.42
0.00
14.36
0.00
0.00
0.00
1.49
0.00
1.60
0.00
0.00
0.00
3.36
0.00
14.65
0.00
0.00
0.00
18.00
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
8.19
0.23
8.19
(pulg)
1/4
3/8
1/2
5/8
3/4
V-302
8.65
5/8
8.49
3/8
46
0.97
1/4
34.60
AZOTEA
0.15
0.18
0.23
DIAM.
AZOTEA
0.23
0.15
V-302
16.98
AZOTEA
0.23
V-302
44.62
0.18
SUB TOTAL (m)
44.62
16.98
0.00
34.60
0.00
0.00
4.96
1.89
0.00
3.84
0.00
0.00
11.16
9.85
0.00
55.36
0.00
0.00
76.36
CROQUIS
4.73
0.10
(pulg)
3/8
1/2
5/8
3/4
AZOTEA
0.10
0.18
0.10
DIAM.
VA-302
4.93
1/2
34
0.71
1/4
19.72
AZOTEA
0.10
VA-302
24.14
0.18
SUB TOTAL (m)
24.14
0.00
19.72
0.00
0.00
0.00
2.68
0.00
2.19
0.00
0.00
0.00
6.04
0.00
20.11
0.00
0.00
0.00
26.15
ACERO VIGAS 266 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
3.98
0.23
3.98
(pulg)
1/4
3/8
1/2
5/8
3/4
VA-304
4.44
1/2
4.18
3/8
23
0.97
1/4
17.76
AZOTEA
0.10
0.18
0.23
DIAM.
AZOTEA
0.23
0.10
VA-304
8.36
AZOTEA
0.23
VA-304
22.31
0.18
SUB TOTAL (m)
22.31
8.36
17.76
0.00
0.00
0.00
2.48
0.93
1.97
0.00
0.00
0.00
5.58
4.85
18.12
0.00
0.00
0.00
28.54
CROQUIS
2.98
0.10
(pulg)
3/8
1/2
5/8
3/4
AZOTEA
0.10
0.08
0.10
DIAM.
VA-30
3.18
3/8
21
0.51
1/4
12.72
AZOTEA
0.10
VA-30
10.71
0.08
SUB TOTAL (m)
10.71
12.72
0.00
0.00
0.00
0.00
1.19
1.41
0.00
0.00
0.00
0.00
2.68
7.38
0.00
0.00
0.00
0.00
10.06
ACERO VIGAS 267 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
5.65
0.10
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
AZOTEA
0.10
0.08
0.10
VA-30
5.85
3/8
34
0.51
1/4
93.60
AZOTEA
0.10
VA-30
69.36
0.08
SUB TOTAL (m)
69.36
93.60
0.00
0.00
0.00
0.00
7.71
10.40
0.00
0.00
0.00
0.00
17.34
54.29
0.00
0.00
0.00
0.00
71.63
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
5826.97 kg
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
37.01
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
46.09
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
29.68
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
ACERO VIGAS 271 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
63.05
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
16.01
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
74.60
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
26.92
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
82.98
ACERO VIGAS 274 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
35.81
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
ACERO VIGAS 275 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
29.74
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
41.23
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
143.37
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
139.56
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
45.80
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
125.95
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
120.21
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
45.80
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
74.60
ACERO VIGAS 283 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
132.31
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
118.82
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
7.20
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
24.52
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
15.04
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
74.60
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
32.76
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
26.86
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
275.58
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
43.98
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
47.14
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
50.36
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
37.30
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
50.36
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
5.30
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
265.73
ACERO VIGAS 297 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
10.53
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
41.52
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
281.82
ACERO VIGAS 299 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
25.79
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
27.99
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
129.93
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
ACERO VIGAS 301 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
148.11
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
25.79
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
139.49
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
160.15
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
136.30
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
134.92
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
298.55
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
367.43
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
10.71
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
10.18
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
7.96
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
12.75
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
61.49
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
298.55
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
402.39
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
46.47
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
12.75
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
61.49
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
16.58
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
33.98
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
84.48
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
12.74
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
5.77
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
53.06
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
24.78
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
9.34
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
15.11
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
21.11
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
18.00
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
12.40
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
80.88
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
22.48
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
7.71
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
18.00
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
76.36
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
26.15
ACERO VIGAS 325 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
28.54
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8
0.00
0.00
0.00
10.06
ACERO VIGAS 326 DE 360
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
0.00
0.00
71.63
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
01.05.05.03
2570.03 kg
PRIMERA PLANTA
DESCRIPCIO
N
N
VECES
CROQUIS
4.00
0.15
N
PIEZAS
DE
ACERO
LONG. DIAM.
PIEZA
DE
ACERO (pulg)
ALIG 1
0.15
1.43
37
4.30
1/2
159.10
74
1.58
1/2
116.92
ALIG 1
0.15
0.00
0.00
0.00
DESCRIPCIO
N
N
VECES
CROQUIS
4.50
0.15
1/4
N
PIEZAS
DE
ACERO
LONG. DIAM.
PIEZA
DE
(pulg)
ACERO
1/4
0.00
0.00
0.00
276.02
30.67
281.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
281.54
ALIG 2
0.15
1.93
4.80
1/2
33.60
14
2.08
1/2
29.12
ALIG 2
0.15
0.00
0.00
0.00
0.00
0.00
0.00
62.72
6.97
63.97
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
63.97
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
DESCRIPCIO
N
N
VECES
CROQUIS
15.08
0.15
N
PIEZAS
DE
ACERO
LONG. DIAM.
PIEZA
DE
ACERO (pulg)
1/4
ALIG 3
0.15
1.33
11
15.88
1/2
174.68
11
1.48
1/2
16.28
11
1.88
1/2
20.68
11
2.45
1/2
26.95
22
2.65
1/2
58.30
4.30
1/2
8.60
1.90
1/2
3.80
2.25
1/2
9.00
ALIG 3
0.15
1.73
ALIG 3
0.15
ALIG 3
2.45
ALIG 3
2.65
4.00
0.15
ALIG 3
0.15
1.60
0.15
ALIG 3
0.15
1.95
0.15
ALIG 3
0.15
0.00
0.00
0.00
0.00
0.00
0.00
318.29
35.37
324.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
324.66
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
DESCRIPCIO
N
N
VECES
CROQUIS
5.25
0.15
N
PIEZAS
DE
ACERO
LONG. DIAM.
PIEZA
DE
ACERO (pulg)
ALIG 4
0.15
2.58
5.55
1/2
44.40
2.73
1/2
21.84
1.88
1/2
15.04
ALIG 4
0.15
1.73
ALIG 4
0.15
0.00
0.00
0.00
DESCRIPCIO
N
N
VECES
CROQUIS
7.22
0.15
1/4
N
PIEZAS
DE
ACERO
LONG. DIAM.
PIEZA
DE
ACERO (pulg)
1/4
0.00
0.00
0.00
81.28
9.03
82.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
82.91
ALIG 5
0.15
1.33
7.52
1/2
52.64
14
1.48
1/2
20.72
2.45
1/2
17.15
2.25
1/2
13.50
ALIG 5
0.15
ALIG 5
2.45
1.95
0.15
SUB TOTAL (m)
ALIG 3
0.15
0.00
0.00
104.01
0.00
0.00
0.00
0.00
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
SUB TOTAL (Nmero de varillas)
SUB TOTAL (kg)
TOTAL DE ACERO (kg)
0.00
0.00
0.00
0.00
11.56
106.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
106.09
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
DESCRIPCIO
N
N
VECES
CROQUIS
2.15
0.15
DE BORDE
4.90
DE BORDE
3.30
DE BORDE
6.00
DE BORDE
10.00
DE BORDE
5.25
DE BORDE
4.55
4.90
5.20
1/2
10.40
3.60
1/2
14.40
6.30
1/2
12.60
10.80
1/2
21.60
5.49
1/2
21.96
4.79
1/2
19.16
5.09
1/2
10.18
VIGUETA
0.12
DE BORDE
4.85
0.12
1/2
VIGUETA
0.12
0.12
2.45
VIGUETA
0.15
0.12
VIGUETA
0.15
0.15
VIGUETA
0.15
0.15
1/4
VIGUETA
0.15
0.15
LONG. DIAM.
PIEZA
DE
ACERO (pulg)
VIGUETA
0.15
0.15
N
PIEZAS
DE
ACERO
VIGUETA
0.12
DE BORDE
0.00
0.00
0.00
0.00
0.00
0.00
115.20
12.80
117.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
117.50
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
DESCRIPCIO
N
N
VECES
CROQUIS
20.73
N
PIEZAS
DE
ACERO
LONG. DIAM.
PIEZA
DE
ACERO (pulg)
1/4
ACERO DE
0.25
TEMPERATURA
8.60
16
20.98
1/4
335.68
48
8.85
1/4
424.80
10
5.70
1/4
57.00
ACERO DE
0.25
TEMPERATURA
5.45
ACERO DE
0.25
TEMPERATURA
817.48
90.83
204.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
204.37
SEGUNDA PLANTA
DESCRIPCIO
N
N
VECES
CROQUIS
4.00
0.15
N
PIEZAS
DE
ACERO
LONG. DIAM.
PIEZA
DE
ACERO (pulg)
1/4
ALIG 1
0.15
1.43
19
4.30
1/2
81.70
38
1.58
1/2
60.04
ALIG 1
0.15
0.00
0.00
0.00
0.00
0.00
0.00
141.74
15.75
144.57
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
144.57
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
DESCRIPCIO
N
N
VECES
CROQUIS
5.00
0.15
N
PIEZAS
DE
ACERO
LONG. DIAM.
PIEZA
DE
ACERO (pulg)
ALIG 2
0.15
2.43
17
5.30
1/2
90.10
17
2.58
1/2
43.86
17
1.58
1/2
26.86
ALIG 2
0.15
1.43
ALIG 2
0.15
0.00
0.00
0.00
DESCRIPCIO
N
N
VECES
CROQUIS
15.58
0.15
1/4
N
PIEZAS
DE
ACERO
LONG. DIAM.
PIEZA
DE
ACERO (pulg)
1/4
0.00
0.00
0.00
160.82
17.87
164.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
164.04
ALIG 3
0.15
2.23
16.38
1/2
98.28
2.38
1/2
14.28
1.48
1/2
8.88
2.45
1/2
14.70
ALIG 3
0.15
1.33
ALIG 3
0.15
ALIG 3
2.45
ALIG 3
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
2.65
SUB TOTAL (m)
SUB TOTAL (Nmero de varillas)
SUB TOTAL (kg)
TOTAL DE ACERO (kg)
12
2.65
1/2
31.80
0.00
0.00
0.00
0.00
0.00
0.00
167.94
18.66
171.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
171.30
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
DESCRIPCIO
N
N
VECES
CROQUIS
5.75
0.15
N
PIEZAS
DE
ACERO
LONG. DIAM.
PIEZA
DE
ACERO (pulg)
ALIG 4
0.15
2.23
6.05
1/2
42.35
2.38
1/2
16.66
2.72
1/2
19.04
ALIG 4
0.15
2.57
ALIG 4
0.15
0.00
0.00
0.00
DESCRIPCIO
N
N
VECES
CROQUIS
7.22
0.15
1/4
N
PIEZAS
DE
ACERO
LONG. DIAM.
PIEZA
DE
ACERO (pulg)
1/4
0.00
0.00
0.00
78.05
8.67
79.61
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
79.61
ALIG 5
0.15
1.33
7.52
1/2
52.64
14
1.48
1/2
20.72
2.45
1/2
17.15
ALIG 5
0.15
ALIG 5
2.45
SUB TOTAL (m)
SUB TOTAL (Nmero de varillas)
SUB TOTAL (kg)
TOTAL DE ACERO (kg)
0.00
0.00
0.00
0.00
0.00
0.00
90.51
10.06
92.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
92.32
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
DESCRIPCIO
N
N
VECES
CROQUIS
11.27
0.15
LONG. DIAM.
PIEZA
DE
ACERO (pulg)
1/4
ALIG 6
0.15
1.53
12.07
1/2
84.49
14
1.68
1/2
23.52
14
1.48
1/2
20.72
0.75
1/2
6.00
2.45
1/2
17.15
2.45
1/2
17.15
ALIG 6
0.15
1.33
ALIG 6
0.15
0.45
0.15
N
PIEZAS
DE
ACERO
ALIG 6
0.15
ALIG 6
2.45
ALIG 6
2.45
SUB TOTAL (m)
SUB TOTAL (Nmero de varillas)
SUB TOTAL (kg)
TOTAL DE ACERO (kg)
0.00
0.00
0.00
0.00
0.00
0.00
169.03
18.78
172.41
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
172.41
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
DESCRIPCIO
N
N
VECES
CROQUIS
17.00
N
PIEZAS
DE
ACERO
LONG. DIAM.
PIEZA
DE
ACERO (pulg)
1/4
ACERO DE
0.25
TEMPERATURA
10.60
20
17.25
1/4
345.00
31
10.85
1/4
336.35
11
6.70
1/4
73.70
13
6.25
1/4
81.25
4.45
1/4
8.90
10
1.25
1/4
12.50
ACERO DE
0.25
TEMPERATURA
6.45
ACERO DE
0.25
TEMPERATURA
6.00
ACERO DE
0.25
TEMPERATURA
4.20
ACERO DE
0.25
TEMPERATURA
1.00
ACERO DE
0.25
TEMPERATURA
857.70
95.30
214.43
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
214.43
TERCERA PLANTA
DESCRIPCIO
N
N
VECES
CROQUIS
5.00
0.12
N
PIEZAS
DE
ACERO
LONG. DIAM.
PIEZA
DE
ACERO (pulg)
1/4
ALIG 7
0.12
5.24
1/2
47.16
ACERO LOSA 338 DE 360
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
1.43
ALIG 7
0.12
2.43
1.55
3/8
2.55
1/2
13.95
ALIG 7
0.12
22.95
0.00
0.00
0.00
13.95
1.55
8.09
70.11
7.79
71.51
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
79.60
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
DESCRIPCIO
N
N
VECES
CROQUIS
2.13
0.15
N
PIEZAS
DE
ACERO
LONG. DIAM.
PIEZA
DE
ACERO (pulg)
ALIG 8
0.15
16
2.43
1/2
4.60
N
PIEZAS
DE
ACERO
LONG. DIAM.
PIEZA
DE
ACERO (pulg)
1.83
38.88
4.32
39.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
39.66
11
4.84
3/8
53.24
22
1.95
3/8
42.90
ALIG 9
0.12
0.00
0.00
0.00
DESCRIPCIO
N
N
VECES
CROQUIS
2.85
1/4
0.00
0.00
0.00
ALIG 9
0.12
0.12
38.88
0.00
0.00
0.00
DESCRIPCIO
N
N
VECES
CROQUIS
0.12
1/4
N
PIEZAS
DE
ACERO
LONG. DIAM.
PIEZA
DE
ACERO (pulg)
1/4
96.14
10.68
55.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
55.76
ALIG 10
0.12
44
3.09
3/8
135.96
0.00
135.96
0.00
0.00
0.00
0.00
0.00
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
SUB TOTAL (Nmero de varillas)
SUB TOTAL (kg)
TOTAL DE ACERO (kg)
0.00
0.00
15.11
78.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
78.86
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
5.00
0.25
0.25
0.25
1/4
20
5.25
1/4
105.00
4.25
1/4
38.25
18
5.55
1/4
99.90
23
3.10
1/4
142.60
ACERO DE
TEMPERATURA
2.85
LONG. DIAM.
PIEZA
DE
ACERO (pulg)
ACERO DE
TEMPERATURA
5.30
N
PIEZAS
DE
ACERO
ACERO DE
TEMPERATURA
4.00
0.25
DESCRIPCIO
N
N
VECES
ACERO DE
TEMPERATURA
385.75
42.86
96.44
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
96.44
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
01.05.06.03
294.60 kg
149.52 kg
CROQUIS
DESCRIPCION
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
1 TRAMO
2.56
1er Piso
2.56
3/8
17.92
1.44
3/8
10.08
1.83
3/8
12.81
3.61
1/2
1.90
3/8
13.30
18
1.15
3/8
20.70
1 TRAMO
1.44
1er Piso
1 TRAMO
1.83
1er Piso
1 TRAMO
3.61
1er Piso
28.88
1 TRAMO
1.90
1er Piso
1 TRAMO
1.15
1er Piso
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
2.50
DESCANSO
2.50
3/8
15.00
0.00
0.00
0.00
89.81
28.88
0.00
0.00
0.00
0.00
9.98
3.21
0.00
0.00
0.00
0.00
52.09
29.46
0.00
0.00
0.00
0.00
81.55
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
DESCRIPCION
N VECES
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
2 TRAMO
1.93
1er Piso
1.93
3/8
13.51
4.47
1/2
1.35
3/8
9.45
1.85
3/8
12.95
16
1.15
3/8
18.40
2 TRAMO
4.47
1er Piso
35.76
2 TRAMO
1.35
1er Piso
2 TRAMO
1.85
1er Piso
2 TRAMO
1.15
1er Piso
0.00
54.31
35.76
0.00
0.00
0.00
0.00
0.00
6.03
3.97
0.00
0.00
0.00
0.00
0.00
31.50
36.48
0.00
0.00
0.00
0.00
67.98
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
145.08 kg
CROQUIS
DESCRIPCION
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
1 TRAMO
1.55
2do Piso
1.55
3/8
10.85
4.22
1/2
2.05
3/8
14.35
1.82
3/8
12.74
1 TRAMO
4.22
2do Piso
33.76
1 TRAMO
2.05
2do Piso
1 TRAMO
1.82
2do Piso
1 TRAMO
1.15
2do Piso
16
1.15
3/8
18.40
2.50
DESCANSO
2.50
3/8
15.00
0.00
71.34
33.76
0.00
0.00
0.00
0.00
0.00
7.93
3.75
0.00
0.00
0.00
0.00
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
0.00
41.38
34.44
0.00
0.00
0.00
0.00
75.81
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012
CROQUIS
DESCRIPCION
N VECES
DIAM.
(pulg)
1/4
3/8
1/2
5/8
3/4
1 3/8
2 TRAMO
1.93
2do Piso
1.93
3/8
13.51
4.47
1/2
1.32
3/8
9.24
1.87
3/8
13.09
18
1.15
3/8
20.70
2 TRAMO
4.47
2do Piso
35.76
2 TRAMO
1.32
2do Piso
2 TRAMO
1.87
2do Piso
2 TRAMO
1.15
2do Piso
0.00
56.54
35.76
0.00
0.00
0.00
0.00
0.00
6.28
3.97
0.00
0.00
0.00
0.00
0.00
32.79
36.48
0.00
0.00
0.00
0.00
69.27
01
01.01
01.01.01
01.01.02
01.01.03
01.01.04
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.02.07
01.03
01.03.01
01.03.02
01.03.03
01.03.04
01.03.05
01.03.06
01.03.07
01.04
01.04.01
01.04.01.01
01.04.02
01.04.02.01
01.04.02.02
01.04.03
01.04.03.01
01.05
01.05.01
01.05.01.01
01.05.01.02
01.05.02
01.05.02.01
01.05.02.02
01.05.02.03
01.05.03
01.05.03.01
01.05.03.02
01.05.03.03
01.05.04
01.05.04.01
01.05.04.02
01.05.04.03
01.05.05
01.05.05.01
01.05.05.02
01.05.05.03
01.05.05.04
01.05.05.05
01.05.06
01.05.06.01
ESTRUCTURAS
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40 x 4.80 m
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
CERCOS PROVISIONALES DE SEGURIDAD
ALMACEN. OFICINA Y CASETA DE GUARDIANIA DE 3.00m x 4.00m
TRABAJOS PRELIMINARES
DESMONTAJE DE TECHO
DESMONTAJE DE PUERTAS
DESMONTAJE DE VENTANAS
DEMOLICION DE MUROS DE TAPIAL
ELIMINACION MATERIAL DE DESMONTE
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL PARA CIMIENTOS-ZAPATAS EN TERRENO NORMAL
RELLENO COMPACTADO MANUAL CON MATERIAL PROPIO
RELLENO COMPACTADO MANUAL, MAT. DE PRESTAMO
ELIMINACION MATERIAL DE MATERIAL EXCEDENTE
NIVELACION INT. Y APISONADO PARA FALSO PISO
BASE GRANULAR PARA ZAPATAS Y CIMIENTOS CORRIDOS
MEJORAMIENTO DE SUELO EN ZAPATAS CON PIEDRA MEDIANA 6 (max)
CONCRETO SIMPLE
CIMIENTOS CORRIDOS
CIMIENTOS CORRIDOS MEZCLA C:H 1:10 + 30% PG MAX 8"
SOBRECIMIENTOS
SOBRECIMIENTO DE CONCRETO C:H 1:8 + 25% PM MAX 3"
ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO
SOLADOS
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON
CONCRETO ARMADO
ZAPATAS
CONCRETO PARA ZAPATAS F'C=210 KG/CM2
ACERO PARA ZAPATAS GRADO 60
VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2
ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION
ACERO EN VIGA DE CIMENTACION FY=4200 KG/CM2
COLUMNAS
CONCRETO EN COLUMNAS F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
ACERO EN COLUMNAS FY=4200 KG/CM2
VIGAS
CONCRETO EN VIGAS F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO EN VIGAS
ACERO EN VIGAS FY=4200 KG/CM2
LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS
ACERO EN LOSAS ALIGERADAS FY=4200 KG/CM2
LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO
LADRILLO HUECO DE ARCILLA 12X30X30 CM PARA TECHO ALIGERADO
ESCALERAS
CONCRETO EN ESCALERAS F'C=210 KG/CM2
RESUMEN 349 DE 360
01.05.06.02
01.05.06.03
02
02.01
02.01.01
02.01.02
02.01.03
02.02
02.02.01
02.02.02
02.02.03
02.03
02.03.01
02.03.02
02.03.03
02.03.04
02.03.05
02.03.06
02.04
02.04.01
02.05
02.05.01
02.05.02
02.05.03
02.05.04
02.05.05
02.05.06
02.05.07
02.05.08
02.05.09
02.05.10
02.06
02.06.01
02.06.02
02.06.03
02.07
02.07.01
02.07.02
02.07.03
02.07.04
02.08
02.08.01
02.08.02
02.08.03
02.08.04
02.08.05
02.09
02.09.01
02.09.02
02.09.03
02.09.04
02.10
02.10.01
02.11
02.11.01
02.11.02
ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MURO DE SOGA LADRILLO DE ARCILLA 9X13X24 CM, MEZ 1:5
JUNTA SISMICA 1" CON TEKNOPORT
MESADA DE CONCRETO
COBERTURA
COBERTURA CON TEJA ANDINA
COBERTURA CON ANDINA SOBRE ARMADURA DE MADERA
CUMBRERA TEJA ANDINA
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO EN INTERIORES ESPESOR 1.5 CM, MEZ 1:5
TARRAJEO EN EXTERIORES ESPESOR 1.5 CM, MEZ 1:5
TARRAJEO DE COLUMNAS, SUPERFICIE E=1.5 CM, MEZ. 1:5
TARRAJEO DE VIGAS, SUPERFICIE E=1.5 CM, MEZ. 1:5
VESTIDURA DE DERRAMES E=1.5, MEZ. 1:5
VESTIDURA FONDO DE ESCALERA MEZCLA 1:5 X 1.5 CM
CIELORRASOS
CIELORRASOS CON MEZCLA DE CEMENTO-ARENA
PISOS Y PAVIMENTOS
FALSO PISO DE 4" DE CONCRETO C:H 1:8
CONTRAPISO DE 48mm
PISO CERAMICO DE ALTO TRANSITO 30X30 CM
PISO DE CEMENTO PULIDO COLOREADO BRUADO E=2"
VEREDA DE CONCRETO f'c=140 kg/cm2 E=4" PASTA 1:2
CONCRETO EN SARDINEL f'c=140 kg/cm2
CONCRETO f'c=210 kg/cm2 EN PATIO Y ESTACIONAMIENTO
ENCOFRADO Y DESENCOFRADO PARA SARDINEL, VEREDAS, PATIO Y ESTACIONAMIENTO
JUNTAS ASFALTICAS 1"
CANTONERA 2"x2"-ALUMINIO, ESCALERA
ZOCALOS Y CONTRAZOCALOS
ZOCALO DE MAYOLICA BLANCA DE 20 X 30
CONTRAZOCALO DE CERAMICO 10 cm x 30 cm
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR EN EXTERIORES
CARPINTERIA DE MADERA
PUERTA APANELADA, MADERA CEDRO E=1 1/4"
VENTANA DE MADERA CEDRO
PUERTA CONTRAPLACADA-MADERA CEDRO E=35 MM
ESTANTE PARA ARMERIA
CARPINTERIA METALICA
PUERTA DE METALICA 5/8"
PUERTA DE METALICA 1/2"
PANELES METALICOS EN SERVICIOS HIGIENICOS
MAMPARA DE 3.82m x 3.00m
MAMPARA DE 4.17m x 2.80m
CERRAJERIA
BISAGRA CAPUCHINA DE 4" X 4"
CERRADURA PARA PUERTA PRINCIPAL PESADA
CERRADURA DE PERILLA PUERTA INTERIOR
CERRADURA PARA PUERTA DE CALABOZO
VIDRIOS
VIDRIO SEMIDOBLE
PINTURA
PINTURA LATEX EN INTERIORES Y CIELORRASOS
PINTURA LATEX EN EXTERIORES
RESUMEN 351 DE 360
02.11.03
02.11.04
03
03.01
03.01.01
03.01.02
03.01.03
03.01.04
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.03
03.03.01
03.03.02
03.03.03
03.03.04
03.03.05
03.04
03.04.01
03.04.02
03.04.03
03.05
03.05.01
03.06
03.06.01
03.07
03.07.01
03.08
03.08.01
03.08.02
03.09
03.09.01
03.09.02
03.10
03.10.01
03.11
03.11.01
03.12
03.12.01
INSTALACIONES ELECTRICAS
CABLES Y CONDUCTORES
CABLE ELECTRICO THW - 2.5 mm2
CABLE ELECTRICO THW - 4 mm2
CABLE ELECTRICO THW - 6 mm2
CABLE ELECTRICO THW - 10 mm2
TUBERIAS
TUBERIA 20 mm PVC SAP
TUBERIA 15 mm PVC SAP
CURVAS 20 mm PVC SAP
CURVAS 15 mm PVC SAP
CONECTOR A CAJA PVC SAP 20mm
CONECTOR A CAJA PVC SAP 15mm
ARTEFACTOS DE ILUMINACION
FLUORECENTE RECTO 2 x 36 W C/EQ + PANTALLA MAS REJILLA
FLUORECENTE RECTO 1 x 36 W C/EQ + PANTALLA MAS REJILLA
FOCO AHORRADOR DE 36 W
SALIDA PARA BRAKETE
LAMPARAS DE EMERGENCIA
INTERRUPTORES
INTERRUPTOR CON DADO SIMPLE
INTERRUPTOR CON DADO DOBLE
INTERRUPTOR CONMUTACION
TOMACORRIENTES
TOMACORRIENTE DOBLE UNIVERSAL MAS TOMA A TIERRA
CALENTADOR
THERMA ELECTRICA
ACOMETIDA
ACOMETIDA AEREA
CAJAS DE PASE METALICAS
CAJA DE FIERRO GALVANIZADO OCTOGONAL
CAJA DE FIERRO GALVANIZADO RECTANGULAR
TABLEROS ELECTRICOS
TABLERO TG-1
TABLERO DISTRIBUCION TG-2
ELECTROBOMBA
ELECTROBOMBA
POZO A TIERRA
POZO A TIERRA
PRUEBAS
PRUEBAS ELECTRICAS
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.01.07
04.01.08
04.01.09
04.01.10
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.02.06
04.02.07
04.02.08
04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06
04.03.07
04.03.08
04.03.09
04.04
04.04.01
04.04.02
04.04.03
04.04.04
05
05.01
05.02
05.03
05.04
INSTALACIONES SANITARIAS
SISTEMA DE AGUA
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"
SALIDA DE AGUA CALIENTE CON TUBERIA DE CPVC-SAP 1/2"
RED DE DISTRIBUCION TUBERIA DE 1" PVC-SAP
VALVULAS DE COMPUERTA DE BRONCE DE 3/4"
VALVULAS DE COMPUERTA DE BRONCE DE 1/2"
RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP
RED DE DISTRIBUCION TUBERIA DE 1/2" CPVC-P/AGUA CALIENTE
RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP
TANQUE DE ALMACENAMIENTO DE POLIETILENO Y ACCESORIOS
TANQUE CISTERNA DE POLIETILENO EQUIPADO CON ACCESORIOS
SISTEMA DE DESAGUE
SALIDA DE DESAGUE EN PVC SAL 2"
SALIDA DE DESAGUE EN PVC SAL 4"
TUBERIA DE DESAGUE PVC SAL 2"
TUBERIA DE DESAGUE PVC SAL 4"
SALIDA DE VENTILACION PVC 2"
REGISTROS DE BRONCE DE 4"
SUMIDEROS DE 2"
CAJA DE REGISTRO 0.30x0.60-TAPA CONCRETO
APARATOS Y ACCESORIOS SANITARIOS
INODORO SIFON JET BLANCO
OVALIN CERALUX 1 LLAVE MONOCOMANDO
URINARIO DE PARED BLANCO 1 LLAVE
DUCHAS CROMADAS DE CABEZA GIRATORIA
TOALLERA CON SOPORTE DE LOSA Y BARRA PLASTICA
PAPELERA DE LOSA Y BARRA PLASTICA COLOR BLANCO
JABONERAS DE LOZA BLANCA SIMPLE DE 15 X 15 cm
TAZA TURCA
LAVADERO DE ACERO INOXIDABLE
SISTEMA DE DESAGUE PLUVIAL
CANALETA DE ZINC DE 6"
MONTANTE PARA BAJADA DE AGUA DE LLUVIA D=3"
TUBERIA DE DESAGUE PVC SAL 4"
CAJA DE REGISTRO 0.40x0.80-TAPA REJILLA
EQUIPAMIENTO Y OTROS
EQUIPAMIENTO
ASTA DE BANDERA
FLETE TERRESTRE
LIMPIEZA GENERAL Y ENTREGA DE OBRA
1.00
1.00
82.58
1.00
und
GLB
m
GLB
152.37
6.00
7.00
152.37
101.90
412.25
412.25
m2
und
und
m2
m3
m2
m2
189.64
181.67
57.21
9.97
181.67
23.47
11.52
m3
m3
m3
m3
m2
m3
m3
26.57
m3
34.99
322.75
m3
m2
76.79
m2
38.40
1228.13
m3
kg
18.88
148.92
2117.71
m3
m2
kg
125.80
310.52
5623.42
m3
m2
kg
163.51
247.03
5826.97
m3
m2
kg
36.78
427.43
2570.03
2850.00
711.00
m3
m2
kg
und
und
4.37
m3
RESUMEN 355 DE 360
26.87
294.60
m2
kg
632.50
4.70
7.74
m2
m2
m2
84.99
38.00
8.40
m2
m2
m
632.50
619.72
310.52
193.62
53.56
13.63
m2
m2
m2
m2
m2
m2
427.43
m2
169.42
169.42
340.29
182.82
83.71
0.43
17.76
17.50
74.95
42.24
m2
m2
m2
m2
m2
m3
m3
m2
m
m
56.92
304.25
42.12
m2
m
m2
52.65
37.63
11.55
2.00
m2
m2
m2
und
2.00
1.00
13.42
2.00
2.00
und
und
m2
und
und
124.00
2.00
25.00
3.00
und
pza
pza
pza
219.14
p2
1216.04
774.98
m2
m2
RESUMEN 357 DE 360
64.20
34.93
m2
m2
1311.10
1042.20
108.15
19.00
m
m
m
m
1030.25
165.00
348.00
12.00
397.00
6.00
m
m
und
und
und
und
29.00
27.00
4.00
5.00
8.00
und
und
und
und
und
32.00
4.00
5.00
und
und
und
85.00
und
1.00
und
1.00
und
67.00
130.00
und
und
1.00
1.00
und
und
1.00
und
1.00
und
1.00
und
25.00
4.00
27.96
11.00
10.00
55.37
59.73
24.21
1.00
1.00
pto
pto
m
pza
pza
m
m
m
und
und
28.00
9.00
15.83
57.32
12.00
9.00
6.00
4.00
pto
pto
m
m
pto
pza
pza
und
6.00
7.00
3.00
4.00
4.00
6.00
4.00
2.00
3.00
pza
pza
pza
pza
pza
pza
pza
pza
pza
52.88
3.00
24.61
1.00
m
und
m
und
1.00
1.00
1.00
1.00
Gbl
Und
Gbl