Anda di halaman 1dari 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

01
01.01
01.01.01

ESTRUCTURAS
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40 x 4.80 m

01.01.02

MOVILIZACION Y DESMOVILIZACION DE EQUIPOS

01.01.03

CERCOS PROVISIONALES DE SEGURIDAD

DESCRIPCION
LONGITUD 1
LONGITUD 2
TOTAL m

N
VECES
1
1

LARGO
(m)
22.72
19.74

01.01.04

ALMACEN. OFICINA Y CASETA DE GUARDIANIA DE 3.00m x 4.00m

01.02
01.02.01

TRABAJOS PRELIMINARES
DESMONTAJE DE TECHO

DESCRIPCION
AREA 1
AREA 2
TOTAL m2
01.02.02

DESMONTAJE DE PUERTAS

01.02.03

DESMONTAJE DE VENTANAS

01.02.04

DEMOLICION DE MUROS DE TAPIAL

DESCRIPCION
AREA 1
AREA 2
TOTAL m2
01.02.05

ALTO
(m)

AREA
(m2)

N
VECES
1
1

LARGO
(m)
9.23
18.23

ANCHO
(m)
6.08
5.28

ALTO
(m)

AREA
(m2)
56.12
96.25
152.37

N
VECES
1
1

LARGO
(m)
9.23
18.23

ANCHO
(m)
6.08
5.28

ALTO
(m)

AREA
(m2)
56.12
96.25
152.37

N
VECES
2
2
2
2

LARGO
(m)
9.23
6.08
18.23
5.28

ANCHO
(m)
0.60
0.60
0.60
0.60

ALTO
(m)
1.75
1.75
1.75
1.75

FACTOR DE
ESPONJAMI
1.25
1.25
1.25
1.25

LARGO

ANCHO

ALTO

AREA

ELIMINACION MATERIAL DE DESMONTE

DESCRIPCION
MURO 1
MURO 2
MURO 3
MURO 4
TOTAL m3
01.02.06

ANCHO
(m)
22.88
17.24
82.58

LIMPIEZA DE TERRENO MANUAL

DESCRIPCION

320012699.xlsx 1 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

DESCRIPCION

AREA TOTAL DEL TERRENO


TOTAL m2
01.02.07

VECES
1

(m)
9.23

(m)
6.08

(m)

(m2)
412.25
412.25

N
VECES

LARGO
(m)

ANCHO
(m)

ALTO
(m)

AREA
(m2)
412.25
412.25

TRAZO Y REPLANTEO

DESCRIPCION
AREA TOTAL DEL TERRENO
TOTAL m2

320012699.xlsx 2 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

01.03
01.03.01

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL PARA CIMIENTOS-ZAPATAS EN TERRENO NORMAL

DESCRIPCION
ZAPATA 1
ZAPATA 2
ZAPATA 3
ZAPATA 4
ZAPATA 5
ZAPATA 5A
ZAPATA 6
ZAPATA 7
ZAPATA 8
ZAPATA 9
ZAPATA 10
ZAPATA 11
ZAPATA 12
ZAPATA 13
ZAPATA 14
ZAPATA 15
ZAPATA 16
ZAPATA 17
ZAPATA 18
CC 1
CC 2
CC 3
CC 4
CC 5
VIGAS ARRIOSTRAS

01.03.02

N
VECES
2
1
1
2
1
1
3
2
1
1
1
1
1
1
1
4
3
2
2
1
1
1
1
1
1

LARGO
(m)
1.50
1.60
1.65
2.20
1.90
2.50
1.80
1.65
3.60
2.00
2.00
2.00
1.60
1.50
2.00
1.90
0.80
1.00
1.20
13.35
47.56
25.21
6.78
4.51
8.05

ANCHO
(m)
1.50
1.50
1.65
2.00
1.80
1.90
1.70
1.50
1.65
1.85
1.70
1.30
1.50
1.40
1.20
1.00
0.80
0.80
1.00
0.50
0.50
0.50
0.60
0.60
0.25

AREA
(m2)

RELLENO COMPACTADO MANUAL CON MATERIAL PROPIO

DESCRIPCION

N
VECES

LARGO
(m)

ANCHO
(m)

ALTO
(m)
1.00

AREA
(m2)
181.67

ANCHO
(m)

ALTO
(m)
0.15
0.15
0.15
0.15
0.15
0.15

AREA
(m2)
4.58
4.64
3.89
5.26
10.59
10.07

RELLENO EN AMBIENTE
TOTAL m3
01.03.03

ALTO
PROMEDIO
(m)
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.45
1.30
1.20
1.35
1.20
1.15

RELLENO COMPACTADO MANUAL, MAT. DE PRESTAMO

DESCRIPCION
SS.HH. HOMBRES
SS.HH. MUJERES
PASADIZO 1
DEPOSITO
DELITOS - FALTAS
VIOLENCIA FAMILIAR

N
VECES
1
1
1
1
1
1

LARGO
(m)

320012699.xlsx 3 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

DEPOSITO 1
SALA DE MEDITACION
SALA DE MEDITACION 1
ATENCION CIUDADANA
MODULO DE ATENCION
INPOL
ADMINISTRACION
VEREDA
DEPOSITO 2
PASADIZO 2
VEREDA+ESTACIONAMIENTO
TOTAL m3

1
1
1
1
1
1
1
1
1
1
1

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

7.33
5.90
5.66
22.31
19.57
24.31
17.12
12.25
10.82
17.39
199.73

320012699.xlsx 4 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

01.03.04

ELIMINACION MATERIAL DE MATERIAL EXCEDENTE

DESCRIPCION

N
VECES

VOLUMEN TOTAL A ELIMINAR


TOTAL m3
01.03.05

VOLUMEN DE
RELLENO

FACTOR DE

VOLUMEN

(m3)
189.64

(m3)
181.67

ESPONJAMIENTO
1.25

(m3)
7.97

LARGO
(m)

ANCHO
(m)

ALTO
(m)

AREA
(m2)
4.58
4.64
3.89
5.26
10.59
10.07
7.33
5.90
5.66
22.31
19.57
24.31
17.12
12.25
10.82
17.39

NIVELACION INT. Y APISONADO PARA FALSO PISO

DESCRIPCION
SS.HH. HOMBRES
SS.HH. MUJERES
PASADIZO 1
DEPOSITO
DELITOS - FALTAS
VIOLENCIA FAMILIAR
DEPOSITO 1
SALA DE MEDITACION
SALA DE MEDITACION 1
ATENCION CIUDADANA
MODULO DE ATENCION
INPOL
ADMINISTRACION
VEREDA
DEPOSITO 2
PASADIZO 2
TOTAL m2
01.03.06

VOLUMEN DE
CORTE

N
VECES
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

181.67

BASE GRANULAR PARA ZAPATAS Y CIMIENTOS CORRIDOS

DESCRIPCION
ZAPATA 1
ZAPATA 2
ZAPATA 3
ZAPATA 4
ZAPATA 5
ZAPATA 5A
ZAPATA 6
ZAPATA 7
ZAPATA 8
ZAPATA 9
ZAPATA 10
ZAPATA 11
ZAPATA 12
ZAPATA 13
ZAPATA 14

N
VECES
2
1
1
2
1
1
3
2
1
1
1
1
1
1
1

LARGO
(m)
1.50
1.60
1.65
2.20
1.90
2.50
1.80
1.65
3.60
2.00
2.00
2.00
1.60
1.50
2.00

ANCHO
(m)
1.50
1.50
1.65
2.00
1.80
1.90
1.70
1.50
1.65
1.85
1.70
1.30
1.50
1.40
1.20

ALTO
(m)
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

AREA
(m2)

320012699.xlsx 5 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

ZAPATA 15
ZAPATA 16
ZAPATA 17
ZAPATA 18
CC 1
CC 2
CC 3
CC 4
CC 5
VIGAS ARRIOSTRAS
TOTAL m3

4
3
2
2
3
2
1
1
1
1

1.90
0.80
1.00
1.20
13.95
49.06
25.21
6.78
5.31
8.05

1.00
0.80
0.80
1.00
0.50
0.50
0.50
0.60
0.60
0.25

0.10
0.10
0.10
0.10
0.15
0.15
0.15
0.15
0.15
1.15

320012699.xlsx 6 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

01.03.07

MEJORAMIENTO DE SUELO EN ZAPATAS CON PIEDRA MEDIANA 6 (max)

DESCRIPCION
ZAPATA 1
ZAPATA 2
ZAPATA 3
ZAPATA 4
ZAPATA 5
ZAPATA 5A
ZAPATA 6
ZAPATA 7
ZAPATA 8
ZAPATA 9
ZAPATA 10
ZAPATA 11
ZAPATA 12
ZAPATA 13
ZAPATA 14
ZAPATA 15
ZAPATA 16
ZAPATA 17
ZAPATA 18
TOTAL m3
01.04
01.04.01
01.04.01.01

LARGO
(m)
1.50
1.60
1.65
2.20
1.90
2.50
1.80
1.65
3.60
2.00
2.00
2.00
1.60
1.50
2.00
1.90
0.80
1.00
1.20

ANCHO
(m)
1.50
1.50
1.65
2.00
1.80
1.90
1.70
1.50
1.65
1.85
1.70
1.30
1.50
1.40
1.20
1.00
0.80
0.80
1.00

ALTO
(m)
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

AREA
(m2)

ANCHO
(m)
0.50
0.50
0.50
0.60
0.60

ALTO
(m)
0.50
0.50
0.50
0.50
0.78

AREA
(m2)

ANCHO
(m)

ALTO
(m)

AREA
(m2)
0.39
0.26
0.39
0.39
0.26
0.39

CONCRETO SIMPLE
CIMIENTOS CORRIDOS
CIMIENTOS CORRIDOS MEZCLA C:H 1:10 + 30% PG MAX 8"

DESCRIPCION
CC 1
CC 2
CC 3
CC 4
CC 5
TOTAL m3
01.04.02
01.04.02.01

N
VECES
2
1
1
2
1
1
3
2
1
1
1
1
1
1
1
4
3
2
2

N
VECES
1
1
1
1
1

LARGO
(m)
13.95
49.06
25.21
6.78
5.31

SOBRECIMIENTOS
SOBRECIMIENTO DE CONCRETO C:H 1:8 + 25% PM MAX 3"

DESCRIPCION
EJE A - A TRAMO 9 - 8
EJE A - A TRAMO 18 - 11
EJE A" - A" TRAMO 9 - 8
EJE C - C TRAMO 9 - 8
EJE C - C TRAMO 7 - 2
EJE D - D TRAMO 7 - 4

N
VECES
1
1
1
1
1
1

LARGO
(m)
3.10
12.10
2.20
1.92
8.68
4.22

320012699.xlsx 7 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

EJE D - D TRAMO 4 - 3
EJE D - D TRAMO 3 - 2
EJE D' - D' TRAMO 9 - 8 , 4 EJE E - E TRAMO 7 - 4
EJE F - F TRAMO 9 - 2
EJE H - H TRAMO 9 - 7
EJE I - I TRAMO 9 - 7
EJE 2 - 2 TRAMO C - E
EJE 2' - 2' TRAMO C - D
EJE 3 - 3 TRAMO C - D
EJE 3'' - 3'' TRAMO C - D
EJE 4 - 4 TRAMO C - F

1
1
1
1
1
1
1
1
1
1
1
1

0.45
2.90
2.35
4.99
11.09
2.40
2.40
2.00
2.90
2.60
1.85
5.60

0.22
0.26
0.39
0.26
0.26
0.26
0.26
0.26
0.39
0.27
0.39
0.27

320012699.xlsx 8 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

EJE 5 - 5 TRAMO C - D
EJE 7 - 7 TRAMO C - F
EJE 8 - 8 TRAMO C - E
EJE 8 - 8 TRAMO E - I
EJE 8' - 8' TRAMO A - E
EJE 9 - 9 TRAMO A - C
EJE 9 - 9 TRAMO C - I
EJE 9 - 9 TRAMO I - N
EJE 11 - 11 TRAMO A - K , L
EJE 11 - 11 TRAMO K - L
TOTAL m3
01.04.02.02

1
1
1
1
1
1
1
1
1
1

2.65
5.65
4.40
5.47
7.20
3.89
12.37
2.43
1.29
3.00

0.27
0.27
0.21
0.27
0.39
0.39
0.27
0.11
0.26
0.20

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO

DESCRIPCION
EJE A - A TRAMO 9 - 8
EJE A - A TRAMO 18 - 11
EJE A" - A" TRAMO 9 - 8
EJE C - C TRAMO 9 - 8
EJE C - C TRAMO 7 - 2
EJE D - D TRAMO 7 - 4
EJE D - D TRAMO 4 - 3
EJE D - D TRAMO 3 - 2
EJE D' - D' TRAMO 9 - 8 , 4 EJE E - E TRAMO 7 - 4
EJE F - F TRAMO 9 - 2
EJE H - H TRAMO 9 - 7
EJE I - I TRAMO 9 - 7
EJE 2 - 2 TRAMO C - E
EJE 2' - 2' TRAMO C - D
EJE 3 - 3 TRAMO C - D
EJE 3'' - 3'' TRAMO C - D
EJE 4 - 4 TRAMO C - F
EJE 5 - 5 TRAMO C - D
EJE 7 - 7 TRAMO C - F
EJE 8 - 8 TRAMO C - E
EJE 8 - 8 TRAMO E - I
EJE 8' - 8' TRAMO A - E
EJE 9 - 9 TRAMO A - C
EJE 9 - 9 TRAMO C - I
EJE 9 - 9 TRAMO I - N
EJE 11 - 11 TRAMO A - K , L
EJE 11 - 11 TRAMO K - L
TOTAL m2

N
VECES
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

LARGO
(m)
3.10
12.10
2.20
1.92
8.68
4.22
0.45
2.90
2.35
4.99
11.09
2.40
2.40
2.00
2.90
2.60
1.85
5.60
2.65
5.65
4.40
5.47
7.20
3.89
12.37
2.43
1.29
3.00

ANCHO
(m)

PERIMETRO
(m)
3.50
2.30
3.50
3.50
2.50
3.50
1.90
2.50
3.50
2.50
2.50
2.50
2.50
2.50
3.50
2.50
3.50
2.50
2.50
2.50
1.80
2.50
3.50
3.50
2.50
1.10
2.30
1.60

AREA
(m2)
10.85
27.83
7.70
6.72
21.70
14.77
0.86
7.25
8.23
12.48
27.73
6.00
6.00
5.00
10.15
6.50
6.48
14.00
6.63
14.13
7.92
13.68
25.20
13.62
30.93
2.67
2.97
4.80
322.75

320012699.xlsx 9 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

01.04.03
01.04.03.01

SOLADOS
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON

DESCRIPCION
ZAPATA 1
ZAPATA 2
ZAPATA 3
ZAPATA 4
ZAPATA 5
ZAPATA 5A
ZAPATA 6
ZAPATA 7
ZAPATA 8
ZAPATA 9
ZAPATA 10
ZAPATA 11
ZAPATA 12
ZAPATA 13
ZAPATA 14
ZAPATA 15
ZAPATA 16
ZAPATA 17
ZAPATA 18
TOTAL m2
01.05
01.05.01
01.05.01.01

N
VECES
2
1
1
2
1
1
3
2
1
1
1
1
1
1
1
4
3
2
2

LARGO
(m)
1.50
1.60
1.65
2.20
1.90
2.50
1.80
1.65
3.60
2.00
2.00
2.00
1.60
1.50
2.00
1.90
0.80
1.00
1.20

ANCHO
(m)
1.50
1.50
1.65
2.00
1.80
1.90
1.70
1.50
1.65
1.85
1.70
1.30
1.50
1.40
1.20
1.00
0.80
0.80
1.00

ALTO
(m)

AREA
(m2)
4.50
2.40
2.72
8.80
3.42
4.75
9.19
4.95
5.94
3.70
3.40
2.60
2.40
2.10
2.40
7.60
1.92
1.60
2.40
76.79

LARGO
(m)
1.50
1.60
1.65
2.20
1.90
2.50
1.80
1.65
3.60
2.00
2.00
2.00
1.60
1.50
2.00
1.90
0.80
1.00

ANCHO
(m)
1.50
1.50
1.65
2.00
1.80
1.90
1.70
1.50
1.65
1.85
1.70
1.30
1.50
1.40
1.20
1.00
0.80
0.80

ALTO
(m)
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

AREA
(m2)

CONCRETO ARMADO
ZAPATAS
CONCRETO PARA ZAPATAS F'C=210 KG/CM2

DESCRIPCION
ZAPATA 1
ZAPATA 2
ZAPATA 3
ZAPATA 4
ZAPATA 5
ZAPATA 5A
ZAPATA 6
ZAPATA 7
ZAPATA 8
ZAPATA 9
ZAPATA 10
ZAPATA 11
ZAPATA 12
ZAPATA 13
ZAPATA 14
ZAPATA 15
ZAPATA 16
ZAPATA 17

N
VECES
2
1
1
2
1
1
3
2
1
1
1
1
1
1
1
4
3
2

320012699.xlsx 10 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

ZAPATA 18
TOTAL m3
01.05.01.02

1.20

1.00

0.50

ACERO PARA ZAPATAS GRADO 6(Ver hoja adjunta)

320012699.xlsx 11 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

01.05.02
01.05.02.01

VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2

DESCRIPCION
EJE A - A T
EJE A - A T
EJE A - A T
EJE C - C T
EJE C - C T
EJE C - C T
EJE C - C T
EJE C - C T
EJE D - D T
EJE D - D T
EJE E - E T
EJE E - E T
EJE E - E T
EJE F - F T
EJE F - F T
EJE F - F T
EJE F - F T
EJE F - F T
EJE H - H T
EJE I - I TR
EJE 2 - 2 T
EJE 2 - 2 T
EJE 3 - 3 T
EJE 3 - 3 T
EJE 4 - 4 T
EJE 4 - 4 T
EJE 4 - 4 T
EJE 5 - 5 T
EJE 5 - 5 T
EJE 7 - 7 T
EJE 7 - 7 T
EJE 8 - 8 T
EJE 8 - 8 T
EJE 8 - 8 T
EJE 8 - 8 T
EJE 8 - 8 T
EJE 9 - 9 T
EJE 9 - 9 T
EJE 9 - 9 T
EJE 9 - 9 T
EJE 9 - 9 T
EJE 9 - 9 T
EJE 11 - 11
EJE 11 - 11

VR1
VR2
VR2
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR2
VR2
VR2

N
VECES
1
4
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

LARGO
(m)
3.25
2.45
2.29
3.55
3.07
3.30
3.80
2.90
3.80
3.05
3.55
3.22
3.30
3.55
3.07
3.30
3.80
2.93
3.55
3.55
2.60
4.75
2.60
4.80
2.60
1.40
3.00
4.40
3.00
4.40
3.00
4.66
4.40
3.00
3.05
2.47
4.66
4.40
3.00
3.05
2.47
2.43
0.64
3.00

ANCHO
(m)
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

ALTO
(m)
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

AREA
(m2)

320012699.xlsx 12 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

EJE 11 - 11
TOTAL m3

VR2

0.66

0.25

0.50

320012699.xlsx 13 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

01.05.02.02

ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION

DESCRIPCION
EJE A - A T
EJE A - A T
EJE A - A T
EJE C - C T
EJE C - C T
EJE C - C T
EJE C - C T
EJE C - C T
EJE D - D T
EJE D - D T
EJE E - E T
EJE E - E T
EJE E - E T
EJE F - F T
EJE F - F T
EJE F - F T
EJE F - F T
EJE F - F T
EJE H - H T
EJE I - I TR
EJE 2 - 2 T
EJE 2 - 2 T
EJE 3 - 3 T
EJE 3 - 3 T
EJE 4 - 4 T
EJE 4 - 4 T
EJE 4 - 4 T
EJE 5 - 5 T
EJE 5 - 5 T
EJE 7 - 7 T
EJE 7 - 7 T
EJE 8 - 8 T
EJE 8 - 8 T
EJE 8 - 8 T
EJE 8 - 8 T
EJE 8 - 8 T
EJE 9 - 9 T
EJE 9 - 9 T
EJE 9 - 9 T
EJE 9 - 9 T
EJE 9 - 9 T
EJE 9 - 9 T
EJE 11 - 11
EJE 11 - 11
EJE 11 - 11
TOTAL m2

VR1
VR2
VR2
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR1
VR2
VR2
VR2
VR2

N
VECES
2
8
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
1
1
1

LARGO
(m)
3.25
2.45
2.29
3.55
3.07
3.30
3.80
2.90
3.80
3.05
3.55
3.22
3.30
3.55
3.07
3.30
3.80
2.93
3.55
3.55
2.60
4.75
2.60
4.80
2.60
1.40
3.00
4.40
3.00
4.40
3.00
4.66
4.40
3.00
3.05
2.47
4.66
4.40
3.00
3.05
2.47
2.43
0.64
3.00
0.66

ANCHO
(m)

ALTO
(m)
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

AREA
(m2)
3.25
9.80
2.29
3.55
3.07
3.30
3.80
2.90
3.80
3.05
3.55
3.22
3.30
3.55
3.07
3.30
3.80
2.93
3.55
3.55
2.60
4.75
2.60
4.80
2.60
1.40
3.00
4.40
3.00
4.40
3.00
4.66
4.40
3.00
3.05
2.47
4.66
4.40
3.00
3.05
2.47
2.43
0.32
1.50
0.33
148.92

320012699.xlsx 14 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

01.05.02.03

ACERO EN VIGA DE CIMENTACION FY=4200 KG/CM2

(Ver hoja adjunta)

320012699.xlsx 15 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

01.05.03
01.05.03.01

COLUMNAS
CONCRETO EN COLUMNAS F'C=210 KG/CM2

DESCRIPCION
EJE A - A C
EJE A - A CO
EJE A - A C
EJE A - A C
EJE A - A C
EJE A - A C
EJE A - A C
EJE A - A C
EJE A - A C
EJE A - A C
EJE A - A C
EJE C - C C
EJE C - C C
EJE C - C CO
EJE C - C C
EJE C - C CO
EJE C - C CO
EJE C - C CO
EJE C - C C
EJE C - C C
EJE C - C CO
EJE C - C C
EJE C - C CO
EJE C - C CO
EJE C - C C
EJE C - C CO
EJE C - C C
EJE C - C CO
EJE C - C CO
EJE C - C C
EJE C - C C
EJE C - C C
EJE C - C C
EJE C - C C
EJE D - D C
EJE D - D CO
EJE D - D CO
EJE D - D C
EJE D - D CO
EJE D - D C
EJE D - D CO
EJE D - D CO
EJE D - D C
EJE D - D CO
EJE D - D CO

C-1
C-9
C-1
C-8
C-7
C-7
C-7
C-7
C-7
C-7
C-7
C-1
C-10
C-9
C-2
C-2
C-10
C-10
C-2
C-10
C-9
C-9
C-9
C-9
C-2
C-9
C-9
C-9
C-9
C-1
C-10
C-2
C-9
C-2
C-2
C-9
C-9
C-4
C-9
C-2
C-9
C-9
C-9
C-9
C-9

N
VECES
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
1
1

LARGO
(m)

ANCHO
(m)

0.25

0.25

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

0.15
0.25
0.40
0.40
0.15
0.15
0.40
0.15
0.25
0.25
0.25
0.25
0.40
0.25
0.25
0.25
0.25

0.15
0.25
0.40
0.40
0.15
0.15
0.40
0.15
0.25
0.25
0.25
0.25
0.40
0.25
0.25
0.25
0.25

0.15
0.40
0.25
0.40
0.40
0.25
0.25
0.40
0.25
0.40
0.25
0.25
0.25
0.25
0.25

0.15
0.40
0.25
0.40
0.40
0.25
0.25
0.40
0.25
0.40
0.25
0.25
0.25
0.25
0.25

ALTO
(m)
10.60
4.20
10.60
5.10
4.90
4.90
4.90
4.90
4.90
4.90
5.40
8.40
1.00
3.70
8.86
3.70
0.96
0.80
8.86
1.00
3.70
3.70
2.40
2.40
8.40
3.70
3.70
2.40
2.40
8.90
1.00
8.90
4.20
8.90
8.40
3.70
2.40
9.80
3.70
9.80
4.40
2.60
7.40
4.40
2.60

AREA
(m2)
1.60
1.60

1.60

1.60

320012699.xlsx 16 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

EJE D - D C
EJE D' - D'
EJE E - E C
EJE E - E C
EJE E - E CO
EJE E - E CO
EJE E - E CO
EJE E - E CO
EJE E - E C
EJE E - E CO
EJE E - E C
EJE E - E C
EJE E - E C

C-9
C-9
C-9
C-2
C-9
C-9
C-9
C-9
C-4
C-9
C-4
C-2
C-2

1
1
1
1
1
1
1
1
1
1
1
1
1

0.25
0.25
0.25
0.40
0.25
0.25
0.25
0.25
0.40
0.25
0.40
0.40
0.40

0.25
0.25
0.25
0.40
0.25
0.25
0.25
0.25
0.40
0.25
0.40
0.40
0.40

7.40
7.40
7.40
7.40
3.70
2.40
3.70
2.40
6.90
2.40
7.40
7.40
8.40

320012699.xlsx 17 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

EJE F - F C
EJE F - F C
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F C
EJE F - F CO
EJE F - F CO
EJE F - F CON
EJE F - F CON
EJE F - F C
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F C
EJE F - F C
EJE F - F C
EJE F - F CO
EJE F - F CO
EJE F - F C
EJE F - F C
EJE H - H C
EJE H - H CO
EJE H - H CO
EJE H - H C
EJE I - I CO
EJE I - I CON
EJE I - I CO
EJE I - I CO
EJE 2 - 2 CO
EJE 2 - 2 CO
EJE 2 - 2 CO
EJE 8 - 8 CO
EJE 8 - 8 CO
EJE 8 - 8 CO
EJE 8 - 8 CO
EJE 8' - 8'
EJE 8' - 8'
EJE 8' - 8'
EJE 8' - 8'
EJE 8' - 8'
EJE 8' - 8'
EJE 9 - 9 CO

C-3
C-2
C-9
C-9
C-10
C-9
C-9
C-10
C-10
C-2
C-9
C-9
C-9
C-9
C-2
C-9
C-9
C-9
C-9
C-10
C-10
C-10
C-1
C-2
C-10
C-9
C-9
C-2
C-2
C-9
C-9
C-2
C-2
C-9
C-10
C-2
C-9
C-9
C-5
C-10
C-9
C-10
C-10
C-10
C-9
C-10
C-9
C-9
C-9
C-9

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

0.40
0.25
0.25
0.15
0.25
0.25
0.15
0.15
0.40
0.25
0.25
0.25
0.25
0.40
0.25
0.25
0.25
0.25
0.15
0.15
0.15

0.40
0.25
0.25
0.15
0.25
0.25
0.15
0.15
0.40
0.25
0.25
0.25
0.25
0.40
0.25
0.25
0.25
0.25
0.15
0.15
0.15

0.40
0.15
0.25
0.25
0.40
0.40
0.25
0.25
0.40
0.40
0.25
0.15
0.40
0.25
0.25
0.30
0.15
0.25
0.15
0.15
0.15
0.25
0.15
0.25
0.25
0.25
0.25

0.40
0.15
0.25
0.25
0.40
0.40
0.25
0.25
0.40
0.40
0.25
0.15
0.40
0.25
0.25
0.30
0.15
0.25
0.15
0.15
0.15
0.25
0.15
0.25
0.25
0.25
0.25

8.05
8.05
3.70
2.40
1.00
3.70
2.40
1.90
0.90
8.40
3.70
2.40
3.70
2.40
8.40
3.70
2.40
3.70
2.40
1.90
0.75
1.00
8.40
8.40
1.90
3.70
3.70
8.40
9.05
3.70
2.40
9.05
8.14
3.70
1.75
8.14
3.70
2.40
1.78
2.70
2.40
1.00
0.90
4.20
4.20
4.20
4.20
3.70
2.40
4.20

0.20

1.60

320012699.xlsx 18 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

EJE 9 - 9
EJE 9 - 9
EJE 9 - 9
EJE 9 - 9
EJE 9 - 9
EJE 9 - 9
EJE 9 - 9
EJE 9 - 9
EJE 9 - 9
EJE 9 - 9
EJE 9 - 9
EJE 9 - 9
EJE 9 - 9

CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
C
CO
C

C-9
C-6
C-9
C-10
C-9
C-9
C-9
C-9
C-9
C-9
C-10
C-7
C-7

1
1
1
1
1
1
1
2
1
1
1
1
1

0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.25

0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.25

2.40
2.70
4.20
1.00
4.20
2.40
3.70
2.40
3.70
2.40
1.00
4.17
4.17

320012699.xlsx 19 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

EJE 11 - 11
EJE 11 - 11
EJE 11 - 11
TOTAL m3
01.05.03.02

C-8
C-8
C-8

1
1
1

0.25
0.25
0.25

0.25
0.25
0.25

5.10
5.10
5.10

LARGO
(m)

ANCHO
(m)

ALTO
(m)
10.60
4.20
10.60
5.10
4.90
4.90
4.90
4.90
4.90
4.90
5.40
8.40
1.00
3.70
8.86
3.70
0.96
0.80
8.86
1.00
3.70
3.70
2.40
2.40
8.40
3.70
3.70
2.40
2.40
8.90
1.00
8.90
4.20
8.90
8.40
3.70
2.40
9.80
3.70
9.80
4.40

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

DESCRIPCION
EJE A - A C
EJE A - A CO
EJE A - A C
EJE A - A C
EJE A - A C
EJE A - A C
EJE A - A C
EJE A - A C
EJE A - A C
EJE A - A C
EJE A - A C
EJE C - C C
EJE C - C C
EJE C - C CO
EJE C - C C
EJE C - C CO
EJE C - C CO
EJE C - C CO
EJE C - C C
EJE C - C C
EJE C - C CO
EJE C - C C
EJE C - C CO
EJE C - C CO
EJE C - C C
EJE C - C CO
EJE C - C C
EJE C - C CO
EJE C - C CO
EJE C - C C
EJE C - C C
EJE C - C C
EJE C - C C
EJE C - C C
EJE D - D C
EJE D - D CO
EJE D - D CO
EJE D - D C
EJE D - D CO
EJE D - D C
EJE D - D CO

C-1
C-9
C-1
C-8
C-7
C-7
C-7
C-7
C-7
C-7
C-7
C-1
C-10
C-9
C-2
C-2
C-10
C-10
C-2
C-10
C-9
C-9
C-9
C-9
C-2
C-9
C-9
C-9
C-9
C-1
C-10
C-2
C-9
C-2
C-2
C-9
C-9
C-4
C-9
C-2
C-9

N
VECES
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.40
0.40
0.15
0.15
0.40
0.15
0.25
0.25
0.25
0.25
0.40
0.25
0.25
0.25
0.25
0.15
0.40
0.25
0.40
0.40
0.25
0.25
0.40
0.25
0.40
0.25

PERIMETRO
(m)
1.45
1.45

1.45

1.45

320012699.xlsx 20 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

EJE D - D CO
EJE D - D C
EJE D - D CO
EJE D - D CO
EJE D - D C
EJE D' - D'
EJE E - E C
EJE E - E C
EJE E - E CO
EJE E - E CO
EJE E - E CO
EJE E - E CO
EJE E - E C
EJE E - E CO

C-9
C-9
C-9
C-9
C-9
C-9
C-9
C-2
C-9
C-9
C-9
C-9
C-4
C-9

1
1
1
1
1
1
1
1
1
1
1
1
1
1

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.40
0.25
0.25
0.25
0.25
0.40
0.25

2.60
7.40
4.40
2.60
7.40
7.40
7.40
7.40
3.70
2.40
3.70
2.40
6.90
2.40

320012699.xlsx 21 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

EJE E - E C
EJE E - E C
EJE E - E C
EJE F - F C
EJE F - F C
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F C
EJE F - F CO
EJE F - F CO
EJE F - F CON
EJE F - F CON
EJE F - F C
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F CO
EJE F - F C
EJE F - F C
EJE F - F C
EJE F - F CO
EJE F - F CO
EJE F - F C
EJE F - F C
EJE H - H C
EJE H - H CO
EJE H - H CO
EJE H - H C
EJE I - I CO
EJE I - I CON
EJE I - I CO
EJE I - I CO
EJE 2 - 2 CO
EJE 2 - 2 CO
EJE 2 - 2 CO
EJE 8 - 8 CO
EJE 8 - 8 CO
EJE 8 - 8 CO
EJE 8 - 8 CO
EJE 8' - 8'
EJE 8' - 8'
EJE 8' - 8'
EJE 8' - 8'

C-4
C-2
C-2
C-3
C-2
C-9
C-9
C-10
C-9
C-9
C-10
C-10
C-2
C-9
C-9
C-9
C-9
C-2
C-9
C-9
C-9
C-9
C-10
C-10
C-10
C-1
C-2
C-10
C-9
C-9
C-2
C-2
C-9
C-9
C-2
C-2
C-9
C-10
C-2
C-9
C-9
C-5
C-10
C-9
C-10
C-10
C-10
C-9
C-10
C-9

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1

0.40
0.40
0.40
0.40
0.25
0.25
0.15
0.25
0.25
0.15
0.15
0.40
0.25
0.25
0.25
0.25
0.40
0.25
0.25
0.25
0.25
0.15
0.15
0.15
0.40
0.15
0.25
0.25
0.40
0.40
0.25
0.25
0.40
0.40
0.25
0.15
0.40
0.25
0.25
0.30
0.15
0.25
0.15
0.15
0.15
0.25
0.15
0.25

7.40
7.40
8.40
8.05
8.05
3.70
2.40
1.00
3.70
2.40
1.90
0.90
8.40
3.70
2.40
3.70
2.40
8.40
3.70
2.40
3.70
2.40
1.90
0.75
1.00
8.40
8.40
1.90
3.70
3.70
8.40
9.05
3.70
2.40
9.05
8.14
3.70
1.75
8.14
3.70
2.40
1.78
2.70
2.40
1.00
0.90
4.20
4.20
4.20
4.20

1.57

1.45

320012699.xlsx 22 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

EJE 8' - 8'


EJE 8' - 8'
EJE 9 - 9 CO
EJE 9 - 9 CO
EJE 9 - 9 CO
EJE 9 - 9 CO
EJE 9 - 9 CO
EJE 9 - 9 CO
EJE 9 - 9 CO
EJE 9 - 9 CO
EJE 9 - 9 CO
EJE 9 - 9 CO
EJE 9 - 9 CO

C-9
C-9
C-9
C-9
C-6
C-9
C-10
C-9
C-9
C-9
C-9
C-9
C-9

1
1
1
1
1
1
1
1
1
1
2
1
1

0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.25
0.25

3.70
2.40
4.20
2.40
2.70
4.20
1.00
4.20
2.40
3.70
2.40
3.70
2.40

320012699.xlsx 23 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

EJE 9 - 9 C
EJE 9 - 9 CO
EJE 9 - 9 C
EJE 11 - 11
EJE 11 - 11
EJE 11 - 11
TOTAL m2

C-10
C-7
C-7
C-8
C-8
C-8

1
1
1
1
1
1

01.05.03.03

ACERO EN COLUMNAS FY=4200 KG/CM2

01.05.04
01.05.04.01

VIGAS
CONCRETO EN VIGAS F'C=210 KG/CM2

DESCRIPCION
VA-101, VAVA2
VA-304
VOLADO
VA-11
VE
VA-102; VAVA-106; VAVE2
VA-303
VOLADO
VA1
VA-107; VAVA21
VA-303
VOLADO
VA-103, VAVA-108, VAVA1
VA21
VA-11
VA-104; VAVA-109; VAVA-301
VOLADO
VA-105, VA-2
VOLADO
VA-11
VA-105
VA-306
VOLADO
V-101, V-201
V-301
VA-11
V-102; V-202

EJE A-A
EJE A-A
EJE A-A
EJE A-A
EJE C-C
EJE C-C
EJE C-C
EJE C-C
EJE C-C
EJE C-C
EJE C-C
EJE D-D
EJE D-D
EJE D-D
EJE D-D
EJE D-D
EJE E-E
EJE E-E
EJE E-E
EJE E-E
EJE F-F
EJE F-F
EJE F-F
EJE F-F
EJE H-H
EJE H-H
EJE H-H
EJE I-I
EJE I-I
EJE I-I
EJE I-I
EJE 2-2
EJE 2-2
EJE 2-2
EJE 3-3

N
VECES
2
1
1
1
1
1
2
2
1
1
1
1
2
1
1
1
2
2
1
1
1
2
2
1
1
1
1
1
1
1
1
2
1
1
2

0.15
0.25
0.25
0.25
0.25
0.25

1.00
4.17
4.17
5.10
5.10
5.10

(Ver hoja adjunta)

LARGO
(m)
3.25
12.09
3.25
1.00
14.56
2.45
3.55
13.07
3.80
5.50
1.50
6.72
6.85
6.72
5.50
1.00
3.55
6.52
7.70
8.20
18.96
3.55
13.10
3.78
0.75
3.55
2.50
1.22
3.55
3.55
1.00
8.95
4.75
2.60
9.05

ANCHO
(m)
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.40
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.25
0.15
0.25

ALTO
(m)
0.40
0.25
0.30
0.20
0.15
0.33
0.40
0.40
0.30
0.30
0.20
0.20
0.25
0.20
0.30
0.20
0.40
0.40
0.20
0.20
0.15
0.40
0.40
0.30
0.20
0.40
0.20
0.15
0.40
0.40
0.20
0.40
0.30
0.15
0.40

AREA
(m2)

320012699.xlsx 24 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

VA-302
V-103; V-203
VA-302
V-104; V-204
V-105; V-205
V-106; V-206
VA-11
V-306
VA
V-107; V-207
VA
VA-11

EJE 3-3
EJE 4-4
EJE 4-4
EJE 5-5
EJE 7-7
EJE 8-8
EJE 8-8
EJE 8-8
EJE 8-8
EJE 9-9
EJE 9-9
EJE 9-9

1
1
1
1
1
2
1
1
1
2
1
1

10.05
16.65
4.80
16.80
15.80
18.43
7.79
5.20
1.68
18.43
4.11
12.97

0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.15

0.17
0.40
0.17
0.40
0.40
0.40
0.15
0.40
0.20
0.40
0.20
0.15

320012699.xlsx 25 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

V-307
EJE 9-9
VA3
EJE 11-11
V01 (Volado 1era Planta)
VA-10 (Volado 1era Planta)
VA (1era Planta)
V02 (2da Planta)
VA-10 (2da Planta)
VA (2da Planta)
V-302 ( Azotea)
V-304 ( Azote
EJE A'-A'
TOTAL m3
01.05.04.02

1
1
1
1
1
1
1
1
1
1

5.20
4.32
15.65
19.00
2.90
2.25
19.67
2.90
13.06
3.55

0.25
0.25
0.25
0.15
0.25
0.25
0.15
0.25
0.25
0.25

0.40
0.40
0.20
0.20
0.20
0.20
0.20
0.20
0.30
0.30

LARGO
(m)
3.25
12.09
3.25
1.00
14.56
2.45
3.55
13.07
3.80
5.50
1.50
6.72
6.85
6.72
5.50
1.00
3.55
6.52
7.70
8.20
18.96
3.55
13.10
3.78
0.75
3.55
2.50
1.22
3.55
3.55
1.00
8.95
4.75
2.60

ANCHO
(m)
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.40
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.25
0.15

ALTO
(m)
0.40
0.25
0.30
0.20
0.15
0.33
0.40
0.40
0.30
0.30
0.20
0.20
0.25
0.20
0.30
0.20
0.40
0.40
0.20
0.20
0.15
0.40
0.40
0.30
0.20
0.40
0.20
0.15
0.40
0.40
0.20
0.40
0.30
0.15

ENCOFRADO Y DESENCOFRADO EN VIGAS

DESCRIPCION
VA-101, VAVA2
VA-304
VOLADO
VA-11
VE
VA-102; VAVA-106; VAVE2
VA-303
VOLADO
VA1
VA-107; VAVA21
VA-303
VOLADO
VA-103, VAVA-108, VAVA1
VA21
VA-11
VA-104; VAVA-109; VAVA-301
VOLADO
VA-105, VA-2
VOLADO
VA-11
VA-105
VA-306
VOLADO
V-101, V-201
V-301
VA-11

EJE A-A
EJE A-A
EJE A-A
EJE A-A
EJE C-C
EJE C-C
EJE C-C
EJE C-C
EJE C-C
EJE C-C
EJE C-C
EJE D-D
EJE D-D
EJE D-D
EJE D-D
EJE D-D
EJE E-E
EJE E-E
EJE E-E
EJE E-E
EJE F-F
EJE F-F
EJE F-F
EJE F-F
EJE H-H
EJE H-H
EJE H-H
EJE I-I
EJE I-I
EJE I-I
EJE I-I
EJE 2-2
EJE 2-2
EJE 2-2

N
VECES
2
1
1
1
1
1
2
2
1
1
1
1
2
1
1
1
2
2
1
1
1
2
2
1
1
1
1
1
1
1
1
2
1
1

AREA
(m2)
4.23
4.23
1.46
0.25
2.18
1.25
4.62
16.99
1.71
2.48
0.38
1.68
6.85
1.68
2.48
0.25
4.62
8.48
1.93
2.05
2.84
4.62
17.03
1.70
0.19
2.31
0.63
0.18
2.31
2.31
0.25
11.64
2.14
0.39

320012699.xlsx 26 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

V-102; V-202
VA-302
V-103; V-203
VA-302
V-104; V-204
V-105; V-205
V-106; V-206
VA-11
V-306
VA
V-107; V-207
VA
VA-11

EJE 3-3
EJE 3-3
EJE 4-4
EJE 4-4
EJE 5-5
EJE 7-7
EJE 8-8
EJE 8-8
EJE 8-8
EJE 8-8
EJE 9-9
EJE 9-9
EJE 9-9

2
1
1
1
1
1
2
1
1
1
2
1
1

9.05
10.05
16.65
4.80
16.80
15.80
18.43
7.79
5.20
1.68
18.43
4.11
12.97

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.15

0.40
0.17
0.40
0.17
0.40
0.40
0.40
0.15
0.40
0.20
0.40
0.20
0.15

11.77
2.51
10.82
1.20
10.92
10.27
23.96
1.17
3.38
0.42
23.96
1.03
1.95

320012699.xlsx 27 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

V-307
EJE 9-9
VA3
EJE 11-11
V01 (Volado 1era Planta)
VA-10 (Volado 1era Planta)
VA (1era Planta)
V02 (2da Planta)
VA-10 (2da Planta)
VA (2da Planta)
V-302 ( Azotea)
V-304 ( Azote
EJE A'-A'
TOTAL m2

1
1
1
1
1
1
1
1
1
1

5.20
4.32
15.65
19.00
2.90
2.25
19.67
2.90
13.06
3.55

01.05.04.03

ACERO EN VIGAS FY=4200 KG/CM2

01.05.05
01.05.05.01

LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2

DESCRIPCION

0.25
0.25
0.25
0.15
0.25
0.25
0.15
0.25
0.25
0.25

0.40
0.40
0.20
0.20
0.20
0.20
0.20
0.20
0.30
0.30

3.38
2.81
3.91
2.85
0.73
0.56
2.95
0.73
5.88
1.60
247.03

ALTO
(m)

VOL DE LAD.
(m3/m2)

(Ver hoja adjunta)

N
VECES

SS.HH.
ATENCION CIUDADANA
MODULO DE ATENCION
INPOL
DELITOS - FALTAS
VIOLENCIA FAMILIAR
SALA DE MEDITACION
DEPOSITO
DEPOSITO 2
ADMINISTRACION
VEREDA
PASADIZO
VOLADO

1
1
1
1
1
1
1
1
1
1
1
1
1

DORMITORIO DE JEFATURA
BAO
COMEDOR
COCINA
RADIO
OFICINA
DORMITORIO FEMENINO
BAO DE MUJERES
ARMERIA
DORMITORIO SUBOFICIALES
PASADIZO
VOLADO, BALCON

1
1
1
1
1
1
1
1
1
1
1
1

LOSA PARA TANQUE


LOSA DE ESCALERA
LOSA INCLINADA 1

1
1
1

LARGO
AREA
(m)
(m2)
LOSA DE PRIMERA PLANTA
8.85
10.05
12.54
21.52
9.57
9.34
16.97
16.42
9.57
11.45
11.09
17.35
15.40
LOSA DE SEGUNDA PLANTA
13.12
2.90
23.43
10.38
9.57
9.34
16.42
16.97
11.45
11.09
14.45
27.06
LOSA DE AZOTEA
5.84
25.49
25.85

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11

0.20
0.17
0.17

0.11
0.09
0.09

320012699.xlsx 28 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

LOSA INCLINADA 2
TOTAL m3

33.97

0.17

0.09

320012699.xlsx 29 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

01.05.05.02

ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS

DESCRIPCION

N
VECES

SS.HH.
ATENCION CIUDADANA
MODULO DE ATENCION
INPOL
DELITOS - FALTAS
VIOLENCIA FAMILIAR
SALA DE MEDITACION
DEPOSITO
DEPOSITO 2
ADMINISTRACION
VEREDA
PASADIZO
VOLADO

1
1
1
1
1
1
1
1
1
1
1
1
1

DORMITORIO DE JEFATURA
BAO
COMEDOR
COCINA
RADIO
OFICINA
DORMITORIO FEMENINO
BAO DE MUJERES
ARMERIA
DORMITORIO SUBOFICIALES
PASADIZO
VOLADO, BALCON

1
1
1
1
1
1
1
1
1
1
1
1

LOSA PARA TANQUE


LOSA DE ESCALERA
LOSA INCLINADA 1
LOSA INCLINADA 2
TOTAL m2

1
1
1
1

LARGO
ANCHO
(m)
(m)
LOSA DE PRIMERA PLANTA

ALTO
(m)

AREA
(m2)
8.85
10.05
12.54
21.52
9.57
9.34
16.97
16.42
9.57
11.45
11.09
17.35
15.40

LOSA DE SEGUNDA PLANTA


13.12
2.90
23.43
10.38
9.57
9.34
16.42
16.97
11.45
11.09
14.45
27.06
LOSA DE AZOTEA
5.84
25.49
25.85
33.97
427.43

01.05.05.03

ACERO EN LOSAS ALIGERADAS FY=4200 KG/CM2

01.05.05.04

LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO

DESCRIPCION

N
VECES

SS.HH.
ATENCION CIUDADANA
MODULO DE ATENCION
INPOL
DELITOS - FALTAS

1
1
1
1
1

(Ver hoja adjunta)

LARGO
ANCHO
(m)
(m)
LOSA DE PRIMERA PLANTA

LAD/m2
(und)

AREA
(m2)

8.33
8.33
8.33
8.33
8.33

8.85
10.05
12.54
21.52
9.57

320012699.xlsx 30 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

VIOLENCIA FAMILIAR
SALA DE MEDITACION
DEPOSITO
DEPOSITO 2
ADMINISTRACION
VEREDA
PASADIZO
VOLADO

1
1
1
1
1
1
1
1

8.33
8.33
8.33
8.33
8.33
8.33
8.33
8.33

9.34
16.97
16.42
9.57
11.45
11.09
17.35
15.40

320012699.xlsx 31 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

LOSA DE SEGUNDA PLANTA


DORMITORIO DE JEFATURA
BAO
COMEDOR
COCINA
RADIO
OFICINA
DORMITORIO FEMENINO
BAO DE MUJERES
ARMERIA
DORMITORIO SUBOFICIALES
PASADIZO
VOLADO, BALCON

8.33
8.33
8.33
8.33
8.33
8.33
8.33
8.33
8.33
8.33
8.33
8.33

13.12
2.90
23.43
10.38
9.57

8.33

5.84

LAD/m2
(und)

AREA
(m2)

8.33
8.33
8.33

25.49
25.85
33.97

ANCHO
(m)
1.28
1.28
1.28
1.28

ALTO
(m)

AREA
(m2)
1.40
0.66
0.71
0.64

ANCHO
(m)
1.28
1.28
0.73
1.12
1.28
1.28
1.28

ALTO
(m)
0.18

AREA
(m2)
7.36
2.98
1.86
2.87
2.78
3.38
2.74
0.83

1
1
1
1
1
1
1
1
1
1
1
1

9.34
16.42
16.97
11.45
11.09
14.45
27.06

LOSA DE AZOTEA
LOSA PARA TANQUE
TOTAL (und)
01.05.05.05

LADRILLO HUECO DE ARCILLA 12X30X30 CM PARA TECHO ALIGERADO

DESCRIPCION

LOSA DE ESCALERA
LOSA INCLINADA 1
LOSA INCLINADA 2
TOTAL (und)
01.05.06
01.05.06.01

N
VECES

LARGO
ANCHO
(m)
(m)
LOSA DE AZOTEA

1
1
1

ESCALERAS
CONCRETO EN ESCALERAS F'C=210 KG/CM2

DESCRIPCION
PRIMER TRAMO (1er Piso)
SEGUNDO TRAMO (1er Piso)
PRIMER TRAMO (1er Piso)
SEGUNDO TRAMO (1er Piso)
TOTAL m3
01.05.06.02

N
VECES
1
1
1
1

LARGO
(m)

ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS

DESCRIPCION
CONTRAPASO
FONDO LOSA PRIMER TRAMO (
DESCANSO
FONDO LOSA SEGUNDO TRAMO
FONDO LOSA PRIMER TRAMO (
FONDO LOSA SEGUNDO TRAMO
CARA LATERAL PRIMER TRAMO

N
VECES
33
1
2
2
1
1
1
2

LARGO
(m)
2.34
1.28
1.28
2.18
2.65
2.15

320012699.xlsx 32 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

CARA LATERAL SEGUNDO TRA


CARA LATERAL PRIMER TRAMO
CARA LATERAL SEGUNDO TRA
TOTAL m2
01.05.06.03

2
2
2

ACERO EN ESCALERAS FY=4200 KG/CM2

0.67
0.82
0.58
26.87
(Ver hoja adjunta)

320012699.xlsx 33 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

02
02.01
02.01.01

ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MURO DE SOGA LADRILLO DE ARCILLA 9X13X24 CM, MEZ 1:5

DESCRIPCION
EJE A-A (1era Planta)
EJE A-A (2da Planta)
EJE A-A (3era Planta)
EJE A''-A'' (1era Planta)
EJE A''-A'' (2da Planta)
EJE C-C (1era Planta)
EJE C-C (2da Planta)
EJE C-C (3era Planta)
EJE D-D (1era Planta)
EJE D-D (2da Planta)
EJE D'-D' (1era Planta)
EJE D'-D' (2da Planta)
EJE E-E (1era Planta)
EJE E-E (2da Planta)
EJE F-F (1era Planta)
EJE F-F (2da Planta)
EJE F-F (3era Planta)
EJE H-H (1era Planta)
EJE H-H (2da Planta)
EJE H-H (3era Planta)
EJE I-I (1era Planta)
EJE J-J (2da Planta)
EJE 2-2 (1era Planta)
EJE 2-2 (2da Planta)
EJE 2-2 (3era Planta)
EJE 3-3 (1era Planta)
EJE 3-3 (2da Planta)
EJE 3'-3' (1era Planta)
EJE 3'-3' (2da Planta)
EJE 3'-3' (3era Planta)
EJE 4-4 (1era Planta)
EJE 4-4 (2da Planta)
EJE 4-4 (3era Planta)
EJE 5-5 (1era Planta)
EJE 5-5 (2da Planta)
EJE 7-7 (1era Planta)
EJE 7-7 (2da Planta)
EJE 8-8 (1era Planta)
EJE 8-8 (2da Planta)
EJE 8-8 (3era Planta)
EJE 8'-8' (1era Planta)
EJE 8'-8' (2da Planta)
EJE 9-9 (1era Planta)
EJE 9-9 (2da Planta)

N
VECES
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

LARGO
(m)

ANCHO
(m)

ALTO
(m)

AREA
(m2)
44.57
7.80
7.80
6.38
6.84
18.09
34.27
11.66
18.25
18.25
3.50
6.60
12.48
21.52
16.25
12.92
8.95
6.36
5.16
4.44
4.96
11.14
9.05
7.85
3.87
6.50
5.76
12.25
24.36
4.65
14.00
6.24
4.65
6.63
6.36
14.13
13.56
14.05
30.06
10.93
19.00
6.24
48.78
41.54

320012699.xlsx 34 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

EJE 9-9 (3era Planta)


EJE 11-11 (1era Planta)
Muros Bajos
TOTAL m2
02.01.02

1
1
1

17.22
3.90
12.78
632.50

JUNTA SISMICA 1" CON TEKNOPORT

DESCRIPCION
JUNTA SISMICA
TOTAL m2

N
VECES
1

LARGO
(m)
9.40

ANCHO
(m)
0.50

ALTO
(m)

AREA
(m2)
4.70
4.70

320012699.xlsx 35 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

02.01.03

MESADA DE CONCRETO

DESCRIPCION
COCINA
SERVICIOS HIGIENICOS 2do
LAVANDERIA
TOTAL m2
02.02
02.02.01

LOSA 7
LOSA 9
LOSA 10
TOTAL m2

VOLADOS
TOTAL m2

ALTO
(m)

AREA
(m2)
3.52
2.05
2.17
7.74

LARGO
(m)

ANCHO
(m)

ALTO
(m)

AREA
(m2)
25.75
25.40
33.84
84.99

VECES
1
1
1

N
VECES
1

LARGO
(m)

ANCHO
(m)

ALTO
(m)

AREA
(m2)
38.00
38.00

LARGO
(m)
8.40
8.40

ANCHO
(m)

ALTO
(m)

AREA
(m2)

LARGO
(m)

ANCHO
(m)

ALTO
(m)

AREA
(m2)
44.57
7.80
7.80
6.38
6.84
18.09
34.27
11.66
18.25
18.25
3.50

CUMBRERA TEJA ANDINA

DESCRIPCION
CUMBRERA TEJA ANDINA
TOTAL m
02.03
02.03.01

ANCHO
(m)

COBERTURA CON ANDINA SOBRE ARMADURA DE MADERA

DESCRIPCION

02.02.03

VECES
1
1
1

LARGO
(m)

COBERTURA
COBERTURA CON TEJA ANDINA

DESCRIPCION

02.02.02

N
VECES
1

REVOQUES ENLUCIDOS Y MOLDURAS


TARRAJEO EN INTERIORES ESPESOR 1.5 CM, MEZ 1:5

DESCRIPCION
EJE A-A (1era Planta)
EJE A-A (2da Planta)
EJE A-A (3era Planta)
EJE A''-A'' (1era Planta)
EJE A''-A'' (2da Planta)
EJE C-C (1era Planta)
EJE C-C (2da Planta)
EJE C-C (3era Planta)
EJE D-D (1era Planta)
EJE D-D (2da Planta)
EJE D'-D' (1era Planta)

N
VECES
1
1
1
1
1
1
1
1
1
1
1

320012699.xlsx 36 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

EJE D'-D' (2da Planta)


EJE E-E (1era Planta)
EJE E-E (2da Planta)
EJE F-F (1era Planta)
EJE F-F (2da Planta)
EJE F-F (3era Planta)
EJE H-H (1era Planta)
EJE H-H (2da Planta)
EJE H-H (3era Planta)
EJE I-I (1era Planta)
EJE J-J (2da Planta)
EJE 2-2 (1era Planta)
EJE 2-2 (2da Planta)

1
1
1
1
1
1
1
1
1
1
1
1
1

6.60
12.48
21.52
16.25
12.92
8.95
6.36
5.16
4.44
4.96
11.14
9.05
7.85

320012699.xlsx 37 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

EJE 2-2 (3era Planta)


EJE 3-3 (1era Planta)
EJE 3-3 (2da Planta)
EJE 3'-3' (1era Planta)
EJE 3'-3' (2da Planta)
EJE 3'-3' (3era Planta)
EJE 4-4 (1era Planta)
EJE 4-4 (2da Planta)
EJE 4-4 (3era Planta)
EJE 5-5 (1era Planta)
EJE 5-5 (2da Planta)
EJE 7-7 (1era Planta)
EJE 7-7 (2da Planta)
EJE 8-8 (1era Planta)
EJE 8-8 (2da Planta)
EJE 8-8 (3era Planta)
EJE 8'-8' (1era Planta)
EJE 8'-8' (2da Planta)
EJE 9-9 (1era Planta)
EJE 9-9 (2da Planta)
EJE 9-9 (3era Planta)
EJE 11-11 (1era Planta)
Muros Bajos
TOTAL m2
02.03.02

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

3.87
6.50
5.76
12.25
24.36
4.65
14.00
6.24
4.65
6.63
6.36
14.13
13.56
14.05
30.06
10.93
19.00
6.24
48.78
41.54
17.22
3.90
12.78
632.50

TARRAJEO EN EXTERIORES ESPESOR 1.5 CM, MEZ 1:5

DESCRIPCION
EJE A-A (1era Planta)
EJE A-A (2da Planta)
EJE A-A (3era Planta)
EJE A''-A'' (1era Planta)
EJE A''-A'' (2da Planta)
EJE C-C (1era Planta)
EJE C-C (2da Planta)
EJE C-C (3era Planta)
EJE D-D (1era Planta)
EJE D-D (2da Planta)
EJE D'-D' (1era Planta)
EJE D'-D' (2da Planta)
EJE E-E (1era Planta)
EJE E-E (2da Planta)
EJE F-F (1era Planta)
EJE F-F (2da Planta)
EJE F-F (3era Planta)
EJE H-H (1era Planta)
EJE H-H (2da Planta)
EJE H-H (3era Planta)
EJE I-I (1era Planta)

N
VECES
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

LARGO
(m)

ANCHO
(m)

ALTO
(m)

AREA
(m2)
44.57
7.80
7.80
6.38
6.84
18.09
34.27
11.66
18.25
18.25
3.50
6.60
12.48
21.52
16.25
12.92
8.95
6.36
5.16
4.44
4.96

320012699.xlsx 38 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

EJE J-J (2da Planta)


EJE 2-2 (1era Planta)
EJE 2-2 (2da Planta)
EJE 2-2 (3era Planta)
EJE 3-3 (1era Planta)
EJE 3-3 (2da Planta)
EJE 3'-3' (1era Planta)
EJE 3'-3' (2da Planta)
EJE 3'-3' (3era Planta)
EJE 4-4 (1era Planta)
EJE 4-4 (2da Planta)
EJE 4-4 (3era Planta)

1
1
1
1
1
1
1
1
1
1
1
1

11.14
9.05
7.85
3.87
6.50
5.76
12.25
24.36
4.65
14.00
6.24
4.65

320012699.xlsx 39 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

EJE 5-5 (1era Planta)


EJE 5-5 (2da Planta)
EJE 7-7 (1era Planta)
EJE 7-7 (2da Planta)
EJE 8-8 (1era Planta)
EJE 8-8 (2da Planta)
EJE 8-8 (3era Planta)
EJE 8'-8' (1era Planta)
EJE 8'-8' (2da Planta)
EJE 9-9 (1era Planta)
EJE 9-9 (2da Planta)
EJE 9-9 (3era Planta)
EJE 11-11 (1era Planta)
TOTAL m2
02.03.03

1
1
1
1
1
1
1
1
1
1
1
1
1

6.63
6.36
14.13
13.56
14.05
30.06
10.93
19.00
6.24
48.78
41.54
17.22
3.90
619.72

TARRAJEO DE COLUMNAS, SUPERFICIE E=1.5 CM, MEZ. 1:5

DESCRIPCION
C-1
C-9
C-8
C-7
C-7
C-1
C-10
C-9
C-2
C-2
C-10
C-10
C-9
C-2
C-1
C-2
C-4
C-2
C-9
C-9
C-9
C-2
C-4
C-4
C-3
C-2
C-10
C-10
C-10
C-2
C-2

N
VECES
2
7
4
6
1
2
9
24
2
1
2
2
25
7
1
2
1
1
2
2
4
2
1
1
1
1
3
2
1
2
2

LARGO
(m)
0.25
0.25
0.25
0.25
0.15
0.25
0.40
0.40
0.15
0.15
0.25
0.40
0.40
0.40
0.40
0.25
0.25
0.25
0.40
0.40
0.40
0.40
0.15
0.15
0.15
0.40
0.40

ANCHO
(m)

ALTO
(m)
10.60
4.20
5.10
4.90
5.40
8.40
1.00
3.70
8.86
3.70
0.96
0.80
2.40
8.40
8.90
8.90
9.80
9.80
4.40
2.60
7.40
7.40
6.90
7.40
8.05
8.05
1.90
0.90
0.75
9.05
8.14

PERIMETRO
(m)
1.45

1.45

1.45

1.57

320012699.xlsx 40 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

C-10
C-5
C-10
C-10
C-6
C-7
TOTAL m2

1
1
1
2
1
2

0.15
0.30
0.15
0.15
0.25
0.25

1.75
1.78
2.70
4.20
2.70
4.17

320012699.xlsx 41 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

02.03.04

TARRAJEO DE VIGAS, SUPERFICIE E=1.5 CM, MEZ. 1:5

DESCRIPCION
VA-101, VAVA2
VA-304
VOLADO
VA-11
VE
VA-102; VAVA-106; VAVE2
VA-303
VOLADO
VA1
VA-107; VAVA21
VA-303
VOLADO
VA-103, VAVA-108, VAVA1
VA21
VA-11
VA-104; VAVA-109; VAVA-301
VOLADO
VA-105, VA-2
VOLADO
VA-11
VA-105
VA-306
VOLADO
V-101, V-201
V-301
VA-11
V-102; V-202
VA-302
V-103; V-203
VA-302
V-104; V-204
V-105; V-205
V-106; V-206
VA-11
V-306
VA
V-107; V-207

EJE A-A
EJE A-A
EJE A-A
EJE A-A
EJE C-C
EJE C-C
EJE C-C
EJE C-C
EJE C-C
EJE C-C
EJE C-C
EJE D-D
EJE D-D
EJE D-D
EJE D-D
EJE D-D
EJE E-E
EJE E-E
EJE E-E
EJE E-E
EJE F-F
EJE F-F
EJE F-F
EJE F-F
EJE H-H
EJE H-H
EJE H-H
EJE I-I
EJE I-I
EJE I-I
EJE I-I
EJE 2-2
EJE 2-2
EJE 2-2
EJE 3-3
EJE 3-3
EJE 4-4
EJE 4-4
EJE 5-5
EJE 7-7
EJE 8-8
EJE 8-8
EJE 8-8
EJE 8-8
EJE 9-9

N
VECES
2
1
1
1
1
1
2
2
1
1
1
1
2
1
1
1
2
2
1
1
1
2
2
1
1
1
1
1
1
1
1
2
1
1
2
1
1
1
1
1
2
1
1
1
2

LARGO
(m)
3.25
12.09
3.25
1.00
14.56
2.45
3.55
13.07
3.80
5.50
1.50
6.72
6.85
6.72
5.50
1.00
3.55
6.52
7.70
8.20
18.96
3.55
13.10
3.78
0.75
3.55
2.50
1.22
3.55
3.55
1.00
8.95
4.75
2.60
9.05
10.05
16.65
4.80
16.80
15.80
18.43
7.79
5.20
1.68
18.43

ANCHO
(m)
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.40
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.25
0.25
0.25

ALTO
(m)
0.40
0.25
0.30
0.20
0.15
0.33
0.40
0.40
0.30
0.30
0.20
0.20
0.25
0.20
0.30
0.20
0.40
0.40
0.20
0.20
0.15
0.40
0.40
0.30
0.20
0.40
0.20
0.15
0.40
0.40
0.20
0.40
0.30
0.15
0.40
0.17
0.40
0.17
0.40
0.40
0.40
0.15
0.40
0.20
0.40

AREA
(m2)
3.25
2.42
0.98
0.25
2.18
0.88
3.55
13.07
1.14
1.65
0.38
1.68
4.80
1.68
1.65
0.25
3.55
6.52
1.93
2.05
2.84
3.55
13.10
1.13
0.19
1.78
0.63
0.18
1.78
1.78
0.25
8.95
1.43
0.39
9.05
2.51
8.33
1.20
8.40
7.90
18.43
1.17
2.60
0.42
18.43

320012699.xlsx 42 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

VA
EJE 9-9
VA-11
EJE 9-9
V-307
EJE 9-9
VA3
EJE 11-11
V01 (Volado 1era Planta)
VA-10 (Volado 1era Planta)
VA (1era Planta)
V02 (2da Planta)
VA-10 (2da Planta)
VA (2da Planta)
V-302 ( Azotea)
TOTAL m2

1
1
1
1
1
1
1
1
1
1
1

4.11
12.97
5.20
4.32
15.65
19.00
2.90
2.25
19.67
2.90
13.06

0.25
0.15
0.25
0.25
0.25
0.15
0.25
0.25
0.15
0.25
0.25

0.20
0.15
0.40
0.40
0.20
0.20
0.20
0.20
0.20
0.20
0.30

1.03
1.95
2.60
2.16
3.91
2.85
0.73
0.56
2.95
0.73
3.92
193.62

320012699.xlsx 43 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

02.03.05

VESTIDURA DE DERRAMES E=1.5, MEZ. 1:5

DESCRIPCION
V-01
V-02
V-03
V-04
V-05
V-06
V-07
V-08
V-09
V-10
V-11
P-01
P-02
P-03
P-04
P-05
P-06
P-07
P-08
P-09
P-10
M-01
M-02
M-03
M-04
TOTAL m2
02.03.06

N
VECES
2
1
1
3
1
1
1
2
4
1
1
10
7
2
2
1
2
1
6
1
2
1
1
3
3

ANCHO
(m)
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

ALTO
(m)
1.80
1.80
1.90
1.50
1.50
1.50
0.50
0.50
1.50
1.00
1.95
2.10
2.10
2.10
3.00
2.40
2.10
1.00
1.80
2.10
2.40
3.00
2.80
2.80
3.00

AREA
(m2)
1.98
0.77
1.02
2.70
1.13
1.07
0.77
1.02
3.38
0.82
1.04
7.80
5.36
1.59
2.25
1.02
1.53
0.40
3.78
0.74
1.67
1.47
1.47
4.40
4.42
53.56

ANCHO
(m)
0.73
1.12
1.28
1.28
1.28

ALTO
(m)

AREA
(m2)
1.86
2.87
2.78
3.38
2.74
13.63

ALTO
(m)

AREA
(m2)

VESTIDURA FONDO DE ESCALERA MEZCLA 1:5 X 1.5 CM

DESCRIPCION

VECES
DESCANSO
2
2
FONDO LOSA SEGUNDO TRAMO
1
FONDO LOSA PRIMER TRAMO (
1
FONDO LOSA SEGUNDO TRAMO
1
TOTAL m2
02.04
02.04.01

LONGITUD
(m)
1.50
0.75
1.50
1.50
2.25
2.07
2.07
1.20
1.32
1.72
1.50
1.00
0.90
1.10
1.50
2.00
0.90
0.65
0.60
0.70
0.75
3.82
4.17
4.17
3.82

LARGO
(m)
1.28
1.28
2.18
2.65
2.15

CIELORRASOS
CIELORRASOS CON MEZCLA DE CEMENTO-ARENA

DESCRIPCION

SS.HH.

N
VECES
1

LARGO
ANCHO
(m)
(m)
LOSA DE PRIMERA PLANTA

8.85

320012699.xlsx 44 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

ATENCION CIUDADANA
MODULO DE ATENCION
INPOL
DELITOS - FALTAS
VIOLENCIA FAMILIAR
SALA DE MEDITACION
DEPOSITO
DEPOSITO 2
ADMINISTRACION
VEREDA
PASADIZO
VOLADO

1
1
1
1
1
1
1
1
1
1
1
1

10.05
12.54
21.52
9.57
9.34
16.97
16.42
9.57
11.45
11.09
17.35
15.40

320012699.xlsx 45 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

LOSA DE SEGUNDA PLANTA


DORMITORIO DE JEFATURA
BAO
COMEDOR
COCINA
RADIO
OFICINA
DORMITORIO FEMENINO
BAO DE MUJERES
ARMERIA
DORMITORIO SUBOFICIALES
PASADIZO
VOLADO, BALCON

13.12
2.90
23.43
10.38
9.57

1
1
1
1
1
1
1
1
1
1
1
1

9.34
16.42
16.97
11.45
11.09
14.45
27.06
LOSA DE AZOTEA

LOSA PARA TANQUE


LOSA DE ESCALERA
LOSA INCLINADA 1
LOSA INCLINADA 2
TOTAL m2
02.05
02.05.01

5.84
25.49
25.85
33.97
427.43

PISOS Y PAVIMENTOS
FALSO PISO DE 4" DE CONCRETO C:H 1:8

DESCRIPCION
SS.HH. HOMBRES
SS.HH. MUJERES
PASADIZO 1
DEPOSITO
DELITOS - FALTAS
VIOLENCIA FAMILIAR
DEPOSITO 1
SALA DE MEDITACION
SALA DE MEDITACION 1
ATENCION CIUDADANA
MODULO DE ATENCION
INPOL
ADMINISTRACION
DEPOSITO 2
PASADIZO 2
TOTAL m2
02.05.02

1
1
1
1

N
VECES
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

LARGO
(m)

ANCHO
(m)

ALTO
(m)

AREA
(m2)
4.58
4.64
3.89
5.26
10.59
10.07
7.33
5.90
5.66
22.31
19.57
24.31
17.12
10.82
17.39
169.42

CONTRAPISO DE 48mm

DESCRIPCION
SS.HH. HOMBRES
SS.HH. MUJERES
PASADIZO 1
DEPOSITO

N
VECES
1
1
1
1

LARGO
(m)

ANCHO
(m)

ALTO
(m)

AREA
(m2)
4.58
4.64
3.89
5.26

320012699.xlsx 46 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

DELITOS - FALTAS
VIOLENCIA FAMILIAR
DEPOSITO 1
SALA DE MEDITACION
SALA DE MEDITACION 1
ATENCION CIUDADANA
MODULO DE ATENCION
INPOL
ADMINISTRACION
DEPOSITO 2
PASADIZO 2
TOTAL m2

1
1
1
1
1
1
1
1
1
1
1

10.59
10.07
7.33
5.90
5.66
22.31
19.57
24.31
17.12
10.82
17.39
169.42

320012699.xlsx 47 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

02.05.03

PISO CERAMICO DE ALTO TRANSITO 30X30 CM

DESCRIPCION

SS.HH. HOMBRES
SS.HH. MUJERES
PASADIZO 1
DELITOS - FALTAS
VIOLENCIA FAMILIAR
ATENCION CIUDADANA
MODULO DE ATENCION
INPOL
ADMINISTRACION
PASADIZO 2
ESCALERA

N
VECES

LARGO
ANCHO
(m)
(m)
PRIMER PISO

ALTO
(m)

AREA
(m2)
4.58
4.64
3.89
10.59
10.07
22.31
19.57
24.31
17.12
17.39
13.48

1
1
1
1
1
1
1
1
1
1
1
SEGUNDO PISO

DORMITORIO JEFATURA
DESPACHO JEFATURA
COCINA-COMEDOR
RADIO
OFICINA
DORMITORIO SUBOFICIALES
BAO VARONES
DORMITORIO FEMENINO
BAO DE MUJERES
PASADIZO
ESCALERA

1
1
1
1
1
1
1
1
1
1
1

LAVANDERIA
TOTAL m2

11.03
28.43
30.31
10.59
10.07
26.94
13.34
17.37
6.98
16.48
13.48
AZOTEA

02.05.04

340.29

PISO DE CEMENTO PULIDO COLOREADO BRUADO E=2"

DESCRIPCION
DEPOSITO
DEPOSITO 1
DEPOSITO 2
ARMERIA
AZOTEA
TOTAL m2
02.05.05

7.35

N
VECES
1
1
1
1
1

LARGO
(m)

ANCHO
(m)

ALTO
(m)

AREA
(m2)
5.26
7.33
10.82
7.95
151.47
182.82

VEREDA DE CONCRETO f'c=140 kg/cm2 E=4" PASTA 1:2

DESCRIPCION
VEREDAS
TOTAL m2

N
VECES
1

LARGO
(m)

ANCHO
(m)

ALTO
(m)

AREA
(m2)
83.71
83.71

320012699.xlsx 48 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

02.05.06

CONCRETO EN SARDINEL f'c=140 kg/cm2

DESCRIPCION
SARDINEL
TOTAL m3
02.05.07

N
VECES
1

LARGO
(m)
17.30

ANCHO
(m)
0.10

ALTO
(m)
0.25

AREA
(m2)

ANCHO
(m)

ALTO
(m)
0.18
0.10

AREA
(m2)
77.00
39.01

CONCRETO f'c=210 kg/cm2 EN PATIO Y ESTACIONAMIENTO

DESCRIPCION
ESTACIONAMIENTO
PATIO
TOTAL m3

N
VECES
1
1

LARGO
(m)

320012699.xlsx 49 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

02.05.08

ENCOFRADO Y DESENCOFRADO PARA SARDINEL, VEREDAS, PATIO Y ESTACIONAMIENTO

DESCRIPCION
SARDINEL
VEREDA+PATIO
ESTACIONAMIENTO
TOTAL m2
02.05.09

SARDINEL
VEREDA
PATIO
ESTACIONAMIENTO
TOTAL m

COTRAPASOS
TOTAL m

BAO HOMBRES (1era Planta


BAO DAMAS (1era Planta)
BAO VARONES (2da Planta)
DUCHA VARONES (2da Planta
BAO MUJERES (2da Planta)
DUCHA MUJERES (2da Planta
TOTAL m2

AREA
(m2)
8.65
4.20
4.65
17.50

N
VECES
1
1
1
1

LONGITUD
(m)
3.60
38.20
20.65
12.50

ANCHO
(m)

ALTO
(m)

TOTAL
(m)
3.60
38.20
20.65
12.50
74.95

N
VECES
33

LONGITUD
(m)
1.28

ANCHO
(m)

ALTO
(m)

TOTAL
(m)
42.24
42.24

N
VECES
1
1
1
1
1
1

LARGO
(m)
8.40
8.40
11.60
2.92
8.60
1.98

ANCHO
(m)

ALTO
(m)
1.30
1.30
1.30
1.80
1.30
1.80

AREA
(m2)
10.92
10.92
15.08
5.26
11.18
3.56
56.92

LARGO
(m)
125.50
36.00
142.75
304.25

ANCHO
(m)

ALTO
(m)

AREA
(m2)

CONTRAZOCALO DE CERAMICO 10 cm x 30 cm

DESCRIPCION
PRIMERA PLANTA
ESCALERA
SEGUNDA PLANTA
TOTAL m
02.06.03

ALTO
(m)
0.25
0.10
0.18

ZOCALOS Y CONTRAZOCALOS
ZOCALO DE MAYOLICA BLANCA DE 20 X 30

DESCRIPCION

02.06.02

ANCHO
(m)

CANTONERA 2"x2"-ALUMINIO, ESCALERA

DESCRIPCION

02.06
02.06.01

LARGO
(m)
17.30
42.00
25.85

JUNTAS ASFALTICAS 1"

DESCRIPCION

02.05.10

N
VECES
2
1
1

N
VECES
1
1
1

CONTRAZOCALO CEMENTO PULIDO S/COLOREAR EN EXTERIORES

320012699.xlsx 50 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

DESCRIPCION

N
VECES

PRIMERA PLANTA
TOTAL m2
02.07
02.07.01

LARGO
(m)
70.20

ANCHO
(m)

ALTO
(m)
0.60

AREA
(m2)
42.12

LARGO
(m)
1.00
0.90
1.10
1.50
2.00

ANCHO
(m)

ALTO
(m)
2.10
2.10
2.10
3.00
2.40

AREA
(m2)
21.00
13.23
4.62
9.00
4.80
52.65

CARPINTERIA DE MADERA
PUERTA APANELADA, MADERA CEDRO E=1 1/4"

DESCRIPCION
P-01
P-02
P-03
P-04
P-05
TOTAL m2

N
VECES
10
7
2
2
1

320012699.xlsx 51 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

02.07.02

VENTANA DE MADERA CEDRO

DESCRIPCION
V-01
V-02
V-03
V-04
V-05
V-06
V-07
V-08
V-09
V-10
V-11
TOTAL m2
02.07.03

N
VECES
2
1
1
3
1
1
1
2
4
1
1

LARGO
(m)
1.50
0.75
1.50
1.50
2.25
2.07
2.07
1.20
1.32
1.72
1.50

ANCHO
(m)

ALTO
(m)
1.80
1.80
1.90
1.50
1.50
1.50
0.50
0.50
1.50
1.00
1.95

AREA
(m2)
5.40
1.35
2.85
6.75
3.38
3.11
1.04
1.20
7.92
1.72
2.93
37.63

LARGO
(m)
0.60
0.70
0.75

ANCHO
(m)

ALTO
(m)
1.80
2.10
2.40

AREA
(m2)
6.48
1.47
3.60
11.55

LARGO
(m)

ANCHO
(m)

ALTO
(m)

PUERTA CONTRAPLACADA-MADERA CEDRO E=35 MM

DESCRIPCION
P-08
P-09
P-10
TOTAL m2

N
VECES
6
1
2

02.07.04

ESTANTE PARA ARMERIA

02.08
02.08.01

CARPINTERIA METALICA
PUERTA DE METALICA 5/8"

02.08.02

PUERTA DE METALICA 1/2"

02.08.03

PANELES METALICOS EN SERVICIOS HIGIENICOS

02.08.04

MAMPARA DE 3.82m x 3.00m

02.08.05

MAMPARA DE 4.17m x 2.80m

02.09
02.09.01

CERRAJERIA
BISAGRA CAPUCHINA DE 4" X 4"

DESCRIPCION
P-01
P-02
P-03
P-04
P-05
P-08

N
VECES
10
7
2
2
1
6

BISAGRAS/PTA
4
4
4
4
4
4

320012699.xlsx 52 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

P-09
P-10
TOTAL (und)
02.09.02

1
2

4
4

CERRADURA PARA PUERTA PRINCIPAL PESADA

DESCRIPCION
P-08
TOTAL (pza)

N
VECES
2

LARGO
(m)

ANCHO
(m)

ALTO
(m)

CERRADU./PTA
1

320012699.xlsx 53 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

02.09.03

CERRADURA DE PERILLA PUERTA INTERIOR

DESCRIPCION
P-01
P-02
P-03
P-04
P-05
P-09
P-10
TOTAL (pza)
02.09.04

P-06
P-07
TOTAL (pza)

V-01
V-02
V-03
V-04
V-05
V-06
V-07
V-08
V-09
V-10
V-11
TOTAL p2

ALTO
(m)

CERRADU./PTA
1
1
1
1
1
1
1

N
VECES
2
1

LARGO
(m)

ANCHO
(m)

ALTO
(m)

LARGO
(m)
1.50
0.75
1.50
1.50
2.25
2.07
2.07
1.20
1.32
1.72
1.50

ANCHO
(m)

ALTO
(m)
1.80
1.80
1.90
1.50
1.50
1.50
0.50
0.50
1.50
1.00
1.95

AREA
(p2)
25.07
11.83
26.60
20.48
31.95
29.19
8.63
4.70
17.89
15.45
27.36
219.14

LARGO
(m)

ANCHO
(m)

ALTO
(m)

AREA
(m2)
427.43
774.98
13.63
1216.04

CERRADU./PTA
1
1

VECES
1
1
1
3
1
1
1
2
4
1
1

PINTURA
PINTURA LATEX EN INTERIORES Y CIELORRASOS

DESCRIPCION
TARRAJEO DE CIELO RAZO
TARRAJEO DE INTERIOR
VESTIDURA DE DERRAMES
TOTAL m2
02.11.02

ANCHO
(m)

VIDRIOS
VIDRIO SEMIDOBLE

DESCRIPCION

02.11
02.11.01

LARGO
(m)

CERRADURA PARA PUERTA DE CALABOZO

DESCRIPCION

02.10
02.10.01

N
VECES
10
7
2
2
1
1
2

N
VECES
1
1
1

PINTURA LATEX EN EXTERIORES

320012699.xlsx 54 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

DESCRIPCION
TARRAJEO DE EXTERIORES
TOTAL m2

N
VECES
1

LARGO
(m)

ANCHO
(m)

ALTO
(m)

AREA
(m2)
774.98
774.98

320012699.xlsx 55 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

02.11.03

PINTURA EN PUERTAS DE MADERA CON BARNIZ

DESCRIPCION
P-01
P-02
P-03
P-04
P-05
P-08
P-09
P-10
TOTAL m2
02.11.04

N
VECES
10
7
2
2
1
6
1
2

LARGO
(m)
1.00
0.90
1.10
1.50
2.00
0.60
0.70
0.75

ANCHO
(m)

ALTO
(m)
2.10
2.10
2.10
3.00
2.40
1.80
2.10
2.40

AREA
(m2)
21.00
13.23
4.62
9.00
4.80
6.48
1.47
3.60
64.20

LARGO
(m)
1.50
0.75
1.50
1.50
2.25
2.07
2.07
1.20
1.32
1.72
1.50

ANCHO
(m)

ALTO
(m)
1.80
1.80
1.90
1.50
1.50
1.50
0.50
0.50
1.50
1.00
1.95

AREA
(m2)
2.70
1.35
2.85
6.75
3.38
3.11
1.04
1.20
7.92
1.72
2.93
34.93

PINTURA EN VENTANAS CON BARNIZ

DESCRIPCION
V-01
V-02
V-03
V-04
V-05
V-06
V-07
V-08
V-09
V-10
V-11
TOTAL m2
03
03.01
03.01.01

INSTALACIONES ELECTRICAS
CABLES Y CONDUCTORES
CABLE ELECTRICO THW - 2.5 mm2

03.01.02

CABLE ELECTRICO THW - 4 mm2

03.01.03

CABLE ELECTRICO THW - 6 mm2

03.01.04

CABLE ELECTRICO THW - 10 mm2

03.02
03.02.01

TUBERIAS
TUBERIA 20 mm PVC SAP

03.02.02

TUBERIA 15 mm PVC SAP

03.02.03

CURVAS 20 mm PVC SAP

03.02.04

CURVAS 15 mm PVC SAP

N
VECES
1
1
1
3
1
1
1
2
4
1
1

320012699.xlsx 56 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

03.02.05

CONECTOR A CAJA PVC SAP 20mm

03.02.06

CONECTOR A CAJA PVC SAP 15mm

03.03
03.03.01

ARTEFACTOS DE ILUMINACION
FLUORECENTE RECTO 2 x 36 W C/EQ + PANTALLA MAS REJILLA

03.03.02

FLUORECENTE RECTO 1 x 36 W C/EQ + PANTALLA MAS REJILLA

03.03.03

FOCO AHORRADOR DE 36 W

03.03.04

SALIDA PARA BRAKETE

03.03.05

LAMPARAS DE EMERGENCIA

320012699.xlsx 57 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

03.04
03.04.01

INTERRUPTORES
INTERRUPTOR CON DADO SIMPLE

03.04.02

INTERRUPTOR CON DADO DOBLE

03.04.03

INTERRUPTOR CONMUTACION

03.05
03.05.01

TOMACORRIENTES
TOMACORRIENTE DOBLE UNIVERSAL MAS TOMA A TIERRA

03.06
03.06.01

CALENTADOR
THERMA ELECTRICA

03.07
03.07.01

ACOMETIDA
ACOMETIDA AEREA

03.08
03.08.01

CAJAS DE PASE METALICAS


CAJA DE FIERRO GALVANIZADO OCTOGONAL

03.08.02

CAJA DE FIERRO GALVANIZADO RECTANGULAR

03.09
03.09.01

TABLEROS ELECTRICOS
TABLERO TG-1

03.09.02

TABLERO DISTRIBUCION TG-2

03.10
03.10.01

ELECTROBOMBA
ELECTROBOMBA

03.11
03.11.01

POZO A TIERRA
POZO A TIERRA

03.12
03.12.01

PRUEBAS
PRUEBAS ELECTRICAS

04
04.01
04.01.01

INSTALACIONES SANITARIAS
SISTEMA DE AGUA
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"

04.01.02

SALIDA DE AGUA CALIENTE CON TUBERIA DE CPVC-SAP 1/2"

04.01.03

RED DE DISTRIBUCION TUBERIA DE 1" PVC-SAP

04.01.04

VALVULAS DE COMPUERTA DE BRONCE DE 3/4"

04.01.05

VALVULAS DE COMPUERTA DE BRONCE DE 1/2"

04.01.06

RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP

04.01.07

RED DE DISTRIBUCION TUBERIA DE 1/2" CPVC-P/AGUA CALIENTE

320012699.xlsx 58 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

04.01.08

RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP

04.01.09

TANQUE DE ALMACENAMIENTO DE POLIETILENO Y ACCESORIOS

04.01.10

TANQUE CISTERNA DE POLIETILENO EQUIPADO CON ACCESORIOS

320012699.xlsx 59 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

04.02
04.02.01

SISTEMA DE DESAGUE
SALIDA DE DESAGUE EN PVC SAL 2"

04.02.02

SALIDA DE DESAGUE EN PVC SAL 4"

04.02.03

TUBERIA DE DESAGUE PVC SAL 2"

04.02.04

TUBERIA DE DESAGUE PVC SAL 4"

04.02.05

SALIDA DE VENTILACION PVC 2"

04.02.06

REGISTROS DE BRONCE DE 4"

04.02.07

SUMIDEROS DE 2"

04.02.08

CAJA DE REGISTRO 0.30x0.60-TAPA CONCRETO

04.03
04.03.01

APARATOS Y ACCESORIOS SANITARIOS


INODORO SIFON JET BLANCO

04.03.02

OVALIN CERALUX 1 LLAVE MONOCOMANDO

04.03.03

URINARIO DE PARED BLANCO 1 LLAVE

04.03.04

DUCHAS CROMADAS DE CABEZA GIRATORIA

04.03.05

TOALLERA CON SOPORTE DE LOSA Y BARRA PLASTICA

04.03.06

PAPELERA DE LOSA Y BARRA PLASTICA COLOR BLANCO

04.03.07

JABONERAS DE LOZA BLANCA SIMPLE DE 15 X 15 cm

04.03.08

TAZA TURCA

04.03.09

LAVADERO DE ACERO INOXIDABLE

04.04
04.04.01

SISTEMA DE DESAGUE PLUVIAL


CANALETA DE ZINC DE 6"

04.04.02

MONTANTE PARA BAJADA DE AGUA DE LLUVIA D=3"

04.04.03

TUBERIA DE DESAGUE PVC SAL 4"

04.04.04

CAJA DE REGISTRO 0.40x0.80-TAPA REJILLA

05
05.01

EQUIPAMIENTO Y OTROS
EQUIPAMIENTO

05.02

ASTA DE BANDERA

05.03

FLETE TERRESTRE

320012699.xlsx 60 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

05.04

LIMPIEZA GENERAL Y ENTREGA DE OBRA

320012699.xlsx 61 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

1.00 und
1.00 GLB
82.58 m
VOLUMEN
(m3)

1.00 GLB

152.37 m2
VOLUMEN
(m3)

6.00 und
7.00 und
152.37 m2
VOLUMEN
(m3)

101.90 m3
VOLUMEN
(m3)
24.23
15.96
47.85
13.86
101.90
412.25 m2
VOLUMEN

320012699.xlsx 62 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

(m3)

412.25 m2
VOLUMEN
(m3)

320012699.xlsx 63 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

189.64 m3

VOLUMEN
(m3)
7.20
3.84
4.36
14.08
5.47
7.60
14.70
7.92
9.50
5.92
5.44
4.16
3.84
3.36
3.84
12.16
3.07
2.56
3.84
9.68
30.91
15.13
5.49
3.25
2.31
189.64
181.67 m3
VOLUMEN
(m3)
181.67
181.67
57.21 m3
VOLUMEN
(m3)
0.69
0.70
0.58
0.79
1.59
1.51

320012699.xlsx 64 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

1.10
0.88
0.85
3.35
2.94
3.65
2.57
1.84
1.62
2.61
29.96
57.21

320012699.xlsx 65 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

9.97 m3
VOLUMEN
A ELIMINAR
(m3)
9.97
9.97
181.67 m2
VOLUMEN
(m3)

23.47 m3
VOLUMEN
(m3)
0.45
0.24
0.27
0.88
0.34
0.48
0.92
0.50
0.59
0.37
0.34
0.26
0.24
0.21
0.24

320012699.xlsx 66 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

0.76
0.19
0.16
0.24
3.14
7.36
1.89
0.61
0.48
2.31
23.47

320012699.xlsx 67 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

11.52 m3
VOLUMEN
(m3)
0.68
0.36
0.41
1.32
0.51
0.71
1.38
0.74
0.89
0.56
0.51
0.39
0.36
0.32
0.36
1.14
0.29
0.24
0.36
11.52

26.57 m3
VOLUMEN
(m3)
3.49
12.27
6.30
2.03
2.49
26.57

34.99 m3
VOLUMEN
(m3)
1.21
3.09
0.86
0.75
2.26
1.65

320012699.xlsx 68 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

0.10
0.75
0.92
1.30
2.88
0.62
0.62
0.52
1.13
0.69
0.72
1.51

320012699.xlsx 69 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

0.72
1.50
0.93
1.48
2.81
1.52
3.28
0.26
0.34
0.60
34.99
322.75 m2
VOLUMEN
(m3)

320012699.xlsx 70 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

76.79 m2
VOLUMEN
(m3)

38.40 m3
VOLUMEN
(m3)
2.25
1.20
1.36
4.40
1.71
2.38
4.60
2.48
2.97
1.85
1.70
1.30
1.20
1.05
1.20
3.80
0.96
0.80

320012699.xlsx 71 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

1.20
38.40
1228.13 kg

320012699.xlsx 72 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

18.88 m3
VOLUMEN
(m3)
0.41
1.23
0.29
0.44
0.38
0.41
0.48
0.36
0.48
0.38
0.44
0.40
0.41
0.44
0.38
0.41
0.48
0.37
0.44
0.44
0.33
0.59
0.33
0.60
0.33
0.18
0.38
0.55
0.38
0.55
0.38
0.58
0.55
0.38
0.38
0.31
0.58
0.55
0.38
0.38
0.31
0.30
0.08
0.38

320012699.xlsx 73 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

0.08
18.88

320012699.xlsx 74 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

148.92 m2
VOLUMEN
(m3)

320012699.xlsx 75 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

2117.71 kg

320012699.xlsx 76 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

125.80 m3
VOLUMEN
(m3)
16.96
0.26
16.96
0.32
0.31
0.31
0.31
0.31
0.31
0.31
0.34
13.44
0.05
0.23
1.42
0.59
0.04
0.04
1.42
0.02
0.23
0.23
0.15
0.15
1.34
0.23
0.23
0.15
0.15
14.24
0.02
1.42
0.26
1.42
1.34
0.23
0.30
1.57
0.23
1.57
0.28
0.16
0.46
0.28
0.16

320012699.xlsx 77 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

0.46
0.46
0.46
1.18
0.23
0.15
0.23
0.15
1.10
0.15
1.18
1.18
1.34

320012699.xlsx 78 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

1.58
1.29
0.23
0.15
0.02
0.23
0.15
0.04
0.02
1.34
0.23
0.15
0.23
0.15
1.34
0.23
0.15
0.23
0.15
0.04
0.02
0.02
13.44
1.34
0.04
0.23
0.23
1.34
1.45
0.23
0.30
1.45
1.30
0.46
0.04
1.30
0.23
0.15
0.16
0.06
0.15
0.02
0.02
0.09
0.26
0.09
0.26
0.23
0.15
0.26

320012699.xlsx 79 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

0.15
0.17
0.26
0.02
0.26
0.15
0.23
0.30
0.23
0.15
0.02
0.26
0.26

320012699.xlsx 80 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

0.32
0.32
0.32
125.80
310.52 m2
AREA
(m2)
15.37
1.58
15.37
1.91
1.84
1.84
1.84
1.84
1.84
1.84
2.03
12.18
0.45
1.39
5.32
2.22
0.43
0.36
5.32
0.23
1.39
1.39
0.90
0.90
5.04
1.39
1.39
0.90
0.90
12.91
0.23
5.34
1.58
5.34
5.04
1.39
1.80
5.88
1.39
5.88
1.65

320012699.xlsx 81 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

0.98
2.78
1.65
0.98
2.78
2.78
2.78
4.44
1.39
0.90
1.39
0.90
4.14
0.90

320012699.xlsx 82 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

4.44
4.44
5.04
12.64
4.83
1.39
0.90
0.23
1.39
0.90
0.43
0.20
5.04
1.39
0.90
1.39
0.90
5.04
1.39
0.90
1.39
0.90
0.43
0.17
0.23
12.18
5.04
0.43
1.39
1.39
5.04
5.43
1.39
1.80
5.43
4.88
2.78
0.39
4.88
1.39
0.90
0.80
0.61
0.90
0.23
0.20
0.95
1.58
0.95
1.58

320012699.xlsx 83 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

1.39
0.90
1.58
0.90
1.01
1.58
0.23
1.58
0.90
1.39
1.80
1.39
0.90

320012699.xlsx 84 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

0.23
1.56
1.56
1.91
1.91
1.91
310.52
5623.42 kg

163.51 m3
VOLUMEN
(m3)
2.60
3.02
0.98
0.20
2.18
0.81
2.84
10.46
1.14
1.65
0.30
1.34
3.43
1.34
1.65
0.20
2.84
5.22
1.54
1.64
2.84
2.84
10.48
1.13
0.15
1.42
0.50
0.18
1.42
1.42
0.20
7.16
1.43
0.39
7.24

320012699.xlsx 85 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

1.71
6.66
0.82
6.72
6.32
14.74
1.17
2.08
0.34
14.74
0.82
1.95

320012699.xlsx 86 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

2.08
1.73
3.13
3.80
0.58
0.45
3.93
0.58
3.92
1.07
163.51
247.03 m2
VOLUMEN
(m3)

320012699.xlsx 87 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

320012699.xlsx 88 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

5826.97 kg

36.78 m3
VOLUMEN
(m3)
LOSA DE PRIMERA PLANTA
0.77
0.88
1.10
1.88
0.84
0.82
1.49
1.44
0.84
1.00
0.97
1.52
1.35
LOSA DE SEGUNDA PLANTA
1.15
0.25
2.05
0.91
0.84
0.82
1.44
1.49
1.00
0.97
1.27
2.37
LOSA DE AZOTEA
0.51
2.04
2.07

320012699.xlsx 89 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

2.72
36.78

320012699.xlsx 90 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

427.43 m2
VOLUMEN
(m3)
LOSA DE PRIMERA PLANTA

LOSA DE SEGUNDA PLANTA

LOSA DE AZOTEA

2570.03 kg
2850.00 und
UNIDADES
(und)
LOSA DE PRIMERA PLANTA
73.68
83.73
104.46
179.23
79.72

320012699.xlsx 91 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

77.79
141.34
136.77
79.69
95.37
92.41
144.53
128.29

320012699.xlsx 92 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

LOSA DE SEGUNDA PLANTA


109.25
24.16
195.17
86.43
79.72
77.79
136.77
141.34
95.37
92.41
120.37
225.38
LOSA DE AZOTEA
48.66
2850.00
711.00 und
UNIDADES
(und)
LOSA DE AZOTEA
212.36
215.32
283.01
711.00

4.37 m3
VOLUMEN
(m3)
1.79
0.84
0.91
0.82
4.37
26.87 m2
VOLUMEN
(m3)

320012699.xlsx 93 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

294.60 kg

320012699.xlsx 94 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

632.50 m2
VOLUMEN
(m3)

320012699.xlsx 95 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

4.70 m2
VOLUMEN
(m3)

320012699.xlsx 96 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

7.74 m2
VOLUMEN
(m3)

84.99 m2
VOLUMEN
(m3)

38.00 m2
VOLUMEN
(m3)

8.40 m
VOLUMEN
(m3)

632.50 m2
VOLUMEN
(m3)

320012699.xlsx 97 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

320012699.xlsx 98 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

619.72 m2
VOLUMEN
(m3)

320012699.xlsx 99 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

320012699.xlsx 100 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

310.52 m2
AREA
(m2)
30.74
11.03
7.65
11.03
2.03
24.36
2.03
33.30
10.63
2.22
0.43
0.36
22.50
35.28
12.91
10.68
5.88
5.88
3.30
1.95
11.10
8.88
4.14
4.44
12.64
4.83
1.28
0.41
0.17
10.86
9.77

320012699.xlsx 101 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

0.39
0.80
0.61
1.89
1.01
3.13
310.52

320012699.xlsx 102 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

193.62 m2
VOLUMEN
(m3)

320012699.xlsx 103 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

320012699.xlsx 104 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

53.56 m2
VOLUMEN
(m3)

13.63 m2
VOLUMEN
(m3)

427.43 m2
VOLUMEN
(m3)
LOSA DE PRIMERA PLANTA

320012699.xlsx 105 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

320012699.xlsx 106 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

LOSA DE SEGUNDA PLANTA

LOSA DE AZOTEA

169.42 m2
VOLUMEN
(m3)

169.42 m2
VOLUMEN
(m3)

320012699.xlsx 107 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

320012699.xlsx 108 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

340.29 m2
VOLUMEN
(m3)
PRIMER PISO

SEGUNDO PISO

AZOTEA

182.82 m2
VOLUMEN
(m3)

83.71 m2
VOLUMEN
(m3)

320012699.xlsx 109 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

0.43 m3
VOLUMEN
(m3)
0.43
0.43
17.76 m3
VOLUMEN
(m3)
13.86
3.90
17.76

320012699.xlsx 110 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

17.50 m2
VOLUMEN
(m3)

74.95 m

42.24 m

56.92 m2
VOLUMEN
(m3)

304.25 m
VOLUMEN
(m3)

42.12 m2

320012699.xlsx 111 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

VOLUMEN
(m3)

52.65 m2
VOLUMEN
(m3)

320012699.xlsx 112 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

37.63 m2
VOLUMEN
(m3)

11.55 m2
VOLUMEN
(m3)

2.00 und

2.00 und
1.00 und
13.42 m2
2.00 und
2.00 und

124.00 und
UNIDAD
(und)
40.00
28.00
8.00
8.00
4.00
24.00

320012699.xlsx 113 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

4.00
8.00
124.00
2.00 pza
UNIDAD
(pza)
2.00
2.00

320012699.xlsx 114 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

25.00 pza
UNIDAD
(pza)
10.00
7.00
2.00
2.00
1.00
1.00
2.00
25.00
3.00 pza
UNIDAD
(pza)
2.00
1.00
3.00

219.14 p2
VOLUMEN
(m3)

1216.04 m2
VOLUMEN
(m3)

774.98 m2

320012699.xlsx 115 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

VOLUMEN
(m3)

320012699.xlsx 116 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

64.20 m2
VOLUMEN
(m3)

34.93 m2
VOLUMEN
(m3)

1311.10 m
1042.20 m
108.15 m
19.00 m

1030.25 m
165.00 m
348.00 und
12.00 und

320012699.xlsx 117 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

397.00 und
6.00 und

29.00 und
27.00 und
4.00 und
5.00 und
8.00 und

320012699.xlsx 118 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

32.00 und
4.00 und
5.00 und

85.00 und

1.00 und

1.00 und

67.00 und
130.00 und

1.00 und
1.00 und

1.00 und

1.00 und

1.00 und

25.00 pto
4.00 pto
27.96 m
11.00 pza
10.00 pza
55.37 m
59.73 m

320012699.xlsx 119 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

24.21 m
1.00 und
1.00 und

320012699.xlsx 120 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

28.00 pto
9.00 pto
15.83 m
57.32 m
12.00 pto
9.00 pza
6.00 pza
4.00 und

6.00 pza
7.00 pza
3.00 pza
4.00 pza
4.00 pza
6.00 pza
4.00 pza
2.00 pza
3.00 pza

52.88 m
3.00 und
24.61 m
1.00 und

1.00 Gbl
1.00 Und
1.00 Gbl

320012699.xlsx 121 DE 360

PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

1.00 Gbl

320012699.xlsx 122 DE 360

PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012
01.05.01.02

ACERO PARA ZAPATAS GRADO 60

CROQUIS

1228.13 kg

DESCRIPCION

N VECES

N PIEZAS DE
ACERO

LONG. PIEZA
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1.40

Z-01

1/4

3/8

1/2

5/8

1.40

5/8

22.40

1.40

5/8

22.40

3/4

HORIZONTAL

1.40

Z-01
VERTICAL

SUB TOTAL (m)

0.00

0.00

0.00

44.80

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

0.00

0.00

4.98

0.00

0.00

SUB TOTAL (kg)

0.00

0.00

0.00

71.68

0.00

0.00

TOTAL DE ACERO (kg)

71.68
DIAM.

CROQUIS

DESCRIPCION

N VECES

N PIEZAS DE
ACERO

LONG. PIEZA
DE ACERO

(pulg)

1.50

Z-02

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1/4

3/8

1/2

5/8

1.50

5/8

12.00

1.40

5/8

12.60

3/4

HORIZONTAL

1.40

Z-02
VERTICAL

SUB TOTAL (m)

0.00

0.00

0.00

24.60

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

0.00

0.00

2.73

0.00

0.00

SUB TOTAL (kg)

0.00

0.00

0.00

39.36

0.00

0.00

TOTAL DE ACERO (kg)

39.36

ACERO ZAPATAS 123 DE 360

PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012

CROQUIS

DESCRIPCION

N VECES

N PIEZAS DE
ACERO

LONG. PIEZA
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1.55

Z-03

1/4

3/8

1/2

5/8

1.55

5/8

13.95

1.55

5/8

13.95

3/4

HORIZONTAL

1.55

Z-03
VERTICAL

SUB TOTAL (m)

0.00

0.00

0.00

27.90

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

0.00

0.00

3.10

0.00

0.00

SUB TOTAL (kg)

0.00

0.00

0.00

44.64

0.00

0.00

TOTAL DE ACERO (kg)

CROQUIS

44.64

DESCRIPCION

N VECES

N PIEZAS DE
ACERO

LONG. PIEZA
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

2.10

Z-04

1/4

3/8

1/2

5/8

11

2.10

5/8

46.20

12

1.90

5/8

45.60

3/4

HORIZONTAL

1.90

Z-04
VERTICAL

SUB TOTAL (m)

0.00

0.00

0.00

91.80

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

0.00

0.00

10.20

0.00

0.00

SUB TOTAL (kg)

0.00

0.00

0.00

146.88

0.00

0.00

TOTAL DE ACERO (kg)

146.88

ACERO ZAPATAS 124 DE 360

PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012

CROQUIS

DESCRIPCION

N VECES

N PIEZAS DE
ACERO

LONG. PIEZA
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1.80

Z-05

1/4

3/8

1/2

5/8

10

1.80

5/8

18.00

10

1.70

5/8

17.00

3/4

HORIZONTAL

1.70

Z-05
VERTICAL

SUB TOTAL (m)

0.00

0.00

0.00

35.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

0.00

0.00

3.89

0.00

0.00

SUB TOTAL (kg)

0.00

0.00

0.00

56.00

0.00

0.00

TOTAL DE ACERO (kg)

CROQUIS

56.00

DESCRIPCION

N VECES

N PIEZAS DE
ACERO

LONG. PIEZA
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

2.40

Z-05A

1/4

3/8

1/2

5/8

10

2.40

5/8

24.00

13

1.80

5/8

23.40

3/4

HORIZONTAL

1.80

Z-05A
VERTICAL

SUB TOTAL (m)

0.00

0.00

0.00

47.40

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

0.00

0.00

5.27

0.00

0.00

SUB TOTAL (kg)

0.00

0.00

0.00

75.84

0.00

0.00

TOTAL DE ACERO (kg)

75.84

ACERO ZAPATAS 125 DE 360

PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012

CROQUIS

DESCRIPCION

N VECES

N PIEZAS DE
ACERO

LONG. PIEZA
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1.70

Z-06

1/4

3/8

1/2

5/8

1.70

5/8

45.95

10

1.60

5/8

48.00

3/4

HORIZONTAL

1.60

Z-06
VERTICAL

SUB TOTAL (m)

0.00

0.00

0.00

93.95

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

0.00

0.00

10.44

0.00

0.00

SUB TOTAL (kg)

0.00

0.00

0.00

150.33

0.00

0.00

TOTAL DE ACERO (kg)

CROQUIS

150.33

DESCRIPCION

N VECES

N PIEZAS DE
ACERO

LONG. PIEZA
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1.55

Z-07

1/4

3/8

1/2

5/8

1.55

5/8

24.80

1.40

5/8

25.20

3/4

HORIZONTAL

1.40

Z-07
VERTICAL

SUB TOTAL (m)

0.00

0.00

0.00

50.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

0.00

0.00

5.56

0.00

0.00

SUB TOTAL (kg)

0.00

0.00

0.00

80.00

0.00

0.00

TOTAL DE ACERO (kg)

80.00

ACERO ZAPATAS 126 DE 360

PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012

CROQUIS

DESCRIPCION

N VECES

N PIEZAS DE
ACERO

LONG. PIEZA
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

3.50

Z-08

1/4

3/8

1/2

5/8

3.50

5/8

31.50

19

1.55

5/8

29.45

3/4

HORIZONTAL

1.55

Z-08
VERTICAL

SUB TOTAL (m)

0.00

0.00

0.00

60.95

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

0.00

0.00

6.77

0.00

0.00

SUB TOTAL (kg)

0.00

0.00

0.00

97.52

0.00

0.00

TOTAL DE ACERO (kg)

CROQUIS

97.52

DESCRIPCION

N VECES

N PIEZAS DE
ACERO

LONG. PIEZA
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1.90

Z-09

1/4

3/8

1/2

5/8

10

1.90

5/8

19.00

11

1.75

5/8

19.25

3/4

HORIZONTAL

1.75

Z-09
VERTICAL

SUB TOTAL (m)

0.00

0.00

0.00

38.25

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

0.00

0.00

4.25

0.00

0.00

SUB TOTAL (kg)

0.00

0.00

0.00

61.20

0.00

0.00

TOTAL DE ACERO (kg)

61.20

ACERO ZAPATAS 127 DE 360

PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012

CROQUIS

DESCRIPCION

N VECES

N PIEZAS DE
ACERO

LONG. PIEZA
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1.90

Z-10

1/4

3/8

1/2

5/8

1.90

5/8

17.10

11

1.60

5/8

17.60

3/4

HORIZONTAL

1.60

Z-10
VERTICAL

SUB TOTAL (m)

0.00

0.00

0.00

34.70

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

0.00

0.00

3.86

0.00

0.00

SUB TOTAL (kg)

0.00

0.00

0.00

55.52

0.00

0.00

TOTAL DE ACERO (kg)

CROQUIS

55.52

DESCRIPCION

N VECES

N PIEZAS DE
ACERO

LONG. PIEZA
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1.90

Z-11

1/4

3/8

1/2

5/8

1.90

5/8

13.30

11

1.20

5/8

13.20

3/4

HORIZONTAL

1.20

Z-11
VERTICAL

SUB TOTAL (m)

0.00

0.00

0.00

26.50

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

0.00

0.00

2.94

0.00

0.00

SUB TOTAL (kg)

0.00

0.00

0.00

42.40

0.00

0.00

TOTAL DE ACERO (kg)

42.40

ACERO ZAPATAS 128 DE 360

PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012

CROQUIS

DESCRIPCION

N VECES

N PIEZAS DE
ACERO

LONG. PIEZA
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1.50

Z-12

1/4

3/8

1/2

5/8

1.50

5/8

12.00

1.40

5/8

12.60

3/4

HORIZONTAL

1.40

Z-12
VERTICAL

SUB TOTAL (m)

0.00

0.00

0.00

24.60

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

0.00

0.00

2.73

0.00

0.00

SUB TOTAL (kg)

0.00

0.00

0.00

39.36

0.00

0.00

TOTAL DE ACERO (kg)

CROQUIS

39.36

DESCRIPCION

N VECES

N PIEZAS DE
ACERO

LONG. PIEZA
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1.40

Z-13

1/4

3/8

1/2

5/8

1.40

5/8

11.20

1.30

5/8

10.40

3/4

HORIZONTAL

1.30

Z-13
VERTICAL

SUB TOTAL (m)

0.00

0.00

0.00

21.60

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

0.00

0.00

2.40

0.00

0.00

SUB TOTAL (kg)

0.00

0.00

0.00

34.56

0.00

0.00

TOTAL DE ACERO (kg)

34.56

ACERO ZAPATAS 129 DE 360

PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012

CROQUIS

DESCRIPCION

N VECES

N PIEZAS DE
ACERO

LONG. PIEZA
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1.90

Z-14

1/4

3/8

1/2

5/8

1.90

5/8

13.30

11

1.10

5/8

12.10

3/4

HORIZONTAL

1.10

Z-14
VERTICAL

SUB TOTAL (m)

0.00

0.00

0.00

25.40

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

0.00

0.00

2.82

0.00

0.00

SUB TOTAL (kg)

0.00

0.00

0.00

40.64

0.00

0.00

TOTAL DE ACERO (kg)

CROQUIS

40.64

DESCRIPCION

N VECES

N PIEZAS DE
ACERO

LONG. PIEZA
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1.80

Z-15

1/4

3/8

1/2

5/8

1.80

5/8

43.20

10

0.90

5/8

36.00

3/4

HORIZONTAL

0.90

Z-15
VERTICAL

SUB TOTAL (m)

0.00

0.00

0.00

79.20

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

0.00

0.00

8.80

0.00

0.00

SUB TOTAL (kg)

0.00

0.00

0.00

126.72

0.00

0.00

TOTAL DE ACERO (kg)

126.72

ACERO ZAPATAS 130 DE 360

PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012

CROQUIS

DESCRIPCION

N VECES

N PIEZAS DE
ACERO

LONG. PIEZA
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

0.70

Z-16

1/4

3/8

1/2

0.70

1/2

10.50

0.70

1/2

10.50

5/8

3/4

HORIZONTAL

0.70

Z-16
VERTICAL

SUB TOTAL (m)

0.00

0.00

21.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

0.00

2.33

0.00

0.00

0.00

SUB TOTAL (kg)

0.00

0.00

21.42

0.00

0.00

0.00

TOTAL DE ACERO (kg)

CROQUIS

21.42

DESCRIPCION

N VECES

N PIEZAS DE
ACERO

LONG. PIEZA
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

0.90

Z-17

1/4

3/8

1/2

0.90

1/2

9.00

0.70

1/2

8.40

5/8

3/4

HORIZONTAL

0.70

Z-17
VERTICAL

SUB TOTAL (m)

0.00

0.00

17.40

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

0.00

1.93

0.00

0.00

0.00

SUB TOTAL (kg)

0.00

0.00

17.75

0.00

0.00

0.00

TOTAL DE ACERO (kg)

17.75

ACERO ZAPATAS 131 DE 360

PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012

CROQUIS

DESCRIPCION

N VECES

N PIEZAS DE
ACERO

LONG. PIEZA
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1.10

Z-18

1/4

3/8

1/2

1.10

1/2

13.20

0.90

1/2

12.60

5/8

3/4

HORIZONTAL

0.90

Z-18
VERTICAL

SUB TOTAL (m)

0.00

0.00

25.80

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

0.00

2.87

0.00

0.00

0.00

SUB TOTAL (kg)

0.00

0.00

26.32

0.00

0.00

0.00

TOTAL DE ACERO (kg)

26.32

ACERO ZAPATAS 132 DE 360

PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012
1228.13 kg
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
71.68
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
39.36

ACERO ZAPATAS 133 DE 360

PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
44.64
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
146.88

ACERO ZAPATAS 134 DE 360

PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
56.00
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
75.84

ACERO ZAPATAS 135 DE 360

PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
150.33
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
80.00

ACERO ZAPATAS 136 DE 360

PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
97.52
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
61.20

ACERO ZAPATAS 137 DE 360

PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
55.52
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
42.40

ACERO ZAPATAS 138 DE 360

PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
39.36
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
34.56

ACERO ZAPATAS 139 DE 360

PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
40.64
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
126.72

ACERO ZAPATAS 140 DE 360

PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
21.42
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
17.75

ACERO ZAPATAS 141 DE 360

PLANILLA
DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCON
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
26.32

ACERO ZAPATAS 142 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

01.05.02.03

ACERO EN VIGA DE CIMENTACION FY=4200 KG/CM2

CODIGO
ESTRUCTURA

CROQUIS

N VECES

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE A-A

4.00
0.45

2117.71 kg

0.45

TRAMO 9-8

4.90

5/8

4.45

1/2

20

1.45

3/8

19.60

VR1
EJE A-A
0.23

0.23

TRAMO 9-8

4.00

VR1

0.20

EJE A-A

0.45

0.45

TRAMO 9-8

8.90

29.00

VR1

0.20
SUB TOTAL (m)

0.00

29.00

8.90

SUB TOTAL (Nmero de varillas)


SUB TOTAL (kg)

19.60

0.00

0.00

0.00

0.00

3.22

0.00

16.82

0.99

2.18

0.00

0.00

0.00

9.08

31.36

0.00

0.00

0.00

TOTAL DE ACERO (kg)

57.26

CODIGO
ESTRUCTURA

CROQUIS

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE A-A

5.60
0.45

N VECES

0.45

TRAMO 18-16

6.50

1/2

6.05

3/8

26.00

VR2
EJE A-A
0.23

0.23

TRAMO 18-16

12.10

ACERO VIGA CIMENTACION 143 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

5.60

VR2

0.20

EJE A-A

0.45

0.45
0.20

SUB TOTAL (m)

TRAMO 18-16

35

1.45

1/4

50.75

VR2
50.75

12.10

SUB TOTAL (Nmero de varillas)

5.64

SUB TOTAL (kg)

12.69

TOTAL DE ACERO (kg)

26.00

0.00

0.00

0.00

0.00

1.34

2.89

0.00

0.00

0.00

0.00

7.02

26.52

0.00

0.00

0.00

0.00
46.23

ACERO VIGA CIMENTACION 144 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

26.00

0.00

0.00

0.00

0.00

EJE A-A

5.60
0.45

N VECES

0.45

TRAMO 15-13

6.50

1/2

6.05

3/8

35

1.45

1/4

26.00

VR2
EJE A-A
0.23

0.23

TRAMO 15-13

5.60

VR2

0.20

EJE A-A

0.45

0.45

TRAMO 15-13

12.10

50.75

VR2

0.20
SUB TOTAL (m)

50.75

12.10

SUB TOTAL (Nmero de varillas)

5.64

1.34

2.89

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

12.69

7.02

26.52

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

46.23

CODIGO
ESTRUCTURA

CROQUIS

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE A-A

2.74
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.45

TRAMO 12-11

3.64

1/2

3.19

3/8

14.56

VR2
EJE A-A
0.23

0.23
2.74

TRAMO 12-11

6.38

VR2
ACERO VIGA CIMENTACION 145 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

EJE A-A

0.20
0.45

0.45
0.20

TRAMO 12-11

16

1.45

1/4

23.20

VR2

SUB TOTAL (m)

23.20

6.38

SUB TOTAL (Nmero de varillas)

2.58

SUB TOTAL (kg)

5.80

TOTAL DE ACERO (kg)

14.56

0.00

0.00

0.00

0.00

0.71

1.62

0.00

0.00

0.00

0.00

3.70

14.85

0.00

0.00

0.00

0.00
24.35

ACERO VIGA CIMENTACION 146 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE C-C

4.00
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.45

TRAMO 9-8

4.90

5/8

4.45

1/2

21

1.45

3/8

19.60

VR1
EJE C-C
0.23

0.23

TRAMO 9-8

4.00

VR1

0.20

EJE C-C

0.45

0.45

TRAMO 9-8

8.90

30.45

VR1

0.20
SUB TOTAL (m)

0.00

30.45

8.90

19.60

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

3.38

0.99

2.18

0.00

0.00

0.00

SUB TOTAL (kg)

0.00

17.66

9.08

31.36

0.00

0.00

0.00

TOTAL DE ACERO (kg)

58.10

CODIGO
ESTRUCTURA

CROQUIS

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE C-C

14.57
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.45

TRAMO 7-2

16.22

5/8

15.62

1/2

64.88

VR1
EJE C-C
0.23

0.23
14.57

TRAMO 7-2

31.24

VR1
ACERO VIGA CIMENTACION 147 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

EJE C-C

0.20
0.45

0.45
0.20

TRAMO 7-2

83

1.45

3/8

120.35

VR1

SUB TOTAL (m)

0.00

120.35

SUB TOTAL (Nmero de varillas)

0.00

13.37

SUB TOTAL (kg)

0.00

69.80

TOTAL DE ACERO (kg)

31.24

64.88

0.00

0.00

0.00

3.47

7.21

0.00

0.00

0.00

31.86

103.81

0.00

0.00

0.00
205.48

ACERO VIGA CIMENTACION 148 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE D-D

7.55
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.45

TRAMO 4-2

8.45

5/8

8.00

1/2

42

1.45

3/8

33.80

VR1
EJE D-D
0.23

0.23

TRAMO 4-2

7.55

VR1

0.20

EJE D-D

0.45

0.45

TRAMO 4-2

16.00

60.90

VR1

0.20
SUB TOTAL (m)

0.00

60.90

16.00

33.80

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

6.77

1.78

3.76

0.00

0.00

0.00

SUB TOTAL (kg)

0.00

35.32

16.32

54.08

0.00

0.00

0.00

TOTAL DE ACERO (kg)

105.72

CODIGO
ESTRUCTURA

CROQUIS

DIAM.

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

EJE E-E

4.00
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.45

TRAMO 9-8

4.90

5/8

4.45

1/2

19.60

VR1
EJE E-E
0.23

0.23
4.00

TRAMO 9-8

8.90

VR1
ACERO VIGA CIMENTACION 149 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

EJE E-E

0.20
0.45

0.45
0.20

TRAMO 9-8

21

1.45

3/8

30.45

VR1

SUB TOTAL (m)

0.00

SUB TOTAL (Nmero de varillas)


SUB TOTAL (kg)
TOTAL DE ACERO (kg)

30.45

8.90

19.60

0.00

0.00

0.00

0.00

3.38

0.00

17.66

0.99

2.18

0.00

0.00

0.00

9.08

31.36

0.00

0.00

0.00
58.10

ACERO VIGA CIMENTACION 150 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE E-E

3.17
0.45

N VECES

0.45

TRAMO 7-4

4.07

5/8

3.62

1/2

41

1.45

3/8

16.28

VR1
EJE E-E
0.23

0.23

TRAMO 7-4

3.17

VR1

0.20

EJE E-E

0.45

0.45

TRAMO 7-4

7.24

59.45

VR1

0.20
SUB TOTAL (m)

0.00

59.45

7.24

SUB TOTAL (Nmero de varillas)


SUB TOTAL (kg)

16.28

0.00

0.00

0.00

0.00

6.61

0.00

34.48

0.80

1.81

0.00

0.00

0.00

7.38

26.05

0.00

0.00

0.00

TOTAL DE ACERO (kg)

67.91

CODIGO
ESTRUCTURA

CROQUIS

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE F-F

4.00
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.45

TRAMO 9-8

4.90

5/8

4.45

1/2

19.60

VR1
EJE F-F
0.23

0.23
4.00

TRAMO 9-8

8.90

VR1
ACERO VIGA CIMENTACION 151 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

EJE F-F

0.20
0.45

0.45
0.20

TRAMO 9-8

21

1.45

3/8

30.45

VR1

SUB TOTAL (m)

0.00

SUB TOTAL (Nmero de varillas)


SUB TOTAL (kg)
TOTAL DE ACERO (kg)

30.45

8.90

19.60

0.00

0.00

0.00

0.00

3.38

0.00

17.66

0.99

2.18

0.00

0.00

0.00

9.08

31.36

0.00

0.00

0.00
58.10

ACERO VIGA CIMENTACION 152 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE F-F

14.70
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.45

TRAMO 7-2

16.35

5/8

15.75

1/2

83

1.45

3/8

65.40

VR1
EJE F-F
0.23

0.23

TRAMO 7-2

14.70

VR1

0.20

EJE F-F

0.45

0.45

TRAMO 7-2

31.50

120.35

VR1

0.20
SUB TOTAL (m)

0.00

120.35

31.50

65.40

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

13.37

3.50

7.27

0.00

0.00

0.00

SUB TOTAL (kg)

0.00

69.80

32.13

104.64

0.00

0.00

0.00

TOTAL DE ACERO (kg)

206.57

CODIGO
ESTRUCTURA

CROQUIS

DIAM.

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

EJE H-H

4.00
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.45

TRAMO 9-7

4.90

5/8

4.45

1/2

19.60

VR1
EJE H-H
0.23

0.23
4.00

TRAMO 9-7

8.90

VR1
ACERO VIGA CIMENTACION 153 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

EJE H-H

0.20
0.45

0.45
0.20

TRAMO 9-7

21

1.45

3/8

30.45

VR1

SUB TOTAL (m)

0.00

SUB TOTAL (Nmero de varillas)


SUB TOTAL (kg)
TOTAL DE ACERO (kg)

30.45

8.90

19.60

0.00

0.00

0.00

0.00

3.38

0.00

17.66

0.99

2.18

0.00

0.00

0.00

9.08

31.36

0.00

0.00

0.00
58.10

ACERO VIGA CIMENTACION 154 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE I-I

4.00
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.45

TRAMO 9-7

4.90

5/8

4.45

1/2

21

1.45

3/8

19.60

VR1
EJE I-I
0.23

0.23

TRAMO 9-7

4.00

VR1

0.20

EJE I-I

0.45

0.45

TRAMO 9-7

8.90

30.45

VR1

0.20
SUB TOTAL (m)

0.00

30.45

8.90

19.60

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

3.38

0.99

2.18

0.00

0.00

0.00

SUB TOTAL (kg)

0.00

17.66

9.08

31.36

0.00

0.00

0.00

TOTAL DE ACERO (kg)

58.10

CODIGO
ESTRUCTURA

CROQUIS

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE 2-2

8.60
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.45

TRAMO C-F

10.25

5/8

9.65

1/2

41.00

VR1
EJE 2-2
0.23

0.23
8.60

TRAMO C-F

19.30

VR1
ACERO VIGA CIMENTACION 155 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

EJE 2-2

0.20
0.45

0.45
0.20

TRAMO C-F

45

1.45

3/8

65.25

VR1

SUB TOTAL (m)

0.00

SUB TOTAL (Nmero de varillas)

0.00

7.25

SUB TOTAL (kg)

0.00

37.85

TOTAL DE ACERO (kg)

65.25

19.30

41.00

0.00

0.00

0.00

2.14

4.56

0.00

0.00

0.00

19.69

65.60

0.00

0.00

0.00
123.13

ACERO VIGA CIMENTACION 156 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE 3-3

8.55
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.45

TRAMO C-F

10.20

5/8

9.60

1/2

45

1.45

3/8

40.80

VR1
EJE 3-3
0.23

0.23

TRAMO C-F

8.55

VR1

0.20

EJE 3-3

0.45

0.45

TRAMO C-F

19.20

65.25

VR1

0.20
SUB TOTAL (m)

0.00

65.25

19.20

40.80

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

7.25

2.13

4.53

0.00

0.00

0.00

SUB TOTAL (kg)

0.00

37.85

19.58

65.28

0.00

0.00

0.00

TOTAL DE ACERO (kg)

122.71

CODIGO
ESTRUCTURA

CROQUIS

DIAM.

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

EJE 4-4

8.55
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.45

TRAMO C-F

10.20

5/8

9.00

1/2

40.80

VR1
EJE 4-4
0.23

0.23
8.55

TRAMO C-F

18.00

VR1
ACERO VIGA CIMENTACION 157 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

EJE 4-4

0.20
0.45

0.45
0.20

TRAMO C-F

50

1.45

3/8

72.50

VR1

SUB TOTAL (m)

0.00

SUB TOTAL (Nmero de varillas)

0.00

8.06

SUB TOTAL (kg)

0.00

42.05

TOTAL DE ACERO (kg)

72.50

18.00

40.80

0.00

0.00

0.00

2.00

4.53

0.00

0.00

0.00

18.36

65.28

0.00

0.00

0.00
125.69

ACERO VIGA CIMENTACION 158 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE 5-5

8.55
0.45

N VECES

0.45

TRAMO C-F

10.20

5/8

9.00

1/2

45

1.45

3/8

40.80

VR1
EJE 5-5
0.23

0.23

TRAMO C-F

8.55

VR1

0.20

EJE 5-5

0.45

0.45

TRAMO C-F

18.00

65.25

VR1

0.20
SUB TOTAL (m)

0.00

65.25

SUB TOTAL (Nmero de varillas)

0.00

7.25

SUB TOTAL (kg)

0.00

37.85

18.00

40.80

0.00

0.00

0.00

2.00

4.53

0.00

0.00

0.00

18.36

65.28

0.00

0.00

0.00

TOTAL DE ACERO (kg)

121.49

CODIGO
ESTRUCTURA

CROQUIS

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE 7-7

7.55
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.45

TRAMO C-F

8.45

5/8

8.00

1/2

33.80

VR1
EJE 7-7
0.23

0.23
7.55

TRAMO C-F

16.00

VR1
ACERO VIGA CIMENTACION 159 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

EJE 7-7

0.20
0.45

0.45
0.20

TRAMO C-F

45

1.45

3/8

65.25

VR1

SUB TOTAL (m)

0.00

SUB TOTAL (Nmero de varillas)

0.00

7.25

SUB TOTAL (kg)

0.00

37.85

TOTAL DE ACERO (kg)

65.25

16.00

33.80

0.00

0.00

0.00

1.78

3.76

0.00

0.00

0.00

16.32

54.08

0.00

0.00

0.00
108.25

ACERO VIGA CIMENTACION 160 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE 8-8

5.41
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.45

TRAMO A-C

6.31

5/8

5.86

1/2

26

1.45

3/8

25.24

VR1
EJE 8-8
0.23

0.23

TRAMO A-C

5.41

VR1

0.20

EJE 8-8

0.45

0.45

TRAMO A-C

11.72

37.70

VR1

0.20
SUB TOTAL (m)

0.00

37.70

11.72

25.24

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

4.19

1.30

2.80

0.00

0.00

0.00

SUB TOTAL (kg)

0.00

21.87

11.95

40.38

0.00

0.00

0.00

TOTAL DE ACERO (kg)

74.20

CODIGO
ESTRUCTURA

CROQUIS

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE 8-8

14.87
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.45

TRAMO C-I

16.52

5/8

15.92

1/2

66.08

VR1
EJE 8-8
0.23

0.23
14.87

TRAMO C-I

31.84

VR1
ACERO VIGA CIMENTACION 161 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

EJE 8-8

0.20
0.45

0.45
0.20

TRAMO C-I

83

1.45

3/8

120.35

VR1

SUB TOTAL (m)

0.00

120.35

SUB TOTAL (Nmero de varillas)

0.00

13.37

SUB TOTAL (kg)

0.00

69.80

TOTAL DE ACERO (kg)

31.84

66.08

0.00

0.00

0.00

3.54

7.34

0.00

0.00

0.00

32.48

105.73

0.00

0.00

0.00
208.01

ACERO VIGA CIMENTACION 162 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE 9-9

5.41
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.45

TRAMO A-C

6.31

5/8

5.86

1/2

26

1.45

3/8

25.24

VR1
EJE 9-9
0.23

0.23

TRAMO A-C

5.41

VR1

0.20

EJE 9-9

0.45

0.45

TRAMO A-C

11.72

37.70

VR1

0.20
SUB TOTAL (m)

0.00

37.70

11.72

25.24

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

4.19

1.30

2.80

0.00

0.00

0.00

SUB TOTAL (kg)

0.00

21.87

11.95

40.38

0.00

0.00

0.00

TOTAL DE ACERO (kg)

74.20

CODIGO
ESTRUCTURA

CROQUIS

DIAM.

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

EJE 9-9

2.42
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.45

TRAMO H-I

3.32

5/8

2.87

1/2

13.28

VR1
EJE 9-9
0.23

0.23
2.42

TRAMO H-I

5.74

VR1
ACERO VIGA CIMENTACION 163 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

EJE 9-9

0.20
0.45

0.45
0.20

TRAMO H-I

17

1.45

3/8

24.65

VR1

SUB TOTAL (m)

0.00

SUB TOTAL (Nmero de varillas)


SUB TOTAL (kg)
TOTAL DE ACERO (kg)

24.65

5.74

13.28

0.00

0.00

0.00

0.00

2.74

0.00

14.30

0.64

1.48

0.00

0.00

0.00

5.85

21.25

0.00

0.00

0.00
41.40

ACERO VIGA CIMENTACION 164 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

15.12

0.00

0.00

0.00

0.00

EJE 9-9

2.88
0.45

N VECES

0.45

TRAMO I-N

3.78

1/2

3.33

3/8

17

1.45

1/4

15.12

VR2
EJE 9-9
0.23

0.23

TRAMO I-N

2.88

VR2

0.20

EJE 9-9

0.45

0.45

TRAMO I-N

6.66

24.65

VR2

0.20
SUB TOTAL (m)

24.65

6.66

SUB TOTAL (Nmero de varillas)

2.74

0.74

1.68

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

6.16

3.86

15.42

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

25.45

CODIGO
ESTRUCTURA

CROQUIS

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE 11 - 11

5.25
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.45

TRAMO A - M

6.15

1/2

5.70

3/8

24.60

VR2
EJE 11 - 11
0.23

0.23
5.25

TRAMO A - M

11.40

VR2
ACERO VIGA CIMENTACION 165 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

EJE 11 - 11

0.20
0.45

0.45
0.20

SUB TOTAL (m)

TRAMO A - M

31

1.45

1/4

44.95

VR2
44.95

11.40

SUB TOTAL (Nmero de varillas)

4.99

SUB TOTAL (kg)

11.24

TOTAL DE ACERO (kg)

24.60

0.00

0.00

0.00

0.00

1.27

2.73

0.00

0.00

0.00

0.00

6.61

25.09

0.00

0.00

0.00

0.00
42.94

ACERO VIGA CIMENTACION 166 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

01.05.03.03

ACERO EN COLUMNAS FY=4200 KG/CM2

CODIGO
ESTRUCTURA

CROQUIS

0.35

0.35

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE A-A

12.75

5/8

12.50

1/2

140

1.13

3/8

127.50

EJE A-A

75.00

C-01

0.32
0.17

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

C-01

11.05
0.50

N VECES

C-01

11.05
0.60

5623.42 kg

0.17

EJE A-A

316.40

0.32
SUB TOTAL (m)

0.00

316.40

75.00

127.50

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

35.16

8.33

14.17

0.00

0.00

0.00

SUB TOTAL (kg)

0.00

183.51

76.50

204.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

464.01

CODIGO
ESTRUCTURA

CROQUIS

0.15

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE A-A

5.50

3/8

38

0.75

1/4

22.00

C-9

0.10
0.20

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

C-9

4.90
0.45

N VECES

0.20

EJE A-A

28.50

0.10
ACERO COLUMNAS 167 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

SUB TOTAL (m)

28.50

SUB TOTAL (Nmero de varillas)


SUB TOTAL (kg)
TOTAL DE ACERO (kg)

22.00

0.00

0.00

0.00

0.00

0.00

3.17

2.44

0.00

0.00

0.00

0.00

0.00

7.13

12.76

0.00

0.00

0.00

0.00

0.00
19.89

ACERO COLUMNAS 168 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

0.20

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE A-A

6.50

1/2

46

0.83

1/4

26.00

C-7

0.17
0.17

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

C-7

5.80
0.50

N VECES

0.17

EJE A-A

38.18

0.17
SUB TOTAL (m)

38.18

0.00

26.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

4.24

0.00

2.89

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

9.55

0.00

26.52

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

36.07

CODIGO
ESTRUCTURA

CROQUIS

0.20

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

EJE A-A

6.00

1/2

40

0.83

1/4

144.00

C-7

0.17
0.17

DIAM.

C-7

5.30
0.50

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.17

EJE A-A

199.20

0.17
SUB TOTAL (m)

199.20

0.00

144.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

22.13

0.00

16.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

49.80

0.00

146.88

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

196.68
ACERO COLUMNAS 169 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

0.20

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE A-A

6.00

1/2

41

0.83

1/4

24.00

C-8

0.17
0.17

DIAM.

C-8

5.30
0.50

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.17

EJE A-A

34.03

0.17
SUB TOTAL (m)

34.03

0.00

24.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

3.78

0.00

2.67

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

8.51

0.00

24.48

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

32.99

CODIGO
ESTRUCTURA

CROQUIS

0.15

0.15

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE C-C

10.80

5/8

10.55

1/2

60

1.13

3/8

86.40

EJE C-C

42.20

C-2

0.32
0.17

LONGITUDES PARCIALES (m)

C-2

9.30
0.50

DIAM.

C-2

9.30
0.60

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.17

EJE C-C

135.60

0.32
ACERO COLUMNAS 170 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

SUB TOTAL (m)

0.00

135.60

SUB TOTAL (Nmero de varillas)

0.00

15.07

SUB TOTAL (kg)

0.00

78.65

TOTAL DE ACERO (kg)

42.20

86.40

0.00

0.00

0.00

4.69

9.60

0.00

0.00

0.00

43.04

138.24

0.00

0.00

0.00
259.93

ACERO COLUMNAS 171 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

0.15

0.15

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE C-C

9.80

5/8

9.55

1/2

55

1.13

3/8

39.20

EJE C-C

19.10

C-2

0.32
0.17

DIAM.

C-2

8.30
0.50

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

C-2

8.30
0.60

N VECES

0.17

EJE C-C

62.15

0.32
SUB TOTAL (m)

0.00

62.15

19.10

39.20

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

6.91

2.12

4.36

0.00

0.00

0.00

SUB TOTAL (kg)

0.00

36.05

19.48

62.72

0.00

0.00

0.00

TOTAL DE ACERO (kg)

118.25

CODIGO
ESTRUCTURA

CROQUIS

0.15

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

EJE C-C

10.78

5/8

10.53

1/2

86.24

C-2

9.28
0.50

DIAM.

C-2

9.28
0.60

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.15

EJE C-C

42.12

ACERO COLUMNAS 172 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

C-2

0.32
0.17

0.17

EJE C-C

60

1.13

3/8

135.60

0.32
SUB TOTAL (m)

0.00

135.60

SUB TOTAL (Nmero de varillas)

0.00

15.07

SUB TOTAL (kg)

0.00

78.65

TOTAL DE ACERO (kg)

42.12

86.24

0.00

0.00

0.00

4.68

9.58

0.00

0.00

0.00

42.96

137.98

0.00

0.00

0.00
259.59

ACERO COLUMNAS 173 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

0.30

0.30

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE C-C

10.97

5/8

10.72

1/2

118

1.13

3/8

54.85

EJE C-C

32.16

C-1

0.32
0.17

DIAM.

C-1

9.32
0.50

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

C-1

9.32
0.60

N VECES

0.17

EJE C-C

133.34

0.32
SUB TOTAL (m)

0.00

133.34

32.16

54.85

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

14.82

3.57

6.09

0.00

0.00

0.00

SUB TOTAL (kg)

0.00

77.34

32.80

87.76

0.00

0.00

0.00

TOTAL DE ACERO (kg)

197.90

CODIGO
ESTRUCTURA

CROQUIS

0.30

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

EJE C-C

10.50

5/8

10.25

1/2

52.50

C-1

8.85
0.50

DIAM.

C-1

8.85
0.60

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.30

EJE C-C

30.75

ACERO COLUMNAS 174 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

C-1

0.32
0.17

0.17

EJE C-C

110

1.13

3/8

124.30

0.32
SUB TOTAL (m)

0.00

124.30

SUB TOTAL (Nmero de varillas)

0.00

13.81

SUB TOTAL (kg)

0.00

72.09

TOTAL DE ACERO (kg)

30.75

52.50

0.00

0.00

0.00

3.42

5.83

0.00

0.00

0.00

31.37

84.00

0.00

0.00

0.00
187.46

ACERO COLUMNAS 175 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

0.17

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE C-C

5.64

3/8

37

0.75

1/4

45.12

C-9

0.20
0.10

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

C-9

5.02
0.45

N VECES

0.10

EJE C-C

55.50

0.20
SUB TOTAL (m)

55.50

45.12

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

6.17

5.01

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

13.88

26.17

0.00

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

40.04

CODIGO
ESTRUCTURA

CROQUIS

0.30

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

EJE C-C

8.07

3/8

51

0.75

1/4

129.12

C-9

0.20
0.10

DIAM.

C-9

7.32
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.10

EJE C-C

153.00

0.20
SUB TOTAL (m)

153.00

129.12

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

17.00

14.35

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

38.25

74.89

0.00

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

113.14
ACERO COLUMNAS 176 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

0.30

0.30

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE C-C

5.92

5/8

5.82

1/2

32

1.13

1/4

23.68

EJE C-C

11.64

C-2

0.32
0.17

DIAM.

C-2

5.02
0.50

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

C-2

5.02
0.60

N VECES

0.17

EJE C-C

36.16

0.32
SUB TOTAL (m)

36.16

0.00

11.64

23.68

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

4.02

0.00

1.29

2.63

0.00

0.00

0.00

SUB TOTAL (kg)

9.04

0.00

11.87

37.89

0.00

0.00

0.00

TOTAL DE ACERO (kg)

58.80

CODIGO
ESTRUCTURA

CROQUIS

0.30

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

EJE C-C

5.27

3/8

32

0.75

1/4

21.08

C-9

0.20
0.10

DIAM.

C-9

4.52
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.10

EJE C-C

24.00

0.20
ACERO COLUMNAS 177 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

SUB TOTAL (m)

24.00

SUB TOTAL (Nmero de varillas)


SUB TOTAL (kg)
TOTAL DE ACERO (kg)

21.08

0.00

0.00

0.00

0.00

0.00

2.67

2.34

0.00

0.00

0.00

0.00

0.00

6.00

12.23

0.00

0.00

0.00

0.00

0.00
18.23

ACERO COLUMNAS 178 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

C-10

1.62
0.45

N VECES

0.15

EJE C-C

2.22

3/8

0.55

1/4

17.76

1 PLANTA
C-10

0.10
0.10

0.10

EJE C-C

9.90

1 PLANTA

0.10
SUB TOTAL (m)

9.90

17.76

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

1.10

1.97

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

2.48

10.30

0.00

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

12.78

CODIGO
ESTRUCTURA

CROQUIS

DIAM.

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

C-10

1.42
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.15

EJE C-C

2.02

3/8

0.55

1/4

16.16

2 PLANTA
C-10

0.10
0.10

0.10
0.10

EJE C-C

9.90

2 PLANTA

SUB TOTAL (m)

9.90

16.16

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

1.10

1.80

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

2.48

9.37

0.00

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

11.85
ACERO COLUMNAS 179 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

C-10

1.32
0.45

N VECES

0.15

EJE C-C

1.92

3/8

0.55

1/4

30.72

AZOTEA
C-10

0.10
0.10

0.10

EJE C-C

19.80

AZOTEA

0.10
SUB TOTAL (m)

19.80

30.72

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

2.20

3.41

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

4.95

17.82

0.00

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

22.77

CODIGO
ESTRUCTURA

CROQUIS

0.15

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

EJE D-D

7.92

3/8

52

0.75

1/4

95.04

C-9

0.20
0.10

DIAM.

C-9

7.32
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.10

EJE D-D

117.00

0.20
SUB TOTAL (m)

117.00

95.04

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

13.00

10.56

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

29.25

55.12

0.00

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

84.37
ACERO COLUMNAS 180 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

0.30

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE D-D

8.57

3/8

57

0.75

1/4

68.56

C-9

0.20
0.10

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

C-9

7.82
0.45

N VECES

0.10

EJE D-D

85.50

0.20
SUB TOTAL (m)

85.50

68.56

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

9.50

7.62

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

21.38

39.76

0.00

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

61.14

CODIGO
ESTRUCTURA

CROQUIS

0.30

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

EJE D-D

5.27

3/8

32

0.75

1/4

21.08

C-9

0.20
0.10

DIAM.

C-9

4.52
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.10

EJE D-D

24.00

0.20
SUB TOTAL (m)

24.00

21.08

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

2.67

2.34

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

6.00

12.23

0.00

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

18.23
ACERO COLUMNAS 181 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

0.30

0.30

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE D-D

11.87

5/8

11.62

1/2

64

1.13

1/4

47.48

EJE D-D

23.24

C-2

0.32
0.17

DIAM.

C-2

10.22
0.50

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

C-2

10.22
0.60

N VECES

0.17

EJE D-D

72.32

0.32
SUB TOTAL (m)

72.32

0.00

23.24

47.48

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

8.04

0.00

2.58

5.28

0.00

0.00

0.00

SUB TOTAL (kg)

18.08

0.00

23.70

75.97

0.00

0.00

0.00

TOTAL DE ACERO (kg)

117.75

CODIGO
ESTRUCTURA

CROQUIS

0.30

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

EJE D-D

11.87

5/8

64

1.13

1/4

71.22

C-4

0.32
0.17

DIAM.

C-4

10.22
0.60

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.17

EJE D-D

72.32

0.32
ACERO COLUMNAS 182 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

SUB TOTAL (m)

72.32

0.00

0.00

SUB TOTAL (Nmero de varillas)

8.04

0.00

SUB TOTAL (kg)

18.08

0.00

TOTAL DE ACERO (kg)

71.22

0.00

0.00

0.00

0.00

7.91

0.00

0.00

0.00

0.00

113.95

0.00

0.00

0.00
132.03

ACERO COLUMNAS 183 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

0.30

0.30

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE D-D

10.47

5/8

10.22

1/2

57

1.13

1/4

41.88

EJE D-D

20.44

C-2

0.32
0.17

DIAM.

C-2

8.82
0.50

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

C-2

8.82
0.60

N VECES

0.17

EJE D-D

64.41

0.32
SUB TOTAL (m)

64.41

0.00

20.44

41.88

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

7.16

0.00

2.27

4.65

0.00

0.00

0.00

SUB TOTAL (kg)

16.10

0.00

20.85

67.01

0.00

0.00

0.00

TOTAL DE ACERO (kg)

103.96

CODIGO
ESTRUCTURA

CROQUIS

0.25

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

EJE E-E

10.42

5/8

10.17

1/2

41.68

C-2

8.82
0.50

DIAM.

C-2

8.82
0.60

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.25

EJE E-E

20.34

ACERO COLUMNAS 184 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

C-2

0.32
0.17

0.17

EJE E-E

57

1.13

1/4

64.41

0.32
SUB TOTAL (m)

64.41

0.00

SUB TOTAL (Nmero de varillas)

7.16

0.00

SUB TOTAL (kg)

16.10

0.00

TOTAL DE ACERO (kg)

20.34

41.68

0.00

0.00

0.00

2.26

4.63

0.00

0.00

0.00

20.75

66.69

0.00

0.00

0.00
103.54

ACERO COLUMNAS 185 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

0.30

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE E-E

8.07

3/8

52

0.75

1/4

129.12

C-9

0.20
0.10

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

C-9

7.32
0.45

N VECES

0.10

EJE E-E

156.00

0.20
SUB TOTAL (m)

156.00

129.12

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

17.33

14.35

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

39.00

74.89

0.00

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

113.89

CODIGO
ESTRUCTURA

CROQUIS

0.25

0.25

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

EJE E-E

8.67

5/8

8.57

1/2

50

1.13

1/4

69.36

EJE E-E

34.28

C-2

0.32
0.17

LONGITUDES PARCIALES (m)

C-2

7.82
0.50

DIAM.

C-2

7.82
0.60

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.17

EJE E-E

113.00

0.32
ACERO COLUMNAS 186 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

SUB TOTAL (m)

113.00

0.00

SUB TOTAL (Nmero de varillas)

12.56

0.00

SUB TOTAL (kg)

28.25

0.00

TOTAL DE ACERO (kg)

34.28

69.36

0.00

0.00

0.00

3.81

7.71

0.00

0.00

0.00

34.97

110.98

0.00

0.00

0.00
174.19

ACERO COLUMNAS 187 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

0.25

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE E-E

8.67

5/8

52

1.13

1/4

52.02

C-4

0.32
0.17

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

C-4

7.82
0.60

N VECES

0.17

EJE E-E

58.76

0.32
SUB TOTAL (m)

58.76

0.00

0.00

52.02

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

6.53

0.00

0.00

5.78

0.00

0.00

0.00

SUB TOTAL (kg)

14.69

0.00

0.00

83.23

0.00

0.00

0.00

TOTAL DE ACERO (kg)

97.92

CODIGO
ESTRUCTURA

CROQUIS

0.20

0.20

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

EJE F-F

10.37

5/8

10.12

1/2

55

1.13

1/4

165.92

EJE F-F

80.96

C-2

0.32
0.17

LONGITUDES PARCIALES (m)

C-2

8.82
0.50

DIAM.

C-2

8.82
0.60

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.17

EJE F-F

248.60

0.32
ACERO COLUMNAS 188 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

SUB TOTAL (m)

248.60

0.00

SUB TOTAL (Nmero de varillas)

27.62

0.00

SUB TOTAL (kg)

62.15

0.00

TOTAL DE ACERO (kg)

80.96

165.92

0.00

0.00

0.00

9.00

18.44

0.00

0.00

0.00

82.58

265.47

0.00

0.00

0.00
410.20

ACERO COLUMNAS 189 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

0.30

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE F-F

5.27

3/8

32

0.75

1/4

42.16

C-9

0.20
0.10

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

C-9

4.52
0.45

N VECES

0.10

EJE F-F

48.00

0.20
SUB TOTAL (m)

48.00

42.16

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

5.33

4.68

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

12.00

24.45

0.00

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

36.45

CODIGO
ESTRUCTURA

CROQUIS

0.30

0.30

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

EJE F-F

10.47

5/8

10.22

1/2

144

1.13

3/8

52.35

EJE F-F

30.66

C-1

0.32
0.17

LONGITUDES PARCIALES (m)

C-1

8.82
0.50

DIAM.

C-1

8.82
0.60

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.17

EJE F-F

162.72

0.32
ACERO COLUMNAS 190 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

SUB TOTAL (m)

0.00

162.72

SUB TOTAL (Nmero de varillas)

0.00

18.08

SUB TOTAL (kg)

0.00

94.38

TOTAL DE ACERO (kg)

30.66

52.35

0.00

0.00

0.00

3.41

5.82

0.00

0.00

0.00

31.27

83.76

0.00

0.00

0.00
209.41

ACERO COLUMNAS 191 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

C-3

8.47
0.70

N VECES

0.40

EJE F-F

10.32

3/4

55

1.47

3/8

61.92

C-3
EJE F-F

1.32

80.85

SUB TOTAL (m)

0.00

80.85

0.00

0.00

61.92

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

8.98

0.00

0.00

6.88

0.00

0.00

SUB TOTAL (kg)

0.00

46.89

0.00

0.00

139.94

0.00

0.00

TOTAL DE ACERO (kg)

186.83

CODIGO
ESTRUCTURA

CROQUIS

0.20

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

EJE F-F

7.97

3/8

50

0.75

1/4

191.28

C-9

0.20
0.10

DIAM.

C-9

7.32
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.10

EJE F-F

225.00

0.20
SUB TOTAL (m)

225.00

191.28

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

25.00

21.25

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

56.25

110.94

0.00

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

167.19
ACERO COLUMNAS 192 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

0.20

0.20

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE F-F

10.02

5/8

9.77

1/2

55

1.13

1/4

160.32

EJE F-F

78.16

C-2

0.32
0.17

DIAM.

C-2

8.47
0.50

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

C-2

8.47
0.60

N VECES

0.17

EJE F-F

248.60

0.32
SUB TOTAL (m)

248.60

0.00

78.16

160.32

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

27.62

0.00

8.68

17.81

0.00

0.00

0.00

SUB TOTAL (kg)

62.15

0.00

79.72

256.51

0.00

0.00

0.00

TOTAL DE ACERO (kg)

398.39

CODIGO
ESTRUCTURA

CROQUIS

DIAM.

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

C-10

2.32
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.15

EJE F-F

2.92

3/8

20

0.55

1/4

35.04

(1 PLANTA)
C-10

0.10
0.10

0.10
0.10

EJE F-F

33.00

(1 PLANTA)
ACERO COLUMNAS 193 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

SUB TOTAL (m)

33.00

SUB TOTAL (Nmero de varillas)


SUB TOTAL (kg)
TOTAL DE ACERO (kg)

35.04

0.00

0.00

0.00

0.00

0.00

3.67

3.89

0.00

0.00

0.00

0.00

0.00

8.25

20.32

0.00

0.00

0.00

0.00

0.00
28.57

ACERO COLUMNAS 194 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

C-10

1.22
0.45

N VECES

0.15

EJE F-F

1.82

3/8

10

0.55

1/4

14.56

(2 PLANTA)
C-10

0.10
0.10

0.10

EJE F-F

11.00

(2 PLANTA)

0.10
SUB TOTAL (m)

11.00

14.56

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

1.22

1.62

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

2.75

8.44

0.00

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

11.19

CODIGO
ESTRUCTURA

CROQUIS

DIAM.

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

C-10

1.32
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.15

EJE F-F

1.92

3/8

10

0.55

1/4

15.36

(AZOTEA)
C-10

0.10
0.10

0.10
0.10

EJE F-F

11.00

(AZOTEA)

SUB TOTAL (m)

11.00

15.36

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

1.22

1.71

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

2.75

8.91

0.00

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

11.66
ACERO COLUMNAS 195 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

0.20

0.20

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE F-F

10.02

5/8

9.77

1/2

55

1.13

1/4

40.08

EJE F-F

19.54

C-2

0.32
0.17

DIAM.

C-2

8.47
0.50

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

C-2

8.47
0.60

N VECES

0.17

EJE F-F

62.15

0.32
SUB TOTAL (m)

62.15

0.00

19.54

40.08

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

6.91

0.00

2.17

4.45

0.00

0.00

0.00

SUB TOTAL (kg)

15.54

0.00

19.93

64.13

0.00

0.00

0.00

TOTAL DE ACERO (kg)

99.60

CODIGO
ESTRUCTURA

CROQUIS

0.20

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

EJE H-H

11.02

5/8

10.77

1/2

88.16

C-2

9.47
0.50

DIAM.

C-2

9.47
0.60

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.20

EJE H-H

43.08

ACERO COLUMNAS 196 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

C-2

0.32
0.17

0.17

EJE H-H

60

1.13

1/4

135.60

0.32
SUB TOTAL (m)

135.60

0.00

SUB TOTAL (Nmero de varillas)

15.07

0.00

SUB TOTAL (kg)

33.90

0.00

TOTAL DE ACERO (kg)

43.08

88.16

0.00

0.00

0.00

4.79

9.80

0.00

0.00

0.00

43.94

141.06

0.00

0.00

0.00
218.90

ACERO COLUMNAS 197 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

C-9

4.52
0.45

N VECES

0.20

EJE H-H

5.17

3/8

32

0.75

1/4

20.68

(1 PLANTA)
C-9

0.20
0.10

0.10

EJE H-H

24.00

(1 PLANTA)

0.20
SUB TOTAL (m)

24.00

20.68

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

2.67

2.30

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

6.00

11.99

0.00

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

17.99

CODIGO
ESTRUCTURA

CROQUIS

DIAM.

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

C-9

3.12
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.20

EJE H-H

3.77

3/8

20

0.75

1/4

30.16

(2 PLANTA)
C-9

0.20
0.10

0.10
0.20

EJE H-H

30.00

(2 PLANTA)

SUB TOTAL (m)

30.00

30.16

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

3.33

3.35

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

7.50

17.49

0.00

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

24.99
ACERO COLUMNAS 198 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

0.15

0.15

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE I-I

10.06

5/8

9.81

1/2

53

1.13

1/4

80.48

EJE I-I

39.24

C-2

0.32
0.17

DIAM.

C-2

8.56
0.50

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

C-2

8.56
0.60

N VECES

0.17

EJE I-I

119.78

0.32
SUB TOTAL (m)

119.78

0.00

39.24

80.48

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

13.31

0.00

4.36

8.94

0.00

0.00

0.00

SUB TOTAL (kg)

29.95

0.00

40.02

128.77

0.00

0.00

0.00

TOTAL DE ACERO (kg)

198.74

CODIGO
ESTRUCTURA

CROQUIS

DIAM.

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

C-9

4.52
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.20

EJE I-I

5.17

3/8

32

0.75

1/4

41.36

(1 PLANTA)
C-9

0.20
0.10

0.10
0.20

EJE I-I

48.00

(1 PLANTA)
ACERO COLUMNAS 199 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

SUB TOTAL (m)

48.00

41.36

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

5.33

4.60

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

12.00

23.99

0.00

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

35.99

ACERO COLUMNAS 200 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

C-10

2.17
0.45

N VECES

0.15

EJE I-I

2.77

3/8

20

0.55

1/4

11.08

(1 PLANTA)
C-10

0.10
0.10

0.10

EJE I-I

11.00

(1 PLANTA)

0.10
SUB TOTAL (m)

11.00

11.08

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

1.22

1.23

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

2.75

6.43

0.00

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

9.18

CODIGO
ESTRUCTURA

CROQUIS

DIAM.

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

C-7

4.00
0.50

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.15

EJE 2-2

4.65

1/2

33

0.83

1/4

37.20

(1 PLANTA)
C-7

0.17
0.17

0.17
0.17

EJE 2-2

54.78

(1 PLANTA)

SUB TOTAL (m)

54.78

0.00

37.20

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

6.09

0.00

4.13

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

13.70

0.00

37.94

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

51.64
ACERO COLUMNAS 201 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

0.20

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE 9-9

7.97

3/8

51

0.75

1/4

63.76

C-9

0.20
0.10

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

C-9

7.32
0.45

N VECES

0.10

EJE 9-9

76.50

0.20
SUB TOTAL (m)

76.50

63.76

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

8.50

7.08

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

19.13

36.98

0.00

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

56.11

CODIGO
ESTRUCTURA

CROQUIS

0.20

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

EJE 9-9

8.97

3/8

56

0.75

1/4

71.76

C-9

0.20
0.10

DIAM.

C-9

8.32
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.10

EJE 9-9

84.00

0.20
SUB TOTAL (m)

84.00

71.76

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

9.33

7.97

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

21.00

41.62

0.00

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

62.62
ACERO COLUMNAS 202 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

C-6

3.02
0.45

N VECES

0.20

EJE 9-9; 8-8

3.67

1/2

3.67

3/8

21

0.83

1/4

29.36

(AZOTEA)
C-6

3.02
0.45

0.20

EJE 9-9; 8-8

14.68

(AZOTEA)
C-6

0.17
0.17

0.17

EJE 9-9; 8-8

34.86

(AZOTEA)

0.17
SUB TOTAL (m)

34.86

14.68

29.36

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

3.87

1.63

3.26

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

8.72

8.51

29.95

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

47.18

CODIGO
ESTRUCTURA

CROQUIS

DIAM.

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

C-10

1.32
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.15

EJE 9-9; 8-8

1.92

3/8

10

0.55

1/4

15.36

(AZOTEA)
C-10

0.10
0.10

0.10
0.10

EJE 9-9; 8-8

11.00

(AZOTEA)
ACERO COLUMNAS 203 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

SUB TOTAL (m)

11.00

15.36

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

1.22

1.71

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

2.75

8.91

0.00

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

11.66

ACERO COLUMNAS 204 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

C-10

1.22
0.45

N VECES

0.15

EJE 8-8

1.82

3/8

0.55

1/4

7.28

(AZOTEA)
C-10

0.10
0.10

0.10

EJE 8-8

4.95

(AZOTEA)

0.10
SUB TOTAL (m)

4.95

7.28

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.55

0.81

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

1.24

4.22

0.00

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

5.46

CODIGO
ESTRUCTURA

CROQUIS

DIAM.

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

C-9

3.12
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.20

EJE 8-8

3.77

3/8

20

0.75

1/4

15.08

(2 Planta)
C-9

0.20
0.10

0.10
0.20

EJE 8-8

15.00

(2 Planta)

SUB TOTAL (m)

15.00

15.08

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

1.67

1.68

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

3.75

8.75

0.00

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

12.50
ACERO COLUMNAS 205 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

C-9

5.02
0.45

N VECES

0.20

EJE 9-9

5.67

3/8

37

0.75

1/4

22.68

(1 PLANTA)
C-9

0.20
0.10

0.10

EJE 9-9

27.75

(1 PLANTA)

0.20
SUB TOTAL (m)

27.75

22.68

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

3.08

2.52

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

6.94

13.15

0.00

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

20.09

CODIGO
ESTRUCTURA

CROQUIS

DIAM.

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

C-9

7.32
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.20

EJE 2-2

7.97

3/8

52

0.75

1/4

31.88

(1 PLANTA)
C-9

0.20
0.10

0.10
0.20

EJE 2-2

39.00

(1 PLANTA)

SUB TOTAL (m)

39.00

31.88

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

4.33

3.54

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

9.75

18.49

0.00

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

28.24
ACERO COLUMNAS 206 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

C-8

5.52
0.45

N VECES

0.20

EJE 2-2

6.17

1/2

41

0.83

1/4

74.04

(1 PLANTA)
C-8

0.17
0.17

0.17

EJE 2-2

102.09

(1 PLANTA)

0.17
SUB TOTAL (m)

102.09

0.00

74.04

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

11.34

0.00

8.23

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

25.52

0.00

75.52

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

101.04

CODIGO
ESTRUCTURA

CROQUIS

0.20

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

EJE D-D

7.97

3/8

52

0.75

1/4

31.88

C-9

0.20
0.10

DIAM.

C-9

7.32
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.10

EJE D-D

39.00

0.20
SUB TOTAL (m)

39.00

31.88

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

4.33

3.54

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

9.75

18.49

0.00

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

28.24
ACERO COLUMNAS 207 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

0.15

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE 8'-8'

5.50

3/8

38

0.55

1/4

44.00

C-10

0.10
0.10

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

C-10

4.90
0.45

N VECES

0.10

EJE 8'-8'

41.80

0.10
SUB TOTAL (m)

41.80

44.00

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

4.64

4.89

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

10.45

25.52

0.00

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

35.97

CODIGO
ESTRUCTURA

CROQUIS

0.15

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1 3/8

EJE 8'-8'

5.50

3/8

38

0.75

1/4

22.00

C-9

0.10
0.20

DIAM.

C-9

4.90
0.45

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

0.20

EJE 8'-8'

28.50

0.10
SUB TOTAL (m)

28.50

22.00

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

3.17

2.44

0.00

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

7.13

12.76

0.00

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

19.89
ACERO COLUMNAS 208 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CODIGO
ESTRUCTURA

CROQUIS

0.15

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

EJE 3-3

2.67

5/8

13

0.93

1/4

10.68

C-5

0.22
0.17

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

C-5

2.07
0.45

N VECES

0.17

EJE 3-3

12.09

0.22
SUB TOTAL (m)

12.09

0.00

0.00

10.68

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

1.34

0.00

0.00

1.19

0.00

0.00

0.00

SUB TOTAL (kg)

3.02

0.00

0.00

17.09

0.00

0.00

0.00

TOTAL DE ACERO (kg)

20.11

ACERO COLUMNAS 209 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

01.05.04.03

ACERO EN VIGAS FY=4200 KG/CM2

CROQUIS

CODIGO ESTRUCTURA N VECES

3.98
0.33

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE A-A
0.33

0.18
0.33

5826.97 kg

VA-101

4.64

5/8

25

1.17

1/4

18.56

EJE A-A
0.33

VS-101

29.25

0.18
SUB TOTAL (m)

29.25

0.00

0.00

18.56

0.00

0.00

SUB TOTAL (Nmero de varillas)

3.25

0.00

0.00

2.06

0.00

0.00

SUB TOTAL (kg)

7.31

0.00

0.00

29.70

0.00

0.00

TOTAL DE ACERO (kg)

37.01

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
3.98
0.33

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE A-A
0.33

4.98
0.33

DIAM.

VA-201

4.64

5/8

9.28

5.41

5/8

10.82

2.30

1/2

25

1.17

1/4

EJE A-A
0.10

VA-201
EJE A-A

2.20

0.10

0.18
0.33

VA-201

4.60

EJE A-A
0.33

VA-201

29.25

0.18
0.18

EJE A-A
ACERO VIGAS 210 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

0.13

0.13

VA-201

10

0.77

1/4

7.70

0.18
SUB TOTAL (m)

36.95

0.00

4.60

SUB TOTAL (Nmero de varillas)

4.11

0.00

SUB TOTAL (kg)

9.24

0.00

TOTAL DE ACERO (kg)

20.10

0.00

0.00

0.51

2.23

0.00

0.00

4.69

32.16

0.00

0.00
46.09

ACERO VIGAS 211 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
3.98
0.33

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

18.40

0.00

0.00

0.00

EJE A-A
0.33

4.08
0.33

DIAM.

VA-301

4.64

1/2

9.28

4.56

1/2

9.12

3.61

3/8

23

1.17

1/4

EJE A-A
0.15

VA-301
EJE A-A

3.61

VA-301

0.18

EJE A-A

0.33

0.33

VA-301

7.22

26.91

0.18
SUB TOTAL (m)

26.91

7.22

SUB TOTAL (Nmero de varillas)

2.99

0.80

2.04

0.00

0.00

0.00

SUB TOTAL (kg)

6.73

4.19

18.77

0.00

0.00

0.00

TOTAL DE ACERO (kg)

29.68

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
5.58
0.13

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE A-A
0.13

0.18
0.13

DIAM.

VA2

5.84

1/2

40

0.77

1/4

46.72

EJE A-A
0.13

VA2

61.60

0.18
SUB TOTAL (m)

61.60

0.00

46.72

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

6.84

0.00

5.19

0.00

0.00

0.00

ACERO VIGAS 212 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

SUB TOTAL (kg)


TOTAL DE ACERO (kg)

15.40

0.00

47.65

0.00

0.00

0.00
63.05

ACERO VIGAS 213 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
2.72
0.13

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE A-A
0.13

0.18
0.13

DIAM.

VA2

2.98

1/2

20

0.77

1/4

11.92

EJE A-A
0.13

VA2

15.40

0.18
SUB TOTAL (m)

15.40

0.00

11.92

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

1.71

0.00

1.32

0.00

0.00

0.00

SUB TOTAL (kg)

3.85

0.00

12.16

0.00

0.00

0.00

TOTAL DE ACERO (kg)

16.01

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
3.98
0.33

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE C-C
0.33

VA-102

4.64

5/8

26

1.17

1/4

37.12

VA-202
0.18
0.33

EJE C-C
0.33

0.18

VA-102

60.84

VA-202

SUB TOTAL (m)

60.84

0.00

0.00

37.12

0.00

0.00

SUB TOTAL (Nmero de varillas)

6.76

0.00

0.00

4.12

0.00

0.00

SUB TOTAL (kg)

15.21

0.00

0.00

59.39

0.00

0.00

TOTAL DE ACERO (kg)

74.60

ACERO VIGAS 214 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

1.93
0.10

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE C-C
0.10

VA-11

2.13

3/8

13

0.55

1/4

34.08

( 1era y 2da Planta)


0.10
0.10

EJE C-C
0.10

0.10

VA-11

28.60

( 1era y 2da Planta)

SUB TOTAL (m)

28.60

34.08

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

3.18

3.79

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

7.15

19.77

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

26.92

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
6.49
0.10

DIAM.

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

EJE C-C
0.10

VA-11

6.69

3/8

38

0.55

1/4

107.04

(Azotea)
0.10
0.10

EJE C-C
0.10

0.10

VA-11

83.60

(Azotea)

SUB TOTAL (m)

83.60

107.04

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

9.29

11.89

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

20.90

62.08

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

82.98
ACERO VIGAS 215 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

2.77
0.10

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE C-C
0.10

VA-11

2.97

3/8

15

0.55

1/4

47.52

(Azotea)
0.10
0.10

EJE C-C
0.10

0.10

VA-11

33.00

(Azotea)

SUB TOTAL (m)

33.00

47.52

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

3.67

5.28

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

8.25

27.56

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

35.81

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
2.88
0.26

DIAM.

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

EJE C-C
0.26

VE

3.40

5/8

2.88

3/8

18

1.03

1/4

13.60

EJE C-C
2.88

VE

0.18

EJE C-C

0.26

0.26

VE

5.76

18.54

0.18
SUB TOTAL (m)

18.54

5.76

0.00

13.60

0.00

0.00

SUB TOTAL (Nmero de varillas)

2.06

0.64

0.00

1.51

0.00

0.00

SUB TOTAL (kg)

4.64

3.34

0.00

21.76

0.00

0.00

ACERO VIGAS 216 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

TOTAL DE ACERO (kg)

29.74

ACERO VIGAS 217 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

4.23
0.23

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE C-C
0.23

VE2

4.69

5/8

4.23

3/8

26

0.97

1/4

18.76

EJE C-C
4.23

VE2

0.18

EJE C-C

0.23

0.23

VE2

8.46

25.22

0.18
SUB TOTAL (m)

25.22

8.46

0.00

18.76

0.00

0.00

SUB TOTAL (Nmero de varillas)

2.80

0.94

0.00

2.08

0.00

0.00

SUB TOTAL (kg)

6.31

4.91

0.00

30.02

0.00

0.00

TOTAL DE ACERO (kg)

41.23

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
14.55
0.33

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

EJE C-C
0.33

15.55
0.33

DIAM.

VA-206

15.81

5/8

31.62

16.63

5/8

33.26

2.35

5/8

4.70

104

1.17

1/4

EJE C-C
0.15

VA-206
EJE C-C

2.20

0.15

0.18
0.33

VA-206
EJE C-C

0.33

VA-206

121.68
ACERO VIGAS 218 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

0.18
0.18
0.15

EJE C-C
0.15

VA-206

0.81

1/4

6.48

0.18
SUB TOTAL (m)

128.16

0.00

0.00

69.58

0.00

0.00

SUB TOTAL (Nmero de varillas)

14.24

0.00

0.00

7.73

0.00

0.00

SUB TOTAL (kg)

32.04

0.00

0.00

111.33

0.00

0.00

TOTAL DE ACERO (kg)

143.37

ACERO VIGAS 219 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

14.55
0.33

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE C-C
0.33

15.05
0.33

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA-106

15.81

5/8

31.62

16.13

5/8

32.26

1.85

5/8

3.70

104

1.17

1/4

121.68

0.81

1/4

4.05

EJE C-C
0.15

VA-106
EJE C-C

1.70

0.15

0.18
0.33

VA-106
EJE C-C

0.33

VA-106

0.18
0.18
0.15

EJE C-C
0.15

VA-106

0.18
SUB TOTAL (m)

125.73

0.00

0.00

67.58

0.00

0.00

SUB TOTAL (Nmero de varillas)

13.97

0.00

0.00

7.51

0.00

0.00

SUB TOTAL (kg)

31.43

0.00

0.00

108.13

0.00

0.00

TOTAL DE ACERO (kg)

139.56

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
5.43
0.23

DIAM.

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

EJE C-C
0.23

VA-303

5.89

1/2

29.45

EJE C-C
ACERO VIGAS 220 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

5.43

VA-303

0.18

EJE C-C

0.23

0.23

VA-303

5.43

3/8

39

0.97

1/4

10.86

37.83

0.18
SUB TOTAL (m)

37.83

10.86

29.45

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

4.20

1.21

3.27

0.00

0.00

0.00

SUB TOTAL (kg)

9.46

6.30

30.04

0.00

0.00

0.00

TOTAL DE ACERO (kg)

45.80

ACERO VIGAS 221 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

14.55
0.15

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE D-D
0.33

7.53
0.33

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA-107

15.63

5/8

31.26

8.19

5/8

16.38

8.20

5/8

16.40

52

1.17

1/4

60.84

43

0.77

1/4

33.11

EJE D-D
0.33

VA-107
EJE D-D

8.05

0.15

0.18
0.33

VA-107
EJE D-D

0.33

VA-107

0.18
0.18
0.13

EJE D-D
0.13

VA-107

0.18
SUB TOTAL (m)

93.95

0.00

0.00

64.04

0.00

0.00

SUB TOTAL (Nmero de varillas)

10.44

0.00

0.00

7.12

0.00

0.00

SUB TOTAL (kg)

23.49

0.00

0.00

102.46

0.00

0.00

TOTAL DE ACERO (kg)

125.95

ACERO VIGAS 222 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

9.04

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE D-D
0.15

VA-207

9.79

5/8

19.57

7.89

1/2

15.77

8.16

1/2

16.31

8.19

5/8

2.33

1/2

52

1.17

1/4

60.84

52

0.77

1/4

40.04

EJE D-D
0.15

7.74

VA-207
EJE D-D

0.15

8.01

VA-207

7.53

EJE D-D

0.33

0.33

VA-207

16.38

EJE D-D
2.18

0.15

0.18
0.33

VA-207

4.66

EJE D-D
0.33

VA-207

0.18
0.18
0.13

EJE D-D
0.13

VA-207

0.18
SUB TOTAL (m)

100.88

0.00

36.74

35.95

0.00

0.00

SUB TOTAL (Nmero de varillas)

11.21

0.00

4.08

3.99

0.00

0.00

SUB TOTAL (kg)

25.22

0.00

37.47

57.52

0.00

0.00

TOTAL DE ACERO (kg)

120.21

ACERO VIGAS 223 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

5.43
0.23

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE D-D
0.23

VA-303

5.89

1/2

5.43

3/8

39

0.97

1/4

29.45

EJE D-D
5.43

VA-303

0.18

EJE D-D

0.23

0.23

VA-303

10.86

37.83

0.18
SUB TOTAL (m)

37.83

10.86

29.45

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

4.20

1.21

3.27

0.00

0.00

0.00

SUB TOTAL (kg)

9.46

6.30

30.04

0.00

0.00

0.00

TOTAL DE ACERO (kg)

45.80

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
3.98
0.33

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

EJE E-E
0.33

0.18
0.33

DIAM.

VA-103

4.64

5/8

26

1.17

1/4

37.12

EJE E-E
0.33

VA-103

60.84

0.18
SUB TOTAL (m)

60.84

0.00

0.00

37.12

0.00

0.00

SUB TOTAL (Nmero de varillas)

6.76

0.00

0.00

4.12

0.00

0.00

SUB TOTAL (kg)

15.21

0.00

0.00

59.39

0.00

0.00

TOTAL DE ACERO (kg)

74.60
ACERO VIGAS 224 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

7.20
0.33

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE E-E
0.33

15.00
0.33

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA-108

7.86

5/8

15.72

16.08

5/8

32.16

9.62

5/8

19.24

49

1.17

1/4

57.33

55

0.77

1/4

42.35

EJE E-E
0.15

VA-108
EJE E-E

8.87

0.15

0.18
0.33

VA-108
EJE E-E

0.33

VA-108

0.18
0.18
0.13

EJE E-E
0.13

VA-108

0.18
SUB TOTAL (m)

99.68

0.00

0.00

67.12

0.00

0.00

SUB TOTAL (Nmero de varillas)

11.08

0.00

0.00

7.46

0.00

0.00

SUB TOTAL (kg)

24.92

0.00

0.00

107.39

0.00

0.00

TOTAL DE ACERO (kg)

132.31

ACERO VIGAS 225 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

7.20
0.33

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE E-E
0.33

8.65

VA-208

7.86

5/8

15.72

8.98

5/8

17.96

10.02

1/2

20.04

9.50

1/2

19.00

49

1.17

1/4

57.33

56

0.77

1/4

43.12

EJE E-E

0.33

VA-208
EJE E-E
9.37

0.15

VA-208
EJE E-E

8.85

0.15

0.18
0.33

VA-208
EJE E-E

0.33

VA-208

0.18
0.18
0.13

EJE E-E
0.13

VA-208

0.18
SUB TOTAL (m)

100.45

0.00

39.04

33.68

0.00

0.00

SUB TOTAL (Nmero de varillas)

11.16

0.00

4.34

3.74

0.00

0.00

SUB TOTAL (kg)

25.11

0.00

39.82

53.89

0.00

0.00

TOTAL DE ACERO (kg)

CROQUIS
2.05

118.82

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

EJE F-F
ACERO VIGAS 226 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

0.30

0.10
0.10

0.10

VA-11

2.45

3/8

11

0.55

1/4

9.80

EJE F-F
0.10

VA-11

6.05

0.10
SUB TOTAL (m)

6.05

9.80

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.67

1.09

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

1.51

5.68

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

7.20

ACERO VIGAS 227 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

1.65
0.30

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE F-F
0.10

0.10
0.10

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA-11

2.05

3/8

10

0.55

1/4

32.80

EJE F-F
0.10

VA-11

22.00

0.10
SUB TOTAL (m)

22.00

32.80

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

2.44

3.64

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

5.50

19.02

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

24.52

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
1.93
0.30

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

EJE F-F
0.30

0.10
0.10

DIAM.

VA-11

2.53

3/8

12

0.55

1/4

20.24

EJE F-F
0.10

VA-11

13.20

0.10
SUB TOTAL (m)

13.20

20.24

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

1.47

2.25

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

3.30

11.74

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

15.04

ACERO VIGAS 228 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

3.98
0.33

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE F-F
0.33

VA-104

4.64

5/8

26

1.17

1/4

37.12

VA-204
0.18
0.33

EJE F-F
0.33

0.18

VA-104

60.84

VA-204

SUB TOTAL (m)

60.84

0.00

0.00

37.12

0.00

0.00

SUB TOTAL (Nmero de varillas)

6.76

0.00

0.00

4.12

0.00

0.00

SUB TOTAL (kg)

15.21

0.00

0.00

59.39

0.00

0.00

TOTAL DE ACERO (kg)

74.60

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
9.69
0.33

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

EJE F-F
0.33

0.10
0.10

DIAM.

VA-11

10.80

3/8

56

0.55

1/4

43.20

EJE F-F
0.10

VA-11

30.80

0.10
SUB TOTAL (m)

30.80

43.20

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

3.42

4.80

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

7.70

25.06

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

32.76

ACERO VIGAS 229 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

4.46
0.23

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE F-F
0.23

0.18
0.23

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA-11

4.92

1/2

28

0.97

1/4

19.68

EJE F-F
0.23

VA-11

27.16

0.18
SUB TOTAL (m)

27.16

0.00

19.68

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

3.02

0.00

2.19

0.00

0.00

0.00

SUB TOTAL (kg)

6.79

0.00

20.07

0.00

0.00

0.00

TOTAL DE ACERO (kg)

26.86

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
14.68
0.33

DIAM.

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

EJE F-F
0.33

VA-109

15.94

5/8

63.76

16.13

5/8

64.52

2.38

1/2

VA-209
15.05
0.33

EJE F-F
0.15

VA-109
VA-209
EJE F-F

1.63

0.15

VA-109

9.52

VA-209
0.18

EJE F-F
ACERO VIGAS 230 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

0.33

0.33

VA-109

0.18

VA-209

0.18

EJE F-F

0.13

0.13
0.18

VA-109

101

1.17

1/4

236.34

0.77

1/4

6.16

VA-209

SUB TOTAL (m)

242.50

0.00

9.52

128.28

0.00

0.00

SUB TOTAL (Nmero de varillas)

26.94

0.00

1.06

14.25

0.00

0.00

SUB TOTAL (kg)

60.63

0.00

9.71

205.25

0.00

0.00

TOTAL DE ACERO (kg)

275.58

ACERO VIGAS 231 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

3.98
0.33

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE F-F
0.33

4.48
0.33

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA-105

4.64

5/8

9.28

4.96

5/8

9.92

2.30

1/2

26

1.17

1/4

30.42

0.77

1/4

3.85

EJE F-F
0.15

VA-105
EJE F-F

1.55

0.15

0.18
0.33

VA-105

4.60

EJE F-F
0.33

VA-105

0.18
0.18
0.13

EJE F-F
0.13

VA-105

0.18
SUB TOTAL (m)

34.27

0.00

4.60

19.20

0.00

0.00

SUB TOTAL (Nmero de varillas)

3.81

0.00

0.51

2.13

0.00

0.00

SUB TOTAL (kg)

8.57

0.00

4.69

30.72

0.00

0.00

TOTAL DE ACERO (kg)

43.98

ACERO VIGAS 232 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

3.98
0.33

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE F-F
0.33

4.98
0.33

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA-205

4.64

5/8

9.28

5.46

5/8

10.92

2.78

1/2

26

1.17

1/4

30.42

0.77

1/4

6.16

EJE F-F
0.15

VA-205
EJE F-F

2.03

0.15

0.18
0.33

VA-205

5.56

EJE F-F
0.33

VA-205

0.18
0.18
0.13

EJE F-F
0.13

VA-205

0.18
SUB TOTAL (m)

36.58

0.00

5.56

20.20

0.00

0.00

SUB TOTAL (Nmero de varillas)

4.06

0.00

0.62

2.24

0.00

0.00

SUB TOTAL (kg)

9.15

0.00

5.67

32.32

0.00

0.00

TOTAL DE ACERO (kg)

47.14

ACERO VIGAS 233 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

3.98
0.33

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE F-F
0.33

4.98
0.33

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA-305

4.64

5/8

9.28

5.46

5/8

10.92

2.78

5/8

5.56

26

1.17

1/4

30.42

0.77

1/4

6.16

EJE F-F
0.15

VA-305
EJE F-F

2.03

0.15

0.18
0.33

VA-305
EJE F-F

0.33

VA-305

0.18
0.18
0.13

EJE F-F
0.13

VA-305

0.18
SUB TOTAL (m)

36.58

0.00

0.00

25.76

0.00

0.00

SUB TOTAL (Nmero de varillas)

4.06

0.00

0.00

2.86

0.00

0.00

SUB TOTAL (kg)

9.15

0.00

0.00

41.22

0.00

0.00

TOTAL DE ACERO (kg)

50.36

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
3.98
0.33

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

EJE I-I
0.33

0.18

DIAM.

VA-105

4.64

5/8

18.56

EJE I-I
ACERO VIGAS 234 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

0.33

0.33

VA-105

26

1.17

1/4

30.42

0.18
SUB TOTAL (m)

30.42

0.00

0.00

SUB TOTAL (Nmero de varillas)

3.38

0.00

SUB TOTAL (kg)

7.61

0.00

TOTAL DE ACERO (kg)

18.56

0.00

0.00

0.00

2.06

0.00

0.00

0.00

29.70

0.00

0.00
37.30

ACERO VIGAS 235 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

3.98
0.33

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE I-I
0.33

4.98
0.33

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA-306

4.64

5/8

9.28

5.46

5/8

10.92

2.78

5/8

5.56

26

1.17

1/4

30.42

0.77

1/4

6.16

EJE I-I
0.15

VA-306
EJE I-I

2.03

0.15

0.18
0.33

VA-306
EJE I-I

0.33

VA-306

0.18
0.18
0.13

EJE I-I
0.13

VA-306

0.18
SUB TOTAL (m)

36.58

0.00

0.00

25.76

0.00

0.00

SUB TOTAL (Nmero de varillas)

4.06

0.00

0.00

2.86

0.00

0.00

SUB TOTAL (kg)

9.15

0.00

0.00

41.22

0.00

0.00

TOTAL DE ACERO (kg)

50.36

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
1.55
0.10

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

EJE I-I
0.10

0.10

DIAM.

VA-11

1.75

3/8

7.00

EJE I-I
ACERO VIGAS 236 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

0.10

0.10

VA-11

0.55

1/4

4.95

0.10
SUB TOTAL (m)

4.95

7.00

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.55

0.78

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

1.24

4.06

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

5.30

ACERO VIGAS 237 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

7.20
0.33

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE 2-2
0.33

VA-101

7.86

5/8

62.88

8.95

1/2

2.60

5/8

5.19

2.95

5/8

5.90

5.38

5/8

10.76

69

1.17

3/8

VA-201
8.65
0.15

EJE 2-2
0.15

VA-101

35.80

VA-201
EJE 2-2
2.27

0.33

VA-101
VA-201
EJE 2-2

2.95

VA-101
VA-201
EJE 2-2

5.38

VA-101
VA-201

0.18
0.33

EJE 2-2
0.33

0.18

VA-101

161.46

VA-201

SUB TOTAL (m)

0.00

161.46

35.80

84.73

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

17.94

3.98

9.41

0.00

0.00

SUB TOTAL (kg)

0.00

93.65

36.52

135.57

0.00

0.00

TOTAL DE ACERO (kg)

265.73
ACERO VIGAS 238 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

3.33
0.10

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE 2-2
0.10

0.10
0.10

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA-11

3.53

3/8

17

0.55

1/4

14.12

EJE 2-2
0.10

VA-11

9.35

0.10
SUB TOTAL (m)

9.35

14.12

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

1.04

1.57

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

2.34

8.19

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

10.53

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
5.58
0.23

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

EJE 2-2
0.23

0.18
0.23

DIAM.

VA-301

6.04

1/2

30

0.97

3/8

24.16

EJE 2-2
0.23

VA-301

29.10

0.18
SUB TOTAL (m)

0.00

29.10

24.16

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

3.23

2.68

0.00

0.00

0.00

SUB TOTAL (kg)

0.00

16.88

24.64

0.00

0.00

0.00

TOTAL DE ACERO (kg)

41.52

ACERO VIGAS 239 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

7.20
0.33

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE 3-3
0.33

VA-102

7.86

5/8

62.88

8.95

1/2

2.75

3/4

5.49

3.30

3/4

6.60

5.25

3/4

10.50

69

1.17

3/8

VA-202
8.65
0.15

EJE 3-3
0.15

VA-102

35.80

VA-202
EJE 3-3
2.42

0.33

VA-102
VA-202
EJE 3-3

3.30

VA-102
VA-202
EJE 3-3

5.25

VA-102
VA-202

0.18
0.33

EJE 3-3
0.33

0.18

VA-102

161.46

VA-202

SUB TOTAL (m)

0.00

161.46

35.80

62.88

22.59

0.00

SUB TOTAL (Nmero de varillas)

0.00

17.94

3.98

6.99

2.51

0.00

SUB TOTAL (kg)

0.00

93.65

36.52

100.61

51.05

0.00

TOTAL DE ACERO (kg)

281.82
ACERO VIGAS 240 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

4.73
0.10

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE 3-3
0.10

0.18
0.10

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA-302

4.93

1/2

32

0.71

1/4

19.72

EJE 3-3
0.10

VA-302

22.72

0.18
SUB TOTAL (m)

22.72

0.00

19.72

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

2.52

0.00

2.19

0.00

0.00

0.00

SUB TOTAL (kg)

5.68

0.00

20.11

0.00

0.00

0.00

TOTAL DE ACERO (kg)

25.79

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
5.18
0.10

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

EJE 3-3
0.10

0.18
0.10

DIAM.

VA-302

5.38

1/2

34

0.71

1/4

21.52

EJE 3-3
0.10

VA-302

24.14

0.18
SUB TOTAL (m)

24.14

0.00

21.52

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

2.68

0.00

2.39

0.00

0.00

0.00

SUB TOTAL (kg)

6.04

0.00

21.95

0.00

0.00

0.00

TOTAL DE ACERO (kg)

27.99

ACERO VIGAS 241 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

9.18
0.33
9.18

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

VA-103

10.44

5/8

9.98

1/2

63

1.17

3/8

41.76

EJE 4-4
0.15

0.18
0.33

DIAM.

EJE 4-4
0.33

0.15

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA-103

19.96

EJE 4-4
0.33

VA-103

73.71

0.18
SUB TOTAL (m)

0.00

73.71

19.96

41.76

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

8.19

2.22

4.64

0.00

0.00

SUB TOTAL (kg)

0.00

42.75

20.36

66.82

0.00

0.00

TOTAL DE ACERO (kg)

129.93

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
10.53
0.33
10.53

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

VA-203

11.79

5/8

11.33

1/2

73

1.17

3/8

47.16

EJE 4-4
0.15

0.18
0.33

LONGITUDES PARCIALES (m)

EJE 4-4
0.33

0.15

DIAM.

VA-203

22.66

EJE 4-4
0.33

VA-203

85.41

0.18
SUB TOTAL (m)

0.00

85.41

22.66

47.16

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

9.49

2.52

5.24

0.00
0.00
ACERO VIGAS 242 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

SUB TOTAL (kg)


TOTAL DE ACERO (kg)

0.00

49.54

23.11

75.46

0.00

0.00
148.11

ACERO VIGAS 243 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

4.73
0.10

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE 4-4
0.10

0.18
0.10

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA-302

4.93

1/2

32

0.71

1/4

19.72

EJE 4-4
0.10

VA-302

22.72

0.18
SUB TOTAL (m)

22.72

0.00

19.72

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

2.52

0.00

2.19

0.00

0.00

0.00

SUB TOTAL (kg)

5.68

0.00

20.11

0.00

0.00

0.00

TOTAL DE ACERO (kg)

25.79

CROQUIS

CODIGO ESTRUCTURA N VECES

8.53
0.33

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE 5-5
0.33

8.53
0.15

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA-104

9.79

5/8

8.83

1/2

2.00

5/8

3.15

3/4

39.16

EJE 5-5
0.15

VA-104

17.66

EJE 5-5
1.67

0.33

VA-104

2.00

EJE 5-5
3.15

VA-104

3.15

EJE 5-5
ACERO VIGAS 244 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

4.95

VA-104

0.18

EJE 5-5

0.33

0.33

VA-104

4.95

3/4

55

1.17

3/8

4.95

64.35

0.18
SUB TOTAL (m)

0.00

64.35

17.66

41.16

8.10

0.00

SUB TOTAL (Nmero de varillas)

0.00

7.15

1.96

4.57

0.90

0.00

SUB TOTAL (kg)

0.00

37.32

18.01

65.85

18.31

0.00

TOTAL DE ACERO (kg)

139.49

ACERO VIGAS 245 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

10.53
0.33

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE 5-5
0.33

10.53
0.15

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA-204

11.79

5/8

47.16

11.33

1/2

3.15

5/8

3.15

4.80

5/8

4.80

72

1.17

3/8

EJE 5-5
0.15

VA-204

22.66

EJE 5-5
3.15

VA-204
EJE 5-5

4.80

VA-204

0.18

EJE 5-5

0.33

0.33

VA-204

84.24

0.18
SUB TOTAL (m)

0.00

84.24

22.66

55.11

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

9.36

2.52

6.12

0.00

0.00

SUB TOTAL (kg)

0.00

48.86

23.11

88.18

0.00

0.00

TOTAL DE ACERO (kg)

160.15

ACERO VIGAS 246 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

8.53
0.33

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE 7-7
0.33

8.53
0.15

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA-105

9.79

5/8

39.16

8.83

1/2

3.15

3/4

3.15

4.95

3/4

4.95

55

1.17

3/8

EJE 7-7
0.15

VA-105

17.66

EJE 7-7
3.15

VA-105
EJE 7-7

4.95

VA-105

0.18

EJE 7-7

0.33

0.33

VA-105

64.35

0.18
SUB TOTAL (m)

0.00

64.35

17.66

39.16

8.10

0.00

SUB TOTAL (Nmero de varillas)

0.00

7.15

1.96

4.35

0.90

0.00

SUB TOTAL (kg)

0.00

37.32

18.01

62.66

18.31

0.00

TOTAL DE ACERO (kg)

136.30

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
9.53
0.33

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

EJE 7-7
0.33

9.53
0.15

DIAM.

VA-205

10.79

5/8

10.33

1/2

43.16

EJE 7-7
0.15

VA-205

20.66
ACERO VIGAS 247 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

0.18
0.33

EJE 7-7
0.33

VA-205

66

1.17

3/8

77.22

0.18
SUB TOTAL (m)

0.00

SUB TOTAL (Nmero de varillas)

0.00

8.58

SUB TOTAL (kg)

0.00

44.79

TOTAL DE ACERO (kg)

77.22

20.66

43.16

0.00

0.00

2.30

4.80

0.00

0.00

21.07

69.06

0.00

0.00
134.92

ACERO VIGAS 248 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

20.76
0.33

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE 8-8
0.33

20.76
0.15

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA-106

22.62

5/8

90.48

22.06

1/2

44.12

2.01

1/2

2.01

5.10

5/8

5.10

3.50

5/8

3.50

137

1.17

3/8

EJE 8-8
0.15

VA-106
EJE 8-8

0.33

1.68

VA-106
EJE 8-8

5.10

VA-106
EJE 8-8

3.50

VA-106

0.18

EJE 8-8

0.33

0.33

VA-106

160.29

0.18
SUB TOTAL (m)

0.00

160.29

46.13

99.08

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

17.81

5.13

11.01

0.00

0.00

SUB TOTAL (kg)

0.00

92.97

47.05

158.53

0.00

0.00

TOTAL DE ACERO (kg)

298.55

ACERO VIGAS 249 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

20.76
0.33

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE 8-8
0.33

20.76
0.15

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA-206

22.62

5/8

90.48

22.06

1/2

2.01

5/8

2.01

21.96

5/8

43.92

3.50

5/8

7.00

137

1.17

3/8

EJE 8-8
0.15

VA-206

44.12

EJE 8-8
0.33

1.68

VA-206
EJE 8-8

20.76

VA-206
EJE 8-8

3.50

VA-206

0.18

EJE 8-8

0.33

0.33

VA-206

160.29

0.18
SUB TOTAL (m)

0.00

160.29

44.12

143.41

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

17.81

4.90

15.93

0.00

0.00

SUB TOTAL (kg)

0.00

92.97

45.00

229.46

0.00

0.00

TOTAL DE ACERO (kg)

CROQUIS
3.35

367.43

CODIGO ESTRUCTURA N VECES

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE 8-8
ACERO VIGAS 250 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

0.10

0.10
0.10

0.10

VA-11

3.55

3/8

18

0.55

1/4

14.20

EJE 8-8
0.10

VA-11

9.90

0.10
SUB TOTAL (m)

9.90

14.20

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

1.10

1.58

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

2.48

8.24

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

10.71

ACERO VIGAS 251 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

3.18
0.10

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE 8-8
0.10

0.10
0.10

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA-11

3.38

3/8

17

0.55

1/4

13.52

EJE 8-8
0.10

VA-11

9.35

0.10
SUB TOTAL (m)

9.35

13.52

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

1.04

1.50

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

2.34

7.84

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

10.18

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
2.40
0.10

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

EJE 8-8
0.10

0.10
0.10

DIAM.

VA-11

2.60

3/8

14

0.55

1/4

10.40

EJE 8-8
0.10

VA-11

7.70

0.10
SUB TOTAL (m)

7.70

10.40

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.86

1.16

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

1.93

6.03

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

7.96

ACERO VIGAS 252 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

2.11
0.13

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE 8-8
0.13

0.18
0.13

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA

2.37

1/2

16

0.77

1/4

9.48

EJE 8-8
0.13

VA

12.32

0.18
SUB TOTAL (m)

12.32

0.00

9.48

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

1.37

0.00

1.05

0.00

0.00

0.00

SUB TOTAL (kg)

3.08

0.00

9.67

0.00

0.00

0.00

TOTAL DE ACERO (kg)

12.75

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
5.13
0.33

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

EJE 8-8
0.33

0.18
0.33

DIAM.

V-306

5.79

5/8

36

1.17

3/8

23.16

EJE 8-8
0.33

V-306

42.12

0.18
SUB TOTAL (m)

0.00

42.12

0.00

23.16

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

4.68

0.00

2.57

0.00

0.00

SUB TOTAL (kg)

0.00

24.43

0.00

37.06

0.00

0.00

TOTAL DE ACERO (kg)

61.49

ACERO VIGAS 253 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

20.76
0.33

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE 9-9
0.33

20.76
0.15

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA-107

22.62

5/8

90.48

22.06

1/2

44.12

2.01

1/2

2.01

5.10

5/8

5.10

3.50

5/8

3.50

137

1.17

3/8

EJE 9-9
0.15

VA-107
EJE 9-9

0.33

1.68

VA-107
EJE 9-9

5.10

VA-107
EJE 9-9

3.50

VA-107

0.18

EJE 9-9

0.33

0.33

VA-107

160.29

0.18
SUB TOTAL (m)

0.00

160.29

46.13

99.08

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

17.81

5.13

11.01

0.00

0.00

SUB TOTAL (kg)

0.00

92.97

47.05

158.53

0.00

0.00

TOTAL DE ACERO (kg)

298.55

ACERO VIGAS 254 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

20.76
0.33

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE 9-9
0.33

20.76
0.15

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA-207

22.62

5/8

90.48

22.06

1/2

2.01

5/8

3.50

3/4

7.00

22.26

3/4

44.52

137

1.17

3/8

EJE 9-9
0.15

VA-207

44.12

EJE 9-9
0.33

1.68

VA-207

2.01

EJE 9-9
3.50

VA-207
EJE 9-9

20.76

VA-207

0.18

EJE 9-9

0.33

0.33

VA-207

160.29

0.18
SUB TOTAL (m)

0.00

160.29

44.12

92.49

51.52

0.00

SUB TOTAL (Nmero de varillas)

0.00

17.81

4.90

10.28

5.72

0.00

SUB TOTAL (kg)

0.00

92.97

45.00

147.98

116.44

0.00

TOTAL DE ACERO (kg)

402.39

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
14.40
0.10

DIAM.

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

EJE 9-9
0.10

VA-11

15.05

3/8

60.20
ACERO VIGAS 255 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

0.10
0.10

EJE 9-9
0.10

VA-11

84

0.55

1/4

46.20

0.10
SUB TOTAL (m)

46.20

60.20

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

5.13

6.69

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

11.55

34.92

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

46.47

ACERO VIGAS 256 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

2.11
0.13

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE 9-9
0.13

0.18
0.13

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA

2.37

1/2

16

0.77

1/4

9.48

EJE 9-9
0.13

VA

12.32

0.18
SUB TOTAL (m)

12.32

0.00

9.48

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

1.37

0.00

1.05

0.00

0.00

0.00

SUB TOTAL (kg)

3.08

0.00

9.67

0.00

0.00

0.00

TOTAL DE ACERO (kg)

12.75

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
5.13
0.33

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

EJE 9-9
0.33

0.18
0.33

DIAM.

VA-307

5.79

5/8

36

1.17

3/8

23.16

EJE 9-9
0.33

VA-307

42.12

0.18
SUB TOTAL (m)

0.00

42.12

0.00

23.16

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

4.68

0.00

2.57

0.00

0.00

SUB TOTAL (kg)

0.00

24.43

0.00

37.06

0.00

0.00

TOTAL DE ACERO (kg)

61.49

ACERO VIGAS 257 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

2.86
0.13

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

EJE 9-9
0.13

0.18
0.13

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA

3.12

1/2

20

0.77

1/4

12.48

EJE 9-9
0.13

VA

15.40

0.18
SUB TOTAL (m)

15.40

0.00

12.48

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

1.71

0.00

1.39

0.00

0.00

0.00

SUB TOTAL (kg)

3.85

0.00

12.73

0.00

0.00

0.00

TOTAL DE ACERO (kg)

16.58

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
5.23
0.33

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

EJE 11-11
0.33

0.18
0.33

DIAM.

VA3

5.89

1/2

34

1.17

1/4

23.56

EJE 11-11
0.33

VA3

39.78

0.18
SUB TOTAL (m)

39.78

0.00

23.56

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

4.42

0.00

2.62

0.00

0.00

0.00

SUB TOTAL (kg)

9.95

0.00

24.03

0.00

0.00

0.00

TOTAL DE ACERO (kg)

33.98

ACERO VIGAS 258 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

1.38
0.13

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1era PLANTA
0.13

0.18
0.13

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

V01

1.64

1/2

14

0.77

1/4

59.04

1era PLANTA
0.13

V01

97.02

0.18
SUB TOTAL (m)

97.02

0.00

59.04

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

10.78

0.00

6.56

0.00

0.00

0.00

SUB TOTAL (kg)

24.26

0.00

60.22

0.00

0.00

0.00

TOTAL DE ACERO (kg)

84.48

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
0.83
0.13

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1era PLANTA
0.13

0.18
0.13

DIAM.

V01

1.09

1/2

10

0.77

1/4

8.72

1era PLANTA
0.13

V01

15.40

0.18
SUB TOTAL (m)

15.40

0.00

8.72

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

1.71

0.00

0.97

0.00

0.00

0.00

SUB TOTAL (kg)

3.85

0.00

8.89

0.00

0.00

0.00

TOTAL DE ACERO (kg)

12.74

ACERO VIGAS 259 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

0.73
0.13

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1era PLANTA
0.13

0.18
0.13

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

V01

0.99

1/2

0.77

1/4

3.96

1era PLANTA
0.13

V01

6.93

0.18
SUB TOTAL (m)

6.93

0.00

3.96

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.77

0.00

0.44

0.00

0.00

0.00

SUB TOTAL (kg)

1.73

0.00

4.04

0.00

0.00

0.00

TOTAL DE ACERO (kg)

5.77

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
1.93
0.13

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1era PLANTA
0.13

0.10
0.13

DIAM.

VA-10

2.19

1/2

11

0.61

1/4

43.80

1era PLANTA
0.13

VA-10

33.55

0.10
SUB TOTAL (m)

33.55

0.00

43.80

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

3.73

0.00

4.87

0.00

0.00

0.00

SUB TOTAL (kg)

8.39

0.00

44.68

0.00

0.00

0.00

TOTAL DE ACERO (kg)

53.06

ACERO VIGAS 260 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

4.73
0.13

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1era PLANTA
0.13

0.10
0.13

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA-10

4.99

1/2

29

0.61

1/4

19.96

1era PLANTA
0.13

VA-10

17.69

0.10
SUB TOTAL (m)

17.69

0.00

19.96

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

1.97

0.00

2.22

0.00

0.00

0.00

SUB TOTAL (kg)

4.42

0.00

20.36

0.00

0.00

0.00

TOTAL DE ACERO (kg)

24.78

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
1.58
0.13

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1era PLANTA
0.13

0.10
0.13

DIAM.

VA-10

1.84

1/2

12

0.61

1/4

7.36

1era PLANTA
0.13

VA-10

7.32

0.10
SUB TOTAL (m)

7.32

0.00

7.36

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.81

0.00

0.82

0.00

0.00

0.00

SUB TOTAL (kg)

1.83

0.00

7.51

0.00

0.00

0.00

TOTAL DE ACERO (kg)

9.34

ACERO VIGAS 261 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

1.18
0.13

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1era PLANTA
0.13

0.10
0.13

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA-10

1.44

1/2

11

0.61

1/4

11.52

1era PLANTA
0.13

VA-10

13.42

0.10
SUB TOTAL (m)

13.42

0.00

11.52

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

1.49

0.00

1.28

0.00

0.00

0.00

SUB TOTAL (kg)

3.36

0.00

11.75

0.00

0.00

0.00

TOTAL DE ACERO (kg)

15.11

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
3.98
0.13

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

1era PLANTA
0.13

0.10
0.13

DIAM.

VA-10

4.24

1/2

25

0.61

1/4

16.96

1era PLANTA
0.13

VA-10

15.25

0.10
SUB TOTAL (m)

15.25

0.00

16.96

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

1.69

0.00

1.88

0.00

0.00

0.00

SUB TOTAL (kg)

3.81

0.00

17.30

0.00

0.00

0.00

TOTAL DE ACERO (kg)

21.11

ACERO VIGAS 262 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

3.33
0.13

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1era PLANTA
0.13

0.10
0.13

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA

3.59

1/2

22

0.61

1/4

14.36

1era PLANTA
0.13

VA

13.42

0.10
SUB TOTAL (m)

13.42

0.00

14.36

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

1.49

0.00

1.60

0.00

0.00

0.00

SUB TOTAL (kg)

3.36

0.00

14.65

0.00

0.00

0.00

TOTAL DE ACERO (kg)

18.00

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
2.18
0.13

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

2da PLANTA
0.13

0.10
0.13

DIAM.

V02

2.44

1/2

16

0.61

1/4

9.76

2da PLANTA
0.13

V02

9.76

0.10
SUB TOTAL (m)

9.76

0.00

9.76

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

1.08

0.00

1.08

0.00

0.00

0.00

SUB TOTAL (kg)

2.44

0.00

9.96

0.00

0.00

0.00

TOTAL DE ACERO (kg)

12.40

ACERO VIGAS 263 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

15.55
0.13

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

2da PLANTA
0.13

0.10
0.13

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA-10

16.31

1/2

94

0.61

1/4

65.24

2da PLANTA
0.13

VA-10

57.34

0.10
SUB TOTAL (m)

57.34

0.00

65.24

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

6.37

0.00

7.25

0.00

0.00

0.00

SUB TOTAL (kg)

14.34

0.00

66.54

0.00

0.00

0.00

TOTAL DE ACERO (kg)

80.88

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
3.98
0.13

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

2da PLANTA
0.13

0.10
0.13

DIAM.

VA-10

4.24

1/2

34

0.61

1/4

16.96

2da PLANTA
0.13

VA-10

20.74

0.10
SUB TOTAL (m)

20.74

0.00

16.96

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

2.30

0.00

1.88

0.00

0.00

0.00

SUB TOTAL (kg)

5.19

0.00

17.30

0.00

0.00

0.00

TOTAL DE ACERO (kg)

22.48

ACERO VIGAS 264 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

1.18
0.13

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

2da PLANTA
0.13

0.10
0.13

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA-10

1.44

1/2

12

0.61

1/4

5.76

2da PLANTA
0.13

VA-10

7.32

0.10
SUB TOTAL (m)

7.32

0.00

5.76

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.81

0.00

0.64

0.00

0.00

0.00

SUB TOTAL (kg)

1.83

0.00

5.88

0.00

0.00

0.00

TOTAL DE ACERO (kg)

7.71

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
3.33
0.13

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

2da PLANTA
0.13

0.10
0.13

DIAM.

VA

3.59

1/2

22

0.61

1/4

14.36

2da PLANTA
0.13

VA

13.42

0.10
SUB TOTAL (m)

13.42

0.00

14.36

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

1.49

0.00

1.60

0.00

0.00

0.00

SUB TOTAL (kg)

3.36

0.00

14.65

0.00

0.00

0.00

TOTAL DE ACERO (kg)

18.00

ACERO VIGAS 265 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

8.19
0.23
8.19

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

V-302

8.65

5/8

8.49

3/8

46

0.97

1/4

34.60

AZOTEA
0.15

0.18
0.23

DIAM.

AZOTEA
0.23

0.15

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

V-302

16.98

AZOTEA
0.23

V-302

44.62

0.18
SUB TOTAL (m)

44.62

16.98

0.00

34.60

0.00

0.00

SUB TOTAL (Nmero de varillas)

4.96

1.89

0.00

3.84

0.00

0.00

SUB TOTAL (kg)

11.16

9.85

0.00

55.36

0.00

0.00

TOTAL DE ACERO (kg)

76.36

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
4.73
0.10

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

AZOTEA
0.10

0.18
0.10

DIAM.

VA-302

4.93

1/2

34

0.71

1/4

19.72

AZOTEA
0.10

VA-302

24.14

0.18
SUB TOTAL (m)

24.14

0.00

19.72

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

2.68

0.00

2.19

0.00

0.00

0.00

SUB TOTAL (kg)

6.04

0.00

20.11

0.00

0.00

0.00

TOTAL DE ACERO (kg)

26.15
ACERO VIGAS 266 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

3.98
0.23
3.98

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

VA-304

4.44

1/2

4.18

3/8

23

0.97

1/4

17.76

AZOTEA
0.10

0.18
0.23

DIAM.

AZOTEA
0.23

0.10

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA-304

8.36

AZOTEA
0.23

VA-304

22.31

0.18
SUB TOTAL (m)

22.31

8.36

17.76

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

2.48

0.93

1.97

0.00

0.00

0.00

SUB TOTAL (kg)

5.58

4.85

18.12

0.00

0.00

0.00

TOTAL DE ACERO (kg)

28.54

N PIEZAS DE LONG. PIEZA


CODIGO ESTRUCTURA N VECES
ACERO
DE ACERO

CROQUIS
2.98
0.10

LONGITUDES PARCIALES (m)

(pulg)

DIAMETRO DE VARILLAS EN PULGADAS


1/4

3/8

1/2

5/8

3/4

AZOTEA
0.10

0.08
0.10

DIAM.

VA-30

3.18

3/8

21

0.51

1/4

12.72

AZOTEA
0.10

VA-30

10.71

0.08
SUB TOTAL (m)

10.71

12.72

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

1.19

1.41

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

2.68

7.38

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

10.06
ACERO VIGAS 267 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

CODIGO ESTRUCTURA N VECES

5.65
0.10

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

AZOTEA
0.10

0.08
0.10

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

VA-30

5.85

3/8

34

0.51

1/4

93.60

AZOTEA
0.10

VA-30

69.36

0.08
SUB TOTAL (m)

69.36

93.60

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

7.71

10.40

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

17.34

54.29

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

71.63

ACERO VIGAS 268 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

5826.97 kg
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
37.01
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

ACERO VIGAS 269 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

0.00
0.00
0.00
46.09

ACERO VIGAS 270 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
29.68
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
ACERO VIGAS 271 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

0.00
63.05

ACERO VIGAS 272 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
16.01
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
74.60

ACERO VIGAS 273 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
26.92
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
82.98
ACERO VIGAS 274 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
35.81
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
ACERO VIGAS 275 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

29.74

ACERO VIGAS 276 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
41.23
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

ACERO VIGAS 277 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

0.00
0.00
0.00
143.37

ACERO VIGAS 278 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
139.56
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

ACERO VIGAS 279 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

0.00
0.00
0.00
45.80

ACERO VIGAS 280 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
125.95

ACERO VIGAS 281 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
120.21

ACERO VIGAS 282 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
45.80
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
74.60
ACERO VIGAS 283 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
132.31

ACERO VIGAS 284 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
118.82
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

ACERO VIGAS 285 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

0.00
0.00
0.00
7.20

ACERO VIGAS 286 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
24.52
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
15.04

ACERO VIGAS 287 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
74.60
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
32.76

ACERO VIGAS 288 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
26.86
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

ACERO VIGAS 289 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

0.00
0.00
0.00
275.58

ACERO VIGAS 290 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
43.98

ACERO VIGAS 291 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
47.14

ACERO VIGAS 292 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
50.36
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

ACERO VIGAS 293 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

0.00
0.00
0.00
37.30

ACERO VIGAS 294 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
50.36
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

ACERO VIGAS 295 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

0.00
0.00
0.00
5.30

ACERO VIGAS 296 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
265.73
ACERO VIGAS 297 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
10.53
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
41.52

ACERO VIGAS 298 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
281.82
ACERO VIGAS 299 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
25.79
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
27.99

ACERO VIGAS 300 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
129.93
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
ACERO VIGAS 301 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

0.00
148.11

ACERO VIGAS 302 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
25.79

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

ACERO VIGAS 303 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

0.00
0.00
0.00
139.49

ACERO VIGAS 304 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
160.15

ACERO VIGAS 305 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
136.30
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

ACERO VIGAS 306 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

0.00
0.00
0.00
134.92

ACERO VIGAS 307 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
298.55

ACERO VIGAS 308 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
367.43

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

ACERO VIGAS 309 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

0.00
0.00
0.00
10.71

ACERO VIGAS 310 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
10.18
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
7.96

ACERO VIGAS 311 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
12.75
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
61.49

ACERO VIGAS 312 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
298.55

ACERO VIGAS 313 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
402.39
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

ACERO VIGAS 314 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

0.00
0.00
0.00
46.47

ACERO VIGAS 315 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
12.75
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
61.49

ACERO VIGAS 316 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
16.58
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
33.98

ACERO VIGAS 317 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
84.48
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
12.74

ACERO VIGAS 318 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
5.77
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
53.06

ACERO VIGAS 319 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
24.78
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
9.34

ACERO VIGAS 320 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
15.11
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
21.11

ACERO VIGAS 321 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
18.00
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
12.40

ACERO VIGAS 322 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
80.88
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
22.48

ACERO VIGAS 323 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
7.71
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
18.00

ACERO VIGAS 324 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
76.36
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
26.15
ACERO VIGAS 325 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
28.54
LONGITUDES PARCIALES (m)
DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
10.06
ACERO VIGAS 326 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
1 3/8

0.00
0.00
0.00
71.63

ACERO VIGAS 327 DE 360

DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
01.05.05.03

2570.03 kg

ACERO EN LOSAS ALIGERADAS FY=4200 KG/CM2

PRIMERA PLANTA
DESCRIPCIO
N
N
VECES

CROQUIS
4.00
0.15

N
PIEZAS
DE
ACERO

LONG. DIAM.
PIEZA

DE
ACERO (pulg)

ALIG 1
0.15

1.43

37

4.30

1/2

159.10

74

1.58

1/2

116.92

ALIG 1
0.15

SUB TOTAL (m)


SUB TOTAL (Nmero de varillas)
SUB TOTAL (kg)
TOTAL DE ACERO (kg)

0.00
0.00
0.00

DESCRIPCIO
N
N
VECES

CROQUIS
4.50
0.15

1/4

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
3/8
1/2
5/8
3/4
1
1 3/8

N
PIEZAS
DE
ACERO

LONG. DIAM.
PIEZA

DE
(pulg)
ACERO

1/4

0.00
0.00
0.00

276.02
30.67
281.54

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
281.54

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
3/8
1/2
5/8
3/4
1
1 3/8

ALIG 2
0.15

1.93

4.80

1/2

33.60

14

2.08

1/2

29.12

ALIG 2
0.15

SUB TOTAL (m)


SUB TOTAL (Nmero de varillas)
SUB TOTAL (kg)
TOTAL DE ACERO (kg)

0.00
0.00
0.00

0.00
0.00
0.00

62.72
6.97
63.97

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
63.97

ACERO LOSA 328 DE 360

DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

DESCRIPCIO
N
N
VECES

CROQUIS
15.08
0.15

N
PIEZAS
DE
ACERO

LONG. DIAM.
PIEZA

DE
ACERO (pulg)

1/4

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
3/8
1/2
5/8
3/4
1
1 3/8

ALIG 3
0.15

1.33

11

15.88

1/2

174.68

11

1.48

1/2

16.28

11

1.88

1/2

20.68

11

2.45

1/2

26.95

22

2.65

1/2

58.30

4.30

1/2

8.60

1.90

1/2

3.80

2.25

1/2

9.00

ALIG 3
0.15

1.73

ALIG 3
0.15
ALIG 3

2.45
ALIG 3
2.65
4.00
0.15

ALIG 3
0.15

1.60
0.15

ALIG 3
0.15

1.95
0.15

ALIG 3
0.15

SUB TOTAL (m)


SUB TOTAL (Nmero de varillas)
SUB TOTAL (kg)
TOTAL DE ACERO (kg)

0.00
0.00
0.00

0.00
0.00
0.00

318.29
35.37
324.66

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
324.66

ACERO LOSA 329 DE 360

DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

DESCRIPCIO
N
N
VECES

CROQUIS
5.25
0.15

N
PIEZAS
DE
ACERO

LONG. DIAM.
PIEZA

DE
ACERO (pulg)

ALIG 4
0.15

2.58

5.55

1/2

44.40

2.73

1/2

21.84

1.88

1/2

15.04

ALIG 4
0.15

1.73

ALIG 4
0.15

SUB TOTAL (m)


SUB TOTAL (Nmero de varillas)
SUB TOTAL (kg)
TOTAL DE ACERO (kg)

0.00
0.00
0.00

DESCRIPCIO
N
N
VECES

CROQUIS
7.22
0.15

1/4

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
3/8
1/2
5/8
3/4
1
1 3/8

N
PIEZAS
DE
ACERO

LONG. DIAM.
PIEZA

DE
ACERO (pulg)

1/4

0.00
0.00
0.00

81.28
9.03
82.91

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
82.91

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
3/8
1/2
5/8
3/4
1
1 3/8

ALIG 5
0.15

1.33

7.52

1/2

52.64

14

1.48

1/2

20.72

2.45

1/2

17.15

2.25

1/2

13.50

ALIG 5
0.15
ALIG 5

2.45
1.95
0.15
SUB TOTAL (m)

ALIG 3
0.15

0.00

0.00

104.01

0.00

0.00

0.00

0.00

ACERO LOSA 330 DE 360

DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
SUB TOTAL (Nmero de varillas)
SUB TOTAL (kg)
TOTAL DE ACERO (kg)

0.00
0.00

0.00
0.00

11.56
106.09

0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00
106.09

ACERO LOSA 331 DE 360

DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

DESCRIPCIO
N
N
VECES

CROQUIS
2.15
0.15

DE BORDE

4.90

DE BORDE

3.30

DE BORDE

6.00

DE BORDE

10.00

DE BORDE

5.25

DE BORDE

4.55

4.90

5.20

1/2

10.40

3.60

1/2

14.40

6.30

1/2

12.60

10.80

1/2

21.60

5.49

1/2

21.96

4.79

1/2

19.16

5.09

1/2

10.18

VIGUETA
0.12

DE BORDE

4.85
0.12

1/2

VIGUETA
0.12

0.12

2.45

VIGUETA
0.15

0.12

VIGUETA
0.15

0.15

VIGUETA
0.15

0.15

1/4

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
3/8
1/2
5/8
3/4
1
1 3/8

VIGUETA
0.15

0.15

LONG. DIAM.
PIEZA

DE
ACERO (pulg)

VIGUETA
0.15

0.15

N
PIEZAS
DE
ACERO

VIGUETA
0.12

DE BORDE

SUB TOTAL (m)


SUB TOTAL (Nmero de varillas)
SUB TOTAL (kg)
TOTAL DE ACERO (kg)

0.00
0.00
0.00

0.00
0.00
0.00

115.20
12.80
117.50

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
117.50

ACERO LOSA 332 DE 360

DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

DESCRIPCIO
N
N
VECES

CROQUIS
20.73

N
PIEZAS
DE
ACERO

LONG. DIAM.
PIEZA

DE
ACERO (pulg)

1/4

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
3/8
1/2
5/8
3/4
1
1 3/8

ACERO DE

0.25

TEMPERATURA
8.60

16

20.98

1/4

335.68

48

8.85

1/4

424.80

10

5.70

1/4

57.00

ACERO DE

0.25

TEMPERATURA
5.45

ACERO DE

0.25

TEMPERATURA

SUB TOTAL (m)


SUB TOTAL (Nmero de varillas)
SUB TOTAL (kg)
TOTAL DE ACERO (kg)

817.48
90.83
204.37

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
204.37

SEGUNDA PLANTA
DESCRIPCIO
N
N
VECES

CROQUIS
4.00
0.15

N
PIEZAS
DE
ACERO

LONG. DIAM.
PIEZA

DE
ACERO (pulg)

1/4

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
3/8
1/2
5/8
3/4
1
1 3/8

ALIG 1
0.15

1.43

19

4.30

1/2

81.70

38

1.58

1/2

60.04

ALIG 1
0.15

SUB TOTAL (m)


SUB TOTAL (Nmero de varillas)
SUB TOTAL (kg)
TOTAL DE ACERO (kg)

0.00
0.00
0.00

0.00
0.00
0.00

141.74
15.75
144.57

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
144.57

ACERO LOSA 333 DE 360

DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

DESCRIPCIO
N
N
VECES

CROQUIS
5.00
0.15

N
PIEZAS
DE
ACERO

LONG. DIAM.
PIEZA

DE
ACERO (pulg)

ALIG 2
0.15

2.43

17

5.30

1/2

90.10

17

2.58

1/2

43.86

17

1.58

1/2

26.86

ALIG 2
0.15

1.43

ALIG 2
0.15

SUB TOTAL (m)


SUB TOTAL (Nmero de varillas)
SUB TOTAL (kg)
TOTAL DE ACERO (kg)

0.00
0.00
0.00

DESCRIPCIO
N
N
VECES

CROQUIS
15.58
0.15

1/4

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
3/8
1/2
5/8
3/4
1
1 3/8

N
PIEZAS
DE
ACERO

LONG. DIAM.
PIEZA

DE
ACERO (pulg)

1/4

0.00
0.00
0.00

160.82
17.87
164.04

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
164.04

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
3/8
1/2
5/8
3/4
1
1 3/8

ALIG 3
0.15

2.23

16.38

1/2

98.28

2.38

1/2

14.28

1.48

1/2

8.88

2.45

1/2

14.70

ALIG 3
0.15

1.33

ALIG 3
0.15
ALIG 3

2.45
ALIG 3

ACERO LOSA 334 DE 360

DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
2.65
SUB TOTAL (m)
SUB TOTAL (Nmero de varillas)
SUB TOTAL (kg)
TOTAL DE ACERO (kg)

12

2.65

1/2

31.80
0.00
0.00
0.00

0.00
0.00
0.00

167.94
18.66
171.30

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
171.30

ACERO LOSA 335 DE 360

DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

DESCRIPCIO
N
N
VECES

CROQUIS
5.75
0.15

N
PIEZAS
DE
ACERO

LONG. DIAM.
PIEZA

DE
ACERO (pulg)

ALIG 4
0.15

2.23

6.05

1/2

42.35

2.38

1/2

16.66

2.72

1/2

19.04

ALIG 4
0.15

2.57

ALIG 4
0.15

SUB TOTAL (m)


SUB TOTAL (Nmero de varillas)
SUB TOTAL (kg)
TOTAL DE ACERO (kg)

0.00
0.00
0.00

DESCRIPCIO
N
N
VECES

CROQUIS
7.22
0.15

1/4

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
3/8
1/2
5/8
3/4
1
1 3/8

N
PIEZAS
DE
ACERO

LONG. DIAM.
PIEZA

DE
ACERO (pulg)

1/4

0.00
0.00
0.00

78.05
8.67
79.61

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
79.61

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
3/8
1/2
5/8
3/4
1
1 3/8

ALIG 5
0.15

1.33

7.52

1/2

52.64

14

1.48

1/2

20.72

2.45

1/2

17.15

ALIG 5
0.15
ALIG 5

2.45
SUB TOTAL (m)
SUB TOTAL (Nmero de varillas)
SUB TOTAL (kg)
TOTAL DE ACERO (kg)

0.00
0.00
0.00

0.00
0.00
0.00

90.51
10.06
92.32

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
92.32

ACERO LOSA 336 DE 360

DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

DESCRIPCIO
N
N
VECES

CROQUIS
11.27
0.15

LONG. DIAM.
PIEZA

DE
ACERO (pulg)

1/4

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
3/8
1/2
5/8
3/4
1
1 3/8

ALIG 6
0.15

1.53

12.07

1/2

84.49

14

1.68

1/2

23.52

14

1.48

1/2

20.72

0.75

1/2

6.00

2.45

1/2

17.15

2.45

1/2

17.15

ALIG 6
0.15

1.33

ALIG 6
0.15

0.45
0.15

N
PIEZAS
DE
ACERO

ALIG 6
0.15
ALIG 6

2.45
ALIG 6
2.45
SUB TOTAL (m)
SUB TOTAL (Nmero de varillas)
SUB TOTAL (kg)
TOTAL DE ACERO (kg)

0.00
0.00
0.00

0.00
0.00
0.00

169.03
18.78
172.41

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
172.41

ACERO LOSA 337 DE 360

DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

DESCRIPCIO
N
N
VECES

CROQUIS
17.00

N
PIEZAS
DE
ACERO

LONG. DIAM.
PIEZA

DE
ACERO (pulg)

1/4

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
3/8
1/2
5/8
3/4
1
1 3/8

ACERO DE

0.25

TEMPERATURA
10.60

20

17.25

1/4

345.00

31

10.85

1/4

336.35

11

6.70

1/4

73.70

13

6.25

1/4

81.25

4.45

1/4

8.90

10

1.25

1/4

12.50

ACERO DE

0.25

TEMPERATURA
6.45

ACERO DE

0.25

TEMPERATURA
6.00

ACERO DE

0.25

TEMPERATURA
4.20

ACERO DE

0.25

TEMPERATURA
1.00

ACERO DE

0.25

TEMPERATURA

SUB TOTAL (m)


SUB TOTAL (Nmero de varillas)
SUB TOTAL (kg)
TOTAL DE ACERO (kg)

857.70
95.30
214.43

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
214.43

TERCERA PLANTA
DESCRIPCIO
N
N
VECES

CROQUIS
5.00
0.12

N
PIEZAS
DE
ACERO

LONG. DIAM.
PIEZA

DE
ACERO (pulg)

1/4

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
3/8
1/2
5/8
3/4
1
1 3/8

ALIG 7
0.12

5.24

1/2

47.16
ACERO LOSA 338 DE 360

DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
1.43

ALIG 7
0.12

2.43

1.55

3/8

2.55

1/2

13.95

ALIG 7
0.12

SUB TOTAL (m)


SUB TOTAL (Nmero de varillas)
SUB TOTAL (kg)
TOTAL DE ACERO (kg)

22.95
0.00
0.00
0.00

13.95
1.55
8.09

70.11
7.79
71.51

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
79.60

ACERO LOSA 339 DE 360

DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

DESCRIPCIO
N
N
VECES

CROQUIS
2.13
0.15

N
PIEZAS
DE
ACERO

LONG. DIAM.
PIEZA

DE
ACERO (pulg)

ALIG 8
0.15

16

2.43

1/2

SUB TOTAL (m)


SUB TOTAL (Nmero de varillas)
SUB TOTAL (kg)
TOTAL DE ACERO (kg)

4.60

N
PIEZAS
DE
ACERO

LONG. DIAM.
PIEZA

DE
ACERO (pulg)

1.83

38.88
4.32
39.66

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
39.66

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
3/8
1/2
5/8
3/4
1
1 3/8

11

4.84

3/8

53.24

22

1.95

3/8

42.90

ALIG 9
0.12

SUB TOTAL (m)


SUB TOTAL (Nmero de varillas)
SUB TOTAL (kg)
TOTAL DE ACERO (kg)

0.00
0.00
0.00

DESCRIPCIO
N
N
VECES

CROQUIS
2.85

SUB TOTAL (m)

1/4

0.00
0.00
0.00

ALIG 9
0.12

0.12

38.88
0.00
0.00
0.00

DESCRIPCIO
N
N
VECES

CROQUIS

0.12

1/4

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
3/8
1/2
5/8
3/4
1
1 3/8

N
PIEZAS
DE
ACERO

LONG. DIAM.
PIEZA

DE
ACERO (pulg)

1/4

96.14
10.68
55.76

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
55.76

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
3/8
1/2
5/8
3/4
1
1 3/8

ALIG 10
0.12

44

3.09

3/8

135.96
0.00

135.96

0.00

0.00

0.00

0.00

0.00

ACERO LOSA 340 DE 360

DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012
SUB TOTAL (Nmero de varillas)
SUB TOTAL (kg)
TOTAL DE ACERO (kg)

0.00
0.00

15.11
78.86

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00
78.86

ACERO LOSA 341 DE 360

DE METRADOS
PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
FECHA: CAJAMARCA - MARZO 2012

CROQUIS
5.00
0.25

0.25

0.25

1/4

LONGITUDES PARCIALES (m)


DIAMETRO DE VARILLAS EN PULGADAS
3/8
1/2
5/8
3/4
1
1 3/8

20

5.25

1/4

105.00

4.25

1/4

38.25

18

5.55

1/4

99.90

23

3.10

1/4

142.60

ACERO DE
TEMPERATURA

2.85

LONG. DIAM.
PIEZA

DE
ACERO (pulg)

ACERO DE
TEMPERATURA

5.30

N
PIEZAS
DE
ACERO

ACERO DE
TEMPERATURA

4.00

0.25

DESCRIPCIO
N
N
VECES

ACERO DE
TEMPERATURA

SUB TOTAL (m)


SUB TOTAL (Nmero de varillas)
SUB TOTAL (kg)
TOTAL DE ACERO (kg)

385.75
42.86
96.44

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
96.44

ACERO LOSA 342 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

01.05.06.03

ACERO EN ESCALERAS FY=4200 KG/CM2

294.60 kg

ESCALERA PRIMERA PLANTA

149.52 kg

CROQUIS

DESCRIPCION

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

1 TRAMO
2.56

1er Piso

2.56

3/8

17.92

1.44

3/8

10.08

1.83

3/8

12.81

3.61

1/2

1.90

3/8

13.30

18

1.15

3/8

20.70

1 TRAMO
1.44

1er Piso

1 TRAMO
1.83

1er Piso

1 TRAMO
3.61

1er Piso

28.88

1 TRAMO
1.90

1er Piso

1 TRAMO
1.15

1er Piso

ACERO ESCALERA 343 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

2.50

DESCANSO

2.50

3/8

15.00

SUB TOTAL (m)

0.00

SUB TOTAL (Nmero de varillas)

0.00

SUB TOTAL (kg)

0.00

TOTAL DE ACERO (kg)

89.81

28.88

0.00

0.00

0.00

0.00

9.98

3.21

0.00

0.00

0.00

0.00

52.09

29.46

0.00

0.00

0.00

0.00
81.55

ACERO ESCALERA 344 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

DESCRIPCION

N VECES

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

2 TRAMO
1.93

1er Piso

1.93

3/8

13.51

4.47

1/2

1.35

3/8

9.45

1.85

3/8

12.95

16

1.15

3/8

18.40

2 TRAMO
4.47

1er Piso

35.76

2 TRAMO
1.35

1er Piso

2 TRAMO
1.85

1er Piso

2 TRAMO
1.15

1er Piso

SUB TOTAL (m)

0.00

54.31

35.76

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

6.03

3.97

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

0.00

31.50

36.48

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

67.98

ACERO ESCALERA 345 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

ESCALERA SEGUNDA PLANTA

145.08 kg

CROQUIS

DESCRIPCION

N PIEZAS DE LONG. PIEZA


N VECES
ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

1 TRAMO
1.55

2do Piso

1.55

3/8

10.85

4.22

1/2

2.05

3/8

14.35

1.82

3/8

12.74

1 TRAMO
4.22

2do Piso

33.76

1 TRAMO
2.05

2do Piso

1 TRAMO
1.82

2do Piso

1 TRAMO
1.15

2do Piso

16

1.15

3/8

18.40

2.50

DESCANSO

2.50

3/8

15.00

SUB TOTAL (m)

0.00

71.34

33.76

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

7.93

3.75

0.00

0.00

0.00

0.00

ACERO ESCALERA 346 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

SUB TOTAL (kg)


TOTAL DE ACERO (kg)

0.00

41.38

34.44

0.00

0.00

0.00

0.00
75.81

ACERO ESCALERA 347 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E") CENTRO POBLADO PORCONPLANILLA
ALTO - PROVINCIA
DE CAJAMARCA-CAJAMARCA
DE METRADOS
FECHA: CAJAMARCA - MARZO 2012

CROQUIS

DESCRIPCION

N VECES

N PIEZAS DE LONG. PIEZA


ACERO
DE ACERO

DIAM.

LONGITUDES PARCIALES (m)

DIAMETRO DE VARILLAS EN PULGADAS

(pulg)

1/4

3/8

1/2

5/8

3/4

1 3/8

2 TRAMO
1.93

2do Piso

1.93

3/8

13.51

4.47

1/2

1.32

3/8

9.24

1.87

3/8

13.09

18

1.15

3/8

20.70

2 TRAMO
4.47

2do Piso

35.76

2 TRAMO
1.32

2do Piso

2 TRAMO
1.87

2do Piso

2 TRAMO
1.15

2do Piso

SUB TOTAL (m)

0.00

56.54

35.76

0.00

0.00

0.00

0.00

SUB TOTAL (Nmero de varillas)

0.00

6.28

3.97

0.00

0.00

0.00

0.00

SUB TOTAL (kg)

0.00

32.79

36.48

0.00

0.00

0.00

0.00

TOTAL DE ACERO (kg)

69.27

ACERO ESCALERA 348 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E")


CENTRODE
POBLADO
PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
PLANILLA
METRADOS
FECHA: CAJAMARCA - MARZO 2012

01
01.01
01.01.01
01.01.02
01.01.03
01.01.04
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.02.07
01.03
01.03.01
01.03.02
01.03.03
01.03.04
01.03.05
01.03.06
01.03.07
01.04
01.04.01
01.04.01.01
01.04.02
01.04.02.01
01.04.02.02
01.04.03
01.04.03.01
01.05
01.05.01
01.05.01.01
01.05.01.02
01.05.02
01.05.02.01
01.05.02.02
01.05.02.03
01.05.03
01.05.03.01
01.05.03.02
01.05.03.03
01.05.04
01.05.04.01
01.05.04.02
01.05.04.03
01.05.05
01.05.05.01
01.05.05.02
01.05.05.03
01.05.05.04
01.05.05.05
01.05.06
01.05.06.01

ESTRUCTURAS
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40 x 4.80 m
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
CERCOS PROVISIONALES DE SEGURIDAD
ALMACEN. OFICINA Y CASETA DE GUARDIANIA DE 3.00m x 4.00m
TRABAJOS PRELIMINARES
DESMONTAJE DE TECHO
DESMONTAJE DE PUERTAS
DESMONTAJE DE VENTANAS
DEMOLICION DE MUROS DE TAPIAL
ELIMINACION MATERIAL DE DESMONTE
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL PARA CIMIENTOS-ZAPATAS EN TERRENO NORMAL
RELLENO COMPACTADO MANUAL CON MATERIAL PROPIO
RELLENO COMPACTADO MANUAL, MAT. DE PRESTAMO
ELIMINACION MATERIAL DE MATERIAL EXCEDENTE
NIVELACION INT. Y APISONADO PARA FALSO PISO
BASE GRANULAR PARA ZAPATAS Y CIMIENTOS CORRIDOS
MEJORAMIENTO DE SUELO EN ZAPATAS CON PIEDRA MEDIANA 6 (max)
CONCRETO SIMPLE
CIMIENTOS CORRIDOS
CIMIENTOS CORRIDOS MEZCLA C:H 1:10 + 30% PG MAX 8"
SOBRECIMIENTOS
SOBRECIMIENTO DE CONCRETO C:H 1:8 + 25% PM MAX 3"
ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO
SOLADOS
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON
CONCRETO ARMADO
ZAPATAS
CONCRETO PARA ZAPATAS F'C=210 KG/CM2
ACERO PARA ZAPATAS GRADO 60
VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2
ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION
ACERO EN VIGA DE CIMENTACION FY=4200 KG/CM2
COLUMNAS
CONCRETO EN COLUMNAS F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
ACERO EN COLUMNAS FY=4200 KG/CM2
VIGAS
CONCRETO EN VIGAS F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO EN VIGAS
ACERO EN VIGAS FY=4200 KG/CM2
LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS
ACERO EN LOSAS ALIGERADAS FY=4200 KG/CM2
LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO
LADRILLO HUECO DE ARCILLA 12X30X30 CM PARA TECHO ALIGERADO
ESCALERAS
CONCRETO EN ESCALERAS F'C=210 KG/CM2
RESUMEN 349 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E")


CENTRODE
POBLADO
PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
PLANILLA
METRADOS
FECHA: CAJAMARCA - MARZO 2012

01.05.06.02
01.05.06.03

ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS


ACERO EN ESCALERAS FY=4200 KG/CM2

RESUMEN 350 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E")


CENTRODE
POBLADO
PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
PLANILLA
METRADOS
FECHA: CAJAMARCA - MARZO 2012

02
02.01
02.01.01
02.01.02
02.01.03
02.02
02.02.01
02.02.02
02.02.03
02.03
02.03.01
02.03.02
02.03.03
02.03.04
02.03.05
02.03.06
02.04
02.04.01
02.05
02.05.01
02.05.02
02.05.03
02.05.04
02.05.05
02.05.06
02.05.07
02.05.08
02.05.09
02.05.10
02.06
02.06.01
02.06.02
02.06.03
02.07
02.07.01
02.07.02
02.07.03
02.07.04
02.08
02.08.01
02.08.02
02.08.03
02.08.04
02.08.05
02.09
02.09.01
02.09.02
02.09.03
02.09.04
02.10
02.10.01
02.11
02.11.01
02.11.02

ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MURO DE SOGA LADRILLO DE ARCILLA 9X13X24 CM, MEZ 1:5
JUNTA SISMICA 1" CON TEKNOPORT
MESADA DE CONCRETO
COBERTURA
COBERTURA CON TEJA ANDINA
COBERTURA CON ANDINA SOBRE ARMADURA DE MADERA
CUMBRERA TEJA ANDINA
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO EN INTERIORES ESPESOR 1.5 CM, MEZ 1:5
TARRAJEO EN EXTERIORES ESPESOR 1.5 CM, MEZ 1:5
TARRAJEO DE COLUMNAS, SUPERFICIE E=1.5 CM, MEZ. 1:5
TARRAJEO DE VIGAS, SUPERFICIE E=1.5 CM, MEZ. 1:5
VESTIDURA DE DERRAMES E=1.5, MEZ. 1:5
VESTIDURA FONDO DE ESCALERA MEZCLA 1:5 X 1.5 CM
CIELORRASOS
CIELORRASOS CON MEZCLA DE CEMENTO-ARENA
PISOS Y PAVIMENTOS
FALSO PISO DE 4" DE CONCRETO C:H 1:8
CONTRAPISO DE 48mm
PISO CERAMICO DE ALTO TRANSITO 30X30 CM
PISO DE CEMENTO PULIDO COLOREADO BRUADO E=2"
VEREDA DE CONCRETO f'c=140 kg/cm2 E=4" PASTA 1:2
CONCRETO EN SARDINEL f'c=140 kg/cm2
CONCRETO f'c=210 kg/cm2 EN PATIO Y ESTACIONAMIENTO
ENCOFRADO Y DESENCOFRADO PARA SARDINEL, VEREDAS, PATIO Y ESTACIONAMIENTO
JUNTAS ASFALTICAS 1"
CANTONERA 2"x2"-ALUMINIO, ESCALERA
ZOCALOS Y CONTRAZOCALOS
ZOCALO DE MAYOLICA BLANCA DE 20 X 30
CONTRAZOCALO DE CERAMICO 10 cm x 30 cm
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR EN EXTERIORES
CARPINTERIA DE MADERA
PUERTA APANELADA, MADERA CEDRO E=1 1/4"
VENTANA DE MADERA CEDRO
PUERTA CONTRAPLACADA-MADERA CEDRO E=35 MM
ESTANTE PARA ARMERIA
CARPINTERIA METALICA
PUERTA DE METALICA 5/8"
PUERTA DE METALICA 1/2"
PANELES METALICOS EN SERVICIOS HIGIENICOS
MAMPARA DE 3.82m x 3.00m
MAMPARA DE 4.17m x 2.80m
CERRAJERIA
BISAGRA CAPUCHINA DE 4" X 4"
CERRADURA PARA PUERTA PRINCIPAL PESADA
CERRADURA DE PERILLA PUERTA INTERIOR
CERRADURA PARA PUERTA DE CALABOZO
VIDRIOS
VIDRIO SEMIDOBLE
PINTURA
PINTURA LATEX EN INTERIORES Y CIELORRASOS
PINTURA LATEX EN EXTERIORES
RESUMEN 351 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E")


CENTRODE
POBLADO
PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
PLANILLA
METRADOS
FECHA: CAJAMARCA - MARZO 2012

02.11.03
02.11.04

PINTURA EN PUERTAS DE MADERA CON BARNIZ


PINTURA EN VENTANAS CON BARNIZ

RESUMEN 352 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E")


CENTRODE
POBLADO
PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
PLANILLA
METRADOS
FECHA: CAJAMARCA - MARZO 2012

03
03.01
03.01.01
03.01.02
03.01.03
03.01.04
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.03
03.03.01
03.03.02
03.03.03
03.03.04
03.03.05
03.04
03.04.01
03.04.02
03.04.03
03.05
03.05.01
03.06
03.06.01
03.07
03.07.01
03.08
03.08.01
03.08.02
03.09
03.09.01
03.09.02
03.10
03.10.01
03.11
03.11.01
03.12
03.12.01

INSTALACIONES ELECTRICAS
CABLES Y CONDUCTORES
CABLE ELECTRICO THW - 2.5 mm2
CABLE ELECTRICO THW - 4 mm2
CABLE ELECTRICO THW - 6 mm2
CABLE ELECTRICO THW - 10 mm2
TUBERIAS
TUBERIA 20 mm PVC SAP
TUBERIA 15 mm PVC SAP
CURVAS 20 mm PVC SAP
CURVAS 15 mm PVC SAP
CONECTOR A CAJA PVC SAP 20mm
CONECTOR A CAJA PVC SAP 15mm
ARTEFACTOS DE ILUMINACION
FLUORECENTE RECTO 2 x 36 W C/EQ + PANTALLA MAS REJILLA
FLUORECENTE RECTO 1 x 36 W C/EQ + PANTALLA MAS REJILLA
FOCO AHORRADOR DE 36 W
SALIDA PARA BRAKETE
LAMPARAS DE EMERGENCIA
INTERRUPTORES
INTERRUPTOR CON DADO SIMPLE
INTERRUPTOR CON DADO DOBLE
INTERRUPTOR CONMUTACION
TOMACORRIENTES
TOMACORRIENTE DOBLE UNIVERSAL MAS TOMA A TIERRA
CALENTADOR
THERMA ELECTRICA
ACOMETIDA
ACOMETIDA AEREA
CAJAS DE PASE METALICAS
CAJA DE FIERRO GALVANIZADO OCTOGONAL
CAJA DE FIERRO GALVANIZADO RECTANGULAR
TABLEROS ELECTRICOS
TABLERO TG-1
TABLERO DISTRIBUCION TG-2
ELECTROBOMBA
ELECTROBOMBA
POZO A TIERRA
POZO A TIERRA
PRUEBAS
PRUEBAS ELECTRICAS

RESUMEN 353 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E")


CENTRODE
POBLADO
PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
PLANILLA
METRADOS
FECHA: CAJAMARCA - MARZO 2012

04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.01.07
04.01.08
04.01.09
04.01.10
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.02.06
04.02.07
04.02.08
04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06
04.03.07
04.03.08
04.03.09
04.04
04.04.01
04.04.02
04.04.03
04.04.04
05
05.01
05.02
05.03
05.04

INSTALACIONES SANITARIAS
SISTEMA DE AGUA
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"
SALIDA DE AGUA CALIENTE CON TUBERIA DE CPVC-SAP 1/2"
RED DE DISTRIBUCION TUBERIA DE 1" PVC-SAP
VALVULAS DE COMPUERTA DE BRONCE DE 3/4"
VALVULAS DE COMPUERTA DE BRONCE DE 1/2"
RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP
RED DE DISTRIBUCION TUBERIA DE 1/2" CPVC-P/AGUA CALIENTE
RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP
TANQUE DE ALMACENAMIENTO DE POLIETILENO Y ACCESORIOS
TANQUE CISTERNA DE POLIETILENO EQUIPADO CON ACCESORIOS
SISTEMA DE DESAGUE
SALIDA DE DESAGUE EN PVC SAL 2"
SALIDA DE DESAGUE EN PVC SAL 4"
TUBERIA DE DESAGUE PVC SAL 2"
TUBERIA DE DESAGUE PVC SAL 4"
SALIDA DE VENTILACION PVC 2"
REGISTROS DE BRONCE DE 4"
SUMIDEROS DE 2"
CAJA DE REGISTRO 0.30x0.60-TAPA CONCRETO
APARATOS Y ACCESORIOS SANITARIOS
INODORO SIFON JET BLANCO
OVALIN CERALUX 1 LLAVE MONOCOMANDO
URINARIO DE PARED BLANCO 1 LLAVE
DUCHAS CROMADAS DE CABEZA GIRATORIA
TOALLERA CON SOPORTE DE LOSA Y BARRA PLASTICA
PAPELERA DE LOSA Y BARRA PLASTICA COLOR BLANCO
JABONERAS DE LOZA BLANCA SIMPLE DE 15 X 15 cm
TAZA TURCA
LAVADERO DE ACERO INOXIDABLE
SISTEMA DE DESAGUE PLUVIAL
CANALETA DE ZINC DE 6"
MONTANTE PARA BAJADA DE AGUA DE LLUVIA D=3"
TUBERIA DE DESAGUE PVC SAL 4"
CAJA DE REGISTRO 0.40x0.80-TAPA REJILLA
EQUIPAMIENTO Y OTROS
EQUIPAMIENTO
ASTA DE BANDERA
FLETE TERRESTRE
LIMPIEZA GENERAL Y ENTREGA DE OBRA

RESUMEN 354 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E")


CENTRODE
POBLADO
PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
PLANILLA
METRADOS
FECHA: CAJAMARCA - MARZO 2012

1.00
1.00
82.58
1.00

und
GLB
m
GLB

152.37
6.00
7.00
152.37
101.90
412.25
412.25

m2
und
und
m2
m3
m2
m2

189.64
181.67
57.21
9.97
181.67
23.47
11.52

m3
m3
m3
m3
m2
m3
m3

26.57

m3

34.99
322.75

m3
m2

76.79

m2

38.40
1228.13

m3
kg

18.88
148.92
2117.71

m3
m2
kg

125.80
310.52
5623.42

m3
m2
kg

163.51
247.03
5826.97

m3
m2
kg

36.78
427.43
2570.03
2850.00
711.00

m3
m2
kg
und
und

4.37

m3
RESUMEN 355 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E")


CENTRODE
POBLADO
PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
PLANILLA
METRADOS
FECHA: CAJAMARCA - MARZO 2012

26.87
294.60

m2
kg

RESUMEN 356 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E")


CENTRODE
POBLADO
PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
PLANILLA
METRADOS
FECHA: CAJAMARCA - MARZO 2012

632.50
4.70
7.74

m2
m2
m2

84.99
38.00
8.40

m2
m2
m

632.50
619.72
310.52
193.62
53.56
13.63

m2
m2
m2
m2
m2
m2

427.43

m2

169.42
169.42
340.29
182.82
83.71
0.43
17.76
17.50
74.95
42.24

m2
m2
m2
m2
m2
m3
m3
m2
m
m

56.92
304.25
42.12

m2
m
m2

52.65
37.63
11.55
2.00

m2
m2
m2
und

2.00
1.00
13.42
2.00
2.00

und
und
m2
und
und

124.00
2.00
25.00
3.00

und
pza
pza
pza

219.14

p2

1216.04
774.98

m2
m2
RESUMEN 357 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E")


CENTRODE
POBLADO
PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
PLANILLA
METRADOS
FECHA: CAJAMARCA - MARZO 2012

64.20
34.93

m2
m2

RESUMEN 358 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E")


CENTRODE
POBLADO
PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
PLANILLA
METRADOS
FECHA: CAJAMARCA - MARZO 2012

1311.10
1042.20
108.15
19.00

m
m
m
m

1030.25
165.00
348.00
12.00
397.00
6.00

m
m
und
und
und
und

29.00
27.00
4.00
5.00
8.00

und
und
und
und
und

32.00
4.00
5.00

und
und
und

85.00

und

1.00

und

1.00

und

67.00
130.00

und
und

1.00
1.00

und
und

1.00

und

1.00

und

1.00

und

RESUMEN 359 DE 360

PROYECTO: CONSTRUCCION DEL LOCAL POLICIAL (TIPO "E")


CENTRODE
POBLADO
PORCON ALTO - PROVINCIA DE CAJAMARCA-CAJAMARCA
PLANILLA
METRADOS
FECHA: CAJAMARCA - MARZO 2012

25.00
4.00
27.96
11.00
10.00
55.37
59.73
24.21
1.00
1.00

pto
pto
m
pza
pza
m
m
m
und
und

28.00
9.00
15.83
57.32
12.00
9.00
6.00
4.00

pto
pto
m
m
pto
pza
pza
und

6.00
7.00
3.00
4.00
4.00
6.00
4.00
2.00
3.00

pza
pza
pza
pza
pza
pza
pza
pza
pza

52.88
3.00
24.61
1.00

m
und
m
und

1.00
1.00
1.00
1.00

Gbl
Und
Gbl
Gbl

RESUMEN 360 DE 360

Anda mungkin juga menyukai